18
Current Personal Projects October 15 2015 Giovanni Paterno [email protected] om

Current Projects - GPaterno 10-15-2015

Embed Size (px)

Citation preview

Page 1: Current Projects - GPaterno 10-15-2015

Current Personal ProjectsOctober 15 2015

Giovanni [email protected]

Page 2: Current Projects - GPaterno 10-15-2015

Excellent Local Resources 1/3

Page 3: Current Projects - GPaterno 10-15-2015

Excellent Local Resources 2/3

10g 3Com Managed Switches with PoECisco Catalyst 3500 Series PoE gig SwitchesPowerEdge 1950 Servers configured asHyper-V and VMWare HostsPowerEdge R900 24Core / 80GB RAM / 2TBServer 2012 R2 Domain ControllersServer 2008 R2 Domain ControllersSharepoint 2010 EnvironmentExchange 2010 EnvironmentServer 2012 WSUS EnvironmentMultiple VirtualBox Servers20TB of Storage CapacityAPC Battery Backup with System Shutdown

Page 4: Current Projects - GPaterno 10-15-2015

Excellent Local Resources 3/3

Page 5: Current Projects - GPaterno 10-15-2015

Secure Local Infrastructure

Page 6: Current Projects - GPaterno 10-15-2015

Desktop Image Rapid Deployment

• USB 3.0 128GB Flash Drive• 1st Primary Partition – Clonezilla + Company

Applications• 2nd Primary Partition – Image Storage• Images Remain Secure in the 2nd partition that

is unreadable by Windows computers• High Speed USB 3.0 can deploy a windows

base image in minutes• Clonezilla is Free and Highly Customizable

Page 7: Current Projects - GPaterno 10-15-2015

Code Development – Visual Ping

Page 8: Current Projects - GPaterno 10-15-2015

Learning More About ASA Technology

Page 9: Current Projects - GPaterno 10-15-2015

Integrating Code Dev with ASA Technology – Visual SysLog

Page 10: Current Projects - GPaterno 10-15-2015

Constantly Upgrading Test Environment

Dell PowerEdge R900(4) Xeon 6 Core X7460 Processors = 24 Cores total80GB RAM(2) 2TB WD Enterprise Storage SATA3 Drives in Raid1 Configuration(2) 146GB SAS 15K RPM Drives in Raid1 Configration (O/S Partition)(1) 146GB SAS for emergency backupMaximum RAM Capacity = 256GBPower Consumption: 1400WattsReplaced 4 lower powered servers that totaled 2000Watts

Page 11: Current Projects - GPaterno 10-15-2015

Thinking “Out of the Box” 1/2

Page 12: Current Projects - GPaterno 10-15-2015

Thinking “Out of the Box” 2/2

Page 13: Current Projects - GPaterno 10-15-2015

Beyond x86 1/3: Home Automation

Page 14: Current Projects - GPaterno 10-15-2015

Beyond x86 2/3: Program Timers

Page 15: Current Projects - GPaterno 10-15-2015

Beyond x86 3/3: “Pinguino” Network Ping Monitor

Page 16: Current Projects - GPaterno 10-15-2015

FreePBX

Page 18: Current Projects - GPaterno 10-15-2015

Warning: Nothing in this presentation could have been accomplished without perseverance and a desire to grow. Do not attempt to reproduce anything seen in this presentation

unless you are willing to stay awake long hours, do lots of reading, and fail a few times before achieving success.