DATE ISSUED: August 26,2009 REPORT NO. 09-090 ATTENTION: Committeeon Land Use & Housing Docket of September2,2009 SUBJECT: Development ServicesDepartmentFee Proposal REOUESTED ACTION: Recommend City Council approves development review user fees to provide full cost recovery to mandatoryregulatory review and inspection services, and to meet service level standards. STAFF RECOMMENDATION: Approve the revised fees. ENVIRONMENTAL IMPACT: This activity is not a "project" and is therefore not subject to CEQA pursuant to State CEQA Guidelines Section 15060(c)(3). BACKGROUND: The City's development review and inspection services are operated without general fund subsidy as an EnterpriseFund. Development Service's customers pay for the department's operating costs similar to most businesses. The level of servicethe departmentis able to provide is directlyrelated to the fees charged. In addition, State law requires that the fees charged "shall not exceed the estimated reasonable cost of providing the service" (California Government Code). The Building Inspection Enterprise Fund1was created in 1985. All development and building inspection related activities have been included in the fund sincethe Council approvedthe de&rtment7s last fee study in 2003. I Now the "Development Services Enterprise Fund."

DATE ISSUED: August 26,2009 REPORT NO. 09-090

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

DATE ISSUED: August 26,2009

REPORT NO. 09-090

ATTENTION:

Committeeon Land Use & Housing

Docket of September2,2009

SUBJECT:

Development ServicesDepartment Fee Proposal

REOUESTED ACTION:

Recommend City Council approves development review user fees to provide full cost recovery

to mandatory regulatory review and inspection services, and to meet service level standards.

STAFF RECOMMENDATION:

Approve the revised fees.

ENVIRONMENTAL IMPACT:

This activity is not a "project" and is therefore not subject to CEQA pursuant to State CEQA

Guidelines Section 15060(c)(3).

BACKGROUND:

The City's development review and inspection services are operated without general fund

subsidy as an EnterpriseFund. Development Service's customers pay for the department's

operating costs similar to most businesses. The level of servicethe departmentis able to provide

is directlyrelated to the fees charged. In addition, State law requires that the fees charged "shall

not exceed the estimated reasonable cost of providing the service" (California Government

Code).

The Building Inspection Enterprise Fund1was created in 1985. All development and building

inspection related activities have been included in the fund sincethe Council approvedthe

de&rtment7s last fee study in 2003.

I Now the "Development Services Enterprise Fund."

As noted at the time of the fiscal year 2008 budget hearings, a comprehensive review of the

department's fees was planned to reevaluate them in light of changes in operating costs, changes

in regulations, and improvements made to departmentprocesses. This report contains fees based

on the results of the fee study performed by the City's consultant, Wohlford Consulting,

SacramentoCalifornia (Attachment No. 1 -A copy of the entire Fee Study is available for

viewing in the Office of the City Clerk).

The fees are proposed to support service levels for high quality and timely plan check and

building inspection; to support s p i c e s that meet state and local law mandates; and to fully

recover department operating costs.

Customer service standards have been established sincethe inception of the Enterprise Fund

(Attachment No. 2). The department has continued to work with rate payers to refine these

measures to meet their needs. Development review and building inspection scl~edules that are

followed by these measures affect customer development costs many times more than the cost of

the review and inspection process itself. Reduction in the department's level of service can

increase time-sensitive financing, lead to costly construction delays, and increased land carrying

costs. Proposed fees support these specific review and inspection service levels expected by

building owners and the industry. In addition, proposed fees support the appropriate staffing,

resources, and training costs to meet the department's mission to protect the public safety, health,

and welfare.

DISCUSSION

The last fee analysis for the department was performed in fiscal year 2003 and resulted in a 27%

fee increase. Over the past 6 years, the department used this fee increase to implement computer

system improvements such as our geographic information system mapping, project tracking

system, interactive voice response inspection scheduling system, and handheld inspection data

entry. The past increase also allowed the department to increase staff training, carry out

customer service initiatives, establish a small business liaison, and return the department's

reserves to an established goal of 7% of the Enterprise Fund's annual expenses.

Followingis a description of the department's current condition, adjustments the departmenthas

made to reduce costs and to operatemore efficiently, and a description ofthe proposed fees to

restore the level of service that department customers expect.

Current Condition

Since the fiscal year 2003 fee adjustment, the department's work load, as represented by the

value of construction (valuation), increased from $2.01 billion in FY 2003 to 2.2 billion in FY05.

Since then, overall valuation has declined to an estimated $750 million in FY 2009 as a result of

the economicdownturn. Staffing has followed this same pattern going from 435 filled positions

in FY03 to 525 filled positions in FY 05. Filled positions, through two reductions in force and

attrition, have been reduced to 305 filled positions at the end of FY09. Further reductions in the

next two months are also necessary to respond to a significantdecline in workload and revenues

over the last four periods of FY09 and projected future declines in FYlO based on the current

economy.

During this same time period, the department has been required to absorb increases in

expenditures which were not automaticallycaptured through fee increases. Examples include a

4% salary increase in July 2007; annual charges for General Government Service Billing

resulting in an increase of 211% (over $2 million) from FY 2004 through FY 2010; fringe related

costs such as Other Post Employment Benefits (OPEB), Unfunded Accrued Actuarial Liability

(UAAL), retiree health contribution, City Employee Retirement System retirement contribution;

and EM Cost Allocation associated with the new citywide financial system. In addition, new

regulations and standards have required additional staff time for plan review and inspections as

part of the permitting process. The department has controlled overall expenses by not filling

positions that became vacant, by drawing down the department's fee stabilizationreserves, by

eliminatingtraining, and by implementing various cost controls and efficiencymeasures.

The department finished FY 2009 in a negative fund balance. At the current rate of workload

decline and lack of full cost recovery, the department, without drastic action, anticipates a

continued loss in FY 2010.

Cost Controls and EfficiencyMeasures

Data from the project tracking system fully implemented during FY03 shows a steady increase in

productivity by staff since tbe last fee increase. Annual reviews performed per staff person have

grown from 107 per employee in FY04 to 179 per employeein FY09. Annual inspections

performed per staff member over this sameperiod have grown from 191 per person to 408 per

person in FY09.

The department has also been able to achieve and maintain its key performance measures

including review and inspection schedules and customer service standards. Since the full

implementation of the project tracking system, staff improved in meeting establishedproject

review times 71% of the time in FY04 to 89 % of the time in FY09 (where the performance

standard is meeting established review targets 80% of the time). Inspection staff improved in

meeting their next day inspection performance goal 93% of the time in FY04 to 95% of the time

in FY09 (where the established goal is performing 90% ofinspections next day).

Improvementswere made to help facilitatethese efficiencies. Completion of the automated

tracking system helped the department's employees and project customers to better manage their

workloads and their projects. It also improved the department's accountability in meeting

established performance standards for our core services. Using standard cell phone technology,

the department has also provided inspectors with direct access to the tracking system to enter real

time inspection results. The Department is expanding this capability into Field Engineering (in

the Engineering and Capital Projects Department) and Neighborhood Code Compliance

Division. This teclmology allowed the departmentto eliminate data entry positions and provide

more flexibilityto customers on inspection scheduling. Additional improvements have been

made including expanded E-Permitting options (increased fiom 2,700 annually in FY03 to 4,300

issued annually in FY09) and a full range of information and forms on DSD's website (over

45,000 web visits per month). This helps reduce customer contacts and saves project applicants

from having to drive downtown or to our Ridgehaven office to obtain these services. In addition

to offeringbetter and smarter services, these new automated systems have allowed the

department to eliminate old "legacy" systems and better gage actual workload.

Other improvementsmade over the past few years include expanded over the counter services,

consolidated reviews, self certification, and municipal code cl~anges that have reduced permit

process levels and complexity for certain project G e s . Many ofthese changes resulted from

ideas and input from our LU&H Technical Advisory Committee (TAC), our employees,and

from the Business Process Reengineering (BPR) effort. These improvements combined with

our automation enhancements have allowed us to continuemeeting service levels, maintain

quality standards, and enhance customer service. In fact, the department was recently

recognized by the University of North Carolina benchmarking stud? as one of the top 3

development service departments in the country for innovation and services.

DSD is also committed to fully implement BPR recommendations that enhance accountability in

project management,project review, and management of project costs. The Departmentwill also

work to further enhance past improvementsthat include strengthening the authority of the

development project manager, furthering quality control, expanding self certification, and

enhancingbilling statement processes. The goal of these future efforts, working closely with the

TAC, will be to improve project review time and cost certainty for applicants and to reduce

department overhead costs.

Fee Proposal

Department workload and operating costs were reviewed by Wohlford Consulting to determine

the department's level of cost-recoverability. In order to develop a fee proposal, the fee

consultant and the department did extensive analysis of performance data, operating costs,

workload, and staffing to develop a fee proposal that would meet performance standards and

reflect the cost of that service. Based upon this analysis, both fee increases and decreases are

being proposed. A comparison of prototype buildings following the model establishedby the

Building IndustryAssociation for their annual fee surveyprovides an overview of the changes

(Attachment No. 3).

One objective of the fee analysis was to simplify and reduce the number of fees currentlyused.

DSD currently has 1,414 fees (AttachmentNo. 4) and has consolidated the number of fees in the

new fee schedule to 494 (AttachmentNo. 1). As an example, existing categories of fees such as

offices, medical offices, public building office, banks, etc. were collapsed into one fee category -

Business.

Fees were also created to correspond with construction practices such as the new

Foundation and Frame category. This methodology is comparable with industry assessment of

construction activities nationwide.

Similarto the department's last fee study, a square footage model using hourly charges and staff

time spent on each project type was followed. A comprehensive analysis was done by assessing

Development Review in Local Government: Benchmarking Best Practices, published 4/24/09 as a joint venture of

the University Of North Carolina School Of Govenunent and the Alliance for Innovation.

4

and developing time estimates for each activity performed by the department and using volume

counts (e.g., how many fees are charged in a year) for each of those activities to determine total

costs associated with performing that activity. Efficiencies implemented over the past 6 years

(project tracking system, web based permitting, increased over the counter services, and

handheld devices for inspection entry) were also factored in. The analysis was done using

calendar year 2008 workload data. The recommended fees presented in the study reflect the full

cost of providing the individual services.

As part of the City Council's recently completed budget process, employees agreed to a 3

percent salaryreduction and to pay for 3 percent of a retirement benefit previously picked up by

the City. In light of this, DSD's consultant has revised the proposed fee scheduleto reflect this

reduction in cost.

By using the same annual activity volumes and multiplying them by the current fees, the fee

consultantwas able to establish the potential revenue from current fees and comparethem to the

proposed. The difference between the two figures is the proposed fee to current fee "gap." The

followingtable shows this analysisbetween the current fees and the proposed new fees.

The cost analysis revealed that the current fee structure recovers approximately 86% ofthe cost

to provide the fee-related services. The recommended fees presented in the study reflect the full

cost of providing the individual services and bringing department reserves to 7% of expenditures

- consistentwith the City's Reserve Policy - over a 5 year timeframe.

At the recommended

fees, the cost recovery rate would increase to 99.9%. The analysis also revealed that some of the

current fees for New Construction (plan check and inspection combined) are less than the full

cost of providing the services,while other fees are currently higher than full cost. Adoptingthe

proposed fee schedule would result in bringing the fee for each service into better balance with

actual costs.

Mechanical,Plumbing

and Electrical

TOTALS:

Because this proposed increase in fees is a result of increased costs that have occurred since the

last fee study, the department is recommendingthat this fee proposal also include an annual cost

inflator that would increase or decreasebased on changes in staff costs (salary and fringe) and

overhead rate (as determined by the Ofice of the City Comptroller). By including this

automatic inflator, future changes in fees would occur gradually, thereby avoiding significant

changes in future years. The proposed change would occur at tlle beginning of each Fiscal Year.

$ 2,559,983

$ 27,267,285

$ 3,382,431

$ 30,014,356

$ 822,447

$ 2,747,072

32%

10%

If approved by Council, the effective date for new fees will be no sooner than sixty days after the

Council action according to California State Code.

FISCAL CONSIDERATIONS:

Because of increased operating costs and the increased complexityof building regulations

administered by DSD, costs of providing the same level of service in plan check and inspection

activities have increased.

Without a fee increase and using conservative revenue estimates, the department would

anticipate the need to further reduce staffing levels by 30 percent (90 employees), primarily in

the building plan check and inspection service areas. Overhead functions such as managing code

updates, providing records to the public, and other non-fee services such as early assistance

would also be drastically cut. Due to the anticipatedbacklog of review and inspection requests

that would occur, DSD estimates that review turnarounds would increase initially by 5-10

business days for typical projects and inspection turnarounds would increase by 2-3 business

days.

If servicerequests stabilize or begin to increase, these performance standards would be further

degraded due to lack of ability to fund staff levels to keep up with workload and backlog. In

addition to the reduction in core service area performance, degradation in quality of review and

inspection functions is anticipated. Based upon the recent reductions in force, the department

has already had to reduce staff in certain areas of expertise and in some instances only one staff

member within review disciplines remain. With future staff reductions, retirements, and

attrition, this could leave the departmentwithout critical expertise and a decline in the quality of

project review and inspection. Options such as allowing state registered project consultants to

self certify their own design and constructionwork would have to be employed.

Even with the proposed fee increases, additional reductions in force will be necessary because of

work volume declines and past fiscal year deficits.

PREVIOUS COUNCIL and/or COMMITTEE ACTION:

As part of the City's FY 10budget deliberations, the Office of the IndependentBudget Analyst

and City Council Budget and Finance Committee recommended that the Development Services

department fee study be completed as quickly as possible and brought forward for full Council

consideration.

COMMUNITY PARTICIPATION AND PUBLIC OUTREACH EFFORTS:

Drafts of the proposed fee study were provided to stakeholderand public interest groups

(Attachment No. 5) on May 22,2009 for review and comment. This was discussed at the

Technical Advisory Committeemeeting on June 10,2009, July 8,2009, and on August 12,2009.

The Committeemade the following motion at their last meeting and it passed by a vote of 8-2-1:

"The LU&H Technical Advisory Colnmittee (TAC) recommends approval of DSD's fee study."

Separate fiom the fee study motion, TAC made the additional motion that passed by a

unanimous vote:

"TAC recommends that DSD continue to be vigilant in moving forward with improvements that

increase accountability,predictability, efficiency, and effectiveness of the developmentprocess."

KEY STAKEHOLDERS AND RROJECTED IMPACTS:

Key stakeholders are the individuals and organizationsthat rely on the department for project

review, permitting, and inspection services for development projects. Approval of this

recomlnendation will allow the department to restore performance levels for the core services

offered by the department. It will allow the department to increase training to established

performance goals and continue to enhance customer service initiatives.

CONCLUSION

In conclusion, the last fee study and approved increase for these fees was completed in fiscal

year 2003. Since that time, the department's labor costs and overhead have increased

significantly. While workload is down, the department had matched this decline by eliminating

more than 37% of its staffing. The department has met its key performancemeasures during this

time while increasing staff productivity.

The fees proposed are necessary to maintain the quality of review and inspection; restore

department's performance and service levels; and enhance the fiscal health of the enterprise

fund. Alternatively, the Council may choose not to adopt some or all of the proposed fees or to

direct that changes to regulatory requirements be made to provide additional staff capacity. If a

no change alternativeis adopted,the departmentwill need to further cut its services,reduce its

existing workforce, and control expendituresaccordingly.

~ e s ~ e c f l l ~ submitted,

Development ServicesDirector

Chief OperatingOfficer

KGB

Attachments:

1. Proposed Fee Schedule

2. Customer ServiceReview Standards

3. Fee Change Comparison

4. Existing Fee Schedule

5. org anikons Notified

6. Miscellaneous Fee Change Comparison

LUBH -Attuchmant 1 -FINAL RESULTS WORKSHEETS - Aug 20 09

NC Fce Scheduic- PC

Cfry Lisa" oiogo

BUILDING COST OF SERVICES [FEE) STUDY

ATTACHMENT I

Davnlopmant SOWISLS Dewmmn t

I PLAN CHECKVARIABLEFEESCHEDULE FORNEW CONSTRUCTION

-

Page 1 of 23

LUSH - Atlachrnenl 1 -FINAL RESULTS WORKSHEETS -Aug 2008

NC Fcs Scheduie-PC

c1ry or san olego

BUILDINGCOST OF SERVICES (FEE) STUDY

ATTACHMENT 1

Dcvelopmrnt saw1s.r Depamcnt

PLAN CHECKVAF3ABLE FEESCHEDULE FOR NEW CONSTRUCTION

-

Wohlhrd conavlking page 2 of 23 Run: 812012009

LUSH -Attachment 1 - RNAL RESULTS WORKSHEETS -Aug 20 09

NC Fae Scheduis. PC

City or san Dlego

BUILDING COST OF SERVICES (FEE) STUDY

ATTACHMENT 1

Develapment Sewlcea Depanmenf

I

PLAN CHECKVARIABLE FEESCHEDULEFOR NEW CONSTRUCTION

I

-

Wohllord Conaulling Page 3 at 23 Run: B12OILooQ

LUBH . Aftschmenl I -FINAL RESULTS WORKSHEETS -Aug 20 09

NC Fec Schedule - PC

Clly irisan o l sp

BUlWlNG COST OF SERVICES (FEE) STUDY

ATTACHMENT I

O a ~sl o ~m ~n t Sewbes oopanmcnt

I

PLAN CHECKVARIABLE FEESCHEDULE FOR NEW CONSTRUCTION

1

-

CONSTRUCTION NP E &RA n O OFRE9UIREDEFFORr:

Group A: I Group 8:

RATED I hOT RATED

RolalkoEHorfFacfar: I RobflvaEHoflFaLor:

. ..

wohlford consulting

Page 4 01 23

LU&H -Altachmcnf 1 -FINAL RESULTS WORKSHEETS -Aug 20 09

NC FBB Schedule-PC

Clfy of san D l s p

ATTACHMENT 1

BUILDING COST OF SERVICES (FEE) STUDY

Devclopmonl Servlses Department

I

PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION

I

Wohlford Consulting

Page 5 a23

LUgH - Atlacllmonll -FINAL RESULTS WORKSHEETS - Auo 20 09 NC Fec Schedule - INSP

CJIY or snn DIO~O

BUILDING COST OF SERVICES [FEE) STUDY

Developmsn! Servlses ~epnr(men!

1 INSPECTIONVARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION I

CONSTRUCTION TYPE &RATIO OFREOURED EFFORT:

Group A: I GrDYD 8:

Wohlfotd consulting Page 6 d 23

LUBH - Atmchmanl I -FINAL RESULTSWORKSHEETS -Aug 20 09 NC Fee Schedule-INSP

CllY o1san Olego

BUILDING COST OF SERVICES (FEE)STUDY

Dcvclopmanl seNlcae Dapaman t

I

INSPECTIONVARIABLE FEE SCHEDULEFOR NEW CONSTRUCTION

I

Wahllord Conrvltlng Page 7 of 23

LUBH -Allachmant 1 -FINAL RESULTS WORKSHEETS -Aug 20 09

NCFee Schedule -INSP

Clly of Ean Dlsgo

BUILDING COST OF SERVICES [FEE) STUDY

Onvelopmsnt S~TVIEES ocpartment

I

INSPECTIONVARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION

I

CONSTRUCTION TYPE 6 RAnO OFREOU IRED EFFORT:

I

page a 0123 Run: Bl2Ol2009

LUSH -Atlariiment 7 -FINAL RESULTS WORKSHEETS -Aug2009

c f t yorsm o k p

BUILDINGCOST OF SERVICES (FEE) STUDY

Development Servlss. Ocpam.nt

I

INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION

I

Wohllord consulting Page 9 of 23 Run: 812012009

LUBH- Attachmonll -FINALRESULTS WORKSHEETS -Aug 20 09 NC Fec Schedule-INSP

CIW orsan DI~OO

BUILDINGCOST OF SERVICES (FEE) STUDY

Development sewicea oepament

I

INSPECTIONVARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION

I

CONSTRUCTION TYPE 6 RATIO OF REQUIRED EFFORT:

Orouo& I C..DUO B.

~~.~

I

- ~ ~ F -

RATED hDT RATED

ROlafl,O EHod Fr r lor : I RO!I~,<O E l lonFac to~

. "" "".

Page lo of23

LU&H - Attachment 1 - FINAL RESULTSWORKSHEETS - Aug 20 09

City ofSan Dlego

BUILDING COST OF SERVICES (FEE) STUDY

Development Services Department

Wohlford Consulting Page 11 of 23

Run: 812012009

LU&H -Attachment 1 - FINAL RESULTSWORKSHEETS - Aug 20 09

City ofSan Diego

BUILDING COST OF SERVICES (FEE) STUDY

Development Services Department

59 or Electric Self Contained - First Sign $ 97.06 1$ 135.11

Awning, Directional or Wall Sign, Non-Electric I

60 or Electric Self Contained -Additional 2-5 Signs $ 60.66 1$ 73.70

Wohlford Consulting

Page 12 of 23

Run: 812012009

LVBH -Attachment 1 -FINAL RESULTS WORKSHEETS - Aug 20 09

City of San Diego

..

BUILDING COST OF SERVICES (FEE) STUDY

Development Services Department

RESULTS ANALYSIS - MISCELLANEOUS ITEMS

TOTALS:

Wohlford Consulting

Page 13 of 23

Run: 812012009

LUBH -Attachment 1 -F INAL RESULTSWORKSHEETS - Aug 20 09

City of San Diego

BUILDINGCOST OF SERVICES (FEE) STUDY

Development Services Department

RESULTS ANALYSIS -OTHER ITEMS

]OTHER FEES: I $ - I $

I

I l~eneral Plan Maintenance Fee fpassthrouah I I I

I ._l_flee for Plannng Deparlpen!: n?:&ost ana yi S]_~L._ ,

- I5

Mapp ng [passrhroJgn fee for IT; no cost

I

2

3

4

5

6

7

8

. '

Wohlford Consulting Page 14 of 23

analysis]

Application Fee

Permitissuance with plans - Each

Permit issuanceno plans - Each[No Cost

Calcs here - includedin MPE fees]

Application Extension fee - Each

Building Permit Extension fee - Each

Recordation

Work Done withoul a Permil fno cost analvsisl

fee cost; I$ - 1

$0.03 per $1.000

10

11

12

Run: 812012009 - 12:ll PM

$ -

$ -

$ 133.46

$ -

$ 140.65

$ -

$ 54.44

Double permit

$0.15 per 51.000

Seismic (residential) [no cost analysis]

Seismic (non-residential)[no cost analysis]

State (resldenlial) [no cost analysis]

$

$

$

$

$

$

$

valuation

$0.06 per $1,000

valuation

$0.07 per $1,000

valuation

$

$

$

LU8H - Attachment 1 -FINAL RESULTS WORKSHEETS - Aug 20 09

City of San Diego

BUILDING COST OF SERVICES (FEE) STUDY

DevelopmentServices Department

RESULTS ANALYSIS -OTHER ITEMS

Wohlford Consulting Page 15 of23

Run: 8/2012009 - 12:ll PM

LU&H -Attachment 1 -FINAL RESULTSWORKSHEETS - Aug 20 09

City of San Diego

BUILDING COST OF SERVICES (FEE) STUDY

Development Services Department

tor Recal - Each

Page 16 of 23

Run: 812012009 - 12:ll PM

LUBH -Attachment 1 - FINAL RESULTSWORKSHEETS - Aug 20 09

CMy of San Diego

-

BUILDING COST OF SERVICES (FEE) STUDY

Resuits Other

Development Services Department

Wohlford Consulting Page 17 of 23 Run: 812012009 - 12:ll PM

LU&H - Attachment 1 -F INAL RESULTS WORKSHEETS - Aug 20 09

CityofSan Diego

BUILDINGCOST OF SERVICES (FEE) STUDY

Development Services Department

RESULTS ANALYSIS -OTHER ITEMS

I I

Other Unique Buildings (Atrium, Convention

Center, Covered Mall and Stadium) (deposit @

132 l~inimum (first 4 hours), - I $

IEmergency (NomScheduled) Call-Out -Each I I

133 additional hour

Afler Hours (Scheduled) Call-Out Fee -

134 Minimum (first 2 hours)

Afler Hours (Scheduled) Cali-Out-Each

135 ladditional hdur IS - I 5

IHourly Fee for Information and Application

I

I !services not covered bv standardfees - oer I I I

Results Other

Wohlford Consulting Page 18 of23

Run: 812012009 - 12:11 PM

LU&H -Attachment 1 - FINAL RESULTS WORKSHEETS -Aug 20 09

Results MPE

BUILDING COST OF SERVICES (FEE) STUDY

Development Services Department

ReplacemenURemodeilAdditian -Per Floor (4

Wohlford Consulting

Page 19 oi23

Run: 812012009 - 12:11 PM

LUBH -Attachment 1 -FINAL RESULTS WORKSHEETS -Aug 20 09

City of San Diego

-

BUILDING COST OF SERVICES (FEE) SNDY

Results MPE

Development Services Dspartmant

RESULTSANALYSIS -MPE ITEMS

Wohtiord Consulting Page 20 of 23

Run: 8/2012009 - 12:11 PM

LU&H -Attachment 1 - FINAL RESULTS WORKSHEETS - Aug 20 09

Cityo f San Diego

BUILDING COST OF SERVICES (FEE) STUDY

Development Services Department

Wohlford Consulting

Page 21 oi23 Run: 812012009 - 12:11 PM

LURH -Attachment 1 -FINAL RESULTSWORKSHEETS - Aug 20 09

City of San Diego

..

BUILDING COST OF SERVICES (FEE) STUDY

Development Services Department

RESULTSANALYSIS - MPE ITEMS

TOTALS:

Wohlford Consulting

Page 22 oi 23

Run: 812012009 - 12:ll PM

CUSTOMER SERVICE REVIEW STANDARDS Attachment No. 2

Wastewater & water Treatment plants

86 ) : 8 = # of work davs for 1st review. (5) =#of work davs for resub@)

(') Revlew tlmes musl be determtned at Prel mtnafy or Completeness revfew

Rev ew Tlme for single struct use the longer RT for mdltlplc slrucs

Page 1 of 4

SubdivisionApproval ReviewTimes 6/8/2009

Certificateof Compliance

Certificate of Correction

Reversionto Acreage

Expedite is typically 75% of Standard

Express is typically 50% of Standard

lO(10) : 10 =#of work days for lst.review, (10) =#of work days for resub.

(*) ReviewTimes must be determined at Preliminary or Completeness review

LUH ReportAttachment No 2 Review Standardsxls

EngineeringConstruction ReviewTimes 61812009

Grading and Public Improvements

greater than 20 Sheets

G &Public ROW with a Subdivision

ImprovementAgreement

Any projectwith multiple

approvals(grading, public improvement,

Expediteis typically 75% of Standard

Express is typically 50% of Standard

lO(10) : 10=#of work daysfor lst.review, (10)=#of work days for resub.

(*) ReviewTimes must be detrmined at preliminary or Completeness review

LUH Report Attachment No 2 Review Standards.xls

Discretionary Review Times 6/8/2009

DevelopmentAgreement

Expedite is typically 75% of Standard

Express is typically 50% of Standard

* Format lO(10) : 10 =#of working days for first review. (10) =#of working days for resubmittals

~ . . ~

LUH Report Attachment No 2 Review Standards.xls

ATTACHMENT 3

.. Fee Change Examples

These prototype projects used to illustratecosts are based upon the models used in an industry survey of fees,

reference the "San Diego Clounty Building industry Association (HA) Fee Survey."

Apartment assumes a Complete Building (not phased).

Single Family Model Home

Current Proposed

/ F e y _

- building Permit

I

P~ototype Description: 4 bedroom. 3 bathroom, 2.700 sq.ft.. 600 sq.

11. garage, 240 sq.ft. patio, fireplace, gas and electric hookups

I:\CSI\Anelysl\Fee-Rate Study -FYOgIFinal ReportIFee Change Prototype 6-25-09 vers 2

Single Family Production

Current Proposed

oPlan Check mother DBuilding Permit

Prototype Descrlption:4 bedroom. 3 bathroom. 2.700 sq.ft., 600

liq. 11. garage, 240 sq.ft, patio, fireplace, gas and electric hookups

Valuation $244,825

Single Family Room Addition

.- .

Current Pmposed

r G zh s c k - mother building Permit

Pmtotype Oescrtplian: 500 sq. 11.

Valuation: $51.000

- - -

OBuiiding Permit .Other OPtan Check

Prototype Description: 370 unit (873 sq. ft.lunit) aparlmenl

complexon 15.7acres.

Industrial 50,000 SF 528,214

Current Pioposed

. - . -

oPian Check mother DBuilding Permit

.

Prototype Description: 50,000 sq.ft., single story building with 20

restrooms on 3.59 acres

Valuation: $1.815.000

Retail -100,000 SF

Current Proposed

. . , - -

oBuilding Permit mother nPian Check

.-

Prototype Description : 100,000 sq. it.. single rtoiy building with 25

re~trooms o n 9.2 acres.

Valuation: $4,530,000

ATTACHMENT 3

Office - 50,000 SF

.- . - -

Current Pmposed

, -

oPlanCheck .Other o~uilding pennit i

L...-

Prototype Description : 50.000 sq. it.. 2 story building with 12

reetroom~ on 3.1 acres

Valuation: $3,215.000

Research & Development- 50,000 SF

Current Pmpo~ ed

1 DBuiiding Permit mother nPlan Check

Pmtotype Description: 50.000 sq. It., single story

buiiding with 12 restmoms on 9.2 acres

Valuation 3.137.000

These prototype projects used to illustrate costs are based upon the modelsused inan industry survey of fees,

reference the "San Diego Ciounty Building industry Association (BIA) Fee Survey."

Commercial Structures assumes a Complete Building (not phased).

I :\CSliAnaly~ t\Fee-Rate Study - FYOS\Final Reporl\Fee Change Prototype 6-25-09 vers 2

ATTACHMENT 4

Fee Schedule

Construction Permits - Structures

TH E can o r s r n oLar o

CITY OF SAN DIEGO DEVELOPMENT SERVICES

1222 FIRST AVENUE. MS 301. SAN DIEGO. CA 92101

CA1.L 1619) 44fi-5300 FOR APPOINTMENTS AND 16191 446-5000 FOR INFORMATION

Thii Info~mation Bulletin lists Lhe fees coUecLed by

tlie City of San Diega for construction permits for

structures (building perniits). Also listed are some,

but not necessarily all, fees that hay be required from

agencies other than the City of Sen Diego. An ab-

breviated foe scheduleis available for Single Fnmily

Dwelling and Duplex projects, see Information Bul-

letin 501a, "Fee Schedule for Confitruction Permits

- Single Family DwellinglDuplex."

The tables within this bulletm are designed to assist

annli ean~i nesti mati neco nstructi o nnermi t fees. Far

& . "

pro jectsubmi ttalrequi reni ents,seeLandDevelo pment

Manual Project Submittal Requirements, Section 2.

I. WHEN FEES ARE PAID

The fees associated with Building Permits may be

collected durinp different poinLs of Lhe permitting

- -

process: a t project submittal, duringreview,at permit

issuance, and during inspection. There are also en-

hancedlontional services for which feesare collected.

Tile follorving sectionsof this fee bulletin describe

what fees are collected and when in lhe erocesfi thev

are collected. Payment may be made by cash, check,

ATM card, Visa or Mastercard. Checks shall be in

Lhe exact amount, payable to the "City Treasurer."

Fee estimates may be requested at any stage of the

.

project. For assistance with a fee estimate, phone

(619) 446-5300 to schedule an appointment.

11. SUBMITTAL FEES

The following fees arepaid a t the time tlie prnject is

submitted for plan review.

A. Genera l P l a nMa int enance Fee

This fee is charged for projects with plans and docu-

ments to be reviewed for comoliance withthe aeneral

plat) nr lunrl dwclup~nonl codc provisions.

Gencra. Part Ida nlenaoce Foe. ............................. 5 88

B. Mapping Fee

This fee is charged when there are plans, drawings,

maps or other geographical documents utilized for

project review.

Mapping Fee ................................................................... S 10

C. New Const ruc t ion PIan Check

Table 501A liststhe pian check fees for new construc-

tion and is based upon the occupancy type, type of

construction and the proposed square footage. For

phased projects (fbundation only permit, structural

franlc eermit, ctc.). use tfic "oartial permit" fees for

that occupunr? type. 'I'llis inforn~ini~n is token frum

l i l t plnns ur projjrc~ ;iul,lnirtnl in order to r:ilrulnl? tiir

I MARCH 2006 1

/Documents referenced in this

1

lnformation Bulletin

.Land Development Manual, Prniect Submittal

Reouirements

.lnformation Bulletin 101, "Building Valuation

Schedule"

lnformation Bulletin 103, "Fee Schedule and

Worksheet for Mechanical, PlumbinglGas,

Electrical"

.lnformationBulletin 104, "Schedule forWater

&Sewer Fees"

lnformation B_u!k!!nl?_4. "How to Oblaln and

Permit Residenllal Master Plans"

! I

I ' Ln_fq~mattonBu llet,nW. '.Requirements for

Development Fee Deferrals"

Informa!lo.n.Bulle!in!!!, "Sign Plan Check to

Permit Issuance"

lnformation Bulletin_LM "How to Obtain Proj-

ect Inspections"

.@formation Bulletin 5OLa, "Fee Schedule for

Construction Permits -Single Family Dwelling1

Duolex

1

Bulletin 532, "lnformationRegard-

Ins lnclusionarv Housino"

- -

. lnformation Bulletin 71Q,"Permit Instructions,

Procedures for Building Demolition/Removal"

II

FEE TABLES

I

~ a a h k s J g e

Table 501A - New Conslruction

Building Plan Che&

Table 5018 - Miscella

Construction Categories I FR and I1 FR ............................ 20

Construction CategoriesI1 1-HR. Ill 1-HR andV 1-HR ..... 27

Construclion Catego 4

Miscellaneous llerns I

Table 501E - Waler & Sewer Fees ....................................... 42

plnncheckfecs. Theinfonnntianis thenverified during

project review and updated as approp~iate. Changes

made during project review may result in additional

plan check fees ruhicli may require payment prior to

subsequent reviews.

. - . - . . - - . ...... - ..... -- - -

i'r nled on racy:leo paper Vsll OLr v!su pngc at !r?,?r 5 i _ ? . 0 . ~ ~ 3 gcv.Ui?. c . . u~~le~l ic!~~c. e~?~

Jpon rc.qrrcsl. 111:s nlolmalon is ava abc tn nllerllrillvc formallor persgns vi;!h d ;obillles.

-. --

......

Us55Ul 13-06]

I

Paae 2 of 43

Citv of San Dieso

D. Rlisoellaneous I t ems P l a n Check

Table 501B lists Lhc Sees for miscellaneous itemfi,

such as nccossozy structures lrelaining tcallfi, Scncc.

garage), additions Lo single dwelling unit8 and du-

pleses, iireplaccs, etc. Thesr items can stand alone,

or he grouped with oiher items.

E. L and Development I tcview

Tho f~~llowing plan cheelr Sees will he assessed for

projects with prior development perqits .

e e r m i t r a p p r M L

CommerciallindustriaI

Multiple Dwelling Units

Single Dwelling Unit

Long Term Permit Monitoring

Storm Water Plan Check

(projecls <1 acre. single dwelling

unit, and tenani improvement)

Storm Water Plan Check

(projects >Iacre)

Initial Subsequent

-eYieYL

$734 5489

$734 $489

$489 $244

$1.225 NIA

5868 NIA

F. Landseupe Review

The following plan check fees ~ $ 1 be assessed when

the pqject includes a pliin review for landscape.

initisl Subsequent

& u && p p l ~ v n l ~ w h -

Sites 1 Acre and larger $734 $488

Sites E 1 Acre

$489 $244

EX. ISSUANCE FEES

Thc Followingfees are colleclcd a t the Linle of permit

issuance.

A. Pe rm i t I s suance P e e

This fSx ii chx:id fur :111 prrgc5ctc.

Prrn .I sslanc2 FLE 1:. 111 ,312-51 . . .S .I<

P~lrulitSL.JJ~CC FOC I.\ IIIOJI i: at^) .. . . . . . . . 5 22

B. Build ing P e rm i t F e e

Build ingpe~mit Sees are collected a t permit issuance.

Table 501C lists the pernlit fees for new construc-

tion and are based upon the occupancy type, type of

construction and the proposed square Soota.gc. For

phased prqjects (foundation only pelmil, structural

frame permit, etc.), use the "partial permit" fees for

Lhat occupancy type.

C. Fire P l a n Checlc & Inspec t ion

Fire plan check and inspection fees a re paid a t pennit

issuance and are contained in Table 6010. For more

inl'or~nation call the Fire Plan Review Section a t (G19)

'L'IG-6410.

Information Bulletin 501 March 2006

D. Ha za rd ou s Mnterinls P roces s ing F e e

This fee is nssessed for each nonresidential pcrmit to

recover the cost of processing the Sta te of California-

required hazardous materials c~11,ificarion.

Hazardous Materials Processing Fee $25

E. S t a t e of California

The State of California charges 10 cents per $1,000

estimated valuation on all permits for cnnstri~ction of

single- or multif:~mily structures one- or two-stories

high. Thc charge iir 21 cents per $1,000 estimated

valuation for ~nultifamily cunstruction three stories or

higher and for permits on nonreside~ltial construction.

Forvalrrationdeternrination, seeI nfo~~n~ationBu lleti~~

101, "Building Vnluation Schedule."

F. Coun ty Wa te r Authori ty

The Snn Diego County Water Autilority ICWA) is a

separate agency from tlic City of San Diego which

supplies mw water t,o the region. They may charge

a capacity fee when a new water meter is installed.

Center, third floor, 01. an the CWA m;b site a t wxm.

sdcwa.org.

I f a SanDiego County WaterAuthority feeisrequired,

proofofpaynlent must bo shownpriorto buildingpermit

issuance. This fee mav be mid directlv to the Countv

Water Autl~ority orth;ougi the Developnlent Services

Department. A$10 checkhandling fbe will be cliargad

Soreach CountyWater Authority capacity fee collected

by the Development Services Deportment.

G. School Fee s

A school See may be assessed by the local school

district(s) for new construction. Contact the appro-

priate school districth) within the project area for

the current Sees and where to pay. If a school fee is

required, proof of payment must he shown prior to

building permit issuance. With the exception of the

San Diegn Unified School District, this See is paid

directly to the school district(s). School fees within

the S"n Diego Unificd School District may be paid a t

their offices or a t the Uevelopment Services Depart-

ment. A $10 check handling fee will he charged for

each schoolfee collecied by the llevelupme~lt Services

DepartmenC

H. Development Fees

The Facilities Financing Scetian of the Planning De-

partment collects certain fees a s part of'land develnp-

nlcnt within the City of Snn Diego. Facilities Benefit

Assessments(Ii B.4)o rDevelo pmentImpactFeesi DIP)

arechargedfordevelopme~~t inall planned urbanizing

and urbinlieed communities. Applicnnts usually pay

onearthe other iIiBAor DIP). not both. In sornacases.

.4 Spccinl Park Fee nlny he required for all new units

constructed within certain commonities.

March 2006

City of San Diego a

Iiousing 111ipact Fees will alsobeassessed for nonresi-

dential new construction;additions or interior remod-

eling to aceommodale a change fion~ the structure's

currelit usc.

Development fies are paid at permit issuance. The

current Facilities Benefit Assessment and 1)evclor~-

melit Ilnpact Fees Schedule is available at wmxv.

sa1i di ego .go v/plan1i i 11gurattheDevelo pmentServi ces

Cenler. For information call Fa~i l i t ies Financing a t

(619) 633-3670,

I.

Water si S ewe r Plan Chec k Fee s

DevelopmentSer~cesassesses awaternnclscwerplan

check fee when a water and sewer review nf allv

charged for boil1 irrigationa swell a sdomesticmeters.

For the purposes of assessing Lhove fees; 20 iixturc

units are given rr value of 1 EDU. Thc plan check fees

a recharged a t permit issuance as tb1lou.s:

ltam Fee

1-29EDUs $166 per meter

3-59EDUs $333per meter

61 EDU's $500 per meter

No meter change B up to 1 EDU 6 88 per meter

Meter change & up lo 2 9 EDU $168 per meter

Cross Connecllon Controls $ 44 per lnstallatlon

J. Water a n d S ewe rCapa c i t y Fee s

Water and Sower capacity fees associated with new

construckion aredetermined duringtlie buildingpermit

- - .

plan review process. A capad& chargeis collected for

the maintenanceloneration ofpresent water andsewer

facilities: as well a sfutureexpansion. Water and sewer

capacity cbergcs arecalculated by Equivalent Dwell-

ingUnit (EDU), and are collected a t building permit

issuance. Capacity fees can be deferred. For further

inlbrniation, see Information Bulletin 108, 'Require-

ments fo~~De~relo~mcntFeeDeierrals." SeeTnble 6OlE

for a list ofwater and sewer capacity fees.

11. Water a n d Sewer Ins t a l la t ion F e e s

Water services nnd sewer lateral insLallation fees as-

sociated with new construction aredetermined during

tlic building permit plan review process. Tahlc 501E

lists ibes fix water and sewer services, including po-

table and redaimed water for the City of Stin Diego.

-4 Water Meter Data Card is used to determine the

correct size required forr~rater meter,service sndseu'er

lateral. Wnter Meter Data Cards areavailable a t the

Development Services Centel.. All water and sewer

costs associated with const,ruction will be assessed nt

the time of building permit issuance.

L. Unreinforced Mnsonry Adminis t ra t ive Fee

Eac 500

N . ENEIANCEDIOPTIONAL SERVICES

A. P ro i e c tManagementServices

Proposed

a ,Ft. Fee

0 - 1,000 $882

1,001 - 5,000 $882 + $7.36/each add'! 100 s.f.

over 1,001

5.001 -20,000 $1.177.00+ S5.891each add'l 100 s.f.

aver 5,001

$2,080.00 + $2,94/each add'l 100 8 .f .

over 20.001

B. Exp r e s s P l a n Checlc Fee s

When available,a reduced review period canbe nccom-

plished by paying Espress Plan Checkfies. a t $1,111

111~s 1.5 times regular plan checlr fee or 1.5 tinies the

hourly mta, -,hen applicabie.

. .

C. Requ e s t for Alterna te MethodsflMaterials

Alternate Methods:

~ ~ - - ~ - -

Cslcgory I (repasts an> lnlrlnlal coin@leril)., . . 51,291

Ci l t ~(~0ry 2 (CO~PIEX 0' 2 ISFJ CSJ . . . . 5 2 726

Calrgn-y 3 lhgllly LDI?>;BX or 3 ISSUBS 2r inloi~). E?.5L3'

'Category 3 requires a deposit into a trust fund account.

Alternate Materials:

Allernate Materials Application Review ...................... $333

Allemate Materiols Research (per hour) ..................... $144

Board of Appeals Hearing (each) ............................. $1,503

Inspections."

V. OTHERFEES

A. Afiordahle Hous ing In-Lieu Fees

The Citv of San Diego's Inclusionarv Housing Ordi-

-

nance requires all nerv residentinl development of hvo

units or more to provide affordable housing, or nav a

Inclusionaiy I-lousing" for more information, including

the in-lieu fees.

B. Plan Cha ng e Fee s

Cliarlges Lo approved plans (after i k ~ d approval aud

permit issua~lcel must be checked. A nonrefundable

supplemental plan check reti nlust be paid at the

hourly rnte isee "Services Not Cove~.ed Above" fbr the

liourly rates).

C. Services Not Covered Above

Building and Safety rechecks, s u ~~p lm e n t n l plan

checlffi and other services nut covered by standard

fees $1'1'1 per hour.

Project A'Ianegen~ent Services not covered by standard

fees S144 per hour.

Land Development Review services nut covered by

standard fees $121 per hour.

Information and Application Services not covered by

standard &es $82 per hour.

Page 4 of 43

City of San Diego. information Bulletin 501

March 2006

I

D. Worlr Done Without a P erm it

Wrrrlc done without a peimit will be assessed regular

,

plan cl~ecli fees and double building permit Sees.

VI. ELECTRICAL, MECHANICAL, PLUMB.

INGIGAS PERRlITS

-

at our Inspection Services Offire lloc;~terl at 9fi01

Ridgehaven Ct,., Suite 220, 858-492-5070), or any of

ourCommunity ServiceCenters (call 619-MG-5350 for

locations). Payment for pern1il;s issued at these loca-

tions most be by check only. You may also apply for

I

M I. DEMOLITION, REMOVAL PERMIT FEES

See Information Bulletin 710, Pcnnit. Inst,ructions.

Procedores for Building Dmnolitioi~/Removd.

I

1W . SLGN PERMIT FEES

See Inlormation Bulletin 111. Sieu Plan Checlr to

Aclditjonal fees are charged for specific: eleclrical, me-

cLai~i cai i i ndplumbingigasinstallati o nsf o ri nult~i f amily

and nonresidential construclion projepts (Information

Bu lletiu103,FceSchedu lcand WorlrsheetforMed~u~~i-

c d ; PlumbingIGns, Elcctricnl"). Thisfee ~cliedule can

be used for single Sonlily nud duplcx projects that

only involve electrical, mechanical or plun~bingigas

rvorlc ~~ i t h o u t any building permit worl~, Electrical,

Mech;inicnl, Plumbinp/GnsPcrmits can be obtaineda t

ATTACHMENT - 4

I March2006 c i t y of San Diego - Information Builet in 501 pa g e 5 of43 /

I

I Table 5018 - New Construction Building Plan Check I

i

ConstructionCategories Construction Categories

I FR, Ii FR

11 1-HR, ill 1-HR. V 1-HR

I

Project Base Plus Base

Plus Base

Plus

Sq. Ft.

Fee . Increment' .

Fee

increment7 Fee

increment' .

O = ~ E c L T Y E ~ - - - _ . - - -.

$84.00 $1,673.50 $70.34 $1,515.50 $56.70Agricu'turai Building -2.000 ~ 2 '5 E L E _-_- . .

........................

I 5.000 $5,591.50 .... S79.47 $4,667.00 $86.24 $3,783.50 $52.98 ,

10;OOO S9.565.00 $77.87 $7,9g9.00

$64.83 $6.432.50 $51 .9 ~ - /

20,000 $17,352.00 . .

$59.07

....... $14.467.50

$49.23 $1 ... 1,623.50 ...-............. $39.36 !

- -

50,000 535,073.00 $35,82 529.255.50

$29.85 $23,437.50 $23.88

Auditorium 1,000 . $2,100.50

576.90 $1,764.50

$64.09

- - $1,426.50 $51.26

5,000 $5,176.50 $76.32 $4,328.00

$63.87

$3,479.50 551.43

- ......... . . . ....

10,000 $8,992.50 $73.13 $7.521.50 _ - $60.94 $6,051.00 $48.75 -

- - - - . -

Bank

50,000

_-$23,365.50 $23.8_3

$19,516.00 $ 1 9 . 8 ~ ~ $15,646.50 $15.68

Bank -Shell 1,000 $1,243.50

$44.21 $1,050.00 .

$36.85 ..... $857.00

$29.48

5,000 $3,012.00 $44.60 52,524.00

$37.44 $ 2 . 0 3 6 ~ 0

$30.29

10,000 55,242.00 $42.05 $4.396.00 $35.04 $3,550.50 $2 8 .0 3 - 1

20,000 . $9,446.50 $31.90 $7,900.00 $26.58 ~ . . . . . $6,353:50 . .?21:?6. . ~

50,000 $19.015.50 $19.34 $15,674.50 $16.12 $12,73250 $12.89 .....

Bowling Aiiey .............. 1,000 $1.848.50 $67.30 $1.554.50 $56.06 $1,250.00 $44.86 -

............................. -.

5.000 $4,540.50 $66.98 $3,797.00 $56.10

~ $3.054.50 $45.22

10.000 $7,669.50 ~ $63.98 $6,602.00 $53.32 $5,315.50 $42.66 -

.. ........

20.000 ~ $14.287.50 ~ . ~ ~ $48.54 $11,934.00 $40.45 $9,581,00 $32.38

50.000 $28,849.00 $29.43 $24,066.50 $24.53 $19.288.00 $19.62

Car Wash 1.000 $3,333.00 $125.98 -. 52,791.00 $105.34 $2.250.00 $84.88

............ ....... ....

5,000 $8,372.00 $120.22 $7,004.50 $100.19 $5,637.00 580.16 . i

1 20.000 . $11,396.00 . $38.60 __ $9,524.50 $32.17 $7.653.50 $25.73 i

- 50,000 $22,976.00 $23.41 $19.175.00 $19.50 $15,373.50 $15.6Cl--.

Fitness Center 1.000 $3,096.00--- $117.03 $2,595.50 597.88 $2.093.00 $78.73

5,000 $7,779.00 $1 11.54 ... S6.510.50 $92.95 $5.242.00 $74.36

'Per each addilional 100 square feet or liaction thereof,

Page 6 of 43

City of San Diego. Information Bullet in Sol

-

Marcli 2006

Table 501 A -New Construction Building Plan Check

Construction Categories Construction Cate ories Construction Categorie:

I FR, 11 FR

ii I-HR, III I-HR, 31-HR

II N, III N, IV, v N

Project Base Plus Base Plus Base Plus

Sq. Ft. Fee Increment' Fee increment1

!?!?_COP_S"CLX~?~ ........ ....... ........... _ ... ................ - Fee-._!"_c~me!t'

Gas Station 400 . $2.805.00 $264.63 $2,351.00 . 5221.41

$1,898.00 $178.16

. . . . . - - - -

2.000 $7,039.00 $251.73 $5.8g3.50 . 5??9:E

.... $4.748.50 $167.83

$10,089.50 $205.53

4.000 $121073.50 .-E4664_ s8.ios.00 $1-

8.000

......................... $21.939.00

$187.10 . $18,310.50 ...

$155.91. _ . $14,681.50 $124.73 .

- 20.000

544.391.00 .......... $113.45

- $37,020.00

$94.55 $29.649.50 575.54~

Hazardous Uses, Other 100

$2,164.00 $793.00

$1.617.00 $1,470.50 5660.88

$528.63

500 .

$5,336.00 . $786.40 - $4.460.50

$658.20

$3 585.00 $529.90

1.000 59.268.00 _-_ $754.10

$7,751.50

$628.40 $6,234.50

$502.75

2,000 $16,803.00 $572.05

S14,035.50

$476.72

511,262.00 5381.35

.. ......... ~ -

5,000 $33.970.50 $346.87 528 337.00 $289.06 $22.702.50 5231.26

.-.. . . _ _ _ _ - _ ... _!_ . . .

_ _ _

Health Care Center 1.000 $2910.00 S81.06 $1,855.50 $67.55 S1,501.00 $54.05

5.000 $5,452.50

-- -

$80.36 54,557,50 . $67.25 $3,663.00 _-$54.13-

10,000 $9.470.50. $77.08 $7,320.00 564.24

$6,369.50 $51.39

.. .........

20.000 S17.178.50 S58.48 $14,344.00 $48.73 $11,508.50 $38.98

50,000 S34,722.00 535.46 S28.962.50

- . - -

$23.203.50 $23.6 1~

. .

Hotel &Motel 1.000 .. $1,861.00 $64.58 $1,579.00 .. $53.80 $1 296.50 $43.04

---I ---.-- . _ I _

5,000 $4,444.00 $66.02-- 53,731 .OO _- $55.58 $3,018.00 $45.14

~

10,000 $7.745.00

- s61.3g $6,510.00 $51.16 $5,275.00 S40.g3

20,000 $13 684.00 $46.57 $11.626.00 $38.81 _..~%%?6Ke0 . .$3!:!!5

$28.24

50,000 $27$l56:0~. $23,269.00 $23.54 $18,682.50 $18.83

Hotel & Motel - 1,000 $2,197.50

- -

$ 7 7 . 3 L - 51,859.00 -- $64.49 $1.521.00 $51.56 ..

/Partial Permit 5,000 $5,292.50 $78.46 ~ - $4,438.50 s6?~.............. $3.584.00 ~ ~ ~ ~ ~ ~ $53.43

1Manufacturing 12,000 $2,689.00 $15.33 $2.254.50 .. ... $12.88 $1.820.50 .... 510.43 !

...................................................... - - - - . . .

20,000 516,405.50 5;55.82 513.699.00 $46.52 510,992.50 S37.21

50.000 $33.151.50 $33.85 $22,156.50 $22.56

. . .......... ... . . 527.654.00 .-.@LL

Lab lR & D -Shell 1.000 $1,340.00 547.91 $1,130.50 $39.91 $921.50 $31.93

......... .. ........ ........ .-

10.000 $5,665.00

- -

$45.55 $4.748.50 $37.96 $3.832.50 $30.37

20,000 . $10,219.50 ... $34.56 S6,544.50 . $28.80 $6,869.00 ................ $23.04

..... ..

- -. 50,000 $20.58600 $20.g5 $17.183.00 $17.46 .... .. $13,780.00 $13.97,-

Laundromat 150 $976.50 $227.00 $827.50 5189.17

- - $679.00 $151.33

750 $2,338.50 $231.47 $1,962.50 $194.73 51,587.00 31_58:i)7_

.. .... . ........ . ............

1.500 2 2 !0 4 5 2 1 5 . L - s3.423.00 .. e 1 ' 3 . .......... $2,772.50 $143.83

3,000 $7.312.00 $163.71 s 6 , 1 2 0 . i ? L - $4,330.00 $109.16

7,500 $14,679.00 $99.27 $9.842.00 .......... $66.18

........... . . . ... ~-_.S?ZLEP:~~ . ~ 2 . 2

'Per each additional 100 square feet or fraclionthereof.

March 2006 City ofSan Diego. information Buiietin 501

Page 7 of 43

Table 50113 - New Construction Building Plan Check

Construction Categories Construction Cate ories Construction Categorie!

i FR, It FR 11 1-HA, 111 1-HR, $1-HR

I l N, I I i N, IV, V N

Project Base Plus Base Plus Base Plus

Sq. Ft. Fee

occupancy Type

Increment' Fee Increment' Fee Increment'

Library I Museum . .'J?!?O $1,970.50 $71.93 S59.94 $1,341.50 $47.95

..................- 1"!165".OP - .

5,000

$4.847.50

571.50 $_"10_5350

$59.87 $3,259.50

$48.22

10.000 58,422.50

$ 6 8 . 4 0 $7,047.00

557.00

$5.670.50 $4560 -

20,000 ~ i5.262 .50 . .

$51.89 .... $12.746.50

543.24 .....

$10,230.50 . $34.60

50.000 S30,829.50 .- - $3146 $25,719.00

$26.22

$20,609.00_ $20.88

NursingHome I 1.000 $2.= 573.70 $1,694.50 561.41 ..... 51,372.50 $49.13 .

Assisted Livillg 5,000 $4.96450 $73.20 $61 2 9 S3.337.50 $49.35

. .......... .... ..... . ................. $4,151 ao . . .... ..

10.000 S8.624.50 -_ S70.08 558.40 . $5,005.50 $46.7 2

I

$7.215.50

i

20,000 $15.632.50 $53.16 $13.055.00

...-....... ...

544.30 $10,477.00 $35.44

$31,580.50 .. .... - - $32.24 S26,345.00 $26.86 S21.109.50 $21.49

. - ............. ..........

Office .. 1.000 . $1,922.00 . $70.10 $1.615.50 $58.41 51,309.50 $46.71

$69.71 $3,952.00 $50.37 53,178.00 $47.04

5.000 54.726.00

10.000 $8.211.50 $66.65 56,870.50 $55.54 55.530.00 $44.43

. . .. .. ....

20,000 $14,878.00

-.

S50.56 $12,424.50 $42.13 $9,973.00 $33.71

/office, High Rise 50.000 $30,810.00 $16.24 525,703.00 $13.53 $20,596.00 $10.83

500,000 . $67.290.00 $6.02 $56.130.50 55.03 - $44,971,50 -__

...............

50,000 $33.874.50 $25.62 $28.258.50 $21.35 $22.838.50 $17.08

office. High Rise -

. . _ _ _ _ - - .

Phased Permit 100.000 546.683.00

_- $13.93.__ $38,930.00 $11.63 $31,178.00 $9.34

'Per eaih additional 100 square feet or fraclion iliereot.

Page 8 of 43

City of San Diego * information Bullet in 501

Table 5014 - New Construction Building Plan Check

1 Construction Categories ConstructionCategories Construction Cate ories

I

I FR, Ii FR

ii 1-HR, Iii 1-HR, V 1-HR 11 N, III N, I",? N

I Project

Base Plus Base Plus Base

Fee increment' Fee increment'

Fee Increment'

Office, Medical 1.000 $1,848.50 $67.30 .... $1,554.50

$1.260.00 $44.85

. . . . . . . .

. .......- ..... .-

wlOSHPD Cerl. 5,000 $4.540.50 $65.98 $3.787.00 $56.10 $3.054.50 $45.22

..........

10,000 $7,889.50 $63.98 $6,602.00 $53.32

........................ .

........................... ................ . .

...............

.. ...........

....................

. ~ ~

-.

$5.315.50 $42.66

20,000 $14,2&.50 $48.54 $11,934.00 $40.45 $9.581.00 $32.36

50,000 $28.849.00 -$29.43

Office. Tenant 1,000 $1.945.00 S20.10 - - $1,634.50 516.76

-

$1,324.50 . -$13.40

i Improvement - 5,000 $2,749.00 $17.31 $2.305.00 $14.71 $1,860.50 $12.10

10,000 $3,614.50 $21.38 $3.040.50 $17.81

- $2.465.50- $14.25 5 5 . -

$12.26 $4.821.50

20,000 $5,752.00. 810.21 $3,890.50 $8.17

50,000 $9,429.00 $10.02 $7,885.50 $8.35 $6,342.00 $6.68. . .

.. ..... .- .. .........

Parking Garage, 1.000 $1.011.50 $35.38 $29.49

S857.00 $702.00 $23.59

Enclosed 5,000 $2,428.50 $36.02 $2,036.50 $30.29 $1.645:50 $24.57

........ ....

10,000 ........... ............ $1,227.50 $33.65 $3,551 .OD $28.04 $2,874.00 $22.43 ...

......

20,000 $7,592.00 . $25.52 $8.354.50 $21.27 $5.117.00 $17.01 -

50,000 $15,248.00 $15.48

$12,734.50 - - $12.90 $10,221.00 $10.32

$39.91 $956.00 $33.26

........... . Garage, Open -.-E0_0_--3%%50~ ...... . oE78_2__OL~-S2&SPP

5.000 $2.727.00 $40.43 $2,286.50

$1.846.00 52752

$33'97

10.000 $4,748.50 $37,!36__ $3,985.00 - $31.63 S3.222.00 $25.30

. -

20,000 . $8.544.50 $28.80 ..... $7.148.00 $24.00 . . . . . . . . $5.752.00 $19.20 . .

-

50,000 $17,183.00 $17.46

..---..-.....--p-. S11,511.00 $11.64 ........ ............... $14,347.00 . $14.55 ...

Preschool / Dnycare - 1,000 $2,258.00 $82.91 $1,896.00 $69.09 $1,533.50 $5=.--

5,000 $5,574.50 $82.15 S4,85g.5~ . ..... $68.74 $3,744.00 $55.33 ,

'Public Building - 1,000 $3,542.00 $133.96- - - $2*968.00

. 12.118- $2.389.50

$90.00 ,_ /

Fire Station - 2 i% ! ! . .... EiB.900:511 ....... K-r.98 . . 57,445.00 $106.64 $5,989.50 $85.32 I

...... ........ ... - ~ . . . . ~ ~ . . . . . .

~ ~ ~ ~ ~ ~

20.000 $27,837.00 $95.1 1

-- $23,225.00 $79.26 $18.613.50 563.41

~ . ~ - ~ . ~ . . . . . . . . . 50,000 $56,371.00 $57.67 $47 L- 004.00 $48.06 $37,636.50 538.45

Public Building - 1.000 $2.620.50 $96.74 $2.198.00 $80.60 $1.775.00 $64.49 __

'Per each additional 100 squar? ieet or iraction thereof.

10,000 $1 1,267.50 [email protected] .$ Q -L- . 417.50 . $76.65 . $7,568.00 $61.31

20.000 . $20,465.00 .... $69.78 ..... .. $17,082.00 $58.15 $13,699.00 $48.52 -_

50.000 $41.387.50-

.- - - - -

$42.31

$34,525.50 $35.26

$27,654.00 $28.21

$80.71

S1.847.50 $87.25

$1,494.50 .553.81 .

Public Building . Office

. ! P!! .. .S2.?40.50 ..................................

5.000 55,429.00 $80.00 $4,537.50- $3.647.00 $53.90 -,

586.95

10.000 S9,429.00-- $75.74 $7.885.50 -. $6,342.00 $51.16

$63.96

20.000 S17,103.00 $58.22

I

............. . .......... ........................ ........

$14,281.00 548.51 $1 1,458.00 $38.81

50,000 $34.588.50

/ . $35.30 $28,834.50- $29.42 S23,101.50 $23.53

I Public Building - Police 1,000 S2,20O050 0 0 ~ 0 0 , 0 0 ,

I

$80.71 $1.847.50 $57.25 51,494.50 $53.83

.

5,000 $5,429.00 $80.00 $4,537.50 . $3,647.00 $53.90 ....

-............ .....- .- - - - - .......- ......... sfis.ss

10,000 $9,429.00 $76.74 $7,885.50 $6.342.00 $51.16

a63.96

20,000 $17.103.00

.- $58.22 $14.281.00 $48.51 51 1,458.00 $ 3 3

$34,568.50 ... .... ....

. .... ................ $35.30 ........ "8834.5! . ....... $?LC- 231101.50-E3S3

i

I

50,000 $46.348.00

$47.39 538,651.00 $39.49 $30,954.50 ~ $31.59

1Public Building - 1,000 $3,756.00 $140.04

$3,144.00

$116.65

$2.532.00 $93&

IUtillly Plant ..5.000 . _

... $9,357.50 ~. . _ ....- ~ 5137.58

- - $7 811,50

$114.93

$6,266.50 ~ $92.27 ~ ~ ~ ,

I

10,000 $16,236.50 $133.14 $13,558.00 $110.96

$10,880.00 $88.77

j- . - - .

March 2006

City of San Diego - information Bulletin 501

Page 9 of 43

Table 501 A - New Construction Building Plan Check

Construction Categories Construction Categories Construction Cate ories

I FR, It FR

I i 1-HR, 111 1-HR, V 1-HR ii N, lli N, IV, 1 N

Project Base Plus Base Plus Base Plus

Sq. Ft. Fee Increment' Fee

OCCUPE~ CY.!~ ~ Fee Increment'

Increment'

Public Building . _l&?!a , $2.925.50 $10835 ~ - . - . $2,452.00 . $90.29 $1.978.00 $72.23 -- ~ . .

Recreation 5,000 $7,259.50 $106.83 $6.063.50 $89.30 $4.867.00 $7179

10,000 $12,601.00 $103.02 $10,528.50 s85??--. $8,456.50 ~ . . ~ $88.68

I 20.000 ~ $22.902.50 $78.15 s1gp113.50.. $55113.~ ..,... 5_i_S:323:00~sS2:'2 .....

I

500.000 $85,798.00 $9.55 $71,554.00 $7.96 557,310.50 $6.38

~. . ... ~

~ ~ . . ~ ~ . ~ . - .

~

Residential - 1.000 $919.00 $69.60 $779.50 p -.-_--_.$59.45 5640.50 $49.20

$59.98

ManufacturedHousing 2,000 S1,815.00 $1,374.00 S49.98 $1,132.50 $40.00

- . . --

I

SeeTable 5018 for combined Pian Check and Inspection Fees

R~sidentisl-SFO!~:P'e_~iBi~~ . ~

Residential - SFDIDuplex, 1,000

nia nla

nla nla $1,240.00

$67.40 .

custom _!E ~ nia

~ nia

! I! _a_a. . . A

. .nia __ . -:?!!S7?:!P ! iE%

-

nla

2.000 da nla da $1.929.50 536.75-

..

nla nla

3,000 n/a nia s2.2g7.00 $52.08

5,000 nla nla nla 63.338.50, . $95.31 .

- __- ~

!! a ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ .. . - . ..

Residentiai - SFD/Duplex,-2,000 nia nla nia nla $703.50 $15:30_~

Models 1,500 nla .- nla "la ~ ~ ~ - ~ nla ~ - ~ - ~ ~ S780.00 $30.70

nla $933.50 $30.65

~ ~ ~ - -

3.000

- -

nia n/a 2!? ~ nla _ $1.240.00 $22.98

5,000 nia nla da nia $1,699.50 $30.64

- , ~ ~p

U e ~~t @ I I l s ~D ! D u p ! e x , ~~~~h a s e S4~e_I!rOrmation B~IIe~in.~j__4~_H~w!o.~b!aLn_a~ilfie~~iRe~id_eil!iajMastELPlvns.....

I

/ Residential Care go _--_ $2.016.50 S368.50 $1.694.50 5307.06 nia nia I

I

1 1 ,O0Op 54.964 50 $366 00 _ _ $4,151.00 $306 45

nla nla I

-- - - -

-

$350.40 $7 215.50 $291.98 nia nla

-.2.000 .. ..S%E?:?D

...-..--._4_4...._4.... _4. -_4-_4_4_---._4.--. . . . . . . _ . ..-. ,.

4,000 $15,632.50 $265.80 .. $13,055.00 $221.50 ... nla

clia nla

$134.32

'Per each addilianal 100 squaro feel or fraction thereof.

-

0 of 43 City of San Diego * I nformation Bulletln 501 March ZOO6 /

Table 501A - New Construction Building Plan Check

Construction Categories Construction Cate ories Construction Cate ories

I FR, II FR

II 1-HA, III I-HR, 31-HR

11 N, III N. IV, f N

1 Pralsct Base Plus Rase Pltts R a sn D ~ S C /

~ -

. - ~ ~

~ ~ ~ -

. . - - - . . .

---- .."-

Occupancy Type Sq. F t - Fee increment' Fee Increment'

Fee Increment'

. . .

1,000 $3.578.50 $135.35 s2~9gs~!'o S113.14 S2.413.50 $90.94

5.000 . S8.992.50 . $129.32 . . . 56,051.00 $86.20

$7,521.50 . $_107:T. -.

10,000 $15,458.50 -70 $12.910.00 5105.58 $10,361.00 $84.117

/

50.000 $56,962.50 558.28 $47.497.00 $48.57 $38,030.50 $36.65

-

. ...... -. .- .- ... ..... ...... .. ..... . ..

Restaurant -Shell 1,000- S2.763.00 ........ .... $104.25 $2,316.50 $87.23 $1.869.50 $70.23

............ ... .

0,000 510,623.00 $35.94 $8.880.50 $29.95 ~ ~ $7.137.50 $23.96

517,866.00 518.16 514,326.00 $14.53 ...

GO0 . _s21!405?0 . $21.74 . . . . . . . . . . . .

Retail .Store, Shell 1,000 $1,147.00 $40.53 $969.50-.

$792.50 $27.03

$33.78

5,000 $2,768.00 - .. $41.02

. $2,320.50 $34.46 $1,873.50 527.90 . . i

10,000 $4.819.00 $38.55 $4,043.50 . 1 z . . . . . $3,268:50 . .

_52570-- 1

20,000 $8.673.50

529.24 $7.255.50-_- $24.37 $6,838.00 $19.49 1

50,000 $17.444.52

$17.73 $14,565.00-_ 514.77 $1 1,685.50 $11.82 -i

1,000 $871.50

- $30.04 $740.50 $25.03

$608.50 $20.03

$30.63 $1.741.50 $25.98 ....... ....

ena ant improvement .. . ~.~E..-S_~,~Z~?.~P...~ . E:!

10,000 $3,614.50 . L E E ..- - - - - $3,040.50 $23.80 $2,465.50 $19.05

$21.67 55,420.50 $18.06 20,000 S6.471.00 54,370.00 $14.45

513.14 S10.837.50 $10.95 . . .

O.000 - . . $ 'Z E O ....... .......

...... $Ei7.04:00 58.76,

i

School 1.000 $2.258.00 S82.91 $69.09 $1.533.50 $55.26- -

$1,896.00 .. .........

'Per each addltlonal 100 square iael or fracllon thereof

March 2006

City of San Dlego. InformationBulletin 501

Page 11 of 43

1 Table 501A -New Construction Building Plan Check 1

Construction Categories Construction Cate ories Construction Categories

i FR, II FR

ti 1-HR, III I-HR, $ 1 - H R 11N, I I ~ N, IV, v N

Project Base Plus Base Plus Base Plus /

Sq. Ft. Fee Increment' Fee

occupancy Typ e

Increment' Fee Incrementt ;

...

Tenant Improvement, 200 s5 % o o . $90.19 5477.50 575.06 .... .................... 8399.00 $60.06 .-

Other .. ...... 1.000 $1.277.50 $95.80 S1.078.00 . . $879.50 $66.70 ~

. . ...

Theater 1.000 51,462.50 $52.58 $1,232.50 543.61 nia

1

"1.3

i

5,000 $3,565.50

... ..... --

$52.70 S2.985.00 $44.20

10.000 $6,200.50 $49.99 S5.195.00 $41.86 nla

. ... .... . .

20,000 $11,199.00 SQ.360.50 $31.60 nia nla 1

537.92 ----____

50,000 S22,575.00 $22.99

~ $16.840.50 - $19.16 nla

Warehouse 2.500 $1,043.00 .. $15.41 .. $ ! ! O - ~ ?iZE . . . . . 7 2 3.0 0 ? 2 : ? ?

- 12,000 S2.506.50 $14.30 52,102.50 s12.02 S1.698.50 .. ............. $9.75 /

125.000 S15,759.50 $8.40 $13.160.50 85.33 - $10,562.00 54.27

..................

Woodworking 1,000 $1.437.00 - $51.59 $1,211.50 $42.98 .-S986.00 S34.39

5.000 $3,500.50 $51.74 $2.930.50 543.41 $2,381.50 $35.06

.. . ...

10,000 56,087.50 -

-

$49.05 S5.101.00 $40.88 -- 5.1,114.50 532.70

1

20,000 S10.992.50 $37.21 $9.188.50 $31.01 57,384.00 $24.81

__1

- .. ---

'Per each addilionai 100 squarefeel or iraction thereof.

Table 501 B-Misceilaneous liems

Plan Check & Inspection Fee Schedule

Iwm Fee

Addressing-New Structure, per address ............................. $27

Antenna, each ................................................................... 5723

Antenna-CeiluiarIMobiie Phone, each .............................. 5645

Awning or Canopy (supported by building), each ............ $378

Carport-Standard, each ................... .............. ! .................. $31 1

Cerport-With Caics, each .............................................. 5533

Cammercia

Equipment

up to 200

each add'l

Fence or Fr

/ Additional

I Fenceor Freestanding Wail

i Masonry,City Standard up to 100 1.i................................... 5411

Masonry Special Design,up to 100 1.1 ................................. $634

Add'l Fence or Wail, Mascnry,each 100 1.1. ................... .... . 522

F ireoiace

Foundation Repair

Standard, up to 100 1.f. ...................................................... $378

Standard, each ad#] 100 1.i.................... . . . .................. $44

Special Design, up to 100 1.i. ......................... .. ............. $745

Special Desipn, each sdd'l 100 1.1 ................ ................. $44

Garage

Wood frame, each 1000 s.i ............................................... $678

Ivlasonry, each 1000 s.i ..................... ... ....................... $1090

Liuhtlno PoielFlaoooie

- - -.

First pole ........................................................................ $557

Each Addilionai pole ....................................................... $266

Paint Spray Booth, each 1000s.f...................................... $678

Partition - Commercial,interior

Up i 0 50 1.f ........................................................................ $367

Additional partition, each 20 i.i .......................................... S30

Partition -Residential, Interior

Balcony-With or Without Cnics

Pile Foundation-Any Material

First 10 piles, up to

23

/ Additional plies, eac 26

Retalnlna Walt-anv material 1

d ~ ~ ~. -

Slnndaro uii io 100 I i . . . . 5376

5pe;ial Dcsgr up lo IUD ,I ......... 57.15

Aoo lhlillal eta nlng v.a.1 each 101, I

i. I.!

Roof Structure Replacement With or Witii

tout Caics

Less than 10 s.i,, aac

Spa or Hot Tub (Pre-fabricated), eac

Stairs

iirst ilighi .................. .. ............................................ $266

Each additionalfiiqhl. per filghi .......................................... 51 11

Storaae Rscks

~ ~ d -

. . . . . . . . . . .

6 ' 2 ..p I 1 0 . : . 5 1 1

5712

AooitS3~ a~ lacZ.5, cilcil 50 1.1 ..........................

560

Stucco and Siding, Stone or Eric): Veneer ~ pp l ic j t ion

...................................... S10

................. 1,136

Closing of existing do

Replacement, iirst on

I

I

'This fee includes ali strucluial, electilcai, piumbingand mechanical wo rk within the footprint of the remodel or mom addition. Stand-

aloneiiems listed eisevihere inTable A are 119! added to lhe plan check and inspection fees, unless those sland-alone items are

outside the footprint ot the remodelor room addition.

i March 2006 Citv of San Dieao. llrformation Bullet in 501 P a u e 130 f 43 i

i

occupancy Type

Agricultural Building

Table 501C - New Construction Building Permit

Conslruclion Categories Construction Categories Construction Categories

I FR, I1 FR

I1 1-HR, 111 1-HR, V 1-HR 11 N, ill N, IV, V N

Project Base

Plus

Base Plus Base

Plus

Sq. Ft.

- Fee

Increment'

Fee

Increment' - _Fee ............. Increment1

1.000 $311.50

$7.86

$259.50 $6.55 $207.50

55.25

....... . . . . . .

5,000 $626.00

51.51

$5zL% $1.28

$417.50 51.00

10,000~---- $701.50 $0.78

$584.50 $0.65

$467.50 $0.52

5,000 $2,088.50 $5.01

-

$1.740.00 $4.18 $1.392.00 $3.34 /

10,000 .. $2,339.00 . . $2.60 $1,949.00 . $2.17

...

$1,559.00 $1.73

i

20.000 $2,598.50 $5.20 52.165.50 $4.33 $j.732.0(]- 53.47 -

- 50.000 54.158.50

$5.72 $3,465.00 s4.? ...... .. $2.772.50 . . 83.81 .

$22.48 $742.00 518.74

!

-1

/Banlr -Shell ..', O'? . . . $a? ! .Do ................................... .. ... $593.50 514.99 1

I ..!?!,ooo. $2.227.50 ....... 64.46 $1,856.00 83.71 . . - $1,484.50 .. - . $2.97

i

54.90

50,000 $3,584.50 , $2.970.00 s4.O9 52,375.50 $3.27

Boviling Alley 1.000 $1,336.00 $33.73 $1.113.50 s28.10 $691.00 $22.48

5,000 $2,685.00 $6.44 - $2,237.50 $5.37

$1.790.00 $4.29 1

p ~ ~ ~

50,000 $5 346.50 $7.35

_ _ _ L - 0 S;Bis_6_4-sO-so~$4.90

$6.13

........

.

Car Wash 1,000 $623.50 $15.74 $519.50 $13.11

$415.00 $10.50

$3.01 $1.044.00 ....

. . 52.51

$835.00 $2.01

__S!%!!_ -._S;!i?!!!-~-.

.

- ~ ~ ~ ~ ~ ~ - ~ - ~ .

Church 1,000 $3,712.50 Sg3.66 $3,094.00 $78.04 82,475.00 882.44.-

$17.90

5,000 -ir,459.00 $6.215.50 $14.93 54.972.50 S11.94

S9.29 $6,962.00 $7.74 65.569.50 $6.19

10.000 $8.35400

."

/nry Cleaning Piant 1.000 X :EE . $29.98 $980.50 ~24.98 $791 5 0 . . . .$19.99 i

53,168.50 >AS-

'Per each additional 100 square lee1 or fraction thereof.

1 ~ a g e 1 4 o f 4 3 city of San Diego. I nformation Bulletin 50 1

March 2006

Table 501C - New Construction Building Permit

Construction Categories Construction Categories ConstructionCategories

I FR, 11 FR

II 1-HR, I ll 1-HR. V 1-HR 11 N, I ll N, IV, V N

I

I

Project Base Plus Base Plus Base Plus

!Occupancy Type Sq. Ft.

- Fee

Increment' Fee

Increment'

Fee Increment'

/ &sZ i G n ~ 400

~ . ~ $1,559.00

~ ....... -$98.34 ~ $1,299.00 $81.94 $1,039.50 $65.56

I

2,000 $3.132.50 $18.80 $2,610.00 $15.70

$2.088.50 $1 2,53.

1 4.000 $3,508.50 $2,924.00 $8.11

$2,339.00 $6.49

S9.75 ~ ~ ~

.~

20.000 . _ $6,237.50 ~ $21.45 - $5 198.00 517.87 $4,158.50 $14.30

/

_

'Hazardous Uses, Other $445.00 $112.38 $370.50 $93.75 $298.50 574.88 -

500 $894.50 $21.50 $745.50 $17.90

$596.00 514.40

I

- - ~ . . ~ .

~ ~

- - ~ . ~

i

1,000 51,002.00 611.15 $835.00 $9.25 $668.00 $7.40

-

~ -

/Health Care Center 1,000 $2,450.00 $61.81 $2.041.50 $51.53

$1.633.00 $41.21

5,000 $4.922.50 $11.83 $4.102.50 - - $9.84

$3.281.50 $7.88

I

10,000 $5,514.

~ ~ ~ ~ ~ ~ ~ - . - -,

. _

I , 50,000 59.802.50 $13.48 $8.188.50 $11% $6.534.50 58.99

/Hotel & Motel 1.000 $1,707.50 $43.09 $1422.50 535.91 $1 138.50 $28.71

.. - - .! .... r ~

IHotel & Motel - 1,000 $1,707.50 $43.09 - $1,422.50 535.91 $1,138.50 $28.71 1

/partial Permit 5,000 $3,431.00 $8.24 $2,859.00 $6.87 $2,287.00 55.49

i

Laundromat 150 $1,113.50 - $187.33

$742.00 $124.92

$927.50 5156.17

750 $2.237.50 $35.80 ~ $1 864.50 $29.87 51.491.50 523.87

- ~ . ._

1 1,500 ~ $2,506.00 $18.57 $2.088.50 $15.43 $1,670.50 $12.37 --

$37.13

3,000 $2.784.50 $2.320.00 $30.94

$1.858.00 524.78

7.500 54,455.50 $40.85

- ... ~ . .. ~ - - - - ~ ~ ~ -~ . ~ ~

.,~ $3.712.50 . - ... $34.04 ~ ... $2,970.00 .. $27.23 . ~ ...

'Per each additional 100 square feet or fraction thereof.

-

I March 2006 City of San Diego - information Bulletin 501 ~ a g e 1 5 o f4 3 /

Table 501C - New Construction Buildina Permit

1

-

Construction Categories Construction Categories Construction Categories

i FR. I1 FR

It 1-HR, 111 1-HR, V 1-HR

ti N, I ll N, IV, V N

i

Project Base Plus Base Plus Base pius j

Sq. Ft. Fee Increment' FCC .. Increment' .... Fee Increment1

-I

1Library /Museum . 1,000 . . 52,375.50 S5g.95 ~ $1.979.50 $49.96 $1,583.50

~ . ? i ? X I

/AssistedLiving .%'??? .. $3,729.50 $6.95 $3,107.50 - $7.47 $2,406.00 $5.97~ . ~ . 1

20,000 $4,641 .OO $9.28 $3,867.50

50,000 $7,426.00 $10.21 $6,166.50 $8.51 $4,950.50 $6.81

. . . ~ .~ ~ ~ . ~ .. ~ ---- .. - ~ ~ ~ . - ..

Office 1.000 $1.670.60 $42.15 $1,392.00 $35.13

$1.113.50 $28.10 _ ,

$8.06 $2.797.00 $6.71 $2.237.50 55.3i5,000 $3,? EEK

~ ~ ~ ~ - ~ ~ ~ ~

1Office -Shell 1,000 $891.00 522.48 $742.00 $16.74 $593,50 $14.99_

I

5.000 $1,790.00 54.29

$1.491 5 0 $3.58

$1.193.00 $2.86

10,000

$2,004.50_____ $2.23 $1.670.50

$1.86 $1,836.00

$1.49

I

-

5~~~~ -

$4.90 $2.970.00

$4.09

52,375.50 . $3.27

Office, High Rise 50,000 $5.569.50

$5.57 $4.641 .OO

$4.64 $3.712.50

$3371.__

$8,354.00 $1.95 $6,962.00 $1.62

'EEo ~ ~ ~ . . . . S5.56950 . .

200,000 $10.303.50 $1.21 d % ? ! L S1.01 $8,869.00 $0.80

500,000 $13,924.00 $2.78 $2.32 $9.282.50 $1.86

- .-

50,000 55.569.50 $5.57 $4.641 .OD $4.64 $3,712.50 $3.71

Office, High Rise - ~ .

Partial Permit - - 100,000 $8,354.00 $1.95 $6*962.00 $1.62 $5,569.50 $1.30

-.

$1.21

200,000 $10,303.50 _____ $6,586.50 $1.01 $6.86900 $0.80

- -

$2.78

/ ~ 5 , s ~ S E .~ ~ _ ~ - S O ~ _ . ... .! %? -~.-~-8%ze~~ $ 1 .8 6 . .

Office, Medicai 1,000 $1,187.50 $29.38 Sg89.50 $24.98 $791.50 $19.99

i

$ 5 . 7 3 -

s.oao..-%EEE ~ $i,gss.50 $4.78 51.591 00 $3.82-._

I

10,000 $2,673.00 $2.97 .~ >Z???~Z . SZ!~ - . $1.782.00 $1.58

20.000 $2,Y70.04 $5.94 $2.475.00 $1,979.50 $3.96

5 4 . 9 5 .

50,000 - $4.752.00 $6.54 $3.960.00 ~ ~ - ~$5.45 $3,168.50 $4.36

Office, Medical - Shell $742.00 $18.74 5593.50 $14.59

1,491.50 $3.58 $1,193.00 S2.85_

10.000 ~ ~$2,004.50 $2.23 ~ ~ $1,670.50 $1.86 $1,336.00 $1.49 I

20,000 $2.227.50 $4.46 $1,856.00 ~ $3.71 ~ . ~ $1.484.50 ~ $2.97 ~ 1

~

50,000 $3,564.50 $4.90 - 52,970.00 $4.09 $2.375.50

$3.27 :

'Per each additional 100 square ice1 or fraction ll~ereaf.

.-

T G e 16 of 43 c i ty of San Diego information Bulletin 501 March 2006 I

Table 501C - New Construction Building Permit

Construction Categories Construction Categories Construction Categories

t FR, ti FR

I i 1-HR, I ll 1-HR. V 1-HR I i N, I ll N, IV, V N

1

1 P roiect Base Plus Rasp P l s t~ Ra+@ PIII.

.

. . . . . . ---- .

Occupancy Type ~ Sq. Ft. Fee incrementi Fee Increment' Fee Increment1I

Office. Medical 1,000 $1,484.50 $37.46 $1,237.00 $31.23 $969.50 $24.98

......... . .............

wlOSHPD Cert. 5,000 52.983.00 $7.17 $2,486.00 $5.97 $1,988.50

............... ....... .. ..

I

10.000 $3,341.50 $3.71 $2.784.50 $3.10 $2,227.50 $2.48

-____ . - -

~_

Enclosed 5.000 $2,237.50 $5.37 $1,664.50 54.48 $1.491.50 $3.58 '

.. - . - ......... . . . ..

10,000 $2,506.00 $2.79 $2,086.50 . $2.32 - .... l& ?z!% .z-.~-%!!!ss . . 1

i

I I--__---

50.000

.................. $3,712.50 $5.11

$3,094.00 54.25

$2,475.00 $ 3 .4 0

/Preschooi I Daycare 1.000 $1.206.00 $30.45 $1.005.00

$25.36

~ 804.00 $ 2 0 .2 9

i

5,000 $2,424.00

-

$5.81 $2,019.50 $4.66 $1.615.50 53.89

10,000 $2,714.50 -- $3.02 52.51 $1,810.00 $2.01

.. .......... sz.2s2.50

!

20.000 53.016.50 S6.03. $2.513.50 . .. $5.03 $2,010.50 ............ $4.02

$8.64 50,000 $4,E26.50 $4,022.00 $5.53 $3.217.50 $4.43-

Public Building - 1.000 $2.286.50 $57.70 51.906.00 S48.06 $1,524.50- 53846

p p .

Fire Station $3,828.50 ..... . . . . ..

. .................

~ ,o o o _ ~ _ _ E z ~ K 511.03 3929 $ 3 .es_ 31_00$7.35.

10,000 55.146.00 s5.72 54,288.00

54.77 $3,430.50 53.82

20.000 $5,718.00 $4,765.00

59.53 $3.812.00 57.62

$12.58 $7,624.00

$10.48 $6.099.00 $8.39

S17.44

50,000 $9,149.00

.... .............. .

I

Public Building - 1.000 51,670.50 S42.15 $1,392.00 $35.13

Misceilaneous 5.000 53,356.50 $8.08 $2,797.00 SG.71 $2.237.50 $5.37

- -

$3,132.50 $3.49 $2,506.00 $2.79

!O.Ooo . . ~3,isS.SE . . . ..,s.!s_ _ .... _ . _

20.000 $4.177.00 58.36 33,481.00 S6.96 ..... $2,784.50 ... $5.57 ...

I ~ ub i i c Building - Police _-I=- 61.856.00 s48.84 $1,546.50 - $39.03 $1,237.00 $31.23 1

I I

'Per each additional 100 square feel or fraction thereof.

/ March2006 City of San Diego. information Bulletin 501 page1 7 of 43 /

Table 501 C -New Construction Buiidina Permit

1

-

Construction Categories Construction Categories Construction Categories

i FA, I i FR I i 1-HR, I ll 1-HR, V 1-HR

II N, I ll N, IV, V N

Project Base Plus Base Plus Base Pius

Sq. Ft. Fee Increment' Fee

!&.w E!T x?L. ...... I nc r ~ e ! K - Fee Increment'

Pubiic Building - 1.000 $4.084.00 $103.03 $3,403.00 $85.86 - ~ $2.722.50 $68.69

-

Recreation 5.000 $8,205.00 __- $19.69 $6,837.50 "A $5.470.00 513.13

10,000 49,189.50 $10.21 $7,658.00 $8.51 56.126.50 $6.81.-

..

20.000 $10,210.50 $20.43 $8,508.50 517.02 $6,807.00 $13.62

. . . .... . .... ....

50.000 $16.338.00 522.46 $1 3.6%OP $18.72 $10.891.50 $14.98 __

PublicBuilding - . 1,000 $2,821.50 ................ $71.18 . $2.351.00 . . $59.33 $1.880.50 547.46-

Utility Plant

~ ~ . . ~ ..

$5.668.50 $13.62 $4,724.00 $11.34 $3.779.00 . - 59.S~ ~ .

5.000 . . . . . . . . . .

$i.O6 $5,291.00

..'LC!!!? s!!%%? ... .... $5.88 $4.232.50 $4 .7 1 ~ - ~ ~

$14.11

20.000 $7.055.00 55,879.00 $11.76 $4,703.00 $9.41

50,000 51 1.287.50 515.52 $9.406.00 $12.94 $7,525.00 $10.35

.. ....... ............. .... .. .... ...... ...

Repair Garage 1,000 $1.113.50 .$28.10 _- S927.50 $23.43 $742.00-_ $18.74

I

5.000 $2,237.50 55,37 $1,864.50 54.48 $1,491.50 $3.58---

Residential -AptlCando, 50.000 S11,139.00 $5.57 $9.282.50

S4.64 57,426.00 $3.71 I

High Rise 100.000 S13.924.00--

$6.96 - $11.603.50 S5.80 $9,282.50

$4.64

200,000 $20,886.50 $2.32 ~ -$17,405.50

$1.93 S13,924._00_,. $1155

;

Residential - 1.000 $559.00 $6.70 s 4 6 5 a $5.60 .. . __ $372.50

$626.00 $3.50 $521 SO

Manufactured Housing .-.2.000

$2.93 $417.50 $2.30

4,000 .... $696.00 . $6.96 $580.00 $5.79 . $463.50 .. $4.64 . .

Residentiai-SFDIDuplex, - - Addition See Table 5018 for combinedPlan Chech and Inspection Foe!

~ . -

Residential - S FD lO up l e x ,~ O nla nla nia nla 5835.00 _ _ _ _ _ . $69.60

Custom 1,500 nla nla nlo ......... nis ..... $1,183.00 .. $41.80

2,000 nla ~ nia nia nla $1,392.00 541 .80

3,000 nia nia nla $1 ,810.oO $6.95--n1a

- - - . _ _ _ _

5,000 nla nia nla nia $1,949.00 $6.96

/

. ............ . ..... ..

Residential - SFDIDupiex. 1.000 nla nla nla nla

SSQ7.00 $39.8",._-

Models

1.500 nla nia

nla n/a 5596.00

$19.90

- .- . -1

2.000 n!a nia n!a nia S795.5O $14.90

.. ........................... .... ... ..........

3,000 nla nla nia nla .... $944.50 $7.45

5.000

- -.

nki nla nla $1,093.50 $5.97

........ .....

i Residential - SFDIDupleu

I- ~ c t i r i ~ q h_ase~ . . . ......... SE !nf~'ma!!~_"~sol!etm !XHow14Pb!?~!?~?.~ermiiR?_~i_d~~!i!l _~ ~ ste i _~ l a ~ . ...... . . . . . . i

/Residential Care 200 $742.00 593.69 $618.00 $78.13 nla ..

$17.90 1.000 $1,491.50 $1.243.00 $14.90 - - nla

2,000 51,670.50 $9.28 $1.392.00 57.73 n/a nla

.................. . ........ . . . . . .

4.000 $1.856.00 $18.57 $1,546.50 $15.48 nla

1

nio

"la - -

10.000 $2,970.00 S20.43 $2.475.00 517.02 ... nla 1

I

'Per each additional 100 square ieet or iraciion thcreof

/ p a g e l a o f 4 3 City of San Diego - Information Bullet in 501

March 2006 1

Table 501C -New Construction Building Permit

ConstructionCategories Construction Cstegorles Construction Categories

I FR, ii FR II I-HR. 111 I-HR. V 1-HR

I1 N, Ill N, IV, V N

Project Base Plus Base Plus Base

Sq. Ft. Fee Increment' Fee i n c r em e n t '

E r &! pm T Y E . . . - . ...... . . . ........... Fee Increment'

... ..... .. ....

1,000 $1,496.50

$37.76 $1.247.00

$31.48

$997.50 $25.18

5,000 $3,007.00

$7.22

$2,506.00 ".02-. $2,004.50

$4,81

1 10,000 $3,368.00 $3.75

$2,807.00 63,12

$2,245.00 S2.50

20,000 $3.742.50 $7.49 ... ~ ~ ~ ~ ~ ! . . . . . . 6124 . . $2.495.00 . $4.99

-

50,000 $5,988.00 $8.24 $6.86 $3,991.50 $5.49

54,990.00 .

Restaurant -Shell -1,00030--. 5997.50 $25.18 $831 .OO s20.g9 $665.00 $16.78

.--.-_ _ _ _ .p

5.000 $2.004.50 $4.81 $1.670.50 $4.01 $1.336.00 53.21

- ~ . ..-........ .... . . .....

10,000 $2.245.00 $2.50 S1.871 .OO _$2.08 $1.496.50 $1.67

20.000 52.495.00 54.99 - $4.18 $1.663.00 $3.33

$2079.00

50,000 53,991.50 $6.49 $3,326.50 $4.58 $2,661.00 $3.68

.. ................................ ....... ........

Retail -Department Stare 1,000 $2.598.50 $65.56 $2,165.50 $54.84 $1,732.00 $43.73

--

_

20,000 $6,498.00- s13.00 $5,414.50

$10.83

$4,331.50 $8.6-

50,000 $10.398.50

514.30 $8,663.50

$11.91

$6.931.00 $9.53--_

-. ....... ........ . .........

Retail -Market 1.000 $1.670.50 . 542.15 51,392.00 $35.13 51,113.50 ... 528.10 - - -

5.000 $3.356.50 $8.06 52.797.00 $6.71 $2937.50 $5.37

50.000 ~ ~ $6,583.50 $9.19 $5,569.50 $7.66 $4,455.50 $8.13 -

Retail -Store 1,000 $1,335.00- 533.73 $1.113.50 $26.10 $891.00 S22.48__-

5.000 $2,685.00 $6.44

- -

$2,237.50 S5.37 $1,790.00

Retail - Store, Shell 1,000 $22.48 s891.00

$742.00 $18.74 $583.50 $14.99

5,000 $1,790.00 $4.29 $1,491.50 53.58 51,193.00 $2.86

. ~ - . ~ - ~ ... . ~ . . ~ ........... ~ . .....

10,000 $2,004.50 $2.23 $1.670.50 $1.86 $1,336.00 $1.49

..~ .............

50,000 $3.564.50 $4.90 52.970.00 $4.09 $2,375.50

.................-.. ... ... . . .

Retail -

- 1.000 $742.00 $18.74 $518.! x $15.83 ..-_-_-_-p $494.50 $12.49

School .l;O?L! . .$3E !:~ 0 . . . . . . $74.93 . S&?'!L"!? .... Se2.4t. . $1,979.50 . $49.96 -

5.000 $5.967.00 $14.33 $4.972.50 - $3,978.00 $9.55

$17.94 ...

'Per each additional 100 square feel or iiaclian thereof,

/ March 2006 c i ty of San Diego. Information Bulletin 501 p a g ZG 4

1 Table 501C - New Construction Buildina Permit 1

.'

Construction Categories Construction Categories Construction Categories

I FR, II FR

II 1-HR, 111 1-HR, V 1-HR ! IN, I ll N, IV, V N

Project Base Plus Base Plus Base

Sq. Ft. Fee Increment'

occupancy Type- - ~ - . . . . . . Fee - .

Increment' Fee Increment'

200 $324.50 $40.94 $270.50 $34.13 $216.00 $27.31 ...

Tenant improvement, _ . . . . . _ .

Other 1,000 $652.00 $7.85 -__ $543.50 $6.50 . . 5434.50 $5.25 i

$730.50

2,000

-

$608.50

S4,05 $3.40 $487.00 $2.70

. ...

$6.77 $541.00 $5.41

- --

$7.45 $865.50 $5.96

Theater - - $44.31 nla nia

-

5.000 54,235.50 $10.17 $3,529.50 $8.47 nla nla

................... . ... ..... ....

10.000 $4.744.00 $5.27 $3.053.00 - $4.40 n:a

n'a .......

$10.54 20,000 $5,271.00

- $4,392.50 $8.79 nla nla

50,000 $8.433.50 $11.60 $9.67 nla nla

...- .. . $7.028.00 . ___ - - - .................

Warehouse 2,500 . $1,085.50 $11.54 $9.61

$g04.60 $723.50 $7.69

$2.02 $1.817.50

12,000 $2,181.50 $1 .88 $1,454.00 $1.35

... .

25,000 $2,443.50 $1.08 $0.91 Sl.G29.00 $0.72

. . . . . ._-E.??~_ms.OO.... . ....... .... ..

125.000 54,344.00 $3,620.00

52.39 - . - _ _ _ -. .... ....

$1.99 52,896.00 $1.59

-_

Woodworiring 1,000 ... $965.00 .... 524.35 $804.00 $20.29 $643.50 $16.23

. -.........-. ....... ..... ..

I

5,000 $1.939.00 $4.65 $1.615.50 $3.89 $1,292.50 53.11

- -

_- -

I

'Per each atiditional 100 square ieei or Iiaclicn thereof.

Page 20 of 43

City of Sen Diego. Information Bulletin 501

March 2006

Table 501 D - Fire Plan Check and lnsaection

1

$1 681.00 $1,846.50 $6.05 $5.10 $14.19 $5.79

' 0 0 $1,0%00_-___~ ~ . . ~ -

i n n cr 9K . 2 "" " A c "n ,c .n n .."on "- "" -.. . .

I

(FA) -Construction Categories I FR and 11 FR

6

$1.48

$ 5 . 9 2 5 4 . 9 4 . ,

.50 $6.60 . .. ....~ $4.34 $=--,

50,000 $8.377.50 pl,B55.00 $4.651 .OD $5,079.50 -50.03

$0.54... $3.43 . . =

Church 1.000 $3.021.00 $1,049.00 $1.681.00 $1,646.50 $6.05

$14.19 $5.79$ S . lL .... ~ ~

!

5,000 ~ $3.263.00 $1,253.00 $2.448.50 . $2,078.00 _ . . . 516.89 %!%g. . , $9.33 $11.44

1

I

1Occupancy Project

1Type Sq. Ft.

1

4 $4.29 $5.38

-- ~.

-. -.

17.46 ~ $0.82 $3.31 55.70

~. ~

Dry Cleaning 1,000 $2.922.50 ~94900$1~780,5 ! $1,750.50 $ 5 ~ 5 $4.70 - . $13.91 $ 5 . 4 6

5,000 53 ,156 .00 $JSlii37.O0 $2.337.00 - $1,969.00 $16.38 $3.75 58.90 $10.97

1 !!!L!!OO. $,3.975_" .....%1~2% ?!s_o. .S2E2:(Ic.-$2.5 17:5 0_~E8_7_-~~. 52.88 ~ ~ $5.57 ~

$9.88 ..~ ~ j

Base Fee

Sprinklers

No Sprinklers

Sprinklers Alarms

& Alarms

or Alarms

Only Only

Plus Increment Per Each Additional

100 SF or Fraction Thereof

Sprinklers

No Sprinklers Sprinklers Alarms

&Alarms

or Alarms Only Only

ATTACHMENT - 4

/ March 2006 Citv of San Dieso -Information Bulletin 501 ~ a o e 2 1 of43 1

1

Table 501D - Fire Plan Check and lns~ ection

20,000 $9,174.00 $2,451.50 $5,497.50 $5,926.00_-- $21.93 $2.10 $9.72 516.11

Hazardous 100 $3.417.50 $1.932.00 ~ . .~ $2.586.00 .. $2.433.00 569.75

uses. o'i'cr , sao -_s3L6_ss:sp

E ! ? KQL _ .>i ? L E -_ . _" ?m.S_182.30 30-.. XLE .8 0 .... 523.1! , _$_1_4116_0_

(FA) - Construction Categories I FR and iI FR

50.000 $9.1 17.50 $3.378.50 $5,889.00 $6,626.0p $8.59 S1.19 $il.Ol $7.06

..~ .. . - - ~ . . ~

LablR&D. 1.000 $3,017.50 $1.302.50 $2,056.50 $1,831.00 ~ ~ $18.14 $5.71

$5.99 , $6.90 ~ .

~

Shell 5,000 $3,257.00 51,578.50 .$2,762.00 $2,059.50 $17.01

5 5 . 5 3 - ? : ? ! $! ! LC_

Occupancy Project

Type Sq. Ft.

Base Fea

Sprinklers

No Sprinklers Sprinklers Alarms

& Alerms

or Alarms Only Only

Plus Increment Per Each Additional

100 SF or Fraction Thereof

Sprinklers No Sprinlrlers Sprinklers

Alarms

&Alarms or Alarms

Only Only

Page 22 of 43

City of San Diego Information Bulletin 501

-

Table 5010 -Fire Plan Check and Inspection

I I

Laundromat. 150 52,432.50 0 0 0 0 $579.50 S1.424.50 $1,254.50. $32.00 ->%67 $87.17 $26.08

750 S2.62420 7!3.S~1,947.50 $1,41100- $91.73 $16.60

-- $49.47 $ 5 4 . 8 0

. ~ ~ ~ ~ ....... ..... . $29.63 $48.23 ......... 1.500 . S3:311.5_0 S82B:O_O_ SZ~iiLs15_0 .511822.0_0_$71.50 . ... _$ 1 1 :0 0 - ~

3,000 $4,385.00 5 9 3 . 0 $2,763.00 $2,545.50 $43.39 $5.53 $22.22 $24.41

7.500 $6.337.50- $1,242.00 - $3,763.00- $3,644.00 $41.60 $3.31 $19.86 $27.84

~ ~ ~ ~ ~

1,000 $3,312.50 $1.324.50 $2,120.00 $2,120.00 56.63

$16.55 . $6.61

Libraw' . . $6.63 .

Museum 5,000 $33.77.50 $1.589.50 $ $2,384.50 $18.55 $5.31

$10.81 $13.26 -

10,000 $4.505.00 $1,855.00 $3,312.54 $3.047.50 514.58

- - ..... ~ ~ . ~ ~ 53.98 $6.83 $11.93

20,000 ~ $5,963.00 $2.252.50 $3,975.00 $4,240.50 ~ - ~ . 58.84 $2.21 .

54.86 $6.18

.

.- - ~

50.000 $8,813.50 $2,915.00 -$5.13300 - $6,095.50 $ 8 2 2

$l.06 $3.84 $6.63 -

Nursing -- 1.000 $3,116.00 $1,126.00 51,918.50 $1,927.50 $6.20

.... . .............. $5.79 $16.04 $8.01

$4.84 $9.75 512.28

"'me'

.2! 990- . .-.S3,35_4.!_0 . $1,357.50 . 522EOO . ... _$ ~O_. . S 1 1 ~5 35 3. .

- - ........

Assisted . lO~~O~~~ll4,240.50 $1,589.50 S 3 . 0 4 Z 52,782.00 - 2 3 . 7 2 ~5 . 99 $&7- -

53.32 . . .......

20.000 $5,612.50 $1.921.00 - -_ 53,646.50 S3,879.00 $8.32 - -_-_

L iving ..__ $1.77 $4.44 $5.62 -

$0.93 53.67 $6.19

. - _LQloao~ _ . 2 s . 0 0 . - . 1 1 5 1 . s oL . ~E? .. .%5,5=LP_~7:BP_ _ ~ _ ~ P _ _ P _ . ~ ~ .......

.. ~ ~ ~ .

Office 1.000 $4,140.50 $1,656.00 $2,650.00 $2,650.00 $8.29

- .. ......... $8.28 $20.70 $ 8 . 28

5,000 S4.472.00 $1,987.00 53,478.00 $2.981.00_~523:g

. $6.63 $13.25 $16.57

10,000 $5.632.00 .............. $2,318.50 $4,140.50 $3,809.50 .. ....... 518.22 $4.98 $8.29 $14.91

.......... .

~ ~

~ ~ ~ ~ ~ ~ ~ ~

20.000 $7,45400- $2,818.00 S4.989.00 $5.300.50_ 511.04 $2.76..-- $6.07 $7.73-

$6 791.00 $7.819.50 $10.27 51.33 54.80 58.28

50,000 $10,766.50 $38844.00 !

O ff i c e S h e i l - 1 s $2,237.50 $551.50 51.3n.50 $1,092.00 ...... ~ . ~ $4.41 $12.86 s3.40-.

53.04

1

5,000 $2,414,00 $673.00 - $1,892.00 51228.00 $12.67

. $2.43 - - $7.21 $7.23 1

.... .... ....... .....

.?!L&!Q.. S3_.057So~-X e.159 3?22~?L02L5aS~22 -19.87 5L55 5 3 . ? 9 56.35 !

1

(FA) - Construction Categories I FR and 11 FR

$0.49 $2.89 $3.69----

. .1,000 ...... $4.140.50 $1,656.00 $2,650.00 $2,153.00 $8.29 $8.28 office- :?PL27E-~. S2I).74-.

Partial 5,000 __S4,472.00 $1.987.00 $3.47800 $2,901.00 _-$ ? 222 56.63 $13.25 $18.57

....

I

Occupancy Project

/Type Sq. Ft.

1

Permit 10,000 S5,832.00 $ 2 . 3 1 8 ~ $ 4 , 1 4 0 . 5 0 . - $3.809.50 $18.22 $4.98

$2.76

2 0 3 9 0 - -~7~4!4 .00$2,~1 '0_O_ .... S!L~L~:P!

S5,300' L? i)-~511104 ...... ................... E07_- '7.13

50,000 $10,7662.5~- $3,644.00 $8,791.00 57,619.50 $10.27 51.33 $3.31 $8.28

Office, 1,000 $1,011.50 nia nla nla

- . - - -

nla

...... $1.96 . la _____---__-

High Rlse 5,000 $1,090.00

- - - . _ -

nla nia $5.79 nla

. ........ . ....

nla ........

. . . . .

nle nla

.

n1a . _ __ - _-

10.000 $1,379.50 nia nla 54.48 .- nla nla .

20,000 $1.827.00 ~ ~ nla ~ nle n h nla 1

. . . ..

.. ....... . . -......... .---... . . ................

$2.72 / a

nla nia nla 52.70 nla nla i

50,000 52~64?JFL .- - ._?i%- I

1,000 S1,011.50

Office, .

nla nia *a - $1.96 nia nia

nla nla .

High Rise- ..5,000. .... $1.090.00 nia $579 nla nla

10,000 $1.379.50 .nlu nla nla $4.48 nia .

partial . . . . ... - ..,. . _ .

20,000 $1 ,027.00 nla nla $2.72

Permit ............... nla . n/a -.--I n/a

50.000 $2,642.00 .- nla nla $2.70 nla . . . . . nla

n h - .. - . -

, I/= ....

Base Fee

Sprinklers

No Sprinklers Sprinklers Alarms

&Alarms

or Alarms Only Only

Plus Increment Per Each Additional

lo0 SF or FractionThereof

Sprinklers No Sprinklers

Sprinklers Alarms

&Alarms or Alarms

Only Oniy 1

I-March 2006

City of San Diego-I nformation Bulle tin 501

Page 23 of 43 1

1,000 S2.629.00 , $662.00 $1,510.50 $1,469.50 $5.24

Office, - . .. 53.31 512.33 ~ ~ . ~ $4.59

Medical 5.000 $2,838.50 S794.50 $2.003.50 $1,653.00 $14.78 $2.65 $7.62 $9.34

....

1 ...-

..-.-.... . . . .... ............. .

10.000 $3,577.50 $927.00 $2,384.50 52,120.00 $11.58 $1.99

........... . . .

$4.72 $8.35

Table 501 D - Fire Plan Check and Inspection

I

(FA) - Construction Categories I FR and II FR

~ ~ ~

'

Office, ~ . $4.98 .. ....

.-..- ..

. $15.50 $4.58

1,ooo 52 .~ 7 .50 $927.00 $ L ~ ~ . . _~11161:00 ~ 5 . 2 ~ __-

Medical- - 5,000 $2,835.50 - 51,126.00 $2,337 .04- S1.644.00 $14.84-

$8.90 59.52

S3.97---p-p

Shell 10.000 S3.57 7 .5~ $~ ~ 2 5.: 0 ~ _&7 8 2 .0 0 52.120.00 - $11.58 $5.36 $8.41

52.65

20,000 54,735.50 $1,589.50 $3.317.50 $2,961.00 $7.03

- - - . . - .. .... - - ..... .. .. . $1.33 . 54.01 $4.27 .

. . . . . . . . . .

- 50,000 $6,842.!0 _--- $_?9L7.00 54.521.00 $4,240.50 $6.70 $0.80 $3.51 $4.84 ...........

Office, 1.000 $9629.00 $662.00 nia n/a

~ $5.24-.

... $3.31 . .. - nla ........... nla

Medical 5,000 $2,838.50 $794.50 nia nla

$14.78 $2.65 nln

-...- . . ...... .......- - . . - - - .

Occupsncy Project

Type Sq. Ft.

wlOSHPD 10,000 _ $3.577.50 $927.00 nia nla 61.99

$11 3 8 nia

nia

20.000 $4.735.50 $1.126.00 ~ ~ ~ ~ ~ ~

50,000 $8 842.00 $1

.. .... L

Office, T e n n n t , $1,573.50 $496.50.- $91 1.00

lmpravement 5,000 $1,9g4_50 8662.00

$! ,242.1)0 . -S1!324.50 E;!-3?5 $3.32 - - $3.31 $13.25

$6.83 $4.98

-.!WOO ....... 42,567oo ...... .$_828.?P. S3oi.E .. =Lo? ....

. ..S?.:SS .............

Base Fee

Sprinklers No Sprinklers Sprinklers Alarms

&Alarms or Alarms Only Only

nla $7.02

- - -

nia

$1"

...

,457.50 nla $6.60 $0.53 nla

.. - - - . . a

- -

$1.159.00 $8.28 $ 4 .1 4 58.28 $414

Plus Increment Per Each Addltional

100 SF or FractionThereof

Sprinklers No Sprinklers Sprinklers Alarms

&Alarms or Alarms Only Only

...... . - .........

20,000 53,561.00 5993.00 4~20701)(1_ $2.484.50 $10.49 86.07 $5.52

151.11

50.000 $6.708.50 $1.324.50 $3,892.00 $4.140.50 $10.27 50.66

55.63 $5.30 1

.

~

Parking 1,000 $2,435.50 5780.50 W,483,50 $1,458.50 $4,86

$3.93 $11.60 . ..... 5%. .

5,000 52.63000 5947.50 $1,947.50 $1,641.00 513.65

Oarage* ..... -- $3.13 . $7.42 $9.14 ,

i

20,000 $4,384.50 $1,343.00. $2,782.00.. $2,919.00 $6.50

- - $1.35 ._ S3.40 _ $4.26 1

.

50,000 $6,333.50 ....... .. 51,748.00 $3.803.00 $4,196.00 $6,06 $0.83 $2.69 $4.57__

1.000 $2,271.50 $625.50 $1.315.50 $1,298.00 $4.51 . .

parking ... . . . ?!I ........ L 34.06~

Garage 5,000 $2.452.00 S754.00 $1,762.00 . _ g144: 50 $12.79 . - - S2.58 $6.72 $8.33

- -

10,000 $3.091.50 $883.00 $2.098.00 $1.877.00 $10.07

,Open - - $1.84 $4.11 $7.41

i

i

20,000 $4.092.50 $1,067.00 $2.508.50... $2.618.00 $6.07 $0.98. . . . . . 33.05 $3.79

..-- . .

i

I

50,000 $5.913.00 $1,361.50 83.423.00 $3.754.00 $5.74 $0.52 --

$2.55 $4.21

Preschool/ - .L~ OL $5,651 .SO !17=.52,! 86.00 $2.178,00 57.25 $6.04 $18.39 $6.80

..........

.. ... .. $4.83 ....... ... .

~ a v c a r e 5 . ~ . $ 3 . 9 ~ 1 . 5 c . _ ~ ! ~ ~ ~ _ - ~ s z . s 2 ~ . ~j~seoo . g . g 613:?4

10.000 $4.969.00 $1.65650, 53,478.00 $3.147.00 S16.08 $3.45 $6.83 512.41

.......... .-

20,000 $6,577.00 $2,001.00 $4,160.50 %4,388.00_- $9.75

- - ... ............. -. 51.84 $5.06 56.36 I

........

50,000 $9,503.00 $2,553.50 $5.678.00 .. . $8,294.50 59.21 . $0.97 . . . . $1.21 $7,03

............ . . .

. ......

Public

1.000 s3,375.00

$965.00

$I,g95.00

$1,913.50

$6.73

...................... $4.85

$18.38 $5.99

Building- $3,644.00

5.000

S1,15~.00

52,650.00 S2.153.00

$18.98

$3.88

- - 510.09 S12.14 -

.. .......

F ire 52.88

$6.23 510.87

... !.OJO!O- ._$_4:j93:0_0 .._S! :353.00-33-1220 ....... 2?27_60.00 .. . % _4 :86 .........................................

Station 20,000 $6,07g.oc-. $1.642.00 $3,777.50 53.846.5F , .. $9.01 $1.59

5 4 . 6 0 -1$558-

. 50,000 >&783.00 $0.78

i

i

I page2 4 of4 3 Cltv of San Diego -information Bulletin 501 March 2006 1

1 Table 501D - Fire Plan Check and ins~ect ion I

I

(FA) - Construction Categories I FR and I i FR

I I Pius Increment Per Each Additional 1

Base Fee

100 SF or Fraction Thereof

I Occupancy

Proj.3ct / Sprlntdsrs No Sprinklers SPrinkien Aianns iSprinIers No Sprinklers Sprinklers Alarms

Type

Sq. Ft. &Alarms or Alarms Only Oniy 8 Alarms or Alarms Only Only

Public .

1.000 . $4,386.50 ........$1,904.50 $2,902.00 $2,891.00 $8.81

, ............. . .

$9.31

. .....

$21.35 $9.03 ...

1

Building - , 5,000

.$4,739.00

S2.277.00

g3L7S6 A(?q. $3,252.00 $24.48 -__ $7.46

$14.32 817.77

Misc. 10.000

55,963.00 $2,650.00

$4,472.00 $4,140 50 - S19.29

$5.80 $9.08

$16.12

...........................

I ............ 20,000 $7,892.00 $3.229.50 $5,380.00 $5.752.00. $11.69 - -53.31 .......... $6.60 $8.43

Public 1,000 $4,386.50 $ 1 ,9 0 4 . 5 0 ~ ~ ~ . 0 0 $2.891.00

.- .....

1.35 ... $9.03

5 000 54,739.00 $2,277.00 $3,756.00 $3,252.00 $24.46 $7.46 $14.32 $17.77

Building - - , ....... .. .

Office 30,000 $5.!363.00 $2,650.00 $4,472.00 $4,14050- -_S19.29 $9.08 $16.12

S 5 . E

/Public 1,000 $4.140.50- $1,656.00 $2.650.00 $2.650.00 .... $8.29

.. $20.70 $8.28 1

-

Building - 5,000 $4,472.00 $1,987.00 S3,478.00800. S2,981 .00 $23.20 $13.25 $16.57

56.63

10.000 $5.632.00 $2,318.50 54.140.50 $3,809.50 $18.22 $4.98 $8.29 $14.81 ..

poiice .............................

20.000 $7.454.00 $2,016.00 S4.989.00___IS5~00.50 $11.04 52.76 $6.07 57.73

Public 1.000 $4,140.50 51,656.00 $2,650.00 $2.85000 $8.29 $8.28

$20.70 $8.28

......... . .........

Bullding- 5,0 0 0 $4.472.00 $1,987.00

S3,478,00

$2,981.00 $23.20

$6.63 813.25 $16.57

Recreation _LD,OOO $ 5 . 6 3 2 . 0 0 . . ~ ~ . 5 0

$4.140.50 $3,809.50

$18.22

---......-..-. $4.88 ,- $8.29 $14.91

-.

20,000 $7,454.00 $2.816.00 $4,969.00 $5,300.50 $11.04 $2.76 $6.07 .. $7.73

. .. ........

50.000 $10.766.50 $3.644.00 $6.791.00 .. $7,619.50 $10.27 $1.33_ $4.80 $8.28

Public . 1,000 $6,829.50 - -$4,748.00 $5.300.50 $5.477.00 $13.84 $23.48 $37.24 . $17.11 ..

........... ........ ......

Building - 5,000 57.383.00 $5,687.00 $6,790.00 $ 6 6 $37.86 518.78 $25.87 533.14

10,000 $9,276.00 $6,626.00-$8,083.50 57,818.50 $30.00 $14.36 $16.59 ..... $30.26

Utility

.

20,000 $12,275.50 $8,061.50 $9,742.50 S10.844.50 1 8 .! 6 . . . $8.10 . . $12.00 $15.98

- 50,000 $17.i~ 2[)_S10.491.00 $13.342.00 .=iLUOo $16.37 $375- $8.83 $16_%_

1,000 $3,778.00 $1,324.50. S2.391.50 $2,318.50 $7.61

Repair ............ $6.23 $18.73 $7.25

OBrage _>$P!! . .. .. %E??!.. -$!&?L3:% .... !??!D6%!E _..S2.fi01(Lf20_s210460Z?2t-~%l-;5 ..... $4.97 ........... $11.67 $14.08 ~ . ,

10,000 $5.134.50 $1,822.00 $3,440 0 $3.312.50

,S16.6-- $4.14 $7.49 $12.84

20,000 $6,705.50 $2,235.50 $4,392.50 - $4,596.50 $10.06

. . $2.49 $5.41 $6.77

50,000 $9,813.00 $2,981.00 $6,016.00 $6,628.00 $9.20 $3.97 $6.95

.-....--..... ........

Residential-. 1,000 $3.114.00 $1.115.00 $1,886.50 S1,919.00 & i ~ - $5.94 - -

$16.84 $6.00

AptjCondo 5,000 $3.360.50 $1,352.50 $22$gS0e SIL59.00 $17.60 $4.74 $9.75 $12.46

10,000 $4,240.50 $1,589.50 $3,047.50 $2.782.00 $13.72 .. ................... $3.21 $5.89 . $11.04

.............. ..................- . . .

20,000

55,612.50

$ 1. 9 10. 0 0 . . $3&3_WOio

52A6.00 $6.33

$1.62 $4.44

55.60

50.000 S8.111.00 $2.395.50

$4,956.00

$5.565.00 $0.95

$7.94

$3.81 $6.33 1

. .. . .

nla nla $1.96 nla nla ..

~ esiaentiai- l,oao 5 .............. nia, .... . ..... - . .............. za_

nla

AptJCondo, 5,000 g l g 0 0 0 nla $5.79 nla nla

n1a - - - -____--

nla ...

nla nla

Higir Rise .10.000 $1.379.50 . nla - $4.48 nla nla

nia ....

~ . .

nla nla nla $2.72 nia nla

........................... . ..................................... 20.90"',8~7!110_ n!a

50,000 $2.642.00 nla nla "!a_---- $2.70 nia nla

nla - - _ . _ _ _ _

March 2006 City of San Dieso -Information Bulletln 501

Pane 25 of 43 1

1

Table 501 D -Fire Plan Check and Inspection

(FA) - Construction Categories I FR and II FR

I

Plus increment Per Each AddLianal

Base Fee

100 SF or Fraction Thereof

Restaurant- 1,0 0 0 $ 2,947.00- $ 983.50 $ 1,760.00 1,766.50 55.83

. - - _ - -

$ 5.21 $ 15.61 $ 5.57

Shell 5 ,0 0 0 $ 3,160.0 0 S L . 0 $ 2,384.50 $ 1 ,8 7 0 0 S 1 4 54.16 59.10 $ 11.49 ______~~

i

i Occupancy Project

1Type Sq. Ft.

Department ...5Qg oo-- ' 3,674.50 $ 1,125.00 $ 2,643.00 $ 2.179.50

$ 19.27 S3z!.. $ 10.08 512.73

Store 10.000 S4.638.00 $ 1.324.50

$ 3,147.0 0 _~~~,616.0 0 $ 15.01

5 2.63 ~ $ 6.03~ ~-.~-~--$ 11.20

Improvement S,O UO .,. $ 2.032.50 $ 703.50 1.15:.50 . , $ tL5j1.50 $ 10.69 - $ 2."9 $ 4.50 S8.91.~-. 1

10 ,0 0 0 S2.567.00 $ 826.00 $ 1,407.50 $ 1,987.00 $ 831. S1.65 52.65 $ 7.89

I

20 ,0 0 0 53,398.00 . ~ $ 993.00 ~ $ 1,672.5 0 . ~ .... ~ 52.776.00 $5.05 $ 0.63 $ 2.01 $ 4.00 .~ ~

I

Sprinklers No Sprinklers Sprinklers

Alanns

&Alarms or Alarms Only Only

Sprinklers

No Sprinklers

Sprinklers Alarms

&Alarms

or Alarms

Only Only

I Page 26 oi 43 city of San Diego lniormation Buiietin 501 Marcli 2006 1

I Table 501D - Fire Plan Check and Inspection 1

(FA) -ConstructionCategories I FR and II FR

Occupancy ProJecf

Type Sq. Ft.

1,000 $4,885.50 $3.220.50 $3,843.00 $3,828.00 $10.03 $14.95 5 5

Semi. $22.19 $11.96

c'nductor 5.000- _35E52 3!8 18 . 5 0 44L3050 .%3_0_650Sa6Z? ........ ?."L~L.. .. $18.03 $2?G .

Fabrication 10.000 $8.626.00 $4,417.00 $5.632.00 . $5,411.00_-$21.42 $10.13 $12.06 $20.62

20,000 $8,767.50 55.429.50 $6,837.50 $7.472.50 $12.94 $6.14 $8.53 $ l l L

~ ~ ~ - . ~ ~ ~ ~ ~ - ~

50,000 $12.649.50 $7,270.00 $9395.00 2 $10822.50 1 . ~. . S?.?? $5.50 510.67

200 $2.499.00 $1,656.00 $1z7= $2,082.50 $25.19 $41.38

l k n a n t $64.63 $32.56

50.EP. . . -23963. 00 .- X ~~Z?L?... 2iLELE. - . SLESIIL $3.58 . . i ? . $2r1 ! L_ $! .64 .

125,000 $8,614.50 $2.337.50 $6,772.50 $4.048.00 $3.32 ~ . ~ $0.35 $205 $1.76 _

Waodworking 1,000

- $ ~ O W ~ ~ O

~$1,037.50 .%.849.50

51.838.50 85.25$ 0

$14.98 $5.75

5.000 $3,280.00

$1,247.50 $2,448.50

$2.068.50 $18.95

$4.20 $9.33 $11.63

. . - , ~ ~ ~ ~ . ~ ~ ~ .~ ~ ~ ....

10,000

$4,107.50 - $1,457.50 $2,915.00 - $2,550.00

$13.29

, ,53.09

$5.78 $10.41

I 20,000

$5,436.50 $1,766.50 ~ . . ~ $3.493.00 $3,691.00

$8.06-

$1.69 - $4.26 $5.37

!

$0.84 53.45 $5.84

I .. . - 50,DOO . ?7,8?.50 .$22?%.L .~L7P-00 ..S?i30E 575S.. . . . , .

i

/

/

I

/

/

Base Fee

Sprlnklers No Sprinklers Sprinklers Alarms

&Alarms or Alarms Only Only

Improvement 1.000 --S2,700.50

$1,987.00 52,295.50 $2.34300

$69.50 $33.15

$43.75 $63.80

Other -~ 2,000 $3,395.50

$2.318.50 $2,733.00 .- $2.981.00

$54.90 S24.88 $27.83 $57.95

~

4.000 $4.493.50 $2.616.00 $3 ,289.9 $4.140.00 533.2 5 $13.80 520.21

$30.38 _

10,000 $6,488.50 $3,644.00 S4.502.00 S5.963.00 $30.25

~ . $6.63 $15.21 $31.65

Theater l,ooo S2,391.00 $7-2 ".3!6?O021.4L':0_0 . _2 ? .76 $3.64 ~ $11.58 $4.45

improvement 1.0oo ..S2,700.50

$1,987.00 52,295.50 $2.34300

$69.50 $33.15

$43.75 ~63 .80

Other - ~ 2,000 $3,395.50

$2.318.50 $2,733.00 .- $2.981.00

$54.90 S24.88 $27.83 $57.95

~

4.000 $4.493.50 $2.616.00 $3 ,289.9 $4.140.00 533.2 5 $13.80 520.21

$30.38 _

10,000 $6,488.50 $3,644.00 S4.502.00 S5.963.00 $30.25

~ . $6.63 $15.21 $31.65

Theater l,ooo S2,391.00 $7-2 ".3!6?O021.4L':0_0 . _2 ? .76 $3.64 ~ $11.58 $4.45

Plus Increment Per Each Additional

100 SF ar Fraction Thereof

Sprinlllers

No Sprinklers Sprinklers Alarms

&Alarms

or Alarms Only Only ,

5.000 $2,581.50 $658.00 __S1,859.50 $1.605.00 3 . 4 4

- - S 2 .9 0 - - $7.08 $9.09 ._

10,000 53,253.50 $1,003.00 52,213.50 S2,059.50 $10.53 $2.12 54.37 $8.12

_-_ _ _ _ _ - ~ ~

5.000 $2,581.50 $658.00 __S1,859.50 $1.605.00 3 . 4 4

- - S 2 .9 0 - - $7.08 $9.09 ._

l n n n " $3,253.50 $1,003.00

52,213.50 S2,059.50 $10.53 _-_ _ _ _ _ - ~ ~

$2.12 54.37 $8.12

1

March 2006

City of San Diego. Information Bulletin 501 Page 27 of 43

Table 501 D - Fire Plan Check and Inspection

(FB) - Construction Categories II 1-HR, ill 1-HR, and V 1-HR

1

Pills Increment Per Each Additional

I

Base Fee

100 SF or Fraction Thereof

i

Occupancy Project Sprinklers No Sprinklers Sprinklers Alarms Sprinklers NoSprinklers Sprinklers Alarms

Type sq. Ft. & Alarms or Alarms Only Only &Alarms or Alarms Only only i

I

.

20,000

$3,800.00

-$200.00 $2.243.50

$2,311.00 $5.64 $0.74 $2.72 $3.34

50.000

55,491.50

51.021.00 $3,060.50

$3,312.50

$5.35

$0.39 - . $ Eg. . . . -v73

.. ...

- -

Bank-Shell 1.000 $2.189.50 $772.50 $1.430.50 $1,217.50 $4.33 -- $4.14 512.93

- - 53LD_

5.000 $2.362.50 $938.00 $1,947.50 $1,368.50 512.37 $3.32 $7.42 $7.94

1

- .. .........

$3.93

/Dry Cleaning 1,000 $2,435.50 $790.50 $1,483.50 $1,458.50 $4.86 $11.60 $4.56

1Plant . 5,000 $2,G3OOO0 $947.50 $1,947.50 $1.641.00 $13.85 $3.13 57.42 $9.14

.....................

Center 5,000 $2.539.50 __-E8f300 $1,87700 $1,545.50 $~.13ss s s $3.03 , 87.15 _ 8 8 3 _ 1

10,000 $3.202.50 $1,034.50 $2,234.50-~~~... pl.tl7.00 $10.37 $2.15 54.37 $7.86

. ..

.... . ..... $1.14 $3.24 54.01 . ....

3E 'L E!!L~E?D S1:2_4(1:P! _S,%?C.P S2.773.0O 6.28 .- .

- - - 50.000 2 5E .E . ,511i569.5~3,644.00 53.975.00 $5.96 $061 $2.73 $4.47

I

I

I

I Page 28 of 43

City of San Diego. information Bulletin 501

March 2006

534.97

Gas Station 200 . . . % 9_39. 5 0 592220 ..... Z!;7B72? 32L17.5D-S1J.'LSs-....S!'13_4 . . .

2.000 $3,174.50 $1,ld4.00 $2,346.50 $1.93200 $76.90 - $13.20 O,-_--- ~

. -

4,000 $4,712.50 $1.366.00 $3.016.50--- W.0 0 50 $14.49 $8.39 $10.74

-.. 54.94

! 8.000 55,292.00 $1.565.50 $3,352.00 $3,435.00 519.61 $3.98 $10.25 $12.53

... ......-..-. ..

20.000 $7.645.00 $2,042.50 $4,581.50

$4.938.50 $18.26

$1.82 $8.10 513.42

Hazardous -_ 100

$2,848.00 $1,610.00

$2,155.00 $2.027.50

$56.00 $74.75 ...

$133.75 $63.38

.......

uses, other 500. $3,08000 . ~;1~!909:00 . $z16?0.00 . ~n?,2exo . 5!57:oo.~ $EEL ~ s ~ ~ ~ s o _ . ~ ~ ~ ~ ~ o _ o ~ ~

Table 5 01 0 -Fire Plan Check and Inspection

(FB) - Constructioll Categories If 1-HR, 111 1-HR, and V 1-HR

20,000 54.677.00 $1,591.50 $3 030.00 $3,238.00 56.94 $1.35 $3.67 $4.67

. . . ~.= _ .

%

50.000 56.759.00 $1,996.50 54.129.50 $4.638.00 58.62 $0.79

. . . .... .... $3.18 $5.27

Hotel & Motel - ~1,000 52.637.00 $1,012.00 $1.656.00 $1,679.00 $5.23 $5.29

$14.24 $5.26

..- . . . ... ... -

Partial Permit 5.000 52,646.00 $1,2 2 3.50 $2,226.50 $1,889.50 $14.85 $4.24 $8.49 $10.79

10,000 $3.588.50 $1,435.50 $2.650.00 $2.429.00 $11.62 _

-

$2.94 $5.17 $9.60

.?OB --~-.Ezso:~!... S!Z?@._~P

%z.~52- -23_.381 ! .~0 ..so . . . ~ ~ I Q ? . .... .$1:53 . . . . $?:84_ . _s?P_T?-

50,000 $6,863.50 $ 2 . 1 1 5 e $4,319.50 $4,858.50 $6.65 - - - ~ .. $0.85

53.25 55.46

Industrial/ . = $3,372.50 5762.00 $1,816.00 $1,981.50 52.83 sl& $6.14 $2.61

Occupancy Project

/Shell 5.000 $2.714.00 $1.315.50 $2,318.50 ~ .51.716.50 $14.16 $4.60

, -- $8.83 $92.4-1. .. ....

Base Fee

Sprinklers No Sprinklers Sprinklers Alarms

lType

Plus increment Per Each Additional

100 SF or Fraction Thereof

Sprinklers No Sprinklers Sprinklers Alarms

Sq. Ft.

&Alarms or Alarms Only Only

&Alarms or Alarms Only Only

March 2006

City of San Dlego - Information Bulle tin 501

Page 29 of 43

!

Table 501D - Fire Plan Check and Inspection

(FB) - Construction Catesories I1 1-HR. I ll 1-HR. and V 1-HR

Occupancy Project Sprinlrlers No Sprinklers Sprinklers

I

Alarms /Sprinklers No Sprinklers Sprinklers Aiams

Ss. Ft. & Alarms or Alarms Onlv Onlv & Aiarms or Aianns Oniv Ontv

Base Fee

....

Nursing

.Home1

!Assisted

/L iving

Plus Increment Per Esch Additional

Partial 5,000 $3,727.00 $1,656.00 $2.898.00 $2.484.50 $19.32 $5.52

$11.05 513.80

........ . . . ......

.... 10,000 $4,693.00 $1.932.00 53,450.50 53,174.50 9.1 2

Perm(t 54.15 $ 6 . 9 c $ 1 2 . 4 3

100 SF or Fraction Thereof

-1

~ ~ ~

20,000 $6,211.50 $2,346.50 54,140.50 $4,417.00 S9.20 $2.30 $5.06 S 6 . 4 L

~ -

50,000 $8.972.50 $3,036.50 . . $5,659.00 $6,349.50 . $8.5

. . . . . .

Office, High - 1,000 $843.00

$1.63 nia

"la -

.. .. .... . .

1Rise 5,000 $908.00 nia nia nia 54.84 nia nia nia

I

I

I

10,000 51.150.00 - .n h . . nia . . . nla $3.73 nla nla

-

20.000 ~ . . -$1,522.50 nla nla nla

-

nla

$ 2 . 2 7 - -_ ....

nla

nla nla nia ~ 0 ~ 0 0 0 E . nia nla

52.25

Office. ~ l,ooO,~ .. $843.00 . nia .. ... nla $1.63 nla n/a

--. - ....... ...................

nla

High Rise 5.000 $908.0L1_-. ~ nla nla nla $4.84 nia nla

Part:a1 .. 10,000 .. .... nia nla nia $3.73 nla

$1,'50.00 nia nia_.

Permit ......... 20,000 . .5!.5?2.5! . . . . __n/a .. nia ......... nia . . . 2 : ! . L 'L ..... nie . . .

50.000 $2,202.00

,-

__ lnia nla " l a $2.25 nla .. . nla nla 1

I ~ a a e 3 0 of43 CI~V of San Diego -information Bulletin 501 March2006 I

Table 501 D -Fire Plan Check and Inspection

(FB) - Construction Categories ii 1-HR, ill 1-HR, and V 1-HR

1.000 $2,190.50 ._....... - i$551.50 $1,258.50 . ._ $1.224.50 $4.36 $2.76 $10.26 $3.83

Office,

. . . . . . . . . . - - .

Medical 5.000 $2,365.00 $662.00 m C 0 $1.377.50 $12.32 $2.21 56.36 $7.78

10,000 $2,981.00 $772.3 . S1.987.00 51,766.50 $9.65 ST.6G 53.94 $6.96 1

$0.92 $2.90 S3.5720.QOQ $3,946.00 ........... $938.00 .$2,3B_~So-$z.4~~--._$5_8_5__.~

50.000 S5.701.00 S1.214.50 $3,250.50 $3,53350 $5.50

.-

$0.44 $2.36 S3.92

.. ......................

1,000 S2.189.50 $77250 S1,430.50 $1.217.50 54.33

office, $4.14 $12.93 ~3 . 8 0

$3.32 $7.42 $7.94

Medic='-

2LE!L ... .S2,352,5(1_593800.-e1.s4L:%C -1!E!z...812137 - . 3 7 . 3 7 . 3 7 3 7 3 7 . ................. . -

Shell 10,000 S2.981.00 S1.1(14.00- $2.318.50 $1.766.50 $ 9 . 6 5 - 52.21 $4.4411_..,701_

Plus Increment Per Each Additional

I00 SF or FractionThereof

Sprinklers No SprinWsrs Sprinklers AlarmsOccupancy Project

$0.66 .

.... .....

/Office, 1,000 S2,190.50 $551.50 nia nia $4.36 $2.76 nia nla

1

Sq. Ft. & Alarms or Alarms Only Only &Alarms or Alarms Only Only

Base Fee

Sprinkiers No Sprinklers Sprinklers Alarms

Medical -, 5,000 S2.365.00 -5662.00 nia n/a $12.32 52.21 nia

w1OSHPD 10,000 S2.961.00 .... 5772.50 nla nla $1.66 nla nia

- .- - .- .. . sg:ss .. ..... - - ..

Cert. 20.000 $3.946.00 _ $938.00 nls nla $5.85 $0.92 "la nia

_ _ _

50,000 .. - - S5,701.00 $1.214.50 nla nia $5.50 50.44 nla

......................

"la

Office, . 1,000 $1,311.00 . $413.50 . $758.50 $966.00 . $6.90 . $3.45 .. ..... $6.90 $3.45 .

5.000 $1.587.00 S551.50 $1,034.50 $1,104.00 S G 4

Tenant $ 276-- -.. ____ $2.77 $11.04 I

j improvement 10,000 52,139.00 S6689.0 01,173.00 $1,656.00 $8.29 $5.52 $4.14 1

51.39

20,000

$2.967.50 $828.00 S1.725.00

..... $2,070.00 .. - $8.74

$0.92 $5.06

$4.60 .

50,000 S55.90.50

$1.104.00

S3.243.50 $3,45050_-S8.56

So,55

$4.69 ~ ~ .~ 54.42

1,000 $2,029.50 $659.00 51,236.50 $1,215.50 $4.05 $3.26

$9.66 $3.79

Parking . ........... .........

Garage 5,000 $2L1-,10_ - 5789.50 $1,623.00 $1,367.00 $11.37 $2.80 $6.18 $7.52

...... $2.00 - . $3.87 $6.85-

$4.04 S13.65 $4.98

l ,QQQ _~ $2,872.50 .............. 5804.50 . 5!:662:50 . . 81:SE:OO g2!? . - _ . . . . . _ -. . . .

Public

Building. 5,000 $3,036.50 $966.00 . $2,208.50 . $1.794.00 ._.. 515.81 $3.23 $8.41 $10.12

Fire 10,000 $3.827.00 $1,12750 $2,629,00 $2,300.00 $12.39 $2.41 $5.20 S9.05

- - -

......

$1.33 ........

... 53.83 $4.65 ...

I ?0,000.. Ss~o66.oL 5 '2s t iQo $3,148.5(L. Ci3Z05.00 $7.51

March 2006

City of San Diego. information Bulletin 501

Page 31 of 43

Table 501D - Fire Plan Check and Inspection

lFBI-Construction Cateoories I1 1-HR. I ll I-HR. and V I-HR

i

. . -

10,000 $4,969.00 $ 2 ,2 0 6 .5 0 _ - ~ i ~ ~ 1 0 ~ O 0 $3,450.50 $16.08

M Isc, $4.83 $7.56 $13.43

$2.76 $5.51 $7.03

20,000 56576.50. $;2:591~50_~~.S4,11830EeeeeS.4L93~~0oo~o~9'44~44444444~4444 _.. _ .

~ .~.

.- 5 O . O k $9,496.00

- ~ 5 1 9 .5 0 $6.134.50 --&9P1.50 $8.95 S124 54.16 57.35

Public 1.000 $3,655.50 $1.567.00

$2.418.00 $2.409=_ $7.34

s7.76 $17.61 $7.54

Base Fee

Ocoupancy Project

Office 10,000 $4,959.00 $2,208.50 $3,727.00 $3,450.50 -!&EL $16.08 .. ..............-p $7.56 $13.43

$2.76

20,000 $6,576.50 _S2,691.50 $4.463.00 -_- - $4.793.00 $9.74 ~

- $5.51 3 7 c

50,000 $9,496.00 $3,519.50 $6,134.50 $6,901.50 $6.95 $1.24 $4.18 $7.35

~ ~ ~ ~ ~ ~ ~ ~ ...... .- ~

Public 1,000 $3,450.50 $1,379.50 $2.206.50

$2,208.50

S6.9J $6.91

- -817.24 $6.90

Building- 5.000

$3,727.00 $1.656.00 $2.696.00

$2,464.50

219,32 $5.52

$11.05 ..-

10,000

$4.693.00 $1,932.00 $3,450.50 $3,174.50 $15.19

$4.15 $6.90

512.43

Police . ~. ~ ~

Plus Increment Per EachAdditional

100 SF or Frsctlon Thereof

Sprinklers No Sprlnklers Sprinklers Alarms Sprlnklers No Sprlnklers Sprinklers Alarms

1,000 $3,450.50 $1,379.50 $2,206.50 $2,208.50 $6.91 $6.91 $17.24 $6.90 1

i public .... _ . . ~ . ~.. ~ ...

/Building 5.000 $3,727.00 51,556.00 $ 0 $2,484.50 _ $19.32 i ! -.--.-.---

I

, $5.52 $11.05 $13.60

i Recreation 10.000 $4,693.00 $1.932.00 S3.450.50 $3.174.50 $15.19.

i

$6.90 $12.43

S 4 . E

I

IType sq. Ft. &Alarms or Alarms Only n i y 1* r a m s or I oniy only

Building- 5.000 $6,152.00 $4,739.00 $5Lt58.5 521.56 L 2z.61

- -

10.000 $7,730.00 $5,521.00 $6,736.00 56,515.00 $2500 $11.97_-.

Utility 513.63 -$252. - .

20.000 $10,229.50 $6.717.50 $8,118.50 $9,037.00 $15.13

P la n t ~ ~ ~ ~ ~ . $6.75 . $10.00 $13.31 ~

Repair 1,000 $3,146.50 $1,104.00 $1,993.00 $1,932.00 $6.34 55.16 $13.94 $6.05

$4.14 $9.72 $11.72

oarage ~ O P O .~~GL ...~~~~! J E_~~~- ~S_O ~~O ~~5 ~ ~ 0 5 1 1 : ~~ .

i

20,000 $4,677.00 $1 .SO $3,030.00 $3.23&00-. $6.94

-

$1.35 $3.67 $ 4.67

50.000 $6,759.00 $1,996.50 $4_112L5Do $4,638.00 - $6.62 s 0 . 7 9 _ - - - _ _ _ _ _ p $3.16 $5.27

nla nla nla nla

ResidentIal- LL.000 $843.00 .. . n !: ~ .. . . - E 6 3 .nia ~ -. ...

AptJCondo

I----

$908.00 nk... .- .~ nla nla $4.64 nla - - nla "'a_.-_

nla

/High Rise 10.000 $1,15!:00. nia nia $3.73 nla nia

I 20.000 $1,522.50 nla nla ~ . . ~ nla ...~ $2.27 nla nla ~ nla . ~

i

~

~ ~ . ~ ~ . - ~ ~

50.000 $2,202.00 nlL.-..- nla tila _ s2.25 .n ? - ~ "la ~ nla ~... _ ..

I

!

i

E g Z 2 o f 43

Citv of San Dieao. informat ion Bullet in 501

March 2 a

Table 5015 -Fire Plan Check and Inspection

(FB) -Construclion Categories I1 I-HR, Ill 1-HR, and V 1-H R

Residential 1 0 0 ~GEG.E_..$~~~~~.oo ,.... - $1,908.00 $1,846.50 5 28 . 8 1 . . S 3 5 6 9 . . $74.50 $28.94

1.000 $2.894.50 S1;102.50 $2,504.00 -$2.078.00 2< 4,9i,-_ $28.45

Care

$47.70 $57.20

2,000 S3.644.00 5i1,987.00 $2,981.00 $2,650.00 $58.95 -_ 521.20

~

$29.83 $51.70

4,000 S4.823.00 $2,411.00 $ 3 , 5 7 7 . 5 0 - $3,684.00

535.71~~~ ..., $_1 ? d_~

~ ...~ . - . ~ ~ - .

$21.87 ~ ..... $26.94 ~ ~ ~ .

- - - 10,000 $6.965.50 $3,110.00~ $410_8_915S $5.300.50 $ 3 3 . 05 $5.71 517.30 . . . % E L

Restaurant-I=. $2,199.50 5545.00 $1,214.50 $1,177.50 $4.35 52.93

$1 1 .a4 -.-$3:EiB_.

5.000 ~ . . ~ ~ $2.373.50 . - . -~ ~ $662.00 $1.656.00 ~ $1.324.50 $12.43 $6.31 $7.73

512.33 - . . . . .

10,000 S2.9g5.00 $778.50 $1,971.50 $1,711.00 $ 9 . 7 0 - $1.57

_$ 3. 79 . ? S : L

20,000 $3,964.50 $ E E L $2,350.00 $2,392.00 $5.88

~ $0.78.. $2.84 $3.44

50,000 S5,730.00 $1,170.00 $3,202.50 53.423.00 $5.61 $2.49 $3.94

- - - . - ~ ~ - - _ - - ~ ~ ~ v:47. - ~ ~ ~ ~

Occupancy Project

/Type Sq. Ft.

Department 5,000 53,062.00 $937.00 S2,202.50 -_$1,816.00 $16.06 $8.40 $10.61

$3.34 .-

Store 10,000 $3.%52L . $1,104.00 52.622.50 $2,346.50 $12.51 $5.02 $9.34

$2.19 ~ ~ ~ ~ .

20.000 $5,115.50 ~ $1,322.50 $3.124.50 ~ ~ $3,280.00 $7.59 $1.07 ~ $3.77 ~ $4.71 ~ - -

I

50,gLOo $7"50 $1,644.50 --54.256.50 $4,693.00 $7.28 $0.67 $3.33 $5.40

20.000 , S4,384,50 $1,324.50 5 2 . 7 6 5 . 0 0 $$P3_3.00 $6.51 51.11 $3.34 $4.2c_-

50,000 $6,337.00 $1,656.00 $3.768.00 $4,196.00 $6.22 $0.66 $2.92

, , 54,g

~ -

~

R e t a l b ~ t o r e , ~ ' $2,271.50 - $855.00 $1.514.50 $1,298.00 - $4.51

$4.49~-- $13.14 $4.06--

Shell 5,000 $2.452.00 -(F1,034.50 $2.040.00 $1,460.50 $3.60 $7.78 $8.33

1 2 U -

Base Fee

~ ~ ~ ~ ~ ~ ~

$2.58 86.91 $3.58

~ e~ a1 i - ~ enant.~ o_o~ ~ .- g; l,57o.i~ ~ 5e~soo -~709:e0 . 3 . ~ 4 1 2 ~ . . - .X LC- . .. . ... ~ ~

improvement 5.000 .$1,694.00 ,@6.00 $985.50 _ 3 ! 3 4 . . $8.90 $2.07 83.75 $7.43

Plus Increment Per Each Additional

100 SF or Fraction Thereof

Sprinklers No Sprinklers Sprinklers Alarms

& Alarms

or Alarms Only

Only

Sprinklers

No Sprinklers Sprinklers Alarms

8% Alarms

or Alarms Onlv Onlv

ATTACHMENT - 4

FaPrication -10.000 55,521.00 53.680.50 $4,693.00- $4,509.00 517.85 $8.44 $10.05. $17.18

20.000 57.306.00 $4,524.00

$5.696.00 56,226.50

$10.78

_- 55.11

87.11 2 3 1 ~ ~ . -

50,000

S10,541.00 ~ . ~ $6,058.00 ~$7.829.50

$9.018.50

$9.38

$1.99 $4.58

38.90

~ ~ ~ ~ .~ ~ ~~ ~ . ~ . ....

Tenant 200 $2,082.00

$1,379.50

$1,1!82.00

$1 ,735.50

5 2 1 . 0 ~ ~ $34.56 $53.81

527.13

Improvement 1,000

52.250.50

$1,656.00 $1.912.50

$1.952.50

557.90 -.527,60

$36.45 $53.20-

Other 2,000 52.829.50

$1,932.00 $2,277.00

~ $2,484.50 ~

$45.75 $20.73 $23.20

548.28

....~

4.000 S3.!4% ....! L ,gsW_ $2,741.00 $3,450.00 S27.71 - 511.50

$16.84 325.32,

- 10.000 $5,407.00__&3L034:50 $!3,751.50 $4,969.00 $25.21 $5.52 $12.67 $26.38

1,000 .. . . $1,932.50 ~ - $593.50 $1,163.50 $1,189.00 $3.95 $3.03

-

~

5,000 52,150.50 ~ $714.50 $1.549.50 $1,337.50 _ % - 52.43 $5.90 S7.58 .

$1.76

10.000 S2.711.50 5836.00 $1,844.50 $1,716.50 58.77--

~ $3.64 $6.76

20.000 $3 588.50 $1,012.00 $2,208.50 $2 392.00 $5.32 $0.96 $2.69 53.47

~ ,

. . -

'

50,000 $5,185.00 $1.298.50 $3.014.50 $3,433.00 $5.3

-- $0.48 $2.21

$7.91 $7.87 $155 ,

Warehouse . . 3 0 -.S217'_911[1..- ~ - P _ ? L L s 3 3 P ! . 'I 2 3 0 P_~ . _S E .. ~ ~

I

City of San Diego * information Bulletin 501

page 33 of43 1

Table 501D - Fire Plan Check and Inspection

(FB) - Construction Categories I1 1-HR. I ll I-HR, and V 1-HR

Occupancy Project

Type Sq. Ft.

Only Only I

Base Fee

Sprinklers No Sprlnitlers Sprinklers Alarms

&Alarms orAlarm6 Only Only

Plus Increment Per Each Additional

100 SF Or FractionThereof

Sprinlrlers No Sprlnklsrs Sprinklers Alarms

&Alarms or Alarms

/ page 34 of4 3 Gitv of San Diecio = lnforrnatlon Bullet il l 501 March2006 1

Table 501 D - Fire Plan Check and Inspection

(FC1- Construction Categories !IN. 111N. IV, and V N

Occupancy Project Sprinklers No Sprinklers Sprinklers

I

Sprinklers No Sprinklers Sprinklers Alarms

!Type Sq. Ft. 5 Alarms or Alarm6 Only Onlv I5 Alarms or Alarms Onlv Onlv ,

Base Fee

Bank-Shell 1,000 $1.751.50 5818.00 $1,144.50 $973.50 $3.46 $3.31-- $10.34 $3.06 /

5,000 S1.890.00 $750.50 $1,558.00 $1,096.00 $9.89 $2.65 $5.94 $6.35

- -

10,000 $2,384.50 .. $883.00 $1,855.00 $1,413.50 $7.72 ...... $1.77 $3.57 $5.61

20,000 $3.155.50 $1,060.00 $2,211.50 $1,974.00 $4.69_- $0.88 $2.68 $2.84

Pius Increment Per Each Additional

100 SF or Fractlon Thereof

5,000 $2,318.50

$662.00 $1,655.00

$1,324.50

$12.04 $2.14

$6.31 $7.37

10,000

$2,920.50 $769.00

$1,971.50

$1.693.00 $9.46 ~ .~ $1.71

53.95 $8.63

........ . ~ .........

~. ~~ .~ ~ ~

$0.99 . . $2.80 ......... $3.44

20,000 $3,866.00 ............. .... 4839 .50, S?L~E.PO . ~2.355150 SZL

50,000 $5,584.50 $1,236.50 53.234.00 3,386.0 0 $5.35

- so.43 .. ....... $2.29 53.68

Church 1,000 $2.014.00 $699.00 $1,254.00 $1,231.00 W.04 $3.41 $9.45 S3.85

--

.

5.000 S2;175.50 $835.50

$1,632.00

$1.385.00

....... $11.25

~ . $2.71 . ~ ........... $6.22 $7.63 1

10,000 =.OO

$971.00 $1.943.00

$1,766.50 $8.86

$2.14 $3.93-86.9OD _ I

~ ~ ~ ~

50,000 $5.235.00 $1.553.00 $3.194.00 $3.533.50 $4.97 "0.55 . . %?! . Sa:!?~.

Dry Cleaning 1,000 $1,948.50

$633.00 $1,1~ 62 - . $1.167.00 $3.89

$3.11

$9.29 ~ $3,64

5.000 $2,104.00

$757.50 51,558.00 $1.312.50

510.92

$2.51 $5.94

$7.31

Plan' - _ _ _ . .

20,000 $3,507.50 $1.074.50 $2,225.50 $2,335.50 55.20 $1.08 52.72 $3.40-~

50.000 $5,087.00 S x 8 . 5 0 53.042.50 $3,356.50 $4.84

-- - .

$0.50 $2.15 $3.66

I

.... .

$3.04

I Fitness 1 , 0 0 0 $1:8!?20L . _ $58500_ EL! % . So $ ! LJ9!5EL~.$3.74 E58 $3.44

Center 5.000 $2,031.50 $706.50 S1,501.50 $1,236.50 _$10.61 $2.42 $5.71 $ 7 . 0 6

10,000 $2,562.00 .. $827.50 $1,787.00 $1,589.50 $8.29 $1.72 $3.50 $6.29 .

20.000 $3,391.00 $999.00 $2,136.50 $2.218.00 $5.03 $0.91 ..,

. . . . . ... -. ??SO. $3 : 2 1

.

- 50.000 $4,900.00 51.271.50 $2.915.00 S3.180.00 $0.49 $2.18 $3.57 1

March 2006

c i ty o i San Dieno information Bulletin 501

~ acce 3 5 T t a

Table 501 D - Fire Plan Check and Inspection

(FC) -Construction Categories I1 N, I iI N, IV, and V N

Hazardous 100 $ 2~~7_ 81 00_ ~~~,$ l,288.00 $1,724.00 $1.622.00 $46.63 $59.75 $107.00 $50.63

500 $2,464.50 $1.527.00 $2,152.00 $1,824.50 $125.40 $47.90 . . . $81.90 $94.40

Other . . . . . . .. . ....

1,000 ....... $3,091.50 $1.766.50 S2,561.50_- $2,296.50 $100.00-_- $40.45 $54.05 $87.75

. - -.

Occupancy Project

Health 1.000 $2.208.50 $863.00 $1,113.50- $1.~113.50 $4.40 $11.04 $4.40 /

$4.43 ~ ~ ~

TYPE Sq. Ft. & Alarms or Alarms Only Only &Alarms or Alarms Only Only ,

Base Fee

Sprinklers No Sprinklers Sprinklers Alarms

50,000 $5,742.00 $1.943.00 $3,622.00 $4,063.50 $5.48 $0.71

52Is ! ._$4.42

Hotel 8 Matd_l.DOD, - $2.0762 . $ 7 _ 4 3 1 0 0 0 0 - Sl.257.50 $1,279.00 $4.11 $3.96

$11.23 $4.00

.... .......... ..

Plus Increment Per Each Additional

100 SF or FractionThereof

Sprlnklers No Sprinirlers Sprinklers Alarms

~

Care 5,000 $2,384.50 . $1,060.00 $1.855.00 - 21 28 g . 5 0 $3.53 57.07 $8.84

10.000 $3,003.50 $1,236.50 $2,208.50 $2,031.50 $9.72 $2.65 ...... $4.42 $7.96

center - - .. _ - - - - - . . . .. _- ._

20.000 $3,975.00 $1,501.50 - - - . $2,650.00 $2,827.00 $5.89 $1.47

$3.24 $4.12-

Partial Permit 5.000 $2,277.00 5978.50 $1,780.50 $1,511.50 __$J.88 $ 339

$6.79 $ 8 , ~ . /

1

~ ~ -

Shell - 5.000 $2.171.00 $I,!%

10.000 $2,738.00 $1,236.50 52,206.50 51,766.50 $8.87 52.50 $4.28 $6.D9

20,000 $3.624.50 $1,486.50 . ........ $2.638.00 $2,485.50 $5.38 $1.26 . ....... . .......

33.19 $3.56

........... ' ., ..... ..................... ~ ...~ . ~ ... ....... . ..~ . .... ~ ~ ~ . ~

Page 36 of 43 City of San Diego. I nformationBulletin 501

March 2006

Table 501 D -Fire Plan Check and Inspection

(FC) - Construction Cateaories I t N. it1 N. IV. and V N

I T y pe Sa:~t. 1 &Alarms or hlerrns Ontv Onlv I &Alarms or hiarrns ' Oniv Onlv 1

. . .

!

. . -

50,000 $5,742.00 $1,943.00 $3.622.00 $4,063.50 $5.48 $0.71 $2.56 $4.42 1

.. ........ . ............................

Nursing 1,000 $2,077.50

5750.50 $1,279.00 $1,285.00 $4.13

53.86 _ _ _ _ _ _ _ -$10.69 $4.01

Home/

2!!? 0o%2!%2!L

~ ~ ~ . . ~ . ~ ! ? % L ~ ,. _

1,4%0-_$1! 8 9 $3.10

$6.50

$8.19

$2.21 $4.00 $7.31 .

.... .....

1"S"'StCad 14.400.-- W ~ I I ~ $'io_ se(10 3~io? ! S'? .. A8 _5soODD3s.1 5___ - -

/L iving 20,000 $3,741.50 $1.280.50 $2,431.00 $2.585.50 55.55 $1.18 $2.9.6 53.75

i Occupancy Project

~

10.000 $2.031.50

$529.50 $1.501.50- $1,080.00

56.58

S I C $2.67

$4.23 i

20.000 .... $2.689.50 $633.00 .

$1,768.00 ... ....

$1.482.50 .........

$3.99 $0.49 .

$2.16 $2.13

50,000 $3,887.00 $779.50 $2,434.50

$2,120.00

j43:K4 .............. $0.33

$1.93 $ 2 . 4 6

i

1,000 $2,760.00 51.104.00 51,766.50 $1,435.50 $5.53

1Office- ..~. $5.51 $13.80 $13.79

Base Fee

~ ~

20.000

S'1,969.00

S1,877.00

53.312.50

$3,533.50 $7.36 $1.84

$4.05 $5.15

50.000 $7,177.50 $2,429.00 54.527.00 55,079.50

$6.85 $0.88 52.21 $5.52

......... .. . .

Office, 1,000 $674.50 nla nia nia $1.30 nia

n/a nia

Plus Increment Per Each Additional

100 SF or Fraction Thereof

H igh -- 5,000 nla nla nla

.. .................

$3.66 nla

$720.50

n i L - - n/a

Rise 10,000 $919.50 nla nia nla nia nla . . . .

....... .. ... . 52 2 s . . . . n/ a .

nla nla nla $1.81

20.000 51:217.50 .... n/a nla- .. ...._ _ _ _ _ _ nia

50,000 S1,761.50 nla nla nin $1.80 - nla

................................. .

nla

" l a - . _ -

Office,

$726.50 nla nla

High Rise 5.000 .....

nla $3.86 nla nia

Partial - -10,000 nla S919.50

nla nia $2.96 nla nla " l a - . . -

20.000 $1,217.50 nla nla nla $1.61 nla nia . ...

.. .-...................-.... ............

nia

permit :- .. -- - .

50.000 51,761.50

. nlo nla nla .. $1.80 nla

Sprinklers No Sprinklers Sprinklers Alarms I ~ ~ r l nk i e r s No Serinklers SerinMers Alarms

/ March 2005 City of San Diego. informat ion Bulletin 501 P a g e 37 o f 43 1

Table 501 D -Fire Plan Check and Inspection

(FC) - Construction Categories II N, Ill N, IV, and V N

$0.35 $1.89 $3.13

50,000 54.561.00 $971.00 $2.600.00 S2.8n.00 $4.40 ( I . . . . ...... . . .

1,000 $1 751.50 %618.00 $1,144.50 ~ ,S % E $346

oflice. L

$3.31 W0.34 S1 J 6-

.... ............. ..... .....................

52.65 $5.94 $6.35

Medical. ,2000 .... 31890,oo 31.% ?2?_. s;r , j~ ~ ! o _ .~ ? ,0 9 6 1 0 O L gE .- . ....... - - ..

Shell 10.000 $2.384.50 $883.00 $1,855.00 $1.413.50 57.72 %I,77 . - . - _ _ _ - ~ ~$3.57 $5.61

20000 $3,156.50 S1.060.00 S2.211.50 $1.974.00 $4.69

A

$0.88 $2.68 - = -

50.000 $4,562.50 $1,324.50 ... $3,014.00 $2.827.00 . $4.47 $0.53 .............. $2.34 $3.22 .....

Office, 1.000 $1,752.50 5441.50 nia Ma S3.‘l9 _ _ _ - ..- $2.20 nia

5,000 $1,892.00 $529.50 nla nia $1.77 nia

Medical

49.85

____-_____---...-_.__

.

10,000 $2,384.50 $618.00 nia nla $7.72 $1.33 nin

VJ'QSHPD . _ . .- .... - - -

20,000 $3,156.50 $750.50 nla nia $4.69

ce*.

$0.7'1

- nia

. . .... ..... . -.

nia nia $4.40 $0.35 n/a nla

.. . 50,000 54,551.00 $971.00 . .

$5.53 $2.76$772.50 $5.51 $2.78

Office, L T D . 1.?!_9PO.~. . 53300 . ,560'E. ................... . .

5,000 $1,269.50 $441.50 $828.00 $883.00 $8.83 $2.20 S2.20 $8.83 -

Tensnt .. ... .

Improvement 10,000 $1 .7 1 1 .0 0 $551.50 5938.00 $1.324.50 $6.63

$4.42 $3.32 _

$1.11

$1 379.50 $1,656.00 $7.00 $0.74 54.05 83.68

-?OLE%- .-2,373.S_a E sE ! . ..... . .

$0.44

50,000 $4.472.00 $883.00 $2.594.50 $2,760.00 56.85 53.76 $3.53

1,000 $1.623.50 $527.00 5989.00 $972.00 $3.24 $2.60 57.74 $3.05

Parking ..... ........................ . . . . . .

Garage, 5,000 $1.753.00 $631.00 $1,298.50 $1,094.00 59.11 $2.09 $4.94 $6.09

$1 545.50 $1,398.50 $7.15 $1.60 53.10 55.46

Enclosed .2P_~0000~ -.$~S.sO~ ..so7~5~50.-.~ .................

$0.90 $2.27 $2.84

20,000 $2!8_2?.0_- . .S895 :! ? ! . .SilJ_855:!!. _s l i i%O ? ... $% .... ..

. - ~ ~ ~ - ~ - ~ ~

50.000 $4.222.00 $1.165.00 $2.535.00 $?= $4.04 So,4z 51.79 $3.05

52.15 S7.44 $2.70

1,000 $1,514.00 $416.50 --$877.00 $865.00 83.01 ..,

Parking I-

5,000 $1,634.50 $502.50 $1,174.5

/Garage, .- ........ ......................... ...... .. 48.-~5556..1

Plus increment Per Each Additional

100 SF or Fraction Thereof

Sprinklers No Sprinklers Sprinklers

Alarms

&Alarms

or Alarms Only Only 1

Occupancy project

i T ~v e 59. Ft.

50.000 $3.942.00 $907.50 S2.282.00 S2.502.50 53.83 50.34 ~ . $!:7P .??.B! .~1

... ..... ....-...-...-.....

PreschooV _ - =

$2,434.00 $782.00 $1,457,50

$1,452.00 S1.84

$4.03

512.25 $4.54 ._

Oaycare _A ,E .......

$2,627.50 $943.00

$1,947.50

$1,633.50

9'13.70 Wz2

____---- $7.42 $9.29

10.000 $3,312.50 $1 104.00 $2,318.50 .. ..................................... $2,098.00 $10.72 $2.30 $4.56 $8.28

. L ..........

20,000 $4,384.50 -. $1,334.00 _ $2.774.00

$2,925.50 S6.50 51.23 $3.37 1 1 4

50.000 $6.335.00 $1.702.50 $3,785.00

$4.196.00 $6.14 Sq.64 $2.81 $4.69

$643.50

$1 330.00 $1,276.00

$4.48 $3.23

Public .. LEO ..... S2E-o0 .-oo-oo-oo-oo-oo-oo..... -_-_.-...so.. ...................... ... -510.91 . $3.99

Building - 5,000 52,429.00 $772.50 51.766.50 $1,435.50 512.66 s2.5g - - - _ _ $6.73 $8.09

Fire l0 .000 $3.062.00 5902.00 S 2 i l I ! 3 ? w 0 . _ 9 . 9 1 .. ............................................. $1.93 $4.16 $7.24

$1.06 $3.07 $3.?2-.

station

.% .E L. .$4,(1tiK?II ... SL.0940 .. . E Z S 5CI .. .$3E%!?a. ... . $6.01 ... .

...............

$3,439.00 .............. $3.680.50 $5.65 $0.52 $2.51 $4.07

. ............ z!oqO .. . .................... -

Base Fee

Sprinklers No Sprinklers Sprinklers Alarms

& Alarms or Alarms Only Only

ATTACHMENT -

I Page 38 of 43 City of San Diego. information Bulletin 501 March 2006 /

Table 501 D -Fire Plan Check and inspection

(FC) -Construction Categories I1 N, 111 N, IV, and V N

Building- .......... 5,000 $3.159.50 $1,518.00 -~ $2,504.00 .. ....... $2,168.00 $16.31 $4.97 $9.54 $11.54 .

10.000 S3.975.00 S1.766.50 $2,981.00 $2.760.00~_$12.86

Office A $6.06 $10.75

20.000 $5.261.00 $2.153.00 $3,586.50 $3.834.50 $7.79 $2.21 $4.40 $5.G2

- -

50,000 $7,596.00 52,616.00 $4,907.00 $5,521.00 $7.16 $0.99 53.34 $5.88

-- .....-.-... ~ . . ... ~ ~ . . ......... ~ ~ .

Occupancy Project

Type Sq. Ft.

10,000 $3.754.00 $1,545.50 $2,760.00 $2,539.50 $12.15 $3.32

Police .......... ...

20.000

- $4,969.00

$1.87/.00- $3,312.50 53,533.50

$7.36

$1.84 54.05

50,000 $7.177.50,

$2.429.00 S4.527.00 L ) L ) L ) $5.079.50 -

$6.85

$0.86 -.

Public 1,000 $2,760.00 $1,104.00 S1,766.50 $1,766.50 55.53 $5.51 S13.60 $5.51

.-.................. ...

Building- 5.000 $2,;z.s81.00 $1.324.50 S2.31180 $1,~87.00 $15.46 $ 4 . 4 ? _ _ _ _ $8.83 511.05

$3.32 $5.53 $9.94Recreation logo^..̂ ..,. g7543,&-._$1.545.50 52,760.00 . $2.539.50 $12.15

Base Fee

Sprinklers

No Sprinklers Sprinklers Alarms

&Alarms

or Alarms Only Only

1 ........... 30300 $7,177.50

$2,429.00

S4.527.00

5 5 , 0 7 9 . L S 6 . 8 5 s " . a s . . -$3.20 $5.52

1,000 $4,553.00 .

53,165.00 ........... 53.533.50

53.651.50 $9.21 . $15.85 . $24.81 . $11.40

Building- 5 , 0 0 0 - .- ~ , $4,921.50 53,791.00 $4.526.00 54,107.50 S25.24

$12.52

Ipubiic

$17.25 $22.09

,

Plus Increment Per Each Additional

100 SF or FractionThereof

Sprinklers No Sprinkiers Sprinklers Alarms

&Alarms or Alarms Only Only

/ ~ esidentiol- 1,000

$2,076.00 S743.00 51,257.50

$1,279.00

$ 4 . 5 53.96

$11.23 $4.00

j AptJCondo

5.000 S2,240.50 $901.50 _

$1,706.50 -$1,439.00

53.17 S l l i 3 $6.50 $8.32 -

....

10.000 $2,827.00 $1.050.00 $2.031.50 $1,855.00 49.15 52.13

_.---.--_..l.-.--..-.-.-- .F?3 5736L

20,000 $3,741.50 $1.273,00 $2,424.00 $2.590.50 $5.55___ $1.08 - . A3?? ....

i

$2.93

AptJCondo 5,000

$726.50 " l a n!a ... n!a

High 10,000 S919.50 nia nla nla

........... . -

I~ i s ~ ..20,000..~-_1$1,21750 !! !4 . nia n!a

. -

nla nla n/a

50,000 53.76150 ....

March 2006

City of San Diego 9 informationBulletin 501

Page 39 of 43

- 4

/Restaurant- .. 1,000 51,964.50 $ 8 5 6 , $1,173.00 S O $3.89 $3.46 $10.41 $3.68 j

~

Table 501 D -Fire Plan Check and Inspection

(FC) - Construction Categories I1 N. I ll N, IV, and V N

1Shell 5.000 $2,120.00 ~ . ~ $794.50 ~ ~ $1,589.50 $1,324.50 ~ $11.03 ~ $2.78 ~ .~ .$6.06 $7.66 1

Occupancy Project

Type Sq. Ft.

~ - ~ ~ ~ . -

1Shell 5.000 $1,961.50 $828.00 $1,832.00 $1.168.50 $10.24 ~ ~ ~ ~

~ . . ~ . ~ ~ ~ . ~ $2.6? 56.22 $6.66 1

1Tenant _- 5,000 $1,355.00 $468.50 $788.00 $1.027.00 $7.12 $1.66 $3.00 $5.95 1

~

Base Fee

Sprlniilers No Sprinklers Sprinklers Alarms

& Alarms or Alarms Only Only

Plus Increment Per Each Additional

100 SF or Fraction Thereof

Sprinklers

No Sprinklers Sprinklers Alarms

&Alarms

or Alarms Only Only

/ Page40 of 43 City of San Diego. Information Bullet in 501 March 2 0 4

$29.20 S42.55

' lmPmVemenLl,OOD -..5 1.8EO _~.~~~_1,324sO so so S~-S~0100. .. SIISSI:SO_SEE ... .2 2 ? .1 0

1.

Other 2,000 $2.263.50 51,545.50 $1,822.00 $1,987.00--536.60 S16.58 $18.53 538.63

. 4,000 $2,995.50 51.877.00 - - $2,192.50 $2.759.50 $22.17 .... $9.20 $13.48 S20.26

$4.42 $10.14 $21.10

.- ...... --!O .OOo ...... $4!325 :5 0 . ! %: ~ ~ 9 . 0 0 _ $ ~~ : ~ 0 . - $3,975.00 . . . . $201L

_ . .........

Warehouse 2,500 $2,207.50 $712.50 $1,730.00 5938.50 $1.85 $1.53

$6.31 _ $1.23

.....

12,000

S2.383.0E $858.00

S2.329.00 ,-

$1,055.50

$4.77 , 51.12 _________

$3.42

25,000-

$3.003.00 $1 ,003.00

32.773.00 $1,349.00

$3.89 $0.85

$2.16

$2.11

... - . . . . . .... ~ ~ . ~ ~ ~

Table 501 D -Fire Plan Check and Inspection

(FC) -Construction Categories II N, IiI N, IV, and V N

Plus Increment Per Each Additional

100 SF or Fraction Thereof

Sprinklers

No Sprinhlers Sprinklers Alarms

&Alarms

or Alarms Only Only

Occupancy Project

Type Sq. F t

Base Fee

Sprinklers No Sprinklers Sprinklers Alarms

& Alarms or Alarms Only Only

1 March 2006 City of San Diego a information Bulletin 501 page 41 of 43 I

Table 501DMire Plan Cheek & I nspection

Miscelleneous Items

Fee

Fire Sprlnkier Systems-Retrofit:

1-50 Heads, per group $500

i 51-100 Heads,par group .................. ...

................. $701

101-200 Heads, per group ...................... ... ................. $902

Every 200 Heads above 200, per group ................. ........ .. $300

/Fire Sorlnlrler Svsterns -Tenant lmorovdments:

1-25 Heads,per group ................... .. ........................... $200

! '

26-100 Heads, per group ................. . . .

$300

Every 100 Heads above 100, per group . ..... $300

Fire Alarm System -Retrofit:

1-50 Devices, per group $601

51.100 Devices,per gio $902

Every 50 Devices above 100, per group ................ .. ........... $300

High Rise. par Ilooi .................... $801

Sprinkler Monitoring System, each $355

Fire Alarm System -Tenant Improvements:

1-50Devices, per group 6400

51-100 Devices. oei orouo $701

Other Suppression Systems:

701

Dry Chemical Sysle 400

Wet ChemicaliKitcli 400

Foam Systems, eac 701

Paint Spray Booth, e 701

Stand Alone Fire Fees:

Hydrantsilinderground Fire Sewice Plan Check, each ..... ... $400

Hydrant Flow Test (existing hydrants). ~ a c h .......................... $400

Fire Plans OHicer Review, eacii ........................ ... ..... ..... $300

ReinspectionFee, per hour

... ........ $99

Board 01 Appsals, each ............. $99

Emergency Call-Out (Nun-Scheduled), 4 Hours ................... $601

After Hours Cali-Out (Scheduled). 2 Houn ........................... 5300

!&xUmc Fee

REQUEST FOR ALTERNATE METHODS AND MATERIALS

Request for Alternate Methods:

Category 1 (repeals and minimal complexity) -

Category 3 -Assist, each

Research of Alternate Materials

Request to Use Alternate Materials

Application Review, each .................... .......,..,.......... $333

Alternate Materials Research

(in addition to fiat fee). per hour ........................ ... ......... $99

Board of Appeals, per hour ...................... .. $ 99

5-Year Certification, per hour ............... .. ..................... $99

Service Required in Excess of Standard, per lhour ................. $99