  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 2: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Dalmia Cement (Bharat) LimitedHalf Yearly Compliance report: April 2019 to September 2019

1 | P a g e

DALMIA CEMENT (BHARAT) LIMITEDUmsoo Mootang, Vill - Thangskai , P.O. Lumshnong , Dist – East Jaintia Hills, Meghalaya - 793 200

COMPLIANCE STATUS

Environment Clearance Letter No: - J-11011/190/2007-IA-II (I) dated: JUNE 19th, 2008.

Period Of Compliance : April 2019 to September 2019

Conditions Compliance Status

A Specific Conditions(i) Continuous stack monitoring facilities to

monitor gaseous emissions from all thestacks shall be provided & limit of SPM fromcement plant shall be controlled within 50Mg/Nm3 by installing adequate AirPollution control system viz. ElectrostaticPrecipitator (ESP) to cooler & CaptivePower Plant, Gas bag house to Raw Mill/Kiln and cement Mills, and Bag filters tomaterial handling areas. At no time theparticulate emission from the cement &captive Power Plant shall exceed 50mg/Nm3 & 100 mg/Nm3 respectively.Interlocking Facility is provided in thepollution control equipment so that in thevent of the pollution control equipment notworking, the respective unit is shut downautomatically.

Opacity meters are installed at all stacks, i.e. RMBH,Coal mill, Cement mill - 1 Cement Mill - 2, ESP cooler& CPP respectively. Emission levels are within thepermissible limit.

ESPs are provided for Clinker cooler & Boiler andbag house for Cement mill, Raw Mill and Coal millrespectively.

Bag filters are provided at various materialtransfer points to arrest the fugitive emission.

Compliance status reports is submitted to Ministryincluding its Regional office at Shillong, MSPCB andCPCB.

Particulate emissions from the Cement Plant as wellas captive Power Plant are within the prescribedlimits i.e. within 30 mg/Nm3 & 50 mg/Nm3respectively. Efforts are being made to meet theemission standards as notified by latest GazetteNotification. Last Six Months Stack EmissionMonitoring Report enclosed in Annexure - I.

Interlocking facilities are provided.(ii) Secondary fugitive emissions shall be

controlled within the prescribed limits &regularly monitored. Guidelines/ Code ofPractice issued by CPCB / MSPCB in thisregard shall be followed.

Secondary fugitive emissions from all sources arecontrolled within the permissible limits issued bythe Ministry and other monitored regularly. LastSix Months Fugitive Emission Monitoring Reportenclosed in Annexure -II.

(iii) The company shall install adequate dustcollection & extraction System to controlfugitive dust emission at various transferpoints. Storage of raw material shall be inclosed roof sheds. Water sprinkling

Installed dust collection systems/bag filters atvarious material transfer points and conveyor beltsare covered to reduce fugitive emission. Rawmaterials, Coal and Fly ash are stored under closedshed.

Page 3: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Dalmia Cement (Bharat) LimitedHalf Yearly Compliance report: April 2019 to September 2019

2 | P a g e

arrangement shall be made in the Rawmaterial Stock yard and cement bagsloading area.

Water sprinkling arrangement is provided in rawmaterial stock yard, on haul roads and inside theplant to control the dust emission.

(iv) Effort shall be made to reduce impact oftransport of the raw material and endproduct on the surrounding environmentincluding agriculture land.

Raw materials are transported through coveredtrucks and there is no impact on surroundingenvironment.

(v) Total water requirement from Lunar rivershall not exceed 2500 m3/day. All theprocess effluents shall be properly treatedand treated waste water shall be recycledand reused for spraying for cooling themills, dust suppression and green beltdevelopment. Domestic effluent water shallbe treated and used for the green beltdevelopment. No Waste water shall bedischarged into any stream /river withoutproper treatment and shall meet theMSPCB/CPCB/Ministry’s norms asmentioned in the E (P) Act.

Water withdrawal from Lunar river is within 2500m3/day.

STP has been installed and is in operation. Cement manufacturing process is totally dry,

there is no waste water generation. Treated water is used for road dust suppression /

green belt development. There is no waste water discharge outside the

plant premises.

(vi) Prior permission for the drawl of 2500m3/day from Lunar River shall be obtainedfrom the concern department

Obtained No objection certificate (NOC) fromIrrigation Department Jowai, Jaintia hills for 5500m3/day for Cement and Power plant dated 11th July2007.

(vii) The dust collected from the pollutioncontrol equipment shall be recycled backinto the process and reutilized.

The dusts from bag house and bag filters is recycledinto the process and re utilized.

(viii) Fly ash shall be utilized as per Fly ashnotification,1999 subsequently amended in2003

Total Fly ash generated from the CPP is utilized inexisting cement manufacturing.

(ix) An effort shall be made to use of highcalorific hazardous waste in the cement kilnand necessary provisions shall be madeaccordingly.

Complied and being Complied The kiln has been designed to use high calorific

hazardous wastes.

(x) Green belt shall be developed in 17ha.(33%)out of total 50 ha. in & around theplant as per the CPCB guidelines inconsultation with the local DFO

The plantation has been undertaken in phasedmanner. The Plantation is done with the consultationof DFO (T), Jowai.

(xi) All the recommendations of the CorporateResponsibility for Environment Protection(CREP) shall be strictly followed.

Complied All CREP conditions for the Cement plants and

Power plants are being implemented and strictlyfollowed.

B General Conditions

Page 4: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Dalmia Cement (Bharat) LimitedHalf Yearly Compliance report: April 2019 to September 2019

3 | P a g e

(i) The project authority must adhere to thestipulations made by Meghalaya StatePollution Control Board and StateGovernment

Yes, We comply with all the stipulation made bythe Meghalaya SPCB, CPCB and State Govt.

(ii) No further expansion or modification of theplant shall be carried out without priorapproval of the ministry

Noted. In future, if any expansion or modification isproposed, prior approval will be obtained from theministry.

(iii) At Least 4 Ambient air quality monitoringstations shall be established in thedownward direction as well as wheremaximum ground level concentration of theSPM, SO2 and NOx are anticipated inconsultation with the Meghalaya StatePollution Control Board. Data on Ambientair quality and stack emissions shall beregularly submitted to this ministryincluding its regional office at Shillong andMeghalaya State Pollution Control Boardonce in Six Months.

We have established four (4) ambient air quality-monitoring stations as suggested by the MeghalayaState Pollution Control Board.

Data on ambient air quality and stack emission aresubmitted to MSPCB on regular basis. Six monthlyreport to Regional office of MoEF&CC is beingsubmitteed. Last Six Months Ambient Air QualityMonitoring & Stack Emission monitoring reportenclosed in Annexure -III & I respectively.

(iv) Industrial waste water shall be properlycollected and treated so as to confirm to thestandards prescribed under GSR 422(E)dated 19th May 1993 and 31stDecember1993 or as amended from time totime .The treated waste water shall beutilized for plantation purpose.

Our cement manufacturing process is totally dryprocess; there is no waste water generation.

Wemaintained zero discharge for the entire plant. Waste-water generated from CPP is reused. Waste-water generated from mines workshop is

used for dust suppression after removing the oil &grease traces through ETP.

(v) The overall Noise level in & around thePlant area shall be kept well within thestandard (85 dbA) by providing noisecontrol measures including acoustic hoods,silencers, enclosures etc. on all sources ofnoise generation. The ambient noise levelsshall confirm to the standards prescribedunder environmental ( Protection ) Act,1986 Rules, 1989 viz. 75dBA (day time) and70 dbA (Night time).

We maintained over all noise level withinprescribed limit in and around the plant area.

The ambient noise levels are well within thestandards prescribed under EPA Rules viz., 75 dB(A) (Daytime) and 70 dB (A) (Night time).

The monitoring is carried out regularly and LastSix Months Monitoring report is attached herewithin Annexure - IV.

(vi) Proper Housekeeping & adequateoccupational Health programmes must betaken up. Occupational Health surveillanceprogramme shall be done on a regular basisand records maintained. The programmemust include Lung function and sputumanalysis tests once in six months.

We maintained good housekeeping in all areas ofplant.

Personal protective equipment/devices areprovided to all the persons to avoid directexposure of dust and noise.

Occupational Health surveillance program is alsoregularly done. Lung Function and sputum analysisis also regular carried out. Please find attach some

Page 5: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Dalmia Cement (Bharat) LimitedHalf Yearly Compliance report: April 2019 to September 2019

4 | P a g e

test report in Annexure - V.

(vii) The company shall harvest the rainwaterfrom the rooftops and storm water drainsto recharge the ground water.

Complied. We harvest Rain water & Storm waterthrough check dam. Further under CSR activity, theroof top structure for rain water harvesting has beenconstructed in surrounding villages.

(viii) The company shall undertake eco-development measures includingcommunity welfare measures in the projectarea.

CompliedUndertaking various community welfare measuresthrough CSR activities like.1. Construction of footbridge cum culvert2. Promotion of fuel efficient cook stoves and solarstudy lamps.3. Medical camps, construction of schools toilets andawareness camps4. Awareness generation campaign. Livelihood andSkill Training. etc.

(ix) The project proponent shall also complywith all the environmental protectionmeasures and safeguards recommended inthe EIA/EMP.

Yes, we are complying with EIA/EMP.

(x) A separate environmental management cellwith full-fledged laboratory facilities tocarry out the various management andmonitoring functions shall be set up underthe control of Senior Executive.

A separate Environment Management Cell has beenestablished with qualified person to carry out variousenvironment functions under the chairmanship of UnitHead.

(xi) As proposed in the EIA/EMP, Projectauthorities shall provide Rs. 40.00 Corestowards capital cost for EnvironmentalPollution control measures for theenvironmental protection measures toimplement the conditions stipulated by theMinistry of Environment and Forests aswell as the State government and submitimplementation schedule for all theconditions stipulated herein to the regionaloffice of this Ministry at Shillong/CentralPollution Control Board /Meghalaya StatePollution Control Board. The funds soprovided shall not be diverted for any otherpurpose.

This has been already sent to your office vide our letterdated 06/07/2011.

The funds so provided will not be diverted for anyother purpose.

(xii) The regional office of this ministry atShillong / Central pollution control board/Meghalaya pollution control board willmonitor the stipulated condition. A Sixmonthly compliance report and monitored

Six monthly compliance report is submitted regularly.

Page 6: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Dalmia Cement (Bharat) LimitedHalf Yearly Compliance report: April 2019 to September 2019

5 | P a g e

data along with the statistical interpretationshall be submitted to them regularly.

(xiii) The project authorities shall inform theregional office as well as the ministry, thedata of financial closer and final approval ofthe project by the concern authorities andthe date of commencing the landdevelopment work.

Financial closure and final approval of the project bythe concerned authorities and the date of commencingthe land development work was submitted on dated11.12.2008.The date of commissioning of various units is given asbelow:CEMENT PLANT : August 2010CAPTIVE POWER PLANT(CPP) : February 2010

(xiv) The project proponent Meghalaya informthe public that the project has beenaccorded environmental clearance by theMinistry and copies of the clearance letterare available with the state Pollutioncontrol Board/committee and may also beseen at website of the Ministry ofEnvironment & Forests athttp:/envfor.nic.in. This should beadvertised within seven days from the dateof issue of the clearance letter at least intwo local newspapers that are widelycirculated in the region of which one shallbe in the vernacular language of the localityconcerned and a copy of the same shall beforwarded to the Regional office at Shillong.

Complied

Public notice had been published & cutting of the localnewspaper already submitted to the office (ref. letterdated 01/02/2008).

Page 7: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/AAQ/APR/19-20/01

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

AMBIENT AIR QUALITY TEST RESULTS

Location(s) PM 2.5

(µg/m3)

PM 10

(µg/m3)

NO2

(µg/m3)

SO2

(µg/m3) SL.

No.

Limit(s)

Date of

Sampling 60

(24 Hrs. Av.) 100

(24 Hrs. Av.) 80

(24 Hrs. Av.) 80

(24 Hrs. Av.)

24.04.2019 22.4 -- -- -- 1. Near Cement Mill

25.04.2019 -- 62.3 8.4 BDL

24.04.2019 18.6 -- -- -- 2. Near CPP

25.04.2019 -- 60.8 13.7 7.6

25.04.2019 16.3 -- -- -- 3. Near CCR

26.04.2019 -- 51.4 5.5 BDL

25.04.2019 13.9 -- -- -- 4. Vrindavan Colony

26.04.2019 -- 34.8 BDL BDL

ND: Not Detected

Analysis Protocol: IS 5182

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 8: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/FE/APR/19-20/01

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

PROCESS FUGITIVE EMISSION TEST RESULTS

Date Locations Fugitive Emission Results for SPM

(µg/m3)

Limits

(µg/m3)

24.04.2019 Fly-ash Storage Section 1549 5000

25.04.2019 Coal Storage Section 577 2000

26.04.2019 Limestone Storage Section 2120 5000

26.04.2019 Cement Packing Section 2369 5000

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 9: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/APR/19-20/01

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/APR/19-20/01

02 Date of Sampling 24.04.2019

03 Material of Construction M. S.

04 Stack Attached To R. A. B. H.

05 Stack Diameter (Meter) 3.0

06 Flue Gas Temperature (0C) 169

07 Exit Velocity of Gas (m/sec) 15.9

08 Flow Rate (Nm3/hr) 272823.8

09 Type of Fuel Used Kiln Coal

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 13.6 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 593.4 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 157.2 mg/Nm3 800

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 10: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/APR/19-20/02

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/APR/19-20/02

02 Date of Sampling 24.04.2019

03 Material of Construction M. S.

04 Stack Attached To Coal Mill B.F.

05 Stack Diameter (Meter) 1.25

06 Flue Gas Temperature (0C) 69

07 Exit Velocity of Gas (m/sec) 12.5

08 Flow Rate (Nm3/hr) 48124.8

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 20.4 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 613.8 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 146.2 mg/Nm3 800

*NA: Not Applicable

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 11: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/APR/19-20/03

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/APR/19-20/03

02 Date of Sampling 25.04.2019

03 Material of Construction M. S.

04 Stack Attached To Cooler E. S. P.

05 Stack Diameter (Meter) 4.0

06 Flue Gas Temperature (0C) 218

07 Exit Velocity of Gas (m/sec) 14.9

08 Flow Rate (Nm3/hr) 409156.7

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 19.8 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 12: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/APR/19-20/04

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/APR/19-20/04

02 Date of Sampling 25.04.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 1

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 65

07 Exit Velocity of Gas (m/sec) 12.8

08 Flow Rate (Nm3/hr) 127649.2

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 23.6 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 13: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/APR/19-20/05

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/APR/19-20/05

02 Date of Sampling 25.04.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 2

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 57

07 Exit Velocity of Gas (m/sec) 13.4

08 Flow Rate (Nm3/hr) 136872.4

09 Type of Fuel Used NA

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 22.2 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 14: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/APR/19-20/06

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/APR/19-20/06

02 Date of Sampling 26.04.2019

03 Material of Construction Refractory Brick

04 Stack Attached To Captive Power Plant (CPP)

05 Stack Diameter (Meter) 4.5

06 Flue Gas Temperature (0C) 89

07 Exit Velocity of Gas (m/sec) 8.8

08 Flow Rate (Nm3/hr) 414824.2

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 27.9 mg/Nm3 50

ii. Sulphur Dioxide (as SO2) 356.9 mg/Nm3 600

iii. Oxides of Nitrogen (as NOx) 196.4 mg/Nm3 300

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 15: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/APR/19-20/07

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/APR/19-20/07

02 Date of Sampling 26.04.2019

03 Material of Construction M. S.

04 Stack Attached To Crusher B.F.

05 Stack Diameter (Meter) 0.7

06 Flue Gas Temperature (0C) 26

07 Exit Velocity of Gas (m/sec) 4.6

08 Flow Rate (Nm3/hr) 6352.6

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 18.4 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

#BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 16: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/NLM/APR/19-20/01

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

NOISE LEVEL MEASUREMENT RESULTS

(DCBL Plant)

Measurement Date: 25.04.2019

Day time

Night Time

Sl. No. Location(s)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

1 Near Coal Mill 75 70 73 66 62 64

2 Near CPP Area 68 64 66 58 54 56

3 Near Dispensary Area 44 37 42 35 32 34

4 Near Raw Mill 73 66 71 64 59 62

5 Near Cement Mill 74 67 72 62 57 60

6 Near Limestone Crusher 76 69 74 67 60 65

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 17: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/DW/APR/19-20/01

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

DRINKING WATER ANALYSIS RESULTS

Sample Type : Drinking Water Collected By : Jointly by Envirocon & Client Sample Source : Labour Colony Collected On : 24.04.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(IS : 10500 : 2012)

1. Colour <1 Hazen Units Max. 5

2. Odour Odourless -- Unobjectionable

3. Taste Agreeable -- Agreeable

4. Turbidity 0.21 NTU Max. 1.0

5. pH 6.8 -- 6.5 – 8.5

6. Temperature 24.6 0C -

7. Total Alkalinity (as CaCO3) 92 mg/L Max. 200

8. Total Dissolved Solids 153 mg/L Max. 500

9. Total Hardness, (as CaCO3) 12 mg/L Max. 200

10. Chlorides (as Cl) 7.6 mg/L Max. 250

11. Residual Free Chlorine ND mg/L Min. 0.2

12. Sulfates, (as SO4) 6.2 mg/L Max. 200

13. Fluorides (as F) ND mg/L Max. 1.0

14. Nitrate (as NO3) ND mg/L Max. 45

15. Iron (as Fe) 0.04 mg/L Max. 0.30

16. Total Arsenic (as As) ND mg/L Max. 0.01

17. Lead ND mg/L Max. 0.01

18. Copper ND mg/L Max. 0.05

19. Boron ND mg/L Max. 0.5

20. Phenolic Compounds (as C6H5OH) ND mg/L Max. 0.001

21. Faecal Coliform NIL MNP/100 ml NIL

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the parameters are under permissible limit and the water from the above mentioned source is fit for drinking.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 18: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SW/APR/19-20/01

Date : 06/04/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

SURFACE WATER ANALYSIS RESULTS

Sample Type : Surface Water Collected By : Jointly by Envirocon & Client Sample Source : Nala Near Vrindavan Colony Collected On : 24.04.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(CPCB Norms)

1. pH 6.5 -- 5.5-9.0

2. Colour Colourless -- --

3. Odour Acceptable -- Acceptable

4. Temperature 24.4 0C Shall not exceed 50C above the receiving water temperature

5. Biochemical Oxygen Demand (3 days at 27⁰C)

19 mg/L Max. 30

6. Chemical Oxygen Demand 52 mg/L Max. 250

7. Oil & Grease 1.6 mg/L Max.10

8. Total Dissolved Solids 323 mg/L Max. 2100

9. Total Suspended Solids 27 mg/L Max. 100

10. Chloride 25 mg/L Max. 600

11. Total Residual Chlorine ND mg/L Max. 1.0

12. Ammonical Nitrogen (as N) 10.7 mg/L Max. 50

13. Free Ammonia (as NH3) <0.01 mg/L Max. 5.0

14. Total Kjeldahl Nitrogen (as N) 34.9 mg/L Max. 100

15. Phenolic Compound (as C6H5OH) ND mg/L Max. 1.0

16. Iron (as Fe) 1.36 mg/L Max. 3.0

17. Copper (as Cu) ND mg/L Max. 3.0

18. Zinc (as Zn) ND mg/L Max. 5.0

19. Nickel (as Ni) <0.01 mg/L Max. 3.0

20. Fluoride (as F) <0.01 mg/L Max. 2.0

21. E Coli Absent MNP/100 ml Absent

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the above mentioned parameters are under permissible limit.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 19: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/AAQ/MAY/19-20/01 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

AMBIENT AIR QUALITY TEST RESULTS

Location(s) PM 2.5

(µg/m3)

PM 10

(µg/m3)

NO2

(µg/m3)

SO2

(µg/m3) SL.

No.

Limit(s)

Date of

Sampling 60

(24 Hrs. Av.) 100

(24 Hrs. Av.) 80

(24 Hrs. Av.) 80

(24 Hrs. Av.)

24.05.2019 19.2 -- -- -- 1. Near Cement Mill

25.05.2019 -- 54.6 6.2 BDL

24.05.2019 17.8 -- -- -- 2. Near CPP

25.05.2019 -- 50.2 10.8 4.2

24.05.2019 14.2 -- -- -- 3. Near CCR

24.05.2019 -- 48.2 4.9 BDL

24.05.2019 10.9 -- -- -- 4. Vrindavan Colony

25.05.2019 -- 29.6 BDL BDL

ND: Not Detected

Analysis Protocol: IS 5182

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 20: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/FE/MAY/19-20/01 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

PROCESS FUGITIVE EMISSION TEST RESULTS

Date Locations Fugitive Emission Results for SPM

(µg/m3)

Limits

(µg/m3)

24.05.2019 Fly-ash Storage Section 1249 5000

24.05.2019 Coal Storage Section 367 2000

25.05.2019 Limestone Storage Section 1869 5000

25.05.2019 Cement Packing Section 2216 5000

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 21: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/MAY/19-20/01 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/MAY/19-20/01

02 Date of Sampling 24.05.2019

03 Material of Construction M. S.

04 Stack Attached To R. A. B. H.

05 Stack Diameter (Meter) 3.0

06 Flue Gas Temperature (0C) 182

07 Exit Velocity of Gas (m/sec) 19.4

08 Flow Rate (Nm3/hr) 323368.56

09 Type of Fuel Used Kiln Coal

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 15.2 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 795.8 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 455.9 mg/Nm3 800

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 22: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/MAY/19-20/02 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/MAY/19-20/02

02 Date of Sampling 24.05.2019

03 Material of Construction M. S.

04 Stack Attached To Coal Mill B.F.

05 Stack Diameter (Meter) 1.25

06 Flue Gas Temperature (0C) 65

07 Exit Velocity of Gas (m/sec) 15.2

08 Flow Rate (Nm3/hr) 59212.29

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 18.2 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 558.6 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 207.2 mg/Nm3 800

*NA: Not Applicable

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 23: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/MAY/19-20/03 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/MAY/19-20/03

02 Date of Sampling 25.05.2019

03 Material of Construction M. S.

04 Stack Attached To Cooler E. S. P.

05 Stack Diameter (Meter) 4.0

06 Flue Gas Temperature (0C) 234

07 Exit Velocity of Gas (m/sec) 14.3

08 Flow Rate (Nm3/hr) 380288.34

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 22.8 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 24: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/MAY/19-20/04 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/MAY/19-20/04

02 Date of Sampling 25.05.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 1

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 69

07 Exit Velocity of Gas (m/sec) 12.6

08 Flow Rate (Nm3/hr) 124185.07

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 20.9 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 25: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/MAY/19-20/05 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/MAY/19-20/05

02 Date of Sampling 25.05.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 2

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 68

07 Exit Velocity of Gas (m/sec) 12.8

08 Flow Rate (Nm3/hr) 126526.22

09 Type of Fuel Used NA

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 17.1 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 26: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/MAY/19-20/06 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/MAY/19-20/06

02 Date of Sampling 26.05.2019

03 Material of Construction Refractory Brick

04 Stack Attached To Captive Power Plant (CPP)

05 Stack Diameter (Meter) 4.5

06 Flue Gas Temperature (0C) 86

07 Exit Velocity of Gas (m/sec) 9.1

08 Flow Rate (Nm3/hr) 432550.61

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 28.6 mg/Nm3 50

ii. Sulphur Dioxide (as SO2) 412.8 mg/Nm3 600

iii. Oxides of Nitrogen (as NOx) 235.4 mg/Nm3 300

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 27: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/MAY/19-20/07 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/MAY/19-20/07

02 Date of Sampling 26.05.2019

03 Material of Construction M. S.

04 Stack Attached To Crusher B.F.

05 Stack Diameter (Meter) 0.7

06 Flue Gas Temperature (0C) 29

07 Exit Velocity of Gas (m/sec) 4.3

08 Flow Rate (Nm3/hr) 6289.44

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 15.7 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

#BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 28: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/NLM/MAY/19-20/01 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

NOISE LEVEL MEASUREMENT RESULTS

(DCBL Plant)

Measurement Date: 24.05.2019

Day time

Night Time

Sl. No. Location(s)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

1 Near Coal Mill 76 72 74 68 65 67

2 Near CPP Area 72 68 70 64 57 61

3 Near Dispensary Area 42 34 39 32 26 29

4 Near Raw Mill 74 69 72 67 62 65

5 Near Cement Mill 75 71 73 66 62 64

6 Near Limestone Crusher 73 67 72 67 61 64

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 29: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/DW/MAY/19-20/01 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

DRINKING WATER ANALYSIS RESULTS

Sample Type : Drinking Water Collected By : Jointly by Envirocon & Client Sample Source : Kaberi Block Collected On : 28.05.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(IS : 10500 : 2012)

1. Colour <1 Hazen Units Max. 5

2. Odour Odourless -- Unobjectionable

3. Taste Agreeable -- Agreeable

4. Turbidity 0.07 NTU Max. 1.0

5. pH 7.2 -- 6.5 – 8.5

6. Temperature 27.2 0C -

7. Total Alkalinity (as CaCO3) 74 mg/L Max. 200

8. Total Dissolved Solids 86.4 mg/L Max. 500

9. Total Hardness, (as CaCO3) 5.2 mg/L Max. 200

10. Chlorides (as Cl) 2.3 mg/L Max. 250

11. Residual Free Chlorine ND mg/L Min. 0.2

12. Sulfates, (as SO4) 10 mg/L Max. 200

13. Fluorides (as F) ND mg/L Max. 1.0

14. Nitrate (as NO3) ND mg/L Max. 45

15. Iron (as Fe) 0.021 mg/L Max. 0.30

16. Total Arsenic (as As) ND mg/L Max. 0.01

17. Lead ND mg/L Max. 0.01

18. Copper ND mg/L Max. 0.05

19. Boron ND mg/L Max. 0.5

20. Phenolic Compounds (as C6H5OH) ND mg/L Max. 0.001

21. Faecal Coliform NIL MNP/100 ml NIL

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the parameters are under permissible limit and the water from the above mentioned source is fit for drinking.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 30: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SW/MAY/19-20/01 Order No. : 8900006691/P15

Date : 04/06/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

SURFACE WATER ANALYSIS RESULTS

Sample Type : Surface Water Collected By : Jointly by Envirocon & Client Sample Source : Nala Near Vrindavan Colony Collected On : 28.05.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(CPCB Norms)

1. pH 6.4 -- 5.5-9.0

2. Colour Colourless -- --

3. Odour Acceptable -- Acceptable

4. Temperature 27.6 0C Shall not exceed 50C above the receiving water temperature

5. Biochemical Oxygen Demand (3 days at 27⁰C)

24 mg/L Max. 30

6. Chemical Oxygen Demand 69 mg/L Max. 250

7. Oil & Grease 1.3 mg/L Max.10

8. Total Dissolved Solids 296 mg/L Max. 2100

9. Total Suspended Solids 41 mg/L Max. 100

10. Chloride 40 mg/L Max. 600

11. Total Residual Chlorine ND mg/L Max. 1.0

12. Ammonical Nitrogen (as N) 14.2 mg/L Max. 50

13. Free Ammonia (as NH3) <0.01 mg/L Max. 5.0

14. Total Kjeldahl Nitrogen (as N) 39.1 mg/L Max. 100

15. Phenolic Compound (as C6H5OH) ND mg/L Max. 1.0

16. Iron (as Fe) 1.18 mg/L Max. 3.0

17. Copper (as Cu) ND mg/L Max. 3.0

18. Zinc (as Zn) ND mg/L Max. 5.0

19. Nickel (as Ni) <0.01 mg/L Max. 3.0

20. Fluoride (as F) <0.01 mg/L Max. 2.0

21. E Coli Absent MNP/100 ml Absent

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the above mentioned parameters are under permissible limit.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 31: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/AAQ/JUN/19-20/01 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

AMBIENT AIR QUALITY TEST RESULTS

Location(s) PM 2.5

(µg/m3)

PM 10

(µg/m3)

NO2

(µg/m3)

SO2

(µg/m3) SL.

No.

Limit(s)

Date of

Sampling 60

(24 Hrs. Av.) 100

(24 Hrs. Av.) 80

(24 Hrs. Av.) 80

(24 Hrs. Av.)

21.06.2019 17.4 -- -- -- 1. Near Cement Mill

22.06.2019 -- 53.2 5.8 BDL

21.06.2019 16.2 -- -- -- 2. Near CPP

22.06.2019 -- 51.8 8.5 4.2

21.06.2019 12.6 -- -- -- 3. Near CCR

22.06.2019 -- 43.8 5.2 BDL

21.06.2019 7.8 -- -- -- 4. Vrindavan Colony

22.06.2019 -- 27.8 BDL BDL

ND: Not Detected

Analysis Protocol: IS 5182

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 32: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/FE/JUN/19-20/01 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

PROCESS FUGITIVE EMISSION TEST RESULTS

Date Locations Fugitive Emission Results for SPM

(µg/m3)

Limits

(µg/m3)

21.06.2019 Fly-ash Storage Section 1168 5000

21.06.2019 Coal Storage Section 384 2000

22.06.2019 Limestone Storage Section 1599 5000

22.06.2019 Cement Packing Section 1982 5000

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 33: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUN/19-20/02 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUN/19-20/02

02 Date of Sampling 21.06.2019

03 Material of Construction M. S.

04 Stack Attached To R. A. B. H.

05 Stack Diameter (Meter) 3.0

06 Flue Gas Temperature (0C) 178

07 Exit Velocity of Gas (m/sec) 17.5

08 Flow Rate (Nm3/hr) 294285.57

09 Type of Fuel Used Kiln Coal

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 17.6 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 741.85 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 409.84 mg/Nm3 800

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 34: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUN/19-20/01 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUN/19-20/01

02 Date of Sampling 21.06.2019

03 Material of Construction M. S.

04 Stack Attached To Coal Mill B.F.

05 Stack Diameter (Meter) 1.25

06 Flue Gas Temperature (0C) 61

07 Exit Velocity of Gas (m/sec) 15.6

08 Flow Rate (Nm3/hr) 61498.30

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 12.1 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 479.14 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 186.70 mg/Nm3 800

*NA: Not Applicable

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 35: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUN/19-20/05 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUN/19-20/05

02 Date of Sampling 22.06.2019

03 Material of Construction M. S.

04 Stack Attached To Cooler E. S. P.

05 Stack Diameter (Meter) 4.0

06 Flue Gas Temperature (0C) 231

07 Exit Velocity of Gas (m/sec) 15.1

08 Flow Rate (Nm3/hr) 403953.47

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 21.4 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 36: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUN/19-20/07 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUN/19-20/07

02 Date of Sampling 22.06.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 1

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 65

07 Exit Velocity of Gas (m/sec) 12.8

08 Flow Rate (Nm3/hr) 127649.23

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 15.9 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 37: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUN/19-20/06 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUN/19-20/06

02 Date of Sampling 22.06.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 2

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 66

07 Exit Velocity of Gas (m/sec) 12.5

08 Flow Rate (Nm3/hr) 124289.73

09 Type of Fuel Used NA

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 16.4 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 38: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUN/19-20/03 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUN/19-20/03

02 Date of Sampling 21.06.2019

03 Material of Construction Refractory Brick

04 Stack Attached To Captive Power Plant (CPP)

05 Stack Diameter (Meter) 4.5

06 Flue Gas Temperature (0C) 84

07 Exit Velocity of Gas (m/sec) 10.2

08 Flow Rate (Nm3/hr) 487553.12

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 29.3 mg/Nm3 50

ii. Sulphur Dioxide (as SO2) 384.66 mg/Nm3 600

iii. Oxides of Nitrogen (as NOx) 213.28 mg/Nm3 300

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 39: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUN/19-20/04 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUN/19-20/04

02 Date of Sampling 22.06.2019

03 Material of Construction M. S.

04 Stack Attached To Crusher B.F.

05 Stack Diameter (Meter) 0.7

06 Flue Gas Temperature (0C) 28

07 Exit Velocity of Gas (m/sec) 4.7

08 Flow Rate (Nm3/hr) 6447.52

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 16.2 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

#BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 40: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/NLM/JUN/19-20/01 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

NOISE LEVEL MEASUREMENT RESULTS

(DCBL Plant)

Measurement Date: 21.06.2019

Day time

Night Time

Sl. No. Location(s)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

1 Near Coal Mill 74 71 72 67 63 65

2 Near CPP Area 67 62 64 62 56 59

3 Near Dispensary Area 39 35 37 32 28 30

4 Near Raw Mill 72 67 70 67 64 66

5 Near Cement Mill 72 68 71 65 61 63

6 Near Limestone Crusher 69 65 67 64 59 61

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 41: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/DW/JUN/19-20/01 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

DRINKING WATER ANALYSIS RESULTS

Sample Type : Drinking Water Collected By : Jointly by Envirocon & Client Sample Source : Engineers Colony Collected On : 23.06.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(IS : 10500 : 2012)

1. Colour 1 Hazen Units Max. 5

2. Odour Odourless -- Unobjectionable

3. Taste Agreeable -- Agreeable

4. Turbidity 0.09 NTU Max. 1.0

5. pH 7.1 -- 6.5 – 8.5

6. Temperature 26.2 0C -

7. Total Alkalinity (as CaCO3) 82 mg/L Max. 200

8. Total Dissolved Solids 88.3 mg/L Max. 500

9. Total Hardness, (as CaCO3) 26 mg/L Max. 200

10. Chlorides (as Cl) 8.1 mg/L Max. 250

11. Residual Free Chlorine ND mg/L Min. 0.2

12. Sulfates, (as SO4) 16 mg/L Max. 200

13. Fluorides (as F) ND mg/L Max. 1.0

14. Nitrate (as NO3) ND mg/L Max. 45

15. Iron (as Fe) 0.018 mg/L Max. 0.30

16. Total Arsenic (as As) ND mg/L Max. 0.01

17. Lead ND mg/L Max. 0.01

18. Copper ND mg/L Max. 0.05

19. Boron ND mg/L Max. 0.5

20. Phenolic Compounds (as C6H5OH) ND mg/L Max. 0.001

21. Faecal Coliform NIL MNP/100 ml NIL

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the parameters are under permissible limit and the water from the above mentioned source is fit for drinking.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 42: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SW/JUN/19-20/01 Order No. : 8900006691/P15

Date : 03/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

SURFACE WATER ANALYSIS RESULTS

Sample Type : Surface Water Collected By : Jointly by Envirocon & Client Sample Source : Nala Near Vrindavan Colony Collected On : 23.06.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(CPCB Norms)

1. pH 6.7 -- 5.5-9.0

2. Colour Colourless -- --

3. Odour Acceptable -- Acceptable

4. Temperature 26.1 0C Shall not exceed 50C above the receiving water temperature

5. Biochemical Oxygen Demand (3 days at 27⁰C)

21 mg/L Max. 30

6. Chemical Oxygen Demand 58 mg/L Max. 250

7. Oil & Grease 0.72 mg/L Max.10

8. Total Dissolved Solids 227 mg/L Max. 2100

9. Total Suspended Solids 41 mg/L Max. 100

10. Chloride 31 mg/L Max. 600

11. Total Residual Chlorine ND mg/L Max. 1.0

12. Ammonical Nitrogen (as N) 10.8 mg/L Max. 50

13. Free Ammonia (as NH3) <0.01 mg/L Max. 5.0

14. Total Kjeldahl Nitrogen (as N) 31.7 mg/L Max. 100

15. Phenolic Compound (as C6H5OH) ND mg/L Max. 1.0

16. Iron (as Fe) 0.82 mg/L Max. 3.0

17. Copper (as Cu) ND mg/L Max. 3.0

18. Zinc (as Zn) ND mg/L Max. 5.0

19. Nickel (as Ni) ND mg/L Max. 3.0

20. Fluoride (as F) <0.01 mg/L Max. 2.0

21. E Coli Absent MNP/100 ml Absent

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the above mentioned parameters are under permissible limit.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 43: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/AAQ/JUL/19-20/01 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

AMBIENT AIR QUALITY TEST RESULTS

Location(s) PM 2.5

(µg/m3)

PM 10

(µg/m3)

NO2

(µg/m3)

SO2

(µg/m3) SL.

No.

Limit(s)

Date of

Sampling 60

(24 Hrs. Av.) 100

(24 Hrs. Av.) 80

(24 Hrs. Av.) 80

(24 Hrs. Av.)

24.07.2019 15.2 -- -- -- 1. Near Cement Mill

25.07.2019 -- 58.4 6.2 BDL

24.07.2019 19.3 -- -- -- 2. Near CPP

25.07.2019 -- 55.9 11.4 4.8

24.07.2019 14.1 -- -- -- 3. Near CCR

25.07.2019 -- 46.8 5.9 BDL

24.07.2019 9.2 -- -- -- 4. Vrindavan Colony

25.07.2019 -- 29.1 BDL BDL

ND: Not Detected

Analysis Protocol: IS 5182

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 44: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/FE/JUL/19-20/01 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

PROCESS FUGITIVE EMISSION TEST RESULTS

Date Locations Fugitive Emission Results for SPM

(µg/m3)

Limits

(µg/m3)

25.07.2019 Fly-ash Storage Section 1312 5000

25.07.2019 Coal Storage Section 502 2000

26.07.2019 Limestone Storage Section 1409 5000

26.07.2019 Cement Packing Section 2143 5000

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 45: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUL/19-20/01 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUL/19-20/01

02 Date of Sampling 24.07.2019

03 Material of Construction M. S.

04 Stack Attached To R. A. B. H.

05 Stack Diameter (Meter) 3.0

06 Flue Gas Temperature (0C) 181

07 Exit Velocity of Gas (m/sec) 16.8

08 Flow Rate (Nm3/hr) 280647.32

09 Type of Fuel Used Kiln Coal

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 17.2 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 677.86 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 371.56 mg/Nm3 800

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 46: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUL/19-20/02 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUL/19-20/02

02 Date of Sampling 24.07.2019

03 Material of Construction M. S.

04 Stack Attached To Coal Mill B.F.

05 Stack Diameter (Meter) 1.25

06 Flue Gas Temperature (0C) 58

07 Exit Velocity of Gas (m/sec) 15.2

08 Flow Rate (Nm3/hr) 60464.52

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 13.2 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 436.05 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 204.92 mg/Nm3 800

*NA: Not Applicable

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 47: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUL/19-20/03 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUL/19-20/03

02 Date of Sampling 25.07.2019

03 Material of Construction M. S.

04 Stack Attached To Cooler E. S. P.

05 Stack Diameter (Meter) 4.0

06 Flue Gas Temperature (0C) 238

07 Exit Velocity of Gas (m/sec) 16.4

08 Flow Rate (Nm3/hr) 432720.91

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 19.8 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 48: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUL/19-20/04 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUL/19-20/04

02 Date of Sampling 25.07.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 1

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 61

07 Exit Velocity of Gas (m/sec) 13.3

08 Flow Rate (Nm3/hr) 134223.98

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 15.3 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 49: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUL/19-20/05 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUL/19-20/05

02 Date of Sampling 25.07.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 2

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 63

07 Exit Velocity of Gas (m/sec) 12.8

08 Flow Rate (Nm3/hr) 128409.05

09 Type of Fuel Used NA

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 15.9 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 50: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUL/19-20/06 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUL/19-20/06

02 Date of Sampling 26.07.2019

03 Material of Construction Refractory Brick

04 Stack Attached To Captive Power Plant (CPP)

05 Stack Diameter (Meter) 4.5

06 Flue Gas Temperature (0C) 82

07 Exit Velocity of Gas (m/sec) 10.6

08 Flow Rate (Nm3/hr) 509527.34

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 28.7 mg/Nm3 50

ii. Sulphur Dioxide (as SO2) 441.09 mg/Nm3 600

iii. Oxides of Nitrogen (as NOx) 241.44 mg/Nm3 300

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 51: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/JUL/19-20/07 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/JUL/19-20/07

02 Date of Sampling 26.07.2019

03 Material of Construction M. S.

04 Stack Attached To Crusher B.F.

05 Stack Diameter (Meter) 0.7

06 Flue Gas Temperature (0C) 26

07 Exit Velocity of Gas (m/sec) 4.5

08 Flow Rate (Nm3/hr) 6214.45

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 14.8 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

#BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 52: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/NLM/JUL/19-20/01 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

NOISE LEVEL MEASUREMENT RESULTS

(DCBL Plant)

Measurement Date: 24.07.2019

Day time

Night Time

Sl. No. Location(s)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

1 Near Coal Mill 73 68 71 69 64 67

2 Near CPP Area 65 61 64 63 58 60

3 Near Dispensary Area 42 36 38 34 28 31

4 Near Raw Mill 73 68 72 68 65 67

5 Near Cement Mill 72 68 70 66 62 65

6 Near Limestone Crusher 69 66 68 65 62 64

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 53: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/DW/JUL/19-20/01 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

DRINKING WATER ANALYSIS RESULTS

Sample Type : Drinking Water Collected By : Jointly by Envirocon & Client Sample Source : Kaberi Block Collected On : 26.07.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(IS : 10500 : 2012)

1. Colour <1 Hazen Units Max. 5

2. Odour Odourless -- Unobjectionable

3. Taste Agreeable -- Agreeable

4. Turbidity 0.13 NTU Max. 1.0

5. pH 7.1 -- 6.5 – 8.5

6. Temperature 25.8 0C -

7. Total Alkalinity (as CaCO3) 85 mg/L Max. 200

8. Total Dissolved Solids 92.4 mg/L Max. 500

9. Total Hardness, (as CaCO3) 18 mg/L Max. 200

10. Chlorides (as Cl) 7.9 mg/L Max. 250

11. Residual Free Chlorine ND mg/L Min. 0.2

12. Sulfates, (as SO4) 6.2 mg/L Max. 200

13. Fluorides (as F) ND mg/L Max. 1.0

14. Nitrate (as NO3) ND mg/L Max. 45

15. Iron (as Fe) 0.034 mg/L Max. 0.30

16. Total Arsenic (as As) ND mg/L Max. 0.01

17. Lead ND mg/L Max. 0.01

18. Copper ND mg/L Max. 0.05

19. Boron ND mg/L Max. 0.5

20. Phenolic Compounds (as C6H5OH) ND mg/L Max. 0.001

21. Faecal Coliform NIL MNP/100 ml NIL

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the parameters are under permissible limit and the water from the above mentioned source is fit for drinking.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 54: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SW/JUL/19-20/01 Order No. : 8900006691/P15

Date : 31/07/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

SURFACE WATER ANALYSIS RESULTS

Sample Type : Surface Water Collected By : Jointly by Envirocon & Client Sample Source : Nala Near Vrindavan Colony Collected On : 26.07.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(CPCB Norms)

1. pH 6.6 -- 5.5-9.0

2. Colour Colourless -- --

3. Odour Acceptable -- Acceptable

4. Temperature 25.2 0C Shall not exceed 50C above the receiving water temperature

5. Biochemical Oxygen Demand (3 days at 27⁰C)

18 mg/L Max. 30

6. Chemical Oxygen Demand 52 mg/L Max. 250

7. Oil & Grease 0.55 mg/L Max.10

8. Total Dissolved Solids 213 mg/L Max. 2100

9. Total Suspended Solids 52 mg/L Max. 100

10. Chloride 26 mg/L Max. 600

11. Total Residual Chlorine ND mg/L Max. 1.0

12. Ammonical Nitrogen (as N) 6.3 mg/L Max. 50

13. Free Ammonia (as NH3) <0.01 mg/L Max. 5.0

14. Total Kjeldahl Nitrogen (as N) 21.4 mg/L Max. 100

15. Phenolic Compound (as C6H5OH) ND mg/L Max. 1.0

16. Iron (as Fe) 0.71 mg/L Max. 3.0

17. Copper (as Cu) ND mg/L Max. 3.0

18. Zinc (as Zn) ND mg/L Max. 5.0

19. Nickel (as Ni) ND mg/L Max. 3.0

20. Fluoride (as F) <0.01 mg/L Max. 2.0

21. E Coli Absent MNP/100 ml Absent

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the above mentioned parameters are under permissible limit.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 55: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/AAQ/AUG/19-20/01 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

AMBIENT AIR QUALITY TEST RESULTS

Location(s) PM 2.5

(µg/m3)

PM 10

(µg/m3)

NO2

(µg/m3)

SO2

(µg/m3) SL.

No.

Limit(s)

Date of

Sampling 60

(24 Hrs. Av.) 100

(24 Hrs. Av.) 80

(24 Hrs. Av.) 80

(24 Hrs. Av.)

26.08.2019 22.6 -- -- -- 1. Near Cement Mill

27.08.2019 -- 65.8 8.9 BDL

26.08.2019 21.3 -- -- -- 2. Near CPP

27.08.2019 -- 62.8 13.8 5.6

26.08.2019 26.8 -- -- -- 3. Near CCR

27.08.2019 -- 69.7 6.2 BDL

26.08.2019 15.1 -- -- -- 4. Vrindavan Colony

27.08.2019 -- 42.4 BDL BDL

ND: Not Detected

Analysis Protocol: IS 5182

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 56: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/FE/AUG/19-20/01 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

PROCESS FUGITIVE EMISSION TEST RESULTS

Date Locations Fugitive Emission Results for SPM

(µg/m3)

Limits

(µg/m3)

26.08.2019 Fly-ash Storage Section 1524 5000

26.08.2019 Coal Storage Section 721 2000

27.08.2019 Limestone Storage Section 1612 5000

27.08.2019 Cement Packing Section 2284 5000

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 57: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/AUG/19-20/01 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/AUG/19-20/01

02 Date of Sampling 26.08.2019

03 Material of Construction M. S.

04 Stack Attached To R. A. B. H.

05 Stack Diameter (Meter) 3.0

06 Flue Gas Temperature (0C) 184

07 Exit Velocity of Gas (m/sec) 15.9

08 Flow Rate (Nm3/hr) 263869.01

09 Type of Fuel Used Kiln Coal

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 15.9 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 626.43 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 328.31 mg/Nm3 800

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 58: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/AUG/19-20/02 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/AUG/19-20/02

02 Date of Sampling 26.08.2019

03 Material of Construction M. S.

04 Stack Attached To Coal Mill B.F.

05 Stack Diameter (Meter) 1.25

06 Flue Gas Temperature (0C) 62

07 Exit Velocity of Gas (m/sec) 14.3

08 Flow Rate (Nm3/hr) 56205.16

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 13.8 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 426.83 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 189.50 mg/Nm3 800

*NA: Not Applicable

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 59: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/AUG/19-20/03 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/AUG/19-20/03

02 Date of Sampling 26.08.2019

03 Material of Construction M. S.

04 Stack Attached To Cooler E. S. P.

05 Stack Diameter (Meter) 4.0

06 Flue Gas Temperature (0C) 228

07 Exit Velocity of Gas (m/sec) 16.2

08 Flow Rate (Nm3/hr) 435975.64

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 18.6 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 60: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/AUG/19-20/04 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/AUG/19-20/04

02 Date of Sampling 27.08.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 1

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 62

07 Exit Velocity of Gas (m/sec) 14.6

08 Flow Rate (Nm3/hr) 146903.79

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 14.2 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 61: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/AUG/19-20/05 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/AUG/19-20/05

02 Date of Sampling 27.08.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 2

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 62

07 Exit Velocity of Gas (m/sec) 13.9

08 Flow Rate (Nm3/hr) 139860.46

09 Type of Fuel Used NA

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 15.1 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 62: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/AUG/19-20/06 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/AUG/19-20/06

02 Date of Sampling 28.08.2019

03 Material of Construction Refractory Brick

04 Stack Attached To Captive Power Plant (CPP)

05 Stack Diameter (Meter) 4.5

06 Flue Gas Temperature (0C) 85

07 Exit Velocity of Gas (m/sec) 10.2

08 Flow Rate (Nm3/hr) 486191.24

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 26.9 mg/Nm3 50

ii. Sulphur Dioxide (as SO2) 410.35 mg/Nm3 600

iii. Oxides of Nitrogen (as NOx) 214.87 mg/Nm3 300

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 63: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/AUG/19-20/07 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/AUG/19-20/07

02 Date of Sampling 28.08.2019

03 Material of Construction M. S.

04 Stack Attached To Crusher B.F.

05 Stack Diameter (Meter) 0.7

06 Flue Gas Temperature (0C) 29

07 Exit Velocity of Gas (m/sec) 4.3

08 Flow Rate (Nm3/hr) 5879.26

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 12.8 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

#BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 64: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/NLM/AUG/19-20/01 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

NOISE LEVEL MEASUREMENT RESULTS

(DCBL Plant)

Measurement Date: 26.08.2019

Day time

Night Time

Sl. No. Location(s)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

1 Near Coal Mill 71 67 69 68 62 64

2 Near CPP Area 68 62 66 62 56 59

3 Near Dispensary Area 41 35 38 36 29 33

4 Near Raw Mill 74 69 71 67 62 65

5 Near Cement Mill 71 66 68 66 62 64

6 Near Limestone Crusher 71 65 67 66 59 63

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 65: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/DW/AUG/19-20/01 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

DRINKING WATER ANALYSIS RESULTS

Sample Type : Drinking Water Collected By : Jointly by Envirocon & Client Sample Source : CCR Collected On : 28.08.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(IS : 10500 : 2012)

1. Colour <1 Hazen Units Max. 5

2. Odour Odourless -- Unobjectionable

3. Taste Agreeable -- Agreeable

4. Turbidity 0.08 NTU Max. 1.0

5. pH 7.1 -- 6.5 – 8.5

6. Temperature 27.2 0C -

7. Total Alkalinity (as CaCO3) 79 mg/L Max. 200

8. Total Dissolved Solids 86.2 mg/L Max. 500

9. Total Hardness, (as CaCO3) 12 mg/L Max. 200

10. Chlorides (as Cl) 6.3 mg/L Max. 250

11. Residual Free Chlorine ND mg/L Min. 0.2

12. Sulfates, (as SO4) 5.6 mg/L Max. 200

13. Fluorides (as F) ND mg/L Max. 1.0

14. Nitrate (as NO3) ND mg/L Max. 45

15. Iron (as Fe) <0.01 mg/L Max. 0.30

16. Total Arsenic (as As) ND mg/L Max. 0.01

17. Lead ND mg/L Max. 0.01

18. Copper ND mg/L Max. 0.05

19. Boron ND mg/L Max. 0.5

20. Phenolic Compounds (as C6H5OH) ND mg/L Max. 0.001

21. Faecal Coliform NIL MNP/100 ml NIL

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the parameters are under permissible limit and the water from the above mentioned source is fit for drinking.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 66: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SW/AUG/19-20/01 Order No. : 8900006691/P15

Date : 05/09/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

SURFACE WATER ANALYSIS RESULTS

Sample Type : Surface Water Collected By : Jointly by Envirocon & Client Sample Source : Nala Near Vrindavan Colony Collected On : 28.08.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(CPCB Norms)

1. pH 6.7 -- 5.5-9.0

2. Colour Colourless -- --

3. Odour Acceptable -- Acceptable

4. Temperature 26.2 0C Shall not exceed 50C above the receiving water temperature

5. Biochemical Oxygen Demand (3 days at 27⁰C)

21 mg/L Max. 30

6. Chemical Oxygen Demand 74 mg/L Max. 250

7. Oil & Grease 0.21 mg/L Max.10

8. Total Dissolved Solids 224 mg/L Max. 2100

9. Total Suspended Solids 43 mg/L Max. 100

10. Chloride 22 mg/L Max. 600

11. Total Residual Chlorine ND mg/L Max. 1.0

12. Ammonical Nitrogen (as N) 3.8 mg/L Max. 50

13. Free Ammonia (as NH3) <0.01 mg/L Max. 5.0

14. Total Kjeldahl Nitrogen (as N) 14.8 mg/L Max. 100

15. Phenolic Compound (as C6H5OH) ND mg/L Max. 1.0

16. Iron (as Fe) 0.42 mg/L Max. 3.0

17. Copper (as Cu) ND mg/L Max. 3.0

18. Zinc (as Zn) ND mg/L Max. 5.0

19. Nickel (as Ni) ND mg/L Max. 3.0

20. Fluoride (as F) <0.01 mg/L Max. 2.0

21. E Coli Absent MNP/100 ml Absent

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the above mentioned parameters are under permissible limit.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 67: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/AAQ/SEPT/19-20/01 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

AMBIENT AIR QUALITY TEST RESULTS

Location(s) PM 2.5

(µg/m3)

PM 10

(µg/m3)

NO2

(µg/m3)

SO2

(µg/m3) SL.

No.

Limit(s)

Date of

Sampling 60

(24 Hrs. Av.) 100

(24 Hrs. Av.) 80

(24 Hrs. Av.) 80

(24 Hrs. Av.)

17.09.2019 26.4 -- -- -- 1. Near Cement Mill

18.09.2019 -- 69.2 8.7 BDL

17.09.2019 22.3 -- -- -- 2. Near CPP

18.09.2019 -- 65.6 12.7 5.8

17.09.2019 25.5 -- -- -- 3. Near CCR

18.09.2019 -- 68.7 6.6 BDL

17.09.2019 17.4 -- -- -- 4. Vrindavan Colony

18.09.2019 -- 45.8 BDL BDL

ND: Not Detected

Analysis Protocol: IS 5182

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 68: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/FE/SEPT/19-20/01 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

PROCESS FUGITIVE EMISSION TEST RESULTS

Date Locations Fugitive Emission Results for SPM

(µg/m3)

Limits

(µg/m3)

17.09.2019 Fly-ash Storage Section 1462 5000

17.09.2019 Coal Storage Section 752 2000

18.09.2019 Limestone Storage Section 1509 5000

18.09.2019 Cement Packing Section 2117 5000

Sampled & Analysed by: ENVIROCON, Digboi

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 69: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/SEPT/19-20/01 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/SEPT/19-20/01

02 Date of Sampling 17.09.2019

03 Material of Construction M. S.

04 Stack Attached To R. A. B. H.

05 Stack Diameter (Meter) 3.0

06 Flue Gas Temperature (0C) 184

07 Exit Velocity of Gas (m/sec) 20.1

08 Flow Rate (Nm3/hr) 378081.62

09 Type of Fuel Used Kiln Coal

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 17.9 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 782.6 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 252.8 mg/Nm3 800

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 70: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/SEPT/19-20/02 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/SEPT/19-20/02

02 Date of Sampling 17.09.2019

03 Material of Construction M. S.

04 Stack Attached To Coal Mill B.F.

05 Stack Diameter (Meter) 1.25

06 Flue Gas Temperature (0C) 72

07 Exit Velocity of Gas (m/sec) 17.1

08 Flow Rate (Nm3/hr) 28800.20

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 14.2 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) 583.44 mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) 158.65 mg/Nm3 800

*NA: Not Applicable

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 71: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/SEPT/19-20/03 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/SEPT/19-20/03

02 Date of Sampling 17.09.2019

03 Material of Construction M. S.

04 Stack Attached To Cooler E. S. P.

05 Stack Diameter (Meter) 4.0

06 Flue Gas Temperature (0C) 231

07 Exit Velocity of Gas (m/sec) 11.5

08 Flow Rate (Nm3/hr) 104400.10

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 22.3 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 72: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/SEPT/19-20/04 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/SEPT/19-20/04

02 Date of Sampling 18.09.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 1

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 67

07 Exit Velocity of Gas (m/sec) 15.4

08 Flow Rate (Nm3/hr) 93600.00

09 Type of Fuel Used NA*

10 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 12.2 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 73: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/SEPT/19-20/05 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/SEPT/19-20/05

02 Date of Sampling 18.09.2019

03 Material of Construction M. S.

04 Stack Attached To Cement Mill No. 2

05 Stack Diameter (Meter) 2.0

06 Flue Gas Temperature (0C) 62

07 Exit Velocity of Gas (m/sec) 13.9

08 Flow Rate (Nm3/hr) 139860.46

09 Type of Fuel Used NA

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 15.1 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

*NA: Not Applicable #BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 74: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/SEPT/19-20/06 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/SEPT/19-20/06

02 Date of Sampling 18.09.2019

03 Material of Construction Refractory Brick

04 Stack Attached To Captive Power Plant (CPP)

05 Stack Diameter (Meter) 4.5

06 Flue Gas Temperature (0C) 103

07 Exit Velocity of Gas (m/sec) 6.0

08 Flow Rate (Nm3/hr) 72000.05

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 37.2 mg/Nm3 50

ii. Sulphur Dioxide (as SO2) 513.9 mg/Nm3 600

iii. Oxides of Nitrogen (as NOx) 284.9 mg/Nm3 300

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 75: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SE/SEPT/19-20/07 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

STACK EMISSION TEST RESULTS

01 Stack Emission Test Ref. No. DCBL/SE/SEPT/19-20/07

02 Date of Sampling 18.09.2019

03 Material of Construction M. S.

04 Stack Attached To Crusher B.F.

05 Stack Diameter (Meter) 0.7

06 Flue Gas Temperature (0C) 29

07 Exit Velocity of Gas (m/sec) 4.3

08 Flow Rate (Nm3/hr) 5879.26

09 Type of Fuel Used Coal

09 Analysis Results of Flue Gas

Parameter(s) Result(s) Unit(s) Limit(s)

i. PM- Particulate Matter 12.8 mg/Nm3 30

ii. Sulphur Dioxide (as SO2) BDL mg/Nm3 1000

iii. Oxides of Nitrogen (as NOx) BDL mg/Nm3 800

#BDL: Below Detection Level

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 76: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/NLM/SEPT/19-20/01 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

NOISE LEVEL MEASUREMENT RESULTS

(DCBL Plant)

Measurement Date: 18.09.2019

Day time

Night Time

Sl. No. Location(s)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

Maximum

(dB-A)

Minimum

(dB-A)

Leq

(dB-A)

1 Near Coal Mill 73 68 71 66 60 64

2 Near CPP Area 69 63 67 60 55 58

3 Near Dispensary Area 46 38 44 35 30 33

4 Near Raw Mill 76 70 74 69 63 67

5 Near Cement Mill 72 67 70 66 62 64

6 Near Limestone Crusher 74 69 72 67 62 65

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 77: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/DW/SEPT/19-20/01 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

DRINKING WATER ANALYSIS RESULTS

Sample Type : Drinking Water Collected By : Jointly by Envirocon & Client Sample Source : Kaberi Block Collected On : 20.09.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(IS : 10500 : 2012)

1. Colour <1 Hazen Units Max. 5

2. Odour Odourless -- Unobjectionable

3. Taste Agreeable -- Agreeable

4. Turbidity 0.12 NTU Max. 1.0

5. pH 7.2 -- 6.5 – 8.5

6. Temperature 26 0C -

7. Total Alkalinity (as CaCO3) 71 mg/L Max. 200

8. Total Dissolved Solids 92.5 mg/L Max. 500

9. Total Hardness, (as CaCO3) 14 mg/L Max. 200

10. Chlorides (as Cl) 5.2 mg/L Max. 250

11. Residual Free Chlorine ND mg/L Min. 0.2

12. Sulfates, (as SO4) 5.7 mg/L Max. 200

13. Fluorides (as F) ND mg/L Max. 1.0

14. Nitrate (as NO3) ND mg/L Max. 45

15. Iron (as Fe) <0.01 mg/L Max. 0.30

16. Total Arsenic (as As) ND mg/L Max. 0.01

17. Lead ND mg/L Max. 0.01

18. Copper ND mg/L Max. 0.05

19. Boron ND mg/L Max. 0.5

20. Phenolic Compounds (as C6H5OH) ND mg/L Max. 0.001

21. Faecal Coliform NIL MNP/100 ml NIL

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the parameters are under permissible limit and the water from the above mentioned source is fit for drinking.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 78: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack

Recognised ByRecognised ByRecognised ByRecognised By PCB, Assam & MSPCB, Meghalaya

Core Services: Environmental Monitoring & Data Generation, EIA & EMP, Environmental Audit & Allied Environmental Management jobs Associate Services: Certification by Competent Person (CIF), NDT, Hydraulic Testing, Chartered Engineer Services etc.

Digboi Stores Building, New Market

Digboi, Assam – 786 171

Ph: 03751-264414, 9435008657, 8876028672

E-mail: [email protected]

Website: www.envirocon.net.in

Report No. : ENV/DCBL/SW/SEPT/19-20/01 Order No. : 8900006691/P15

Date : 01/10/2019 Date : 03/05/2019

M/s DALMIA CEMENT (BHARAT) LIMITED

Village: Thangskai, Lumshnong

Meghalaya

SURFACE WATER ANALYSIS RESULTS

Sample Type : Surface Water Collected By : Jointly by Envirocon & Client Sample Source : Nala Near Vrindavan Colony Collected On : 20.09.2019

Sl. No. Parameter(s) Result(s) Unit(s) Desirable Limit

(CPCB Norms)

1. pH 6.6 -- 5.5-9.0

2. Colour Colourless -- --

3. Odour Acceptable -- Acceptable

4. Temperature 29 0C Shall not exceed 50C above the receiving water temperature

5. Biochemical Oxygen Demand (3 days at 27⁰C)

19 mg/L Max. 30

6. Chemical Oxygen Demand 68 mg/L Max. 250

7. Oil & Grease 0.18 mg/L Max.10

8. Total Dissolved Solids 242 mg/L Max. 2100

9. Total Suspended Solids 46 mg/L Max. 100

10. Chloride 25 mg/L Max. 600

11. Total Residual Chlorine ND mg/L Max. 1.0

12. Ammonical Nitrogen (as N) 3.5 mg/L Max. 50

13. Free Ammonia (as NH3) <0.01 mg/L Max. 5.0

14. Total Kjeldahl Nitrogen (as N) 13.8 mg/L Max. 100

15. Phenolic Compound (as C6H5OH) ND mg/L Max. 1.0

16. Iron (as Fe) 0.31 mg/L Max. 3.0

17. Copper (as Cu) ND mg/L Max. 3.0

18. Zinc (as Zn) ND mg/L Max. 5.0

19. Nickel (as Ni) ND mg/L Max. 3.0

20. Fluoride (as F) <0.01 mg/L Max. 2.0

21. E Coli Absent MNP/100 ml Absent

Analysis Protocol: IS 3025 ND: Not Detected

Note: All the above mentioned parameters are under permissible limit.

Checked By: Mr. Pankaj Baroi, ENVIROCON

NOTE: 1. Results reported are valid at the time of and under the prevailing conditions of measurement.

2. Results refer only to the particular parameters tested.

3. This test report shall not be reproduced except in full, without the written permission of ENVIROCON, Digboi Stores Building, New Market, Digboi – 786171, Assam.

Page 79: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 80: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 81: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 82: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 83: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 84: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 85: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 86: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 87: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 88: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 89: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack
Page 90: DalmiaCement(Bharat)Limited - Dalmia Bharat Group Pioneer ...€¦ · M/s DALMIA CEMENT (BHARAT) LIMITED Village: Thangskai, Lumshnong Meghalaya STACK EMISSION TEST RESULTS 01 Stack