Department of TransportationORGANIZATION

GovernorDavid Y. Ige

Director of TransportationFord N. Fuchigami

Deputy AdministrationJade T. Butay

DeputyRoss M. Higashi

DeputyDarrell T. Young

DeputyEdwin H. Sniffen

Department of TransportationLEGISLATION

SB2938/HB2409 – Relating to Transportation

Increases the state fuel tax to generate additional revenues for the state highway fund by amending section 243-4, Hawaii Revised Statutes. Allows for an increase in the state motor vehicle registration fee and increases the amount of the fee to be deposited into the state highway fund by amending section 249-31, Hawaii Revised Statutes. Increases the state motor vehicle weight tax by amending section249-33, Hawaii revised Statutes.

Department of TransportationLEGISLATION

HB2086 – Relating to Transportation

Appropriates and deposits $37M in the general funds into the state highway fund as subsidy. Requires Governor to provide a plan to sustain the state highway fund.

5

Department of TransportationLEGISLATION

SB3072 – Relating to an Airport Authority

Authorizes the Governor to establish the Hawaii Airport Authority within the Department of Transportation. Sets out the appointment of members to the board of directors and powers and duties of the Hawaii Airport Authority. Transfers the aeronautics functions of the DOT to the Hawaii Airport Authority. Appropriates funds for a radar facility and a concrete pad for radar installation at Kalaeloa Airport.

Department of TransportationFY16-17 Appropriations

210,805,000

79,885,000

172,190,000

FY17 Appropriations$462.880 M

AIR HAR HWY

458,974,000

614,159,000

265,202,000

FY17 Supplemental Increase$1,338,335 B

Department of TransportationAIRPORTS DIVISION PROJECTS

Master Plan DevelopmentHonolulu International Airport

DESCRIPTIONReplace three (3) pedestrian bridge crossings between the Overseas Terminal and the Overseas Terminal Parking Structure.

CONSTRUCTION COST$17M

SCHEDULEEst. Start Jan 2018Est. Completion June 2019

Existing

Conceptual

OST Pedestrian Bridges ReplacementHonolulu International Airport (CM)

DESCRIPTIONReplace the roadway, terminal and parking structure way finding signage, including rename the terminals and gates to alpha-numeric, and baggage claims to numeric.

CONSTRUCTION COST$22M

SCHEDULEEst. Start Jan 2017Est. Completion Dec2019

Roadway/Terminal Signage ImprovementsHonolulu International Airport (CM)

Existing Signage Proposed Signage

Roadway/Terminal Signage ImprovementsHonolulu International Airport (CM)

DESCRIPTIONTicket Lobby renovations in Lobbies 4 & 6, including glass wall/ticket counters in Lobbies 4, 5 & 6.

CONSTRUCTION COST$150M

SCHEDULEEst. Start July 2017Est. Completion June 2019Lobby 8 Lobby 7

Ticket Lobby RenovationsHonolulu International Airport (CM)

DESCRIPTIONTerminal Modernization to include centralized security checkpoint, In-Line Baggage Handling System, connectivity of the north and south holdrooms for improved passenger experience and airline/airport operations.

CONSTRUCTION COST$70M

SCHEDULEEst. Start May 2016Est. Completion May 2018

Terminal Modernization, Ph. IKona International Airport at Keahole (CM)

DESCRIPTIONDemolish planter boxes fronting the ticket lobby. Enlarge holdrooms and air condition the walkways.

Ticket Lobby & Holdroom ImprovementsLihue Airport (CM)

CONSTRUCTION COST$8M

SCHEDULEEst. Start Jan 2017Est. Completion Dec 2017

DESCRIPTIONReconstruct Runway2-20.

Environmental Impact Statement to be completed in 2018.

CONSTRUCTION COST$150M

SCHEDULEEst. Start 2018Est. Completion 2020

Airport Runway ReconstructionKahului Airport (Design and CM)

Apron & Lease LotsKahului Airport (Design and CM)

This image cannot currently be displayed.

DESCRIPTIONDesign Lease Lots for Corporate and General Aviation Aircraft

CONSTRUCTION COST$60M

SCHEDULEEst. Start 2018

Holdroom and Gate ImprovementsKahului Airport (Design and CM)

DESCRIPTIONRenovate south terminal to maximize footprint and add additional gates by repositioning loading bridges.

CONSTRUCTIONCOST$50M

SCHEDULEEst. Design Start December 2016

DESCRIPTIONAt-grade consolidated facility. Proposed site is a portion of the Grove Farms property the State is in negotiations to purchase. Site will accommodate customer service, ready/return vehicles, fueling and washing facilities, and overflow vehicle storage.Customer rental and return access via existing Kapule Highway intersection. Common busing will be between passenger terminal and the consolidated rental car facility along AhukiniRoad.

Consolidated Rental Car FacilityLihue Airport (Design and CM)

Kapule Highway

Ahukini

Project Site

Department of TransportationHARBORS DIVISION PROJECTS

Honolulu Harbor, OahuKalaeloa Barbers Point Harbor, Oahu Kahului Harbor, Maui

Nawiliwili Harbor, Kauai Hilo Harbor, Hawaii Island Kawaihae Harbor, Hawaii Island

PRIMARY HARBORS

Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu

DESCRIPTIONNew Container Terminal

EST. TOTAL COST $ 430M

SCHEDULE Est. Construction Start: 2017 Ph1 Yard, 2018 Ph 2

Harbors DivisionKapalama Container TerminalHonolulu Harbor, Oahu (CM)

Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu

Harbors DivisionFuel PierKalaeloa Barbers Point Harbor, Oahu (Design and CM)

DESCRIPTIONDedicated Segmented Fuel Pier

EST. TOTAL COST $ 42M

SCHEDULE Est. Construction Start: 2019

Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu

Harbors DivisionMauka Area Infrastructure ImprovementsKalaeloa Barbers Point Harbor, Oahu (Design and CM)

DESCRIPTION• Internal Perimeter Road• Extension of Utilities• Lighting System

EST. TOTAL COST $ 37 million

SCHEDULE Est. Construction Start: 2019

Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu

Harbors DivisionYard Improvements at Acquisition PropertyKahului Harbor, Maui (Design)

DESCRIPTION

• Pavement• Fencing• Lighting system

EST. TOTAL COST $ 17.5 million

SCHEDULE Est. Construction Start: 2020

Proposed Yard Buildout

Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu

Harbors DivisionMain Entrance, South Gate and Other ImprovementsKawaihae Harbor, Hawaii Island (Design)

DESCRIPTION• Entrance Improvements• South Gate

Improvements• Yard Pavement

EST. TOTAL COST $ 6 million

SCHEDULE Est. Design & Construction Start: 2018

Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu

Harbors DivisionYard & Pier Improvements to Improve EfficienciesKaumalapau Harbor, Lanai (Design)

DESCRIPTIONKauamalapau Harbor improvements.

EST. TOTAL COST $ 14.5 million

SCHEDULE Est. Design Start: 2019

Yard contains Restricted Areasfrom the use of Heavy EquipmentDue to its Condition

Harbors DivisionAloha Tower Improvements (Design)

DESCRIPTIONAloha Tower Improvements

EST. TOTAL COST $ 18 million

SCHEDULE Est. Design Start: 2018

Harbors DivisionHarbors Division OfficeHale Ku Awa Moku (Design and CM)

DESCRIPTIONHarbors Division Office

EST. TOTAL COST $ 23 M

SCHEDULE Est. 2017

Department of TransportationHIGHWAYS DIVISION PROJECTS

State Highway System1013 Miles

GOALS

1. Better traffic flow through project area in PM

2. Reduce duration of PM peak

CONTRAFLOW1. Increase capacity in the Waianae-bound direction

2. Reduce amount of conflicting movements.

3. Implemented August 10, 2016. Hours of operation: 3:30 PM – 7:00 PM.

4. Eastbound taper begins at Lualualei Naval Rd; Westbound taper begins at Piliokahi Ave

Highways Division – Oahu

Farrington Highway PM Contraflow

Highways Division – Oahu Farrington Highway PM Contraflow Operational

Honolulu-Bound Left-Turns Prohibited When Coned Nanaikeola Street

Helelua Street

Nanakuli Avenue

Haleakala Avenue

Honolulu-Bound Left-Turn Detour1. Turn right onto Laumania Ave, then left

onto Pohakunui Ave.

2. Turn left onto Piliokahi Ave then again onto Farrington Hwy, Waianae-bound

Highways Division – Oahu H-1 Eastbound AM Shoulder Lane Vicinity of Kualakai Parkway to Kunia Road Off-Ramp

HOURS OF OPERATION: 5 AM to 9 AMWeekdays except Holidays

START DATE:August 15, 2016

Highways Division – Oahu Interstate Route H-1, H-2 and H201 Destination Sign Upgrade/Replacement Phase 2

SCOPEThe scope of work includes the removal and replacement of 12 overhead sign structures located along H-1, H201 and Moanalua Freeway.

EST. COST $ 7.0 Million

EST. SCHEDULEAnticipated RTA: Fall 2016

This image cannot currently be displayed.This image cannot currently be displayed.This image cannot currently be displayed.This image cannot currently be displayed.

 

Highways Division – Oahu Interstate Route H-1 Bridge RehabilitationKapalama Canal (Halona Street Bridge)

SCOPEReplace the existing bridge to meet current design standards.

EST. COST$6.4 Million

EST. SCHEDULEAnticipated RTA: Fall 2016

Highways Division – Oahu Kamehameha Highway, Kawela Stream Bridge Replacement

SCOPEReplace the existing bridge with a new bridge that meets current AASHTO requirements.

EST. COST $ 6.3 Million

EST. SCHEDULEAnticipated RTA: Summer 2017

Highways Division – Oahu Kamehameha HighwayHoolapa (Nanahu) Bridge Replacement

SCOPEImprove the safety and reliability of the existing bridge, through rehabilitation or replacement, addressing bridge width, load capacity, bridge railing and transitions, and bridge approaches

CONSTRUCTION COST$4.5 Million

EST. SCHEDULEAnticipated RTA: Summer 2017

Highways Division – Oahu Kamehameha Hwy - Rehabilitation of Kipapa Stream Bridge (a.k.a. Franklin D. Roosevelt Bridge)

SCOPERehabilitate the existing deficient bridge to meet current HDOT and AASHTO standards for geometrics, Bridges, lightings, etc.

EST. COST$16.9 Million

EST. SCHEDULEAnticipated RTA: Winter 2016

Highways Division -OahuPali Hwy Resurfacing, Waokanaka St. to Kamehameha Hwy, andPali Hwy Lighting Replacement, Vineyard Blvd To Kamehameha Hwy

SCOPEResurfacing the existing roadway and repaving from Waokanaka to KamehamehaHwy. Replacing existing street lighting with a flat lenses from Vineyard Blvd. to Kamehameha Hwy.Upgrading safety improvements such as metal beam guardrail and attenuators.

EST. COST$44 Million

EST. SCHEDULEAnticipated RTA: Winter 2016Lighting Replacement limits

Resurfacing limits

Highways Division – Oahu Leeward Bikeway, Phases 1, Waipio Point Access Road to Hawaii Railroad Society Train Station

SCOPEConstruct 10-foot wide asphalt concrete bike path with 2-foot shouldersPhase I - Vicinity of WaipioPoint Access Road to Hawaii Railroad Society Train StationPhase II - Hawaii Railroad Society Train Station to Lualualei Naval Road

EST. COSTPhase 1 - $9 Million

EST. SCHEDULEAnticipated RTA for Phase I:Summer 2017

Highways Division – Oahu Interstate Route H-1, Guardrail and Shoulder Improvements, Kapiolani Interchange to Ainakoa Ave

SCOPEInstallation and upgrading all guardrails, guardrail to bridge connections, bridge railings, guardrail end terminals, crash attenuators, shoulder improvements, miscellaneous drainage and other appurtenant improvements.

EST. COST$6.24 Million

EST. SCHEDULEAnticipated RTA : Winter 2016

Highways Division – Oahu Moanalua Freeway and Interstate Route H-2,Guardrail and Shoulder Improvements

SCOPEInstallation and upgrading all guardrails, guardrail to bridge connections, bridge railings, guardrail end terminals, crash attenuators, shoulder improvements, miscellaneous drainage and other appurtenant improvements.

EST. COST$6.3 Million

EST. SCHEDULEAnticipated RTA: Spring 2017

Highways Division – Oahu Moanalua Freeway (Route H-201), Highway Lighting Improvements, M.P. 1.12 to M.P. 4.09

SCOPEInstallation and upgrading of highway light systems.

EST. COST$6.3\ Million

EST. SCHEDULEAnticipated RTA: Summer 2017

Highways Division – OahuProjects Programmed in 2017

Project Title Phase $MH1 AIRPORT VIADCUT DECK REPAIRS, VICINTIY OF VALKENBERG TO MIDDLE STREET CON 20.0KAMEHAMEHA HWY, PAUMALU BRIDGE REPAIRS CON 2.5KALIHI STREET RESURFACING NIMITZ HIGHWAY TO SCHOOL STREET MP 0.00 TO MP 1.15 CON 6.9KAMEHAMEHA HIGHWAY REHABILITATION, VICINITY OF KAPUHI STREET TO DAIRY ROAD, MP 5.94 TO MP 9.72 CON 9.0MOKAPU SADDLE ROAD RESURFACING NANAMOANA STREET TO ONEAWA STREET CON 15.0FARRINGTON HWY & KAUKONAHUA RD REHABILITATION, MAKALENA BRIDGE TO WEED CIRCLE, MP 3.03 TO 7.86 CON 7.5KALANIANAOLE HWY RESURFACING, WAIMANALO BEACH PARK TO HANAUMA BAY PARK MP 5.61 TO MP 12.49 CON 9.0KAMEHAMEHA HIGHWAY RESURFACING, HAUULA HOMESTEAD RD TO NORTH PUNALUU BRIDGE CON 1.0

Highways Division – HawaiiMamalahoa Highway Drainage ImprovementsVicinity of Pu’uwa’awa’a Ranch Road

SCOPEConstruct an underground drainage system and retaining walls, and associated roadway improvements

EST CONSTRUCTION $6 million

EST SCHEDULEAnticipated Bid Date: Fall 2016

SCOPE Replace Hilea & Ninole Bridges

EST. COST$14.5 million

EST. SCHEDULEAnticipated Bid – Winter 2016

Highways Division – HawaiiMamalahoa Hwy, Hilea & Ninole Bridge Replacement

SCOPEImprove operation, capacity and safety of Queen Kaahumanu Hwy & Kawaihae Road intersection.

EST. COST$1.3 Million

EST. SCHEDULEAnticipated RTA : Winter 2016

Highways Division – HawaiiQueen Kaahumanu HighwayIntersection Improvements at Kawaihae Road

Highways Division – HawaiiProjects Programmed in 2017

Project Title Phase $MAKONI PULE HWY PAVEMENT PREVENTIVE MAINTENANCE, MP 27.3 - MP 29 CON 5.3HAWAII BELT RD, REPAIRS TO WEAKENED PAVEMENT AREAS, MP 60.6 - MP 69.7 CON 2.3KOHALA MOUNTAIN RD, REPAIRS TO WEAKENDED PAVMENT AREAS, MP 6.44 - MP 13.1 CON 4.8

SCOPEInstall milled rumble strips on centerline and shoulders, traffic signage, and stabilization in one area.

EST. TOTAL COST$3-2 million

EST. SCHEDULEAnticipated RTA: Winter 2017

Highways Division – MauiHonoapiilani Highway Safety Improvements Kapoli St. to Papalaua Beach Park

Highways Division – MauiProjects Programmed in 2017

Project Title Phase $M

KALAE HWY RESURFACING: MAUNALOA HWY - KALAUPAPA LOOKOUT, MP 0.00-5.79 CON 5.7

HANA HWY RESURFACING: HOOKIPA PARK TO KAUPAKAULA RD, MP 8.89-16.23 CON 6.5HANA HWY RESURFACING: PAIA TOWN TO HOOKIPA PARK , MP 6.7 TO MP 8.89 CON 2.5KAHEKILI HWY RESURFACING: WAIEHU BEACH RD - CAMP MALUHIA, MP 0.00-4.59 CON 3.4

CRATER ROAD PPM: MP 2.00-10.10 CON 2.7

KAHULUI BEACH RD PPM: KAAHUMANU AVE - WAIEHU BEACH RD, MP 0.0-2.62 CON 2.0

KAMEHAMEHA V HWY RESURFACING: 13.2 to 18 CON 5.0

Highways Division – Kauai Guardrail and Shoulder Improvements at Various Locations On State Highways, Kauai

SCOPEInstallation and upgrading all guardrails, guardrail to bridge connections, bridge railings, guardrail end terminals, crash attenuators, shoulder improvements, miscellaneous drainage and other appurtenant improvements.

EST. COST$1 Million

EST. SCHEDULEAdvertised on July 26, 2016

Highways Division – Kauai Kaumualii Highway,Bridge No. 7E Rehabilitation

SCOPEReplace the existing deficient bridge to meet current design standards for roadway width, load capacity, bridge railing and transition, and bridge approaches

CONSTRUCTION COST$4.5 Million

EST. SCHEDULEAnticipated RTA: Winter 2016

Highways Division – Kauai Kaumualii Highway, Hanapepe Bridge Rehabilitation

SCOPERepair existing bridge structure, including the initiation of scour prevention measures to improve bridge footings.

EST. TOTAL COST$ 25.5 Million

EST. SCHEDULEDetour road Anticipated RTA: Spring 2017

SCOPEReplace the existing deficient Kapaa Stream Bridge.Improve the intersection at Kuhio Highway and Mailihuna Road.

EST. COST$15.3 Million

EST. SCHEDULEDetour road Anticipated RTA: Summer 2017

Highways Division – Kauai Kuhio Highway - Intersection Improvements At Mailihuna Road, And Kapaa Stream Bridge Rehabilitation

Project has been obligated for constructionProject has been obligated for construction

Highways Division – Kauai Kuhio HighwayReplacement of Wainiha Bridges, Nos. 1, 2, and 3

SCOPEReplace Wainiha bridges nos. 1, 2 & 3 with structures that meet current bridge design standards. one lane width bridges will be maintained to preserve historical/cultural aspects of the highway.

CONSTRUCTION COST$23.75 million

EST. SCHEDULEDetour road Anticipated RTA: Spring 2107

Highways Division – KauaiProjects Programmed in 2017

Project Title Phase $MKUHIO HWY RESURFACING: KAPULE HWY TO NORTH LEHO DRIVE CON 6.3KUHIO HWY RESURFACING: ALIOMANU RD TO SOUTH KOOLAU RD CON 2.9KAUMUALII HWY RESURFACING: KOLOA RD TO HALEWILI RD (KALAHEO TOWN RESURFACING) CON 1.7

WAAPA RD / RICE ST / KAPULE HWY RESURFACING CON 1.0