    District of Columbia Water and Sewer AuthorityGeorge S. Hawkins, General Manager

    December 13, 2012

    Briefing on:

    DC CLEAN RIVERS PROJECTNortheast Boundary and Branch Tunnels

    Briefing for:

    Special Joint Meeting of the Bloomingdale Civic Association,

    SMD 5C04 and SMD 5C07

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    2/13

    2

    Flooding Mitigation Measures

    Clean Rivers Project Snapshot

    First Street Tunnel Field Investigation

    Agenda

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    3/13

    3

    DC Water Short Term Efforts to Mitigate Basement andStreet Flooding

    Visual inspection of sewers

    Rebate program for installing backflow preventers

    Rain barrel-subsidy and installation program

    Sandbag distribution

    Analysis of plumbing and housing code

    Flooding Mitigation Measures

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    4/13

    44

    V St

    W St

    Adams St

    Bryant St

    U St

    Thomas St

    Michigan Ave

    N

    1st St N

    .CapSt

    Future 23 Dia.

    Northeast Boundary

    Tunnel (Long Term

    recommendation)

    McMillan Stormwater

    Storage

    6 mg Stormwater

    Storage (3 mg from N.

    Cap, 3 mg from First St)

    First Street Tunnel

    19 Dia tunnel, 2,800 ft

    long, 6 mg storage

    Temp.

    Pumping

    Station

    Medium TermRecommendationsfor Bloomingdale &LeDroit Park

    3 of 10 acres is needed

    for construction

    Fourrecommendations:

    1. McMillan StormWater Storage

    2. First St Tunnel

    3. Rain BarrelProgram

    4. GreenInfrastructure

    Final Site for First Street

    Storage and Tunnel Shaft

    Site being coordinated

    with District.

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    5/13

    5

    Long Term Control Plan (LTCP) Control combined sewer overflows (CSOs) Reduce flooding Meet nutrient discharge limits of

    Chesapeake Bay Program

    Schedule

    LTCP = 20 years (2005-2025) Nitrogen = 2007-2015

    Cost LTCP = $2.5 billion Nitrogen = $950 M

    Total > $3.5 billion

    Drivers Projects required to meet regulatory

    requirements (NPDES Permit and ConsentDecree)

    Flood Relief

    Clean Rivers Project Snapshot

    5

    A Blue Plains Tunnel

    C CSO 019 Overflow and Diversion Structures

    D JBAB Overflow and Potomac Outfall Sewer DiversionE M Street Diversion Sewer (CSOs 015, 016 and 017)

    G CSO 007 Diversion Structure and Diversion Sewer

    H Anacostia River Tunnel

    I Main Pumping Station and Tingey Street Diversions

    J Northeast Boundary and Branch Tunnels

    Y Blue Plains Dewatering Pumping Station and ECF

    Z Poplar Point Pumping Station Replacement

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    6/13

    66

    Northeast Boundary and Branch Tunnels

    Planned Boring Locations

    Survey and utility locationwork to prepare for test

    boringsSoil borings and

    groundwater monitoring

    Topographic survey

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    7/1377

    Traffic ControlPlans for eachinvestigation sitealong the alignmentwill be approved by

    District Departmentof Transportation(DDOT).

    Lane closures andshifts may occur.

    Field Investigation Traffic Plans

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    8/1388

    24-hour parkingrestrictions withinthe work zones.

    Work hours will be

    7:00 a.m. to 7:00p.m., MondaySaturday

    Work at each sitewill takeapproximately 10business days.

    Field Investigation Parking Restrictions

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    9/1399

    Field Investigation Survey Work

    There may be noiseand vibrationsduring drilling andsoil sampling.

    Surveyors willneed to takemeasurements onthe front stoops of

    many homes.

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    10/13

    1010

    Geotechnical Investigation

    Max. Sample Depth = 220 ft +

    Below Ground Surface

    Tunnel Depth = 45 ft to 150 ft

    Below Ground Surface

    First Street Tunnel

    19-ft Inside Diameter

    Drill Rig

    DrillStringw/Sampler

    Scale = 1 H : 1 V

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    11/13

    1111

    Public Outreach Program

    DC Water is working to educate the community and minimize impact of theinvestigative work and tunneling operations.

    Outreach Efforts

    Meetings with Councilmembers, ANCs and neighborhood groups

    Project materials with details and contact information

    Traffic advisories

    Doorhangers to affected residents

    DC Water website, listservs and Twitter

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    12/13

    1212

    Next Steps

    DDOT/DCRA Permits Public Outreach Program

    Field Work December 2012 June 2013

    McMillan Storage Construction June 2013

    March 2014

    First Street Tunnel Construction 2014 2016

    NEBT Tunnel Construction 2016 2022

  • 7/30/2019 DC Water Presentation for Special Meeting of Bloomingdale Civic Association, 5C04 and 5C07 2012 12 13

    13/13

    1313

    Questions?

    Please contact:

    DC Water Geotechnical Team Leader:Randy Lentell (202) 787-4450

    DC Water 24-hr Emergency: (202) 612-3400

    DC Water Office of External Affairs: (202) 787-2200

    Email: [email protected]

    Website: www.dcwater.com/cleanrivers

    mailto:[email protected]://www.dcwater.com/cleanrivershttp://www.dcwater.com/cleanriversmailto:[email protected]