YPFB CHACO S.A. Reporte Diario de Perforacion Well: SMG-X1 Report No.: 32 Report Date: 10/11/2014 Wellbore No.: OH Well Name: San Miguel X1 Common Name: SMG-X1 Project: YPFB CHACO S.A. Site: SAN MIGUEL Rig Name/No.: SAI-379/379 Event: ORIG DRILLING Start Date: 10/10/2014 End Date: Spud Date: 10/10/2014 AFE No.: 1 Currency: Active Datum: WELL @341.60m (above Mean Sea Level) UWI: SMG-X1 INFORMACION DE POZO API No.: Block: San Miguel Supervisor: Ruddy Torrico Paz Engineer: Omar Pedrazas PROFUNDIDAD DIARIA MD: 2,560.00 m TVD: 2,498.49 m Progress: Avg ROP: 0.00 m/hr Rotating Hours: Cum Rot Hrs: 232.53 hr DFS: 32.00 days Est Days: MD Auth: 3,593.00 m Last Casing: 9.625 in @ 2,558.00 m ESTADO Current Status: Realizando RREE VSP 24 Hr Summary: Rotó cemento hasta 2552 mts. Sacó hta a superficie. Corrió RREE USIT-CBL VDL y RREE VSP (En Progreso) 24 Hr Forecast: Finalizar RREE VSP. Armar 27 Tiros DP 5". Armar y bajar BHA Direccional 8.1/2" hasta TOC, realizar cambio Fluido Agua x Lodo Drill N 10 ppg y perforar 5 m Formación para realizar FIT Dens Equi = 13 ppg. COSTOS Daily Cost: 34,422.97 $ Authorized Cost: 9,816,715.00 $ Cumulative Total: 3,714,956.33 $ Expenditure: 37.84% RESUMEN DE OPERACIONES De: A: Dur. (hr) Fase Tarea Activi dad Cod. MD desde (m) MD Hasta (m) Operación 0:00 1:30 1.50 PROD PRE V DRLC MT P 2560 2560 Rota cemento + accesorios desde 2545m hasta 2552m , c/ bba#1 y 2, 4-8klbs peso, 55x2 epm, 450gpm, 850-900si, 50rpm TD + 6-8klbs-ft TQ. Al retorno por zaranda observa cemento duro. ROP: 10min/m. 1:30 2:30 1.00 PROD PRE V CIR P 2560 2560 En 2552m bombea 50bbl de bache viscoso de 8.35ppg, 170seg, c/ bba#1, 57epm, 260psi. Dezplaza c/ c/ bba#1 y 2, 67x2 epm, 550gpm, 1230psi. Circula hasta zaranda limpias. Al retorno de bache en superficie observa apreciable cantidad de cemento semiduro + goma. 2:30 7:00 4.50 PROD PRE V POH P 2560 2560 Saca hta. Con elevador desde 2552m hasta 206m, llenado continuo del trip tank. 7:00 9:00 2.00 PROD PRE V POH P 2560 2560 Saca BHA de limpieza de 206m hasta superficie : 2 tiros HWDP 5" + Drill Jar 6 1/2" + 4 tiros HWDP 5" + X-Over + 1 tiro DC 6 1/2" + Bit Sub c/ valv. + Csg.Scrapper + Bit Tric. 8 1/2". 9:00 9:15 0.25 PROD PRE V CLNR IG P 2560 2560 Acondiciona plataforma, para corrida de RR.EE. 9:15 9:30 0.25 PROD PRE V SAFE TY P 2560 2560 Realiza reunión de seguridad y operativa para corrida de RR.EE. 9:30 10:30 1.00 PROD PRE V MU P 2560 2560 Cía. Schlumberger posiciona unidad de Wireline + arma y monta roldanas. 10:30 12:45 2.25 PROD PRE V RIH P 2560 2560 1er Carrera: Cia. Schlumberger arma y baja sonda: USIT-CBL-VDL-GR-CCL. (Ultrasonic Imagen Tool - Cement Bond Log - Variable Density Log - Gamma Ray - Casing Collar Locator)(Long. Total Sonda=15.54m, Max OD= 6.69") hasta 2548m. 12:45 16:00 3.25 PROD PRE V POH P 2560 2560 Saca sonda: USIT-CBL-VDL-GR-CCL registrando desde 2548m hasta 1100m (Tramo principal). Registra tramo repetido 2548-2448m. Continúa sacando sonda desde 1100m hasta superficie. 16:00 16:30 0.50 PROD PRE V LD P 2560 2560 Cia. Schlumberger recupera y desarma sonda en superficie + aparta a rampla. 16:30 21:00 4.50 PROD PRE RIH P 2560 2560 2da Carrera: Cia. Schlumberger arma y baja sonda por pza 11/11/2014 07:07:49 1

Daily Drilling Report YPFB Chaco SA # 32 2014 11 11

Embed Size (px)

DESCRIPTION

reporte de perforacion ypfb chaco

Citation preview

  • YPFB CHACO S.A.

    Reporte Diario de Perforacion

    Well: SMG-X1 Report No.: 32 Report Date: 10/11/2014

    Wellbore No.: OH Well Name: San Miguel X1 Common Name: SMG-X1

    Project: YPFB CHACO S.A. Site: SAN MIGUEL Rig Name/No.: SAI-379/379

    Event: ORIG DRILLING Start Date: 10/10/2014 End Date: Spud Date: 10/10/2014

    AFE No.: 1 Currency:

    Active Datum: WELL @341.60m (above Mean Sea Level) UWI: SMG-X1

    INFORMACION DE POZOAPI No.: Block: San Miguel Supervisor: Ruddy Torrico Paz Engineer: Omar Pedrazas

    PROFUNDIDAD DIARIAMD: 2,560.00 m TVD: 2,498.49 m Progress: Avg ROP: 0.00 m/hr Rotating Hours: Cum Rot Hrs: 232.53 hrDFS: 32.00 days Est Days: MD Auth: 3,593.00 m

    Last Casing: 9.625 in @ 2,558.00 m

    ESTADO

    Current Status: Realizando RREE VSP

    24 Hr Summary: Rot cemento hasta 2552 mts. Sac hta a superficie. Corri RREE USIT-CBL VDL y RREE VSP (En Progreso)

    24 Hr Forecast: Finalizar RREE VSP. Armar 27 Tiros DP 5". Armar y bajar BHA Direccional 8.1/2" hasta TOC, realizar cambio Fluido Agua x Lodo Drill N 10 ppg y perforar 5 m Formacin para realizar FIT Dens Equi = 13 ppg.

    COSTOS

    Daily Cost: 34,422.97 $ Authorized Cost: 9,816,715.00 $ Cumulative Total: 3,714,956.33 $ Expenditure: 37.84%

    RESUMEN DE OPERACIONESDe: A: Dur.

    (hr)Fase Tarea Activi

    dadCod. MD

    desde(m)

    MD Hasta

    (m)

    Operacin

    0:00 1:30 1.50 PROD PREV

    DRLCMT

    P 2560 2560 Rota cemento + accesorios desde 2545m hasta 2552m , c/ bba#1 y 2, 4-8klbs peso, 55x2 epm, 450gpm, 850-900si, 50rpm TD + 6-8klbs-ft TQ. Al retorno por zaranda observa cemento duro. ROP: 10min/m.

    1:30 2:30 1.00 PROD PREV

    CIR P 2560 2560 En 2552m bombea 50bbl de bache viscoso de 8.35ppg, 170seg, c/ bba#1, 57epm, 260psi. Dezplaza c/ c/ bba#1 y 2, 67x2 epm, 550gpm, 1230psi. Circula hasta zaranda limpias. Al retorno de bache en superficie observa apreciable cantidad de cemento semiduro + goma.

    2:30 7:00 4.50 PROD PREV

    POH P 2560 2560 Saca hta. Con elevador desde 2552m hasta 206m, llenado continuo del trip tank.

    7:00 9:00 2.00 PROD PREV

    POH P 2560 2560 Saca BHA de limpieza de 206m hasta superficie : 2 tiros HWDP 5" + Drill Jar 6 1/2" + 4 tiros HWDP 5" + X-Over + 1 tiro DC 6 1/2" + Bit Sub c/ valv. + Csg.Scrapper + Bit Tric. 8 1/2".

    9:00 9:15 0.25 PROD PREV

    CLNRIG

    P 2560 2560 Acondiciona plataforma, para corrida de RR.EE.

    9:15 9:30 0.25 PROD PREV

    SAFETY

    P 2560 2560 Realiza reunin de seguridad y operativa para corrida de RR.EE.

    9:30 10:30 1.00 PROD PREV

    MU P 2560 2560 Ca. Schlumberger posiciona unidad de Wireline + arma y monta roldanas.

    10:30 12:45 2.25 PROD PREV

    RIH P 2560 2560 1er Carrera: Cia. Schlumberger arma y baja sonda: USIT-CBL-VDL-GR-CCL. (Ultrasonic Imagen Tool - Cement Bond Log - Variable Density Log - Gamma Ray - Casing Collar Locator)(Long. Total Sonda=15.54m, Max OD= 6.69") hasta 2548m.

    12:45 16:00 3.25 PROD PREV

    POH P 2560 2560 Saca sonda: USIT-CBL-VDL-GR-CCL registrando desde 2548m hasta 1100m (Tramo principal). Registra tramo repetido 2548-2448m. Contina sacando sonda desde 1100m hasta superficie.

    16:00 16:30 0.50 PROD PREV

    LD P 2560 2560 Cia. Schlumberger recupera y desarma sonda en superficie + aparta a rampla.

    16:30 21:00 4.50 PROD PRE RIH P 2560 2560 2da Carrera: Cia. Schlumberger arma y baja sonda por pza

    11/11/2014 07:07:49 1

  • YPFB CHACO S.A.

    Reporte Diario de Perforacion

    Well: SMG-X1 Report No.: 32 Report Date: 10/11/2014

    Wellbore No.: OH Well Name: San Miguel X1 Common Name: SMG-X1

    Project: YPFB CHACO S.A. Site: SAN MIGUEL Rig Name/No.: SAI-379/379

    Event: ORIG DRILLING Start Date: 10/10/2014 End Date: Spud Date: 10/10/2014

    AFE No.: 1 Currency:

    Active Datum: WELL @341.60m (above Mean Sea Level) UWI: SMG-X1

    RESUMEN DE OPERACIONESDe: A: Dur.

    (hr)Fase Tarea Activi

    dadCod. MD

    desde(m)

    MD Hasta

    (m)

    Operacin

    V hasta 60m + calibra misma: VSI (Versatile Seismic Imager)(Long. Total Sonda=70,67m, Max OD= 3 5/8"). Continua bajando sonda desde 60m hasta 2500m.

    21:00 0:00 3.00 PROD PREV

    POH P 2560 2560 Saca sonda: VSI (Versatile Seismic Imager) registrando desde 2500m hasta 1470m. Toma datos de sismica cada 15.24m.

    Novedades 11 Noviembre 2014.-00:00 - 03:00 Hrs.- Saca sonda: VSI (Versatile Seismic Imager) registrando desde 1470m hasta 150m. Toma datos de sismica cada 60.96m. A partir de 1150m toma datos de sismica cada 200m. Saca sonda hasta superficie revisa la misma + cambia Cartucho de Telemetra, Ok.03:00 - 05:30 Hrs.- 3er Carrera: Cia. Schlumberger baja sonda: VSI (Versatile Seismic Imager)(Long. Total Sonda=71,30m, Max OD= 3 3/8") hasta 2500m.05:30 - 06:00 Hrs.- Saca sonda: VSI (Versatile Seismic Imager) registrando desde 2500m hasta 2196m. Toma datos de sismica cada 60.96m.

    SECCIONES DE AGUJEROSection Name Tipo de

    SeccinEffective

    Hole Diameter

    (in)

    ID(in) Top

    MD (m)Base

    Hole Section Start Date/Time

    Hole Section End Date/Time

    Tramo 17 1/2" Casing 19.500 19.500 0 15 10/10/2014 03:30 18/10/2014 13:30

    Open Hole 21.139 17.500 15 604 10/10/2014 03:30 18/10/2014 13:30

    Tramo 12 1/4" Casing 12.615 12.615 0 603 18/10/2014 13:30 09/11/2014 06:15

    Open Hole 12.250 13.000 603 2560 18/10/2014 13:30 09/11/2014 06:15

    Tramo 6" Casing 8.755 8.755 0 2558 09/11/2014 06:15

    Open Hole 6.293 6.000 2558 3593 09/11/2014 06:15

    LODODaily Mud: 0.00 $ Cum Mud Cost: 266,969.17 $

    Mud Desc Density(ppg)

    Viscosity(s/qt)

    Date/Time MD Check

    (m)

    PV(cp)

    YP(lbf/100ft)

    Cl-(ppm)

    Ca+(ppm)

    pH Pm Pf(cc)

    Mf(cc)

    WATER BASED MUD 8.34 36.00 11/7/2014 0:00 2,560.00 11.00

    BHA No.# 11 Bit No.: 6

    Date/Time In: 09/11/2014 07:00 Date/Time Out: 10/11/2014 09:00 Purpose: Rotar CF + Cemento

    BHA Length: 206.620 (m) Min ID: 2.250 (in) Weight (Above/Below) Jars: 63.0/ (48.0kip)MD(m)

    Footage(m)

    String WtUp / Down / Rot

    (kip)

    Drag(kip)

    TQ On/Off (ft-lbf)

    Assembly ComponentsComponent Type Num

    ber of Joints

    Length(m)

    OD(in)

    ID(in) OD

    (in)

    Connection

    NameWeight(ppf)

    Grade PinBox

    Serial No. Left Or

    Right Spiral

    Length(m)

    Fish Neck

    OD(in)

    Heavy Weight Drill Pipe 6 55.790 5.000 3.000 6.500 NC 50 49.70 1340 MOD PB A6622

    11/11/2014 07:07:49 2

  • YPFB CHACO S.A.

    Reporte Diario de Perforacion

    Well: SMG-X1 Report No.: 32 Report Date: 10/11/2014

    Wellbore No.: OH Well Name: San Miguel X1 Common Name: SMG-X1

    Project: YPFB CHACO S.A. Site: SAN MIGUEL Rig Name/No.: SAI-379/379

    Event: ORIG DRILLING Start Date: 10/10/2014 End Date: Spud Date: 10/10/2014

    AFE No.: 1 Currency:

    Active Datum: WELL @341.60m (above Mean Sea Level) UWI: SMG-X1Assembly Components

    Component Type Number of Joints

    Length(m)

    OD(in)

    ID(in) OD

    (in)

    Connection

    NameWeight(ppf)

    Grade PinBox

    Serial No. Left Or

    Right Spiral

    Length(m)

    Fish Neck

    OD(in)

    Hydraulic Jar 1 9.880 6.500 2.750 4 1/2 IF 91.79 4145H MOD PB SNAA-57195

    Heavy Weight Drill Pipe 12 109.830 5.000 3.000 6.500 NC 50 49.70 1340 MOD PB A66237

    Cross Over 1 0.660 6.720 2.400 NC46 IF 105.07 4145H MOD PB 525 0.457 6.720Drill Collar 3 27.950 6.500 2.250 4 1/2 FH 99.38 4145H MOD PB A-24762

    Bit Sub 1 1.200 6.000 2.400 4 1/2 REG

    79.51 4145H MOD PB 447 0.457 6.000

    Casing Scraper 1 1.070 9.625 2.250 API REG 43.50 4145H MOD PB 110 0.250Tri-Cone Bit 1 0.240 8.500 90.00 PY-7591 0.100 4.500

    DETALLES DE TREPANOBit No. Size

    (in)Manufacturer Model No. Class IADC Code Serial No. Jets

    (32nd")MD In

    (m)MD Out

    (m)I-O-D-L-B-G-O-R

    6 8.500 Security DBS XR-PS U 247X PY-7591 3X20 2,558.00 2,558.00 - - - - - -

    TODAY CUMULATIVE

    MD (m) WOBMin/Max

    (kip)

    Current RPM (rpm)

    Flow Rate

    (gpm)

    SPP (psi)

    P Bit (psi)

    % @ Bit HHP (hp)

    Hours (hr)

    Footage (m)

    ROP (m/hr)

    Hours Cum (hr)

    Footage Cum (m)

    ROP Cum (m/hr)

    BOMBAS/HIDRAULICOSNo. Make/Model Stroke

    (in)Liner Size

    (in)Efficiency

    (%)Pressure

    (psi)SPM(spm)

    Output(gpm)

    Kill SPM/Pressure/Depth(spm/psi/m)

    1 GARDNER-DENVER / PZ-10-1350 10.00

    2 GARDNER-DENVER / PZ-10-1350 10.00

    SURVEYSMD(m)

    Inc()

    Azi()

    TVD(m)

    N/S(m)

    E/W(m)

    V. Sec(m)

    DLeg(/100ft)

    Survey Tool

    2,560.00 15.10 212.40 2,498.49 -399.54 -254.24 473.57 0.00 MWD

    11/11/2014 07:07:49 3

  • YPFB CHACO S.A.

    Reporte Diario de Perforacion

    Well: SMG-X1 Report No.: 32 Report Date: 10/11/2014

    Wellbore No.: OH Well Name: San Miguel X1 Common Name: SMG-X1

    Project: YPFB CHACO S.A. Site: SAN MIGUEL Rig Name/No.: SAI-379/379

    Event: ORIG DRILLING Start Date: 10/10/2014 End Date: Spud Date: 10/10/2014

    AFE No.: 1 Currency:

    Active Datum: WELL @341.60m (above Mean Sea Level) UWI: SMG-X1

    SEGURIDAD

    ESTADO

    DSLTI: DSLTA: 31.00 (days) STOP Cards: 21.00

    MOMENTO DE SEGURIDAD

    Topic: Difusin Objetivo Enfcate

    Comments: Stop: 21 ATS 13 Visita Gerencial 0 Simulacro 0 Alcohotest 20 (-) R. Pre- Trabajo 3Stop del da: Se observa personal queriendo pasar por las mangueras de alta presin. Se le detiene a la persona y se explica los riesgo de transitar por es rea y que tome muy encuenta la sealizacin, el agradece la correccin.Comentarios: Seguimiento a las operaciones en el equipo. Reunion de seguridad para Operaciones especiales (Registro de Schlumberger).Entrega de incentivo por la pro-actividad en la prevencin del uso de Tarjetas Enfcate.* 1 Polera de YPFB Chaco- Calixto Robles (Emserso)* 1 Gorra de YPFB Chaco- Luis A. Ortega (PFM)* 1 Gorra de Intergas- Marcelino Ortega (NOV CDS)* 1 Llavero de Intergas- Robin Segovia (PFM)Cambio de turno personal de Emserso

    INSPECCIONES DE PERFORACION

    Drill Type: Last Drill: Last Fire/Boat Drill:

    Last Evacuation Drill: Last Weekly Rig Check: Daily Inspection Done:

    Last Safety Inspection: Last Safety Meeting: Last Csg Press Test: 08/11/2014

    Last Csg Press: 2,500.00 (psi) Last Pit Drill: Last Diverter Drill:

    Test COM.: Ton Miles: Last H2S Drill:

    Last Trip Drill:

    PRUEBAS DE PRESION DE BOP

    Last BOP Pressure Test: 09/11/2014 Next Test Due: 23/11/2014 Last BOP Function Test: 09/11/2014

    Last BOP Drill: 09/11/2014 Standpipe Manifold: 4,000.00 (psi) Kelly Hose: 4,000.00 (psi)

    Diverter Pressure: 4,000.00 (psi) Annular Press: 3,500.00 (psi) Upper Rams: 4,000.00 (psi)

    Lower Rams: 4,000.00 (psi) Choke Line: 4,000.00 (psi) Choke Manifold: 4,000.00 (psi)

    Kill Line: 4,000.00 (psi)

    PERSONAL

    Total No. of People: 89COMPANIA No. DE

    PERSONASCOMPANIA No. DE

    PERSONASHALLIBURTON LATIN AMERICA S.A. 1 TRANS C & C SRL 2

    OIL FIELD TRUCK 2 INTERGAS LTDA (MUD LOGGING) 5

    PFM SERVICIOS PETROLEROS 10 YPFB CHACO S.A. 4

    SEGEPET-SAI 4 META GROUP SRL 2

    CONSUTRANS 1 TRANS AVALOS 1

    ASIMEIN S.R.L. 1 TUBOSCOPE SERVICIOS DE BOLIVIA S.A. 5

    SAI - MARLIN 22 EMSERSO 17

    COSIBOL 2 SCHLUMBERGER 6

    YPFB FISCAL 2 TUBOSCOPE FLUIDOS 2

    COMENTARIOSDiesel Equipo Anterior 112.439 Lts. Ingreso Lts. Consumo 2.799 Lts. Saldo Actual 109.640 Lts.Campamento Anterior 9.051 Lts. Ingreso 0 lts Consumo 549 Lts. Saldo Actual 8.502 Lts.

    FLUIDOS:

    11/11/2014 07:07:49 4

  • YPFB CHACO S.A.

    Reporte Diario de Perforacion

    Well: SMG-X1 Report No.: 32 Report Date: 10/11/2014

    Wellbore No.: OH Well Name: San Miguel X1 Common Name: SMG-X1

    Project: YPFB CHACO S.A. Site: SAN MIGUEL Rig Name/No.: SAI-379/379

    Event: ORIG DRILLING Start Date: 10/10/2014 End Date: Spud Date: 10/10/2014

    AFE No.: 1 Currency:

    Active Datum: WELL @341.60m (above Mean Sea Level) UWI: SMG-X1

    COMENTARIOS*PFM: Desecho slidos generados: 28 bbl. por rotacin de cemento. Seinyecta 256 bbl. de desechos liquidos en el CRC-FW2, se diluye con 60 bbl. agua de limpieza de Halliburton + Skimmers. Se coordina Co Man, PFM inisiar la inyeccin a primera hora de maana. Transfiere a piletas 155 bbl. de lodo Drill-N recuperado del tk. cilindrico 4 quedando slidos asentado de carga muerta, Agua acumulada 760 bbl. en tk. industrial SAI*CDS: bomba 5x6, continua agitando lodo en la planta y procede al carguo de fluido contaminado para su inyeccin. bombas neumticas (1,2 y 3), trabajos en las transferencias de fluidos en el rea de control de slidos y cajones del sistema . 28 bbl de solidos hmedos generados. posteriormente con bomba se procedi al carguo a cisterna, 50 bbl de fluido contaminado desde los skimmers y tanque de oro

    Con presencia de FISCAL YPFB Rubn Gutierrez desde 07-11-2014