    PERFORMANCE BASED

    CONTRACTING

    25 Sep 2005 M Keeney 1

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    2/17

    Performance-Based Contracting

    Performance-based contractininvolves structuring all aspects of

    an acquisition around the purposeof the work to be performed asopposed to either the manner by

    or a broad and imprecise statement

    25 Sep 2005 M Keeney 2

    .

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    3/17

    What vs. How

    Lower costs

    Solution is the responsibility on the

    25 Sep 2005 M Keeney 3

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    4/17

    A formal written description of your

    minimum requirements to be performedy a con rac or

    e eart o your procurement

    25 Sep 2005 M Keeney 4

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    5/17

    Why is a Clear and Concise

    Establishes a baseline for proposal evaluation

    Reduces evaluation and negotiation time

    Minimizes need for future changes

    25 Sep 2005 M Keeney 5

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    6/17

    Many Documents Are BasedOn The SOW

    SOW

    NAFI QA REPORTINGPLAN

    EVALUATION CRITERIASECTION (M)

    INSTRUCTION FORPROPOSAL PREPARATION

    SECTION (L)

    25 Sep 2005 M Keeney 6

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    7/17

    STATEMENT OF WORKPROCESS OVERVIEW

    The following is a summary of the recommended process steps forpreparing a Statement of Work SOW :

    . . .,objective of your procurement)

    2. List the tasks to be performed ( i.e., All performance requirements

    you intend the contractor to satisfy, all requirements that the

    3. Group similar and related tasks.4. Organize the tasks in logical sequence5. Identify the input ( Required resources to perform the tasks)

    6. Identify the output ( Required results or deliverables )7. Identify the timeline or frequency of the deliverables (output)

    8. Develop the parameters for acceptable quality and performance

    25 Sep 2005 M Keeney 7

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    8/17

    Step 1

    ESTABLISH A PRELIMINARY SCOPESTATEMENT THAT:

    Identifies the objective or purpose of the procurement

    Description of work to be performed

    Define the magnitude of work to be performed

    Defines the boundaries of performance andresponsibilities

    25 Sep 2005 M Keeney 8

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    9/17

    Step 2

    List task to be performed that will:

    Accomplish the objective of the SOW

    Focus of what not how the contractor will erform

    25 Sep 2005 M Keeney 9

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    10/17

    Step 3

    Group similar and related task

    sub-tasks

    through this

    25 Sep 2005 M Keeney 10

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    11/17

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    12/17

    Step 5

    Identify the required resources for eachtask in ut

    May be labor, equipment and material

    Identify any operating restrictions or

    25 Sep 2005 M Keeney 12

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    13/17

    Step 6

    Identify required results and ordeliverables (output)Meetings

    Reports Provides information to develop

    oversight plan

    Contractor responsible for the work(input to output)

    25 Sep 2005 M Keeney 13

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    14/17

    Step 7

    Identify the frequency and timeline ofdeliverables

    Assists in

    Method of surveillance

    Cost estimate

    25 Sep 2005 M Keeney 14

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    15/17

    Step 8

    Develop performance standard or acceptancecriteria expressed in Qualit

    Quantity

    Time

    Appearance

    ou nc u e e emen s suc as a , w en,where, how many times

    Should be appropriate for the contract and

    Necessary Realistic

    Objective and measurable

    25 Sep 2005 M Keeney 15

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    16/17

    Step 9

    Determine how you will monitor the deliverables Must be appropriate for the contract

    Cost effective

    Methods include: Random sampling

    Periodic inspection

    Review of progress milestons

    Reports by contractor

    25 Sep 2005 M Keeney 16

  • 8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]

    17/17

    Conclusion

    Lastly, the key factor in the success ofe er ormance ase on rac s e

    ability of you, the customer, to writegoo requ remen s.

    25 Sep 2005 M Keeney 17