1 OFFICE OF THE ASSTT. ENGINEER (PIA) IWMP P.S. CHOHTAN DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10 (UNDER INTEGRATED WATERSHED MANAGEMENT PROGRAMME) BLOCK: CHOHTAN DISTRICT : BARMER AGRO CLIMATIC ZONE- 14 TOTAL GEOGRAPHICAL AREA – 4773 HAC. TOTAL COST- 715.95 LACS. UNIT COST- 15.000/HAC. SUBMITTED BY PROJECT MANAGER DISTRICT WATERSHED DEVELOPMENT UNIT BARMER. (RAJASTHAN)

DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

1

OFFICE OF THE ASSTT. ENGINEER (PIA) IWMP P.S. CHOHTAN

DETAIL PROJECT REPORT

BARMER (IWMP)-VII

YEAR 2009-10 (UNDER INTEGRATED WATERSHED MANAGEMENT PROGRAMME)

BLOCK: CHOHTAN DISTRICT : BARMER

AGRO CLIMATIC ZONE- 14

TOTAL GEOGRAPHICAL AREA – 4773 HAC.

TOTAL COST- 715.95 LACS.

UNIT COST- 15.000/HAC.

SUBMITTED BY

PROJECT MANAGER

DISTRICT WATERSHED DEVELOPMENT UNIT

BARMER. (RAJASTHAN)

Page 2: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

2

Index S.No Topics Page no.

1 Chapter -1

• Location 4

• General Features of watershed (Cost and Area details) 4

• Climatic and Hydrological information 5-6

• Other Development Schemes in the project area 6

• Details of infrastructure in the project areas 7-8

• Institutional arrangements (.DWDU.PIA.WDT.WC) 8-11

2 Chapter -2

1.1 Demography Details 12-13

1.2 Development Indicators 13-15

1.3 Land use 15-16

1.4 Agriculture status and Productivity Gap Analysis 16-17

1.5 Horticulture/Vegetable/Floriculture status 17-18

1.6 Land holding pattern 18

1.7 Livestock status 19

1.8 Fodder status 19

1.9 Farm Implements 20

1.10 NREGS Status 20

1.11 Migration details 21

1.12 Livelihood Details. 21

1.13 Existing SHG 22

1.14 Ground Water details 22

1.15 Drinking Water Status 23

1.16 Water use efficiency 23

1.17 Slope details 23

1.18 Water Budgeting 24

1.19 Soil Details 25

Page 3: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

3

1.20 Soil erosion status 25

3 Chapter-3 . Proposed Development Plan 26-34

4 Chapter-4. Activity wise Total Abstract of cost 35-39

5 Chapter-5. Annual Action Plan 5.1 Project fund 5.2 Convergence Plan

40-57

6 Chapter -6. Project outcomes 58

7 Technical designs and estimates for proposed

activities 59-97

8 Enclosures 8 .1 Maps

a. Location –District. block. village. watershed location map

b. Map of Project with Watershed Boundary demarcation in cadastral map

c. Land Use Land Cover map

d. Existing water bodies. DLT

e. PRA Map (along with photos & paper drawing)

f. GIS based intervention map

g. Treatment map proposed works on revenue map

8.2 Documents of Agreements:

• Proceedings of gram sabha for EPA approval

• Proceedings of gram sabha Resolution for committee constitution

• Documents related to PRA exercise

• Proceedings of gram sabha for DPR approval

• Proceedings of Panchayat Samiti General body for DPR approval

• Watershed Committee Registration certificate

Page 4: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

4

CHAPTER – I

INTRODUCTION

Location.

                                   Barmer (IWMP)‐VII project is located in Chouhtan Block. of Barmer district. The project  area  is between  the  latitudes 25º  29’  to 25º  22’ E &    longitudes 70º  58’    to 70º 55’.N It is at a distance of 15 km from its Block head quarter and 65 Kms from the district head quarters. There are four number of habitations & sevral Dhanies are  in the Project area and other details are given below.  General features of watershed:-

S.No.  Name of Project(as per GOI)  BARMER(IWMP)‐VII (a)  Name of Catchment   Cluster (b)  Name of  watershed area(local name)  Booth rathodan ©  Project Area   4773 (d)  Net treatable Area   4773 (e)  Cost of Project  715.95 (f)  Cost/hectare   15000 (g)  Year of Sanction   2009‐2010 (h)  Watershed Code   Cluster (i)  No. of Gram Panchayats in project area   3 (j)  No. of villages  in project area   5 (k)  Type of Project   Desert 

(l)  Elevation (metres)   170 ‐250 (m)  Major streams   0 (n)  Slope range (%)   1% to  15% 

Villagewise area covered in watershed:-

S.NO.  Name of Gram Panchayat  Name of Villages Covered 

Census code of villages 

Area

1  Booth rathodan  Booth rathodan  0007.02252000  1859 2  Booth rathodan Mate ka tala 0007.02250300 4713  Booth rathodan Pananion ka dhani  0007.02245400 696 4  Bijrad  Sukaliya 0007.02250200 9925  Dhok  Ghoniya  0007.02245500 755 

Total 4773

Page 5: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

5

The watershed falls in Agroclimatic Zone Dry Arid Hot.The soil texture is Sandy to sandy loam. The average rainfall is 35.6 cm . The temperatures in the area are in the range between 30º  to 49º centigrade during summer and 10º  to 25º centigrade during winter. The major crops in the area are Bajara . Moong. Moth.Til.Guar .The project area have 75.75% land is under cultivation. 20.50% land fallow. 3.75% land is wasteland. 1.52% land is irrigated.               There are 682 no of households are BPL (23.77% households). 706 are  landless (38.75% households) and 1027 are small and marginal farmers 58.35% (household) .Average land  holding  in  the  area  is  5  ha.  98.48%  area  is  single  cropped  area  and  1.52%  is  double cropped. The main source of irrigation is tubewell. The average annual rainfall (10 years) in the  area  is  356 mm.  .The major  festivals  in  the  village  are Holi.Diwali.Akha Teej &  Idd.    At present  these  villages  are  having  7517  population  with  Communities  like  Rajput.Bheel jat.Meghwal.purohit .Tailor.Suthar.  

Climatic and Hydrological information:- 1 Average Annual Rainfall(mm)

  Year  Average Annual Rainfall(mm) 1  2001  482 2  2002  72 3  2003  474 4  2004  182 5  2005  200 6  2006  875 7  2007  181 8  2008  294 9  2009  240 10  2010  563 

2 Average Monthly rainfall (last ten years)    Month  Rainfall(mm) i)  June  56 ii)  July  122 iii)  August  140 iv)  September  38 

3 Maximum rainfall intensity (mm) Duration  rainfall intensity(mm)  i) 15 minute duration   8  ii) 30 minute duration   21  iii) 60 minute duration  34  

4 Temperature (Degree C) Season  Max  Min  i) Summer Season   48   30  ii) Winter Season  25 10   iii) Rainy Season  41 29 

5 Potential Evaporation Transpiration (PET) (mm/day)    Season  PET 

Page 6: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

6

   i) Summer  4.70    ii) Winter  1.50    iii) Rainy  6.40 6  Runoff   

   i) Peak Rate (cum/hr)  260     ii) Total run off volume of rainy season (ha.m.) 0.012    iii) Time of return of maximum 

flood 5 years Nill 

10 years Nill 

In‐Year 25 Year 

   iv)Periodicity of Drought in village area 

Once in 2.50   Year 

Other Development Schemes in the project area:-

S.No  Scheme 

Name of 

the 

departme

nt 

Key interventions under 

the Scheme 

Targeted 

Beneficiari

es 

Provisions under 

the Scheme 

1  MGNREGS  RD 

Construction of Tanka. 

beri . Gravel Road. Nadi 

etc 

SC.ST.BPL 

& Others 

100 DAYS 

Gurranted 

employment 

2  BRGF  RD 

Construction of 

Anganwadi .School 

building.subcenter.Comm

unity center etc 

Common 

work 

Gap filling for 

infrastructure 

properly use 

3  TFC  RD 

Construction of tanka for 

drinking water. 

pipelines.Toilets etc 

Common 

work 

Drinking water 

& sinitation 

4  SFC  RD 

Construction of tanka for 

drinking water. 

pipelines.Toilets etc 

Common 

work 

Drinking water 

& sinitation 

5  IAY  RD  Construction of Houses  BPL 

families 

Provide House 

for poor people 

6 ANGANWA

DI ICDS 

Development for women 

&Childern 

women 

&Childern 

Development for 

women 

&Childern 

7  TSC  RD  Construction of Toilets  BPL 

families Sanitation 

Page 7: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

7

 

Details of infrastructure in the project areas :‐  

Parameters  Status 

(i)  No. of villages connected to the main 

road by an all‐weather road  

5  

(ii)  No. of villages provided with electricity   4 

(iii)  No. of households without access to 

drinking water 

1275 

(iv)  No. of educational institutions :   (P) 

20 

(S) 

(HS

(VI) 

0 Primary(P)/ Secondary(S)/ Higher 

Secondary(HS)/ vocational 

institution(VI) 

(v)  No. of villages with access to Primary 

Health Centre  

(vi)  No. of villages with access to Veterinary 

Dispensary  

0

(vii)  No. of villages with access to Post Office   1 

(viii)  No. of villages with access to Banks    0 

(ix)  No. of villages with access to Markets/ 

mandis 

(x)  No. of villages with access to Agro‐

industries 

(xi)  Total quantity of surplus milk  0 

(xii)  No. of milk collection centres         (U) 

(S) 

(PA

(O) 

Self 

Ownership

(e.g. Union(U)/ Society(S)/ Private 

agency(PA)/ others (O)) 

(xiii)  No. of villages with access to Anganwadi 

Centre  

           5    

(xiv)  Any other facilities with no. of villages 

(please specify) 

Mobile tower.Internet. 

(xv)  Nearest  KVK     Barmer   

Page 8: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

8

(xvi)  cooperative society  Dhok 

(xvii

NGOs 

   Sure sansthan  

(xviii

Credit institutions 

  

   

   (i) Bank     0   

   (ii) Cooperative Society     1   

(xix)  Agro Service Centre's     0   

INSTITUTIONAL ARANGEMENT (SLNA.DWDU.PIA.WDT.WC. SECRETARY 

DWDU Details 

 

PIA particulars 

 

1  2  3 

S.No  Particulars  Details of DWDU 

1.   PM .DWDU   Tej Singh Choudhary  

2.   Address with contact no.. 

website 

Zila Parishad (RDC)‐Barmer 

+919414289496 

3.   Telephone  02982220292 

4.   Fax  02982222041 

5.   E‐mail  [email protected] 

1  2  3

S.No  Particulars  Details of PIA  

6.   Name of PIA  Bharmal Ram Khambhoo 

7.   Designation    Assistant Engineer 

8.   Address with contact no.. 

website 

WD & SC .Panchayat Samiti Chouhtan 

+919950292611 

9.   Telephone  02989220126 

10. Fax  02989286183 

11. E‐mail  [email protected] 

Page 9: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

9

 

WDT Particulars:  

  

 

1  2  3  4  5  6  7  8 

 

S.N

Name of WDT 

member 

M/F  Age  Qualificatio

Experience in 

watershed(Yrs

Description of 

professional  

training 

Role/ 

Function 

1  Manish 

Kumar 

M  22  BE(Elect)  1/2  GLTPP  WDT 

(Engg ) 

2  Vijay Kumar  M  22  Diploma(Vet

1 ‐  WDT 

(Vet) 

3  Santosh 

Choudhary 

F  30  BA(Socio)  1  Sarwa siksha  WDT 

(Social ) 

4  ‐  ‐  ‐  ‐  ‐  ‐  WDT 

(AGG)  

Page 10: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

10

Details of Watershed Committees (WC) 

S.No.  Name of WCs 

Date of Gram 

Sabha for WC 

Date of Registration as a Society (dd/mm/yyy

Designation 

Name M/F  SC/ST/OBC/General 

Landless/MF/SF/ BF 

Name of UG/SHG Educational 

qualification 

1  Booth rathodan 

17.08.2010 

19.08.2010  President Husain khan  M  OBC  BF  UG construnction of farm pond 

Litrate 

Secretary Hinglazdan M OBC BF Secretary Gradute 

Member  Prem kanwer  F  OBC  BF  SHG  ILitrate 

Member Somjiram M ST BF UG Pasture development 

Litrate 

Member Poonjaram  M  SC  Bf  UG Live stock development 

5 th 

Member Jethudan  M  OBC  BF  UG Crpo demonstration 

8th 

Member Raimalram  M  SC  MF  SHG Farm Implements 

8th 

Member Laxamidevi  F  SC  SF  SHG  Litrate 

Member Bhuraram  M  SC  BF  UG Live stock development 

5th 

Member hansaram  M  SC  BF  UG Horticlture  Litrate 

Member danaram  M  ST  SF  SHG Farm Implements 

5th 

Member Alamkhan  M  OBC  BF  UG Horticlture  Litrate 

Member Anchhidevi  F  ST  MF  SHG  Litrate 

Page 11: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

11

S.No.  Name of WCs 

Date of Gram 

Sabha for WC 

Date of Registration as a Society 

(dd/mm/yyyy 

Designation 

Name M/F SC/ST/OBC/General 

Landless/MF/SF/ BF 

Name of UG/SHG Educational qualification 

2  Ghoniya  23.07.2010 

31.08.2010 President Vershalsingh  M  Gen  BF  UG  Construction  tanka 

Litrate 

Secretary  Khetsingh  M  Gen  SF  Secretary  12 th 

Member  Vijaram  M  ST  BF  UG Horticlture  5 th 

Member Hadwantsingh 

M  Gen  BF  UG Live stock development 

il Litrate

Member Ramudevi  F  SC  MF  UG Crpo demonstration 

il Litrate

Member Lakhsingh  M  Gen  Bf  UG Pasture development 

Litrate 

Member hamiraram  M  ST  MF  SHG Farm Implements 

Litrate

Member Loonsingh  M  Gen  SF  UG Renovation of nadies 

Litrate

Member Kumpsingh M Gen SF UG Live stock development 

il Litrate

Member Kumpsingh  M  Gen  BF  UG Crpo demonstration 

5th 

Member Bhursingh M Gen BF UG Renovation of nadies 

Litrate

Member Kamalsingh  M  Gen  SF  SHG Farm Implements 

Litrate

Page 12: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

12

S.No.  Name of WCs 

Date of Gram Sabha for WC 

Date of Registration as a Society (dd/mm/yyyy 

Designation 

Name  M/F  SC/ST/OBC/General 

Landless/MF/SF/ BF 

Name of UG/SHG  Educational qualification 

3  Sukaliya  22.10.2010  8.11.2010 President Suleman  M  OBC  BF  UG  Construction of tanka 

litrate 

Secretary  Mustfa khan  M  OBC SF  Secretary  12 th 

Member Gulhasan  M  OBC SF  UG  Construction of  Farm pond 

8 th 

Member Aderman M OBC BF UG  Construction of tanka 

8 th

Member Jhani  F  OBC SF  SHG  Aman  Illitrate 

Member Adam  M  OBC SF  UG  Construction of  Farm pond 

litrate 

Member Halim  M  OBC SF  UG Crop demostration 

Illitrate 

Member Misara F OBC SF SHG  alanani Illitrate

Member Shaitansingh  M  Gen SF  UG Horticulture  litrate 

Member Panaram  M  OBC SF  UG  Renovation of nadi 

Illitrate 

Member Lunaram  M  SC Sf  UG  Pasture Development 

litrate 

Member Reshi F SC SF SHG  Jalani Illitrate

Page 13: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

13

CHAPTER – II

SOCIO ECONOMIC FEATURES. PROBLEMS AND SCOPE

                                       The  socio  economic  conditions  of  the  area  can  be  improved  through increased  production  which  can  be  achieved  through  expansion  in  cultivated  area  and productivity  enhancement.  The  project  have  773  ha  arable  wasteland    and  206  ha  arable fallow land can be brought under cultivation.Only 70 ha is irrigated and with efforts it will be be increased upto 500 ha. The productivity gap of major crops in the project area as compared with district and with agro climatic zones indicate that there are huge potential to increase the productivity.  The  demonstration  of  improved  package  of  practices.  improved  varieties. increased irrigation facilities and soil conservation measures under the project can bridge this gap. Due to small land holdings in the area focus of the project would be on diversification in agriculture  (horticulture.  vegetables.  green  houses.  Agro  forestry.  fodder  crops)and diversification  in  Livelihoods(Agriculture.  Animal  husbandry.  self  employment)  44135.30 Quintal  fodder  scarcity  can  be  met  out  through  Pasture  development  .Improved  animal Husbandry practices can increase the productivity of livestock. There are 560 persons migrate due  to    lack  of  job  &  this  migration  can  be  checked  through  creation  of  employment opportunities  in  the  project  area  through  increase  in  production  and  diversification  in agriculture and Livelihoods activities as mentioned above.                                     The  wind  erosion  is  the  main  problem  in  the  watershed  area.  The  wind velocity reaches upto more than 50 m/sec in summer .As the soil of watershed area is mainly sandy therefore soil erosion occurs mainly due to wind  leadind  to  land degradation. Shelter belt plantation are used to reduce wind velocity resulting reduce wind eroson . In watershed area  due  to  scare  rainfall  runoff  is  less  resulting  in  lesser  soil  erosion.  Agriculture  in  the watershed  area  is  totally  rainfed  although  there  are  some  tube wells  use  for  irrigation  and drinking  purpose  only.The  runoff  of  the  area  harvest  in  khet  talai  /Farm pond  and  use  for horticulture  plantation.  shelter  belt  plantaton  made  to  increase  income  of  households.  In watershed  area  animals  rearing  is  the  main  occupation  and  the  need  of  breed improvement.vaccination medical  camps  are  the  key works  to  be  looked  into  .  People  have large  livestock  holding  but  there  are  problem  of  drinking  water  and  fodder.To  solve  the drinking water  existing  nadi/traditional  rain  water  harvesting  structures  Tankas  are  to  be constructed  and  renovated.  Also  to  meet  deficiency  of  fodder  about  50  ha  of  pasture development can be done in the project area.  Natural Resource Management :                                   The watershed area located in western Rajasthan desert . The ground water depth is 78 meter. Ground water mostly contains florid and is  saline. The water is not potable for drinking. The people has to  travel 4‐5 KM for drinking water. There  is no run off due to desert area.  . As per need and suggestions given by the beneficiaries/ public representative. the tanka . talai have been proposed to drinking water.                                  While  socially  surveying  the  area.  it  was  realized  that  various  water harvesting structures mostly Tanka . Talai/Nadi.  have been constructed in the area for storing the water. But due  to non availability  of  pucca  agore  .    outlets/ waste weirs  the water was released by cutting the banks. The main problem of the area is availability of stored water. For further development.  it has been planned that all the water harvesting structures like Tanka will  be  constructed with pucca  catchment  .  The  existing Tankas will  be  renovated by pucca 

Page 14: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

14

cathment so that rain water can be stored. To reduce infiltration of water existing  Nadies will be renovated so that water can be stored for longer time .                                 The some agriculture land of the area is affected by sheet erosion and forming the rills/ gullies. Therefore to protect the land and conserve the moisture  main thrust is given on khadin with proper outlets.                                   The agriculture land of the area is affected by wind erosion. The problem can be  solved by vegetation  .  plantation on sand dunes. Therefore  to protect  the  land.  the main thrust is given on sand dune stabilization & vegetative barriers.   Agriculture and Horticulture Productivity :                            In the watershed area the production of Agriculture and Horticulture Plants are not to that extent due to lack of improved variety and techniques. The Agriculture production of different crops grown in Kharif/ Rabi seasons of the proposed watershed area is shown in Table 13. The production will be increased by introduction of new varieties of different crop. The  existing  horticulture  area  is  shown  above.  The  horticulture  Plants  will  be  provided  to farmers . Rain water harvested in farm pond will be used to horticulture plantation.   Live Stock –gap of fodder  Availability :                      The  existing  fodder  area  in  the  villages  of  proposed  area  is  shown  above.  The availability  of  fodder  in  the proposed watershed  area  is  less.  To meet  the  requirement.  the farmers of the area have to purchase from other places. The pasture development will be meet out the fodder deficiency of the project area.  

Livelihood and Micro enterprises :                   The  people  of  the  area  are  dependent  on  Agriculture.  In  the  proposed  area  the landless families are fully dependent on work. After introduction of NREGA. these families are getting job in the area. But it is not to the extent to increase the livelihood. For development of their  livelihood.  the  various  meetings  were  organized  to  know  their  interest  and  skills. According  to  social  survey  conducted  in  different  villages  of  the  project  area.  different individual  and  group  works/  activities  like  Kasidakari  .  Ker‐sagari  Udhyog.Bhjan  Mandal. Carpentry.  and  Compost  Pit/  Vermi  compost  were  identified.  According  to  their  interest homogeneous groups have been made. The main thrust will be given for land less persons.  

Table 2.1 Population & Household Details:- Total Population

S.NO. Name of Village Male Female Total Population SC ST

1  Booth rathodan 1422 1242 2664 1176 492

2  Mate ka tala  895 739 1634 368 128

3  Pananion ka dhani  520 424 944 248 5

4  Sukaliya  549 479 1028 37 142

5  Ghoniya  685 565 1247 113 287

Total

4071 3449 7517 1960 1052

Page 15: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

15

Total Household S.NO

. Name of Village

BPL household

L. Less Small Farmer

M. Farmer

Total household

SC household

ST household

1  Booth rathodan 

227  174 136 159 638 299 118 2  Mate ka 

tala 

191  45 74 141 367 92 32 3  Pananio

n ka dhani 

121  8 97 63 227 62 1 4  Sukaliya 

76  46 62 77 227 9 40 5  Ghoniya 

67  20 122 96 301 28 72

Total 682 293 491 536 1760 490 263

Table 2.2 Development indicators

S. No. Development Indicators  State  Project Area 1 Per capita income (Rs.)  33731  24000/yr 2 Poverty ratio (%)  22.80 28.40 3 Literacy (%)  60.4  57.49  4 Sex Ratio Per 1000 male  921 900 5 Infant mortality rate Per 1000  63  78 6 Maternal mortality ratio Per 

100000 388  677 

S.no. Particular Before project After Development I.        (i)          (ii) 

Water Lavel in m Open Well Borwells 

 76 198 

 70 195 

II    (i)  Crop grown area(Hac.) 

3615  4250 

      (ii)  Crop wise area & yield  

Area (ha) 

Yield(Qtl/ha)  Area (ha) Yield(kg/ha) 

Kharif Bajra 

 1446 

 1.15 

 1400 

 5.25 

Page 16: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

16

Moong. Guar Moth Rabi Jeera Isabgol 

361 1073 564  50 20 

0.75 1.72 1.45  

3.60 5.00 

250 250 700  

400 100  

3.05 2.95 1.95  

6.00 10.00  

III Certified Seed (Cultivators No.) 

0   

IV Bio‐ Fertilizer   0  375 V Fodder Production  Qtls/ Hac.  Qtls/ Hac.  Lucern/ Barseem 

Bajra  0 

 5.00 

VI Horticulture  :‐  Plants No.  Plants No.  Ber 

Citrus Aonla 

00 0 

10000 1000 3000  

VII Agroforestry:‐   Plants No.  Plant /hac.  Plants No.  Plant /hac. Arable land  Pasture land 

22000120000 

8.00120 

53000200000 

20 200 

VIII (i)

Animal Husbandry:‐  Cross Breed 

   

Cow Buffalo 

0 0 

200 2 

(ii)

Average milk yield/ Lts. 

Lts/ Day  Lts/ Day 

Cow Buffalo 

5.00 8.00 

7.50 10.00 

IX Social And Financial      

(i)

Average Income/ household 

35000 75000 

Self help group  4  30 

The table indicates poor socio economic conditions.   Table 2.3 Land Use

S.No  Present land use   Area in Hact. 

1  Total geographical area   

          i  Non arable land  628.50 

          ii  Arable land  4594.00 

Page 17: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

17

2  Non arable land   

          i  Forest land  0.00 

          ii  Panchayat & pasture land  581.00 

          iii  Govt. Waste land   13.00 

          iv 

Area not available for development (Habitation. roads. mines. rails etc.  34.50 

3  Arable land   

          i  Irrigated  0.00 

          ii  Un irrigated  4594 

   Total arable land   4594 

4  Land available for treatment   

          i  Non arable land  179.00 

          ii  Arable land  4594 

   Total  4773 

The project area has 773 ha of cultivable wasteland . 206 ha of fallow land 

(total  979  ha)  can  be  brought  under  cultivation  if  some  irrigation  source  can  be  provided 

through  Construction  of  WHS  like  Khadin.  Tanka.  Farm  ponds  etc.  And  also  through  

demonstration of    rainfed varieties  of  crops.  Construction of WHS  can also  increase  in  area 

under irrigation which is only 1.52%  of the project area. 962 ha area is  under wastelands and 

can be brought under vegetative cover. with reasonable effort .Activities like Afforestation of 

wastelands and Pasture development will be taken up on these lands. 

 

Pasture  development  the  land  use  table  shows  that  there  is  179  hectare 

pasture  land  (3.75%).  This  emphasizes  the  need  for  taking  up  pastureland  development 

works through sowing of promising species of grasses and plantation.   

 

 

 

 

 

 

Page 18: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

18

 

Table 2.4 .a Agriculture and Horticulture status and fuel availability. Cropping Status Kharif season: (2010- 2011) S.No Village Bajra Moong Guar Til Moth Total 1 Booth rathodan  580 145 435 71 219 1450 2 Mate ka tala  130 32 86 15 62 325 3 Pananion ka dhani  228 57 171 25 89 570 4 Sukaliya  300 75 225 42 108 750 5 Ghoniya  208 52 156 18 86 520 Total 1446 361 1073 171 564 3615

Rabi season: (2009- 2010)

S.No Village Jeera Isabgoal Aradi Total 1 Booth rathodan  50  20  0  70 2 Mate ka tala  0  0  0  0 3 Pananion ka 

dhani 0  0  0  0 

4 Sukaliya  0  0  0  0 5 Ghoniya  0  0  0  0  Total 50 20 0 70

Table 2.4.b Abstract of cropped Area(ha)

                                              The farmers are using Indigenous varieties of Bajra. whereas varieties like –Hybrid  can  increase  the production. Crop of Bajra: The  farmers are using  Indigenous varieties  of  Bajra.  whereas  varieties  like  HHB‐67.ICMH‐356.RHB‐30.RHB‐131.HHB‐67.CZP‐9802 can  increase  the production of Bajra.Crop of Guar: The  farmers are using  Indigenous varieties  of  Guar.  where  as  varieties  like  RGC‐936.RGC‐1002.RGC‐1003.RGM‐112  can increase the production of Guar.                                       Crop  of  Moong:  The  farmers  are  using  Indigenous  varieties  of  Moong. where as varieties like RMG‐62. K‐851 can increase the production of Moong.Crop of Moth: The  farmers are using  Indigenous varieties of Moth. where as varieties  like RMO‐40. RMO‐257.RMO‐435 can increase the production of Moth.                            Crop Rotation will vary from project to project                                        Bajra              ‐          Guar 

 Guar      ‐  Moong  Moong    ‐   Moth  Moong    ‐   Fallow 

Area under Single crop  3545 

Area under Double crop  70 

Area under Multiple crop  0 

Page 19: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

19

The table shows that only 70 ha is (1.52%) is  double cropped area. Also the crop rotation shows that fallow lands are there. This indicates that there is scope for change in crop  rotation  in  fields  where  there  are  fallow  lands  through  Soil  and  Water  conservation measures. crop demonstration and diversification in agriculture.                   Soil  and  Water  conservation  measures  besides  putting  fallow  lands  under cultivation can change the area under single cropping to double and multiple cropping.

Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)

Bajra  738  645  525  173  115 Moong  410  338  305  107  75 Moth  315  198  195  194  145 Guar  465  305  295  207  172                           Analysis of the above  table indicate that  besides national gap there is wide gap in productivity within  state  and even within  same agro  climatic  zones. The  reasons  for  this variation  are.The  farmers  are  using    varieties    desi  of  Bajra  moong  monthwhereas  the recommended varieties  like Bajra‐Kamdhenu. SR11(Gaveri) Moth‐ RMO40  .RMO256 Moong‐RMG268.SML268.IPM02‐3.  Guar‐KS277.HFG119.HFG156  etc.  Lack  of  Availability  of  good quality  seeds  of  desired  crop  and  variety  in  adequate  quantities  and  time  to  the  farmers. 267341 cum runoff/water availability for cultivation.  

                            The  productivity  gap  and  reasons  of  it  indicate  potential  to  increase  the productivity  through  crop  demonstration  .Crop  demonstrations  would  be  carried  out  on improved  crops/  varieties.  improved  agronomic  practices.  INM.  IPM.  Mixed  cropping. distribution of  fodder  seed mini  kit. Demonstration of  improved methods and economics of fodder  crops  cultivation  and  also  distribution  foundation  seeds  of  Forage  Crops  for  further multiplication. introduction of fodder crops in the existing crop rotations.   

Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)

Activity Area Species Varieties Recommended varieties Production

Horticulture  0  0  0  0  0 Vegetables  0  0  0  0  0 Floriculture  0  0  0  0  0 Medicinal Plants           

Table 2.6 Land holding Pattern in project area

Type of Farmer 

Total Households 

Land holding (ha) irrigation source wise 

Land holding (ha)Social group wise 

Irrigated 

(source)

Rainfed Total  General 

SC  ST  OBC  BPL

(i)Large farmer           

   

Booth  169  0  845  845  23  69  0  77  13 

Name of the crop

Productivity kg/ha

India Highest Average

in Rajasthan

Highest Average of Agro climatic zone District Project Area

Page 20: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

20

rathodan Mate ka tala  107  0 305  305  15  22  0  70  29 Pananion ka dhani 

59  0 295  295  2  11  1  45  18 

Sukaliya  42  0 210  210  1  1  0  40  9 Ghoniya  63  0 315  315  6  2  6  49  6 (ii)  Small farmer 

  0              

Booth rathodan 

136  0 476  476  6  65  29  36  56 

Mate ka tala  74  0 127  127  2  28  5  39  40 Pananion ka dhani 

97  0 312  312  3  28  0  66  50 

Sukaliya  62  0 276  276  1  3  6  52  11 Ghoniya  122  0 328  328  0  13  32  77  13 (iii) Marginal farmer 

  0    

Booth rathodan 

159  0 387  387  1  

68  0  90  73 

Mate ka tala  141  0 39 39 0 37 1  103 104Pananion ka dhani 

63  0 89  89  1  22  0  41  52 

Sukaliya  77 0 506 506 0 4 4  68 29Ghoniya  96  0 84  84  2  24  54  18  38     0              (iv)  Landless person 

  0              

Booth rathodan 

174  0 0  0  0  97    77  85 

Mate ka tala  45  0 0  0  0  5    40  18 Pananion ka dhani 

8  0 0  0  0  1    7  1 

Sukaliya  46  0 0  0  0  1  3  42  27 Ghoniya  20  0 0  0  0  0  2  18  10 

Total 1760  

0 4594  4594  61  501 173  1055  682 

                                                                          There are 58.0% land holdings belong to small and marginal farmers who own 57 % of total cultivated area. Horticulture/vegetables could be more economical to Small and  marginal  farmers  with  irrigation  source.  For  large  farmers  with  no  irrigation  facility Horticulture/vegetables  will  be  promoted  in  a  part  of  land  with  farm  pond/Tanka construction. The  following activities will be more beneficial  for small  land holdings and  for diversification and income for large farmers.   

Horticulture plantation. Medicinal Crops. :­ As discussed earlier .  Horticulture/vegetables could  be more  economical  to  Small  and marginal  farmers with  irrigation  source.    Also  the project area has good potential for medicinal & aromatic crops like Sonamukhi. Isabgol. etc.  

Page 21: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

21

Agro  forestry  plantation:­  To  increase  the  income  of  farmers  and  also  for  shelter  belt plantation as wind velocity is high in the project area.    

Setting of Vermi Compost Units  :­ Keeping  in view the side effect of residues of chemicals and  fertilizers  on  human  health  the  emphasis  would  be  on  cultivation  of  organic  produce through motivating  farmers and providing assistance  for production of organic  input. ermin compost.   

Production and distribution of quality seed: –  There  is need  to  ensure  that  good quality seed  is  available  for  cultivators  for  which  adequate  seed  production  would  be  initiated  in watershed  areas  with  the  assistance  of  private  sector  and  agriculture  department technologies .Sprinklers and pipelines for efficient water management practices emphasis  on demonstration  of  sprinklers  with  adequate  financial  support  and  convergence/private partnership.     

Innovative  hi­tech/  export  oriented  activities:­.  Drip  irrigation  will  be  promoted  in  all horticulture plantations. vegetables for higher yields and quality produce.  

Table 2.7 FODDER REQUIREMENT &AVAILABILITY IS AS CALCULATED BELOW

REQUIREMENT

S.No  Animals  No’s  Equ. Cow units 

Average Dry matter requirement per day 

Dry matter requirement per year (Kg.) 

Total requirement in M.T. 

1  Cows  1019  1019  7 Kg.  2603545  2603.55 

2  Buffaloes  82  82  7 Kg.  209510  209.51 

4  Goat  5758  2879  7 Kg.  7355845  7355.85 

5  Sheep  1892  946  7 Kg.  2417030  2417.03 

6  Camel  500  500  7 Kg.  1277500  1277.5 

  Total  9251  5426  ‐  13863430  13863.43 

FODDER AVAILABILITY

S.No. Name of Crop Area in Hac.

Coo production M.T./Hac.

Fodder Availability

 A.  1.  2.  3. 

(In Watershed Area) Kharif  Crop ;‐  Bajra  Moong  Guar 

   1146  361  1073 

   0.50  0.20  0.40 

   573.00  72.20  429.20 

Page 22: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

22

 B.      D. 1. 2. 3. 

 Culturable  vaste land &        pasture land  (Out of watershed village Area) Bajra Moong Guar 

 2725    3575 570 2560  

 2.00    0.50 0.20 0.40 

 5450.00    1787.50 114.00 1024.00   

Total

12010.00 -

9449.90

       The  table above shows  there  is  fodder deficiency  (Requirement is 13863.43  tons‐and availability  is 9449.90 tons/yr.) To minimize  the  large  and expanding gap between  feed  and  fodder  resource availability and demand there is need for 

• Increase in area under fodder crops • Increase in productivity of fodder crops • Development of pastures  • And  reduction  in  large  number  of  livestock  production  through  replacement  by  few but 

productive animals   Table 2.9 Agriculture implements

Farm mechanization and seed banks: - As discussed earlier 58 % land holdings belong to 

small and marginal farmers who own only 57 % of total cultivated area . To purchage of 

farm implements by individual farmers is not economical  so SHG would be promoted to 

buy farm implements  and rent to farmer. 

S. No  Implements  Booth rathodan

Mate ka tala 

Pananion ka tala 

Sukaliya  Ghoniya Total 

1  Tractor  25  7  5  5  2  44 2  Sprayers‐manual/ 

power 10  0  0  0  0 

 10 

3  Cultivators/Harrows  25  7  5  5  2  44 4  Seed drill  0  0  0  0  0  0 5  Tractor trolly  25  7  5  3  1  41 6  Thressure  7  5  3  1  0  16 

Page 23: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

23

Table 2.10 NREGA Status :-

S.No

Name of Village

No. Of Card

Holders

Employment

Activity taken so far

1  

Booth rathodan 

615  14762  1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3.Constraction of Tanka 

2 Mate ka tala  345  8215 1.Excavation of Talab / Nadi 

2.Constraction of Gravel Road 3. Constraction of Tanka 

3 Pananion ka dhani 

212  5088  1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka 

4 Sukaliya  208  4992  1.Excavation of Talab / Nadi 

2.Constraction of Gravel Road 3. Constraction of Tanka 

5  

Ghoniya  282  6273  .Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka 

  Total  1662  39330                ‐ 

Page 24: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

24

Table 2.11 Migration Details

Name of village 

No. Of persons migrating 

No. Of days per year of migration 

Major reason(s) for migrating 

Distance of destination of migration from the village (km) 

Occupation during migration 

Income from such occupation (Rs. In lakh) 

Booth rathodan 

150  18000  ‐  450   Labour  36.00 

Mate ka tala  75  9000 Scarcity of labour&fodder  

450 Labour 18.00

Pananion ka dhani 

60  7200  Scarcity of labour&fodder  

450 Labour  14.50 

Sukaliya  150  18000 Scarcity of labour&fodder  

450 Labour 36.00

Ghoniya  125  15000  Scarcity of labour&fodder  

450 Labour  30.00 

                                 The migration can be check by creation of employment opportunities. enhancing  farm level economy.  increases  the income  of  the  people  engaged  in  animal  husbandry  by  dairy.  poultry  and marketing  and  value  addition.  (As  discussed  earlier)  and diversification in livelihoods . 

      The existing livelihoods Village are given below Table 2.12 (a)Major activities (On Farm)

Name of activity No of House holds 

Average annual income from the Booth rathodan 

Mate ka tala 

Pananion ka tala 

Sukaliya Ghoniya Total 

Soap  15  5  3  3  3  29  60000 Goat /sheep rearing  237  142  132  127  25  663  36000 Sangari  40  23  0  0  0  63  5000 Basket  3  1  4  5  0  13  7500 Rope making  5  3  7  10  0  25  5000 

Page 25: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

25

Table 2.12(b)Major activities (Off Farm)

Name of activity 

Households/individuals  Average annual income  

Booth rathodan 

Mate ka tala 

Pananion ka tala 

Sukaliya 

Ghoniya 

Total 

Artisans  52  23  5  12  0  92  3000 Carpenter                   25  32  8  8  12  85  75000 Blacksmith  0  0  0  0  0  0  0 Leather Craft                         0  0  0  4  0  4  24000 Porter                       0  0  0  0  0  0  0  Mason   27  20  15  7  8  77  120000 Kashidakari(handicraft)  532  258  260  237  0  1287  15000 Others specify (Cycle Repair  .STD.Craft etc) 

0  0  0  0  0  0  0 

                  The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals  

Table 2.13( a ) Status of Existing SHG

S.No  

Name of SHG 

Members 

Activity 

involved 

Monthly 

income

Fund availabl

Assistance available 

Source of assistance

Training 

received 

1  SHG Jilani    11  Kashid

akari  1000  7000  50000  Loan  Trained

2  SHG Kamal    10  Kashid

akari  1000  0  0  0  0 

3  SHG Arisar    10  Kashid

akari  1000  0  0  0  0 

SHG Talibanion ki basti  

10  Kashidakari  1000  3000  20000  0  0 

The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance 

 

Technical Features Table 2.14 Ground Water

S.No  Source  No.  Functional depth 

Dry  Area irrigated 

Water availability(days) 

(i)  Open  wells  19  250 Ft  ‐  ‐  ‐ (ii)  Shallow tube wells  7  350 ft ‐ 70 Ha  (iii)  Pumping sets    ‐  ‐  ‐  8 month (iv)  Deep Tube Wells  ‐  ‐  ‐  ‐  ‐    Total  44  ‐  ‐  ‐  ‐ 

Page 26: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

26

                            The  table  indicates  ground water  very  deep  and  also  need  to  recharge  by construction of anicut and other water harvesting structures. 

Table 2.15 Availability of drinking water

S.No  Name of the village 

Drinking water 

requirement  

Ltrs/day 

Present availability of drinking water  

Ltrs/day 

No. of drinking water sources available 

No. functional 

No. requires repairs 

1  Booth rathodan 

250000  175000  2  2  ‐ 

2  Mate ka tala 

150000  75000  1  1  ‐ 

3  Pananion ka dhani 

100000  50000  1  1  ‐ 

4  Sukaliya  100000  75000  2  2  0 

5  Ghoniya  120000  75000  4  3  1 

Table 2.16 Water Use efficiency

Name of major crop 

Area (Hectare) through water 

saving devices(Drip/Sprinklers) 

through water conserving 

agronomic practices#

Any other (pl. specify) 

Total 

Bajara   27  240  ‐  240 Jeera  50  0  ‐  15 Isabgol  15  0 ‐ 5Aradi  5  0  ‐  5  

The tables above indicate need for judicious use of available Water. Encouraging optimum use of water through installation of sprinklers on every operational wells   

Table 2.17 Slope details.

Slope of Watershed S.No.  Slope percentage 

  Area in hectares 

1  0 to 3%  2896 2  3 to 8%  110 3  8 to 25%  1767 4  > 25%  0 

Page 27: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

27

                                       The most of  the area has  slope  less  than 3% construction of  contour bunds can solve the problem of water erosion in agriculture fields and protect washing of top soil and manures/fertilisers         

Water Budgeting Table 2.18 ( a )Total available runoff(cum) use Stranges table Area  Type of 

Catchment Yield of runoff from 

catchment per ha.(cum.) use Stranges table 

 

Total Runoff 

0  Good  188 0 725  Average  141  102225 4048  bed  94  380512 4773  Total    482737 

Table 2.18( b) Details of already stored runoff(Surface Water structures)

S.No.  Name  No.  Storage Capacity (cum) 

Area irrigated (ha) 

i)  Major Irrigation Project 0 0 0 ii)  Khadin  0  0  0 iii)  Farm Ponds/Tanks  350  17500  0 iv)  Anicuts  0  0  0 v  Nadi  7  350000  0    Total  357  367500  0 

  Table 2.18 (c) Balance available runoff (cum)  

Total run off Net tapped Runoff   Balance Run off   Available for Harvesting (0.75* 

1  2  3 4 482737  367500  115237  86428 

                              The water  budgeting  indicates potential  for water  harvesting  in  the  area. Following Strutures are to be constructed in watershed area to harvesting available runoff.  

S. No.  Name of Structure  No. of structure  Capacity of Structure 

Total  water Harvested IWMP  NREGA  Total 

1  Khadin  1  3  14  15000  210000 2  Farm pond  37  0  37  150  5550 3  Tanka  76  244  320  50  16000 

Total  188  250  438  ‐  265952 

Page 28: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

28

Table 2.19 Soil details /Soil Profile

A  Major Soil Classes  Area in hectares 1   sandy  865 2   Sandy loam  2686 3  Rocky  0   Soil Depth :  B.  Depth (Cms.)  Area in hectares 1  0.00 to 7.50                                                             150 2  7.50 to 45.00                                                          1806 3  > 45.00                                                                     2817 C  Soil fertility Status  Kg/ha  Recommended    N  60  120    P  12  80    K  1.50  40    Micronutrients  PPM   

                                                                    The  analysis  of  table  shows  need  to  improve  and  maintain  soil fertility.  Soil  health  card  to  every  farmer  every  crop  season will  be provided. which will include the recommendation for Application micro nutrient and fertilizers   

Table 2.20:- Erosion details

Erosion status in project Area

Cause Type of erosion

Area affected  (ha) 

Run off(mm/ year) 

Average soil loss (Tonnes/ ha/ year)

Water erosion a  Sheet  498  356  1.25  622.50 b 

Rill  125  

1.5 187.50

c Gully   

    

 

Sub‐Total     Wind erosion  4150    1.75           7262.50 

Total for project 4773 8072.50

The need is: To check  land degradation   To reduce excessive biotic pressure by containing the number and increase of livestock  To  check  cultivation  on  sloping  lands  without  adequate  precautions  of  soil  and  water conservation measures To discourage cultivation along susceptible nallah beds To check Faulty agriculture techniques To check Uncontrolled grazing and developed cattle tracks 

Page 29: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

29

To check Deforestation of steep slopes To  check  erosive  velocity  of  runoff.  store  Runoff.  to  arrest  silt  carried  by  runoff  and  to recharge Ground Water structures life Earthen check dams. gully plugs. Bank Stabilisation. Loose  stone  check  Dams.  Gabions.  Earthen  embankment  (Nadi)  and  Anicuts  would  be taken up.  

Page 30: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

30

CHAPTER - III

PROPOSED DEVELOPMENT PLAN

Name of project BARMER(IWMP )-VII Block CHOHTAN District. BARMER

Proposed Development Plan S. N. NAME OF ACTIVITY Unit

Unit cost

GP-1 Booth Rathodan 3026 453.9

Beneficiary Contribution

Quantity Total Cost Cost from Project Fund Convergence Fund

Quantity Amt. Quantity Amt.

I. Administration - 0.1 - 45.39 - 45.39 - - 0

II Monitoring - 0.01 - 4.539 - 4.539 - - 0

III Evaluation - 0.01 - 4.539 - 4.539 - - 0

IV Entry point activity - 4% - 18.156 - 18.156 - - 0

V Inst. & Capacity Building

- 5% - 22.695 - 22.695 - - 0 VI DPR Preparation

- 1% - 4.539 - 4.539 - - 0 TOTAL (A)

- 22% - 99.858 - 99.858 - 0 W/S WORK PHASE

VII NRM

60% 272.34 0 0 1 Conservation measures for areable land

(private land)

(i) Farm Pond Nos 180000 54 97.2 20 36 34 61.2 2.7

(ii) Khadeen Nos 500000 15 75 2 10 13 65 0.75

Page 31: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

31

(iii) Repair of existing Khadeen Nos 180000 0 0 0 0 0 0 0

(iv) Vegitative barriers m 175 7500 13.125 6092 10.661 1408 2.464 0.799575

(v) Tanka Nos 150000 652 978 86 129 566 849 9.675

(vi) Renovation of Existing Tanka Nos 50000 32 16 32 16 0 0 1.2

2 Conservation measures for non areable land

(i) Plantation Ha 113400 70 79.38 20 22.68 50 56.7

(ii) Renovation of nadi Nos 1600000 6 96 3 48 3 48

(iii) stangle Trenches Nos 300 0 0 0 0 0 0

3 Drainage line treatment

(ii) LSCD Nos 5000 0 0 0 0 0 0 0

(i) Drop Spilway Nos 165000 0 0 0 0 0 0 0

(ii) Anicuts Nos 800000 0 0 0 0 0 0 0

TOTAL (B) 1354.705 272.341 2074 1082.364

VIII Production System and micro enterprise 0.15 15% 68.085

I Arable Land Production System

-1 Crop Demonstration

i Single Crop No. 870 450 3.915 250 2.175 200 1.74 0.6525

ii Enter Cropping No. 700 275 1.925 150 1.05 125 0.875 0.315

-2 Agro Forestry No. 15 56100 8.415 20007 3.00105 36093 5.41395 0.900315

-3 Dry land Horticulture No. 60 20000 12 8290 4.974 11710 7.026 1.4922

Page 32: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

32

-4 Homestead Kitchen Garden No. 500 475 2.375 145 0.725 330 1.65 0.2175

-5 Organic Farming

i Compost Pit No. 1000 260 2.6 50 0.5 210 2.1 0.15

ii Vermi Compost Unit No. 2200 45 0.99 20 0.44 25 0.55 0.132

-6 Household Production System (For Marginal Farmer and landless Labour )

i Small Live Stock – Goat and Sheep Rearing

No. 10000 350 35 248 24.8 102 10.2 7.44

ii Service sector Carpentry Tailoring. Blacksmith. Repair shop for Cycle/ Two wheelers etc.

No. 5000 25 1.25 10 0.5 15 0.75 0.15

-7 Water Tank. No. 50000 30 15 0 0 30 15 0

-8 HDPE/ PVC Pipe No. 15000 42 6.3 0 0 42 6.3 0

-9 Nepesek Spraier by hand mounted No. 650 25 0.1625 0 0 25 0.1625 0

-10 Nepesek Spraier by foot mounted No. 800 20 0.16 0 0 20 0.16 0

-11 Hand rotetary duster No. 800 40 0.32 0 0 40 0.32 0

-12 Seed cum fertilizer drill No. 15000 24 3.6 0 0 24 3.6 0

-13 Isopam (Threser) No. 40000 15 6 5 2 10 4 0.6

-14 Drip irrigation set No. 23000 86 19.78 86 19.78 0 0 5.934

-15 Sprinkler irrigation set No. 19000 35 6.65 20 3.8 15 2.85 1.14

Total - 126.4425 63.74505 49016 62.69745 19.123515

-1 Over seeding in Pasture land Hac. 860 151 1.2986 70 0.602 81 0.6966

Page 33: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

33

-2 Over seeding in Non Arable land Hac 220 435 0.957 25 0.055 410 0.902

Total 2.2556 0.657 491 1.5986

III Live Stock Management

-1 Fodder Demonstration No. 900 175 1.575 150 1.35 25 0.225

-2 Mangers Distribution No. 400 208 0.832 208 0.832 0 0

-3 Animal Health Camps No. 15000 20 3 10 1.5 10 1.5

Total 5.407 3.682 35 1.725

Total Production System 134.1051 68.08405 49542 66.02105 19.123515

X CONSOLIDATED PHASE 13.617 13.617 0 0

GRAND TOTAL 1602.285 453.90005 1148.385 19.123515

Page 34: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

34

S. N. NAME OF ACTIVITY Unit

Unit cost

GP-2 Bijrad 992 148.8 Beneficiary Contribution Quantity Total Cost Cost from Project Fund Convergence Fund

Quantity Amt. Quantity Amt. I. Administration - 0.1 - 14.88 - 14.88 - - 0 II Monitoring - 0.01 - 1.488 - 1.488 - - 0 III Evaluation - 0.01 - 1.488 - 1.488 - - 0 IV Entry point activity - 4% - 5.952 - 5.952 - - 0 V Inst. & Capacity Building - 5% - 7.44 - 7.44 - - 0 VI DPR Preparation - 1% - 1.488 - 1.488 - - 0 TOTAL (A) - 22% - 32.736 - 32.736 - 0 W/S WORK PHASE

VII NRM 60% 89.28 0 0 1 Conservation measures for areable land

(private land)

(i) Farm Pond Nos 180000 10 18 5 9 5 9 0.675

(ii) Khadeen Nos 500000 5 25 0 0 5 25 0

(iii) Repair of existing Khadeen Nos 180000 0 0 0 0 0 0 0

(iv) Vegitative barriers m 175 5984 10.472 2017 3.52975 3967 6.94225 0.26473125

(v) Tanka Nos 150000 250 375 30 45 220 330 3.375

(vi) Renovation of Existing Tanka Nos 50000 7 3.5 7 3.5 0 0 0.2625

2 Conservation measures for non areable land

(i) Plantation Ha 122500 10 12.25 10 12.25 0 0

(ii) Renovation of nadi Nos 1600000 5 80 1 16 4 64

(iii) stangle Trenches Nos 300 0 0 0 0 0 0

3 Drainage line treatment

(ii) LSCD Nos 5000 0 0 0 0 0 0 0

(i) Drop Spilway Nos 165000 0 0 0 0 0 0 0

(ii) Anicuts Nos 800000 0 0 0 0 0 0 0

TOTAL (B) 524.222 89.27975 4197 434.94225

Page 35: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

35

VIII Production System and micro enterprise 0.15 15% 22.32

I Arable Land Production System

-1 Crop Demonstration

i Single Crop No. 870 500 4.35 100 0.87 400 3.48 0.261

ii Enter Cropping No. 700 300 2.1 50 0.35 250 1.75 0.105

-2 Agro Forestry No. 15 50000 7.5 5000 0.75 45000 6.75 0.225

-3 Dry land Horticulture No. 60 10100 6.06 2200 1.32 7900 4.74 0.396

-4 Homestead Kitchen Garden No. 500 500 2.5 45 0.225 455 2.275 0.0675

-5 Organic Farming

i Compost Pit No. 1000 250 2.5 35 0.35 215 2.15 0.105

ii Vermi Compost Unit No. 2200 50 1.1 5 0.11 45 0.99 0.033

-6 Household Production System (For Marginal Farmer and landless Labour )

i Small Live Stock – Goat and Sheep Rearing

No. 10000 500 50 70 7 430 43 2.1

ii Service sector Carpentry Tailoring. Blacksmith. Repair shop for Cycle/ Two wheelers etc.

No. 5000 30 1.5 5 0.25 25 1.25 0.075

-7 Water Tank. No. 50000 15 7.5 0 0 15 7.5 0

-8 HDPE/ PVC Pipe No. 15000 10 1.5 0 0 10 1.5 0

-9 Nepesek Spraier by hand mounted No. 650 5 0.0325 0 0 5 0.0325 0

-10 Nepesek Spraier by foot mounted No. 800 5 0.04 0 0 5 0.04 0

-11 Hand rotetary duster No. 800 25 0.2 0 0 25 0.2 0

-12 Seed cum fertilizer drill No. 15000 20 3 0 0 20 3 0

-13 Isopam (Threser) No. 40000 15 6 2 0.8 13 5.2 0.24

-14 Drip irrigation set No. 23000 30 6.9 30 6.9 0 0 2.07

-15 Sprinkler irrigation set No. 19000 25 4.75 5 0.95 20 3.8 0.285

Total - 107.5325 19.875 54833 87.6575 5.9625

-1 Over seeding in Pasture land Hac. 860 10 0.086 10 0.086 0 0

-2 Over seeding in Non Arable land Hac 220 5 0.011 0 0 5 0.011

Total 0.097 0.086 5 0.011 III Live Stock Management -1 Fodder Demonstration No. 900 150 1.35 75 0.675 75 0.675

Page 36: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

36

-2 Mangers Distribution No. 400 320 1.28 46 0.184 274 1.096

-3 Animal Health Camps No. 15000 20 3 10 1.5 10 1.5

Total 5.63 2.359 359 3.271 Total Production System 113.2595 22.32 55197 90.9395 5.9625 X CONSOLIDATED PHASE 4.464 4.464 0 0

GRAND TOTAL 674.6815 148.79975 525.88175 5.9625

Page 37: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

37

S. N. NAME OF ACTIVITY Unit

Unit cost

GP-3 Dhok(Ghoniya) 755 113.25 Beneficiary Contribution

Quantity Total Cost Cost from Project Fund Convergence Fund Quantity Amt. Quantity Amt.

I. Administration - 0.1 - 11.325 - 11.325 - - 0 II Monitoring - 0.01 - 1.1325 - 1.1325 - - 0 III Evaluation - 0.01 - 1.1325 - 1.1325 - - 0 IV Entry point activity - 4% - 4.53 - 4.53 - - 0 V Inst. & Capacity Building - 5% - 5.6625 - 5.6625 - - 0 VI DPR Preparation - 1% - 1.1325 - 1.1325 - - 0 TOTAL (A) - 22% - 24.915 - 24.915 - 0 W/S WORK PHASE

VII NRM 60% 67.95 0 0 1 Conservation measures for areable land

(private land)

(i) Farm Pond Nos 180000 7 12.6 5 9 2 3.6 0.675

(ii) Khadeen Nos 500000 10 50 1 5 9 45 0.375

(iii) Repair of existing Khadeen Nos 180000 0 0 0 0 0 0 0

(iv) Vegitative barriers m 175 5984 10.472 1829 3.20075 4155 7.27125 0.24005625

(v) Tanka Nos 150000 200 300 24 36 176 264 2.7

(vi) Renovation of Existing Tanka Nos 50000 32 16 5 2.5 27 13.5 0.1875

2 Conservation measures for non areable land

(i) Plantation Ha 122500 10 12.25 10 12.25 0 0

(ii) Renovation of nadi Nos 1600000 0 0 0 0 0 0

(iii) stangle Trenches Nos 300 0 0 0 0 0 0

3 Drainage line treatment

(ii) LSCD Nos 5000 0 0 0 0 0 0 0

(i) Drop Spilway Nos 165000 0 0 0 0 0 0 0

(ii) Anicuts Nos 800000 0 0 0 0 0 0 0

TOTAL (B) 401.322 67.95075 4369 333.37125

VIII Production System and micro enterprise 0.15 15% 16.9875

I Arable Land Production System

Page 38: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

38

-1 Crop Demonstration

i Single Crop No. 870 320 2.784 50 0.435 270 2.349 0.1305

ii Enter Cropping No. 700 300 2.1 20 0.14 280 1.96 0.042

-2 Agro Forestry No. 15 50000 7.5 1465 0.21975 48535 7.28025 0.065925

-3 Dry land Horticulture No. 60 10100 6.06 2110 1.266 7990 4.794 0.3798

-4 Homestead Kitchen Garden No. 500 150 0.75 25 0.125 125 0.625 0.0375

-5 Organic Farming

i Compost Pit No. 1000 80 0.8 50 0.5 30 0.3 0.15

ii Vermi Compost Unit No. 2200 12 0.264 10 0.22 2 0.044 0.066

-6 Household Production System (For Marginal Farmer and landless Labour )

i Small Live Stock – Goat and Sheep Rearing

No. 10000 75 7.5 40 4 35 3.5 1.2

ii Service sector Carpentry Tailoring. Blacksmith. Repair shop for Cycle/ Two wheelers etc.

No. 5000 15 0.75 5 0.25 10 0.5 0.075

-7 Water Tank. No. 50000 5 2.5 0 0 5 2.5 0

-8 HDPE/ PVC Pipe No. 15000 3 0.45 0 0 3 0.45 0

-9 Nepesek Spraier by hand mounted No. 650 2 0.013 0 0 2 0.013 0

-10 Nepesek Spraier by foot mounted No. 800 5 0.04 0 0 5 0.04 0

-11 Hand rotetary duster No. 800 5 0.04 0 0 5 0.04 0

-12 Seed cum fertilizer drill No. 15000 3 0.45 0 0 3 0.45 0

-13 Isopam (Threser) No. 40000 10 4 2 0.8 8 3.2 0.24

-14 Drip irrigation set No. 23000 24 5.52 24 5.52 0 0 1.656

-15 Sprinkler irrigation set No. 19000 10 1.9 5 0.95 5 0.95 0.285

Total - 43.421 14.42575 57313 28.99525 4.327725

-1 Over seeding in Pasture land Hac. 860 10 0.086 10 0.086 0 0

-2 Over seeding in Non Arable land Hac 220 18 0.0396 0 0 18 0.0396

Total 0.1256 0.086 18 0.0396 III Live Stock Management -1 Fodder Demonstration No. 900 120 1.08 75 0.675 45 0.405

-2 Mangers Distribution No. 400 110 0.44 75 0.3 35 0.14

-3 Animal Health Camps No. 15000 20 3 10 1.5 10 1.5

Page 39: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

39

Total 4.52 2.475 90 2.045 Total Production System 48.0666 16.98675 57421 31.07985 4.327725 X CONSOLIDATED PHASE 3.3975 3.3975 0 0

GRAND TOTAL 477.7011 113.25 364.4511 4.327725

Page 40: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

40

S. N. NAME OF ACTIVITY Unit

Unit cost

Total 4773 715.95 Beneficiary Contribution

Quantity Total Cost Cost from Project Fund Convergence Fund Quantity Amt. Quantity Amt.

I. Administration - 0.1 - 71.60 - 71.60 - - 0.00 II Monitoring - 0.01 - 7.16 - 7.16 - - 0.00 III Evaluation - 0.01 - 7.16 - 7.16 - - 0.00 IV Entry point activity - 4% - 28.64 - 28.64 - - 0.00 V Inst. & Capacity Building - 5% - 35.80 - 35.80 - - 0.00 VI DPR Preparation - 1% - 7.16 - 7.16 - - 0.00 TOTAL (A) - 22% - 157.51 - 157.51 - 0.00 W/S WORK PHASE

VII NRM 60% 429.57 0.00 0.00 1 Conservation measures for areable land

(private land)

(i) Farm Pond Nos 180000 71 127.80 30 54.00 41 73.80 4.05

(ii) Khadeen Nos 500000 30 150.00 3 15.00 27 135.00 1.13

(iii) Repair of existing Khadeen Nos 180000 0 0.00 0 0.00 0 0.00 0.00

(iv) Vegitative barriers m 175 19468 34.07 9938 17.39 9530 16.68 1.30

(v) Tanka Nos 150000 1102 1653.00 140 210.00 962 1443.00 15.75

(vi) Renovation of Existing Tanka Nos 50000 71 35.50 44 22.00 23 11.50 1.65

2 Conservation measures for non areable land

(i) Plantation Ha 39340 90 103.88 40 47.18 50 56.70

(ii) Renovation of nadi Nos 1600000 11 176.00 4 64.00 7 112.00

(iii) stangle Trenches Nos 300 0 0.00 0 0.00 0 0.00

3 Drainage line treatment

(ii) LSCD Nos 5000 0 0.00 0 0.00 0 0.00 0.00

(i) Drop Spilway Nos 165000 0 0.00 0 0.00 0 0.00 0.00

(ii) Anicuts Nos 800000 0 0.00 0 0.00 0 0.00 0.00

TOTAL (B) 2278.25 429.57 10640 1848.68 VIII Production System and micro enterprise 0.15 15% 107.39

Page 41: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

41

I Arable Land Production System

-1 Crop Demonstration

i Single Crop No. 870 1270 11.05 400 3.48 870 7.57 1.04

ii Enter Cropping No. 700 875 6.13 220 1.54 655 4.59 0.46

-2 Agro Forestry No. 15 156100 23.42 26472 3.97 129628 19.44 1.19

-3 Dry land Horticulture No. 60 40200 24.12 12600 7.56 27600 16.56 2.27

-4 Homestead Kitchen Garden No. 500 1125 5.63 215 1.08 910 4.55 0.32

-5 Organic Farming

i Compost Pit No. 1000 590 5.90 135 1.35 455 4.55 0.41

ii Vermi Compost Unit No. 2200 107 2.35 35 0.77 72 1.58 0.23

-6 Household Production System (For Marginal Farmer and landless Labour )

i Small Live Stock – Goat and Sheep Rearing

No. 10000 925 92.50 358 35.80 567 56.70 10.74

ii Service sector Carpentry Tailoring. Blacksmith. Repair shop for Cycle/ Two wheelers etc.

No. 5000 70 3.50 20 1.00 50 2.50 0.30

-7 Water Tank. No. 50000 50 25.00 0 0.00 50 25.00 0.00

-8 HDPE/ PVC Pipe No. 15000 55 8.25 0 0.00 55 8.25 0.00

-9 Nepesek Spraier by hand mounted No. 650 32 0.21 0 0.00 32 0.21 0.00

-10 Nepesek Spraier by foot mounted No. 800 30 0.24 0 0.00 30 0.24 0.00

-11 Hand rotetary duster No. 800 70 0.56 0 0.00 70 0.56 0.00

-12 Seed cum fertilizer drill No. 15000 47 7.05 0 0.00 47 7.05 0.00

-13 Isopam (Threser) No. 40000 40 16.00 9 3.60 31 12.40 1.08

-14 Drip irrigation set No. 23000 140 32.20 140 32.20 0 0.00 9.66

-15 Sprinkler irrigation set No. 19000 70 13.30 30 5.70 40 7.60 1.71

Total - 277.40 98.05 161162 179.35 29.41

-1 Over seeding in Pasture land Hac. 860 171 1.47 90 0.77 81 0.70

-2 Over seeding in Non Arable land Hac 220 458 1.01 25 0.06 433 0.95

Total 2.48 0.83 514 1.65 III Live Stock Management -1 Fodder Demonstration No. 900 445 4.01 300 2.70 145 1.31

-2 Mangers Distribution No. 400 638 2.55 329 1.32 309 1.24

Page 42: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

42

-3 Animal Health Camps No. 15000 60 9.00 30 4.50 30 4.50

Total 15.56 8.52 484 7.04 Total Production System 295.43 107.39 162160 188.04 29.41 X CONSOLIDATED PHASE 21.48 21.48 0.00 0.00

GRAND TOTAL 2754.67 715.95 2038.72 29.41

Page 43: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

43

A) Preparatory phase activities Capacity Building Trainings and EPA                                     The IEC activities  like Group meetings. door to door campaign. slogans and wall writings etc. were carried out in all the habitations of Barmer(IWMP)‐VII  cluster. A series of meetings were conducted with GP members. community  and discussed about the  implementation  of  IWMP programme. User  groups were  also  formed.  Grama  Sabhas were conducted for approval of EPA (Village). for selecting the watershed committee and approval of DPR. S.no Name of the Gram Panchayat Date on which Grama

Sabha approved EPA

1 Booth Rathodan 24.08.2010

2 Bijrad (Sukaliya) 05.03.2010

3 Dhok (Ghoniya) 26.08.2010

S. No. 

Names of  village 

Amount earmarked for EPA  

Entry Point 

Activities planned 

Estimated cost  

Expenditure incurred  Balance  Expected 

outcome Actual outcome 

1  Booth rathodan 

11.15 lacs  Water Tank. solar lights. 

2.50 lacs&.25 lacs        

13.00lacs  ‐  Drinking water for 125 

Family & Light facility 

Drinking water for 125 

Family & Light facilit 

2  Mate ka tala 

2.83 lacs  Tanka on common place. solar lights 

1.50 lacs&.25 lacs        

2.25lacs  ‐  Drinking water for 80Family & Light facilit 

Drinking water for 80Family & Light facilit 

3  Pananion ka dhani 

4.18 lacs  Tanka on common place. solar lights 

1.50 lacs&.25 lacs        

3.25 lacs  ‐  Drinking water for 45Family & Light facilit 

Drinking water for 45Family & Light facilit 

4  Sukaliya  5.95 lacs  Tanka on common place. GLR &solar lights 

1.50 lacs&.25 lacs        

 5.754lacs  ‐  Drinking water for 120Family & Light facilit 

Drinking water for 120Family & Light facilit 

5  Ghoniya  4.53 lacs  Tanka on common place. GLR &solar lights 

1.50 lacs&.25 lacs        

 3.50 lacs  ‐  Drinking water for 120Family & Light facilit 

Drinking water for 120Family & Light facilit 

Page 44: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

44

The PRA exercise was carried out in all the villages on the dates shown below:

S.no Name of the village/Habitation Date on which PRA conducted

1 Booth rathodan  11.02.2011

2 Mate ka tala  11.02.2011

3 Pananion ka dhani  11.02.2011

4 Sukaliya  05.02.2011

5 Ghoniya  07.02.2011

Transact walk were  carried  out  involving  the  community  for  Social mapping. 

Resource  mapping.  Detailed  discussions  and  deliberations  with  all  the  primary 

stakeholders were carried out.  

                   Socio‐economic  survey  was  carried  out  during  8/08/2010  to  30/12/2010 

(dates)  period  covering  all  the  households  and  primary  data  on  demography.  Land 

holdings.  Employment  status.  Community  activities  etc.  was  collected  as  mentioned  in 

chapter 2.  

       State remote sensing department was assigned the work of preparing various 

thematic  layers  using  Cartosat‐1  and  LISS‐3  imageries  for  Creation.  development  and 

management of geo‐spatial database depicting present  conditions of  land  (terrain). water 

and vegetation with respect to watershed under different ownerships at village level 

Various thematic layers provided by SRSAC are : 

Delineation of Macro/Micro watershed boundaries. 

Digitised Khasara maps of the villages falling in project area. 

Network of Drainage lines. existing water bodies. falling in the project area. 

Base maps (transport network. village/boundaries. and settlements). 

Land Use / Land cover map. 

Contours at 1 meter interval. slope map 

           Based on GIS thematic layers. Field visits  . PRA and analysis of   benchmark data (as 

discussed in chapter 2) final Treatment plan on revenue map for implementation has been 

framed. Thus each intervention identified has been marked on revenue map (map enclosed 

in  DPR  as  annexure.The  GIS  based  intervention  map.PRA  based  intervention  map  are 

annexed.

Page 45: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

45

CHAPTER – IV

ACTIVITYWISE ABSTRACT OF COST

Name of the project BARMER(IWMP)-VII Block CHOHTAN District. BARMER

S. N. NAME OF ACTIVITY Unit

Unit cost

TOTAL 4773 715.95 Beneficiary Contribution Quantity Total Cost Cost from Project Fund Convergence Fund

Quantity Amt. Quantity Amt.

I. Administration - 0.1 - 71.60 - 71.6 - - 0 II Monitoring - 0.01 - 7.16 - 7.2 - - 0 III Evaluation - 0.01 - 7.16 - 7.2 - - 0 IV Entry point activity - 4% - 28.64 - 28.6 - - 0 V Inst. & Capacity Building - 5% - 35.80 - 35.8 - - 0 VI DPR Preparation - 1% - 7.16 - 7.2 - - 0 TOTAL (A) - 22% - 157.51 - 157.5 - 0 W/S WORK PHASE

VII NRM 60% 429.6 0.00 0 1 Conservation measures for

areable land (private land)

(i) Farm Pond Nos 180000 71 127.80 30 54.0 41 73.80 4.05 (ii) Khadeen Nos 500000 30 150.00 3 15.0 27 135.00 1.13 (iii) Repair of existing Khadeen Nos 180000 0 0.00 0 0.0 0 0.00 0.00 (iv) Vegitative barriers m 175 19468 34.07 9938 17.4 9530 16.68 1.30 (v) Tanka Nos 150000 1102 1653.00 140 210.0 962 1443.00 15.75 (vi) Renovation of Existing

Tanka Nos 50000 71 35.50 44 22.0 27 13.50 1.65

Page 46: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

46

2 Conservation measures for non areable land

(i) Plantation Ha 113400 90 103.88 40 47.2 50 56.70 (ii) Renovation of nadi Nos 1600000 11 176.00 4 64.0 7 112.00 (iii) stangle Trenches Nos 300 0 0.00 0 0.0 0 0.00

3 Drainage line treatment (ii) LSCD Nos 5000 0 0.00 0 0.0 0 0.00 0.00 (i) Drop Spilway Nos 165000 0 0.00 0 0.0 0 0.00 0.00 (ii) Anicuts Nos 800000 0 0.00 0 0.0 0 0.00 0.00

TOTAL (B) 2280.25 429.6 10644 1850.68 VIII Production System and

micro enterprise 0.15 15% 107.4

I Arable Land Production System

-1 Crop Demonstration i Single Crop No. 870 1270 11.05 400 3.5 870 7.57 1.04 ii Enter Cropping No. 700 875 6.13 220 1.5 655 4.59 0.46

-2 Agro Forestry No. 15 156100 23.42 26472 4.0 129628 19.44 1.19 -3 Dry land Horticulture No. 60 40200 24.12 12600 7.6 27600 16.56 2.27 -4 Homestead Kitchen

Garden No. 500 1125 5.63 215 1.1 910 4.55 0.32

-5 Organic Farming i Compost Pit No. 1000 590 5.90 135 1.4 455 4.55 0.41 ii Vermi Compost Unit No. 2200 107 2.35 35 0.8 72 1.58 0.23

-6 Household Production System (For Marginal Farmer and landless Labour )

i Small Live Stock – Goat and Sheep Rearing

No. 10000 925 92.50 358 35.8 567 56.70 10.74

ii Service sector Carpentry Tailoring. Blacksmith. Repair shop for Cycle/ Two wheelers etc.

No. 5000 70 3.50 20 1.0 50 2.50 0.30

Page 47: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

47

-7 Water Tank. No. 50000 50 25.00 0 0.0 50 25.00 0.00 -8 HDPE/ PVC Pipe No. 15000 55 8.25 0 0.0 55 8.25 0.00 -9 Nepesek Spraier by hand

mounted No. 650 32 0.21 0 0.0 32 0.21 0.00

-10 Nepesek Spraier by foot mounted

No. 800 30 0.24 0 0.0 30 0.24 0.00

-11 Hand rotetary duster No. 800 70 0.56 0 0.0 70 0.56 0.00 -12 Seed cum fertilizer drill No. 15000 47 7.05 0 0.0 47 7.05 0.00 -13 Isopam (Threser) No. 40000 40 16.00 9 3.6 31 12.40 1.08 -14 Drip irrigation set No. 23000 140 32.20 140 32.2 0 0.00 9.66 -15 Sprinkler irrigation set No. 19000 70 13.30 30 5.7 40 7.60 1.71

Total - 277.40 98.0 161162 179.35 29.41 -1 Over seeding in Pasture

land Hac. 860 171 1.47 90 0.8 81 0.70

-2 Over seeding in Non Arable land

Hac 220 458 1.01 25 0.1 433 0.95

Total 2.48 0.8 514 1.65III Live Stock Management -1 Fodder Demonstration No. 900 445 4.01 300 2.7 145 1.31 -2 Mangers Distribution No. 400 638 2.55 329 1.3 309 1.24 -3 Animal Health Camps No. 15000 60 9.00 30 4.5 30 4.50 Total 15.56 8.5 484 7.04 Total Production

System 295.43 107.4 162160 188.04 29.41

X CONSOLIDATED PHASE 21.48 21.5 0.00 0.00 GRAND TOTAL 2754.67 715.95 2038.72 29.41

 

 

 

 

 

Page 48: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

48

CHAPTER-V

ANNUAL ACTION PLAN THROUGH PROJECT FUND

Name of the project BARMER (IWMP)-VII Macro/Micro Cluster Geographical Area 3460.5 Ha

G.P-1 BOOTH RATHODAN Scheme IWMP Effective Area 3026 Ha

Block CHOHTAN Date of Sanction 30.01.2009 Total Arable land

2875 Ha

District. BARMER Date of Appoval of the work plan

1. Irrigated 70 Ha

Village Covered 3 NO. 2. Unirrigated

2805 Ha

Project outlay 453.9 LAC No. of SHG's formed 7 Total Nonarable land

586 Ha

Total Area 3026 Hactare No. of UG's formed 10 1. Pasture

151 Ha

No. of WC's formed 1 2. Govt. / waste /OTHER LAND

435 Ha

ANNUAL ACTION PLAN THROUGH PROJECT FUND S. N. NAME OF

ACTIVITY Uni

t QTY. Unit cost Amt. 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 TOTAL

FIRST YEAR SECOND YEAR

THIRD YEAR

FOURTH YEAR

FIFTH YEAR SIXTH YEAR SEVENTH YEAR

PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN I. Administration 10% 45.39 9.08 9.08 9.078 9.078 9.078 10% 45.390 II Monitoring 1% 4.54 0.91 0.91 0.908 0.908 0.908 1% 4.539 III Evaluation 1% 4.54 2.270 2.270 1% 4.539 IV Entry point activity 4% 18.16 42 18.16 4% 18.156

V Inst. & Capacity Building

5% 22.70 7.94 6.81 5.674 1.135 1.135 5% 22.695 VI DPR Preparation 1% 4.54 1 2.723 1 1.82 1% 4.539

TOTAL (A) 99.86 2.723 37.90 16.79 17.929 11.121 11.121 2.270 99.858

W/S WORK PHASE

VII NRM 60% 272.340 0.00 0.00 34.04 136.170 102.128 3.780 0.000 276.120

1

Conservation measures for areable land (private land)

(i) Farm Pond/Khet Talai Nos

20 180000 36.00 0 0.00 0 0.00 3 4.50 10 18.000 8 13.500 0 0.000 0 0.000 20 36.000

Page 49: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

49

(ii) Khadeen Nos 2 500000 10.00 0 0.00 0 0.00 0 1.25 1 5.000 1 3.750 0 0.000 0 0.000 2 10.000

(iii) Repair of existing Khadeen Nos

0 180000 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 (iv) Tanka Nos 86 150000 129.00 0 0.00 0 0.00 11 16.13 43 64.500 32 48.375 0 0.000 0 0.000 86 129.000 (v) Vegitative Barrier m 6092 175 10.66 0 0.00 0 0.00 761 1.33 3046 5.330 2284 3.998 0 0.000 0 0.000 6092 10.660

(vi) Renovation of existing tanka Nos

32 50000 16.00 0 0.00 0 0.00 4 2.00 16 8.000 12 6.000 0 0.000 0 0.000 32 16.000

2 Conservation measures for non areable land

0 0.00 0 0.000 0 0.000

(i) Plantation Ha 20 113400 22.68 0 0.00 0 0.00 3 2.84 10 11.340 4 4.725 3.780 17 22.680 (ii) Renovation of nadi Nos 3 1600000 48.00 0 0.00 0 0.00 0 6.00 2 24.000 1 18.000 0 0.000 3 48.000 (iii) stangle Trenches Nos 0 300 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000

3 Drainage line treatment

0 0.00 0 0.000 0 0.000 (i) LSCD Nos 0 10000 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 (ii) Drop spilway Nos 165000 0.00 0.00 0 0.00 0 0.000 0 0.000 0.000 0 0.000 (iii) Anicuts Nos 800000 0.00 0.00 0 0.00 0.000 0 0.000 0.000 0 0.000

TOTAL (B) 6233 272.34 0 0.00 779 34.04 3116 136.170 2334 98.348 0 3.780 0.000 6251 272.340

VIII Production System and micro enterprise

15% 68.09 0.00 0.00 13.62 13.617 13.617 13.617 13.617 15% 68.085

X CONSOLIDATED PHASE

3% 13.62 0.00 0.00 0.00 0.000 0.000 8.170 5.447 3% 13.617

GRAND TOTAL 453.90 2.72 37.90 64.45 167.72 123.09 36.69 21.33 453.90

Page 50: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

50

Name of the project BARMER (IWMP)-VII Macro/Micro 30/1-11 Geographical Area 997 Ha

G.P-2 BIJRAD Scheme IWMP

Effective Area 992 Ha

Block CHOHTAN Date of Sanction 30.01.2009 Total Arable land

982 Ha

District. BARMER Date of Appoval of the work plan

1. Irrigated 0 Ha

Village Covered 1 NO. 2. Unirrigated

982 Ha

Project outlay 148.8 LAC No. of SHG's formed 18 Total Nonarable land

15 Ha

Total Area 992 Hactare No. of UG's formed 10 1. Pasture

10 Ha

No. of WC's formed 1 2. Govt. / waste /OTHER LAND

5 Ha

ANNUAL ACTION PLAN THROUGH PROJECT FUND S. N. NAME OF

ACTIVITY Uni

t QTY. Unit cost Amt. 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 TOTAL

FIRST YEAR SECOND YEAR

THIRD YEAR

FOURTH YEAR

FIFTH YEAR SIXTH YEAR SEVENTH YEAR

PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN

I. Administration 10% 14.88 2.98 2.98 2.976 2.976 2.976 10% 14.880 II Monitoring 1% 1.49 0.30 0.30 0.298 0.298 0.298 1% 1.488 III Evaluation 1% 1.49 0.744 0.744 1% 1.488 IV Entry point activity 4% 5.95 42 5.95 4% 5.952

V Inst. & Capacity Building

5% 7.44 2.60 2.23 1.860 0.372 0.372 5% 7.440 VI DPR Preparation 1% 1.49 1 0.893 1 0.60 1% 1.488

TOTAL (A) 32.74 0.893 12.42 5.51 5.878 3.646 3.646 0.744 32.736

W/S WORK PHASE

VII NRM 60% 89.280 0.00 0.00 11.16 44.640 33.480 2.042 0.000 91.322

1

Conservation measures for areable land (private land)

(i) Farm Pond/Khet Talai Nos

5 180000 9.00 0 0.00 0 0.00 1 1.13 3 4.500 2 3.375 0 0.000 0 0.000 5 9.000 (ii) Khadeen Nos 0 500000 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000

(iii) Repair of existing Khadeen Nos

0 180000 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000

Page 51: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

51

(iv) Tanka Nos 30 150000 45.00 0 0.00 0 0.00 4 5.63 15 22.500 11 16.875 0 0.000 0 0.000 30 45.000 (v) Vegitative Barrier m 2017 175 3.53 0 0.00 0 0.00 252 0.44 1009 1.765 756 1.324 0 0.000 0 0.000 2017 3.530

(vi) Renovation of existing tanka Nos

7 50000 3.50 0 0.00 0 0.00 1 0.44 4 1.750 3 1.313 0 0.000 0 0.000 7 3.500

2 Conservation measures for non areable land

0 0.00 0 0.000 0 0.000

(i) Plantation Ha 10 122500 12.25 0 0.00 0 0.00 1 1.53 5 6.125 2 2.552 2.042 8 12.250 (ii) Renovation of nadi Nos 1 1600000 16.00 0 0.00 0 0.00 0 2.00 1 8.000 0 6.000 0 0.000 1 16.000 (iii) stangle Trenches Nos 0 300 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000

3 Drainage line treatment

0 0.00 0 0.000 0 0.000 (i) LSCD Nos 0 10000 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 (ii) Drop spilway Nos 0 165000 0.00 0.00 0 0.00 0 0.000 0 0.000 0.000 0 0.000 (iii) Anicuts Nos 0 800000 0.00 0.00 0 0.00 0 0.000 0 0.000 0.000 0 0.000

TOTAL (B) 2065 89.28 0 0.00 258 11.16 1033 44.640 773 31.438 0 2.042 0.000 2068 89.280

VIII Production System and micro enterprise

15% 22.32 0.00 0.00 4.46 4.464 4.464 4.464 4.464 15% 22.320

X CONSOLIDATED PHASE

3% 4.46 0.00 0.00 0.00 0.000 0.000 2.678 1.786 3% 4.464

GRAND TOTAL 148.80 0.89 12.42 21.13 54.98 39.55 12.83 6.99 148.80

Page 52: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

52

Name of the project BARMER (IWMP)-VII Macro/Micro 30/1-11 Geographical Area 755 Ha

G.P-3 DHOK Scheme IWMP Effective Area 755 Ha

Block CHOHTAN Date of Sanction 30.01.2009 Total Arable land

727 Ha

District. BARMER Date of Appoval of the work plan

1. Irrigated 0 Ha

Village Covered 1 NO. 2. Unirrigated

727 Ha

Project outlay 113.25 LAC No. of SHG's formed 18 Total Nonarable land

28 Ha

Total Area 755 Hactare No. of UG's formed 10 1. Pasture

10 Ha

No. of WC's formed 1 2. Govt. / waste /OTHER LAND

18 Ha

ANNUAL ACTION PLAN THROUGH PROJECT FUND S. N. NAME OF

ACTIVITY Uni

t QTY. Unit cost Amt. 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 TOTAL

FIRST YEAR SECOND YEAR

THIRD YEAR

FOURTH YEAR

FIFTH YEAR SIXTH YEAR SEVENTH YEAR

PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN

I. Administration 10% 11.33 2.27 2.27 2.265 2.265 2.265 10% 11.325 II Monitoring 1% 1.13 0.23 0.23 0.227 0.227 0.227 1% 1.133 III Evaluation 1% 1.13 0.566 0.566 1% 1.133 IV Entry point activity 4% 4.53 42 4.53 4% 4.530

V Inst. & Capacity Building

5% 5.66 1.98 1.70 1.416 0.283 0.283 5% 5.663 VI DPR Preparation 1% 1.13 1 0.680 1 0.45 1% 1.133

TOTAL (A) 24.92 0.680 9.46 4.19 4.473 2.775 2.775 0.566 24.915

W/S WORK PHASE

VII NRM 60% 67.950 0.000 0.00 0.00 8.49 33.975 25.481 2.042 0.000 69.992

1

Conservation measures for areable land (private land)

(i) Farm Pond/Khet Talai Nos

5 180000 9.00 0 0.00 0 0.00 1 1.13 3 4.500 2 3.375 0 0.000 0 0.000 5 9.000 (ii) Khadeen Nos 1 500000 5.00 0 0.00 0 0.00 0 0.63 1 2.500 0 1.875 0 0.000 0 0.000 1 5.000

(iii) Repair of existing Khadeen Nos

0 180000 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000

Page 53: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

53

(iv) Tanka Nos 24 150000 36.00 0 0.00 0 0.00 3 4.50 12 18.000 9 13.500 0 0.000 0 0.000 24 36.000 (v) Vegitative Barrier m 1829 175 3.20 0 0.00 0 0.00 229 0.40 914 1.600 686 1.200 0 0.000 0 0.000 1829 3.200

(vi) Renovation of existing tanka Nos

5 50000 2.50 0 0.00 0 0.00 1 0.31 3 1.250 2 0.938 0 0.000 0 0.000 5 2.500

2 Conservation measures for non areable land

0 0.00 0 0.000 0 0.000

(i) Plantation Ha 10 122500 12.25 0 0.00 0 0.00 1 1.53 5 6.125 2 2.552 2.042 8 12.250 (ii) Renovation of nadi Nos 0 1600000 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 (iii) stangle Trenches Nos 0 300 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000

3 Drainage line treatment

0 0.00 0 0.000 0 0.000 (i) LSCD Nos 0 10000 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 (ii) Drop spilway Nos 0 165000 0.00 0.000 0.00 0.00 0 0.00 0 0.000 0 0.000 0.000 0 0.000 (iii) Anicuts Nos 0 800000 0.00 0.000 0.00 0.00 0 0.00 0.000 0 0.000 0.000 0 0.000

TOTAL (B) 1868 67.95 0 0.00 233 8.49 934 33.975 699 23.440 0 2.042 0.000 1872 67.950

VIII Production System and micro enterprise

15% 16.99 0.00 0.00 3.40 3.398 3.398 3.398 3.398 15% 16.988

X CONSOLIDATED PHASE

3% 3.40 0.00 0.00 0.00 0.000 0.000 2.039 1.359 3% 3.398

GRAND TOTAL 113.25 0.68 9.46 16.08 41.85 29.61 10.25 5.32 113.25

Page 54: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

54

Name of the project BARMER (IWMP)-VII Macro/Micro 30/1-11 Geographical Area 5212.5 Ha

G.P.(TOTAL) BOOTH RTHODAN BIJRAD DHOK Scheme IWMP Effective Area 4773 Ha

Block CHOHTAN Date of Sanction 30.01.2009 Total Arable land

4584 Ha

District. BARMER Date of Appoval of the work plan

1. Irrigated 70 Ha

Village Covered 5 NO. 2. Unirrigated

4514 Ha

Project outlay 715.95 LAC No. of SHG's formed 25 Total Nonarable land

629 Ha

Total Area 4773 Hactare No. of UG's formed 20 1. Pasture

171 Ha

No. of WC's formed 3 2. Govt. / waste /OTHER LAND

458 Ha

ANNUAL ACTION PLAN THROUGH PROJECT FUND S. N. NAME OF

ACTIVITY Uni

t QTY. Unit cost Amt. 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 TOTAL

FIRST YEAR SECOND YEAR

THIRD YEAR

FOURTH YEAR

FIFTH YEAR SIXTH YEAR SEVENTH YEAR

PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN

I. Administration 10% 71.60 14.32 14.32 14.319 14.319 14.319 10% 71.595 II Monitoring 1% 7.16 1.43 1.43 1.432 1.432 1.432 1% 7.160 III Evaluation 1% 7.16 3.580 3.580 1% 7.160 IV Entry point activity 4% 28.64 42 28.64 4% 28.638

V Inst. & Capacity Building

5% 35.80 12.53 10.74 8.949 1.790 1.790 5% 35.798 VI DPR Preparation 1% 7.16 1 4.296 1 2.86 1% 7.160

TOTAL (A) 157.51 4.296 59.78 26.49 28.280 17.541 17.541 3.580 157.509

W/S WORK PHASE

VII NRM 60% 429.570 0.00 0.00 53.70 214.785 161.089 7.863 0.000 437.433

1

Conservation measures for areable land (private land)

(i) Farm Pond/Khet Talai Nos

30 180000 54.00 0 0.00 0 0.00 4 6.75 15 27.000 11 20.250 0 0.000 0 0.000 30 54.000 (ii) Khadeen Nos 3 500000 15.00 0 0.00 0 0.00 0 1.88 2 7.500 1 5.625 0 0.000 0 0.000 3 15.000

(iii) Repair of existing Khadeen Nos

0 180000 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 (iv) Tanka Nos 140 150000 210.00 0 0.00 0 0.00 18 26.25 70 105.000 53 78.750 0 0.000 0 0.000 140 210.000

Page 55: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

55

(v) Vegitative Barrier m 9937 175 17.39 0 0.00 0 0.00 1242 2.17 4969 8.695 3726 6.521 0 0.000 0 0.000 9937 17.390

(vi) Renovation of existing tanka Nos

44 50000 22.00 0 0.00 0 0.00 6 2.75 22 11.000 17 8.250 0 0.000 0 0.000 44 22.000

2 Conservation measures for non areable land

0 0.00 0 0.000 0 0.000

(i) Plantation Ha 40 117950 47.18 0 0.00 0 0.00 5 5.90 20 23.590 8 9.829 7.863 33 47.180 (ii) Renovation of nadi Nos 4 1600000 64.00 0 0.00 0 0.00 1 8.00 2 32.000 2 24.000 0 0.000 4 64.000 (iii) stangle Trenches Nos 0 300 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000

3 Drainage line treatment

0 0.00 0 0.000 0 0.000 (i) LSCD Nos 0 10000 0.00 0 0.00 0 0.00 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 (ii) Drop spilway Nos 0 165000 0.00 0.00 0 0.00 0 0.000 0 0.000 0.000 0 0.000 (iii) Anicuts Nos 0 800000 0.00 0.00 0 0.00 0.000 0 0.000 0.000 0 0.000

TOTAL (B) 10165 429.57 0 0.00 1271 53.70 5083 214.785 3805 153.225 0 7.863 0.000 10191 429.570

VIII Production System and micro enterprise

15% 107.39 0.00 0.00 21.48 21.479 21.479 21.479 21.479 15% 107.393

X CONSOLIDATED PHASE

3% 21.48 0.00 0.00 0.00 0.000 0.000 12.887 8.591 3% 21.479

GRAND TOTAL 715.95 4.30 59.78 101.66 264.54 192.24 59.77 33.65 715.95

Page 56: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

56

ANNUAL ACTION PLAN THROUGH CONVERGANCE

Name of the project BARMER(IWMP)-VII Macro/Micro Cluster Geographical Area 3460.5 Ha G.P-1 BOOTH RATHODAN Scheme IWMP Effective Area 3026 Ha Block CHOHTAN Date of Sanction 30.01.2009 Total Arable land 2875 Ha

District. BARMER Date of Appoval of the work plan

1. Irrigated

70 Ha

Village Covered 3 NO. 2. Unirrigated 2805 Ha

Project outlay 453.9 LAC No. of SHG's formed 7 Total Nonarable land 586 Ha

Total Area 3026 Hactare No. of UG's formed 10 1. Pasture 151 Ha

No. of WC's formed 1 2. Govt. / waste /OTHER LAND 435 Ha

ANNUAL ACTION PLAN THROUGH CONVERGANCE

S. N. NAME OF ACTIVITY Unit QTY.

Unit cost Amt. Name of scheme 2011-12 2012-13 2013-14 2014-15 2015-16

TOTAL THIRD YEAR FOURTH YEAR

FIFTH YEAR SIXTH YEAR SEVENTH YEAR

PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN

I. Administration

II Monitoring

III Evaluation

IV Entry point activity

V Inst. & Capacity Building

VI DPR Preparation

TOTAL (A)

W/S WORK PHASE VII NRM

1 Conservation measures for areable land (private land)

(i) Farm Pond Nos 34 180000 61.20 Agg Ext. 7 12.60 10 18.00 9 16.20 8 14.40 34 61.20 (ii) Khadeen Nos 13 500000 65.00 NREGA 3 15.00 4 20.00 3 15.00 3 15.00 13 65.00

Page 57: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

57

(iii) Repair of existing Khadeen Nos 0 180000 0.00 NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (iv) Vegitative barrier m 1408 175 2.46 282 0.49 422 0.74 352 0.62 352 0.62 1408 2.46 (v) Tanka Nos 566 150000 849.00 NREGA 113 169.50 170 255.00 142 213.00 141 211.50 566 849.00 (vI) Renovation of Tanka Nos 0 50000 0.00 NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

2 Conservation measures for non areable land

(i) Plantation Ha 50 113400 56.70 NREGA 10 11.34 15 17.01 13 14.74 12 13.61 50 56.70

(iii) Renovation of nadi Nos 3 1600000 48.00 NREGA 1 16.00 1 16.00 1 16.00 0 0.00 3 48.00 (iv) stangle Trenches Nos 0 300 0.00 NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 3 Drainage line treatment (i) LSCD Nos 0 5000 0.00 NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (ii) Drop Spilway Nos 0 165000 0.00 NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (iii) Anicuts Nos 0 800000 0.00 NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

TOTAL (B) 1082.36 416 224.93 622 326.75 520 275.56 516 255.12 0 0.00 2074 1082.36 VIII Production System and

micro enterprise

I Arable Land

Production System

-1 Crop Demonstration i Single Crop No. 200 870 1.74 Agg Ext. 40 0.35 60 0.52 50 0.44 50 0.44 200 1.74 ii Enter Cropping No. 125 700 0.88 Agg Ext. 25 0.18 38 0.27 31 0.22 31 0.22 125 0.88

-2 Agro Forestry No. 36093 15 5.41 Agg Ext. 7219 1.08 10828 1.62 9023 1.35 9023 1.35 36093 5.41 -3 Dry land Horticulture No. 11710 60 7.03 Agg Ext. 2342 1.41 3513 2.11 2928 1.76 2927 1.76 11710 7.03 -4 Homestead Kitchen

Garden No. 330 500 1.65

Agg Ext. 66 0.33 99 0.50 83 0.42 82 0.41 330 1.65

-5 Organic Farming 0 0.00 Agg Ext. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 i Compost Pit No. 210 1000 2.10 Agg Ext. 42 0.42 63 0.63 53 0.53 52 0.52 210 2.10 ii Vermi Compost Unit No. 25 2200 0.55 Agg Ext. 5 0.11 8 0.18 6 0.13 6 0.13 25 0.55

-6 Household Production System (For Marginal Farmer and landless Labour )

0 0.00

0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 i Small Live Stock – Goat and Sheep Rearing

No. 102 10000 10.20 Bank Loaning

20 2.00 31 3.10 26 2.60 25 2.50 102 10.20 ii Service sector Carpentry Tailoring. Blacksmith. Repair shop for Cycle/ Two wheelers etc.

No. 15 5000 0.75

Bank Loaning

3 0.15 5 0.25 4 0.20 3 0.15 15 0.75 -7 Water Tank. No. 30 50000 15.00 Agg Ext. 6 3.00 9 4.50 8 4.00 7 3.50 30 15.00 -8 HDPE/ PVC Pipe No. 42 15000 6.30 Agg Ext. 8 1.20 13 1.95 11 1.65 10 1.50 42 6.30

Page 58: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

58

-9 Nepesek Spraier by hand mounted

No. 25 650 0.16 Agg Ext.

5 0.03 8 0.05 6 0.04 6 0.04 25 0.16 -10 Nepesek Spraier by foot

mounted No. 20 800 0.16

Agg Ext. 4 0.03 6 0.05 5 0.04 5 0.04 20 0.16

-11 Hand rotetary duster No. 40 800 0.32 Agg Ext. 8 0.06 12 0.10 10 0.08 10 0.08 40 0.32 -12 Seed cum fertilizer drill No. 24 15000 3.60 Agg Ext. 5 0.75 7 1.05 6 0.90 6 0.90 24 3.60 -13 Isopam (Threser) No. 10 40000 4.00 Agg Ext. 2 0.80 3 1.20 3 1.20 2 0.80 10 4.00 -14 Drip irrigation set No. 0 23000 0.00 Agg Ext. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -15 Sprinkler irrigation set No. 15 19000 2.85 Agg Ext. 3 0.57 5 0.95 4 0.76 3 0.57 15 2.85

Total - 62.70 9803 12.47 14708 19.02 12257 16.31 12248 14.90 0 0.00 49016 62.70 -1 Over seeding in Pasture

land Hac. 81 860 0.70

NREGA 16 0.14 24 0.21 20 0.17 21 0.18 81 0.70

-2 Over seeding in Non Arable land

Hac 410 220 0.90 NREGA

82 0.18 123 0.27 103 0.23 102 0.22 410 0.90 Total 491 1.60 98 0.32 147 0.48 123 0.40 123 0.41 0 0.00 491 1.60 III Live Stock Management 0.00 -1 Fodder Demonstration No. 25 900 0.23

Animal husbandary

5 0.05 8 0.07 6 0.05 6 0.05 25 0.23 -2 Mangers Distribution No. 0 400 0.00

Animal husbandary

0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -3 Animal Health Camps No. 10 15000 1.50

Animal husbandary

2 0.30 3 0.45 3 0.45 2 0.30 10 1.50 Total 1.73 7 0.35 11 0.52 9 0.50 8 0.35 0 0.00 35 1.73

Total Production System

66.02

9908 13.13 14866 20.02 12389 17.21 12379 15.66 0 0.00 49542 66.02

X CONSOLIDATED PHASE

GRAND TOTAL 1148.39 10324 238.07 15488 346.76 12909 292.77 12895 270.79 0 0.00 51616 1148.39

Page 59: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

59

Name of the project BARMER(IWMP)-VII Macro/Micro Cluster Geographical Area 997 Ha G.P-2 BIJRAD(SUKALIYA) Scheme IWMP Effective Area 992 Ha Block CHOHTAN Date of Sanction 30.01.2009 Total Arable land 982 Ha

District. BARMER Date of Appoval of the work plan

1. Irrigated

0 Ha

Village Covered 3 NO. 2. Unirrigated 982 Ha

Project outlay 453.9 LAC No. of SHG's formed 7 Total Nonarable land 15 Ha

Total Area 3026 Hactare No. of UG's formed 10 1. Pasture 10 Ha

No. of WC's formed 1 2. Govt. / waste /OTHER LAND 5 Ha

ANNUAL ACTION PLAN THROUGH CONVERGANCE

S. N. NAME OF ACTIVITY Unit QTY.

Unit cost AMOUNT Name of scheme 2011-12 2012-13 2013-14 2014-15 2015-16

TOTAL THIRD YEAR FOURTH YEAR

FIFTH YEAR SIXTH YEAR SEVENTH YEAR

PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN

I. Administration

II Monitoring

III Evaluation

IV Entry point activity

V Inst. & Capacity Building

VI DPR Preparation

TOTAL (A)

W/S WORK PHASE

VII NRM

1 Conservation measures for areable land (private land)

(i) Farm Pond Nos 5 180000 9.00

Agg Ext. 1 1.80 2 3.60 1 1.80 1 1.80 5 9.00

Page 60: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

60

(ii) Khadeen Nos 5 500000 25.00

NREGA 1 5.00 2 10.00 1 5.00 1 5.00 5 25.00

(iii) Repair of existing Khadeen Nos 0 180000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(iv) Vegitative barrier m 3967 175 6.94

793 1.39 1190 2.08 992 1.74 992 1.74 3967 6.94

(v) Tanka Nos 220 150000 330.00

NREGA 44 66.00 66 99.00 55 82.50 55 82.50 220 330.00

(vI) Renovation of Tanka Nos 0 50000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

2 Conservation measures for non areable land

(i) Plantation Ha 0 122500 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(iii) Renovation of nadi Nos 4 1600000 64.00

NREGA 1 16.00 1 16.00 1 16.00 1 16.00 4 64.00

(iv) stangle Trenches Nos 0 300 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

3 Drainage line treatment

(i) LSCD

Nos 0 5000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(ii) Drop Spilway

Nos 0 165000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(iii) Anicuts

Nos 0 800000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

TOTAL (B) 434.94

840 90.19 1261 130.68 1050 107.04 1050 107.04 0 0.00 4201 434.94

VIII Production System and micro enterprise

I Arable Land

Production System

-1 Crop Demonstration

i Single Crop No. 400 870 3.48

Agg Ext. 80 0.70 120 1.04 100 0.87 100 0.87 400 3.48

ii Enter Cropping No. 250 700 1.75 Agg Ext.

50 0.35 75 0.53 63 0.44 62 0.43 250 1.75

Page 61: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

61

-2 Agro Forestry No. 45000 15 6.75 Agg Ext.

9000 1.35 13500 2.03 11250 1.69 11250 1.69 45000 6.75 -3 Dry land Horticulture No. 7900 60 4.74

Agg Ext. 1580 0.95 2370 1.42 1975 1.19 1975 1.19 7900 4.74

-4 Homestead Kitchen Garden

No. 455 500 2.28 Agg Ext.

91 0.46 137 0.69 114 0.57 113 0.57 455 2.28 -5 Organic Farming 0 0.00

Agg Ext. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

i Compost Pit No. 215 1000 2.15 Agg Ext.

43 0.43 65 0.65 54 0.54 53 0.53 215 2.15 ii Vermi Compost Unit No. 45 2200 0.99

Agg Ext. 9 0.20 14 0.31 11 0.24 11 0.24 45 0.99

-6 Household Production System (For Marginal Farmer and landless Labour )

0 0.00

0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 i Small Live Stock – Goat and Sheep Rearing

No. 430 10000 43.00

Bank Loaning

86 8.60 129 12.90 108 10.80 107 10.70 430 43.00 ii Service sector Carpentry Tailoring. Blacksmith. Repair shop for Cycle/ Two wheelers etc.

No. 25 5000 1.25

Bank Loaning

5 0.25 8 0.40 6 0.30 6 0.30 25 1.25 -7 Water Tank. No. 15 50000 7.50

Agg Ext. 3 1.50 5 2.50 4 2.00 3 1.50 15 7.50

-8 HDPE/ PVC Pipe No. 10 15000 1.50 Agg Ext.

2 0.30 3 0.45 3 0.45 2 0.30 10 1.50 -9 Nepesek Spraier by hand

mounted No. 5 650 0.03

Agg Ext. 1 0.01 2 0.01 1 0.01 1 0.01 5 0.03

-10 Nepesek Spraier by foot mounted

No. 5 800 0.04 Agg Ext.

1 0.01 2 0.02 1 0.01 1 0.01 5 0.04 -11 Hand rotetary duster No. 25 800 0.20

Agg Ext. 5 0.04 8 0.06 6 0.05 6 0.05 25 0.20

-12 Seed cum fertilizer drill No. 20 15000 3.00 Agg Ext.

4 0.60 6 0.90 5 0.75 5 0.75 20 3.00

Page 62: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

62

-13 Isopam (Threser) No. 13 40000 5.20 Agg Ext.

3 1.20 4 1.60 3 1.20 3 1.20 13 5.20 -14 Drip irrigation set No. 0 23000 0.00

Agg Ext. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

-15 Sprinkler irrigation set No. 20 19000 3.80 Agg Ext.

4 0.76 6 1.14 5 0.95 5 0.95 20 3.80 Total - 87.66

10967 17.69 16454 26.64 13709 22.05 13703 21.28 0 0.00 54833 87.66

-1 Over seeding in Pasture land

Hac. 0 860 0.00 NREGA

0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -2 Over seeding in Non

Arable land Hac 5 220 0.01

NREGA 1 0.00 2 0.00 1 0.00 1 0.00 5 0.01

Total 0 0.01

1 0.00 2 0.00 1 0.00 1 0.00 0 0.00 5 0.01

III Live Stock Management 0.00

-1 Fodder Demonstration No. 75 900 0.68 Animal

husbandary 15 0.14 23 0.21 19 0.17 18 0.16 75 0.68 -2 Mangers Distribution No. 274 400 1.10 Animal

husbandary 55 0.22 82 0.33 69 0.28 68 0.27 274 1.10 -3 Animal Health Camps No. 10 15000 1.50 Animal

husbandary 2 0.30 3 0.45 3 0.45 2 0.30 10 1.50 Total 3.27

72 0.66 108 0.99 91 0.90 88 0.73 0 0.00 359 3.27

Total Production System

90.94

11040 18.35 16564 27.63 13801 22.95 13792 22.01 0 0.00 55197 90.94

X CONSOLIDATED PHASE

GRAND TOTAL 525.88

11880 108.54 17825 158.31 14851 129.98 14842 129.05 0 0.00 59398 525.88

Page 63: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

63

Name of the project BARMER(IWMP)-VII Macro/Micro Cluster Geographical Area 755 Ha G.P-3 DHOK(GHONIYA) Scheme IWMP Effective Area 755 Ha Block CHOHTAN Date of Sanction 30.01.2009 Total Arable land 727 Ha

District. BARMER Date of Appoval of the work plan

1. Irrigated

0 Ha

Village Covered 3 NO. 2. Unirrigated 727 Ha

Project outlay 453.9 LAC No. of SHG's formed 7 Total Nonarable land 2299 Ha

Total Area 3026 Hactare No. of UG's formed 10 1. Pasture 10 Ha

No. of WC's formed 1 2. Govt. / waste /OTHER LAND 2289 Ha

ANNUAL ACTION PLAN THROUGH CONVERGANCE

S. N. NAME OF ACTIVITY Unit QTY.

Unit cost AMOUNT Name of scheme 2011-12 2012-13 2013-14 2014-15 2015-16

TOTAL THIRD YEAR FOURTH YEAR

FIFTH YEAR SIXTH YEAR SEVENTH YEAR

PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN

I. Administration

II Monitoring

III Evaluation

IV Entry point activity

V Inst. & Capacity Building

VI DPR Preparation

TOTAL (A)

W/S WORK PHASE

VII NRM

1 Conservation measures for areable land (private land)

(i) Farm Pond Nos 2 180000 3.60

Agg Ext. 0 0.00 1 1.80 1 1.80 0 0.00 2 3.60

Page 64: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

64

(ii) Khadeen Nos 9 500000 45.00

NREGA 2 10.00 3 15.00 2 10.00 2 10.00 9 45.00

(iii) Repair of existing Khadeen Nos 0 180000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(iv) Vegitative barrier m 4155 175 7.27

831 1.45 1247 2.18 1039 1.82 1038 1.82 4155 7.27

(v) Tanka Nos 176 150000 264.00

NREGA 35 52.50 53 79.50 44 66.00 44 66.00 176 264.00

(vI) Renovation of Tanka Nos 27 50000 13.50

NREGA 5 2.50 8 4.00 7 3.50 7 3.50 27 13.50

2 Conservation measures for non areable land

(i) Plantation Ha 0 122500 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(iii) Renovation of nadi Nos 0 1600000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(iv) stangle Trenches Nos 0 300 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

3 Drainage line treatment

(i) LSCD

Nos 0 5000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(ii) Drop Spilway

Nos 0 165000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(iii) Anicuts

Nos 0 800000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

TOTAL (B) 333.37

873 66.45 1312 102.48 1093 83.12 1091 81.32 0 0.00 4369 333.37

VIII Production System and micro enterprise

I Arable Land

Production System

-1 Crop Demonstration

i Single Crop No. 270 870 2.35

Agg Ext. 54 0.47 81 0.70 68 0.59 67 0.58 270 2.35

ii Enter Cropping No. 280 700 1.96 Agg Ext.

56 0.39 84 0.59 70 0.49 70 0.49 280 1.96

Page 65: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

65

-2 Agro Forestry No. 48535 15 7.28 Agg Ext.

9707 1.46 14561 2.18 12134 1.82 12133 1.82 48535 7.28 -3 Dry land Horticulture No. 7990 60 4.79

Agg Ext. 1598 0.96 2397 1.44 1998 1.20 1997 1.20 7990 4.79

-4 Homestead Kitchen Garden

No. 125 500 0.63 Agg Ext.

25 0.13 38 0.19 31 0.16 31 0.16 125 0.63 -5 Organic Farming 0 0.00

Agg Ext. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

i Compost Pit No. 30 1000 0.30 Agg Ext.

6 0.06 9 0.09 8 0.08 7 0.07 30 0.30 ii Vermi Compost Unit No. 2 2200 0.04

Agg Ext. 0 0.00 1 0.02 1 0.02 0 0.00 2 0.04

-6 Household Production System (For Marginal Farmer and landless Labour )

18 0.00

4 0.00 5 0.00 5 0.00 4 0.00 18 0.00 i Small Live Stock – Goat and Sheep Rearing

No. 35 10000 3.50

Bank Loaning

7 0.70 11 1.10 9 0.90 8 0.80 35 3.50 ii Service sector Carpentry Tailoring. Blacksmith. Repair shop for Cycle/ Two wheelers etc.

No. 10 5000 0.50

Bank Loaning

2 0.10 3 0.15 3 0.15 2 0.10 10 0.50 -7 Water Tank. No. 5 50000 2.50

Agg Ext. 1 0.50 2 1.00 1 0.50 1 0.50 5 2.50

-8 HDPE/ PVC Pipe No. 3 15000 0.45 Agg Ext.

1 0.15 1 0.15 1 0.15 0 0.00 3 0.45 -9 Nepesek Spraier by hand

mounted No. 2 650 0.01

Agg Ext. 0 0.00 1 0.01 1 0.01 0 0.00 2 0.01

-10 Nepesek Spraier by foot mounted

No. 5 800 0.04 Agg Ext.

1 0.01 2 0.02 1 0.01 1 0.01 5 0.04 -11 Hand rotetary duster No. 5 800 0.04

Agg Ext. 1 0.01 2 0.02 1 0.01 1 0.01 5 0.04

-12 Seed cum fertilizer drill No. 3 15000 0.45 Agg Ext.

1 0.15 1 0.15 1 0.15 0 0.00 3 0.45

Page 66: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

66

-13 Isopam (Threser) No. 8 40000 3.20 Agg Ext.

2 0.80 2 0.80 2 0.80 2 0.80 8 3.20 -14 Drip irrigation set No. 0 23000 0.00

Agg Ext. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

-15 Sprinkler irrigation set No. 5 19000 0.95 Agg Ext.

1 0.19 2 0.38 1 0.19 1 0.19 5 0.95 Total - 29.00

11467 6.07 17203 8.99 14336 7.22 14325 6.72 0 0.00 57331 29.00

-1 Over seeding in Pasture land

Hac. 0 860 0.00 NREGA

0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -2 Over seeding in Non

Arable land Hac 18 220 0.04

NREGA 4 0.01 5 0.01 5 0.01 4 0.01 18 0.04

Total 0 0.04

4 0.01 5 0.01 5 0.01 4 0.01 0 0.00 18 0.04

III Live Stock Management 0.00

-1 Fodder Demonstration No. 45 900 0.41 Animal

husbandary 9 0.08 14 0.13 11 0.10 11 0.10 45 0.41 -2 Mangers Distribution No. 35 400 0.14 Animal

husbandary 7 0.03 11 0.04 9 0.04 8 0.03 35 0.14 -3 Animal Health Camps No. 10 15000 1.50 Animal

husbandary 2 0.30 3 0.45 3 0.45 2 0.30 10 1.50 Total 2.05

18 0.41 28 0.62 23 0.59 21 0.43 0 0.00 90 2.05

Total Production System

31.08

11489 6.49 17236 9.62 14364 7.82 14350 7.16 0 0.00 57439 31.08

X CONSOLIDATED PHASE

GRAND TOTAL 364.45

12362 72.94 18548 112.10 15457 90.93 15441 88.48 0 0.00 61808 364.45

Page 67: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

67

Name of the project BARMER(IWMP)-VII Macro/Micro Cluster Geographical Area 5212.5 Ha G.P.(TOTAL) BOOTH RATHODAN. DHOK . BIJRAD Scheme IWMP Effective Area 4773 Ha Block CHOHTAN Date of Sanction 30.01.2009 Total Arable land 4584 Ha

District. BARMER Date of Appoval of the work plan

1. Irrigated

70 Ha

Village Covered 3 NO. 2. Unirrigated 4514 Ha

Project outlay 453.9 LAC No. of SHG's formed 7 Total Nonarable land 2900 Ha

Total Area 3026 Hactare No. of UG's formed 10 1. Pasture 171 Ha

No. of WC's formed 1 2. Govt. / waste /OTHER LAND 2729 Ha

ANNUAL ACTION PLAN THROUGH CONVERGANCE

S. N. NAME OF ACTIVITY Unit QTY.

Unit cost AMOUNT Name of scheme 2011-12 2012-13 2013-14 2014-15 2015-16

TOTAL THIRD YEAR FOURTH YEAR

FIFTH YEAR SIXTH YEAR SEVENTH YEAR

PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN

I. Administration

II Monitoring

III Evaluation

IV Entry point activity

V Inst. & Capacity Building

VI DPR Preparation

TOTAL (A)

W/S WORK PHASE

VII NRM

1 Conservation measures for areable land (private land)

(i) Farm Pond Nos 41 180000 73.80

Agg Ext. 8 14.40 12 21.60 10 18.00 11 19.80 41 73.80

(ii) Khadeen Nos 27 500000 135.00

NREGA 5 25.00 8 40.00 7 35.00 7 35.00 27 135.00

Page 68: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

68

(iii) Repair of existing Khadeen Nos 0 180000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(iv) Vegitative barrier m 9530 175 16.68

1906 3.34 2859 5.00 2383 4.17 2382 4.17 9530 16.68

(v) Tanka Nos 962 150000 1443.00

NREGA 192 288.00 289 433.50 241 361.50 240 360.00 962 1443.00

(vI) Renovation of Tanka Nos 27 50000 13.50

NREGA 5 2.50 8 4.00 7 3.50 7 3.50 27 13.50

2 Conservation measures for non areable land

(i) Plantation Ha 50 122500 56.70

NREGA 10 12.25 15 18.38 13 15.93 12 14.70 50 61.25

(iii) Renovation of nadi Nos 7 1600000 112.00

NREGA 1 16.00 2 32.00 2 32.00 2 32.00 7 112.00

(iv) stangle Trenches Nos 0 300 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

3 Drainage line treatment

(i) LSCD

Nos 0 5000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(ii) Drop Spilway

Nos 0 165000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(iii) Anicuts

Nos 0 800000 0.00

NREGA 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

TOTAL (B) 1850.68

2127 361.49 3193 554.48 2663 470.10 2661 469.17 0 0.00 10644 1855.23

VIII Production System and micro enterprise

I Arable Land

Production System

-1 Crop Demonstration

i Single Crop No. 870 870 7.57

Agg Ext. 174 1.51 261 2.27 218 1.90 217 1.89 870 7.57

ii Enter Cropping No. 655 700 4.59 Agg Ext.

131 0.92 197 1.38 164 1.15 163 1.14 655 4.59 -2 Agro Forestry No. 129628 15 19.44

Agg Ext. 25926 3.89 38888 5.83 32407 4.86 32407 4.86 129628 19.44

Page 69: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

69

-3 Dry land Horticulture No. 27600 60 16.56 Agg Ext.

5520 3.31 8280 4.97 6900 4.14 6900 4.14 27600 16.56 -4 Homestead Kitchen

Garden No. 910 500 4.55

Agg Ext. 182 0.91 273 1.37 228 1.14 227 1.14 910 4.55

-5 Organic Farming 0 0.00 Agg Ext.

0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 i Compost Pit No. 455 1000 4.55

Agg Ext. 91 0.91 137 1.37 114 1.14 113 1.13 455 4.55

ii Vermi Compost Unit No. 72 2200 1.58 Agg Ext.

14 0.31 22 0.48 18 0.40 18 0.40 72 1.58 -6 Household Production

System (For Marginal Farmer and landless Labour )

0.00

0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 i Small Live Stock – Goat and Sheep Rearing

No. 567 10000 56.70

Bank Loaning

113 11.30 170 17.00 142 14.20 142 14.20 567 56.70 ii Service sector Carpentry Tailoring. Blacksmith. Repair shop for Cycle/ Two wheelers etc.

No. 50 5000 2.50

Bank Loaning

10 0.50 15 0.75 13 0.65 12 0.60 50 2.50 -7 Water Tank. No. 50 50000 25.00

Agg Ext. 10 5.00 15 7.50 13 6.50 12 6.00 50 25.00

-8 HDPE/ PVC Pipe No. 55 15000 8.25 Agg Ext.

11 1.65 17 2.55 14 2.10 13 1.95 55 8.25 -9 Nepesek Spraier by hand

mounted No. 32 650 0.21

Agg Ext. 6 0.04 10 0.07 8 0.05 8 0.05 32 0.21

-10 Nepesek Spraier by foot mounted

No. 30 800 0.24 Agg Ext.

6 0.05 9 0.07 8 0.06 7 0.06 30 0.24 -11 Hand rotetary duster No. 70 800 0.56

Agg Ext. 14 0.11 21 0.17 18 0.14 17 0.14 70 0.56

-12 Seed cum fertilizer drill No. 47 15000 7.05 Agg Ext.

9 1.35 14 2.10 12 1.80 12 1.80 47 7.05 -13 Isopam (Threser) No. 31 40000 12.40

Agg Ext. 6 2.40 9 3.60 8 3.20 8 3.20 31 12.40

Page 70: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

70

-14 Drip irrigation set No. 0 23000 0.00 Agg Ext.

0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -15 Sprinkler irrigation set No. 40 19000 7.60

Agg Ext. 8 1.52 12 2.28 10 1.90 10 1.90 40 7.60

Total - 179.35

32231 35.68 48350 53.75 40295 45.33 40286 44.58 0 0.00 161162 179.35

-1 Over seeding in Pasture land

Hac. 81 860 0.70 NREGA

16 0.14 24 0.21 20 0.17 21 0.18 81 0.70 -2 Over seeding in Non

Arable land Hac 433 220 0.95

NREGA 87 0.19 130 0.29 108 0.24 108 0.24 433 0.95

Total 0 1.65

103 0.33 154 0.49 128 0.41 129 0.42 0 0.00 514 1.65

III Live Stock Management 0.00

-1 Fodder Demonstration No. 145 900 1.31 Animal

husbandary 29 0.26 44 0.40 36 0.32 36 0.32 145 1.31 -2 Mangers Distribution No. 309 400 1.24 Animal

husbandary 62 0.25 93 0.37 77 0.31 77 0.31 309 1.24 -3 Animal Health Camps No. 30 15000 4.50 Animal

husbandary 6 0.90 9 1.35 8 1.20 7 1.05 30 4.50 Total 7.04

97 1.41 146 2.12 121 1.83 120 1.68 0 0.00 484 7.04

Total Production System

188.04

32431 37.42 48650 56.37 40544 47.57 40535 46.69 0 0.00 162160 188.04

X CONSOLIDATED PHASE

GRAND TOTAL 2038.72

34558 398.90 51843 610.84 43207 517.67 43196 515.85 0 0.00 172804 2043.27

Page 71: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

71

CHAPTER – VI

EXPECTED OUT COMES

S. No.  Item  Unit of measurement 

Pre‐project Status 

Expected Post‐project Status  Remarks 

1  Status of water table (Depth to Ground water level) Meters 78  71

2  Ground water structures repaired/ rejuvenated No. nill  nill

3  Quality of drinking water  Description Saline  Good4  Availability of drinking water  Description 8 Month 12 Month5  Change in irrigated Area   Ha 70   5006  Change in cropping/ land use pattern Description  7  Area under agricultural crop  Ha    I  Area under single crop Ha 2300  1800  Ii  Area under double crop Ha 70  500  Iii  Area under multiple crop Ha 0  3508  Change in cultivated  Area  Ha 3615  42259   Yield of Bajra  q/ha 1.15  5.25

Yield of Guar  q/ha 1.72  2.95Yield of Moong  q/ha 0.75  3.05Yield of Moth  q/ha 1.45  1.95

10   Production of Bajra  ton 131.79  575Production of Guar  ton 184.556 425Production of Moong  ton 27.075  125Production of Moth  ton 150.075 275

11  Area under vegetation  Ha Nil  5012  Area under horticulture  Ha Nil  10013  Area under fuel   Ha Nil  21814  Area under Fodder  Ha Nil  4015  Fodder production  Q 94500  15000016  Milk production  Litres/day 1750  280017  SHGs Active  No. 4  3018  No. of livelihoods  No. 45  6019  Income per house hold  Rs.in la 0.35  0.7520  Migration  No. 560  12521  SHG Federations formed  No. 4  30

Page 72: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

72

CHAPTER – VII

TECHNICAL DESIGNS AND ESTIMATES FOR PROPOSED ACTIVITIES

Nameof work :- Renovation of Talab (Nadi) Name of scheme :- IWMP

Name of Watershed Project : - Barmer(IWMP)-VII Name of Panchayat Samiti : - Chohtan

******************************

DETAILS OF MEASUREMENTS AND ABSTRACT OF COST S.No. ITEMS No. L W D QTY. Unit RATE AMOUNT

1 Earth work in excavation over areas (exceeding 30 Cm. In depth. 1.5 Mtr. in width as well as 10 Sqm. on plan) including disposal of excavated earth lead up to 50 M and lift up to 1.5 Mtr. disposed earth to be leveled and neatly dressed:All kinds of soil.

Pond 1 42.00 42.00 2.05 3616.20 Cum

Wall 4 50.60 0.60 0.90 109.30 Cum

Weir 4 2.00 0.60 0.90 4.32 Cum

Weir 2 7.00 0.60 0.90 7.56 Cum

3737.38 Cum 92.00 343838.59 2 Add extra for every additional lift of 1.5 Mtr.

or part thereof : In all kind of soils. 1 30.25 30.25 1.55 1418.35 Cum 11.00 15601.82

3 Add extra for lead including loading. unloading beyond 50 Mtr. With additional 150 Mtr. lead.

Qty. sameas per above item No.1 1418.35 Cum 33.75 47869.21

Page 73: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

73

4 Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth level 1:4:8 (1Cement :4 Course Sand :8 Graded stone aggregate 40 mm nominal size

For side slope 4 42.00 8.60 0.100 144.48 Cum Bottom 1 34.00 34.00 0.15 86.70 Cum Top 2 50.00 0.30 0.10 3.00 Cum 2 50.60 0.30 0.10 3.04 Cum 237.22 Cum 1749.00 414890.78

5 Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth level 1:3:6 (1Cement :3 Course Sand :6 Graded stone aggregate 20 mm nominal size

For side slope 4 42.00 8.60 0.075 108.36 Cum Bottom 1 34.00 34.00 0.100 115.60 Cum Top 2 50.00 0.30 0.050 1.50 Cum 2 50.60 0.30 0.050 1.52 Cum 226.98 Cum 2118.00 480739.40

6 Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth level 1:5:10 (1Cement :5 Course Sand :10Graded stone aggregate 40 mm nominal size

Wall 4 50.60 0.60 0.15 18.22 Cum

Weir 4 2.00 0.60 0.15 0.72 Cum

Weir 2 7.00 0.60 0.15 1.26 Cum

20.20 Cum 1566.00 31626.94

Page 74: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

74

7 Random Rubble stone masonary for foundation and plinth in Cement Sand Mortar above 30 Cm. thick wall in : Cement Mortar 1:6 (1-Cement:6-Sand).

Wall 4 50.60 0.45 0.30 27.32 Cum Wall 4 50.60 0.30 1.05 63.76 Cum Weir 4 2.00 0.45 0.30 1.08 Cum Weir 4 2.00 0.30 0.60 1.44 Cum Weir 2 7.00 0.45 0.30 1.89 Cum Weir 2 7.00 0.30 0.60 2.52 Cum

Deduct 2 5.80 0.30 0.60 -2.09 Cum Deduct 2 7.60 0.30 0.33 -1.50 Cum

94.42 Cum 1840.00 173727.65 8 Supply and fixing lintels 2 7.60 0.30 0.33 1.50 Cum 5817.60 8754.32 Plaster on new surface on walls in cement

sand mortar 1:6 including racking of joint etc. complete fine finished: 20mm thick.

9 Pointing on stone masonary in cement sand mortar 1:3 (1-Cement:3-Sand) : 8 50.60 0.60 242.88 Sqm

Deduct 4 5.80 0.60 -13.92 Sqm 228.96 Sqm 51.80 11860.13

10 Cement concrete flooring grade 1:2:4 (1-Cement:2-Coarse sand:4-graded stone aggregate) rounding off edges etc. but excluding the cost of nosing of steps etc. complete : 50 mm thick with 20 mm thick nominal size aggregate.

4 50.60 0.30 60.72 Sqm 204.00 12386.88

Page 75: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

75

11 Providing and laying two coats of black rubberized water proof coating after cleaning the existing surface with wire brush. surface should be free from dust. loose particle. oil and grease etc. Apply 1st coat over surface or RCC/Stone slab/Lime terrace/and MS Tanks etc. and apply 2nd coat after drying completely 1st coat (drying period 8 hours) complete in all respects (as per manufacturer's specification).

2600.80 Sqm. 53.00

12 Structural steel work in single section fixed without connecting plate including cutting. hoisting. fixing in position and applying a priming coat of approved steel primer all complete above plinth level up to 4.5 mtr. Height in joist flats. tees. angles and chhanels. Angle 40x40x5mm with drillling holes 3 nos per angle

40 0.90 wt. @3.5kg/m 126.00 Kg 52.20 6577.20

13 Supply and fixing galvanized barbed wire instead of black barbed wire for each wire line.

4 50.60 3.00 607.20 Mtr. 6.30 3825.36

14 Supply and fixing Direction and place identification sign board made out of 2mm thick M.S. sheet framed to angle iron 40x40x5mm and two vertical posts of angle iron of size 65x65x6mm 3meter long with hold fasts. stove enameled paint reflective letter symbol complete of size 120x75 cm.

1 No. 5000.00 5000.00

15 Supply and fixing angle iron gate with enameled paint complete of size 120x90cm. 1 0.90 1.20 wt. @14kg/sqm 15.12 Kg 52.20 789.26

16 Contigency 46724.63

GRAND TOTAL 1604212.17

Say Rs. 1604000.00

Page 76: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

76

Page 77: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

77

MODEL ESTIMATE OF FARM POND/KHET TALAI 1 Name of work - Farm Pond ( capacity 150000 ltrs) 2 Name of watershed project - Barmer(IWMP)-VII 3 Name of Panchayat Samiti - Chohtan

Detail & absract of work SN WORK

MEASUREMENT QTY QTY RATE AMOUNT NO. LENGTH WIDTH HEIGHT CUFT/SQRFT CUM/SQRM LABOUR TOTAL LABOUR TOTAL

1 Excavation For fundation tranches or drains including loading unloading disposal and dressing of excavated material within initial lead

0.5 x( 1849 + 225 )x 7.0 = 7259.00 Cft

1 x 167.00 x 2.00 x 1.5 = 501.00 Cft

1 x 55.00 x 2.00 x 1.5 = 165.00 Cft

1 x 75.00 x 3.50 x 3.0 = 787.50 Cft

8712.50 Cft = 246.60 Cum 75 75 18495 18495 3 R/R stone massonary in cement mortor

(1:6)(a) for fundation. 4 x 29.8 x 1.50 x 2.25 = 401.625 Cft

1 x 15.5 x 1.50 x 2.25 = 52.313 Cft

453.938 Cft = 12.85 Cum 438 1844 5628 23693 2 cement concerete well mixed in cement

mortor (1:5:10) laying in position complete including carring with maximum sixe aggrigare upto 20mm

4 x 30.25 x 18.85 x 0.50 = 1140.309 Cft

1 x 15 x 15.00 x 0.50 = 112.500 Cft

1252.809 Cft = 35.46 Cum323.0 1566 11454 55531

4 Cement concerete well mixed in cement mortor (1:2:4)laying in position complete including carring with maximum size aggrigare upto 20mm

4 x 30.25 x 18.85 x 0.25 = 570.154 Cft

1 x 15.00 x 15.00 x 0.25 = 56.250 Cft

Page 78: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

78

626.404 Cft = 17.73 Cum349 2660 6187 47154

6 Dry Bolder Piching 4 x 30.25 x 18.85 x 0.75 = 1710.463 Cft

1 x 15.00 x 15.00 x 0.75 = 168.750 Cft

7 Water course 1 x 75.00 x 2.00 x 0.75 = 112.500 Cft 2 x 75.00 x 1.75 x 0.75 = 196.875 Cft 2188.588 Cft = 61.95 Cum 68 485 4212 30044

8 Contigency 3 % 5247 Total 45976 180200 Grand Total 180200 Labour 46000 Material 134000 Total 180000

MODEL ESTIMATE OF FARM POND Material Consuption Statement

1 Cement 95 Bag

2 Sand 16.33 Cum

3 Agg 40 mm 31.91 Cum

4 Agg 20 mm 0.89 Cum

5 Soling 61.95 Cum

Page 79: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

79

Page 80: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

80

DESIGN OF KHADEEN1 Total catchment area 40.00 2 Submergence area 3.00 3 Average annual rainfall 34.74 4 Rainfall intesity 7.00 5 Side slope U/S 2.5 /1 D/S 1.5 /1 6 Seepage line slope 5 /1 7 Runoff cofficient of the catchment area is calculated by the formula as follow A1*C1+A2*C2 C= A1+A2 Where A1= cultivated land= 18.00 A2 = Hilly area= 22.00 C1= cofficient of Runoff of cultivated area= 0.30 C2=cofficient of Runoff of hilly area= 0.40 Therefor C= 0.36 8 Expected runoff from catchment area in cum Q= C I A 49330.8 Full tank level (F T L )= 99.3 Lowest levelof boundary= 97.9 Hence maximum submergence depth= 1.4 9 Capacity of khadeen upto F T L is calculated by following formula (A) Vo= h/3(Ao+A1+(Ao X A1 )1/2 x10000 Where H1= 0.20 A0= 0 A1= 1.25 Vo= 833.33 V1= h/3(A1+A2+(A1 X A2 )1/2 x10000 Where H2= 0.50 A1= 1.25 A2= 1.75 V1= 7465 V2= h/3(A2+A3+(A2 X A3 )1/2 x10000 Where H3= 0.50 A2= 1.75 A3= 2.50

Page 81: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

81

V2= 10569 V3= h/3(A3+A4+(A3 X A4 )1/2 x10000 Where H4= 0.10 A3= 2.50 A4= 3.00 V2= 2746 Capacity of khadeen = 21614

Because of expected runoff from catchment area is higher than the khadeen capacity so waste weir is required

maximum depth of submegence= 1.40 depth of overflow= 0.50 Free board= 0.50 Total ht of khadeen bund 1.90 Top width of bund= H/5+1.5 1.880 say 1.900 m Base width= 3x ht of bund+2.5x ht of bund+top width 12.35 m Seepage line = max.impound depth x 5+ max. impond depth x 2.5 10.5 m The basewidth is greater than seepageline hence safe The pipe (RCC) is placed at lowest level of the boundary . The pipe lenth is required= . 10.00 m

DESIGN OF WASTE WEIR BASIC INPUT DATA Catchment Coefficent C : 11.4 CONSTANT Catchment Area M : 0.4 Km.Sqm. Length of Waste weir L : 4.00 Meters Nallah Depth : 1.40 Meters Depth of foundation : 1.5 Meters

1. MAXIMUM DISCHARGE AT WEIR Q = C (M) ^X Where Q = Design discharge Cumec C = 11.4 for Northen India M = Area in Sq Km. X = 0.75

Page 82: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

82

Now Q is 5.73 Cumec 2. HYDRAULIC DESIGN Q = c L (h)^1.5 Where Q = Design Discharge Cumec c = 1.71 L = Length of Anicut h = Flow depth over weir So h = (Q/c L)^0.67 Now h is = 0.89 Meter Total flood lift 'd' = h+0.25 h(Free board) = 1.10 Meter 3. STRUCTURAL DESIGN (i) Head wall Height H = Nallah depth - d = 0.30 Meter Top width TW = d/(e - 1)^0.5 Where e=2.3 Now top width a = 1 Meter Bottom width BW = a+.8*H = 1.4 Meter Depth of foundation : As per test pit at site OR by Scour depth which ever is maximum Scour Depth :

D = 1.5 R Meter

Where R = 0.47(Q/H)^0.33 Now R is 1.24 Meter

Now D is 1.9 MeterReq depth 1.9 Meter

(ii) Head Wall Extension Length = H + d + 1 = 2.40 Meter Height = H + d = 1.40 Meter Top Width t = 0.6 Meter Bottom Width = t+.4(H + d) = 1.2 Meter (iii) Wing Wall Length = 2.25 d = 2.5 Meter Height H' = 1.5 d = 1.7 Meter Top width = 0.6 Meter Bottom Width = top width + .4*height = 1 Meter (iv) Side Wall Length = 1.75H +.75h +.45 = 2.7 Meter Height at junction of head wall = H + d = 1.40 Meter Height at junction of wing wall = 1.5d = 1.65 Meter Top width = 0.6 Meter Bottom Width at junction of head wall = 0.6+.4*(H+d) = 1.2 Meter Bottom Width at junction of wing wall = 0.6+.4*H' = 0.7 Meter (v) Apron Length = L = 4 Meter Width = Length of side wall - Battar of head wall = 2.3 Meter Thickness = (H + d)/4 = 0.3 Meter Required thickness 0.3 Meter (vi) Toe Wall Length = = 4 Meter

Page 83: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

83

Height = 0.6 = 0.3 Meter Top width = 0.6 Meter Bottom width = 0.6 Meter Depth of foundation = 0.3 Meter below Apron depth

4. CHECKS FOR STABILITY

Assumption 1. Unit weight of masonary = 2300 Kg 0r 2.30 Ton Per Cubic Meter 2. Unit weight of water = 1000 Kg or 1.00 Ton Per Cubic Meter S.No. Particulers Forces Lever Moment Hor Ver Arm About Toe 1. W1=H*a*2.3 0.69 0.90 0.62 2. W2=H*(b-a)*2.3/2 0.14 0.27 0.04 3. F3=h*a*1 0.89 0.90 0.80 4. F1=h*H*1 0.27 0.15 0.04 5. F2=H*H*1/2 0.04 0.10 0.00 6. U=C*1*(H+h)*b/2 0.42 0.93 0.39 Total => 0.31 1.30 3.25 1.89 (i) Safety against overturning at toe. Restoring Moment Mr = 1.46 Overturning Moment Mo = 0.43 Fs = Mr/Mo = 3.37 Fs is > 1.5 hance safe. (ii) Safety against sliding u sigma(V-U)/sigma H Where u is Cofficient of friction = 0.65 2.71 Which is > 1 hance safe. (iii) Safety against Rupture from tension x = M/V where X is distance of Resultant force which cut the base from Moment point. M is the excess Moment = Mr-Mo = 1.03 V is the net vertical force = W1+W2+F3-U = 1.30 Therefore x = 0.79 Eccentricity (e) = b/2 - x = -0.0879 b/6 = 0.23 therefore e < b/6 hance safe Fmax = Sigma V /b (1+6e/b) = 3.73 Ton/Sq.m. Dimension of structure

S.No.

Name of part

L

H

Tw

Bw

Width of C.C.

Depth of

Bed foundation 1 Head Wall 4.00 0.30 1 1.4 0.3 1.5

2 Head Wall exten. 2.40 1.40 0.6 1.2 0.3 2.5

3 Side Wall 2.7 1.40 0.6 1.2 0.3 2.2 2.7 1.65 0.6 0.7 0.3 2.2 4 Wing Wall 2.5 1.7 0.6 1 0.3 2.2 5 Apron 4 0.3 0.3 0.3 0.3 6 Toe Wall 4 0.3 0.6 0.6 0.9 0.6

Page 84: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

84

EARTHWORK CHART NAME OF WORK : CONSTRUCTION OF KHADIN NAME OF BLOCK : CHOHTAN

NAME OF WS PROJECT: BARMER(IWMP)-VII

S. NO.

CHAINAGE INTERVAL

NSL FTL TBL HT OF BUND

TOP OF BUND

BASEWIDTH OF KHADIN

X-SEC AVG. X-SEC

EARTH WORK

1 0 0 100.300 99.3 100.3 0.000 1.900 1.900 0.000 0.000 0.000 2 30 30 98.700 99.3 100.3 1.600 1.900 8.300 7.920 3.960 118.800 3 60 30 98.400 99.3 100.3 1.900 1.900 9.500 10.830 9.375 281.250 4 90 30 98.300 99.3 100.3 2.000 1.900 9.900 11.900 11.365 340.950 5 120 30 98.200 99.3 100.3 2.100 1.900 10.300 13.020 12.460 373.800 6 150 30 98.200 99.3 100.3 2.100 1.900 10.300 13.020 13.020 390.600 7 180 30 98.200 99.3 100.3 2.100 1.900 10.300 13.020 13.020 390.600 8 210 30 98.250 99.3 100.3 2.050 1.900 10.100 12.454 12.737 382.106 9 240 30 98.300 99.3 100.3 2.000 1.900 9.900 11.900 12.177 365.306 10 270 30 98.300 99.3 100.3 2.000 1.900 9.900 11.900 11.900 357.000 11 300 30 98.300 99.3 100.3 2.000 1.900 9.900 11.900 11.900 357.000 12 330 30 98.320 99.3 100.3 1.980 1.900 9.820 11.682 11.791 353.730 15 360 30 98.925 99.3 100.3 1.375 1.900 7.400 6.033 8.857 265.722 16 390 30 99.350 99.3 100.3 0.950 1.900 5.700 3.159 4.596 137.873 17 400 10 100.300 99.3 100.3 0.000 1.900 1.900 0.000 1.579 15.794 4130.532

Page 85: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

85

DETAILED ESTIMATE NAME OF WORK : CONSTRUCTION OF KHADIN NAME OF BLOCK : CHOHTAN NAME OF WS PROJECT: BARMER(IWMP)-VII (with central waste weir)

NO. ITEM No. L B H QUANTITY1 Dag belling 5cm to 7cm deeo (As per item

no. page no. of BSR irrg cricle Ajmer 1 400 6.10 2440 Sqm

2 Cutting and clearing at ordinary jungl including bushes.shurbs grasses on khadeen bund. 1 400 24.40 9760 Sqm

3 Earth work forbund in hard soil dry or moist soil inciuding laying in layers of 15cm breaking of ciods dressing to required profile with manual compaction initial lad of 30m and lift 15m(

4130.532 Cum4 excavation in ordanary murrum or earth

mixed with bajarl kankar bodders dry or moist including disposal of excavated material with intial of 30m & lift of 1.5m

Head wall 1 4.00 1.00 1.50 6.00

Cum

Head wall extention 1 1.95 1.00 1.50 2.92 side wall 1 12.70 1.00 1.50 19.05 wing wall 1 1.10 0.90 1.50 1.49 Toe wall 1 4.00 0.60 0.90 2.16 Total. 31.616

5 cement concerete well mixed in cement mortor (1:4:8)laying in position complete including carring with maximum sixe aggrigare upto 20mm (for waste weir and piller

Head wall 1 4.00 1.00 0.15 0.60

Cum

Head wall extention 1 1.95 1.00 0.15 0.29 side wall 1 12.70 1.00 0.15 1.91 wing wall 1 1.10 0.90 0.15 0.15 Toe wall 1 4.00 0.60 0.15 0.36 Apron 1 4.00 5.85 0.30 7.02 Total. 10.326

6 R.r stone massonary in cement mortor (1:6)(a) for fundation.

Head wall 1 4.00 1.00 1.35 5.40

Cum

Head wall extention 1 1.95 1.00 1.35 2.63 side wall 1 12.70 1.00 1.35 17.15 wing wall 1 1.10 0.90 1.35 1.34 Toe wall 1 4.00 0.60 0.75 1.80 Total. 28.311

7 R.r stone massonary in cement mortor (1:6)(b) for superstructure

Head wall 1 4.00 0.80 0.90 2.88

Cum

Head wall extention 1 1.95 0.80 2.40 3.74 side wall 1 7.30 0.80 2.40 14.02 wing wall 1 1.10 0.45 0.80 0.40 Toe wall 1 4.00 0.30 0.45 0.54 Total. 21.571

Page 86: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

86

8 Cement concerete well mixed in cement mortor (1:2:4)laying in position complete including carring with maximum size aggrigare upto 20mm (for waste weir and piller)

Head wall 1 4.00 0.60 0.10 0.24

Cum

Head wall extention 1 1.95 0.60 0.10 0.12 side wall 1 12.70 0.60 0.10 0.76 wing wall 1 1.10 0.60 0.10 0.07 Toe wall 1 4.00 0.45 0.10 0.18 Apron 1 4.00 5.85 0.10 2.34 Total. 3.70

9 25 mm Cement plaster in cement mortor (1:4)

Head wall 2 4.00 0.90 7.20

Sqm

Head wall extention 2 1.95 2.40 9.35 side wall 2 7.30 2.40 35.04 wing wall 2 1.10 0.80 1.76 Toe wall 2 4.00 0.45 3.60 Total. 56.948

Page 87: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

87

ABSTRACT OF ESTIMATE

NAME OF WORK : CONSTRUCTION OF KHADIN NAME OF PANCHAYAT SAMITI : CHOHTAN NAME OF WS PROJECT: BARMER(IWMP)-VII (with central waste weir)

NO. ITEM Qnty. Unit Rate Amount

Labour Total Labour Total 1 Dag belling 5cm to 7cm deep

2440.00 Sqm 0.28 0.28 683 683 2 Cutting and clearing at ordinary

jungl including bushes.shurbs grasses on khadeen bund. 9760.00 Sqm 3.70 3.70 36112 36112

3 Earth work forbund in hard soil dry or moist soil inciuding laying in layers of 15cm breaking of ciods dressing to required profile with manual compaction initial lad of 30m and lift 15m 4130.53 Cum 84 84 346965 346965

4 excavation in ordanary murrum or earth mixed with bajarl kankar bodders dry or moist including disposal of excavated material with intial of 30m & lift of 1.5m 31.62 Cum 122 122 3857 3857

5 cement concerete well mixed in cement mortor (1:4:8)laying in position complete including carring with maximum sixe aggrigare upto 20mm (for waste weir and piller

10.33 Cum 323 1749 3335 18060 6 R.r stone massonary in cement

mortor (1:6)(a) for fundation. 28.31 Cum 438 1840 12400 52092

R.r stone massonary in cement mortor (1:6)(a) for superstructure.

21.57 Cum 593 1995 12792 43035 Cement concerete well mixed in

cement mortor (1:2:4)laying in position complete including carring with maximum size aggrigare upto 20mm (for waste weir and piller)

3.70 Cum 349 2660 1293 9855 7 Cement plaster in cement mortor

(1:4) 56.95 Sqm 72 147 4100 8371 8 Contingency 3.00 % 15571 421537 500000

SAY 500000

Material

1 Cement 161 Begs 2 sand 33.59 Cum 3 Agg 20 mm 3.33 Cum 4 Agg 40 mm 28.45 Cum 5 Stone 49.88 Cum

Page 88: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

88

CROSS SECTION OF KHADIN

1.9 U/S D/S 2.5:01:00 AM 1.5:01:00 AM 1.90

1.0 12.35 (All Measurement in Meter)

Page 89: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

89

CONSTRUCTION OF KHADIN CROSS SECTIONS OF DIFFERENT COMPONENTS

0.60 CC (1:2:4) 0.30 G.l. 0.60 1.90 2.3 Stone Khranja in CM(1:6) 0.30

1.4 CC (1:3:6)

cut of Section of anicut (Head Wall .Appron & Toe Wall)

0.6 1.40 NSL 1.90 0.30 1.2 CC (1:3:6) C/S OF HEAD WALL EXTENTION 0.6 1.40 0.6 1.70 NSL NSL 0.6 0.6 0.30 0.30

1.2 CC (1:3:6)

CC (1:3:6)

C/S OF SIDE WALL At HWExt Juct. C/S OF WING WALL At.S.W. Juct.

Prepared By Checked By Approved By

Jr Engineer Asst. Engineer Ex. Engineer

Not to the Scale

All Dimension in Meter

Page 90: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

90

MODEL ESTIMATE OF VEGETATIVE BARRIER NAME OF WORK VEGETATIVE BARRIER NAME OF BLOCK CHOHTAN NAME OF

PROJECT BARMER (IWMP) -VII Lenth 100 Mtrs.

S. NO. Particular UNIT Qty Rate Amount

Labour Total Labour Total 1 Cutting and clearing at ordinary jungl

including bushes.shurbs grasses on field boundry.

1 X 100.00 X 1.00 Sq.Mtr. 100.00 3.70 3.70 370 370

2 Transportation of thor sticks from nursery to plantation site by vehical including cost of thor stick.

@ 12 sticks per Mtr. No. 1200 11 0 13200 3 Loading of planting sticks from beds to

vehiclae or unloading of planting sticks from vehicle No.

1200 0.31 0.31 372 372

4 Planting of thor sticks in plain or undulating fields. No.

1200 2.50 2.50 3000 3000

5 Contigency 3 percent 508 Total 370 17450

Labour 400 Material 17100

Total 17500 Material

Thor sticks 1200 Nos.

Page 91: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

91

Cost per running Mtr. 175

Model Estimate of Forest Plantation

Forest Platation - 20 Ha 1. Plantation Unit& 5. Periferi Lenth -1600 m 2. Plantation - 400 Per Ha 6. Periferi Lenth per Ha -107 m

3. Plantaion Distance - 5 m X 5 m 7. Labor Rate- 135 Per day 4. Model Calculation - Per ha 8. Toatl -Five Yr

Forest Year & 0 Year 20 Ha

S.NO. Work Particulars Unit Qty Labour Total Labour Total

1 Survey of the area by chain and compass. demarcation.layout and lien cutting and making kachhi muddis

Ha 20 89.60 89.60 1792 1792

2 Making cement. Bajri. Concrete block of size (15+25)/2x(15+25)/2x30 cubic cm near water wource and curing 6 times in three days. (Cement. Bajri. Concret mixture 1:4:8)

RM 2140 2.50 10.27 5350 21978

3 Suply of iron angle 35x35x5 mm of 1.6 m NO. 389 0.00 39 0 15171

4 Suply of Barbed wire Kg 1241.2 0.00 52 0 64542

5 Suply of Binding wire Kg 12.412 0.00 50 0 621

6 Cement. Bajri. concrete block transport by camle cart 0 to 5 km

NO. 389 3.9 21 1517 8169

7 Loading and unloading of cement concrete block in vehical

NO. 389 1.37 1.37 533 533

8 Fixing of cement concrete block in a pit of size 30cm x30cm x 40cm. ( Including local transport and pit digging)

NO. 389 8.15 8.15 3170 3170

9 Strenching of barbed wire and fixing it with the post with thin wire

RM 2140 0.92 0.92 1969 1969

10 Interlacing the barbed wire with locally avaialbe bushy material at a spcaing of 15 cms

RM 2140 5.48 5.48 11727 11727

Page 92: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

92

11 Mulching on shifting sand dunes usig locally available material against the wind direction in parallel lines (including cutting and trasnport of local shrubs upto a distance of 500 meters). Height of mulching should not be less than 30cms.

RM 80000 5.48 5.48 438400 438400

12 Digging of pits of size (0.50+0.40)/2m x (0.50+0.40)/2m x0.45m including alignment

NO. 8000 8.38 8.38 67040 67068

13 Cost of Plant NO. 8000 0 5.00 0 40000

14 Transportation of plants from nursery to plantation site by camel cart

NO. 8000 0 2.52 0 20160

15 Treatment of plants in nurseries using insectcides NO. 8000 0 0.55 0 4400 16 Suply of sewan Grass kg 120 0 49.97 0 5996.4

17 Construction of cattle hut NO. 1 3000 5000 3000 5000

18 Plantation Board NO. 1 200 1500 200 1500

19 Plantation Gate 1 500 5000 500 5000

20 Construction of Tanka NO. 2 35000 150000 70000 300000

20 others 1400 ;ksx%& 605198.4 1018596.48

Page 93: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

93

Forest Platation- first year 20 Ha

21 Plantaion of 400 Plant making of Thawal and first watering

NO. 8000 5.95 8.90 47600 71200

22 Casuality Plants 80 Plants per ha NO. 1600 0 8.65 0 13840

23 Seed sowing By tractor Ha 20 456 869 9120 17380

24 Water dirking 400 plants per ha four times in a year. NO. 64000 3.21 3.21 205440 205440

25 One Hoeing and weeding after rain and 3 times hoeing after watering

NO. 64000 4.55 5.05 291200 323200

26 Prooning of 10 percent Plants NO. 1000 0.95 0.95 950 950

27 Afterlook and Protection Month 12 4106.3 4106 49275 49272 Total 603585 681282

Forest Platation- second year 15 Ha

28 80 Transportation of plants From nursury to plantation site

NO. 1600 0 2.52 0 4032

29 80 plants per ha casuality Plantaion . making of Thawal and first watering

NO. 1600 8.65 8.65 13840 13840

30 four times watering of 400 plants per ha NO. 48000 3.21 3.21 154080 154080

31 Hoeing and weeding after rain and 3 times hoeing after watering

NO. 48000 4.55 5.05 218400 242400

32 Prooning of 70 percent Plants NO. 5600 0.70 0.70 3920 3920

33 Repair of fencing RM 2140 0.22 0.33 471 706

34 Afterlook and Protection Month 12 2000 2000 24000 24000

Total 414710.8 442978

Page 94: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

94

Forest Platation- third year

20 Ha

35 50 percent watering of Plants NO. 4000 3.21 3.21 12840 12840

36 Hoeing and weeding of 50 percent plants NO. 4000 2.85 2.85 11400 11400

37 Prooning of 20 percent Plants NO. 1600 0.95 0.95 1520 1520

38 Afterlook and Protection Month 12 4106 4106 49272 49272

Total 75032 75032

Forest Platation- four year 20 Ha

39 Repair of fencing RM 2140 0.22 0.33 471 706

40 a- Afterlook and Protection b- Others

Month 12 4106 4106 49272 49272

Total 49743 49978

Grant Total 1748269 2267867

Page 95: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

95

MODEL ESTIMATE OF CONSTRUCTION OF TANKA

NAME OF WAORK - CONSTRUCTION OF TANKA NAME OF BLOCK - CHOHTAN NAME OF SCHEME - IWMP (2009-10) NAME OF PROJECT - BARMER(IWMP)-VII

DETAIL AND ABSTRACT OF WORK

S.NO. PARTICULARS

MEASUREMENT IN M QTY RATE AMT

NO. LENTH WIDTH HEIGHT IN M LABOUR TOTAL LABOUR TOTAL

1 Excavation For fundation tranches or drains including loading unloading disposal and dressing of excavated material within initial lead

π/4 X 4.10 X 4.10 X 4.21 = 55.61 Cum 92.00 92.00 5116 5116

Periferi of agore π X 15.8 X 0.3 X 0.30 = 4.47 Cum 92.00 92.00 411 411 2 additional lift more

than 1.50 m π/4 X 4.10 X 4.10 X 1.50 = 19.81 Cum 11.00 11.00 218 218 3 additional lift more

than 3.00 m π/4 X 4.10 X 4.10 X 1.21 = 15.98 Cum 22.00 22.00 352 352 4 cement concerete

well mixed in cement mortor (1:5:10) laying in position complete including carring with maximum sixe aggrigare upto 20mm

π/4 X 4.10 X 4.10 X 0.25 = 3.30 Cum 323 1749 1067 5775

5 cement concerete well mixed in cement mortor (1:5:10) laying in position complete

π X 3.95 X 0.15 X 3.96 = 7.37 Cum 323 2118 2382 15618

Page 96: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

96

including carring with maximum sixe aggrigare upto 20mm

6 Centering shuttering for construction of tanka

π X 3.80 X 3.96 = 47.29 Sqm 64.3 112 3041 5297

7 R/R stone masonary for foundation in cm ( 1:6)

π X 4.15 X 0.35 X 0.45 = 2.05 −3 X 0.3 X 0.35 X 0.3 = -0.09

−3 X 0.6 X 0.35 X 0.10 = -0.06 dqy ek=k 1.90 Cum 438 1840 831 3490

8 R/R stone masonary for foundation in cm ( 1:8)

π X 15.8 X 0.3 X 0.75 = 11.17

−1 X 0.75 X 0.3 X 0.38 = -0.08 dqy ek=k 11.09 Cum 438 1752 4857 19427

9 S/F stone patties in CM ( 1:3) 50mm thick flooring in CC ( 1:2:4)

π/4 X 4.50 X 4.50 = 15.91 Sqm 171 793 2721 12617

10 50mm thick flooring in CC ( 1:2:4) π/4 X 3.80 X 3.80 = 11.35

dqy ek=k 11.35 Sqm 84 204 953 2315

11 Cement plaster 20 mm thick in cm(1:4)

π X 3.8 X 4.41 = 52.67

π X 4.5 X 0.45 = 6.36 π X 15.8 X 0.75 = 37.24 −3 X 0.3 X 0.30 = -0.27

dqy ek=k 96.01 Sqm 44 100 4224 9601 12 S/F stoneasslet fo

lintel in cm(1:4) 4 X 3.35 X 0.08 X 0.25 = 0.27

3 X 0.6 X 0.35 X 0.1 = 0.06

dqy ek=k 0.33 Cum 1921.8 5818 636 1926 13 S/l quiry rubbish in 40

mm aggregates in catchment area

π X 10 X 5.5 X 0.14 = 24.20 Cum 89 411 2154 9946

Page 97: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

97

14 s 50 mm cc 1%2%4 in 20 mm aggregates π X 10 X 5.5 = 172.86 Sqm 84 204 14520 35263

15 s/f iron angle 40X40X5mm 17 X 1.5 @

3.5kg/m = 89.25 Kg 9.7 52.2 866 4659 16 S/f barbed wire π X 15.8 X 4 = 198.63 Mt 6.30 0 1251 17 S/F jali in inlets of

tanka 3 X 0.3 X 0.3 = 0.27 Sqm 233 1071 63 289 18 S/F alluminium door

0.6 X 0.6 = 2.50 Kg 200 0 500 19 S/F iron door with grill 0.75 X 1.2 = 13.50 Kg 9.7 52.2 131 705 20 Pointing in cm (1:3)

π X 16.1 X 0.45 = 22.77 Sqm 42 51.8 956 1179

22 S/F PVC pipe for overflow = 5.30 Mt 60 0 318

23 Enalment paint on new surface 17 X 0.27 + 2 X 1.00 = 14.83 Sqm 26.20 65.00 388 964

24 S/F name plate = 1 Nos 500 0 500 25 Transportation ofmaterial lead upto 20 km 7572

TOTAL 45886 145308 CONTIGENCY 4359

GRANT TOTAL 45886 149667

SAY 150000.0 CEMENT 134 Bags Rate Distance Km Amount

SAND 15.33 Cum. 5.20 20 115 7572

AGG 20MM 15.35 Cum. 5.60 20 20 0

AGG 40MM 2.97 Cum. 5.60 20 20 0

STONE SLABE 1.40 Cum. 20 0

STONE 14.28 Cum. 5.60 20 20 0

Total 7572

Page 98: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

98

Page 99: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

99

Model Estimate of Tool Kit

Household Production System( for Marginal farmer and Land less labour ) Service sector- Tool Kit Specification Trade wise Detail of tools requirement in one set 1. One set of carpentry tools COST RS. 4000/ Kit S.No. Name of tools Specification Quantity

1 Hand saw Size 15” 1 No 2 Hand saw Size 12” 1 No 3 Screw driver Size 8”x25mm 1 No 4 Combination pliers Size 8”Make – Taparia 1 No 5 Charsi with handle Size 25 mm 1 No 6 Charsi with handle Size 18 mm 1 No 7 Charsi with handle Size 10 mm 1 No 8 Wooden Randda Big- Made of Sagwan 1 No 9 Wooden Randda Small – Made of Sagwan 1 No

10 File half round Make JK 1 No 11 File regular Make JK 1 No 12 Tee Bar carpenter frame

(shikanja) for wooden frame Size 4’x2” 1 No

13 Stone silly Size 6”- ISI Mark 1 No 14 Basola with handle Weight 800 gram 1 No 15 Ball peen harmmer Weight 300 gram Make Ambica 1 No 16 Cross peen hammer Weight 500 gram – Make Ambica 1 No 17 Measurement tape Size 10 feet- Make Freeman 1 No 18 Pincer Size 200 mm- 1 No 19 Girmit Size ½ “ 1 No 20 Tri Square Size 8” 1 No 21 Hand Operated drill Size ¼ “ 1 No 22 Steel box for Tools Size( 22”x11”) – G.I. sheet 1 No

2. One set of Mason tools COST RS. 2000/ Kit S.No. Name of tools Specification Quantity

1 Karni Size – Big- 1 No 2 Karni Size – small 1 No 3 Mashtar wooden Size 36” Made of Sagwan 1 No 4 Mashtar wooden Size 24 “ Made of Sagwan 1 No 5 Mashtar wooden Size 15” Made of Sagwan 1 No 6 Gurmala 1 No 7 Soot 1 No 8 Sabbal Heavy iron 1 No 9 L shape measurement (Gunia) 1 No 10 Level pipe(25 foot) 5 mm 1 No 11 Chiesal Size 6” . 8” Make – Taparia 1 No 12 Ball pine hammer Weight 500 gm Make – Ambica 1 No 13 Cross pine hammer Weight 300 gm Make – Ambica 1 No 14 Aluminium rib Size 60” x 4”x 1.5” 1 No 15 Measurement tape Size 10 feet Make – Freemans 1 No 16 Canvas bag for above tools Made of Heavy canvas 1 No

Page 100: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

100

3 . One set of Pottery Tools COST RS. 12000/ Kit S.No. Name of tools Specification Quantity

1 Clay lump beating hammer MS pat. Size – D 100 – 120 mm x T5-6mm. with iron pipe handle

1

2 Wooden hammer(Thapa) Sheesam Wood. Size – D6-7”x T1.25”. handle- L6”

1

3 Tasla MS Sheet. Size- D15”. SWG-20

1

4 Spade (Phawda) MS sheet. Size L 10 “x w10”. SWGT-20. fitted with Wooden Handle

1

5 Kamdai Wooden Size- 2”x 1-1.25” approx. Arc. Shap

6 Pindi Cement Various Sizes

3

7 Decoration tools MS (Banki. Sua. Piyali. Patti)

8

8 Decoration Wheel Size- H 16” x D 12-15”. Tripod Structure. Fitted with double Ball Bearing. Iron sheet 5 mm

1

9 Manual Potter Wheel Outer Dia- inner plate size – D-300mm x T-20mm. T-WT- 17 kg minimum (Casted iron body). Tripod Casted Iron Structure with Ball bearing. 2 nos. of outer rings made of T or steal of 12 mm Dia. Cross Wooden Support Structure.

1

10 Electric Potter wheel Structure dimension (25”x16”x16”) iron angle (iron angle structure 35-5) casted iron wheel dia 23”. Ball bearing -2 (6206) sealed. Shaft dia 2”. V- belt pully. WT 23-25 kg.

1

Page 101: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

101

4. One set of Footwear(Mojari) Tools COST RS. 12000/ Kit S.No. Name of tools Specification Quantity

1 Hummer Ball Pane Drop forged steel. Induction hardened. Seasoned wood handle. WT- 300 gms with wooden handle. Nylon hammer (L 240 mm. head size L80x D300mm)

2 Wooden Block Size- L 18”x W4”x T 4” 1 3 Pincer Size – 8” 1 4 Scissors Size- 9”. Steel Body. Brass Handle 1 5 Bodam / Shoe anvil Graded CI with 3 phases. WT – 4 kg

. approx. 1

6 Cutting Blade Set (Ramp) Steel with Wooden Handle. Size- L 150x W30X T6mm

set

7 Stitching Awl Steel with Sheesham Wood Handle 1 8 Sharpening Stone Size- 150x50x25mm. 109 no. 1 9 Shoe measuring Tape Size—2’ fibre/ good quality plastic

material 1

10 Lock Punch Set Steel 1 11 Eye let setting tool Steel 1 12 Round whole punch set Steel. Size – L 100 Range- 1 to 10 1 set(10 pcs.) 13 Design punch Set En-9 steel. Size – L100 1 set(3 pcs.) 14 Zig zag Steel Scissors Steel. Size- 81/2”. Grooves on

cutting edge. 1

15 Pattern Cutting Knife Steel. Size – 6” 1 16 PP Block Size- L 6” x W 6” x T 20mm 1 17 Steel Scale Size-12” and 24” 1 18 Leather Scraping Brush Size- 8” with wooden Handle 1 19 Adhesive Brush Size- 10 mm. 12 mm. 25 mm 1 20 Spring Divider Steel- Size 9” 1 21 Sant Steel- H 6” WT – 1 kg. 1 22 Sizzeore Passing Steel- Size 8” 1 23 Thread Cutter Steel with plaste handle. Size- L 100

mm 1

24 Number sety Steel Set of 10 25 Capsol Punch Size (8-10-12-16) Set 26 Brush Size 10 mm. 12mm.25mm 1 Machine Tools 1

27 HD Flat Bad Swing Machine 31 K. Branded Company 1

Page 102: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

102

5. One set of Blacksmith Tools COST RS. 6000/ Kit S.No. Name of tools Specification Quantity

1 Big Hammer Ghon – 5 kg 1 2 Hammer Ghon – 1 kg 1 3 Hammer Ghon – ½ kg 1 4 Anvil- chouka Ghon – 10 kg 1 5 Chisel- 3 Nos Ghon – 1 kg.500 kg.

750gm 1

6 Meaurement tape 3 MTR 1 7 Tringle 6” 1 8 Plie Taparia 8” 1 9 Scra drive 10” Tapana 1 10 Tin 10” 1 11 Hand operated electric hand

drill - 1

12 Sansasi- flat and round - 1 13 Table Vice - 1 14 Haksa Frame Poland type - 1

6 One set of Cycle Mechanic Tools COST RS. 6000/ Kit S.No. Name of tools Specification Quantity

1 Hammer 500gm 60.00 2 Hammer 1 kg 100.00 3 Plies 8” Taparia 180.00 4 Screw driver Taparia 6”-8”-12” 250.00 5 Pincer- 6” 6” 100.00 6 Nose plier-6” 6” 100 7 Alignment equipment cycle wheel 1000 8 Anivil – Chowka 5 kg 500.00 9 Screw wrench 10” 150.00 10 Hexa Frame polaud type 120.00 11 Spanner Set fix type 8 pcs 8 pcs 380.00 12 Electric hand drill machine 2000.00 13 Hand Skipper 10” 100.00 14 Solution 50.00 15 Water Pump Plier 100.00 16 Punch 6” 50.00 17 Hand Scissors 8” 120.00 18 Oil cane 250 gm 80.00

Page 103: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

103

Critical Assumption

• No severe droughts/ unexpected floods/ natural disasters

• Adequate funds are allocated for the same and released on time.  

• There is no significant pest/ disease attack. and if so. then it will have been contained 

before irreversible damage is done. 

• Adverse market conditions do not persist long. 

• Sound macro‐economic and growth conditions continue and the benefits are widely 

distributed particularly in the rural areas. 

• Facilitating agencies and resource providers have the required competent staff so that 

timely and appropriate technical advice and services are provided to farmers whenever 

required. 

• The Capacity Building Plan is implemented. monitored and modified to address evolving 

needs and feedback from participants. 

• The execution of the Women’s Empowerment Pedagogy is regularly monitored by the 

District and State level Implementing Agencies  Means of Verification of indicators

• Baseline surveys like household income .expenditure. health and nutrition etc at the 

beginning. mid‐term and end of the project period  

• Annual participatory assessment by communities during project period. 

• Regular project monitoring reports prepared by project monitoring teams/ agencies. 

• Membership and other Records. Minutes of Meetings maintained by the SHGs. WCs/ 

Individual beneficiaries/project‐related village and local bodies/PRIs.  

• External review missions 

• Data maintained by Government department (Revenue. Agriculture. Groundwater. 

Irrigation. Animal Husbandry 

Page 104: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

104

CHAPTER - VIII

Page 105: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

105

Page 106: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

106

Page 107: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

107

Page 108: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

108

Page 109: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

109

Page 110: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

110

Page 111: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

111

Page 112: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

112

Page 113: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

113

Page 114: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

114

Page 115: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

115

Page 116: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

116

Page 117: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

117

Page 118: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

118

Page 119: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

119

Page 120: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

120

Page 121: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

121

Page 122: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

122

Page 123: DETAIL PROJECT REPORT BARMER (IWMP)-VII YEAR 2009-10water.rajasthan.gov.in/content/dam/water/watershed... · 1 office of the asstt. engineer (pia) iwmp p.s. chohtan detail project

123