Department of TransportationORGANIZATION
GovernorDavid Y. Ige
Director of TransportationFord N. Fuchigami
Deputy AdministrationJade T. Butay
DeputyRoss M. Higashi
DeputyDarrell T. Young
DeputyEdwin H. Sniffen
Department of TransportationLEGISLATION
SB2938/HB2409 – Relating to Transportation
Increases the state fuel tax to generate additional revenues for the state highway fund by amending section 243-4, Hawaii Revised Statutes. Allows for an increase in the state motor vehicle registration fee and increases the amount of the fee to be deposited into the state highway fund by amending section 249-31, Hawaii Revised Statutes. Increases the state motor vehicle weight tax by amending section249-33, Hawaii revised Statutes.
Department of TransportationLEGISLATION
HB2086 – Relating to Transportation
Appropriates and deposits $37M in the general funds into the state highway fund as subsidy. Requires Governor to provide a plan to sustain the state highway fund.
Department of TransportationLEGISLATION
SB3072 – Relating to an Airport Authority
Authorizes the Governor to establish the Hawaii Airport Authority within the Department of Transportation. Sets out the appointment of members to the board of directors and powers and duties of the Hawaii Airport Authority. Transfers the aeronautics functions of the DOT to the Hawaii Airport Authority. Appropriates funds for a radar facility and a concrete pad for radar installation at Kalaeloa Airport.
Department of TransportationFY16-17 Appropriations
210,805,000
79,885,000
172,190,000
FY17 Appropriations$462.880 M
AIR HAR HWY
458,974,000
614,159,000
265,202,000
FY17 Supplemental Increase$1,338,335 B
DESCRIPTIONReplace three (3) pedestrian bridge crossings between the Overseas Terminal and the Overseas Terminal Parking Structure.
CONSTRUCTION COST$17M
SCHEDULEEst. Start Jan 2018Est. Completion June 2019
Existing
Conceptual
OST Pedestrian Bridges ReplacementHonolulu International Airport (CM)
DESCRIPTIONReplace the roadway, terminal and parking structure way finding signage, including rename the terminals and gates to alpha-numeric, and baggage claims to numeric.
CONSTRUCTION COST$22M
SCHEDULEEst. Start Jan 2017Est. Completion Dec2019
Roadway/Terminal Signage ImprovementsHonolulu International Airport (CM)
Existing Signage Proposed Signage
Roadway/Terminal Signage ImprovementsHonolulu International Airport (CM)
DESCRIPTIONTicket Lobby renovations in Lobbies 4 & 6, including glass wall/ticket counters in Lobbies 4, 5 & 6.
CONSTRUCTION COST$150M
SCHEDULEEst. Start July 2017Est. Completion June 2019Lobby 8 Lobby 7
Ticket Lobby RenovationsHonolulu International Airport (CM)
DESCRIPTIONTerminal Modernization to include centralized security checkpoint, In-Line Baggage Handling System, connectivity of the north and south holdrooms for improved passenger experience and airline/airport operations.
CONSTRUCTION COST$70M
SCHEDULEEst. Start May 2016Est. Completion May 2018
Terminal Modernization, Ph. IKona International Airport at Keahole (CM)
DESCRIPTIONDemolish planter boxes fronting the ticket lobby. Enlarge holdrooms and air condition the walkways.
Ticket Lobby & Holdroom ImprovementsLihue Airport (CM)
CONSTRUCTION COST$8M
SCHEDULEEst. Start Jan 2017Est. Completion Dec 2017
DESCRIPTIONReconstruct Runway2-20.
Environmental Impact Statement to be completed in 2018.
CONSTRUCTION COST$150M
SCHEDULEEst. Start 2018Est. Completion 2020
Airport Runway ReconstructionKahului Airport (Design and CM)
Apron & Lease LotsKahului Airport (Design and CM)
This image cannot currently be displayed.
DESCRIPTIONDesign Lease Lots for Corporate and General Aviation Aircraft
CONSTRUCTION COST$60M
SCHEDULEEst. Start 2018
Holdroom and Gate ImprovementsKahului Airport (Design and CM)
DESCRIPTIONRenovate south terminal to maximize footprint and add additional gates by repositioning loading bridges.
CONSTRUCTIONCOST$50M
SCHEDULEEst. Design Start December 2016
DESCRIPTIONAt-grade consolidated facility. Proposed site is a portion of the Grove Farms property the State is in negotiations to purchase. Site will accommodate customer service, ready/return vehicles, fueling and washing facilities, and overflow vehicle storage.Customer rental and return access via existing Kapule Highway intersection. Common busing will be between passenger terminal and the consolidated rental car facility along AhukiniRoad.
Consolidated Rental Car FacilityLihue Airport (Design and CM)
Kapule Highway
Ahukini
Project Site
Department of TransportationHARBORS DIVISION PROJECTS
Honolulu Harbor, OahuKalaeloa Barbers Point Harbor, Oahu Kahului Harbor, Maui
Nawiliwili Harbor, Kauai Hilo Harbor, Hawaii Island Kawaihae Harbor, Hawaii Island
PRIMARY HARBORS
Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu
DESCRIPTIONNew Container Terminal
EST. TOTAL COST $ 430M
SCHEDULE Est. Construction Start: 2017 Ph1 Yard, 2018 Ph 2
Harbors DivisionKapalama Container TerminalHonolulu Harbor, Oahu (CM)
Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu
Harbors DivisionFuel PierKalaeloa Barbers Point Harbor, Oahu (Design and CM)
DESCRIPTIONDedicated Segmented Fuel Pier
EST. TOTAL COST $ 42M
SCHEDULE Est. Construction Start: 2019
Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu
Harbors DivisionMauka Area Infrastructure ImprovementsKalaeloa Barbers Point Harbor, Oahu (Design and CM)
DESCRIPTION• Internal Perimeter Road• Extension of Utilities• Lighting System
EST. TOTAL COST $ 37 million
SCHEDULE Est. Construction Start: 2019
Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu
Harbors DivisionYard Improvements at Acquisition PropertyKahului Harbor, Maui (Design)
DESCRIPTION
• Pavement• Fencing• Lighting system
EST. TOTAL COST $ 17.5 million
SCHEDULE Est. Construction Start: 2020
Proposed Yard Buildout
Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu
Harbors DivisionMain Entrance, South Gate and Other ImprovementsKawaihae Harbor, Hawaii Island (Design)
DESCRIPTION• Entrance Improvements• South Gate
Improvements• Yard Pavement
EST. TOTAL COST $ 6 million
SCHEDULE Est. Design & Construction Start: 2018
Harbors DivisionH.C. 10298 - Kapalama Terminal Environmental Impact Statement, Honolulu Harbor, Oahu
Harbors DivisionYard & Pier Improvements to Improve EfficienciesKaumalapau Harbor, Lanai (Design)
DESCRIPTIONKauamalapau Harbor improvements.
EST. TOTAL COST $ 14.5 million
SCHEDULE Est. Design Start: 2019
Yard contains Restricted Areasfrom the use of Heavy EquipmentDue to its Condition
Harbors DivisionAloha Tower Improvements (Design)
DESCRIPTIONAloha Tower Improvements
EST. TOTAL COST $ 18 million
SCHEDULE Est. Design Start: 2018
Harbors DivisionHarbors Division OfficeHale Ku Awa Moku (Design and CM)
DESCRIPTIONHarbors Division Office
EST. TOTAL COST $ 23 M
SCHEDULE Est. 2017
GOALS
1. Better traffic flow through project area in PM
2. Reduce duration of PM peak
CONTRAFLOW1. Increase capacity in the Waianae-bound direction
2. Reduce amount of conflicting movements.
3. Implemented August 10, 2016. Hours of operation: 3:30 PM – 7:00 PM.
4. Eastbound taper begins at Lualualei Naval Rd; Westbound taper begins at Piliokahi Ave
Highways Division – Oahu
Farrington Highway PM Contraflow
Highways Division – Oahu Farrington Highway PM Contraflow Operational
Honolulu-Bound Left-Turns Prohibited When Coned Nanaikeola Street
Helelua Street
Nanakuli Avenue
Haleakala Avenue
Honolulu-Bound Left-Turn Detour1. Turn right onto Laumania Ave, then left
onto Pohakunui Ave.
2. Turn left onto Piliokahi Ave then again onto Farrington Hwy, Waianae-bound
Highways Division – Oahu H-1 Eastbound AM Shoulder Lane Vicinity of Kualakai Parkway to Kunia Road Off-Ramp
HOURS OF OPERATION: 5 AM to 9 AMWeekdays except Holidays
START DATE:August 15, 2016
Highways Division – Oahu Interstate Route H-1, H-2 and H201 Destination Sign Upgrade/Replacement Phase 2
SCOPEThe scope of work includes the removal and replacement of 12 overhead sign structures located along H-1, H201 and Moanalua Freeway.
EST. COST $ 7.0 Million
EST. SCHEDULEAnticipated RTA: Fall 2016
This image cannot currently be displayed.This image cannot currently be displayed.This image cannot currently be displayed.This image cannot currently be displayed.
Highways Division – Oahu Interstate Route H-1 Bridge RehabilitationKapalama Canal (Halona Street Bridge)
SCOPEReplace the existing bridge to meet current design standards.
EST. COST$6.4 Million
EST. SCHEDULEAnticipated RTA: Fall 2016
Highways Division – Oahu Kamehameha Highway, Kawela Stream Bridge Replacement
SCOPEReplace the existing bridge with a new bridge that meets current AASHTO requirements.
EST. COST $ 6.3 Million
EST. SCHEDULEAnticipated RTA: Summer 2017
Highways Division – Oahu Kamehameha HighwayHoolapa (Nanahu) Bridge Replacement
SCOPEImprove the safety and reliability of the existing bridge, through rehabilitation or replacement, addressing bridge width, load capacity, bridge railing and transitions, and bridge approaches
CONSTRUCTION COST$4.5 Million
EST. SCHEDULEAnticipated RTA: Summer 2017
Highways Division – Oahu Kamehameha Hwy - Rehabilitation of Kipapa Stream Bridge (a.k.a. Franklin D. Roosevelt Bridge)
SCOPERehabilitate the existing deficient bridge to meet current HDOT and AASHTO standards for geometrics, Bridges, lightings, etc.
EST. COST$16.9 Million
EST. SCHEDULEAnticipated RTA: Winter 2016
Highways Division -OahuPali Hwy Resurfacing, Waokanaka St. to Kamehameha Hwy, andPali Hwy Lighting Replacement, Vineyard Blvd To Kamehameha Hwy
SCOPEResurfacing the existing roadway and repaving from Waokanaka to KamehamehaHwy. Replacing existing street lighting with a flat lenses from Vineyard Blvd. to Kamehameha Hwy.Upgrading safety improvements such as metal beam guardrail and attenuators.
EST. COST$44 Million
EST. SCHEDULEAnticipated RTA: Winter 2016Lighting Replacement limits
Resurfacing limits
Highways Division – Oahu Leeward Bikeway, Phases 1, Waipio Point Access Road to Hawaii Railroad Society Train Station
SCOPEConstruct 10-foot wide asphalt concrete bike path with 2-foot shouldersPhase I - Vicinity of WaipioPoint Access Road to Hawaii Railroad Society Train StationPhase II - Hawaii Railroad Society Train Station to Lualualei Naval Road
EST. COSTPhase 1 - $9 Million
EST. SCHEDULEAnticipated RTA for Phase I:Summer 2017
Highways Division – Oahu Interstate Route H-1, Guardrail and Shoulder Improvements, Kapiolani Interchange to Ainakoa Ave
SCOPEInstallation and upgrading all guardrails, guardrail to bridge connections, bridge railings, guardrail end terminals, crash attenuators, shoulder improvements, miscellaneous drainage and other appurtenant improvements.
EST. COST$6.24 Million
EST. SCHEDULEAnticipated RTA : Winter 2016
Highways Division – Oahu Moanalua Freeway and Interstate Route H-2,Guardrail and Shoulder Improvements
SCOPEInstallation and upgrading all guardrails, guardrail to bridge connections, bridge railings, guardrail end terminals, crash attenuators, shoulder improvements, miscellaneous drainage and other appurtenant improvements.
EST. COST$6.3 Million
EST. SCHEDULEAnticipated RTA: Spring 2017
Highways Division – Oahu Moanalua Freeway (Route H-201), Highway Lighting Improvements, M.P. 1.12 to M.P. 4.09
SCOPEInstallation and upgrading of highway light systems.
EST. COST$6.3\ Million
EST. SCHEDULEAnticipated RTA: Summer 2017
Highways Division – OahuProjects Programmed in 2017
Project Title Phase $MH1 AIRPORT VIADCUT DECK REPAIRS, VICINTIY OF VALKENBERG TO MIDDLE STREET CON 20.0KAMEHAMEHA HWY, PAUMALU BRIDGE REPAIRS CON 2.5KALIHI STREET RESURFACING NIMITZ HIGHWAY TO SCHOOL STREET MP 0.00 TO MP 1.15 CON 6.9KAMEHAMEHA HIGHWAY REHABILITATION, VICINITY OF KAPUHI STREET TO DAIRY ROAD, MP 5.94 TO MP 9.72 CON 9.0MOKAPU SADDLE ROAD RESURFACING NANAMOANA STREET TO ONEAWA STREET CON 15.0FARRINGTON HWY & KAUKONAHUA RD REHABILITATION, MAKALENA BRIDGE TO WEED CIRCLE, MP 3.03 TO 7.86 CON 7.5KALANIANAOLE HWY RESURFACING, WAIMANALO BEACH PARK TO HANAUMA BAY PARK MP 5.61 TO MP 12.49 CON 9.0KAMEHAMEHA HIGHWAY RESURFACING, HAUULA HOMESTEAD RD TO NORTH PUNALUU BRIDGE CON 1.0
Highways Division – HawaiiMamalahoa Highway Drainage ImprovementsVicinity of Pu’uwa’awa’a Ranch Road
SCOPEConstruct an underground drainage system and retaining walls, and associated roadway improvements
EST CONSTRUCTION $6 million
EST SCHEDULEAnticipated Bid Date: Fall 2016
SCOPE Replace Hilea & Ninole Bridges
EST. COST$14.5 million
EST. SCHEDULEAnticipated Bid – Winter 2016
Highways Division – HawaiiMamalahoa Hwy, Hilea & Ninole Bridge Replacement
SCOPEImprove operation, capacity and safety of Queen Kaahumanu Hwy & Kawaihae Road intersection.
EST. COST$1.3 Million
EST. SCHEDULEAnticipated RTA : Winter 2016
Highways Division – HawaiiQueen Kaahumanu HighwayIntersection Improvements at Kawaihae Road
Highways Division – HawaiiProjects Programmed in 2017
Project Title Phase $MAKONI PULE HWY PAVEMENT PREVENTIVE MAINTENANCE, MP 27.3 - MP 29 CON 5.3HAWAII BELT RD, REPAIRS TO WEAKENED PAVEMENT AREAS, MP 60.6 - MP 69.7 CON 2.3KOHALA MOUNTAIN RD, REPAIRS TO WEAKENDED PAVMENT AREAS, MP 6.44 - MP 13.1 CON 4.8
SCOPEInstall milled rumble strips on centerline and shoulders, traffic signage, and stabilization in one area.
EST. TOTAL COST$3-2 million
EST. SCHEDULEAnticipated RTA: Winter 2017
Highways Division – MauiHonoapiilani Highway Safety Improvements Kapoli St. to Papalaua Beach Park
Highways Division – MauiProjects Programmed in 2017
Project Title Phase $M
KALAE HWY RESURFACING: MAUNALOA HWY - KALAUPAPA LOOKOUT, MP 0.00-5.79 CON 5.7
HANA HWY RESURFACING: HOOKIPA PARK TO KAUPAKAULA RD, MP 8.89-16.23 CON 6.5HANA HWY RESURFACING: PAIA TOWN TO HOOKIPA PARK , MP 6.7 TO MP 8.89 CON 2.5KAHEKILI HWY RESURFACING: WAIEHU BEACH RD - CAMP MALUHIA, MP 0.00-4.59 CON 3.4
CRATER ROAD PPM: MP 2.00-10.10 CON 2.7
KAHULUI BEACH RD PPM: KAAHUMANU AVE - WAIEHU BEACH RD, MP 0.0-2.62 CON 2.0
KAMEHAMEHA V HWY RESURFACING: 13.2 to 18 CON 5.0
Highways Division – Kauai Guardrail and Shoulder Improvements at Various Locations On State Highways, Kauai
SCOPEInstallation and upgrading all guardrails, guardrail to bridge connections, bridge railings, guardrail end terminals, crash attenuators, shoulder improvements, miscellaneous drainage and other appurtenant improvements.
EST. COST$1 Million
EST. SCHEDULEAdvertised on July 26, 2016
Highways Division – Kauai Kaumualii Highway,Bridge No. 7E Rehabilitation
SCOPEReplace the existing deficient bridge to meet current design standards for roadway width, load capacity, bridge railing and transition, and bridge approaches
CONSTRUCTION COST$4.5 Million
EST. SCHEDULEAnticipated RTA: Winter 2016
Highways Division – Kauai Kaumualii Highway, Hanapepe Bridge Rehabilitation
SCOPERepair existing bridge structure, including the initiation of scour prevention measures to improve bridge footings.
EST. TOTAL COST$ 25.5 Million
EST. SCHEDULEDetour road Anticipated RTA: Spring 2017
SCOPEReplace the existing deficient Kapaa Stream Bridge.Improve the intersection at Kuhio Highway and Mailihuna Road.
EST. COST$15.3 Million
EST. SCHEDULEDetour road Anticipated RTA: Summer 2017
Highways Division – Kauai Kuhio Highway - Intersection Improvements At Mailihuna Road, And Kapaa Stream Bridge Rehabilitation
Project has been obligated for constructionProject has been obligated for construction
Highways Division – Kauai Kuhio HighwayReplacement of Wainiha Bridges, Nos. 1, 2, and 3
SCOPEReplace Wainiha bridges nos. 1, 2 & 3 with structures that meet current bridge design standards. one lane width bridges will be maintained to preserve historical/cultural aspects of the highway.
CONSTRUCTION COST$23.75 million
EST. SCHEDULEDetour road Anticipated RTA: Spring 2107
Highways Division – KauaiProjects Programmed in 2017
Project Title Phase $MKUHIO HWY RESURFACING: KAPULE HWY TO NORTH LEHO DRIVE CON 6.3KUHIO HWY RESURFACING: ALIOMANU RD TO SOUTH KOOLAU RD CON 2.9KAUMUALII HWY RESURFACING: KOLOA RD TO HALEWILI RD (KALAHEO TOWN RESURFACING) CON 1.7
WAAPA RD / RICE ST / KAPULE HWY RESURFACING CON 1.0