Deepak Word 97 2003

Embed Size (px)

Citation preview

  • 8/2/2019 Deepak Word 97 2003

    1/5

    DEEPAK BHATIADELHI - INDIA

    [email protected], [email protected] &

    [email protected]+91 565 2408525 ( India Phone No. )+91 565 6520484 ( India ph. No. )

    +91 9927442476 ( India mobile no. )________________________________________________________________________________________

    TOTAL 19 years of experience (10 yrs -Construction, 9 yrs.-Estimation & Tendering)

    Tanks (fixed & floating roofs) construction as per API 650

    Plant piping construction as per ANSIB 31.3

    Construction supervision and management

    Monitoring and follow-up with clients

    Contracts & business development

    Estimation & bid preparation

    Incoming material inspection

    Sub contracting and subcontract administration1 Well versed with Estimation of Tankages, Plant Piping, Structures, Pressure Vessels,

    Heat Exchangers, Piping, Compressors, Pumps, Blowers, Heaters and completeProject Estimation etc.

    2Knowledge of ICARUS Design & Estimation Software.

    ACHEIVEMENTS

    Worked with M/s Lurgi India Pvt. Ltd. Which is part of Air Liquide Group , France.Currently looking after the estimation of Refineries, Petrochemicals, Coal basedgasification plants estimates. Well versed with the estimation of above mentionedplants/ projects.

    worked with Dodsal Pte. Ltd. and responsible for Subcontracting & Subcontractmanagement for Tankages and Cathodic protection Subcontracts. Value of both theSubcontracts being 20 Million USD. Other responsibilities include checking of billssubmitted by subcontractors, preparation of variation Orders checking of extra claimsand award of new Subcontracts as per requirement of Engineering and ConstructionDepartments. SAP Entry of all invoices and variation orders.

    Completed independently as lead construction engineer of P.M.C. (E.I.L.), the oil-marketingterminal of I.O.C.L. Sangrur, Punjab, from fabrication stage to commissioning stage. Activitiesinvolved construction of tankages, plant piping, manifold pump house, truck loading gantry,fire water system etc.

    Completed independently plant piping of gas processing unit of U.P. Petrochemicals, Pata,plant of Gas Authority of India Ltd. as P.M.C.( E.I.L. ) Engineer.

    Completed independently Hydrogen generation unit of Mathura Refinery of Indian Oil

    Corporation and was responsible for mechanical engineering works from fabrication tocommissioning assistance.

    Associated in completion of plant piping of hydro cracker unit of Mathura Refinery project ofIndian Oil Corporation at Mathura.

    *Estimation & bid preparation of pressure vessels, tankages pipelines, plant piping, structuresetc. while in service with ATV PROJECTS INDIA LTD. And received orders for company fortanks, piping , pressure vessels and heat exchangers for Chambal Fertilizers, Bindal Agrochemicals , GAIL, IOCL.

    mailto:[email protected]:[email protected]:[email protected]
  • 8/2/2019 Deepak Word 97 2003

    2/5

    EMPLOYMENTMs NASSSR ABD MOHAMMAD CONTRACTING CO. BAHARIN- AS ESTIMATION ENGINEERFOR OIL AND GAS PROJECTS ( 5.07.2011 - 31.07.2011 )

    Ms ATV PROJECTS INDIA LTD ( SINCE 8.02.11 TO 9.06.2011 ) as estimation manager forestimation of pressure vessels and exchangers

    M/S AL HASSAN ENGG. ABU DHABI ( FROM JULY, 2010 TO SEPT. , 10)

    M/S KARINDA CONSTRUCTION CO. , MATHURA, U.P., INDIA( FROM DEC09 - FEB 10 )

    M/s Costain Abu Dhabi Co. W.L.L. Abu Dhabi ( Since 23.03.09 22.06.09 ) as Sr. EstimationEngr.

    Engaged in oil & gas projects estimation. Worked on following projects till date.

    Replacement of flare structure fabrication and painting for ADGAS DAS OIL FIELD( SS 304Fabrication )

    Fabrication & Erection of 3 k.m. long piping for GASCO , HABSHAN. ( CS Piping ) valuearound 24 million AED.

    Repair and refurbication of 23 nos LARGE DIA oil storage tanks for TAKREER, RUWAISREFINERY.

    M/s L&T KUWAIT ( Since 2.11.08 TO 15.03.09 ) As Estimation Manager

    Estimation of oil and gas projects such as tankages, plant piping etc.

    M/s Lurgi India Pvt. Ltd., NEW DELHI

    Lead Estimation & Costing ( Since May 28, 2007 )

    Nature of duties-1Estimation of Equipments and Manhour Estimation & complete plant estimation for process

    plant ( completed estimation of 1200 TPD Methanol Plant ) Using Icarus Design /Estimation Software for Mechanical Equipments.

    2Licensor cost evaluation.3+/- 5, 10% cost report preparation for the project.2Preparation of Proposals for the complete process plants.

    3Floating Enquiries, analysis of offers received from vendors in consultation with engg. Dept. ,raising queries and try to get complete offer from vendors without any exclusions.4Comparing various offers.5Selection of vendors / contractors6Compiling various offers and putting their values in excel based software and to calculate the

    cost of project.________________________________________________________________________________________

    M/s DODSAL Pte. Ltd., ABU DHABI, U.A.E.

  • 8/2/2019 Deepak Word 97 2003

    3/5

    Senior Sub Contracts Engineer ( Since March,2006 to 20.05.07 )

    Nature of duties-1Preparing subcontract conditions based on main contract with client2Floating enquiries, preparing comparative statements.3Coordination with engineers regarding technical acceptance of sub contractors4Negotiation with sub contractors, preparing recommendations5Award & Administration of subcontract6Arranging Approval of vendors selected by Subcontractors.7Drafting contractual letters to sub contractors on the basis of project progress, monitoring and

    on Technical and commercial issues.

    M/S MEDGULF CONSTRUCTION CO. W.L.L., DOHA, QATAR (CLIENT- QATAR PETROLEUM)

    Engineer Construction (Sep 2005 to Jan 2006)

    Nature of duties-1Construction supervision and management of fire water piping works for L.N.G. tanker loading

    berth at Ras Laffan area of Qatar2Planning for men, machines and materials3Execution of works as per DRGS. And Q.P. standards4Review of Isometric DRG. study these in conjunction with P.A.D. and P&ID5Find out any mismatch among these DRGS. And get the matter resolved thru projects6Coordination with projects department

    M/S EPC EMIRATES L.L.C., DUBAI

    Engineer Estimation (April 2005 to July 2005)

    Nature of duties-1Estimation and bid preparation for tanks, piping, structural projects

    2Preparation of B.O.Q., floating enquiries for material prices and maintain material price databank

    3Estimation using Excel Sheet4Final bid preparation and submission and follow up with the client

    M/S APC INTERNATIONAL FZC, UAE (DEPUTATION TO B.I.P.C., AN IRAN GOVT. COMPANY)

    Specialist Piping Engineer / Project Engineer - VCM Revamping Project (August 2004 to Feb2005)

    Nature of duties-1Responsible for finding out old data sheets of various static, rotary equipments & piping which

    are to be replaced with new one

    2Preparing fresh data sheets3Floating enquiries, making comparative statement of offers received4Selection of vendors5Execution of project after receipt of equipments and materials

    M/S ANABEEB LTD., SAUDI ARABIA

    Senior Cost Estimator Mechanical (Feb 2004 to April 2004)

    Nature of duties-

  • 8/2/2019 Deepak Word 97 2003

    4/5

    1Responsible for estimation & bid preparation for turn around project of refineries,petrochemicals & fertilizer plants in Saudi Arabia as well as in other gulf countries

    2Estimation of tenders for minor/major shutdown activities or modification required in plantssuch as replacement of vessels internals, tanks cleaning and tanks repair works etc.

    M/S HITECH ENGINEERS, AONLA, BAREILLY

    Site In charge (May 2002 to Jan 2004)

    Nature of duties-1Responsible for complete site handling for fabrication, erection, testing, commissioning of two

    nos. naphtha storage tanks and shut down jobs of IFFCO, ANOLA plant. Majorresponsibilities include deployment of labor, envisage the requirements of men, machines& materials, billing, coordination with client, responsibility for correctness offabrication/erection/testing/commissioning of tanks and shut down jobs.

    M/S SPECIAL TECHNICAL SERVICES, MUSCAT (OMAN)

    Design Coordinator(Feb 2001 to April 2002)2Coordination with client & design contractor, approval of drawings from client, rectification of

    drawings from design contractor, monitoring progress of flow lines.

    Assignment undertaken:Design coordination for construction of flow lines for high-pressure gas, oil & water wells inOMAN.

    M/S ENGINEERS INDIA LTD., INDIA

    Senior Engineer(June 1994 to June 2000)

    Nature of duties-3Construction supervision & management4Inspection at various stages of construction

    5Monitoring & follow-up with contractors.6Inspection during construction, erection, hydro testing, pre-commissioning stage7Checking specification compliance8Checking extra claims9Progress monitoring & reporting10Coordination with various agencies, incoming material inspection11Fabrication, erection of tanks, piping, static & rotary equipment12Involved in N.D.T. examination of oil storage tanks, oil piping & structural works.

    Assignments undertaken:Mathura Refinery Project - MathuraInvolved in construction of hydrogen generation unit and hydrocracker unit. Materialsinvolved were C.S, LTCS , STAIN STLL , LOE AND HIGH ALLOY STEELS.

    U.P. Petrochemicals Complex PataConstruction of above ground piping works for GAS PROCESSING unit.

    Marketing Terminal of I.O.C.L. - Sangrur, PunjabConstruction of oil marketing terminal of I.O.C.L. at Sangrur, Punjab. Activities involvedwere construction of tank ages, plant piping, manifold pump house, truck loading gentry,fire water system, foam system, commissioning.

    M/S ATV PROJECTS INDIA LTD., INDIA

  • 8/2/2019 Deepak Word 97 2003

    5/5

    Engineer(April 1989 to June 1994)

    Nature of duties-1Estimation of pressure vessels, heat exchangers, tank ages, plant piping2Preparation of bids3Construction supervision4Inspection at various stages of construction5Coordination with clients and contractors6Involved in N.D.T. examination of oil storage tanks and piping

    Assignments undertaken:Business Development / Contracts (May 1992 to June 1994)Estimation and tendering of process equipments, preparation of documents for registrationwith clients, coordination with clients regarding technical/commercial matters related tocontract.

    Project Execution (May 1989 to April 1992)Involved in construction supervision of 14 nos. of oil storage tanks built as per API 650 andassociated piping works of national dairy development board's Patparganj and Narela

    terminals in Delhi.Involved in execution of giant fabrication shop of ATV PROJECTS having two bays of 155meter * 26 meter each and commissioning of cranes.

    QUALIFICATION

    B.E. in Mechanical Engineering from R.E.C. Surat, Gujarat (India) 1988.

    GENERAL

    Nationality : Indian

    Date of birth : Sep 13th, 1965

    Permanent address : 4, Tilak Nagar, Mathura, U.P. (India), Tel: +91 5652408525

    Salary Drawn : looking for good opportunity , immediately available

    Expected Salary : Negotiable