1 1 / 66 DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR 820 2011 800 2011 2300 2012 1300 2012 805 2012 405 2012 4700 2013 1700 2013 2100 2013 533 2013 1000 2013 1070 2013 1200 2013 2110 2014 3110 2014 2700 2014 1200 2014 524 2014 415 2013 1250 2012 85 2011 84 2011 300 2012 6140 2020 2011 1900 2014 1450 2014 196 2014 1500 2014 463 2014 272 2012 1255 2014 400 2014 935 2014 463 2013 350 2012 MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010 COMPLETION DATE July 2008 Abu Dhabi Shuweihat S2 IWPP Project (Power) GDF SUEZ SAMSUNG/KOREA-SIEMENS/GERMANY Powergen July 2008 Abu Dhabi Shuweihat S2 IWPP Project (Desalination) GDF SUEZ DOOSAN/KOREA Water/desal January 2009 Abu Dhabi SAS Project Package A Adco PETROFAC Production January 2009 Abu Dhabi SAS Project Package B Adco TECNICAS REUNIDAS/SPAIN-CCC Production March 2009 Abu Dhabi Bab Gas Compression Project Adco SK ENG/KOREA Production May 2009 Abu Dhabi IGD Project (Offshore portion) Adma Opco NPCC/UAE Production July 2009 Abu Dhabi IGD Project (Habshan 5 Plant) Gasco JGC/J - MAIRE TECNIMONT/ITALY Gas/treatment July 2009 Abu Dhabi IGD Project (Habshan 5 Offsites & Utiliti Gasco HYUNDAI ENG Gas/treatment July 2009 Abu Dhabi IGD Project (Ruwais 4th NGL Train) Gasco PETROFAC / GS ENGINEERING Gas/treatment July 2009 Abu Dhabi IGD Project (Ruwais Storage Tanks) Gasco CB&I/USA Storage July 2009 Abu Dhabi IGD Project (Das Island Gas Plant) Adgas HYUNDAI HEAVY INDUSTRIES/SOUTH KOREA Gas/treatment July 2009 Abu Dhabi Borouge 3 Project (ethane cracker) Borouge LINDE/GERMANY Petrochemical October 2009 Abu Dhabi Ruwais Fertilizer Expansion Fertil SAMSUNG/KOREA-UHDE/GERMANY Petrochemical November 2009 Abu Dhabi Ruwais Refinery (CDU Package) Takreer SK ENG/KOREA Refining November 2009 Abu Dhabi Ruwais Refinery (RFCC Package) Takreer GS ENGINEERING/SOUTH KOREA - TARGET ENG Refining November 2009 Abu Dhabi Ruwais Refinery (O&U Package) Takreer SAMSUNG ENGINEERING Refining November 2009 Abu Dhabi Ruwais Refinery (Tankage Package) Takreer DAEWOO/SOUTH KOREA - CB&I/USA Storage November 2009 Abu Dhabi Ruwais refinery (Marine Facilities Packag Takreer GS ENGINEERING/SOUTH KOREA Refining November 2009 Abu Dhabi Asab 3 Project Gasco TECHNIP/ABU DHABI Gas/treatment December 2009 Abu Dhabi Bab & Qusahwira Fields Devlpt Adco NPCC/UAE Production January 2010 Abu Dhabi Pipeline between Thamama C & Asab Gasco DODSAL/UAE Transportation January 2010 Abu Dhabi Mirfa-Habshan Nitrogen Pipeline Elixier DODSAL/UAE Transportation February 2010 Abu Dhabi Bida El Qemzan Field Devlpt Adco VECO/USA (CH2M HILL) Production March 2010 Abu Dhabi Construction of Four Nuclear Plants Kepco HYUNDAI ENG / SAMSUNG ENG / KOPEC Powergen April 2010 Abu Dhabi Ruwais Isomerate Quality Improvement Pjt Takreer LITWIN/F Refining April 2010 Abu Dhabi Shah Gas Project (Processing Plant) Adnoc SAIPEM/ITALY Gas/treatment April 2010 Abu Dhabi Shah Gas Project (Sulfur Recovery Unit) Adnoc SAIPEM/ITALY Gas/treatment April 2010 Abu Dhabi Shah Gas Project (Pipelines Package) Adnoc SAIPEM/ITALY Transportation April 2010 Abu Dhabi Shah Gas Project (Offsites&Utilities) Adnoc SAMSUNG ENGINEERING Gas/treatment April 2010 Abu Dhabi Shah Gas Project (Gas Gathering System) Adnoc TECNICAS REUNIDAS/SPAIN-PUNJLLOYD/INDIA Gas/treatment May 2010 Abu Dhabi IRP Project (Tankage portion) Takreer DAEWOO/SOUTH KOREA Storage May 2010 Abu Dhabi Borouge 3 Project (Polyolefins Package) Borouge TECNIMONT/ITALY-SAMSUNG ENGINEERING Petrochemical May 2010 Abu Dhabi Borouge 3 Project (LDPE Package) Borouge TECNIMONT/ITALY-SAMSUNG ENGINEERING Petrochemical May 2010 Abu Dhabi Borouge 3 Project (Offsites & Utilities) Borouge HYUNDAI ENG Petrochemical May 2010 Abu Dhabi Ruwais Base Oil Production Facilites Takreer HYUNDAI ENG Refining May 2010 Abu Dhabi Zakum Central Super Complex Demothballing Adma Opco NPCC/UAE Production

Current Projects 2010-n°172

Embed Size (px)

DESCRIPTION

World projects

Citation preview

1 1 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

820 2011

800 2011

2300 2012

1300 2012

805 2012

405 2012

4700 2013

1700 2013

2100 2013

533 2013

1000 2013

1070 2013

1200 2013

2110 2014

3110 2014

2700 2014

1200 2014

524 2014

415 2013

1250 2012

85 2011

84 2011

300 2012

6140 2020

2011

1900 2014

1450 2014

196 2014

1500 2014

463 2014

272 2012

1255 2014

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

July 2008 Abu Dhabi Shuweihat S2 IWPP Project (Power) GDF SUEZ SAMSUNG/KOREA-SIEMENS/GERMANY Powergen

July 2008 Abu Dhabi Shuweihat S2 IWPP Project (Desalination) GDF SUEZ DOOSAN/KOREA Water/desal

January 2009 Abu Dhabi SAS Project Package A Adco PETROFAC Production

January 2009 Abu Dhabi SAS Project Package B Adco TECNICAS REUNIDAS/SPAIN-CCC Production

March 2009 Abu Dhabi Bab Gas Compression Project Adco SK ENG/KOREA Production

May 2009 Abu Dhabi IGD Project (Offshore portion) Adma Opco NPCC/UAE Production

July 2009 Abu Dhabi IGD Project (Habshan 5 Plant) Gasco JGC/J - MAIRE TECNIMONT/ITALY Gas/treatment

July 2009 Abu Dhabi IGD Project (Habshan 5 Offsites & Utilities) Gasco HYUNDAI ENG Gas/treatment

July 2009 Abu Dhabi IGD Project (Ruwais 4th NGL Train) Gasco PETROFAC / GS ENGINEERING Gas/treatment

July 2009 Abu Dhabi IGD Project (Ruwais Storage Tanks) Gasco CB&I/USA Storage

July 2009 Abu Dhabi IGD Project (Das Island Gas Plant) Adgas HYUNDAI HEAVY INDUSTRIES/SOUTH KOREA Gas/treatment

July 2009 Abu Dhabi Borouge 3 Project (ethane cracker) Borouge LINDE/GERMANY Petrochemical

October 2009 Abu Dhabi Ruwais Fertilizer Expansion Fertil SAMSUNG/KOREA-UHDE/GERMANY Petrochemical

November 2009 Abu Dhabi Ruwais Refinery (CDU Package) Takreer SK ENG/KOREA Refining

November 2009 Abu Dhabi Ruwais Refinery (RFCC Package) Takreer GS ENGINEERING/SOUTH KOREA - TARGET ENG Refining

November 2009 Abu Dhabi Ruwais Refinery (O&U Package) Takreer SAMSUNG ENGINEERING Refining

November 2009 Abu Dhabi Ruwais Refinery (Tankage Package) Takreer DAEWOO/SOUTH KOREA - CB&I/USA Storage

November 2009 Abu Dhabi Ruwais refinery (Marine Facilities Package) Takreer GS ENGINEERING/SOUTH KOREA Refining

November 2009 Abu Dhabi Asab 3 Project Gasco TECHNIP/ABU DHABI Gas/treatment

December 2009 Abu Dhabi Bab & Qusahwira Fields Devlpt Adco NPCC/UAE Production

January 2010 Abu Dhabi Pipeline between Thamama C & Asab Gasco DODSAL/UAE Transportation

January 2010 Abu Dhabi Mirfa-Habshan Nitrogen Pipeline Elixier DODSAL/UAE Transportation

February 2010 Abu Dhabi Bida El Qemzan Field Devlpt Adco VECO/USA (CH2M HILL) Production

March 2010 Abu Dhabi Construction of Four Nuclear Plants Kepco HYUNDAI ENG / SAMSUNG ENG / KOPEC Powergen

April 2010 Abu Dhabi Ruwais Isomerate Quality Improvement Pjt Takreer LITWIN/F Refining

April 2010 Abu Dhabi Shah Gas Project (Processing Plant) Adnoc SAIPEM/ITALY Gas/treatment

April 2010 Abu Dhabi Shah Gas Project (Sulfur Recovery Unit) Adnoc SAIPEM/ITALY Gas/treatment

April 2010 Abu Dhabi Shah Gas Project (Pipelines Package) Adnoc SAIPEM/ITALY Transportation

April 2010 Abu Dhabi Shah Gas Project (Offsites&Utilities) Adnoc SAMSUNG ENGINEERING Gas/treatment

April 2010 Abu Dhabi Shah Gas Project (Gas Gathering System) Adnoc TECNICAS REUNIDAS/SPAIN-PUNJLLOYD/INDIA Gas/treatment

May 2010 Abu Dhabi IRP Project (Tankage portion) Takreer DAEWOO/SOUTH KOREA Storage

May 2010 Abu Dhabi Borouge 3 Project (Polyolefins Package) Borouge TECNIMONT/ITALY-SAMSUNG ENGINEERING Petrochemical

2 2 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

400 2014

935 2014

463 2013

350 2012

350 2012

1600 2011

2800 2012

1970 2011

2100 2011

3000 2012

500 2011

4200 2012

2011

405 2011

1640 2012

143 2011

156 2011

54 2011

2200 2012

673 2012

1800 2012

2600 2012

1090 2012

1500 2013

233 2012

800 2011

580 2011

150 2011

4000 2012

1800 2011

2011

645 2011

2011

May 2010 Abu Dhabi Borouge 3 Project (LDPE Package) Borouge TECNIMONT/ITALY-SAMSUNG ENGINEERING Petrochemical

May 2010 Abu Dhabi Borouge 3 Project (Offsites & Utilities) Borouge HYUNDAI ENG Petrochemical

May 2010 Abu Dhabi Ruwais Base Oil Production Facilites Takreer HYUNDAI ENG Refining

May 2010 Abu Dhabi Zakum Central Super Complex Demothballing Adma Opco NPCC/UAE Production

June 2010 Abu Dhabi Lower Zakum Field Adma Opco J.RAY McDERMOTT Production

June 2007 Algeria Arzew Fertilizer Complex Sorfert UHDE/GERMANY-OCI ALGERIA Petrochemical

July 2007 Algeria Skikda LNG Train Reconstruction Sonatrach KBR/USA Gas/treatment

November 2007 Algeria Terga/Ain Temouchent Power Plant Sonelgaz ALSTOM/F-ORASCOM/EG Powergen

November 2007 Algeria Koudiet Edraouch Power Plant Sonelgaz GENERAL ELECTRIC/USA-IBERDROLA/SPAIN Powergen

March 2008 Algeria Mers el Hadjaj Ammonia-Urea Complex Sonatrach/Bahwan MITSUBISHI HEAVY IND/J-DAEWOO ENG Petrochemical

July 2008 Algeria Rhourde Nouss Field Development Sonatrach JGC/JAPAN Gas/treatment

July 2008 Algeria Arzew LNG Plant Sonatrach SAIPEM/ITALY - CHIYODA/JAPAN - DAEWOO ENG Gas/treatment

July 2008 Algeria Skikda Storage Tanks (Skikda Lng Pjt) Sonatrach ENTREPOSE CONTRACTING/F Storage

November 2008 Algeria Arzew Refinery Expansion Naftec HYUNDAI ENG / HANWHA CORP / DAEWOO Refining

November 2008 Algeria Hassi Messaoud LPG Facility Sonatrach SAIPEM/ITALY - SHAW/USA Gas/treatment

November 2008 Algeria Alrar Power Plant Expansion Sonatrach BONATTI / GAVAZZI IMPIANTI Powergen

November 2008 Algeria GREO Gas Pipeline (packages 1-2-3) Sonelgaz COSIDER/KANAGHAZ/ENAC/ERCIYAS-T Transportation

November 2008 Algeria GREO Gas Pipeline (package 5 ) Sonelgaz GUNSAYIL/TURKEY Transportation

March 2009 Algeria EL Merk Field Devlpt (CPF Package) Sonatrach/Anadarko PETROFAC - ORASCOM Production

March 2009 Algeria El Merk Field Devlpt (Flowlines/Gathering) Sonatrach/Anadarko ABB SARPI/ALGERIA - PETROJET/EGYPT Production

March 2009 Algeria MLE Field Development Sonatrach/ENI SAIPEM/ITALY Production

May 2009 Algeria Skikda Refinery Upgrading Sonatrach SAMSUNG/KOREA Refining

June 2009 Algeria Hamra Gas Processing Facilities Sonatrach LAVALIN/Canada Gas/treatment

June 2009 Algeria Gassi Touil Gas Processing Facilities Sonatrach JGC/JAPAN Gas/treatment

June 2009 Algeria Haoud Berkaoui Gas Flaring Sonatrach ABB SARPI/ALGERIA Gas/treatment

June 2009 Algeria GK-3 Pipeline (pack 1 & 2) Sonatrach PETROJET/EGYPT Transportation

June 2009 Algeria GK-3 Pipeline (pack 3) Sonatrach SAIPEM/ITALY Transportation

October 2009 Algeria El Merk Field Devlpt (Pipelines) Sonatrach/Anadarko BONATTI /ITALY Transportation

February 2007 Angola Soyo LNG Project Angola LNG BECHTEL/USA Gas/treatment

December 2007 Angola Pazflor Project (Subsea Package) Total TECHNIP/F - ACERGY Production

February 2008 Angola Pazflor Project (FPSO & Topsides) Total DAEWOO/SOUTH KOREA - KBR/USA Production

July 2008 Angola Block 31 PSVM Pjt (subsea flowlines - umbilicals)BP TECHNIP/F Production

July 2008 Angola Block 31 PSVM Pjt (FPSO) BP MODEC/SINGAPORE - TOYO ENGINEERING/JAPAN Production

3 3 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

1000 2011

520 2011

550 2011

110 2010

2011

670 2011

348 2012

5000 2011

2011

620 2011

868 2011

2011

2800 2013

1700 2011

2011

2300 2014

550 2013

2060 2013

170 2010

2014

750 2013

2014

826 2011

2011

2011

314 2011

251 2011

414 2011

500 2012

616 2014

2012

2013

1250 2011

July 2008 Angola Block 31 PSVM Pjt (URF Risers) BP HEEREMA MARINE CONTRACTORS Production

July 2008 Angola Block 31 PSVM Pjt (Umbilicals) BP SUBSEA 7 - AKER SOLUTIONS Production

December 2008 Angola Pipeline Network for Soyo LNG Angola LNG SPIE CAPAG/F - ACERGY Transportation

September 2009 Angola Block 17/18 GEP Phase 2 Project Total E&P Angola ACERGY GROUP Production

July 2009 Angola Kizomba Satellites Devlpt (TieBack) Esso Exploration Angola SAIPEM/ITALY - PONTICELLI/F - AMEC Production

December 2007 Argentina El Rio Turbio Power Plant YACIMIENTO CARBONIFERO ISOLUX CORSAN/SPAIN Powergen

August 2009 Argentina La Plata CCR Plant YPF ODEBRECHT Refining

March 2008 Australia North Rankin 2 Project North West Shelf Venture HHI/SOUTH KOREA-EOS-McDERMOTT Production

August 2008 Australia Fishermann's Landing LNG Project LNG Ltd SK ENG/KOREA - LAING O'ROURKE Gas/treatment

November 2008 Australia Southern Seawater Desalination Project Water Corporation TECNICAS REUNIDAS/SPAIN-AJ LUCAS Water/desal

February 2009 Australia Adelaide Desalination Plant Ministry ACCIONA AGUA/SPAIN-McCONNELL DOWELL Water/desal

March 2009 Australia Reindeer Gas Project (onshore Portion) Apache / Santos CLOUGH/AUSTRALIA - J.HOLLAND Gas/treatment

June 2009 Australia Collie Urea Project Perdaman Chemicals SAMSUNG/KOREA-IKPT/INDONESIA Petrochemical

July 2009 Australia Wonthaggi Desalination Plant Victoria Government DEGREMONT/F - THIESS/AUSTRALIA Water/desal

September 2009 Australia Reindeer Gas Project (wellhead platform) Apache / Santos SHENZHEN CHIWAN SEMBAWANG ENG/CHINA Production

September 2009 Australia Gorgon LNG Plant Chevron/ExxonMobil/Shell KJVG (KBR/JGC/CLOUGH/HATCH) Gas/treatment

October 2009 Australia Gorgon LNG Pjt (Storage Tanks) Chevron/ExxonMobil/Shell CB&I/USA Storage

October 2009 Australia Gorgon LNG Pjt (LNG modules) Chevron/ExxonMobil/Shell HYUNDAI HEAVY IND/SOUTH KOREA-COOEC/CHINA Gas/treatment

October 2009 Australia Devil Creek Development Project Apache / Santos SAPURAACERGY Transportation

February 2010 Australia Curtis LNG Plant QGC / BG Group BECHTEL/USA Gas/treatment

April 2010 Australia Morwell coal-fired power plant HRL Corporation CNEEC/CHINA Powergen

May 2010 Australia Gladstone LNG Project (Upstream Portion) Santos / Petronas FLUOR AUSTRALIA Production

August 2008 Austria Mellach Combined Cycle Power Plant Verbund Austrian Power SIEMENS/AUSTRIA - AE&E/AUSTRIA Powergen

August 2008 Bahrain Addur IWPP (Power Package) Suez Energy / GIC Kuwait HYUNDAI/KOREA Powergen

August 2008 Bahrain Addur IWPP (Desalination Package) Suez Energy / GIC Kuwait DEGREMONT/F Water/desal

August 2008 Bahrain Sitra Base Lube Oil Plant Bapco / Neste SAMSUNG/KOREA Petrochemical

February 2010 Bangladesh Chandpur & Sylhet Power Plants Government CHENGDA ENG/CHINA - SHANGHAI ELECTRIC Powergen

December 2008 Belgium Tessenderlo Power Plant T-Power SIEMENS/GERMANY-FABRICOM GTI-PAUWELS INT Powergen

June 2010 Bolivia Margarita Gas Processing Plant Repsol YPF TECNICAS REUNIDAS/SPAIN Gas/treatment

May 2010 Bosnia Stanari Thermal Electric Plant EFT Group DONGFANG ELECTRIC CORP/CHINA Powergen

November 2008 Botswana Morupule B Power Station Botswana Power Corp CNEEC/CHINA - SBW/CHINA Powergen

November 2008 Botswana Mmamabula Energy Project CIC Energy SHANGHAI ELECTRIC GROUP/CHINA Powergen

January 2008 Brazil P-57 Platform Petrobras SBM OFFSHORE/NETHERLANDS Production

4 4 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

1600 2011

150 2011

241 2011

1500 2011

1400 2011

845 2011

160 2011

343 2012

200 2010

100 2011

1000 2013

1300 2013

200 2011

8900 2012

623 2013

824 2013

1000 2013

250 2012

175 2011

2012

500 2011

150 2011

1900 2012

195 2011

380 2013

2011

1310 2011

40 2011

8000 2014

53 2011

2011

2011

January 2008 Brazil Itaqi/Maranhao & Pecem Power Plants MPX TECNIMONT/ITALY Powergen

March 2008 Brazil Refap HDS Unit Petrobras SKANSKA/BRAZIL Refining

March 2008 Brazil Vittoria Gas Treatment Plant Petrobras MAIRE TECNIMONT/BRAZIL - ALUSA Gas/treatment

July 2008 Brazil Repar Refinery Upgrading (delayed coker) Petrobras CAMARGO CORREA/PROMON Refining

July 2008 Brazil Repar Refinery Upgrading (interconnections) Petrobras INTERPAR/BRASIL Refining

September 2008 Brazil P-55 Platform Petrobras QUEIROZ GALVAO - IESA - UTC ENGENHARIA Production

September 2008 Brazil Supply of Equipment for North East Refinery Petrobras LARSEN & TOUBRO/INDIA Refining

October 2008 Brazil Pecem II Power Station MPX MAIRE TECNIMONT/BRAZIL Powergen

March 2009 Brazil Tambau Urugua & P-56 Development Petrobras SUBSEA 7 Transportation

July 2009 Brazil Refap Refinery Upgrading (interconnections) Petrobras SKANSKA/BRAZIL Refining

October 2009 Brazil Papa Terra TLWP P-61 Petrobras FLOATEC/USA Production

October 2009 Brazil Papa Terra FPSO P-63 Petrobras BW OFFSHORE/QUIP CONSORTIUM Production

October 2009 Brazil Roncador Field (P-55 connection) Petrobras SUBSEA 7 / BRAZIL Transportation

December 2009 Brazil Abreu e Lima Refinery Petrobras CAMARGO CORREA-CNEC-ODEBRECHT Refining

March 2010 Brazil Comperj Refinery (DAV Portion) Petrobras SKANSKA/BRAZIL-PROMON-ENGEVIX Refining

March 2010 Brazil Comperj Refinery (UHC Portion) Petrobras ALUSA/BRAZIL Refining

March 2010 Brazil Comperj Refinery (delayed coker) Petrobras TECHINT/BRAZIL - ANDRADE GUTTIEREZ Refining

May 2010 Brazil Cabo Power Plant Energetica Suape II WARTSILA/FINLAND Powergen

March 2010 Cameroon Kribi Power Plant Kribi Power Devlpt Cy WARTSILA/FINLAND Powergen

June 2010 Cameroon Limbe Refinery Upgrade 1st Phase Sonara FOSTER WHEELER Refining

November 2007 Canada North West Upgrader Pjt (Gasifier unit) North West Upgrading LURGI/GERMANY-KBR/USA Gas/treatment

April 2008 Canada Vancouver LNG Peak Shaving Project Terasen Gas HORTON CBI Storage

June 2008 Canada Regina Refinery Expansion Project CCRL COLT WORLEYPARSONS/CANADA Refining

August 2008 Canada Horizon Expansion project Canadian Natural Resources TECHNIP/ITALY Production

November 2009 Canada Oakville Power Plant Transcanada AKER SOLUTIONS Powergen

January 2008 Chile Mejillones Power Plant Suez / Antofagasta Minerals COBRA/SPAIN Powergen

April 2008 Chile Construction of two power plants Aes Gener POSCO ENGINEERING/SOUTH KOREA-ANSALDO/I Powergen

January 2009 Chile Mejillones Sulfuric Acid Plant Noracid OUTOTEC/FINLAND Petrochemical

December 2006 China Construction of 4 nuclear Plants SNPTC SHAW/USA - WESTINGHOUSE/USA Powergen

December 2008 China Huizhou Acrylic Acid Plant CNOOC Energy LURGI/GERMANY Petrochemical

January 2009 China Fujian LNG Terminal Project CNOOC Fujian LNG CB&I/USA Storage

June 2009 China Yinchuan LNG Plant Ningxia Hanas Nat Gas Cy TECHNIP/MALAYSIA-CHINA Gas/treatment

5 5 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

1400 2011

2012

1030 2012

1400 2013

1000 2013

322 2011

187 2011

50 2010

10000 2014

1200 2012

1800 2014

132 2010

2010

55 2010

330 2013

367 2012

120 2011

101 2012

375 2011

214 2011

2012

2011

2012

2010

2010

100 2011

2012

2012

600 2012

1500 2011

750 2012

2011

August 2009 China Nanjing Petrochemical Complex Expansion BASF - YPC TOYO/JAPAN Petrochemical

September 2009 China Shanghai Polycarbonate Resin Plant Mitsubishi Gas Chemical TOYO/JAPAN Petrochemical

November 2009 China Zheijiang Ningbo LNG Terminal CNOOC CNOOC/CHINA - CHENGDA ENGINEERING Gas/treatment

November 2009 Colombia Cartagena Refinery Expansion Reficar CB&I/USA Refining

June 2009 Czech republic Pocerady Power Plant CEZ SKODA PRAHA Powergen

July 2009 Cyprus Vasilikos Power Plant Expansion Electricity Authority J&P AVAX/GREECE - HITACHI POWER EUROPE Powergen

December 2008 Ecuador Esmeraldas Refinery Rehabilitation Petroecuador SK ENG/KOREA Refining

March 2009 Ecuador Monteverde Storage Facilities Flopec CB&I/USA Storage

January 2010 Ecuador Refineria del Pacifico Petroecuador-PDVSA SK ENG/KOREA Refining

August 2009 Equatorial Guinea Aseng FPSO Noble Energy SBM OFFSHORE/NETHERLANDS-KEPPEL SHIPYARD Production

August 2007 Egypt Mostorod Refinery Egyptian Refining Cy MITSUI/J - GS ENGINEERING/SOUTH KOREA Refining

January 2008 Egypt Sidi Krier & El Atf Power Plants Delta Electricity ANSALDO ENERGIA Powergen

August 2008 Egypt Khalda 5th Gas Processing Train Khalda Petroleum Cy PETROFAC Gas/treatment

February 2009 Egypt Alexandria Delayed Coker Expansion Midor TECHNIP/ITALY Refining

February 2010 Egypt Ain Sokhna Power Plant East Delta Electricity Cy DOOSAN/KOREA Powergen

June 2010 Egypt West Delta Deep Marine Phase VIIIa Devlpt Burullus Gas Cy TECHNIP/F Production

June 2008 Finland Porvoo Isomerization Unit Neste Oil NESTE JACOBS/FINLAND Refining

March 2010 Finland Forssa Power Plant Fingrid ANSALDO ENERGIA Powergen

March 2008 France Bayet Power Plant Atel (3CB) ANSALDO ENERGIA Powergen

June 2008 France Beynes underground gas storage facility GDF LITWIN/F Storage

June 2009 France Etrez Gas Storage Expansion Project Storengy JACOBS ENGINEERING/FRANCE Storage

September 2009 France Gonfreville Cracker Expansion Total Petrochemicals TECHNIP/F Petrochemical

January 2010 France Cere la Ronde Gas Storage Expansion Pjt Storengy JACOBS ENGINEERING/FRANCE Storage

June 2007 Fujairah Fujairah II Power Project IP / Marubeni ALSTOM/F Powergen

June 2007 Fujairah Fujairah II Desalination Project IP / Marubeni SIDEM/F Water/desal

April 2010 Fujairah Fujairah Oil Terminal Expansion Vopak Horizons BELLELI/ITALY Storage

May 2010 Gabon Anguille Field Wellhead Platform Total SAIPEM/ITALY - EIFFEL/F Production

May 2007 Germany Construction of 2 coal-biomass Power Plants Electrabel HITACHI POWER EUROPE Powergen

October 2007 Germany Lünen Power Plant Trianel Power SIEMENS/GERMANY-A-TEC/AUSTRIA-IHI/J Powergen

March 2008 Germany Mainz combined Heat & Power Plant Mainz-Wiesbaden AG SIEMENS/GERMANY-AE&E/AUSTRIA-IHI/J Powergen

April 2008 Germany Hamm power plant RWE ALSTOM/F Powergen

June 2008 Germany Wilhelmshaven LNG Plant E.ON TECNIMONT/I-SOFREGAZ/F-VINCI/F-ENTREPOSE Gas/treatment

6 6 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

2011

2010

673 2013

2011

2010

2010

1560 2011

170 2011

360 2011

72 2011

731 2012

2011

1220 2012

250 2011

3000 2014

1128 2011

841 2012

743 2010

144 2010

720 2011

152 2010

835 2011

514 2012

428 2011

2500 2012

550 2012

1100 2012

2010

262 2011

2011

209 2011

143 2010

July 2009 Germany Etzel Crystal Gas Storage Project EDF / ENBW ENERGIE TECHNIP/GERMANY Storage

August 2009 Germany Connect Project Phase I Shell Deutschland GmbH TECHNIP/GERMANY Refining

November 2009 Germany Mannheim 9 Power Project Grosskraftwerk Mannheim ALSTOM/F Powergen

March 2010 Germany Krefeld-Uerdingen Chlorine Plant Bayer Materialscience AG UHDE/GERMANY Chemical

August 2008 Ghana Jubilee FPSO Tullow Ghana Ltd MODEC/USA Production

October 2009 Ghana Jubilee Field (subsea) Tullow Ghana Ltd TECHNIP/USA Production

May 2008 Greece Elefsis Refinery Upgrade Hellenic Petroleum TECNICAS REUNIDAS/SPAIN Refining

July 2008 Greece Thessaloniki Refinery Upgrade Hellenic Petroleum FOSTER WHEELER ITALIANA Refining

November 2008 Greece Corinth Power Plant Motor Oil Hellas/Mytilineos METKA/GREECE Powergen

December 2008 Greece Nea Messambria Compressor Station Desfa STROYTRANSGAZ/RUSSIA Transportation

August 2009 Greece Megalopolis Power Plant Public Power Corp METKA/GREECE Powergen

August 2008 Hungary Szazhalombatta Hydrocracking Complex MOL Hungarian Oil&Gas TECNICAS REUNIDAS/SPAIN Refining

May 2007 India Mundra Ultra Mega Power Project Tata Power Cy DOOSAN/KOREA - TOSHIBA/J Powergen

November 2007 India Kochi LNG Terminal (storage tanks) Petronet IHI/JAPAN Storage

November 2007 India Krishnapatnam Power Plant Coastal Andhra Power RELIANCE ENERGY LTD/INDIA Powergen

January 2008 India North Chennai Power Station Tamil Nadu Electricity BHEL/INDIA Powergen

February 2008 India Anpara D Power Station UPRVUNL BHEL/INDIA Powergen

February 2008 India Construction of two power plants in Gurajat GSEG - GSPC BHEL/INDIA Powergen

March 2008 India Mumbai Lube Oil Base Stock Plant Hindustan Petroleum LARSEN & TOUBRO/INDIA Refining

March 2008 India Mumbai High Offshore Field (PRP-2 Project) ONGC LEIGHTON AUSTRALIA Transportation

June 2008 India Barauni MSQ Upgradation Project Indian Oil Corporation PUNJ LLOYD/INDIA Refining

June 2008 India Delhi Power Plant Pragati Power Corp PPCL BHEL/INDIA Powergen

June 2008 India Pallatana Power Plant in Tripura ONGC Tripura Power Cy BHEL/INDIA-GE/USA Powergen

June 2008 India Bokaro Power Plant Damodar Valley Corp BHEL/INDIA Powergen

June 2008 india Sasan Ultra Mega Power Project Reliance Industries RELIANCE INFRASTRUCTURE LTD/INDIA Powergen

July 2008 India Mettur Power Plant Expansion Tamil Nadu Electricity BGR ENERGY/INDIA Powergen

July 2008 India Kalisindh Thermal Power Project RRVUNL BGR ENERGY/INDIA Powergen

August 2008 India Guwahati/Digboi MS Quality Upgradation Pjt Indian Oil Corporation UHDE/INDIA Refining

August 2008 India Goindwal Sahib Power Plant GVK Power Ltd BHEL/INDIA Powergen

September 2008 India Bharuch Nitric Acid Plant GNVFC UHDE/INDIA Petrochemical

September 2008 India Chhabra Thermal Power Plant Expansion RRVUNL BHEL/INDIA Powergen

November 2008 India Hydrogen Units at Bhatinda Refinery HPCL-Mittal LARSEN & TOUBRO/INDIA Refining

7 7 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

2010

267 2012

1430 2012

245 2012

435 2012

2011

3200 2013

561 2012

968 2012

2012

265 2011

362 2011

2012

316 2011

150 2011

2012

2011

2011

269 2012

334 2012

2012

80 2011

545 2011

1180 2012

312 2012

334 2011

828 2013

113 2011

2011

415 2012

198 2011

278 2011

November 2008 India SRU Units at Bhatinda Refinery HPCL-Mittal TOYO INDIA Refining

November 2008 India Kakatiya Thermal Power Generating Unit APGenco BHEL/INDIA Powergen

December 2008 India Dahej Ethylene Plant OPAL LINDE/GERMANY-SAMSUNG/SOUTH KOREA Petrochemical

December 2008 India Bina Power Plant Jaiprakash Power Ventures BHEL/INDIA Powergen

December 2008 India Mauda Super Thermal Power Project NTPC BHEL/INDIA Powergen

January 2009 India Mangalore Refinery Expansion (CDU/VDU) MRPC JACOBS ENGINEERING / INDIA Refining

January 2009 India Tilaiya Ultra Mega Power Project Government RELIANCE POWER/INDIA Powergen

February 2009 India Sri Damodaram Sanjeevaiah Thermal Power APPDCL TATA PROJECTS/INDIA Powergen

February 2009 India Malwa Thermal Power Project MPPGC BHEL/INDIA - LARSEN & TOUBRO/INDIA Powergen

March 2009 India Paradip Refinery (EPCM-1) Indian Oil Corporation FOSTER WHEELER/UK Refining

April 2009 India Mangalore Refinery Expansion (DHT/HGU) MRPC LARSEN & TOUBRO/INDIA Refining

April 2009 India Mumbai High North ICP-R Platform ONGC GUNANUSA/INDONESIA-AFCON/INDIA Production

April 2009 India Paradip Refinery (EPCM-2) Indian Oil Corporation UHDE INDIA Refining

May 2009 India Avantha Bhandar Thermal Power Project Korba West Power Cy Ltd BHEL/INDIA Powergen

May 2009 India Bela Thermal Power Project Ideal Energy Projects Ltd BHEL/INDIA Powergen

June 2009 India Paradip Refinery (EPCM-4) Indian Oil Corporation TOYO INDIA Refining

June 2009 India Vizag Formaldehyde Plant Kanoria Chemicals UHDE/INDIA Chemical

June 2009 India Aditya Power Plant Hindalco Industries BHEL/INDIA Powergen

July 2009 India Jharkland Power Plant APNRL BHEL/INDIA Powergen

July 2009 India Chandrapur Super Thermal Power Station Mahagenco BGR ENERGY/INDIA Powergen

July 2009 India KOCHI LNG Terminal (liquefaction facilities) Petronet CTCI/TAIWAN Gas/treatment

August 2009 India Mangalore Refinery CHTU Project MRPC TECNIMONT INDIA Refining

August 2009 India Derang Thermal Power Project Jindal India Thermal Power BHEL/INDIA Powergen

August 2009 India Mumbai High North Process Platform ONGC LARSEN & TOUBRO/INDIA Production

August 2009 India Mangalore Polypropylene Unit MRPC EIL/INDIA Petrochemical

August 2009 India Marwa Thermal Power Project Chhattisgarh State Power BGR ENERGY/INDIA Powergen

August 2009 India Nigrie Supercritical Thermal Power Plant Jaypee Group LARSEN & TOUBRO/INDIA - MHI/INDIA Powergen

September 2009 India Mangalore Coke drum structure package MRPC PUNJ LLOYD/INDIA Refining

September 2009 India Mangalore CDU/VDU n°1 revamping MRPC TOYO INDIA Refining

September 2009 India Vemagiri Power Plant GMR Energy LARSEN & TOUBRO/INDIA Powergen

September 2009 India Meenaskshi Power Plant Meenaskshi Energy THERMAX/INDIA Powergen

September 2009 India B-22 Field Development ONGC NPCC/UAE Production

8 8 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

150 2012

720 2011

2011

1070 2011

2015

1490 2013

1200 2012

212 2012

162 2011

464 2013

1200 2012

1000 2013

2100 2013

446 2012

1300 2012

735 2012

223 2012

240 2013

312 2012

224 2012

1500 2012

235 2012

2011

1400 2013

650 2012

2012

315 2012

2013

2013

618 2012

235 2012

689 2013

October 2009 India Vizag Diesel Hydrotreat Project Hindustan Petroleum TECHNIP/INDIA Refining

October 2009 India Mumbai Diesel Hydrotreat Project Hindustan Petroleum TOYO INDIA Refining

October 2009 India Mangalore Refinery Delayed Coker BOP MRPC TOYO INDIA Refining

October 2009 India Jindal Power Plant Expansion Jindal India Thermal Power BHEL/INDIA Powergen

October 2009 India Haripur Nuclear Power Plant Nuclear Power Corp ATOMSTROYEXPORT Powergen

November 2009 India Koradi Power Station Mahagenco LARSEN & TOUBRO/INDIA Powergen

November 2009 India Prayagraj Thermal Power Project Prayagraj Power Generation BHEL/INDIA Powergen

December 2009 India Bharuch Ammonia Plant GNFC LARSEN & TOUBRO/INDIA Petrochemical

December 2009 India RS-12 Well Platform at Mumbai High Field ONGC NPCC/UAE Production

January 2010 India Panipat & Bathinda Ammonia Conversion Pjt National Fertilizers Ltd LARSEN & TOUBRO/INDIA Petrochemical

January 2010 India Maharashtra coal-fired power plant Lanco Mahanadi Power Ltd LANCO INFRATECH Ltd Powergen

January 2010 India Raipur-Chhattisgarh Coal-Fired Power Plant GMR Energy DOOSAN/KOREA Powergen

February 2010 India Godhna Power Plant Karnataka Power Corp LARSEN & TOUBRO/INDIA Powergen

March 2010 India Mangalore Aromatics Complex ONGC Mangalore Petr LARSEN & TOUBRO/INDIA Petrochemical

March 2010 India Nasik & Amravati coal-fired power plants Elena Power Infrastr. Ltd BHEL/INDIA Powergen

March 2010 India Paradip Captive Power Plant Indian Oil Corporation BHEL/INDIA Powergen

March 2010 India Tadali Power Plant Dhariwal Infrastructure PUNJ LLOYD/INDIA Powergen

March 2010 India Nangal Ammonia Plant Conversion Pjt National Fertilizers Ltd TECNIMONT INDIA Petrochemical

March 2010 India Paradip FCC Reactor Regenerator Pjt Indian Oil Corporation LARSEN & TOUBRO/INDIA Refining

March 2010 India Mumbai High North Phase II ONGC LARSEN & TOUBRO/INDIA Production

April 2010 India Jharsuguda coal-fired power plant Vedanta Resources SEPCO/CHINA Powergen

April 2010 India Deen Dayal Wellhead Platform Gujarat State Petroleum LARSEN & TOUBRO/INDIA Production

April 2010 India Cuddalore Refinery (Inside Battery Limit) Nagarjuna Oil Corp PUNJ LLOYD/INDIA Refining

April 2010 India Karnataka Power Plant Raichur Power Corp Ltd BHEL/INDIA Powergen

May 2010 India Manali Resid Upgradation Project Chennai Petroleum JACOBS ENGINEERING / INDIA Refining

May 2010 India Cuddalore Refinery (DHDS Package) Nagarjuna Oil Corp SAMSUNG ENGINEERING INDIA Refining

May 2010 India Mallavaram Onshore Gas Terminal GSPC EIL/INDIA Gas/treatment

May 2010 India Babrala Fertilizer Expansion (ammonia pack) Tata Chemicals HALDOR TOPSOE/DENMARK Petrochemical

May 2010 India Babrala Fertilizer Expansion (urea pack) Tata Chemicals SAIPEM/ITALY Petrochemical

May 2010 India B-193 Field Devlpt (platform) ONGC SWIBER HOLDINGS / SIME DARBY Production

May 2010 India D-1 Field Devlpt (platforms/pipelines) ONGC ESSAR OFFSHORE SUBSEA / IOEC Production

June 2010 India Gautami Power Plant Expansion Pjt GVK Gautami Power HYUNDAI ENG / LARSEN & TOUBRO Powergen

9 9 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

66 2012

540 2011

300 2011

889 2011

240 2010

605 2012

2012

2011

430 2011

173 2011

240 2012

1720 2011

628 2011

320 2010

310 2011

284 2011

2012

2011

2011

340 2012

5500 2014

1800 2012

1000 2012

1400 2013

1800 2012

81 2010

80 2011

170 2012

451 2012

470 2012

592.5 2011

375 2011

June 2010 India Hazira Additional Gas Processing faciities ONGC LARSEN & TOUBRO/INDIA Gas/treatment

September 2007 Indonesia Cirebon Thermal Power Plant PT Cirebon Electric Power DOOSAN/KOREA Powergen

December 2007 Indonesia Balongan Refinery Expansion Pertamina TOYO/JAPAN - PT REKAYASA/INDONESIA Refining

April 2008 Indonesia 2 power plants in East Java and Aceh PT PLN CNEEC/CHINA - SINOHYDRO/CHINA Powergen

August 2008 Indonesia Muara Tawar Combined Cycle Power Plant PT PLN ALSTOM/F-MARUBENI/J Powergen

December 2008 Indonesia Adipala Power Plant PT PLN CNTIC/CHINA Powergen

December 2008 Indonesia Donggi-Senoro LNG Terminal PT Donggi Senoro LNG JGC/JAPAN Gas/treatment

January 2009 Indonesia Tanjung Priok CCGT Power Plant PT PLN MITSUBISHI HEAVY IND/J Powergen

May 2009 Indonesia Gajah Baru Field Development Premier Oil Natuna SMOE/INDONESIA - PT SAIPEM/INDONESIA - NISCONI Production

June 2009 Indonesia Bontang Ammonium Nitrate Plant PT Kaltim Nitrate Indonesia PT REKAYASA/INDONESIA Petrochemical

April 2010 Indonesia South Mahakam Field (platform/pipelines) Total PT NISCONI Production

March 2007 Iran Esfahan Refinery Upgrading Project Esfahan Oil Refining Cy DAELIM/KOREA - LURGI/G-UHDE/G Refining

April 2007 Iran Lorestan & Mahabad Polyethylene Plants Bakhtar Petrochemical Cy NARGAN/IRAN-TECNIMONT/I Petrochemical

February 2007 Iran Nioc LNG Project (tankage Project) NIOC LNG DAELIM/KOREA - KHATAM AL ANBIA Storage

September 2007 Iran Tehran Refinery Upgrading Phase II NIORDC IGC/IRAN-ODCC/IRAN-D&I/IRAN Refining

April 2008 Iran South Pars Phase 12 (epc-1) Petropars ARAS CONSORTIUM Storage

October 2008 Iran Imam Khomeini Propane Dehydrogenation NIPC UHDE/GERMANY Petrochemical

December 2008 Iran Three Ammonia-Urea Complexes NIPC HAMPA ENGINEERING CONTRACTOR/IRAN Petrochemical

March 2009 Iran Assaluyeh Ammonia Plant Star Aria Ammonia Chem Cy CHINA TCC / MEHVAR SAZAN Petrochemical

March 2009 Iran Assaluyeh ESBR Plant Assaluyeh Sadaf Chemical TECNIMONT/I-NARGAN/IRAN Petrochemical

May 2009 Iran South Pars Phase 20-21 NIOC OIEC/IRAN Production

June 2009 Iran South Pars Phase 12 (epc-3) Petropars TECNIMONT/ITALY-NARGAN-DORRIZ-GAMMA Gas/treatment

June 2009 Iran Tombak Liquefaction Plant Iran LNG GS ENGINEERING/SOUTH KOREA-PIDECO/IRAN Gas/treatment

October 2009 Iran Assaluyeh Gas Sweetening Plant Pars Oil & Gas Cy GS ENGINEERING/SOUTH KOREA Gas/treatment

October 2009 Iran South Pars Phase 12 (epc-2) Petropars DAELIM/SOUTH KOREA - SAZEH-KAYSON-IIND Gas/treatment

August 2008 Iraq Samawah Refinery Upgrading Ministry of Oil CICSCO/USA Refining

July 2009 Iraq Akas and Al Mansuria Fields Devlpt Scop BGR ENERGY/INDIA Production

September 2009 Iraq Hilla & Al Taji Power Plants Ministry SNC LAVALIN/CANADA - URUK GROUP Powergen

November 2009 Israel Ashdod Desalination Plant Mekorot SADYT/SPAIN - MINRAV/ISRAEL Water/desal

May 2010 Israel Mishor Rotem Power Plant OC Power Ltd DAEWOO/SOUTH KOREA Powergen

February 2008 Italy Livorno Offshore LNG Terminal Olt LNG SAIPEM/ITALY Gas/treatment

March 2008 Italy San Severo combined-cycle power plant Atel (Progetto EnPlus) ANSALDO ENERGIA Powergen

10 10 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

644 2012

150 2010

1500 2011

500 2011

193 2011

650 2012

105 2010

2600 2012

1040 2013

27 2011

1600 2014

320 2010

649 2011

544 2010

2600 2012

123 2011

724 2013

890 2013

900 2013

25 2011

650 2011

650 2011

540 2011

432 2012

7000 2014

344 2010

500 2011

637 2010

720 2010

6800 2014

825 2011

2014

July 2009 Italy Aprilia Power Plant Sorgenia ANSALDO ENERGIA Powergen

September 2009 Italy Priolo Power Plant Reconstruction Isab Energy FLUOR/UK Powergen

November 2009 Italy Aquila FPSO Eni SAIPEM/ITALY Production

July 2008 Jordan Al Qatrana Independent Power Project Kepco / Xenel LOTTE E & C / SOUTH KOREA Powergen

September 2009 Jordan Samra Power Plant Expansion Phase 3 Samra Electric Power Cy HANWHA ENGINEERING - ALSTOM Powergen

May 2010 Jordan Fertilizer Plant (Jifco Pjt) JPMC/IFFCO LAVALIN EUROPE Petrochemical

April 2008 Kazakhstan Kashagan 4th Gas Compressor Train Agip Kco PETROFAC Gas/treatment

May 2009 Kazakhstan Kashagan Phase One Hook-Up Agip KCO AKER SOLUTIONS - SAIPEM Production

October 2009 Kazakhstan Atyrau Aromatics Complex Kazmunaigas SINOPEC ENGINEERING/CHINA Petrochemical

November 2009 Kazakhstan Atyrau Refinery Modernization Kazmunaigas ROMINSERV/KAZAKHSTAN Refining

March 2010 Kazakhstan Atyrau Polypropylene Plant KPI SINOPEC ENGINEERING/CHINA Petrochemical

March 2008 Kuwait Shuwaikh Desalination Plant MEW DOOSAN/KOREA Water/desal

May 2008 Kuwait Gas Booster Station GS 160 KOC SNAMPROGETTI/ITALY Gas/treatment

November 2008 Kuwait Pipeline between BS 131 & Mina Al Ahmadi KOC PETROFAC Transportation

August 2009 Kuwait Subiya Power Plant MEW HYUNDAI HEAVY INDUSTRIES - GE/USA Powergen

October 2009 Kuwait Gas Compressors at GC 7, 8 &21 KOC SAIPEM/ITALY Gas/treatment

December 2009 Kuwait Gas Booster 132 Project KOC SK ENG/KOREA Gas/treatment

June 2010 Kuwait Mina Al Ahmadi 4th LPG Recovery Unit KNPC DAELIM/KOREA Gas/treatment

June 2010 Kuwait Gas Booster Station BS-171 KOC SAIPEM/ITALY Gas/treatment

May 2009 Liberia Bushrod Product Storage Terminal Expansion Liberia Petroleum Refining ZAKHEM INT CONSTRUCTION/UK Storage

March 2007 Libya Tripoli West Power Plant Expansion Phase 2 Gecol HYUNDAI ENG/DOOSAN Powergen

October 2007 Libya Al Khalij Power Plant Gecol HYUNDAI/KOREA Powergen

December 2007 Libya Sarir Power Plant Gecol HYUNDAI/KOREA Powergen

April 2009 Lithuania Combined-cycle Power plant Lietuvos Elektrine AB IBERDROLA INGENIERA/SPAIN Powergen

May 2007 Malaysia Trans-Peninsula Pipeline Transpen RANHILL ENGINEERS & CONSTRUCTORS/ML Transportation

February 2008 Malaysia Salam Power Plant Tenaga Nasional BhD CNEEC/CHINA Powergen

March 2008 Malaysia Sabah-Sarawak Pipeline Petronas Carigali PUNJ LLOYD/INDIA - DAILOG E&C Transportation

April 2008 Malaysia Sabah Oil Platforms Petronas Carigali SIME DARBY ENGINEERING/MALAYSIA-MISC Production

October 2008 Malaysia Tangga Barat, Kumang, Kinabalu Gas Pjts Petronas Carigali MMHE/MALAYSIA - SIME DARBY ENGINEERING Production

December 2008 Malaysia Putrana Refinery El-One Resources HAMPA ENGINEERING CONTRACTOR/IRAN Refining

March 2009 Malaysia Gumusut-Kakap Field Devlpt Sabah Shell Petroleum ACERGY GROUP/SAPURACREST Production

July 2009 Malaysia Sungai Limau Refinery (Kedah) Merapoh Resources SK ENG/KOREA Refining

11 11 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

174 2012

630 2011

2010

268 2011

244 2011

638 2013

633 2012

345 2012

981 2012

620 2014

50 2011

2012

31 2011

2012

1400 2013

750 2011

2012

1176 2011

592 2010

470 2010

2012

2011

1000 2012

1000 2011

195 2011

600 2011

992 2011

60 2011

2011

2013

159 2012

70 2011

January 2010 Malaysia Tanjung Bin Oil Terminal ATT Tanjung Bin Sdn Bhd PEC Ltd/SINGAPORE Storage

March 2008 Mexico Manzanillo LNG Plant CFE SAMSUNG/KOREA Gas/treatment

October 2008 Mexico Baja Sulphuric Acid Plant MMB LAVALIN/Canada Petrochemical

May 2009 Mexico Poza Rica Cryogenic Plant Pemex ICA FLUOR - LINDE PROCESS PLANTS Gas/treatment

June 2009 Mexico La Cangrejera Aromatics Exp Phase 1 Pemex Petrochemicals DRAGADOS/SPAIN-ACS-SENERMEX Petrochemical

August 2009 Mexico Cadereyta & Madero Clean Fuels Project Pemex ICA FLUOR Refining

September 2009 Mexico Tabasco Cogeneration Plant Pemex ABENGOA MEXICO - ABENER Powergen

February 2010 Mexico Salamanca & Tula Refineries Clean Fuels Pjt Pemex SAIPEM/ITALY Refining

February 2010 Mexico Manzanillo Power Plant Modernization CFE ACS SERVICIOS/COBRA/INELECTRA Powergen

February 2010 Mexico Salina Cruz & Minatitlan Clean Fuels Pjt Pemex ICA FLUOR Refining

April 2010 Mexico Salamanca Sulfur Recovery Unit Pemex ISOLUX/TECNA/TECHNIP Refining

November 2009 Morocco Mohammedia Refinery Topping 4 Pjt Samir TECNICAS REUNIDAS/SPAIN - TEKFEN/T Refining

November 2009 Morocco Mohammedia Bitumen Plant Samir POERNER/AUSTRIA Refining

October 2009 Myanmar Yetagun Compression Platform Petronas Carigali NIPPON STEEL/THAILAND Production

November 2009 Myanmar Shwe Gas Development Pjt Daewoo International HYUNDAI HEAVY INDUSTRIES/SOUTH KOREA Production

April 2007 Netherlands Sloe Power Plant at Vlissingen Delta Energy / EDF SIEMENS/GERMANY Powergen

May 2007 Netherlands Maasvlakte coal-biomass power plant Electrabel HITACHI POWER EUROPE Powergen

July 2007 Netherlands Maasvlakte LNG Terminal Gate Terminal TECHINT/I-SENER/SP-ENTREPOSE/F-VINCI/F Gas/treatment

January 2008 Netherlands Lelystad FlevoCentrale Project Electrabel Nederland ALSTOM/F Powergen

February 2008 Netherlands Rijnmond II Power Plant Intergen SIEMENS/GERMANY Powergen

February 2008 Netherlands Magnum Power Plant Nuon MITSUBISHI HEAVY IND/J - PONTICELLI/F Powergen

June 2008 Netherlands Moerdijk Power Plant Essent TECNICAS REUNIDAS/SPAIN-GE Powergen

June 2008 Netherlands Claus Power Plant Expansion Essent ALSTOM/F Powergen

June 2008 Netherlands Rotterdam Biodiesel Plant Neste Oil TECHNIP/ITALY Bio

June 2008 Netherlands Rotterdam Hydrogen Plant Air Liquide LURGI/GERMANY Gas/treatment

June 2008 Netherlands Sluiskil Urea Plant Yara UHDE/GERMANY Petrochemical

May 2009 Netherlands Rotterdam Combined-Cycle Power Plant Enecogen SIEMENS/GERMANY Powergen

August 2009 Netherlands Pernis Refinery Diesel Hydtrotreat Shell CB&I LUMMUS/NETHERLANDS Refining

November 2009 Netherlands Rotterdam Hydrogen Plant Air Products TECHNIP/NETHERLANDS Gas/treatment

November 2009 Netherlands Bergermeer Gas Storage Project Taqa Energy FLUOR/NETHERLANDS Gas/treatment

March 2010 Netherlands Rotterdam Tank Terminal Euro Tank Terminal BV VERWATER-AUDEX BV Storage

March 2010 Netherlands Rotterdam Terminal Tank Dutch Botlek Tank Terminal POLIMEX MOSTOSTAL/POLAND Storage

12 12 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

2012

120 2012

3500 2012

2012

1600 2011

1300 2011

2010

567 2011

1160 2012

190 2010

200 2013

500 2011

2011

2012

179 2012

120 2011

690 2011

175 2012

218 2011

395 2013

294 2013

1100 2013

2012

350 2011

1000 2013

220 2013

1700 2013

132 2010

100 2011

100 2011

4000 2012

April 2010 Netherlands Hemweg 9 Power Plant Nuon SIEMENS/GERMANY Powergen

April 2010 New Caledonia Koniambo Power Plant Xstrata DOOSAN/KOREA Powergen

June 2007 Nigeria Brass LNG Project Brass Lng Ltd BECHTEL/USA Gas/treatment

Unofficial (03/07) Nigeria Olokola Lng Project OK LNG TECHNIP-F/SNAMPROGETTI/I Gas/treatment

February 2008 Nigeria Usan Field Development (FPSO Package) Total/Elf Petroleum Nigeria HYUNDAI HEAVY IND/SOUTH KOREA Production

March 2008 Nigeria Usan Field Development (URF-OLT)Package Total/Elf Petroleum Nigeria SAIPEM/ITALY Production

July 2008 Nigeria Lagos Beach Compression Station (LBCS) WAGPCo ENTREPOSE CONTRACTING/F Gas/treatment

September 2008 Nigeria Bilabri, Owaneri, Orobiri gas Pjt (LNG-FPSO) Flex Lng SAMSUNG HEAVY/KOREA Gas/treatment

October 2008 Nigeria OML58 Upgrade Project Phase 1 Total E&P Nigeria SAIPEM/I - PONTICELLI Production

May 2009 Nigeria Revamping of three wellhead Plaforms Mobil Nigeria ACERGY GROUP Production

October 2009 Nigeria Bonga North-West Field Subsea Devlpt Shell Nigeria SAIPEM/ITALY Transportation

October 2009 Nigeria Escravos Gas Development Chevron Nigeria ACERGY Production

November 2009 Nigeria Kaduna Power Station Ministry of Power ROCKSON ENG / NUOVO PIGNONE Powergen

February 2010 Nigeria O.U.R. Pipeline Project TEPNG ZAKHEM BAYWOOD JV Transportation

April 2010 Nigeria Utorogu-Ughelli Gas Pipeline Shell Petroleum Nigeria DAEWOO/SOUTH KOREA Transportation

May 2010 Nigeria Offshore Installation Work at Oso ExxonMobil ACERGY GROUP Production

February 2007 Norway Skarv FPSO BP Norge AS SAMSUNG HEAVY/KOREA - AKER KVAERNER Production

July 2007 Norway Karsto Gas Treatment Plant Expansion Statoil MW KELLOGG/UK Gas/treatment

February 2009 Norway Kollsnes Gas Plant Upgrade Gassco AKER SOLUTIONS Gas/treatment

September 2009 Norway Goliat Field Development (subsea portion) Eni AKER SOLUTIONS Production

October 2009 Norway Goliat Field Development (infield pipelines) Eni TECHNIP/NORWAY Production

February 2010 Norway Goliat Field Development (FPSO) Eni HYUNDAI HEAVY IND/SOUTH KOREA - CB&I Production

March 2010 Norway Ekofisk 2/4L Jacket ConocoPhillips AKER SOLUTIONS Production

July 2009 Oman Kauther Gas Compression Project PDO PETROFAC - AL HASSAN ENG Gas/treatment

November 2009 Oman Salalah Independent Power & Water Pjt Sembcorp Utilities SEPCO III/CHINA - HYFLUX/SINGAPORE Powergen

December 2009 Oman Saih Nihayda Gas Compression Pjt PDO GS ENGINEERING/SOUTH KOREA Gas/treatment

May 2010 Oman Barka 3 / Sohar 2 IPP Projects GDF SUEZ GS ENGINEERING/SOUTH KOREA -SIEMENS/GER Powergen

January 2008 Pakistan Mahmood Kot Refinery Diesel HDS Unit Parco CNCEC/CHINA-HYUNDAI ENGINEERING Refining

April 2009 Pakistan Guddu & Naudero Power Plants Walters Power Int PROENERGY EPC SERVICES/USA Powergen

September 2009 Panama Panama Terminal Expansion Project Petroterminal de Panama CB&I/USA Storage

February 2008 Papua New Guinea Napa-Napa LNG Plant Liquid Niugini Gas BECHTEL/USA Gas/treatment

13 13 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

4500 2013

1000 2013

450 2013

430 2013

2010

350 2012

1200 2015

300 2011

513 2013

580 2012

789 2012

526 2011

90 2010

2012

903 2014

910 2011

455 2011

47 2011

2011

900 2011

214 2012

3200 2011

2070 2011

2011

2010

800 2011

550 2011

610 2012

1200 2013

62 2011

650 2013

1000 2014

December 2009 Papua New Guinea PNG LNG Project (LNG Plant) ExxonMobil CHIYODA/J-JGC/J Gas/treatment

December 2009 Papua New Guinea PNG LNG Project (Hides Gas Plant) ExxonMobil CB&I/USA-CLOUGH/AUSTRALIA Gas/treatment

December 2009 Papua New Guinea PNG LNG Project (Offshore Pipelines) ExxonMobil SAIPEM/ITALY Transportation

December 2009 Papua New Guinea PNG LNG Project (Onshore Pipelines) ExxonMobil SPIE CAPAG/F Transportation

September 2008 Peru Las Flores Thermo-Electric Power Station Duke Energy Egenor SIEMENS/GERMANY Powergen

October 2009 Peru Chilca Power Plant Conversion Kalipa Generacion POSCO ENGINEERING/SOUTH KOREA Powergen

December 2009 Peru Talara Refinery Expansion Petroperu TECNICAS REUNIDAS/SPAIN Refining

December 2007 Philippines Cebu Power Plant Kepco DOOSAN/KOREA Powergen

February 2008 Philippines Batangas Ethylene/Propylene Plant JG Summit DAELIM/KOREA Petrochemical

March 2009 Philippines Mariveles Power Plant GN Power CNEEC/CHINA Powergen

June 2008 Poland LMG Project PGNIG TECHNIP KTI/ITALY / PBG POLAND Production

October 2008 Poland Wierzchowice Gas Storage Expansion PGNIG TECNIMONT/ITALY-SOFREGAZ/F-PBG POLAND Storage

October 2008 Poland Gdansk Refinery Upgrading (deasphalting) Grupa Lotos TECHNIP/ITALY Refining

April 2010 Poland Polaniec Biomass Power Station GDF Suez FOSTER WHEELER POLAND Powergen

June 2010 Poland Swinoujscie LNG Terminal Polish LNG SAIPEM/TECHINT/PBG-PL Gas/treatment

August 2007 Portugal Sines Refinery Upgrading Galp Energia TECNICAS REUNIDAS/SPAIN Refining

August 2007 Portugal Porto Refinery Upgrading Galp Energia FLUOR/UK Refining

October 2008 Portugal Sines Steamcracker Furnaces Repsol TECHNIP/NETHERLANDS Petrochemical

October 2008 Portugal Sines Polyethylene Plant Repsol TECNICAS REUNIDAS/SPAIN Petrochemical

March 2008 Portugal Abrantes Power Plants Elecgas SIEMENS/GERMANY Powergen

May 2009 Portugal Sines LNG Terminal Expansion Ren Atlantico SOMAGUE/PORTUGAL Gas/treatment

November 2007 Qatar Qafco-V Expansion Project Qafco SNAMPROGETTI/I-HYUNDAI/SOUTH KOREA Petrochemical

March 2008 Qatar Ras Laffan C IWPP Project (power part) Suez/Mitsui HYUNDAI ENG/MHI-J Powergen

March 2008 Qatar Ras Laffan C IWPP Project (desalination part) Suez/Mitsui SIDEM/F Water/desal

April 2008 Qatar Qafco-V Storage Project Qafco CB&I/USA Storage

September 2008 Qatar Strategic Gas Transmission Project Qatar Petroleum PUNJ LLOYD/INDIA Transportation

May 2009 Qatar Mesaieed Polyethylene Plant (LDPE-3 Pjt) Qapco UHDE/GERMANY - TEKFEN/T Petrochemical

October 2009 Qatar Qafco-VI Expansion Project Qafco SAIPEM/I - HYUNDAI/SOUTH KOREA Petrochemical

February 2010 Qatar Plateau Maintenance Project (PMP) Qatargas TECHNIP/F-CHIYODA/J Gas/treatment

March 2010 Qatar Idd Al Shargi Pipelines Upgrading Pjt Occidental Petroleum NPCC/UAE Transportation

March 2010 Qatar Messaieed & Dukhan Gas Sweetening Pjts Qatar Petroleum PETROFAC Gas/treatment

April 2010 Qatar Ras Laffan Gas Recovery Pjt Qatargas FLUOR/USA Gas/treatment

14 14 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

200 2013

600 2011

97 2011

140 2010

2011

2012

800 2011

1000 2012

646 2012

2013

2010

2010

2010

139 2011

508 2011

2011

2010

695 2012

284 2011

2010

2010

123 2012

2200 2014

973 2012

4800 2014

2012

855 2012

18 2012

2000 2011

500 2011

2011

2011

May 2010 Qatar Ras Laffan Helium Plant Rasgas AIR LIQUIDE/F - CHIYODA AL MANA ENG Gas/treatment

March 2008 Romania Brazi Power Plant Petrom METKA/GREECE-GE/USA Powergen

April 2008 Romania Petromidia Refinery Hydrogen Plant Rompetrol TECHNIP/NETHERLANDS Refining

July 2008 Romania Petrobrazi Refinery Clean Fuels Project Petrom UHDE/GERMANY Refining

March 2010 Romania Navoradi High Polyethylene Plant Expansion Rompetrol ROMINSERV/ROMANIA Petrochemical

April 2010 Romania Petrobrazi Refinery Modernization Petrom FOSTER WHEELER Refining

October 2007 Russia Khabarovsk Refinery Expansion Alliance Oil Corp TECNICAS REUNIDAS/SPAIN Refining

December 2007 Russia Tobolsk PDH Plant Tobolsk Polymer TECNIMONT/ITALY Petrochemical

December 2007 Russia Tobolsk Polypropylene Plant Tobolsk Polymer LINDE/GERMANY Petrochemical

February 2008 Russia Ikra Project Rusvinyl TECHNIP/F Petrochemical

March 2008 Russia Perm Polystyrene Plant Sibur Khimprom CHEMIEANLAGENBAU CHEMNITZ/GER Petrochemical

April 2008 Russia Perm EthylBenzene Plant Sibur Khimprom TOYO/JAPAN Petrochemical

April 2008 Russia Irkusk Vinyl Chloride Plant Sayankhimplast UHDE/GERMANY Petrochemical

May 2008 Russia Melamine Plant at Nevinnomyssky Azot Eurochem LURGI/GERMANY Petrochemical

May 2008 Russia Yajvinskaya Gres CCGT Power Plant OGK-4 ENKA/TURKEY Powergen

May 2008 Russia Krasnodar gas-fired power plant TGK-8 E4 GROUP/RUSSIA - MHI/JAPAN Powergen

July 2008 Russia Nizhnekamsk Refinery (Fired Heaters) Taneco (Tatneft) FOSTER WHEELER ITALIANA Refining

August 2008 Russia Nyaganskaya & Tyumen TPP2 projects TGK-10 E4 GROUP/RUSSIA - SIEMENS/GERMANY Powergen

August 2008 Russia Kstovo Ethylene Plant Expansion Sibur Neftekhim TECHNIP/NETHERLANDS Petrochemical

October 2008 Russia Noyabrsk Gas Processing Expansion Pjt Sibur FLUOR/UK - STROYTRANSGAZ/RUSSIA Gas/treatment

March 2009 Russia Portovaya Gas Treatment Unit Gazkomplektimpex SIIRTEC NIGI/ITALY Gas/treatment

April 2009 Russia Novy Urengoy Polyethylene Plant NUGCC (Gazprom) TECNIMONT/ITALY Petrochemical

May 2009 Russia Taif-NK Nizhnekamsk Refinery Upgrading Taif-NK LURGI/GERMANY Refining

May 2009 Russia Mendeleevsk Fertilizer Complex JSC Ammoni MITSUBISHI HEAVY IND/J Petrochemical

June 2009 Russia Volgodonsk Nuclear Units 3 & 4 Energoatom NN-AEP/RUSSIA Powergen

October 2009 Russia Astrakhan Refinery Modernization Gazprom Komplektatsiya LURGI/GERMANY Refining

May 2010 Russia Urengoi Thermal Power Plant OGC-1 TECHNOPROMEXPORT/RUSSIA Powergen

June 2010 Russia Bratsk Chlorine Dioxide Plant Ilim Group AKER SOLUTIONS Chemical

September 2007 Russia-Germany Nord Stream Pipeline Gazprom-Norstream SAIPEM/ITALY Transportation

March 2008 Salvador Construction of a coal-fired power plant AES POSCO ENGINEERING/SOUTH KOREA Powergen

May 2007 Saudi Arabia Manifa Field Platforms Saudi Aramco J.RAY MCDERMOTT Production

September 2007 Saudi Arabia Offshore Maintain Potential Program (LTA) Saudi Aramco SAIPEM/TAQA/AL RUSHAID Production

15 15 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

962 2011

1000 2011

450 2011

2850 2012

3000 2011

800 2013

1800 2013

501 2013

500 2013

195 2013

293 2011

2500 2013

2500 2013

2000 2013

1200 2011

1300 2011

500 2011

2011

158 2011

353 2011

1700 2013

1700 2013

500 2013

700 2013

900 2013

1300 2013

420 2013

745 2013

247 2013

300 2013

720 2012

300 2011

December 2007 Saudi Arabia Jubail NCP Complex (Polyolefins Pack) Saudi Polymers Cy DAELIM/KOREA Petrochemical

December 2007 Saudi Arabia Jubail NCP Complex (Ethylene Pack) Saudi Polymers Cy JGC/JAPAN Petrochemical

June 2008 Saudi Arabia Manifa Offshore Pipelines Saudi Aramco VALENTINE MARITIME/UAE Transportation

July 2008 Saudi Arabia Shoaiba Power Plant Phase III SEC ALSTOM/F Powergen

July 2008 Saudi Arabia PP10 Power Plant SEC ARABIAN BEMCO Powergen

July 2008 Saudi Arabia Manifa Project (Utilities & Storage) Saudi Aramco JGC/JAPAN Gas/treatment

July 2008 Saudi Arabia Manifa Project (Central Processing Facilities) Saudi Aramco SAIPEM/ITALY Gas/treatment

August 2008 Saudi Arabia Manifa Project (Gas Processing Plant) Saudi Aramco GS ENGINEERING/SOUTH KOREA Gas/treatment

August 2008 Saudi Arabia Manifa Project (Power Plant) Saudi Aramco TECNICAS REUNIDAS/SPAIN Powergen

August 2008 Saudi Arabia Manifa Project (pipeline package) Saudi Aramco NACAP/NETHERLANDS Transportation

November 2008 Saudi Arabia Jeddah Desalination Expansion Phase 3 SWCC DOOSAN/KOREA - WETICO/SAUDI Water/desal

November 2008 Saudi Arabia Jazan Power Plant MMC/BINLADEN/CHALCO CPI POWER ENGINEERING/CHINA Powergen

July 2009 Saudi Arabia Rabigh Independent Power Project Kepco / Acwa Power SEPCO III/CHINA - DONGFANG ELECTRIC CORP Powergen

January 2009 Saudi Arabia Yanbu Refinery Clean Fuels Project Samref WORLEYPARSONS/USA Refining

February 2009 Saudi Arabia Karan Gas Pjt (offshore package) Saudi Aramco J.RAY MCDERMOTT Production

February 2009 Saudi Arabia Karan Gas Pjt (onshore package) Saudi Aramco HYUNDAI ENG Production

February 2009 Saudi Arabia Karan Gas Pjt (cogeneration/utilities) Saudi Aramco PETROFAC Production

February 2009 Saudi Arabia Karan Gas Pjt (sulfur recovery unit) Saudi Aramco GS ENGINEERING/SOUTH KOREA Production

February 2009 Saudi Arabia Ras Abu Ali Plant Upgrade Saudi Aramco BONATTI/ITALY Production

April 2009 Saudi Arabia Ras Tanura / Riyadh Pipeline Saudi Aramco NACAP/NETHERLANDS Transportation

June 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package One) Saudi Aramco / Total TECNICAS REUNIDAS/SPAIN Refining

July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 2A) Saudi Aramco / Total TECHNIP/ITALY Refining

July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 2B) Saudi Aramco / Total DAELIM/KOREA Refining

July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 3) Saudi Aramco / Total SAMSUNG/KOREA Refining

July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 4) Saudi Aramco / Total SAMSUNG/KOREA-CHIYODA/JAPAN Refining

July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 5A) Saudi Aramco / Total TECHNIP/ITALY - CTCI/TAIWAN Refining

July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 5B) Saudi Aramco / Total SK ENG/KOREA Refining

July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 6) Saudi Aramco / Total ROTARY ENGINEERING/ PETRO STEEL/SAUDI Storage

July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 9) Saudi Aramco / Total DAYIM PUNJ LLOYD/SAUDI Storage

July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 8) Saudi Aramco / Total GULF CONSOLIDATED CONTRACTORS Transportation

July 2009 Saudi Arabia Yanbu Power Plant Exp Phases 5 & 6 Marafiq HANWHA ENGINEERING & CONSTRUCTION Powergen

July 2009 Saudi Arabia Jubail Air Separation Unit National industrial Gases SAMSUNG/KOREA Gas/treatment

16 16 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

2014

1850 2011

325 2011

400 2012

288 2010

2012

2012

141 2012

1000 2013

1600 2013

70 2012

2011

2011

2011

2011

2011

2011

2011

2000 2013

450 2013

818 2010

175 2010

594 2013

628 2013

250 2012

490 2013

1021 2014

4900 2015

4000 2017

315 2010

2010

242 2014

Aout 2009 Saudi Arabia Yanbu Refinery (Utilities package) Saudi Aramco/ConocoPhillips KBR/USA Refining

September 2009 Saudi Arabia Al Qurayyah Power Plant Conversion Pjt SEC ARABIAN BEMCO - DOOSAN HEAVY Powergen

October 2009 Saudi Arabia Jubail Low Density Polyethylene Plant Saudi Kayan DAELIM/KOREA Petrochemical

December 2009 Saudi Arabia Jubail Petrochemical Plant Arabian Chlor Vinyl Cy DAELIM/KOREA Petrochemical

January 2010 Saudi Arabia Al Qassim Power Plant Expansion SEC ARABIAN BEMCO Powergen

January 2010 Saudi Arabia Jubail Amines Complex Saudi Kayan CTCI/TAIWAN Petrochemical

January 2010 Saudi Arabia Jubail Refinery Clean Fuels Project Sasref JGC/JAPAN Refining

January 2010 Saudi Arabia Wasea Bulk Plant Saudi Aramco SINOPEC ENGINEERING/CHINA Storage

March 2010 Saudi Arabia Safaniya Field Upgrading Pjt Saudi Aramco J.RAY MCDERMOTT Production

June 2010 Saudi Arabia Riyadh PP9 Power Plant GDF Suez HYUNDAI HEAVY IND/SOUTH KOREA Powergen

September 2009 Serbia Pancevo Refinery Modernization NIS CB&I LUMMUS/NETHERLANDS Refining

September 2007 Singapore Jurong 2nd Petrochemical Pjt (Ethylene part) ExxonMobil SHAW GROUP/USA Petrochemical

September 2007 Singapore Jurong 2nd Petrochemical Pjt (Power Plant) ExxonMobil SHAW GROUP/USA Powergen

September 2007 Singapore Jurong 2nd Petrochemical Pjt (PE Units) ExxonMobil MITSUBISHI HEAVY IND/J Petrochemical

September 2007 Singapore Jurong 2nd Petrochemical Pjt (PP Unit) ExxonMobil MITSUI ENG/JAPAN Petrochemical

September 2007 Singapore Jurong 2nd Petrochemical Pjt (Elastomers) ExxonMobil MITSUI ENG/JAPAN Petrochemical

September 2007 Singapore Jurong 2nd Petrochemical Pjt (O&U) ExxonMobil FOSTER WHEELER/WORLEYPARSONS Petrochemical

October 2007 Singapore Jurong 2nd Petrochemical Pjt (aromatics) ExxonMobil FOSTER WHEELER/USA Petrochemical

October 2007 Singapore Jurong Aromatics Project Jurong Aromatics Corp SK ENG/KOREA Petrochemical

November 2007 Singapore Jurong Aromatics Project (Offsites/Utilities Jurong Aromatics Corp SEMBAWANG E&C/SINGAPORE Petrochemical

January 2008 Singapore Tuas Biodiesel Plant Neste Oil TECHNIP/ITALY & SINGAPORE Bio

January 2008 Singapore Tuas Hydrogen Plant Neste Oil AIR LIQUIDE/SINGAPORE Gas/treatment

April 2009 Singapore Jurong Oil Storage Project JTC Corp HYUNDAI ENG Storage

February 2010 Singapore Jurong LNG Terminal Singapore Lng Corp SAMSUNG/KOREA Gas/treatment

February 2010 Singapore Tembusu Power Plant Tuas Power MARUBENI/JAPAN Powergen

June 2010 Singapore Jurong Butyl Rubber Plant Lanxess FOSTER WHEELER Petrochemical

December 2009 Slovenia Söstanj coal-fired steam power plant Termoelektrama Sostanj ALSTOM/F Powergen

November 2007 South Africa Medupi Power Station Eskom ALSTOM/F-HITACHI POWER EUROPE Powergen

February 2008 South Africa Bravo Power Station Eskom ALSTOM/F-HITACHI POWER AFRICA Powergen

May 2008 South Africa Durban-Gautenberg Fuel Pipeline Project Transneft ENTREPOSE CONTRACTING/F-GROUP FIVE Transportation

September 2008 South Africa Sasolburg Chemical Plant Senmin International FOSTER WHEELER SOUTH AFRICA Chemical

August 2008 South Africa Koeberg PBMR Demonstration Power Plant PBMR LAVALIN/CANADA - MURRAY & ROBERTS Powergen

17 17 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

96 2011

2012

176 2012

1500 2011

974 2011

582 2011

562 2010

2014

3400 2017

2011

4750 2011

1300 2011

2011

320 2011

2010

510 2011

290 2011

686 2012

550 2013

454 2011

477 2010

400 2011

910 2012

58 2010

33 2011

60 2012

2012

540 2011

2010

2011

820 2011

2010

March 2010 South Africa Secunda CAN Plant Sasol Nitro LAVALIN/Canada Petrochemical

March 2010 South Africa Sasolburg Wax Expansion Sasol FOSTER WHEELER SOUTH AFRICA Petrochemical

May 2010 South Africa Sasolburg Nitric Acid Plant Omnia UHDE/GERMANY Petrochemical

April 2008 South Korea Incheon Hydrocracker SK Energy SK ENG/KOREA Refining

June 2008 South Korea Onsan Aromatics Complex S-Oil SAMSUNG/KOREA Petrochemical

October 2008 South Korea Daesan Refinery Heavy Oil Project Hyundai Oilbank HYUNDAI ENG Refining

November 2008 South Korea Yeosu Desulfurization Unit GS Caltex Corp GS ENGINEERING/SOUTH KOREA Refining

November 2008 South Korea Taean IGCC n° 1 Power Plant Kowepo DOOSAN/KOREA Powergen

January 2010 South Korea Incheon Tidal Power Plant KHNP GS ENGINEERING/SOUTH KOREA Powergen

June 2010 South Korea Daesan NCC Plant Revamping Project Samsung Total TOYO KOREA Petrochemical

February 2007 Spain Cartagena Refinery Expansion Repsol TECNICAS REUNIDAS/SPAIN Refining

February 2008 Spain Cartagena Refinery Expansion (O&U portion) Repsol FLUOR/SPAIN Refining

March 2008 Spain Cartagena Delayed Coker Complex Repsol FOSTER WHEELER IBERIA Refining

April 2008 Spain El Musel LNG Terminal Enagas FLUOR/SPAIN Gas/treatment

May 2008 Spain Besos 5 Power Plant Endesa GE ENERGY/F Powergen

August 2008 Spain Soto de Ribera Power Station HC Energia ALSTOM/F-DURO FELGUERA/SPAIN Powergen

September 2008 Spain Compostilla Power Station Expansion Endesa MHI/JAPAN - INITEC/SPAIN Powergen

December 2008 Spain Granadilla & Arinaga LNG Terminals Gascan TECNICAS REUNIDAS/SPAIN Gas/treatment

June 2010 Suriname Paramaribo Refinery Expansion Project Staatsolie SAIPEM/ITALY Refining

March 2008 Syria Jidar Gas Processing Facilities Hayan Petroleum PETROFAC Gas/treatment

April 2008 Syria Ebla Gas Project PetroCanada PETROFAC Gas/treatment

June 2008 Syria Tishreen Power Plant PEEGT BHEL/INDIA Powergen

July 2009 Syria Deir Ali Power Plant PEEGT METKA/GREECE-ANSALDO/I Powergen

October 2008 Syria Arab Gas Pipeline 2nd Phase Syrian Gas Cy STROYTRANSGAZ/RUSSIA Transportation

April 2009 Sweden Nynäshamn LNG Terminal Nynäshamns Gasterminal NCC/SWEDEN Storage

June 2010 Sweden Nynäshamn Sulphur Recovery Unit Nynas TECHNIP KTI Refining

August 2009 Taiwan Lin Yuan Naphtha Cracker 6 CPC CTCI/TAIWAN - CB&I LUMMUS Refining

January 2008 Thailand Map Ta Phut LNG Regasification Plant PTT Lng Co Ltd GS ENGINEERING/SOUTH KOREA Gas/treatment

March 2008 Thailand Map Ta Phut Acrylic Plant Thai MMA CHIYODA/J Petrochemical

March 2008 Thailand Platong 2 Gas Project Chevron J.RAY McDERMOTT/SINGAPORE Production

June 2008 Thailand Map Ta Phut Power Plant Gheco-One (Suez) DOOSAN/KOREA Powergen

June 2008 Thailand Map Ta Phut Phenol Plant PTT Phenol Cy TOYO THAI / THAILAND Petrochemical

18 18 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

302 2011

2010

2011

2010

2011

71 2011

58 2010

33 2011

222 2011

124 2011

43 2011

131 2012

2010

700 2011

220 2012

540 2011

2010

2010

662 2012

2012

1500 2013

585 2010

1400 2012

3900 2012

654 2013

1460 2011

94 2010

872 2011

325 2012

2013

300 2011

7000 2012

July 2008 Thailand Combined-cycle Power plant Glow Energy MARUBENI/JAPAN - BLACK&VEATCH/USA Powergen

September 2008 Thailand Map Ta Phut Epichlorohydrin Plant Solvay TOYO THAI / THAILAND Petrochemical

October 2008 Thailand Greater Bongkot Gas Pjt (CPP) PTT Thailand HYUNDAI HEAVY IND/SOUTH KOREA-GUNANUSA Production

November 2008 Thailand Map Ta Phut Hydrogen Peroxide Plant MTP-HP / Solvay TOYO THAI / THAILAND Petrochemical

December 2008 Thailand Map Ta Phut Propylene Oxide Plant MTP-HPPO Manufacturing FOSTER WHEELER THAILAND Petrochemical

April 2009 Thailand Prachinburi Bio Ethanol Plant tba SUMATEC CORP/MALAYSIA Bio

May 2009 Thailand 3 EPC contracts Various Customers TOYO THAI / THAILAND Petrochemical

July 2009 Thailand Map Ta Phut Storage Tank PTT Tank Terminal ROTARY ENGINEERING Storage

August 2009 Thailand Map Ta Phut Clean Fuels Project PTTAR SK ENG/KOREA Refining

September 2009 Thailand Rayong Power Plant IRPC MARUBENI/JAPAN Powergen

January 2010 Thailand Chachaengsao Ethanol Plant Impress Ethanol Co Ltd KNM GROUP/MALAYSIA Bio

January 2010 Thailand TNP2 Power Plant International Power Ltd JURONG ENGINEERING/SINGAPORE Powergen

January 2009 Trinidad Tobago Angostura Gas Export Platform Project BHP Billion Trinidad J.RAY MCDERMOTT Production

February 2009 Trinidad Tobago La Brea Power Plant Trinidad Generation Unltd MAN FERROSTAAL/GERMANY Powergen

November 2009 Trinidad Tobago Pointe a Pierre ULSD Project Petrotrin SAMSUNG/KOREA Refining

April 2008 Tunisia Ghannouch Power Plant Steg ALSTOM/F Powergen

July 2008 Tunisia La Skhira Sulfuric Acid Plant Tifert TECHNIP/F - PIRECO Petrochemical

April 2008 Turkey Bandirma Power Plant Enerjisa Power Cy MITSUBISHI HEAVY IND/J - A-TEC/AUSTRIA Powergen

October 2009 Turkey Denizli Power Plant RWE & Turcas METKA/GREECE Powergen

November 2009 Turkey Aliaga Ethylene Plant Expansion Petkim SHAW GROUP/USA Petrochemical

November 2009 Turkey Izmit Refinery Upgrading Project Tupras TECNICAS REUNIDAS/SPAIN Refining

February 2008 Turkmenistan Malay-Bagtyyarlik Gas Pipeline TurkmenGaz STROYTRANSGAZ/RUSSIA Transportation

December 2009 Turkmenistan Southern Yoloten Gas Pjt (Gas Processing 1) TurkmenGaz HYUNDAI ENG / LG Int Gas/treatment

December 2009 Turkmenistan Southern Yoloten Gas Pjt (Gas Processing 2) TurkmenGaz PETROFAC Gas/treatment

January 2010 Turkmenistan Mary Fertilizer Complex Turkmenhimiya KAWASAKI PLANT SYSTEMS/JAPAN Petrochemical

February 2007 UK Pembroke Power Plant RWE Npower ALSTOM/F Powergen

May 2008 UK Drax Biomass Processing facility Drax Group ALSTOM/F Powergen

October 2008 UK Portland Gas Project Portland Gas CB&I/UK Storage

September 2009 UK Gaia Biomass Power Plant Gaia Power Tees Valley AKER SOLUTIONS/UK Powergen

March 2010 UK Stublach Storage Above-Ground Works Storengy JACOBS ENGINEERING Gas/treatment

February 2009 Uruguay La Teja Refinery Desulfurisation Project Ancap ASTRA EVANGELISTA/ARGENTINA Refining

August 2006 USA Port Arthur Refinery Expansion Motiva Enterprises BECHTEL-USA / JACOBS ENGINEERING Refining

19 19 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

2000 2011

3800 2012

2012

1000 2011

2012

1300 2011

1900 2012

2000 2012

1100 2011

2200 2011

2016

275 2011

500 2010

9800 2016

1200 2011

2010

2011

400 2011

2010

2012

2011

2011

2010

7600 2018

619 2011

600 2011

2012

2012

100 2011

250 2013

400 2012

280 2012

October 2006 USA Prairie State Energy Power Plant Peabody Energy BECHTEL/USA Powergen

October 2006 USA Whiting Refinery Upgrade BP FLUOR/USA Refining

April 2007 USA Whiting SRU & Hydrotreater Project BP JACOBS ENGINEERING Refining

April 2007 USA Little Gipsy Re-Power Project Entergy SHAW/USA Powergen

April 2007 USA Southwest Virginia Power Plant Dominion SHAW/USA Powergen

May 2007 USA John W.Turk Electric Generating Plant Swepco SHAW GROUP/USA-BABCOCK&WILCOX Powergen

January 2008 USA Detroit Refinery Expansion Marathon Oil FLUOR/USA Refining

January 2008 USA Edwardsport Power Station Duke Energy BECHTEL/USA - GE/USA Powergen

February 2008 USA Pascagoula LNG Terminal Gulf LNG Energy AKER KVAERNER/USA - IHI/USA Gas/treatment

March 2008 USA Port Arthur Refinery Expansion Total FLUOR/USA Refining

April 2008 USA Vogtle Nuclear Plant Georgia Power Cy SHAW GROUP/WESTINGHOUSE Powergen

May 2008 USA Construction of a gas-fired power plant Duke Energy Carolinas SHAW/USA Powergen

May 2008 USA Cooper River Fiber Plant Dupont BE&K ENGINEERING/AKER SOLUTIONS Chemical

May 2008 USA VC Summer Nuclear Units SCE&G/Santee Cooper SHAW GROUP/WESTINGHOUSE Powergen

August 2008 USA St Charles & Port Arthur Hydrocrackers Valero Energy FLUOR/USA Refining

August 2008 USA Port Arthur Expansion Project (2 units) Valero Energy TECHNIP/USA Refining

August 2008 USA Whiting Refinery Delayed Coker BP FOSTER WHEELER/USA Refining

October 2008 USA Nevada Gas-Fired Power Plant NV Energy SHAW/USA Powergen

October 2008 USA Corpus Christi Diesel Desulfurization Unit Flint Hills Resources JACOBS ENGINEERING Refining

October 2008 USA Jordan Cove LNG Project Jordan Cove Energy KIEWIT-BLACK&VEATCH-ENTREPOSE/F-VINCI/F Gas/treatment

November 2008 USA Jack County Generating Unit 2 Brazos Electric Power FLUOR/USA Powergen

December 2008 USA Wood River Coker Refinery Expansion Pjt WRB Refining Co FLUOR/USA Refining

January 2009 USA Bayton & Baton Rouge Diesel Projects ExxonMobil JACOBS ENGINEERING Refining

January 2009 USA Levy County Nuclear Plant Progress Energy Florida SHAW GROUP/WESTINGHOUSE Powergen

April 2009 USA Bear Garden Power Station Dominion Virginia Power FLUOR/USA Powergen

April 2009 USA Richmond County Power Plant Progress Energy Florida BE&K CONSTRUCTION CY Powergen

April 2009 USA Detroit Refinery (Hydrogen Plant) Marathon Oil TECHNIP/USA / AIR PRODUCTS Refining

October 2009 USA Luling Hydrogen Plant Monsanto TECHNIP/USA / AIR PRODUCTS Gas/treatment

October 2009 USA Temple LNG Expansion UGI LNG Inc CB&I/USA Storage

January 2010 USA Flambeau River Biofuels Project Flambeau River Biofuels AMEC/USA - MIRON CONSTRUCTION Bio

March 2010 USA Toledo Reformer 3 Project BP-Husky KBR/USA Refining

May 2010 USA Elk Hills Gas Processing Plant Occidental of Elf Hills CB&I/USA Gas/treatment

20 20 / 73

COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR

MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010

DATE OF AWARD

COMPLETION DATE

2015

1400 2015

505 2012

2011

980 2011

1500 2013

2000 2012

900 2012

2011

1650 2012

250 2011

429 2012

1300 2013

1000 2011

700 2011

1400 2014

990 2014

June 2010 USA Sabine Pass LNG Terminal Expansion Cheniere Energy BECHTEL/USA Gas/treatment

June 2010 USA Coleto Creek 2 Power Project International Power/STEC ZACHRY INDUSTRIAL INC Powergen

November 2009 Uzbekistan Navoi Thermal Power Plant Uzbekenergo INITEC ENERGIA - MHI/JAPAN Powergen

January 2008 Venezuela El Tablazo Low Density Polyethylene Plant Polinter TECNIMONT/ITALY Petrochemical

October 2008 Venezuela Tamare & Bachaquero Power Plants Enelven MAN FERROSTAAL/GERMANY Powergen

June 2009 Venezuela Termocentro Combined Cycle Power Plant Electricidad de Caracas DURO FELGUERA/SPAIN Powergen

July 2009 Venezuela Cumana Power Plant (Antonio Jose de Sucre) PDVSA IBERDROLA INGENIERA/SPAIN Powergen

May 2008 Vietnam Ca Mau Fertilizer Plant Petrovietnam Wuhuan Engineering / CNMIEC-CHINA Petrochemical

January 2009 Vietnam Vung Tae CO2 Recovery Unit Petrovietnam SAMSUNG/KOREA Petrochemical

April 2009 Vietnam Vung Ang 1 & Nhon Trach 2 Power Plants Petrovietnam LILAMA GROUP Powergen

May 2009 Vietnam Hai Phong Polyester Plant Petrovietnam-Vinatex HYUNDAI ENG Petrochemical

July 2009 Vietnam Mao Khe Power Plant Vinacomin KAIDI ELECTRIC POWER/CHINA Powergen

October 2009 Vietnam Vinh Tan Thermal Power Plant Electricity of Vietnam SHANGHAI ELECTRIC GROUP/CHINA Powergen

October 2009 Vietnam Chim Sao FPSO Premier Oil EMAS OFFSHORE/SINGAPORE - SAIPEM - KEPPEL Production

November 2009 Vietnam Te Giac Trang FPSO Hoang Long JO BUMI ARMADA/MALAYSIA-KEPPEL SHIPYARD Production

March 2010 Vietnam Duyen Hai Thermo Power Plant Electricity of Vietnam DONG FANG ELECTRIC CORP CHINA Powergen

June 2010 Vietnam Nghi Son Power Plant Electricity of Vietnam MARUBENI/JAPAN Powergen

21 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / Situation

March 2009 CLOUGH AUSTRALIA AUSTRALIA APACHE/SANTOS

September 2009 CLOUGH AUSTRALIA AUSTRALIA CHEVRON/EXXONMOBIL/SHELL

December 2009 CLOUGH AUSTRALIA PAPUA NEW GUINEA EXXONMOBIL

May 2010 FLUOR AUSTRALIA AUSTRALIA SANTOS / PETRONAS

September 2009 KBR AUSTRALIA AUSTRALIA CHEVRON/EXXONMOBIL/SHELL

March 2008 LEIGHTON AUSTRALIA INDIA ONGC

February 2010 CHENGDA ENG CHINA BANGLADESH GOVERNMENT

March 2009 CHINA TCC CHINA IRAN ASSALUYEH AMMONIA PLANT STAR ARIA AMMONIA CHEMICAL CY

September 2009 CHINA AUSTRALIA APACHE/SANTOS

January 2008 CNCEC CHINA PAKISTAN PARCO

February 2008 CNEEC CHINA MALAYSIA TENAGA NASIONAL Bhd

April 2008 CNEEC CHINA INDONESIA PT PLN

November 2008 CNEEC CHINA BOTSWANA MORUPULE B POWER PLANT BOTSWANA POWER CORPORATION

March 2009 CNEEC CHINA PHILIPPINES GN POWER

April 2010 CNEEC CHINA AUSTRALIA HRL CORPORATION Scope : coal-fired 550mw

Contractor's nationality

REINDEER GAS PROJECT(Devil Creek gas plant)

three months after the cancellation of the contract, CLOUGH has been re-awarded the onshore portion of the project, on a smaller basis. Clough will supply the engineering, design works, procurement of materials and equipment, fabrication ans assembly of all modules for the facilityIn september 2009 J.HOLLAND, part of Leighton Group, informed that they won a USD 138M contract for construction work

GORGON LNG PLANTUSD 2,3 BILLION

Scope : the plant will include three 5 Million t/y LNG trains and a 300 tonnes joules/day domestic gas plant. The contract has been awarded to KJVG consortium including KBR, JGC, CLOUGH and HATCHChevron and its partners have taken the final investment decision mid september. The plant will be built in modular mode.

PNG LNG PROJECT(Hides Gas Plant)

Scope : Hides Gas Conditioning Plant including nearby wellheads and associated piping and infrastructure.Contract won in association with CBI (as leader with 65%)

GLADSTONE LNG PROJECT(upstream portion)

the upstream scope comprises all coal seam gas and associated water gathering and processing infrastructure for the Fairview and Roma fieldsFLUOR AUSTRALIA selected as preferred Upstream Contractor. EPC contract to be signed once a final investment decision is done. In the interim Fluor will start early works activities

GORGON LNG PLANTUSD 2,3 BILLION

Scope : the plant will include three 5 Million t/y LNG trains and a 300 tonnes joules/day domestic gas plant. The contract has been awarded to KJVG consortium including KBR, JGC, CLOUGH and HATCHChevron and its partners have taken the final investment decision mid september. The plant will be built in modular mode.

MUMBAI HIGH FIELD (PRP-2 PROJECT) - USD 720 M

The project, PRP - 2 (Pipeline Replacement Project - 2), involves engineering, procurement and installation of over 200 kilometres of fixed and flexible pipelines of various diameterscontract value for Leighton : USD 720M

CHANDPUR POWER PLANTUSD 146 M

Scope : 150mw combined-cyclethe government has signed the contract with Chengda Eng early february - turnkey contract

Scope : capacity of 720t/d on Haldor Topsoe technologyEPC contract awarded to CHINA TIANCHEN CHEMICAL ENGINEERING CORPORATION (CHINA-TCC) with the local MEHVAR SAZAN

CHIWAN SEMBAWANG ENGINEERING

REINDEER GAS PROJECT(wellhead platform)

The chinese company has won the contract to build the 2000t wellhead platform

MAHMOOD KOT REFINERY DIESEL HDS UNIT - USD 132 M

Scope : a 26,000b/d diesel hydrodesulfurization unit.PARCO has signed an agreement with a consortium including the chinese CNCEC and the korean HYUNDAI ENGINEERING - Work will start in March

SALAM COAL-FIRED POWER PLANTUSD 344 M

Scope : a 300mw plantThe chinese CHINA NATIONAL ELECTRIC EQUIPMENT CORPORATION (CNEEC) has been awarded the contract. 35% of the contract value will be given out to local companies

2 POWER PLANTS IN EAST JAVA AND ACEH - USD 889 M

PT PLN has awarded the contract to build the Tanjung Awar-Awar Power plant in East Java to CNEEC with PT PENTA ADI SAMUDRA. Contract value USD 642M - Capacity 700mwThe contract to build the Nagan Raya Plant has gone to the chinese SINOHYDRO - Capacity 220mw - Contract value USD 247,4M

Scope : coal-fired power plant 4x150mwconstruction contract signed with CNEEC with SBW - Work to start in february 2009

MARIVELES POWER PLANTUSD 580M

Scope : 600mw (2x300mw)EPC contract for CNEEC

MORWELL POWER PLANTUSD 750M

22 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

November 2009 CNOOC CHINA CHINA CNOOC

December 2008 CNTIC CHINA INDONESIA PT PLN

April 2010 COOEC CHINA AUSTRALIA CHEVRON/EXXONMOBIL/SHELL

November 2008 CPI POWER ENG CHINA SAUDI ARABIA MMC / BINLADEN / CHALCO

March 2010 CHINA VIETNAM ELECTRICITY OF VIETNAM

May 2010 CHINA BOSNIA EFT GROUP

July 2009 KAIDI ELECTRIC CHINA VIETNAM VINACOMIN

April 2010 SEPCO CHINA INDIA VEDANTA RESOURCES

July 2009 SEPCO III CHINA SAUDI ARABIA KEPCO/ACWA POWER INT

November 2009 SEPCO III CHINA OMAN SEMCORP UTILITIES

November 2008 CHINA BOTSWANA MMAMABULA ENERGY PROJECT CIC ENERGY

October 2009 CHINA VIETNAM ELECTRICITY OF VIETNAM

February 2010 CHINA BANGLADESH GOVERNMENT

October 2009 CHINA KAZAKHSTAN KAZMUNAIGAZ

January 2010 CHINA SAUDI ARABIA SAUDI ARAMCO

March 2010 CHINA KAZAKHSTAN KPI

ZHEJIANG NINGBO LNG TERMINALUSD 1 BILLION

Scope : capacity 3 million t/y in a first phase to be completed in 2012CNOOC will take care of the procurement & construction, CHENGDA in charge of detailed design. In consortium with TGE GAS ENGINEERING GmbH.An EPC contract will be awarded for the storage tanks

ADIPALA POWER PLANTUSD 605 M

The coal-fired power plant will have a capacity of 660mwcntic = China National Technical Import & Export Corporation

GORGON LNG PLANT (second-tier modules) - USD 180M

Scope : 157 modules. The contract includes project management, shop design, materials procurement, construction...

JAZAN POWER PLANTUSD 2,5 BILLION

Scope : 2400mwthe power plant will supply power to the aluminium smelter planned by MMC CORPORATION / SAUDI BINLADEN / CHALCOWork to start in 2009

DONG FANG ELECTRIC CORP

DUYEN HAI THERMO POWER PLANTUSD 1,4 B

Scope : 1245mw EPC contract signed with DONG FANG ELECTRIC CORPORATION

DONG FANG ELECTRIC CORP

STANARI THERMAL ELECTRIC POWER PLANT - USD 616M

Scope : 300mwTurnkey contract for Dongfang Electric, financing at 25% by EFT, balance by a consortium of chinese and european banks

MAO KHE POWER PLANTUSD 429M

Scope : 2x440mwEPC contract for Kaidi Electric, work to start immediately, commissioning in 42 months

JHARSUGUDA COAL FIRED POWER PLANT - USD 1,5 B

Scope : 1980mw (3x660mw)SHANGHAI ELECTRIC POWER CONSTRUCTION CORPORATION (SEPCO) has won the contract

RABIGH INDEPENDENT POWER PROJECT - USD 2,5 BILLION

Scope : 1200mw (oil-fired)The South Korean KEPCO with ACWA POWER INT has been selected by SEC to carry out the project. Their named EPC contractors are SHANDONG ELECTRIC POWER CONSTRUCTION CORPORATION (SEPCO III) and DONGFANG ELECTRICContract signed in July 2009, postponed due to difficulties in securing financing, commissioning expected in 2013 instead of 2012

SALALAH POWER & WATER INDEPENDENT PROJECT - USD 1B

Scope : 400mw power - 15 million g/d desalinationIn November 09, Sembcorp has been awarded the BOO contract, its nominated EPC contractor is Shandong Electric Power Cy (Sepco3)Sepco3 has awarded the contract for the desalination package to Hyflux/Singapore in November 09

SHANGHAI ELECTRIC GROUP

Scope : 1320mw - SHANGHAI ELECTRIC GROUP selected as epc contractor. Work to start mid-2009 - PARSONS BRINCKERHOFF/USA is the engineer

SHANGHAI ELECTRIC GROUP

VINH TAN THERMAL POWER PLANTUSD 1,3 B

Scope : 1224mwEPC contract for Shanghai Electric

SHANGHAI ELECTRIC GROUP

SYLHET POWER PLANTUSD 105M

Scope : single cycle power plantturnkey contract

SINOPEC ENGINEERING

ATYRAY AROMATICS COMPLEXUSD 1,04 B

Scope : 133,000t/y of benzene - 496,000t/y of paraxylene on Axens technology. The work will also cover a catalytic reforming unitturnkey contract for Sinopec

SINOPEC ENGINEERING

WASEA BULK PLANTUSD 141 M

scope : construction of oil tanks, pumps, substations + civil & structural works.SINOPEC has won the contract with a very low offer

SINOPEC ENGINEERING

ATYRAU POLYPROPYLENE PLANTUSD 1,6 B

KPI owned by Kazmunaigas and SAT & Cy. The project is part of a petrochemical complex initially planned with Lyondellbasell. As Lyondellbasell dropped from the project, KPI decided to go alone in a first phase and has signed a contract with SINOPEC ENGINEERING for a 450,000t/y polypropylene plant. Financing to come from Eximbank of China

23 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

June 2009 TECHNIP CHINA CHINA YINCHUAN LNG PLANT NINGXIA HANAS NATURAL GAS CY

May 2008 WUHUAN ENG CHINA VIETNAM PETROVIETNAM

January 2008 BHEL INDIA INDIA TAMIL NADU ELECTRICITY BOARD

February 2008 BHEL INDIA INDIA UPRVUNL

February 2008 BHEL INDIA INDIA GSEG - GSPC

June 2008 BHEL INDIA INDIA

June 2008 BHEL INDIA SYRIA PEEGT

June 2008 BHEL INDIA INDIA ONGC TRIPURA POWER CY

June 2008 BHEL INDIA INDIA DAMODAR VALLEY CORPORATION

August 2008 BHEL INDIA INDIA GVK POWER LTD

September 2008 BHEL INDIA INDIA

November 2008 BHEL INDIA INDIA APGenco

December 2008 BHEL INDIA INDIA JAIPRAKASH POWER VENTURES

December 2008 BHEL INDIA INDIA NTPC

Scope : capacity of 400,000t/y, Air Products liquefaction processcontract to be executed by Technip in Kuala Lumpue and Shanghaithe contract covers engineering, supply of main equipment, procurement and construction management services for facilities (natural gas pre-treatment, liquefaction, LNG storage and loading, offsites, buildings & other infrastructures)

CA MAU FERTILIZER PLANTUSD 900 M

The plant will produce 800,000t/y of fertilizersPetrovietnam has awarded the EPC contract to the chinese companies WUHUAN ENGINEERING and CHINA NATIONAL MACHINERY IMPORT & EXPORT CORPORATION

NORTH CHENNAI POWER PLANTUSD 1128 M

Scope : 600mwcontract won againt international biddingIn July 2008 BHEL has signed a second contract to set up a 600mw unit, contract value USD 503M

ANPARA D POWER PLANTUSD 841 M

Scope : 1000mw BHEL's scope includes design, engineering, manufacture, suply, erection & commissioning of boiler turbine generator package with associated auxiliaries and balance of the plant

CONSTRUCTION OF TWO POWER PLANTS IN GUJARAT - USD 743 M

1) a USD 270m contract with Gujarat Sate Energy Generation Cy to set up a combined-cycle power plant at Hazira on an epc basis - capacity 350mw2) a USD 473M contract with GSPC Piparav Power Company to build a combined-cycle power plant near Pipavav - capacity 700mw

DELHI POWER PLANTUSD 835 M

PRAGATI POWER CORPORATIONPPCL

Scope : 1371mwBHEL's contract includes design, engineering, manufacture, supply, erection of gas & steam turbines, generators, associated auxiliaries and balance of the plant equipment

TISHREEN POWER PLANTUSD 400 M

Scope : 400mwBHEL's contract includes design, engineering, manufacture, supply, erection of the main plant equipment with associated auxiliaries and balance of the plant

PALLATANA POWER PLANT IN TRIPURAUSD 514 M

Scope : 740mwBHEL has won the contract with GE against ALSTOMcommissioning between 42 and 45 months turnkey contract

BOKARO POWER PLANTUSD 428 M

Scope : 500mw BHEL's contract cover design, engineering, manufacture, supply, erection of steam turbines, generators, boilers, associated auxiliaires and balance of the plant

GOINDWAL SAHIB POWER PLANTUSD 262 M

Scope : 2x270mwBHEL's contract covers design, engineering, manufacture, supply, erection and commissioning of steam turbines, generators, boilers and auxiliaries

CHHABRA THERMAL POWER STATION EXPANSION - USD 209M

RRVUNL(Rajasthan Rajia Vidyut Utpadan

Nigam Ltd)

Scope : units 3 & 4 : 2x250mw unitsBHEL supplied the first two units

KAKATIYA THERMAL POWER GENERATING UNIT - USD 267M

Scope : 600mwBHEL's scope includes design, engineering, manufacture, supply, erection & commissioning of steam turbines, generators, boilers, associated auxiliaries? Control & instrumentation

BINA POWER PLANTUSD 245M

2X250MWThe thermal plant will be located at Bina in Madhya Pradesh - BHEL’s scope covers design, engineering, manufacture, supply, erection, testing and commissioning of Boilers, Steam Turbines, Turbo-Generators and associated auxiliaries along with state-of-the-art Controls and Instrumentation system including Generator and Station transformers

MAUDA SUPER THERMAL POWER PROJECT USD 435 M

1000mwBHEL's scope covers design, engineering, manufacture, supply & erection of steam generators & turbine generators along with associated auxiliaries & instrumentation

24 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

February 2009 BHEL INDIA INDIA MPPGC

May 2009 BHEL INDIA INDIA KORBA WEST POWER CY Ltd

May 2009 BHEL INDIA INDIA IDEAL ENERGY PROJECTS Ltd

June 2009 BHEL INDIA INDIA HINDALCO INDUSTRIES

July 2009 BHEL INDIA INDIA

August 2009 BHEL INDIA INDIA JINDAL INDIA THERMAL POWER

October 2009 BHEL INDIA INDIA JINDAL INDIA THERMAL POWER

November 2009 BHEL INDIA INDIA

March 2010 BHEL INDIA INDIA

March 2010 BHEL INDIA INDIA INDIAN OIL CORPORATION

April 2010 BHEL INDIA INDIA RAICHUR POWER CORPORATION

July 2008 BGR ENERGY INDIA INDIA TAMIL NADU ELECTRICITY BOARD

July 2008 BGR ENERGY INDIA INDIA

July 2009 BGR ENERGY INDIA INDIA MAHAGENCO

MALWA THERMAL POWER PROJECTUSD 968 M

Scope : 2x600mwBHEL's contract (USD 618M)includes design, engineering, manufacture, supply, erection & commissioning of steam turbines, generators, boilers and associated auxiliariesIn november 2009 LARSEN & TOUBRO won the turnkey contract (USD 350M) for the design, engineering, manufacture, supply, erection & commissioning of balance of plant systems

AVANTHA BHANDAR THERMAL POWER PROJECT - USD 316M

Scope : 600mwBHEL's contract includes design, engineering, manufacture, supply, erection and commissioning of Boiler, Steam Turbine, Generator along with associated auxiliariesthe plant will be located in Chhatisgarh

BELA THERMAL POWER PROJECTUSD 150 M

Scope : 270mwBHEL's contract includes design, engineering, manufacture, supply, erection and commissioning of Boiler, Steam Turbine, Generator along with associated auxiliariesThe plant will be located at Bela in Nagpur District/Maharashtra

ADITYA POWER PLANT The plant will be built at Hindalco's aluminium sitethe captive power plant will have a capacity of 900mw (6x150mw)BHEL will supply generators, turbines, boilers and set up the core plant

JHARKLAND POWER PLANTUSD 269M

APNRL(Adhunik Power & Natural Resources

Ltd)

Scope : 270mwBHEL's scope covers design, engineering, manufacture, supply, erection & commissioning of Steam Turbine, Generator and Boiler along with associated auxiliariesIn december 2009 BHEL secured a repeat order from APNRL for a second unit with the same capacity (270mw)

DERANG THERMAL POWER PJTUSD 545 M

Scope : 2x600mwBHEL's contract covers design, engineering, manufacture, supply, erection & commissioning of steam turbines, generators, boilers along with associated auxiliaries

JINDAL SUPER THERMAL POWER PLANT EXPANSION - USD 1,07 B

Scope : expansion by 2400mw (4x600mw)The contract covers design, engineering, manufacture, supply, erection of boilers, steam turbines turbo-generators and associated auxiliaries

PRAYAGRAJ THERMAL POWER PROJECT - USD 1,2 B

PRAYAGRAJ POWER GENERATION CY

Scope : 3x660mwBHEL's contract covers design, engineering, manufacture, supply, erection & commissioning of steam turbines, generators and boilers, along with associated auxiliaries

NASIK & AMRAVATI COAL-FIRED POWER PLANTS - USD 1,3 B

ELENA POWER & INFRASTRUCTURES Ltd

Each site involves 5 units of 270mwBHEL's scope : design, engineering, manufacture, supply, erection & commissioning of steam turbines, generators & boilers with associated auxiliaries

PARADIP CAPTIVE POWER PLANTUSD 735M

Scope : 376mw for the upcoming refineryBHEL's contract covers design, engineering, manufacture, supply, erection of the plant with associated balance of the plant

SUPERCRITICAL THERMAL POWER PROJECT - USD 1,4 B

Scope : 2 coal-fired thermal units of 800mw in RaichurRPCL is a JV between BHEL and Karnataka Power Corp - BHEL's scope : engineering, manufacture, supply, erection & commissioning

METTUR POWER PLANT EXPANSIONUSD 550 M

Scope : expansion by 600mwBGR ENERGY has won the contract against BHEL, the contract covers the design, engineering, supply of boiler, steam turbine generator and complete balance of plant equipment

KALISINDH THERMAL POWER PROJECT - USD 1,1 BILLION

RRVUNL(Rajasthan Rajia Vidyut Utpadan

Nigam Ltd)

Scope : 2x600mw The contract covers design, engineering, supply of boiler, steam turbine generator and complete Balance of Plant equipments

CHANDRAPUR SUPER THERMAL POWER STATION EXPANSION

Scope : expansion 2x500mwBGR ENERGY will provide engineering, procurement & construction of Balance of Plant, work duration 33 months

25 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

July 2009 BGR ENERGY INDIA IRAQ SCOP

August 2009 BGR ENERGY INDIA INDIA CHHATTISGARH STATE POWER CY

August 2009 EIL INDIA INDIA MRPC

May 2010 EIL INDIA INDIA GSPC Part of the Deen Dayal Project

May 2010 ESSAR OFFSHORE INDIA INDIA ONGC

January 2009 JACOBS ENGINEERIN INDIA INDIA MRPC

May 2010 JACOBS ENGINEERIN INDIA INDIA CHENNAI PETROLEUM

January 2010 LANCO INFRATECH INDIA INDIA LANCO MAHANADI POWER Scope : 2x660mw

March 2008 LARSEN&TOUBRO INDIA INDIA HINDUSTAN PETROLEUM

September 2008 LARSEN&TOUBRO INDIA BRAZIL PETROBRAS

November 2008 LARSEN&TOUBRO INDIA INDIA HPCL-MITTAL

April 2009 LARSEN&TOUBRO INDIA INDIA MRPC

August 2009 LARSEN&TOUBRO INDIA INDIA ONGC

August 2009 LARSEN&TOUBRO INDIA INDIA JAYPEE GROUP

September 2009 LARSEN&TOUBRO INDIA INDIA GMR ENERGY

AKAS & AL MANSURIA FIELDS DEVLPT - USD 80M

the contract includes engineering, procurement and supply of key utilities : gas and fire detection systems, gas generators, water systems….Both gas projects will have a combined capacity to produce 110 million cf/d

MARWA THERMAL POWER PROJECTUSD 334M

Scope : 2x500mwBGR ENERGY has been awarded the balance of plant contract, contract won against Larsen & Toubro and TATA Projects

MANGALORE POLYPROPYLENE PLANT - USD 312 M

Scope : a 440,000t/y polypropylene unitEIL has won the contract against TOYO, UHDE, JACOBS and TECHNIP.

MALLAVARAM ONSHORE GAS TERMINAL - USD 315 M

D-1 FIELD DEVLPT (platforms, pipelines)USD 235M

Scope : three unmanned wellhead platforms along with associated pipelines, subsea maniflds and modification at the D-1 wellhead platformcontract won in association with IRANIAN OFFSHORE ENGINEERING & CONSTRUCTION

MANGALORE REFINERY EXPANSION PHASE 3 (CDU/VDU Units)

part of the Upgradation & Expansion Phase III Project.JACOBS ENGINEERING INDIA has been awarded the enginering, procurement & construction management contract for the crude distillation and the vacuum distillation units.EIL is the consultantContract confirmed by JACOBS in March 09, work will also covera a LPG treatment unit and ATF merox unit.

MANALI RESID UPGRADATION PJTUSD 650M

Jacobs will provide project management consultancy and engineering, procurement & construction management services. Scope of work includes process packages for the utility & offsite facilities, a detailed feasibility report, PMC services for execution of a coker block and sulfur block and EPCM services for the balance of the project. The Resid Upgradtion Project involves a delayed coker, revamping of the hydrcracker, a sulfur recovery unit + utilities

MAHARASHTRA COAL-FIRED POWER PLANT - USD 1,2B

MUMBAI LUBRICATING OIL BASE STOCK PLANT

Scope : capacity 200,000t/y - Part of the Quality Upgrading ProjectL&T's scope include design, detailed engineering, procurement, supply, transportation, fabrication, construction and installationJACOBS ENGINEERING will provide project management services, ExxonMobil the technology

SUPPLY OF EQUIPMENT FOR THE NORTH EAST REFINERY - USD 160M

L&T has won the contract to manufacture and supply ten hydrotreating reactors and twelve coke drums for the planned refinery

HYDROGEN UNITS AT BHATINDA REFINERY - USD 143 M

Scope : 2 hydrogen Generation Units (capacity 44,000t/y) based on Haldor Topsoe Technology L&T's contract covers detailed enginering, procurement, supply, transportation, fabrication, construction, mechanical completion

MANGALORE REFINERY EXPANSION PHASE 3 (HGU/DHT units)USD 265 M

L&T's contract covers a diesel hydrotreating unit capa 3,7 MMt/y (Axens Technology) and a hydrogen Generation unit capa 70,000t/y (Haldor Topsoe technology) - L&T in charge of the design, engineering, procurement, supply, construction, installation & commissioning

MUMBAI HIGH NORTH PROCESS PLATFORM - USD 1,18 B

L&T will be responsible for survey, engineering, procurement, fabrication, installation and commissioning for major process, living quarters and twin flare platforms, all connected by bridges, in addition to the three compression modules. Over 80,000 tonnes of structures, process facilities and utilities will be erected in the high seas.

NIGRIE SUPERCRITICAL THERMAL POWER PROJECT - USD 828M

Scope : 1320mw contract won in association with Mitsubishi Heavy Industries India, the project represents an investment of USD 1,65 Billion

VEMAGIRI POWER PLANTUSD 415 M

Gas-fired power plant 2x384mwL&T’s scope includes the design, detailed engineering supply, instalaltion & commissioning of the plant on a turnkey basis.L&T SARGENT & LUNDY will carry out the plant integration & detailed engineering

26 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

November 2009 LARSEN&TOUBRO INDIA INDIA MAHAGENCO

December 2009 LARSEN&TOUBRO INDIA INDIA

January 2010 LARSEN&TOUBRO INDIA INDIA NATIONAL FERTILIZERS Ltd

February 2010 LARSEN&TOUBRO INDIA INDIA KARNATAKA POWER CORP

March 2010 LARSEN&TOUBRO INDIA INDIA

March 2010 LARSEN&TOUBRO INDIA INDIA INDIAN OIL CORPORATION

March 2010 LARSEN&TOUBRO INDIA INDIA ONGC

June 2010 LARSEN&TOUBRO INDIA INDIA ONGC

April 2010 LARSEN&TOUBRO INDIA INDIA

March 2008 PUNJLLOYD INDIA MALAYSIA PETRONAS CARIGALI

June 2008 PUNJLLOYD INDIA INDIA INDIAN OIL CORPORATION

September 2008 PUNJLLOYD INDIA QATAR QATAR PETROLEUM

September 2009 PUNJLLOYD INDIA INDIA MRPC

March 2010 PUNJLLOYD INDIA INDIA DHARIWAL INFRASTRUCTURE

KORADI POWER STATIONUSD 1,49 B

Scope 1980mwL&T's scope includes design, engineering, manufacture, supply, erection & commissioning of super-critical boilers, steam turbine generators & associated auxiliaries besides balance of plant equipment

BHARUCH AMMONIA PLANTUSD 212 M

GNFC(Gujarat Narmada Valley Fertilizers)

Scope : an ammonia unit capacity 1120t/d based on Haldor Topsoe technologycontract to be executed on a lump sum turnkey basis by L&T's Engineering & Construction Division

PANIPAT & BATHINDA AMMONIA CONVERSION PJT - USD 464M

the projects involve changeover of the feestock of the 900t/d ammonia plants from fuel oil to natural gas. L&T's turnkey contract include basic engineering, detailed engineering, procurement, construction, interconnection with existing facilities - Gas synthesis technology supplied by Haldor Topsoe

GODHNA THERMAL POWER PLANTUSD 2,1 B

Scope : 1600mw (2x800)L&T has signed a JV with Karnataka Power. Work to start by the end of 2010

MANGALORE AROMATICS COMPLEXUSD 446M

ONGC MANGALORE PETROCHEMICALS

Scope : the complex will produce paraxylene & benzene as well as other products like hydrogen, heavy aromatics and LPGUOP will supply the technology for the paraxylene & benzene unitsepc contract

PARADIP FCC REACTOR REGENERATOR PROJECT USD 312 M

Scope : 4,17 Million t/y Fluidized Catalytic Cracker Reactor Regeneration using Indmax technology for converting heavy distillate and residue into LPG/light distillate productL&T's scope : residual and detailed engineering, procurement, supply, manufacture, fabrication, construction & commissioning on a lumpsum turnkey basis

MUMBAI HIGH NORTH PHASE IIUSD 224 M

Scope : construction of four wellhead platforms, each with 12 slots with remote well testing and monitoring facilities from the NQ complex at Mumbai High Northengineering work to be carried out by L&T Valded in Bangalore, Chennai and Faridabad

HAZIRA ADDITIONAL GAS PROCESSING FACILITIES - USD 66M

Scope : a 6,3 million cm/ gas sweetening unit, a gas dehydration unit with the same capacity, a cooling water system, associated utilities

DEEN DAYAL WELHEAD PLATFORMUSD 235M

GUJARAT STATE PETROLEUM CORP

contract won against Afconsengineering, procurement, fabrication and installation of the wellhead platform.

SABAH-SARAWAK GAS PIPELINEUSD 500 M

Scope : 512km diam 36" pipeline + metering stations & compressor stationsThe contract has been awarded to a consortium led by PUNJLLOYD and including DIALOG E&C Sdb Bhd

BARAUNI MSQ UPGRADATION PROJECT - USD 152M

Scope : a 274,000t/y reformer splitter - a 183,000t/y naphta hydrotreating unit a 126,000t/y isomerisation unit, a 403,000t/y Prime G+ unit & offsites/utilitiesContract value for PunjLLoyd : USD 152M - Axens will supply technology for the process units, work to be complete in 23 months

STRATEGIC GAS TRANSMISSION PROJECT - USD 800 M

Scope : laying of 211km of pipelines with associated stations and infrastructure. The 363 pipeline will transport 2 Billion cf/d of sweet lean gas from Ras Laffan to different consumers

MANGALORE COKE DRUM PACKAGEUSD 113M

Punj Lloyd will provide engineering, procurement & construction of the coke drum structure package of the delayed coker unit for the Phase 3 project. CB&I LUMMUS provided the basic engineering process design of the 3 million t/y delayed coker unit

TADALI POWER PLANTUSD 223M

Dhariwal Infrastructure is part of RPG GroupPunj Lloyd's contract cover engineering procurement & construction of complete balance of plant systems for the 2x300mw plant

27 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

April 2010 PUNJLLOYD INDIA INDIA NAGARJUNA OIL CORP

November 2007 RELIANCE ENERGY INDIA INDIA COASTAL ANDHRA POWER

June 2008 RELIANCE INFRA INDIA INDIA RELIANCE ENERGY

January 2009 RELIANCE POWER INDIA INDIA GOVERNMENT

May 2010 SAMSUNG ENG INDIA INDIA NAGARJUNA OIL CORP

February 2009 TATA PROJECTS INDIA INDIA

August 2009 TECNIMONT INDIA INDIA MRPC

March 2010 TECNIMONT INDIA INDIA NATIONAL FERTILIZERS Ltd

October 2009 TECHNIP INDIA INDIA HINDUSTAN PETROLEUM

September 2009 THERMAX INDIA INDIA MEENAKSHI ENERGY

November 2008 TOYO INDIA INDIA HPCL-MITTAL

June 2009 TOYO INDIA INDIA MANGALORE REFINERY (EPCM-4) INDIAN OIL CORPORATION

September 2009 TOYO INDIA INDIA MRPC

October 2009 TOYO INDIA INDIA HINDUSTAN PETROLEUM

CUDDALORE REFINERY (Insiide Battery Limit)

Relocation of a german refinery (Mobil Woerth) in Cuddalore. capacity 6 Million t/yPUNJLLOYD 's contract covers the installation of inside Battery Limit and interconnection pipe rack : setting up of crude & vacuum distillation units, gasoline and saturated gas plant and catalytic hydro-desulfurization & isomerization units : construction-related procurement, civil works, structural works, mechanical equipment erection. Long delayed project, ABB LUMMUS was awarded the basic enginering, detailed engineering, procurement and construction management Once installed, the refinery will be expanded to 15 Million t/y

KRISHNAPATNAM POWER PLANTUSD 3 BILLION

Scope : 4000mwReliance Power has won the contract against Larsen & Toubro

SASAN ULTRA MEGA POWER PROJECT - USD 2,5 Billion

Scope : 3960mw to be commissioned in different stages within 42 months for the first 660mw, the 5 others with an interval of 3 monthsEPC contract for Reliance Infrastructure

TILAIYA ULTRA MEGA POWER PLANT - USD 3,2 B

Scope : 4,000mwRELIANCE will receive the Letter of Intent early February 09, formal contract to be signed within one month

CUDDALORE REFINERY (DHDS Project)

Scope : the diesel hydro desulfurization unit will have a capacity of 125,000b/dSAMSUNG ENGINEERING INDIA will be in charge of the design, procurement, construction & commissioning - Completion in March 2012

SRI DAMODARAM SANJEEVAIAH THERMAL POWER PROJECTUSD 561 M

APPDCL(Andhra Pradesh Power Devlpt)

Scope : coal-fired power plant 2x800mwTATA PROJECTS has won the EPC contract for the balance of plant, BHEL will supply the boilers and LARSEN & TOUBRO the turbines under separate contracts

MANGALORE REFINERY CHTU PROJECT - USD 80M

Scope : construction of a heavy coker gas oil hydrotreating unit, part of the Phase III Expansion projectlump sum turnkey contract for TICB, commissioning by the end of 2011

NANGAL AMMONIA PLANT CONVERSION PJT - USD 240M

Scope : revamping of the existing plant for feestock changeover from Fuel Oil/Low Sulphur Heavy Stock to re-liquified natural gas. Capacity of the ammonia plant will remain at 950t/d. The project includes also the revamping of utilities & Offsiteslumpsum turnkey contract inclusing technologu liecensign, engineering, procurement, construction & commissioning

VIZAG DIESEL HYDROTREAT PROJECT - USD 150M

Scope : a diesel hydrotreat unit 2,2 Million t/y - A hydrogen generation unit 36,000t/yTechnip has been awarded the lump sum tunrkey contract, confirmation by Technip in April 2010, followed by New Delhi office - TOYO INDIA is the Project Management Consultant

MEENAKSHI POWER PLANTUSD 198 M

capacity 2x135mwturnkey contract for Thermax who will also supply the water treatment & effluent systems

CONSTRUCTION OF SRUs AT BHATINDA REFINERY

Scope : 2 x 300t/d sulphur recovery units based on Prosernat process, TEIL's scope of work includes detailed engineering, construction management and procurement services

Scope : a Propylene Recovery Unit 1,9 Mmt/y and a 4,17 Mmt/y FCC IndmaxTOYO's contract covers project management, detailed engineering, procurement, construction management & supervision.

MANGALORE CDU/VDU N°1 REVAMPING

Scope : revamping of the crude/vacuum distillation units n°1TEIL's scope includes residual process design and detailed engineering, project management, procurement, supply, fabrication & commissioning

MUMBAI DIESEL HYDROTREAT PROJECT - USD 720M

Scope : a 2,2 Million t/y diesel hydrotreat unit, UOP processTEIL's scope of contract includes residual process design, detailed engineering, procurement, supply, storage, fabrication & mechanical completion

28 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

October 2009 TOYO INDIA INDIA MANGALORE DELAYED COKER BOP MRPC

August 2008 UHDE INDIA INDIA INDIAN OIL CORPORATION

September 2008 UHDE INDIA INDIA BHARUCH NITRIC ACID PLANT GNVFC

April 2009 UHDE INDIA INDIA PARADIP REFINERY (EPCM-2) INDIAN OIL CORPORATION

June 2009 UHDE INDIA INDIA VIZAG FORMALDEHYDE PLANT

April 2009 GUNANUSA INDONESIA INDIA ONGC

April 2010 PT NISCONI INDONESIA INDONESIA TOTAL

June 2009 PT REKAYASA INDONESIA INDONESIA PT KALTIM NITRATE INDONESIA

May 2009 SAIPEM INDONESIA INDONESIA PREMIER OIL NATUNA

May 2009 SMOE INDONESIA INDONESIA PREMIER OIL NATUNA

March 2008 CHIYODA JAPAN THAILAND MAP TA PHUT ACRYLIC PLANT

July 2008 CHIYODA JAPAN ALGERIA SONATRACH

July 2009 CHIYODA JAPAN SAUDI ARABIA

December 2009 CHIYODA JAPAN PAPUA NEW GUINEA EXXONMOBIL

February 2010 CHIYODA JAPAN QATAR QATARGAS

November 2007 IHI JAPAN INDIA PETRONET LNG two LNG storage tanks with 155,000 m3 of capacity

TEIL's contract covers the Balance of Plant of Delayed Coker Unit (3 MMT/y-ABB Lummus design) excluding the coke drum structure awarded to Punjlloyd in September 09 - EIL is the Project Management Consultant

GUWAHATI/DIGBOI MS QUALITY UPGRADATION PROJECT

Scope : isomerisation units with naphta hydrotreating units at both refineries + an indmax Gasoline splitter (Lurgi technology) at Guwahati and a naphtha splitter and a reformate splitter at DigboiUHDE INDIA selected as EPCM contractor by IOCL

Scope : 300t/d. UHDE's contract covers provess license, basic & detailed engineering, procurement and supply of equipment, civil works, erection & commissioning. The client is Gujarat Narmada valley Fertilizers

Scope : vacuum oil gas hydrotreater 5,4MMt/y (Axens) - Diesel Hydrotreater 5,2 MMt/y (Shell Global). UHDE INDIA 's scope : PMC, engineering, procurement. Long lead items procurement between May and July 09

KANORIA CHEMICALS & INDUSRIES LTD

Scope : capacity of 300t/d -UHDE INDIA's contract includes detailed engineering, procurement, project management, supervision. Basi engineering performed by Formox of Sweden

MUMBAI HIGH NORTH ICP-R PROCESS PLATFORM - USD 362M

Scope : engineering, procurement, construction & installation of the platform (topsides 7300t - jacket 3600t) and a flare tripod

SOUTH MAHAKAM FIELD(platforms/pipelines) - USD 240M

construction, transport, installation of 3 tripod platforms at Main Stupa, East Mandu and West Stupa fields + 80km of subsea pipelines

BONTANG AMMONIUM NITRATE PLANT - USD 173M

Scope : capacity of 300,000t/yPT REKAYASA has won the USD 173M contract, work to start in summer 2009

GAJAH BARU FIELD DEVELOPMENTUSD 430 M

Scope : a central processing platform (topsides 8200 tons), wellhead platform (topsides 900 t)3km subsea pipeline (16")Contract won in association with SMOE/INDONESIAPT SAIPEM INDONESIA's scope include engineering design, procurement, transportation and installation of the platforms and the subsea pipeline

GAJAH BARU FIELD DEVELOPMENTUSD 430 M

Scope : a central processing platform (topsides 8200 tons), wellhead platform (topsides 900 t)3km subsea pipeline (16")Contract won in association with PT SAIPEM INDONESIASMOE's scope : part procurement, construction engineering, construction, hook-up and commissioning of two platform. Share of the contract USD 156M In August 2009 NISCONI won the EPCI contract to fabricate the deck and jackets or the 2 platforms

THAI MMA(Mitsubishi Rayon/SCG Chemicals)

Scope : capacity 20,000t/yCHIYODA/JAPAN will be in charge of engineering & procurement while CHIYODA/THAILAND will undertake construction works

ARZEW LNG PLANT(GL3Z)USD 4,2 BILLION

Scope : capacity of 4,7 million t/y of LNGSAIPEM/SNAMPROGETTI in joint venture with CHIYODA has been awarded the lump sum turnkey contract

JUBAIL REFINERY(SATORP PJT)PACK-4 - Coker - USD 900M

SAUDI ARAMCOTOTAL

Scope : Coker Unit capacity 100,000b/donshore work will be performed by Chiyoda Petrostar as leader and Samsung Saudi Arabia

PNG LNG PROJECT(LNG Plant) - USD 4,5 B

Scope : capacity 6,6 million t/y (2 trains) including facilities for processing & treating natural gas, liquefaction, storage & loadingcontract won by CHIYODA, as leader, and JGC

PLATEAU MAINTENANCE PROJECT (PMP)USD 1,2 B

The project will enable Qatargas to maintain its current production level of 10 million t/y of LNGScope : a new acid gas removal unit, a new sulphur recovery unit and moridication to utility systems for handling increased feedgas rates to the existing trains.Contract won in association with TECHNIP

KOCHI LNG TERMINAL(storage tanks) - USD 250 M

29 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

December 2007 JGC JAPAN SAUDI ARABIA

July 2008 JGC JAPAN SAUDI ARABIA SAUDI ARAMCO

July 2008 JGC JAPAN ALGERIA SONATRACH

December 2008 JGC JAPAN INDONESIA DONGGI-SENORO LNG TERMINAL PT DONGGI SENORO LNG

June 2009 JGC JAPAN ALGERIA SONATRACH

July 2009 JGC JAPAN ABU DHABI GASCO

September 2009 JGC JAPAN AUSTRALIA CHEVRON/EXXONMOBIL/SHELL

December 2009 JGC JAPAN PAPUA NEW GUINEA EXXONMOBIL

January 2010 JGC JAPAN SAUDI ARABIA SASREF

January 2010 JAPAN TURKMENISTAN TURKMENHIMIYA

July 2008 MARUBENI JAPAN THAILAND GLOW ENERGY

September 2009 MARUBENI JAPAN THAILAND IRPC Scope : 220mw - Combined heat & power plant

February 2010 MARUBENI JAPAN SINGAPORE TUAS POWER

JUBAIL NCP COMPLEX(ethylene pack)USD 1.2 BILLION

SAUDI POLYMERS CY (NATIONAL CHEVRONPHILLIPS/SIIG)

Scope : a 1,2 million t/y ethylene plant, a 200,000t/y methathesis plant on ABB LUMMUS technology and a 100,000t/y 1-hexene plant on Chevron Phillips TechnologyContract won by JGC in December 2007, work to start in January scheduled for completion in September 2011

MANIFA PROJECT (Utilities/Storage)USD 800 M

JGC's contract covers package two of the Manifa project, involving utilities, storage and shipping facilities for the central processing facilitiescontract to be executed by JGC/Japan and JGC Gulf International in Saudicommissioning deferred to 2013 instead of 2011

RHOURDE NOUSS FIELD DEVELOPMENT - USD 500M

Scope : an oil separation and treatment unit with a capacity of 1000 cubic meters per day and a compression station with capacity of 8 million cm/d + a boosting unit for the compression of 20 million cm/d of gas

the terminal will have a capacity of 2,1 million tonnes/yearJGC/JAPAN selected as EPC contractor, still in negotiations with the client for final prices.PT DONGGI SENORO is a jv between MEDCO, PERTAMINA and MITSUBISHI

GASSI TOUIL GAS PROCESSING FACILITIES - USD 1,5 BILLION

EPC contract covering the construction of gas processing facilities with a throughput of 12 million cubic meters a day, gas gathering and pipelines at the Gassi Touil field - the facilities will also produce 1000t/d of LPG and 1600t/d of condensates. The gas will be sent to the Arzew LNG plant

IGD PROJECT (HABSHAN 5 GAS PROCESSING PLANT - USD 4,7 B

scope : engineering, procurement, construction and commissioning of the following core units : Gas Processing Unit (2 Billion cf/d), Sulphur Recovery Units (5000t/d), NGL Recovery unit (1,2 Billion cf/d). JGC won the contract with the italian Maire Tecnimont, JGC leader of the consortiumIn January 2010 KHARAFI/KUWAIT won a USD 700M subcontract and CCC a USD 300M subcontract for civil, mechanical & electrical works.

GORGON LNG PLANTUSD 2,3 BILLION

Scope : the plant will include three 5 Million t/y LNG trains and a 300 tonnes joules/day domestic gas plant. The contract has been awarded to KJVG consortium including KBR, JGC, CLOUGH and HATCHChevron and its partners have taken the final investment decision mid september. The plant will be built in modular mode.

PNG LNG PROJECT(LNG Plant) - USD 4,5 B

Scope : capacity 6,6 million t/y (2 trains) including facilities for processing & treating natural gas, liquefaction, storage & loadingcontract won by CHIYODA, as leader, and JGC

JUBAIL REFINERY CLEAN FUELS PROJECT - USD 100M

Scope : upgrade of super claus units, a off-gas treating unit, a sour water stripper. The project aims at meeting the US refinery emissions regulations by removing sulphur dioxide from air emissions JGC selected in January 2010, waiting for official confirmation

KAWASAKI PLANT SYSTEMS

MARY FERTILIZER COMPLEXUSD 654M

Scope : 1200t/d of ammonia - 1925t/d ureaK.PLANT, part of Kawasaki Heavy Industries, has won the contract with SojizK.PLANT will be responsible for the engineering and the supply of equipment while Sojitz will be responsible for coordination & financing In January 2010 MW KELLOGG selected to provide license technology and basic engineering design

COMBINED-CYCLE POWER PLANTUSD 302M

Scope : 380mw to be located at Map Ta Phut/RayongMARUBENI will be responsible for procurement of main equipment of the plant such as gas turbine generator and steam turbine generator from Siemens as well as overall civils and installation works. BLACK&VEATCH will be the technical maanger, responsible for engineering, plant equipment procurement, construction management, start-up & commissioning

RAYONG POWER PLANTUSD 124M

TEMBUSU POWER PLANTUSD 250 M

Scope : biomass and clean coal generation plant, part of a utilities complex102mw - engineering, procurement & construction contract

30 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

June 2010 MARUBENI JAPAN VIETNAM ELECTRICITY OF VIETNAM

August 2007 MITSUI ENG JAPAN EGYPT EGYPTIAN REFINING CY

September 2007 MITSUI ENG JAPAN SINGAPORE EXXONMOBIL

September 2007 MITSUI ENG JAPAN SINGAPORE EXXONMOBIL

September 2007 JAPAN SINGAPORE EXXONMOBIL

February 2008 JAPAN NETHERLANDS MAGNUM PLANT NUON

March 2008 JAPAN ALGERIA

April 2008 JAPAN TURKEY BANDIRMA POWER PLANT

September 2008 JAPAN SPAIN ENDESA

January 2009 JAPAN INDONESIA PT PLN

May 2009 JAPAN RUSSIA JSC AMMONI

December 2007 TOYO JAPAN INDONESIA PERTAMINA

April 2008 TOYO JAPAN RUSSIA PERM ETHYLBENZENE PLANT SIBUR KHIMPROM

NGHI SON POWER PLANTUSD 990M

Scope : coal-fired ower plant 600mwMarubeni's scope : engineering, procurement, delivery of equipment & construction. Steam turbines to be procured from Fuji Eectric Systems, boilers from Foster Wheelerpartly financing by Japan

MOSTOROD REFINERYUSD 1, 8 BILLION

150,000b/dturnkey contract awarded to a consortium including MITSUI and GS ENGINEERINGMay 2009 : Project halted due to financing, both EPC contractors have been offered a 30% share in the project, negotiations with Export Import Bank of South Korea and JBIC/JAPAN expected to be closed in October 2009 enabling work to start early 2010.Project to be commissioned in 2013 instead of 2011

JURONG 2nd PETROCHEMICAL COMPLEX (PP UNIT)

Scope : a 450,000t/y polypropylene unitMITSUI ENGINEERING has been awarded the EPC contract for the PP units and for the steam cracker furnaces in association with HEURTEY PETROCHEM

JURONG 2nd PETROCHEMICAL COMPLEX (Elastomers Unit)

Scope : a 300,000t/y specialty elastomers unitMITSUI ENG has been awarded the engineering, procurement & construction contract

MITSUBISHI HEAVY IND

JURONG 2nd PETROCHEMICAL COMPLEX (Polyethylene Units)

Scope : 2 polyethylene units 650,000t/yMHI/JAPAN has been awarded the engineering procurement & construction for the 2 PE units and for polyolefins finishing, packaging and shipping

MITSUBISHI HEAVY IND

Scope : 1300mwMHI will supply the three gas turbines, steam turbine generators, heat recovery steam generators and balance of the plant. BALLAST NEDAM has been awarded a € 130M subcontract by MHI for the civil works Work was halted in May 2008 as all the permits were not obtained, all the authorizations have been given in July 2009 and work will restart on site in september. Ponticelli is a MHI's subcontractor

MITSUBISHI HEAVY IND

MERS EL HADJAJ AMMONIA-UREA COMPLEX - USD 3 BILLION

SONATRACH / SUHAI BAHWAN(El Djazairia El Omania Lil Asmidal)

Scope : ammonia capacity 4000t/d - urea capacity 7,000t/dMHI/JAPAN and DAEWOO ENGINEERING/SOUTH KOREEA have won the EPC contract with an offer of USD 2,415 Billion - The official EPC contract has been signed mid-april

MITSUBISHI HEAVY IND

ENERJISA POWER CY(Verbund / Sabanci)

Scope : 920mwMHI in association with the austrian A-TEC has been given the green light to implement the project

MITSUBISHI HEAVY IND

COMPOSTILLA POWER PLANT EXPANSION - USD 290 M

Units 6 & 7 : 2x400mwMHI has received the turnkey contract. Scope : each unit will include a gas turbine, a steam turbine, a generator and a heat recovery steam generatorCivil engineering, installation work and procurement of other auxiliary equipment to be done by a spanish consortium led by INITEC and including COBRA and ACCIONA

MITSUBISHI HEAVY IND

TANJUNG PRIOK CCGT POWER PLANT

Scope : 750mw combined-cycle power plantturnkey contract for MHI

MITSUBISHI HEAVY IND

MENDERLEEVSK FERTILIZER COMPLEX - USD 973M

Scope : production of 717,000t/y ammonia, 230,000t/y of methanol, 380,000t/y of ammonium nitrate - Haldor Topsoe Technology agreement signed between the client and MHI and SOJITZ CORPORATION. MHI will act as EPC contractor

BALONGAN REFINERY EXPANSIONUSD 300 M

Expansion of the propylene production from 1000t/d to 1700t/dToyo has won the USD 300M contract, work to start in january 08Official contract signed on January 22 with TOYO and PT REKAYASA. The project is called ROPP (RCC Off-Gas to Propylene), ABB LUMMUS will supply the technology

Scope : capacity 220,000t/y on Badger TechnologyTOYO has signed the EPC contract

31 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

August 2009 TOYO JAPAN CHINA BASF YPC

September 2009 TOYO JAPAN CHINA MITSUBISHI GAS CHEMICAL

November 2009 BUMI ARMADA MALAYSIA VIETNAM HOANG LONG JOINT OPERATING

January 2010 KNM GROUP MALAYSIA THAILAND IMPRESS ETHANOL Co Ltd

October 2008 MMHE MALAYSIA MALAYSIA PETRONAS CARIGALI

May 2007 MALAYSIA MALAYSIA TRANSPEN

October 2009 SAPURAACERGY MALAYSIA AUSTRALIA APACHE/SANTOS

April 2008 SIME DARBY ENG MALAYSIA MALAYSIA PETRONAS CARIGALI

October 2008 SIME DARBY ENG MALAYSIA MALAYSIA PETRONAS CARIGALI

April 2009 SUMATEC CORP MALAYSIA THAILAND TBA

NANJING PETROCHEMICAL COMPLEX EXPANSION - USD 1,4B

Expansion & construction of 14 process units, among them the expansion of the ethylene cracker by 140,000t/y, of the ethylene oxide plant by 80,000t/y, construction of EO derivatives plants, a new amines complexTOYO will perform engineering, procurement and construction management, it will form an integrated project team with FLUOR and DAELIM to manage the project. TOYO will form a global TOYO team comprising Toyo China and Toyo Korea for 4 of the process units

SHANGHAI POLYCARBONATE RESIN PLANT

scope : capacity of 80,000t/yConstruction work will start in 2010

TE GIAC TRANG FPSOUSD 700M

The field is also called White RhinocerosThe FPSO will have a production capacity of 45,000b/d and a storage capacity of 1 million barrels. Bumi Armada will convert a Suezmax tankerthe malaysian company is associated with VietsopetroIn march 2010 KEPPEL SHIPYARD won a USD 140M subcontract for conversion work : fabrication & installation of accomodation works, turret support structure & topside modules

CHACHAENGSAO BIOETHANOL PLANT - USD 43M

Scope : capacity of 200,000 litres per dayproject to be executed by KNM subsidiaries KNM Process Systems Sdn Bhd and KNM Projects Co Ltd in Thailand

TANGGA BARAT, KINABALU & KUMANG PROJECTS - USD 720 M

MMHE's contract : a topside and a jacket for Tangga Barat's CPP and a topside for Kinabalu central processing platform (contract value USD 337M)SIME DARBY's contract : two drilling platforms's topsides for Kumang and Tangga Barat projects, a topside for Kumang's CPP and a drilling platform jacket for Kinabalu project (USD 314M)RAMUNIA FABRICATORS a drilling platfom jacket and a CPP jacket for Kumang and a drilling platform jacket for Tangga Barat(USD 39M ) - OILFAB Sdn Bhd (USD 28,6M) : a drilling platform jacket, flare module and bridge for Tangga Barat, a drilling platfom jacket, flare module, bridge and tripod for the Kumang Pjt

RANHILL ENGINEERS & CONSTRUCTORS

TRANS-PENINSULA PIPELINEUSD 7 B

Scope : a 300km 48" pipeline across Malaysia's northern states of Kedah, Perak and Kelantan. RANHILL will undertake the engineering, procurement & construction, PT TRIPATRA will undertake engineering design and project management. Pipes will be supplied by Bakrie & Brothers

DEVIL CREEK DEVELOPMENT PJTUSD 170M

The project will recover & process the gas reserves from the Reindeer gas fieldSapuraAcergy's contract covers the transportation & installation of 91km 16" rigid pipeline including subsea tie-in together with a wellhead platform and a topside processing modulecontract to be executed from Kuala Lumpur & Perth offices

SABAH OIL PLATFORMSUSD 637 M

Petronas has awarded SIME DARBY and MISC contracts to build oil platforms offshore Sabah.

TANGGA BARAT, KINABALU & KUMANG PROJECTS - USD 720 M

SIME DARBY's contract : two drilling platforms's topsides for Kumang and Tangga Barat projects, a topside for Kumang's CPP and a drilling platform jacket for Kinabalu project (USD 314M)MMHE's contract : a topside and a jacket for Tangga Barat's CPP and a topside for Kinabalu central processing platform (contract value USD 337M)RAMUNIA FABRICATORS a drilling platfom jacket and a CPP jacket for Kumang and a drilling platform jacket for Tangga Barat(USD 39M ) - OILFAB Sdn Bhd (USD 28,6M) : a drilling platform jacket, flare module and bridge for Tangga Barat, a drilling platfom jacket, flare module, bridge and tripod for the Kumang Pjt

PRACHINBURI BIO ETHANOL PLANTUSD 500 M

Scope : 500,000 litres per day with biogas plant & organic fertiliser plant. EPC Contract signed in association with EC CHEMICAL BIO CO LTD/THAILAND

32 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

June 2009 TECHNIP MALAYSIA CHINA YINCHUAN LNG PLANT NINGXIA HANAS NATURAL GAS CY

January 2008 AIR LIQUIDE SINGAPORE SINGAPORE NESTE OIL

October 2009 EMAS OFFSHORE SINGAPORE VIETNAM PREMIER OIL

June 2010 FOSTER WHEELER SINGAPORE SINGAPORE LANXESS

March 2008 J.RAY McDERMOTT SINGAPORE THAILAND CHEVRON

January 2010 JURONG ENG SINGAPORE THAILAND INTERNATIONAL POWER

July 2008 MODEC SINGAPORE ANGOLA BP ANGOLA

January 2010 PEC Ltd SINGAPORE MALAYSIA ATT TANJUNG BIN Sdn Bhd

July 2009 ROTARY ENGINEERIN SINGAPORE SAUDI ARABIA

July 2009 ROTARY ENGINEERIN SINGAPORE THAILAND MAP TA PHUT STORAGE TANK PTT TANK TERMINAL CY

November 2007 SEMBAWANG E&C SINGAPORE SINGAPORE JURONG AROMATICS CORP

May 2010 SWIBER OFFSHORE SINGAPORE INDIA ONGC

February 2007 DAELIM SOUTH KOREA IRAN NIOC LNG

Scope : capacity of 400,000t/y, Air Products liquefaction processcontract to be executed by Technip in Kuala Lumpue and Shanghaithe contract covers engineering, supply of main equipment, procurement and construction management services for facilities (natural gas pre-treatment, liquefaction, LNG storage and loading, offsites, buildings & other infrastructures)

TUAS HYDROGEN PLANTUSD 175M

Scope : capacity of 100,000m3 per hourAIR LIQUIDE in Singapore, SOXAL, will build, own and operate the plant

CHIM SAO FPSOUSD 1 BILLION

the FPSO will be converted from a Suezmax tanker, it will have an oil storage between 600,000 and 1 million barrels, and a production capacity of 50,000b/dEmas is part of Ezra HoldingsSAIPEM won in December 09 the transportation & installation of the platform & subsea pipelines, umbilicals & pipelines end manifolds in addition to the detailed engineering for infield pipelinesKEPPEL SHIPYARD has won the subcontract for the conversion of the tanker into a FPSO (accomodation upgrade, fabrication & installation of topside modules and turret mooring system, flare tower, structural steel and new piping system

JURONG BUTYL RUBBER PLANTUSD 490 M

Scope : capacity of 100,000t/y FOSTER WHEELER ASIA PACIFIC selected to provide engineering, procurement services and construction management services

PLATONG 2 GAS PROJECT J.RAY McDermott's contract covers the full Engineering, Procurement, Construction & Installation for the central processing platform (19,000 tonnes) and the associated living quarters platform, flare tripod and 3 bridges

TNP2 POWER PROJECTUSD 131M

Scope : 110mw gas-firedJurong Engineering (part of IHI) has won the turnkey EPC contract

BLOCK 31 PSVM PROJECT(FPSO)

The FPSO will have a production capacity of 157,000b/d and storage capacity of 1,6 million barrelsMODEC has been awarded a frame agreement for the suply of the FPSO under an EPCI contract, the agreement covers an option for a second FPSO in the areaIn October 2008 TOYO has been awarded the detailed topsides engineering work

TANJUNG BIN OIL TERMINALUSD 174M

the oil terminal will have a storage capacity of 841,000 cubic metersthe contract will be executed by PEC's subsidiary Audex Pte Ltd

JUBAIL REFINERY PROJECTPACKAGE 6 - USD 745 M

SAUDI ARAMCOTOTAL

The package covers the refinery tank farm covering 62 atmospheric storage tanks and 8 bullett tanks. Work outside Saudi to be managed by Rotary Engineering in Singapore (USD 384M), inside Saudi by Petrosteel (JV between Rotary Engineering & Rafid Group

the tank will store ammoniaRotary Eng's contract covers the supply of equipment and materials, engineering, construction, commissioning & start up

JURONG AROMATICS PROJECT(Offsites & Utilities) - USD 450M

Sembawang E&C will be responsible for the engineering, procurement, construction of all the ancillary facilities, including product tankage, receiving & exporting jetties, power and steam cogeneration plant, wastewater treatment unitIn February 09, project postponed due to problems in securing the financing, financing expected to be closed by mid-2009

B-193 FIELD (PLATFORM PACKAGE)USD 618M

Scope : six-slot process platformcontract in joint-venture with SIME DARBY/MALAYSIA

NIOC LNG PROJECT (TANKAGE PROJECT) - USD 320 M

Scope : two 140,000m3 LNG tanks and three 30,000m3 LPG storage tanksDAELIM will carry out the contract with a subsidiary of Khatam Al Anbia. Technip and JGC carried out the FEED

33 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

March 2007 DAELIM SOUTH KOREA IRAN ESFAHAN OIL REFINING CY

December 2007 DAELIM SOUTH KOREA SAUDI ARABIA

February 2008 DAELIM SOUTH KOREA PHILIPPINES JG SUMMIT

July 2009 DAELIM SOUTH KOREA SAUDI ARABIA

October 2009 DAELIM SOUTH KOREA SAUDI ARABIA SAUDI KAYAN

October 2009 DAELIM SOUTH KOREA IRAN PETROPARS

December 2009 DAELIM SOUTH KOREA SAUDI ARABIA ARABIAN CHLOR VINYL CY

June 2010 DAELIM SOUTH KOREA KUWAIT KNPC

February 2008 DAEWOO SOUTH KOREA ANGOLA TOTAL

March 2008 DAEWOO SOUTH KOREA ALGERIA

February 2009 DAEWOO SOUTH KOREA ALGERIA SONATRACH

November 2009 DAEWOO SOUTH KOREA ABU DHABI TAKREER

April 2010 DAEWOO SOUTH KOREA NIGERIA SHELL PETROLEUM NIGERIA

May 2010 DAEWOO SOUTH KOREA ISRAEL OC POWER Ltd

May 2010 DAEWOO SOUTH KOREA ABU DHABI TAKREER

May 2007 DOOSAN SOUTH KOREA INDIA TATA POWER CY

September 2007 DOOSAN SOUTH KOREA INDONESIA PT CIREBON ELECTRIC POWER

ESFAHAN REFINERY UPGRADINGUSD 1720 M

The production of the gasoline will be boosted from 9 million liters to 12 millions. The contract will be executed by DAELIM, UHDE, LURGI and the local companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project management consultant. The upgrading involves construction of several units

JUBAIL NCP COMPLEX(Polyolefins Complex)USD 962,3 M

SAUDI POLYMERS CY(ARABIAN CHEVRON PHILLIPS/SIIG)

Scope : high density polyethylene (550,000t/y), low density polyethylene (550,000t/y) polypropylene (400,000t/y) polystyrene (200,000t/y)DAELIM has won the epc contract - NCP is a joint venture between Chevron Phillips and Saudi Industrial Investment Group

BATANGAS ETHYLENE/PROPYLENE PLANT - USD 513 M

Daelim has won the USD 513M contract to build an ethylene plant (capacity 350,000t/y) and a propylene plantIn December 09, the client is going ahead with the project as financing is secured, work to start in March 2010 for commissioning in 2013 instead of 2010 initially foreseen. Lummus will supply the technology

JUBAIL REFINERY(SATORP PJT)PACK-2A SULFUR

SAUDI ARAMCOTOTAL

Scope : Sulphur & Amine Unitsestimated contract value USD 500M

JUBAIL LOW DENSITY POLYETHYLENE PLANT - USD 325M

Scope : 300,000t/ythe contract was awarded in 2007 to Simon Carves/UK but not converted into a lump sum turnkey. DAELIM announced the award in October 09

SOUTH PARS PHASE 12 (EPC-2)USD 1,8 BILLION

The package covers liquid processing facilitiesDAELIM has won the contract in association with the local companies SAZEH, KAYSON and IIND

JUBAIL PETROCHEMICAL PLANTUSD 400 M

Scope : a 300,000t/y ethylene dichloride unit, a 250,000t/y caustic soda unitArabian Chlor Vinyl is a joint-venture between Maaden and Sahara Petrochemical Cy

MINA AL AHMADI 4th LPG RECOVERY UNIT - USD 890M

The facility will treat 850 million cf/d of natural gasepc contract for Daelim, work will take 3 years to complete

PAZFLOR PROJECT (FPSO & TOPSIDES)

The FPSO is design with a processing capacity of 200,000 barrels per day, 150 million cf/d of gas and a storage capacity of 1,9 million barrels of crudeDAEWOO SHIPBUILDING & MARINE ENGINEERING (DSME) has been awarded the contract, KBR/USA will provide topsides engineering, procurement and interface design services

MERS EL HADJAJ AMMONIA-UREA COMPLEX - USD 3 BILLION

SONATRACH / SUHAI BAHWAN(El Djazairia El Omania Lil Asmidal)

Scope : ammonia capacity 4000t/d - urea capacity 7,000t/dMHI/JAPAN and DAEWOO ENGINEERING/SOUTH KOREA have won the EPC contract with an offer of USD 2,415 Billion - The official EPC contract has been signed mid-april - DAEWOO's share of the contract is USD 626,5 M

ARZEW LNG PROJECT(storage tanks)

DAEWOO has been awarded a subcontract by SAIPEM, contract value USD 280,3 M for storage facilities

RUWAIS REFINERY(Tankage Package) - USD 1,2 B

Scope : 67 tanks + interconnecting pipingcontract value : USD 1,2 BillionIn June 2010, DAEWOO subcontracted the propylene storage tanks to CB&I

UTOROGU/UGHELLI GAS PIPELINEUSD 179M

Scope : 100km gas lineWork to start in May 2010 for commissioning in 2012

MISHOR ROTEM POWER PLANTUSD 470M

Scope : 440mw - OC Power Ltd is owned by Israel Corporation and Veoliaturbines to be supplied by Mitsubishi Power

IRPP PROJECT PHASE IIUSD 272M

Part of the Inter Refineries Pipelines Project Phase II - Work will involve construction of 16 storage tanks to be commissioned in November 2012

MUNDRA ULTRA MEGA POWER PROJECT - USD 1,22N

Scope : 4000mwDOOSAN has been selected by Tata PowerTOSHIBA/JAPAN signed the contract to supply the five steam turbine generators

CIREBON THERMAL POWER PLANTUSD 540 M

Scope : 700mwEPC contract for Doosan. PT CEP is a joint-venture formed by Korea Midland Power and Samtan of Korea, Marubeni/Japan and Tripatra/Indonesia

34 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

November 2007 DOOSAN SOUTH KOREA KUWAIT MEW

December 2007 DOOSAN SOUTH KOREA PHILIPPINES KEPCO

June 2008 DOOSAN SOUTH KOREA THAILAND

July 2008 DOOSAN SOUTH KOREA ABU DHABI GDF SUEZ

November 2008 DOOSAN SOUTH KOREA SOUTH KOREA TAEAN IGCC n°1 KOWEPO

November 2008 DOOSAN SOUTH KOREA SAUDI ARABIA SWCC

January 2010 DOOSAN SOUTH KOREA INDIA GMR ENERGY

February 2010 DOOSAN SOUTH KOREA EGYPT EAST DELTA ELECTRICITY

April 2010 DOOSAN SOUTH KOREA NEW CALEDONIA XSTRATA

August 2007 GS ENGINEERING SOUTH KOREA EGYPT EGYPTIAN REFINING CY

January 2008 GS ENGINEERING SOUTH KOREA THAILAND PTT LNG Co Ltd

August 2008 GS ENGINEERING SOUTH KOREA SAUDI ARABIA SAUDI ARAMCO

November 2008 GS ENGINEERING SOUTH KOREA SOUTH KOREA GS CALTEX

February 2009 GS ENGINEERING SOUTH KOREA SAUDI ARABIA SAUDI ARAMCO

June 2009 GS ENGINEERING SOUTH KOREA IRAN IRAN LNG

July 2009 GS ENGINEERING SOUTH KOREA ABU DHABI GASCO

SHUWAIKH DESALINATION PLANTUSD 320 M

The plant will utilise Reverse Osmosis technology and will be able to produce 30 million gallons per day of desalinated water.DOOSAN has won the construction contractcontract signed on March 10

CEBU COAL-FIRED POWER PLANTUSD 300 M

Scope : 100mwDOOSAN HEAVY will be responsible for the entire project from engineering to production

MAP TA PHUT POWER PLANTUSD 820M

GHECO-ONE(SUEZ)

Scope : coal-fired power 700mw DOOSAN HEAVY has won the contract against Alstom & Siemens

SHUHEIHAT S2 IWPP PROJECT(Desalination Package) USD 800 M

Scope : capacity of 100 millions g/dGDF SUEZ has won the IWPP Project, its named epc contractor for the desalination plant is DOOSAN HEAVY

The Integrated Gasification Combined Cycle Power plant (300mw) will be converting 2600 tonnes per day of coal into powerSHELL has signed the coal gasification and gas treatment license constract with Kowepo. DOOSAN is the named FEED and EPC contractor

JEDDAH DESALINATION EXPANSION PHASE 3 - USD 293 M

The plant, using reverse osmosis technology, will have a production capacity of 240,000 cubic meters per day. DOOSAN HEAVY will carry out the contract with the local WETICO

RAIPUR-CHHATTISGARH COAL FIRED POWER PLANT - USD 1B

Scope : 1370mwDOOSAN's contract covers the engineering, procurement & construction for the whole project

AIN SOKHNA POWER PLANTUSD 330M

Scope : 2x650mwDOOSAN has won a USD 330M for the supply & equipment of the plant (boilers). Civil works still to be awarded.

KONIAMBO POWER PLANTUSD 120M

Scope : 270mwthe plant will serve the nickel mine project

MOSTOROD REFINERYUSD 1, 8 BILLION

150,000b/dturnkey contract awarded to a consortium including MITSUI and GS ENGINEERINGMay 2009 : Project halted due to financing, both EPC contractors have been offered a 30% share in the project, negotiations with Export Import Bank of South Korea and JBIC/JAPAN expected to be closed in October 2009 enabling work to start early 2010.Project to be commissioned in 2013 instead of 2011February 2010, financing will be in place during the second quarter of 2010, commissioning now in 2014April 2010 : Financing close in July 2010, work will start shortly after - some long lead items have already been bought

MAP TA PHUT LNG REGASIFICATION TERMINAL - USD 540 M

A consortium led by GS ENGINEERING & CONSTRUCTION, including DAEWOO ENGINEERING, KOREA GAS CORP and HANYANG CORP has won the contract, work to start in February 2008

MANIFA PROJECT (Gas Processing Package) - USD 501 M

The gas plant will have the capacity to produce 90 million cf/d of gas and 66,400b/d of sour condensate - package 4 of the Manifa ProjectCommissioning deferred to 2013 instead of 2011

YEOSU DESULFURIZATION UNITUSD 562 M

the unit will produce 113,000b/d of cleaner burning fuels Commissioning in December 2010

KARAN GAS PROJECT(sulfur recovery unit)

Scope : 640t/dGS Engineering has still to confirm the contract announced by Aramco

TOMBAK LIQUEFACTION PLANTUSD 1 BILLION

Scope : capacity of 10,8 Million t/y (two trains 5,4 Mmt/y)GS E&C will carry out the contract with the local PIDECO

IGD PROJECT (RUWAIS 4th NGL TRAIN) - USD 2,1 BILLION

The facility will produce 4761t/d of ethane, 7657t/d of propane, 9364t/d of butane, 5546t/d of paraffinic naphtha and 6712t/d of condensate return.Contract won in association with PETROFAC

35 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

October 2009 GS ENGINEERING SOUTH KOREA IRAN PARS OIL & GAS CY

November 2009 GS ENGINEERING SOUTH KOREA ABU DHABI TAKREER

November 2009 GS ENGINEERING SOUTH KOREA ABU DHABI TAKREER

December 2009 GS ENGINEERING SOUTH KOREA OMAN PDO

January 2010 GS ENGINEERING SOUTH KOREA SOUTH KOREA KHNP

May 2010 GS ENGINEERING SOUTH KOREA OMAN GDF SUEZ

November 2008 HANWHA E&C SOUTH KOREA ALGERIA NAFTEC

July 2009 HANWHA E&C SOUTH KOREA SAUDI ARABIA MARAFIQ

September 2009 HANWHA E&C SOUTH KOREA JORDAN SAMRA ELECTRIC POWER GY

March 2007 HYUNDAI SOUTH KOREA LIBYA GECOL

October 2007 HYUNDAI SOUTH KOREA LIBYA GECOL

November 2007 HYUNDAI SOUTH KOREA QATAR QAFCO

December 2007 HYUNDAI SOUTH KOREA SAUDI ARABIA ARABIAN AMINES CY

ASSALUYEH GAS SWEETENING PLANT - USD 1,4 Billion

The plant will be able to process 3,900 million cf/d of gas from South Pars 6-7-8. GE E&C's scope include the overall construction process from designing to purchasing construction materials, building and test running. Work to start in November. Contract won in association with the local IRANIAN INTERNATIONAL GENERAL CONTRACTOR

RUWAIS REFINERY (RFFC Package)USD 3,11 B

Scope : residue fluidized catalytic cracking package (127,000b/d)work to start in December 2009 - Commissioning January 2014In June 2010 Target Engineering won a USD 115M subcontract for civil works, steel structures, piping works

RUWAIS REFINERY (Marine Facilities Package ) - USD 524M

Scope : a jetty, marine loading arms, main export pipeline, a fire water pump house - Contract value USD 524M

SAIH NIHAYDA GAS COMPRESSION PROJECT - USD 220M

Scope : installation of 3 gas compressor units supplied by GE OIL & GAS, air coolers, separators and auxiliary works.Epc lump sum turnkey contract - work to take 43 months to complete

INCHEON TIDAL POWER PLANTUSD 3,4 B

the tidal power plant will have a capacity of 1,32 million KW/hwork will start in the second half of 2011 for commissioning in 2017project still waiting for approvals from regulators

BARKA 3 / SOHAR 2 IPP PROJECTSUSD 1,7 B

In May 2010 GDF SUEZ has been awarded the contract for the construction & operation of the two gas-fired power plants, each with a capacity of 744MW. GDF has a 46% stake and is leader of a consortium including the japanese SOJITZ and SHIKOKU and local companies.Named EPC contractors are GS ENGINEERING/SOUTH KOREA and SIEMENS/GERMANY

ARZEW REFINERY UPGRADINGUSD 405 M

The capacity of the refinery will be boosted from 60,000b/d to 90,000b/d + rehabilitation of existing units to meet Euro IV normscontract signed with a consortium led by HYUNDAI ENGINEERING and including HANWHA E&C and DAEWOO

YANBU POWER PLANT EXPANSIONPHASES 5 & 6 - USD 720 M

The project will add 2x250mwHANWHA selected as EPC contractor, Doosan Heavy Industries and Siemens are subcontractors for the supply of turbines/generators and other parts needed for the expansion

SAMRA POWER PLANT EXPANSION PHASE 3 - USD 193M

The project involves two gas turbine stations with a total generating capacity of 286mw,, increasing the total capacity to 900mwIn October 09, ALSTOM won the contract for two gas turbines, generators and auxiliaries, contract value : € 100m

TRIPOLI WEST POWER PLANT EXPANSION PHASE 2

Scope : 4x350mwGecol has selected Hyundai to install the turbines and carry out the electromechanical works, Doosan Heavy to install the boiler, Daewoo Engineering to do civil works and Archirodon/Greece for the offshore works - Financing still to be settled HYUNDAI has been officially awarded the contract in october 2007DAEWOO pulls out of the project in March 2009, financing still not settled

AL KHALIJ POWER PLANTUSD 650 M

Scope 4x350mwHDEC has won the turnkey contract

QAFCO-V EXPANSION PROJECTUSD 3,2 BILLION

Scope : two ammonia plants with a total production of 4600t/d and an urea plant with a capacity of 3850t/dSNAMPROGETTI with HYUNDAI have received the Letter of Intent in November 2007, work will start in January 2008 ; the project will also include upgrade of existing facilities

JUBAIL ETHYLENE AMINES PROJECTUSD 200 M

Scope : 27,000 tonnes/year - Products : ethylenediamine, diethylenetriamine, triethylenetramineARABIAN AMINES is a joint-venture between Zamil Group and Huntsman.Contract awarded to a consortium of HANWHA ENGINEERING and HYUNDAI ENGINEERING. JACOBS is the project management consultant and carried out the FEED for the outside battery limits, BURNS & McDONNELL ENGINEERING is the inside battery limits FEED contractor

36 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

December 2007 HYUNDAI SOUTH KOREA LIBYA GECOL

January 2008 HYUNDAI SOUTH KOREA PAKISTAN PARCO

April 2008 HYUNDAI SOUTH KOREA QATAR SUEZ/MITSUI

August 2008 HYUNDAI SOUTH KOREA BAHRAIN ADDUR IWPP (Power Package)

October 2008 HYUNDAI SOUTH KOREA SOUTH KOREA HYUNDAI OILBANK

November 2008 HYUNDAI SOUTH KOREA ALGERIA NAFTEC

February 2009 HYUNDAI SOUTH KOREA SAUDI ARABIA SAUDI ARAMCO

April 2009 HYUNDAI SOUTH KOREA SINGAPORE JTC CORP

May 2009 HYUNDAI SOUTH KOREA VIETNAM

July 2009 HYUNDAI SOUTH KOREA ABU DHABI GASCO

October 2009 HYUNDAI SOUTH KOREA QATAR QAFCO

December 2009 HYUNDAI SOUTH KOREA TURKMENISTAN TURKMENGAZ

March 2010 HYUNDAI SOUTH KOREA ABU DHABI KEPCO

May 2010 HYUNDAI SOUTH KOREA ABU DHABI

May 2010 HYUNDAI SOUTH KOREA ABU DHABI TAKREER

SARIR POWER PLANTUSD 540 M

Scope : 855mwHyundai's share of the contract is 250M USD, SIEMENS will supply three 285mw turbines

MAHMOOD KOT REFINERY DIESEL HDS UNIT - USD 132 M

Scope : a 26,000b/d diesel hydrodesulfurization unit.PARCO has signed an agreement with a consortium including the chinese CNCEC and the korean HYUNDAI ENGINEERING - Work will start in March

RAS LAFFAN C IWPP PROJECT(power package)

SUEZ/MITSUI has won the IWPP Project, agreement signed in March 2008. Scope : 2730mwHYUNDAI ENGINEERING & CONSTRUCTION has received the preliminary contract in April, formal contract to be signed in May, contract value USD 2,07 Billion. MHI/JAPAN will supply the turbines

SUEZ ENERGYGULF INVESTMENT CORP

Suez Energy with Gulf Investment Corp/Kuwait have won the IWPP. . HYUNDAI is the named EPC contractor for the power package (1234mw)

DAESAN REFINERY HEAVY OIL PROJECT - USD 582 M

Scope : the expansion will allow for conversion of high-sulfur fuel to higher value refining products : a 52,000b/d residue fluidized catalytic cracking and a 66,000b/d atmospheric residue desulfurization unit. Once completed the heavy fuel capacity will be raised to 116,000b/d from 64,000. In june 08 SHAW/USA was selected to provide FEED, project management and procurement of critical equipment

ARZEW REFINERY UPGRADINGUSD 405 M

The capacity of the refinery will be boosted from 60,000b/d to 90,000b/d + rehabilitation of existing units to meet Euro IV normscontract signed with a consortium led by HYUNDAI ENGINEERING and including HANWHA E&C and DAEWOO

KARAN GAS PROJECT(onshore portion ) USD 1,3 B

Scope : construction of a gas processing facility at Khursaniyah to accommodate around 1.8 billion standard cubic feet per day of high pressure sour gas from the offshore Karan field. consisting of gas handling, sweetening, dehydration, acid gas enrichment, and supplementary propane refrigeration + recovery of 900 tonnes a day of sulphur

JURONG OIL STORAGE PROJECTUSD 594 M

the first phase involves the construction of 5 caverns with a total capacity of 1n48 million cubic meters. Work to start by the end of the year

HAI PHONG POLYESTER PLANTUSD 250 M

PETROVIETNAMVINATEX DINH YU

Scope : capacity 500t/dEPC contract for HYUNDAI ENGINEERING - work duration 25 months

IGD PROJECT (HABSHAN 5 OFFSITES & UTILITIES)USD 1,7 BILLION

Scope : Offsites & Utilities Contract value : USD 1,7 Billion

QAFCO-VI EXPANSION PJTUSD 610 M

Scope : a urea unit 3850t/d + associated utilitiescontract awarded to the same consortium who is presently carrying out Qafco-V. Saipem in association with HYUNDAI

SOUTH YOLOTEN GAS PJT(gas processing) - USD 1,4 B

construction of a gas processing plant with a capacity of 10 Billion cubic meters a yearcontract won by a consortium HYUNDAI ENG / LG INTERNATIONAL

CONSTRUCTION OF FOUR NUCLEAR PLANTS - USD 5,59 B

In December 2009 KEPCO won the USD 20 B deal to build 4 nuclear plants with ENEC. KEPCO has awarded in March 2010 construction subcontracts to HYUNDAI ENGINEERING (USD 5,59B), SAMSUNG ENG (USD 2,52B) and KOPEC (USD 569M)

BOROUGE 3 PROJECT(O&U Package)USD 935M

BOROUGE(Adnoc/Borealis)

Scope : Offsites & Utilities (buildings, storage and basic processing facilities, seawater cooling systems....

RUWAIS BASE OIL FACILITIES PROJECT - USD 463M

Scope : the facility will be able to produce 500,000t/y of Group III base oils as well as 100,000 t/y of group II base oils. The project comprises a new pre-distillation, hydroisomerizatio and product distillation units, revamping of the existing hyrocracker units, new storage tanks and integration with existing facilities

37 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

June 2010 HYUNDAI SOUTH KOREA INDIA GVK GAUTAMI POWER

February 2008 HYUNDAI HEAVY IND SOUTH KOREA NIGERIA TOTAL/ELF PETROLEUM NIGERIA

March 2008 HYUNDAI HEAVY IND SOUTH KOREA AUSTRALIA NORTH WEST SHELF VENTURE

October 2008 HYUNDAI HEAVY IND SOUTH KOREA THAILAND PTT THAILAND

July 2009 HYUNDAI HEAVY IND SOUTH KOREA ABU DHABI ADGAS

August 2009 HYUNDAI HEAVY IND SOUTH KOREA KUWAIT MEW

October 2009 HYUNDAI HEAVY IND SOUTH KOREA AUSTRALIA CHEVRON/EXXONMOBIL/SHELL Scope : 48 modules weighing 190,000tonnes

November 2009 HYUNDAI HEAVY IND SOUTH KOREA MYANMAR DAEWOO INTERNATIONAL

February 2010 HYUNDAI HEAVY IND SOUTH KOREA NORWAY ENI

June 2010 HYUNDAI HEAVY IND SOUTH KOREA SAUDI ARABIA GDF SUEZ

July 2008 LOTTE E&C SOUTH KOREA JORDAN KEPCO/XENEL

March 2008 POSCO E&C SOUTH KOREA SALVADOR AES

GAUTAMI POWER PLANT EXPANSION PROJECTUSD 689M

Scope : combined cycle 800mwHYUNDAI ENGINEERING selected in association with L&T.

USAN FIELD DEVELOPMENT (FPSO PACKAGE)

The FPSO will have a processing capacity of 160,000b/d of oil and 175 MMcf/d of gas and will store about 2 million barrels of oilThe FPSO will be delivered in October 2011

NORTH RANKIN 2 PROJECTUSD 4,6 BILLION

Scope : a second offshore platform including gas compression facilities, utilities and new living quarters, the platform will be connected by a 100m ridge to the existing North Rankin A platform + tie-insHHI has won the USD 320M contract for the construction of the topsides. EOS, a joint-venture between KBR and WORLEYPARSONS has been awarded the detailed engineering & procurement services, PT McDERMOTT INDONESIA for the substructure, bridges & piles. HEEREMA MARINE CONTRACTORS the USD 110M contract for the transport & installation of the substructure

GREATER BONGKOT SOUTH GAS PROJECT (CPP)

The HHI's contract covers the construction of a fixed central processing platform weighing about 22,000 tonnes plus bridge links and a flare tower. The platform will feature a topsides weighing 17,000 tonnes and be anchored by a 5,000 tonne steel jacketIn January 2009 GUNANUSA/INDONESIA has won the third package of the project, covering a living quarters platform and a flare jacket

IGD PROJECT ( GAS ISLAND GAS PLANT ) - USD 1 BILLION

The plant will consist of 24 modules with a capacity of 283 millions cm/d of gas

SUBIYA POWER PLANTUSD 2,6 Billion

Scope : 2,000mw combined cycle HHI has won the contract with GE/USA. HHI will carry out the engineering, procurement & construction, GE will supply 3 combined-cycle power blocks, including six Frame 9FA gas turbines, three steam turbines, nine generators and a turbine and plant level control protection system. GE will also operate and maintain the plant for seven years

GORGON LNG PJT (LNG MODULES)USD 2,06 B

SHWE GAS PROJECTUSD 1,4 BILLION

HHI's turnkey contract covers a 40,000 ton offshore gas platform, a subsea production system, subsea pipelines and an onshore gas terminalthe gas platform will produce 500 million cf/d of gas in March 2013contract officially signed in February 2010

GOLIAT FIELD DEVELOPMENT (FPSO PACKAGE) - USD 1,1 BILLION

HHI has won the contract for the Floating Production Storage and Offloading unit, designed done by Sevan MarineHHI has awarded the USD 50M contract to CB&I to provide detailed engineering for topsides The FPSO will produce 100,000b/d of crude oil and 3,9 million cubic meters of gas per day and will be able to store 1 million barrels of oil

RIYADH PP9 POWER PLANTUSD 1,6 BILLION

Scope : 1730mwGDF SUEZ has signed the agreement with SEC to build and operate the power plant in association with SOJITZ/JAPAN and AL JOMAIH.HYUNDAI HEAVY INDUSTRIES is the named EPC contractor

AL QATRANA INDEPENDENT POWER PROJECT - USD 500 M

The korean KEPCO with XENEL INDUSTRIES selected as preferred bidder for the 373mw project, a formal contract will be signed in May 09, its named epc contractor is LOTTE ENGINEERING & CONSTRUCTION, project to be partially financed by Eximbank/Korea and World Bank

CONSTRUCTION OF A COAL-FIRED POWER PLANT - USD 500M

Scope : 260mwPOSCO E&C has signed the EPC contract, work will start in July 2008 for commissioning in september 2011

38 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

April 2008 POSCO E&C SOUTH KOREA CHILE AES GENER

October 2009 POSCO E&C SOUTH KOREA PERU KALIPA GENERACION

February 2007 SAMSUNG SOUTH KOREA SINGAPORE ISLAND POWER CY PTE

August 2007 SAMSUNG SOUTH KOREA SINGAPORE TEMASEK

March 2008 SAMSUNG SOUTH KOREA MEXICO CFE

June 2008 SAMSUNG SOUTH KOREA SOUTH KOREA S-OIL

July 2008 SAMSUNG SOUTH KOREA ABU DHABI GDF SUEZ

August 2008 SAMSUNG SOUTH KOREA BAHRAIN BAPCO / NESTE

December 2008 SAMSUNG SOUTH KOREA INDIA

January 2009 SAMSUNG SOUTH KOREA VIETNAM VUNG TAE CO2 RECOVERY UNIT PETROVIETNAM

May 2009 SAMSUNG SOUTH KOREA ALGERIA SONATRACH

June 2009 SAMSUNG SOUTH KOREA AUSTRALIA

July 2009 SAMSUNG SOUTH KOREA SAUDI ARABIA

CONSTRUCTION OF TWO POWER PLANTS - USD 1310M

POSCO E&C has won two contracts : - the Angamos coal-fired power plant in Antofagasta : 520mw, contract value USD 870M- the Campiche coal-fired power plant at Ventanas : 270mw, contract value USD 440MIn may 2008 ANSALDO won the € 75M contract from POSCO to supply the steam turbines and generators

CHILCA POWER PLANT CONVERSION - USD 350M

The plant will be converted into a combined cycle with an annual generating capacity of 830mw. Contract won against Siemens & Abengoa

JURONG ISLAND POWER PLANTUSD 651 M

Scope : 785mw - Island Power Cy Pte is an INTERGEN's affiliatethe contract has been awarded to a consortium of SIEMENS and SAMSUNG, financing will be secured during the first quarter of 2007Official contract signed early July 07, SAMSUNG will perform integration of the steam turbine generators and will supply main & auxiliary systems and perform civil and assembly work

PULAU SERAYA COMBINED CYCLE POWER PLANT - USD 680 M

Scope : 800mw and 300 tons of steam per hourContract won in association with SIEMENS who will supply two steam turbines, the heat recovery steam generators, the electrical, instrumentation and control equipmentSAMSUNG's share of the contract : USD 190M

MANZANILLO LNG PLANTUSD 900 M

Scope : two LNG tanks, a regasification facility (500MMcf/d) , and a pierCFE has awarded the contract to build and operate the plant to consortium Terminal KMS de GNL including KOREA GAS, MITSUI/J, SAMSUNG. The EPC works will be carried out by SAMSUNG E&CIn August 2008 SAMSUNG confirmed the award of the turnkey contract

ONSAN AROMATICS COMPLEXUSD 974 M

Scope : a 900,000t/y paraxylene unit and a 280,000t/y benzene unitSAMSUNG has received the Letter of intent in June 08

SHUHEIHAT S2 IWPP PROJECT(Power Package) USD 820 M

Scope : 1500mwGDF SUEZ has been awarded the IWPP Project, its named EPC contractor is SAMSUNGSAMSUNG will carry out the EPC contract in partnership with SIEMENSWork to start in December

SITRA BASE LUBE OIL PLANTUSD 314 M

Scope : capacity of 400,000t/y of lube oillumpsum turnkey contract for Samsung - Commissioning in April 2011

DAHEJ PETROCHEMICAL PLANT(ETHYLENE PACKAGE)USD 1,43 BILLION

OPAL(ONGC PETRO ADDITIONS)

Scope : capacity of 1,1 Million t/y of ethylene and 340,000t/y of propylenecontract awarded to a consortium of LINDE/GERMANY and SAMSUNGLINDE's share of the contract is EUROS 350M, they will be responsible for the technology, the basic engineering and the supply of critical componentsSAMSUNG's share of the contract is USD 960M, covering the detail engineering, the supply of the remaining components, the construction and assembly

Scope : capacity of 250t/d based on MHI processEngineering, procurement, construction & commissioning contract for Samsung

SKIKDA REFINERY UPGRADINGUSD 2,6 BILLION

the refinery's capacity will be boosted from 15 Million t/y to 16,6 Million t/yrehabilitation & modernization + nex units (isomerization, paraxylene, benzene)SAMSUNG ENGINEERING has won the EPC contract, commissioning expected during the second half of 2012

COLLIE UREA PLANTUSD 2,8 BILLION

PERDAMAN CHEMICALS & FERTILISERS

Scope : capacity of 2 million t/y of ureaSAMSUNG ENGINEERING selected as lead contractor for the epc contract in association with IKPT/INDONESIAconstruction work to start in 2010

JUBAIL REFINERY(SATORP PJT)PACK-3 - AromaticsUSD 700M

SAUDI ARAMCOTOTAL

Scope : paraxylene 700,000t/y - Benzene 140,000t/y - 200,000t/y Polymer Grade Propylene

39 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

July 2009 SAMSUNG SOUTH KOREA SAUDI ARABIA

July 2009 SAMSUNG SOUTH KOREA SAUDI ARABIA NATIONAL INDUSTRIAL GASES CY

October 2009 SAMSUNG SOUTH KOREA ABU DHABI FERTIL

November 2009 SAMSUNG SOUTH KOREA ABU DHABI TAKREER

November 2009 SAMSUNG SOUTH KOREA TRINIDAD&TOBAGO PETROTRIN

February 2010 SAMSUNG SOUTH KOREA SINGAPORE SINGAPORE LNG CORP

March 2010 SAMSUNG SOUTH KOREA ABU DHABI KEPCO

April 2010 SAMSUNG SOUTH KOREA ABU DHABI ADNOC

May 2010 SAMSUNG SOUTH KOREA ABU DHABI

May 2010 SAMSUNG SOUTH KOREA ABU DHABI

February 2007 SAMSUNG HEAVY SOUTH KOREA NORWAY BP NORGE

September 2008 SAMSUNG HEAVY SOUTH KOREA NIGERIA FLEX LNG

JUBAIL REFINERY(SATORP PJT)PACK-4 - Coker - USD 900M

SAUDI ARAMCOTOTAL

Scope : Coker Unit capacity 100,000b/donshore work will be performed by Chiyoda Petrostar as leader and Samsung Saudi ArabiaIn January 2010, NESMA & PARTNERS has been awarded the subcontract for civil works, structural steel, mechanical, piping erection, instrumentation, insulation....

JUBAIL AIR SEPARATION UNITUSD 300M

Scope : the plant will produce gaseous oxygen (3550t/d), nitrogen (3600t/d), and argon (150t/d)Samsung will execute the licensing, engineering, procurement and construction under a lump sum turnkey contract

RUWAIS FERTILIZER PLANT EXPANSION - USD 1,2 B

Scope : a 2,000t/d ammonia unit - a 3500t/d urea unitSAMSUNG has won the contract on a lump sum turnkey basis in partnership with UHDE/GERMANY

TAKREER REFINERY (O&U Package)USD 2,7,B

Scope : offsites & utilities including a sour water stripper, wastewater treatment facilities, nitrogen production units, steam generation units, steam condensate recovery unit - Contract still to be confirmed

POINTE A PIERRE ULSD PROJECTUSD 220M

Scope : a 40,000b/d Ultra Low Sulphur Diesel Unitlump sum turnkey contract for Samsung Engg

JURONG LNG TERMINALUSD 628M

scope : initial capacity of 3,5 Million t/ySLNG has selected SAMSUNG as EPC contractor, FLUOR could be involvedFOSTER WHEELER ASIA PACIFIC has been appointed Project Management ConsultantFLUOR selected by SAMSUNG in February 2010 to provide engineering and related management services, contract to be executed by Fluor in Singapore, Manilla and Houston

CONSTRUCTION OF FOUR NUCLEAR PLANTS - USD 5,59 B

In December 2009 KEPCO won the USD 20 B deal to build 4 nuclear plants with ENEC. KEPCO has awarded in March 2010 construction subcontracts to HYUNDAI ENGINEERING (USD 5,59B), SAMSUNG ENG (USD 2,52B) and KOPEC (USD 569M)

SHAH GAS PROJECT (Offsites & Utilities) - USD 1,5 Billion

The project will treat 1 Billion cubic feet a day of sour gasEngineering, Procurement & Construction of the Offsites & utilities

BOROUGE 3 PROJECT(POLYOLEFINS PACKAGE)USD 1,255 B

BOROUGE(Adnoc/Borealis)

Scope : two polyethylene units, each with a capacity of 540,000t/y and two polypropylene units, each with a capacity of 480,000t/y - BORSTAR technology - Contract won in association with SAMSUNG. TECNIMONT leader of the consortium, its share of the contract is USD 910M for the two packages (see hereunder)

BOROUGE 3 PROJECT(LDPE Package) - USD 400M

BOROUGE(Adnoc/Borealis)

Scope : a low density polyethylene unit with a capacity of 350,000t/y - LyondellBasell technology Contract won in association with SAMSUNG. TECNIMONT leader of the consortium, its share of the contract is USD 910M for the two packages (see above)

SKARV FPSOUSD 690 M

SHI has won the contract to supply BP with a FPSO which will be able to produce 90,000b/d of oilOfficial award made in July 2007In September 2007 AKER KVAERNER has been awarded the engineering, procurement and construction management assistance contract for the 16,000 tonnes topsides, contract value USD 360M

BILABRI, OWANERI, OROBIRI GAS PJT (LNG-FPSO)

the LNG-FPSO will have a capacity of 1,7 million tons of LNG and a storage capacity of 170,000m3 of LNG and 50,000m3 of condensate

40 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

October 2007 SK ENGINEERING SOUTH KOREA SINGAPORE JURONG AROMATICS CORP

April 2008 SK ENGINEERING SOUTH KOREA SOUTH KOREA SK ENERGY

August 2008 SK ENGINEERING SOUTH KOREA AUSTRALIA

December 2008 SK ENGINEERING SOUTH KOREA ECUADOR PETROECUADOR

March 2009 SK ENGINEERING SOUTH KOREA ABU DHABI ADCO

July 2009 SK ENGINEERING SOUTH KOREA SAUDI ARABIA contract value USD 420M covering plant utilities (water, power, steam…)

July 2009 SK ENGINEERING SOUTH KOREA MALAYSIA MERAPOH RESOURCES

August 2009 SK ENGINEERING SOUTH KOREA THAILAND PTTAR

November 2009 SK ENGINEERING SOUTH KOREA ABU DHABI TAKREER

December 2009 SK ENGINEERING SOUTH KOREA KUWAIT KOC

January 2010 SK ENGINEERING SOUTH KOREA ECUADOR

June 2010 TOYO SOUTH KOREA SOUTH KOREA DAESAN NCC REVAMPING PROJECT

September 2009 CTCI TAIWAN SAUDI ARABIA

July 2009 CTCI TAIWAN INDIA PETRONET LNG

JURONG AROMATICS PROJECTUSD 2 BILLION

JAC partners include Glencore, SK Energy, Noor/Kuwaitscope : 800,000t/y paraxylene, 200,000t/y orthoxylene, 450,000t/y of benzene and 2,5 million tonnes of oil productsSK ENG & CONSTRUCTION has been awarded the lumpsum turnkey contract - UOP will supply the technology In February 09, project postponed due to problems in securing the financing, financing expected to be closed by mid-2009 In May 09, project once more delayed, financing to be secured during the second half of the year, enabling work to start early 2010.

INCHEON HYDROCRACKERUSD 1,52 Billion

Scope : capacity of 40,000b/dwork to start in June 08, epc to be carried out by SK E&C

FISHERMAN's LANDING LNG PROJECT

LNG LtdGladstone LNG Pty Ltd

Scope : capacity of 1,5 million t/ySKEC signed in August 08 an engineering & construction service contract with LNG Ltd, the korean will form a joint-venture with Laing O'Rourke to enter into an EPC contract in December 2008

ESMERALDAS REFINERY REHABILITATION & MODERNIZATION USD 187 M

The project will boost the capacity of the refinery by 20%, to 100,000b/dcontract signed on December 29, work to start immediately

BAB GAS COMPRESSION PROJECTUSD 805 M

scope : intallation of 3 gas compressor units at the field, part of Bab field expansion project. Work will also involve flare & pig launchers, trunk lines and a 25km tie-in with habshan fieldfeed done by Technip.

JUBAIL REFINERY(Satorp Project)Pack 5B - Plant Utilities

SAUDI ARAMCOTOTAL

SUNGAI LIMAU REFINERY (KEDAH STATE)

Scope 350,000b/dSKEC selected as EPC contractor, work to start by the end of 2009. The chinese CNPC will take a share in the project

MAP TA PHUT REFINERY CLEAN FUELS PROJECT

Scope : a diesel desulphurisation unit that will produce 85,700b/d of diesel with sulphur below 10 ppmSKEC signed the contract in association with the local Thai Woo Ree Engineering Co Ltd

RUWAIS REFINERY (CDU Package)USD 2,11 B

Scope : package one : crude distillation unit & associated downstream unitsCommissioning in 2014 - the refinery will be built alongside the existing one, capacity 400,000b/d

GAS BOOSTER 132 ProjectUSD 724M

Scope : a gas booster station with a capacity of 250 Million cf/d, compressors, gathering centers and pipeline network between the GCs and the boosting station. Work to start in January 2010

REFINERIA DEL PACIFICOUSD 10 B

PETROECUADORPDVSA

Scope : 300,000b/dAfter having been selected to carry out the study, The Ministry announced in January 2010 that SKEC will carry out the EPC contract. However financing has still to be set up. In March 2010 SKEC signed a USD 260M contract to undertake basic engineering

SAMSUNG TOTAL PETROCHEMICALS

Scope : revamping of the Naphtha Cracking Center which will expand the capacity of ethylene from 840,000t/y to 940,000t/y and propylene from 550,000t/y to 600,00t/y - Commissioning in December 2011

JUBAIL REFINERY(Satorp Project)Pack 5A - Offsites & Utilities

SAUDI ARAMCOTOTAL

Scope : Offsites & Utilities (interconnection, process control..)contract awarded to Technip with CTCI, estimated contract value : USD 1,3 BCTCI confirmed the contract award in Sept 09, in charge of engineering & procurement services for Flare and Cooling Water Systems

KOCHI LNG TERMINAL(liquefaction facilities)

Capacity 2,5 Million t/yCTCI has signed the contract in August on a lump-sum basis, the storage tanks are being built by IHI. WHESSOE is the Project Manager.

41 / 73

FIRM PROJECTS AWARDED TO ASIAN COMPANIES

Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

August 2009 CTCI TAIWAN TAIWAN LIN YUAN NAPHTHA CRACKER 6 CPC

January 2010 CTCI TAIWAN SAUDI ARABIA JUBAIL AMINES COMPLEX SAUDI KAYAN

December 2008 FOSTER WHEELER THAILAND THAILAND MTP HPPO MANUFACTURING

October 2009 THAI NIPPON STEEL THAILAND MYANMAR PETRONAS CARIGALI

June 2008 TOYO THAI THAILAND THAILAND MAP TA PHUT PHENOL PLANT PTT PHENOL CY

September 2008 TOYO THAI THAILAND THAILAND SOLVAY

November 2008 TOYO THAI THAILAND THAILAND

May 2009 TOYO THAI THAILAND THAILAND VARIOUS CUSTOMERS

April 2009 LILAMA GROUP VIETNAM VIETNAM PETROVIETNAM

CTCI will provide the engineering, procurement and consortium services for the 720,000t/y (CB&I Lummus technology)CB&I LUMMUS has been awarded a USD 40M subcontract from CTCI to supply eight heaters

Scope : 210,000t/ySamsung terminated the contract awarded in 2007, a new tender was issued by Saudi Kayan with CTCI selected in January 2010

MAP TA PHUT PROPYLENE OXIDE PLANT

Scope : capacity of 390,000t/yFW's contract covers the engineering, procurement & construction management of the facility + the power, utilities & infrastructuresthe client is a subsidiary of Siam Styrene Monomer Cy, a JV between Dow Chemical and Siam Cement Group

YETAGUN COMPRESSION PLATFORM

the topsides of the platform will be built in Thailand, the steel kacket in Indonesia (Batam). The contract includes also tie-in & modification work on existing platform

Scope : capacity of 150,000t/y based on Mitsubishi TechnologyToyo Thai's contract includes detailed engineering, procurement of equipment & materials and construction on a lump-sum turnkey basis

MAP TA PHUT EPICHLOROHYDRIN PLANT

Scope : capacity of 100,000t/y based on Solvay technologyTOYO THAI has received the Letter of Intent for the engineering, procurement service and construction management

MAP TA PHUT HYDROGEN PEROXIDE PLANT

MTP HPSOLVAY

Scope : 2 units - total capacity 330,000t/yMTP HP is a joint venture between Dow Chemical & Solvay

3 EPC CONTRACTS USD 58 M

for Ube Industries : a 1,6 hexanediol plantfor AGC Chemicals : a chlor-alkali project to produce caustic soda and chlorinefor PTT : a Lube Base Oil Pilot-Scale Production Unit EPC contracts for TTCL - Commissioning in 2010 & 2011

VUNG ANH 1 & NHON TRACH 2 POWER PLANTS - USD 1,65 B

The Vung Ang 1 will have a capacity of 1200mw, to be delivered in two phases, the first 600mw in april 2012, the second 600mw in march 2013 The Nhon Trach 2 will have a capacity of 750mw, work is starting in April commissioning within 30 monthsJuly 2009 : Vung Ang : TOSHIBA/JAPAN will supply the steam turbines, BABCOCK & WILCOX BEEIJING CY has the USD 180M contract to supply two 600mw boilers

42 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / Situation

August 2008 SIEMENS AUSTRIA AUSTRIA

November 2009 POERNER AUSTRIA MOROCCO SAMIR

June 2009 SKODA PRAHA CZECH REPUBLIC CZECH REPUBLIC CEZ

May 2010 HALDOR TOPSOE DENMARK INDIA TATA CHEMICALS

June 2008 NESTE JACOBS FINLAND FINLAND NESTE OIL

January 2009 OUTOTEC FINLAND CHILE NORACID

March 2010 WARTSILA FINLAND CAMEROON KRIBI POWER DEVLPT CY

May 2010 WARTSILA FINLAND BRAZIL ENERGETICA SUAPE II

December 2007 ACERGY FRANCE ANGOLA TOTAL

December 2008 ACERGY FRANCE ANGOLA ANGOLA LNG

March 2009 ACERGY FRANCE MALAYSIA SABAH SHELL PETROLEUM

May 2009 ACERGY FRANCE NIGERIA MOBIL PRODUCING NIGERIA

September 2009 ACERGY FRANCE ANGOLA TOTAL E&P ANGOLA

October 2009 ACERGY FRANCE NIGERIA CHEVRON NIGERIA

May 2010 ACERGY FRANCE NIGERIA EXXONMOBIL

Contractor's nationality

Final Destination

MELLACH COMBINED CYCLE POWER PLANT - USD 826M

VERBUND AUSTRIAN THERMAL POWER GmbH

Scope : 800mw SIEMENS AUSTRIA is the main contractor, the austrian AE&E will supply the aste heat boilers - Work will start early 2009

MOHAMMEDIA REFINERY BITUMEN UNIT - USD 31M

Scope : a 270,000t/y bitumen plant + two tanks each with capacity of 5,500 cubic metersafter having carried out the engineering, POERNER will act as general contractor on a lump sum tunrkey basis

POCERADY POWER PLANTUSD 1 BILLION

Scope : 841mwCEZ has signed the construction contract with Skoda Praha, gas turbines to be supplied by SIEMENS/GERMANY

BABRALA FERTILIZER PLANT EXPANSION (ammonia package)

Scope : 2,200t/d Haldor Topsoe selected as technology supplier and EPCM contractor

PORVOO ISOMERISATION UNITUSD 120 M

the unit will be able to process 600,000t/y of existing gasoline fractions into higher value, premium-quality gasoline, it wil increase the total gasoline ouput by 200,000t/y - Work will start in 2009

MEJILLONES SULFURIC ACID PLANT - USD 40 M

Scope : capacity of 600,000t/yOUTOTEC's scope of contract covers engineering, process equipment and supervisory services

KRIBI POWER PLANTUSD 175M

Scope : 216mwWARTSILA, selected in November 2009, signed the contract in March 2010 - Turnkey contract - Commissioning end of 2011 - financing in place

CABO POWER PLANTUSD 250 M

Scope : 380mwturnkey contract for Wartsila - Energetica Suape II is owned by CIBE PARTICIPACAO & PETROBRAS

PAZFLOR PROJECT (SUBSEA PACKAGE) - USD 1,8 B

Pazflor involves 4 fields : Perpetua, Hortensia, Zinia and AcaciaACERGY's share is USD 700M, work will involve 55km of water injection rigid flowlines, gas injection and gas export lines, umbilicals & jumpers and installation of manifolds, 3 subsea sepration units with associated umbilicals and the FPSO mooring lines. Fabrication in Angola - Technip's share of the contract is USD 1,1 Billion

PIPELINE NETWORK FOR SOYO LNG - USD 550 M

ANGOLA LNG has awarded the contract to SPIE CAPAG and ACERGYACERGY's share of the contract is USD 250M. Scope : engineering, procurement, fabrication and installation of approx 50km of pipelines, including the shore approach and above water tie-Ins toghether with the offshore crossing

GUMUSUT-KAKAP FIELD DEVLPTUSD 825 M

Scope : engineering, procurement, transportation & installation of : - flowlines, jumpers, steel catenary risers, pipeline end terminations anf flowline inline structures - an oil export pipeline and catenary riser - mooring wires, chain & piles for a semi-submersible floating production system. Contract won in association with Sapuracrest

REVAMPING OF 3 WELLHEAD PLATFORMS - USD 190M

The wellhead platforms are located in water depths of 35mthe contract includes an option for 5 further platformsengineering & work to start immediately, engineering support to be provided by Glocal Oceon Engineers Nigeria Ltd

BLOCK 17/18 GEP Phase 2USD 110M

Acergy's contract covers the installationn of 70km 24" pipeline rom block 2, together with associate"d jumper, PLET and tie-ins, to the Neashore/onshore pipeline

ESCRAVOS GAS DEVELOPTUSD 500 M

Acergy's contract covers the procurement & installation of 130km of pipelines, the fabrication & installation of 15 risers and 3 subsea tie-ins and the installation of 40 crossings

OFFSHORE INSTALLATION WORK AT OSO - USD 120M

Scope : removal of existing risers, intallation of 15km of new pipelines and associated risers together with associated diving and hook-up activities

43 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

May 2010 AIR LIQUIDE FRANCE QATAR RASGAS

February 2007 ALSTOM FRANCE UK PEMBROKE POWER PLANT RWE NPOWER

June 2007 ALSTOM FRANCE FUJAIRAH FUJAIRAH II POWER PROJECT

November 2007 ALSTOM FRANCE SOUTH AFRICA ESKOM

November 2007 ALSTOM FRANCE ALGERIA SONELGAZ

January 2008 ALSTOM FRANCE NETHERLANDS ELECTRABEL NEDERLAND

February 2008 ALSTOM FRANCE SOUTH AFRICA ESKOM

April 2008 ALSTOM FRANCE TUNISIA STEG

April 2008 ALSTOM FRANCE GERMANY RWE

May 2008 ALSTOM FRANCE UK DRAX GROUP

RAS LAFFAN HELIUM PLANTUSD 200M

Project called Qatar Helium II - Turnkey contract for the construction of the Helium extraction, purification and liquefaction unit, production of 38 million m3 per year.CHIYODA AL MANA ENGINEERING will provide epc management services, responsible for construction the extraction units that will feed the Helium facility

The plant will deliver up to 2000mw, ALSTOM selected by RWE as EPC contractorThe project has received approval from the British Government in February 2009, work will start soon April 09 : contract officially signed by Alstom for a value of € 1 Billion

INTERNATIONAL POWERMARUBENI

Scope : 2000mwINTERNATIONAL POWER and MARUBENI have been selected as preferred bidder. Their nominated EPC contractor for the power plant is ALSTOM. The financial close is expected in october 2007.

MEDUPI POWER STATIONUSD 4,9 Billion

Scope 4800mw (6x800mw)ALSTOM has been selected to provide the steam turbines, turbogenerators, turbine island auxiliary equipment & associated erection services, contract value € 1,4 Billion. The steam generators will be supplied by Hitachi Power EuropeIn May 2008, Eskom has awarded the civil works subcontract (USD 383,9M) to the local MURRAY & ROBERTS, GRINAKER-LTA and CONCO

TERGA/AIN TEMOUCHENT POWER PLANT - USD 1,97 B

Scope : 1200mwALSTOM in association with ORASCOM/EGYPT has won the construction contractIn November 08, ALSTOM signed the € 317M long-term maintenance contract (20 years)

LELYSTAD FLEVOCENTRALE PROJECTUSD 592 M

Scope : 870mw Alstom will design and built the fully plant and will provide the main components including two GT26 gas turbines and associated equipment

BRAVO POWER STATIONUSD 4 Billion

Scope : 4750mw (6x790mw)ALSTOM has signed a USD 1,36 Billion (supply of steam turbines & turbo-generator package),HITACHI POWER SOUTH AFRICA has won the USD 2,5 B contract for the boilers package - Commissioning between 2013 & 2017In may 2008 BLACK&VEATCH announced that they will provide project management & engineering services for the project In december 2008 ESKOM has awarded a USD 283M contract for civil works to a consortium of local companies led by Stefanutti Stocks, including Group Five, Basil Read and WBHO Construction

GHANNOUCH POWER PLANTUSD 540 M

Scope : 400mwAlstom has been selected against Siemens

HAMM POWER PLANTUSD 750 M

capacity 1600mwALSTOM has won the contract (Euros 500M) to supply the boilers for the two units and to complete all auxiliary equipment including erection and commissioning - ALPINE/AUSTRIA will carry out foundations and civil works

DRAX BIOMASS PROCESSING FACILITYUSD 94,5M

ALSTOM will build the main processing works associated with the 1,5 million t/y biomass co-firing facility to be constructed at the 4,000mw power station in North Yorkshire. The processing works will receive, handle, store and process various biomass materials ready for direct injection into the coal-fired boiler. Work itself to start during the second half of the year

44 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

June 2008 ALSTOM FRANCE NETHERLANDS ESSENT

July 2008 ALSTOM FRANCE SAUDI ARABIA SEC

August 2008 ALSTOM FRANCE SPAIN HC ENERGIA

August 2008 ALSTOM FRANCE INDONESIA PT PLN

November 2009 ALSTOM FRANCE GERMANY GROSSKRAFTWERK MANNHEIM AG

December 2009 ALSTOM FRANCE SLOVENIA TERMOELEKTRAMA SOSTANJ

August 2008 DEGREMONT FRANCE BAHRAIN

July 2009 DEGREMONT FRANCE AUSTRALIA VICTORIA GOVERNMENT

July 2007 ENTREPOSE FRANCE NETHERLANDS GATE LNG TERMINAL

May 2008 ENTREPOSE FRANCE SOUTH AFRICA TRANSNEFT

July 2008 ENTREPOSE FRANCE ALGERIA SONATRACH

July 2008 ENTREPOSE FRANCE NIGERIA WAGPCo

CLAUS POWER PLANT EXPANSION - USD 1 BILLION

repowering of Claus B and the construction of Claus C located at Maasbracht, resulting in a 1,280 MW GT26-based combined-cycle power plant. The contract include a long-term operation support and maintenance agreementALSTOM received the Full Notice to Proceed in December 08

SHOAIBA POWER PLANT PHASE III - USD 2,85 B

Scope : 1200mwthis new phase will bring the total output to 5600mw - Like for the previous phases, ALSTOM will work with SAUDI ARCHIRODON who will carry out the civil worksAlstom will design, supply, install and commission the entire plant - contract officially signed on september 1

SOTO DE RIBERA POWER PLANTUSD 510 M

Scope : combined-cycle 400mwALSTOM and DURO FELGUERA have won the turnkey contract, additionally Alstom will provide long-term operation support and maintenance contract

MUARA TAWAR COMBINED CYCLE POWER PLANT - USD 240M

Scope : construction of a fifth unit (235mw)ALSTOM as leader of a consortium including MARUBENI/J will engineer, procure and commission a fully integrated power island while MARUBENI will supply Balance of Plant & civil works

MANNHEIM 9 POWER PJT€ 450 M

Scope : 900mwALSTOM will supply new boiler and turbine units, it will replace existing units 3 & 4

SOSTANG COAL-FIRED STEAM POWER PLANT - € 700M

Scope : 600mwAlstom will supply the complete power island including the steam turbine generator, the water-steam cycle, the boiler…

ADDUR IWPP (DESALINATION PACKAGE)

SUEZ ENERGYGULF INVESTMENT CORP

Suez Energy with Gulf Investment Corp/Kuwait have won the IWPP. DEGREMONT/F selected as EPC contractor for the desalination plant (capacity 48 million g/d)

WONTHAGGI DESALINATION PROJECT - € 1,2 B

financing, design,construction and operation, for the period to 2039, of a plant with a capacity of 450,000 m3 of drinking water per day, as well as an 85 km water distribution network. Contract to be executed by Degremont with Thiess - Work to start in October

GATE TERMINAL(Vopak/Gasunie)

the terminal will have a capacity of 8-12 billion cmGate terminal has selected a consortium including TECHINT/ITALY, SENER/SPAIN, ENTREPOSE/France and VINCI GRANDS PROJETS for the EPC contract. A final investment decision has been taken in December 2007, and the engineering construction companies have received notice to proceed in January 08. VINCI and Entrepose will be responsible for the construction of three storage tnaks (180,000cm3 each)

DURBAN-GAUTENBERG FUEL PIPELINE PROJECT - USD 315M

Scope : 544km 24" line and an additional line linking Kerdal to Waltloo and Jameson Park to Langlaagte via Alrode - contract to be carried out by Spie Capag, part of Entrepose Group. SPIE's share of the contract €105M - work to start in july 2008

SKIKDA LNG TANKS (Skikda LNG Project)

The contract has been awarded by KBR/USA, the main contractor of the Skikda LNG Project.Scope : a very large cryogenic storage tank with capacity of 150,000m3 for storing LNG, two cryogenic tanks of 65,000m3 for storing LPG and a sphere of 3000m3 for gas storage

LAGOS BEACH COMPRESSION STATION (LBCS PROJECT)

The station will compress, boost and transmit the gas through the WAGPCO pipeline from Nigeria to Benin, Togo and Ghanacontract to be executed with DELATTRE BEZONS NIGERIA

45 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

October 2008 ENTREPOSE FRANCE USA JORDAN COVE ENERGY

June 2010 FOSTER WHEELER FRANCE CAMEROON SONARA

June 2008 GE ENERGY FRANCE SPAIN BESOS 5 POWER PLANT ENDESA

June 2009 JACOBS ENGINEERING FRANCE FRANCE STORENGY

January 2010 JACOBS ENGINEERING FRANCE FRANCE STORENGY

May 2010 LAVALIN EUROPE FRANCE JORDAN JPMC / IFFCO

June 2008 LITWIN FRANCE FRANCE GDF

April 2010 LITWIN FRANCE ABU DHABI TAKREER

June 2007 SIDEM FRANCE FUJAIRAH

March 2008 SIDEM France QATAR SUEZ/MITSUI

December 2008 SPIE CAPAG FRANCE ANGOLA ANGOLA LNG

December 2009 SPIE CAPAG FRANCE EXXONMOBIL

JORDAN COVE LNG TERMINAL JORDAN COVE ENERGY has selected 4 companies to design & build the project : KIEWIT (construction of the terminal), BLACK&VEATCH (engineering design), ENTREPOSE CONTRACTING AND VINCI GRANDS PROJETS/F (LNG tanks). However the project has still to be approved before construction starts.The LNG terminal will have a capacity of 1 Billion cubic feet per day, two storage tanks (160,000cm each)

LIMBE REFINERY UPGRADING PROJECT PHASE 1

Phase One will cover revamping of the existing crude distillation unit, addition of a new vacuum distillation unit, new catalytic reformer unit, power generation and associated offsites & utilitiesEPCM contract for FW who performed the feed

Scope : 840mw tunkey contract, besides the gas turbines, generators, steam turbines, heat recovery steam generators, GE's contract includes engineering, balance of the plant equipment, civil works, erection & commissioning

ETREZ GAS STORAGE EXPANSION

Storengy is a GDF Suez CompanyJACOBS ENGINEERING has won the contract to provide engineering, procurement and construction management services to upgrade the facilitywork will cover four additional caverns to the existing 17 caverns. Jacobs will design and install gas compression, gas treatment, a control system and utilities

CERE LA RONDE UNDERDROUND GAS STORAGE FACILITY UPGRADING

The project will increase storage capacity to 1,200 million cubic metersJACOBS will design and install new gas compression, double the gas treatment facilities and upgrade the control system & utilities

FERTILIZER PLANT - JIFCO PjtUSD 650M

Scope : production of 4500t/d of sulphuric acid - 1500t/d of phosphoric acidFinancing by IFC and EIB and the developersSNC LAVALIN will provide overal project management, detailed design, proprietary equipment items and construction management. Contract to be followed by SNC LAVALIN EUROPE

BEYNES UNDERGROUND GAS STORAGE FACILITIES USD 214M

Redevelopment of the Beynes underground gas storage facility including gas compression and treatment. Contract to be executed with BOCCARD. Litwin share of the contract is € 75M

RUWAIS ISOMERATE QUALITY IMPROVEMENT PJT - USD 50M

Scope : construction of facilities to process high octane gasoline productsFEED done by TECNICAS REUNIDAS

FUJAIRAH II DESALINATION PROJECT

INTERNATIONAL POWERMARUBENI

Scope : capacity of 130 million g/dINTERNATIONAL POWER and MARUBENI have been selected as preferred bidder. Their nominated EPC contractor for the desalination plant is SIDEM. The financial close is expected in october 2007.

RAS LAFFAN C IWPP PROJECT(DESALINATION PACKAGE)

SUEZ/MITSUI has won the IWPP Project, agreement signed in March 2008.The named EPC contractor for the desalination package (286,000cm/day) is SIDEM, contract still to be confirmed by Sidem/Veolia

PIPELINE NETWORK FOR SOYO LNG - USD 550 M

ANGOLA LNG has awarded the contract to SPIE CAPAG and ACERGYSPIE CAPAG (part of ENTREPOSE Group)'s share of contract is USD 300M, it covers epcm of a pipeline system comprising 3 gas lines (18"/22"/24"), a Beach valve Station and a LNG plant tie-in station with associated facilities. Engineering & procurement to commence immediately with construction to start in the third quarter of 2009ACERGY in charge of the nearshore scope

PAPUA NEW GUINEA

PNG LNG PROJECT(Onshore pipelines) USD 430M

Scope : engineering, procurement, construction & commissioning of an onshore pipeline system of approx 450km of pipeline from 2" to 34"

46 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

TECHNIP FRANCE NIGERIA OLOKOLA LNG PROJECT

December 2007 TECHNIP FRANCE ANGOLA TOTAL

TECHNIP FRANCE RUSSIA IKRA PROJECT

July 2008 TECHNIP FRANCE TUNISIA TIFERT

July 2008 TECHNIP FRANCE ANGOLA BP ANGOLA

December 2008 TECHNIP FRANCE INDIA RELIANCE INDUSTRIES

July 2009 TECHNIP FRANCE SAUDI ARABIA

July 2009 TECHNIP FRANCE SAUDI ARABIA

TECHNIP FRANCE FRANCE TOTAL

February 2010 TECHNIP FRANCE QATAR QATARGAS

March 2007(unofficial)

OK LNG(NNPC, CHEVRON, SHELL, BG)

Scope : two LNG trains with a capacity of 5,5 Millions t/y each. TECHNIP has been selected in March 2007 with SNAMPROGETTI to carry out the contract. Contract not confirmed by Technip

PAZFLOR PROJECT (SUBSEA PACKAGE) - USD 1,8 B

Pazflor involves 4 fields : Perpetua, Hortensia, Zinia and AcaciaTECHNIP's share of the contract is USD 1,1 B, coverin 80km of production and water injection rigid flowlines, conventional flexible risers as well as engineering, procurement & fabrication of 60 km of umbilicalsTechnip/Paris will execute the contract, fabrication to take place in Angola. ACERGY's share is USD 700M

February 2008(unofficial)

RUSVINYL(Sibur / Solvin)

The plant, located at Kstovo, will produce 300,000t/y of PVC- suspension, 30,000t/y of PVC- emulsion and 225,000t/y of caustic sodaTechnip selected for the FEED and the EPCProject has been delayed, work expected to start early 2010

LA SKHIRA SULFURIC ACID PLANT

Scope : capacity of 3600 tons per day based on Monsanto processTifert is a joint-venture between Cie des Phosphates de Gafsa, Le Groupe Chimique Tunisien and the indian GSFC and Coromandel FertilizersThe unit is part of a project that will use sulfuric acid and phosphate to produce phosphoric acidContract to be executed by Technip in Paris with the local PIRECO

BLOCK 31 (PSVM PROJECT)USD 450 M

Technip signed a frame agreement contract for the engineering, procurement of equipment, construction & installation of the subea flowlines, first call-off contract signed for 45km of rigid water injection lines and 20km of rigid gas-injection lines In september 08, Technip has been awarded two new frame agreements with BP : for flexible pipes and for 34 umbilicals (total length 43km) -

MA D6 FIELD DEVELOPMENTPHASE II

Technip has been awarded a € 140 M subcontract by AKER Installation for engineering, project management, transportation & installation of 18km flexible production & gas export risers & flowlines + transport & installation of 5 umbilicals and a gas export manifold supplied by the client and installation of a 24" rigid spool - contract to be executed by Technip in Paris and Aberdeen with the support from Chennai/India

JUBAIL REFINERY(Satorp Project)Pack 2 - Conversion Unit

SAUDI ARAMCOTOTAL

Scope : epc of the hydro and catalytic cracking conversion process units. Contract to be executed by Technip in Italy and France with assistance from the group organization in the Middle East. estimated contract value USD 1,7B

JUBAIL REFINERY(Satorp Project)Pack 5A - Offsites & Utilities

SAUDI ARAMCOTOTAL

Scope : Offsites & Utilities, interconnecting network & process control for the whole refinery contract awarded to Technip with CTCI, estimated contract value : USD 1,3 Bto be executed by Technip in Roma, in Paris with the support from the organization in Middle EastCTCI confirmed the contract award in September 09, in charge of the engineering & procurement services for Flare and Cooling systems

September 2009(not confirmed)

GONFREVILLE CRACKER EXPANSION

upgrading of the vapocracker and the high density polyethylene unitscontract said to be followed by Lyon (no official confirmation)

PLATEAU MAINTENANCE PROJECT (PMP)USD 1,2 B

The project will enable Qatargas to maintain its current production level of 10 million t/y of LNGScope : a new acid gas removal unit, a new sulphur recovery unit and moridication to utility systems for handling increased feedgas rates to the existing trains.Contract won in association with CHIYODA

47 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

June 2010 TECHNIP FRANCE EGYPT BURULLUS GAS CY

July 2007 VINCI FRANCE NETHERLANDS GATE LNG TERMINAL

March 2008 GERMANY RUSSIA PERM POLYSTYRENE PLANT SIBUR KHIMPROM

May 2007 HITACHI POWER EUROPE GERMANY NETHERLANDS ELECTRABEL

May 2007 HITACHI POWER EUROPE GERMANY GERMANY ELECTRABEL

November 2007 HITACHI POWER EUROPE GERMANY SOUTH AFRICA ESKOM

December 2007 LINDE GERMANY RUSSIA TOBOLSK POLIMER

December 2008 LINDE GERMANY INDIA

July 2009 LINDE GERMANY ABU DHABI

March 2007 LURGI GERMANY IRAN ESFAHAN OIL REFINING CY

November 2007 LURGI GERMANY CANADA NORTH WEST UPGRADING

WEST DELTA DEEP MARINE PHASE VIIIaUSD 367M

Scope : Design, supply and installation of three production manifolds and three subsea distribution assemblies - Engineering, welding and installation of approximately 67 km of rigid production flowlines - Engineering, fabrication and installation of approximately 88 km of umbilicals - 12 km of flexible flowlines and three flexible jumpers - Connection of the flowlines and umbilicals to the wellheads and subsea manifolds. Contract to be executed by Paris with assistance from Genesis/UK and Technip Egypt

GATE TERMINAL(Vopak/Gasunie)

the terminal will have a capacity of 8-12 billion cmGate terminal has selected a consortium including TECHINT/ITALY, SENER/SPAIN, ENTREPOSE/France and VINCI GRANDS PROJETS for the EPC contract. A final investment decision has been taken in December 2007, and the engineering construction companies have received notice to proceed in January 08. VINCI and Entrepose will be responsible for the construction of three storage tnaks (180,000cm3 each)

CHEMIEANLAGENBAUCHEMNITZ GmbH

Scope : 50,000t/y with a potential for future expansion to 100,000t/yCHEMIEANLAGENBAU CHEMNITZ (CAC) will provide the design, equipment supply and management of construction

MAASVLAKTE COAL-BIOMASS POWER PLANT

Scope : 800mwElectrabel has signed the contract with Hitachi Power Europe

CONSTRUCTION OF 2 COAL-BIOMASS POWER PLANTS

One will be built in Stade, the other in Brunsbüttel or Wilhelmshaven. Each plant will have a capacity of 800mwElectrabel has signed the contract with Hitachi Power Europe

MEDUPI POWER STATIONUSD 4,9 Billion

Scope : 4800mw (6x800mw)HITACHI POWER EUROPE will supply six coal-fired steam generators, contract value euros 2 Billion, ALSTOM will supply the steam turbines & auxiliary equipment

TOBOLSK POLYPROPYLENE PLANT

Scope : capacity of 500,000t/y based on Ineos TechnologyLINDE will act as EPC contractor, contract to be followed by Linde KCA in DresdenTobolsk Polimer is a SIBUR's subsidiaryFinancing in place in Sept 09 (USD 154M), work to be completed mid-2012 instead of mid-2011EPC contract signed in December 09, contract value € 450M

DAHEJ PETROCHEMICAL PLANT(ETHYLENE PACKAGE)USD 1,43 BILLION

OPAL(ONGC PETRO ADDITIONS)

Scope : capacity of 1,1 Million t/y of ethylene and 340,000t/y of propylenecontract awarded to a consortium of LINDE/GERMANY and SAMSUNGLINDE's share of the contract is EUROS 350M, they will be responsible for the technology, the basic engineering and the supply of critical componentsSAMSUNG's share of the contract is USD 960M, covering the detail engineering, the supply of the remaining components, the construction and assembly

BOROUGE 3 PROJECT(ETHANE CRACKER)USD 1,07 B

BOROUGE(Adnoc/Borealis)

Scope: capacity of 1,5 Million t/ycontract to be executed on a lump sum turnkey basis, construction work to be undertaken by CCC

ESFAHAN REFINERY UPGRADINGUSD 1720 M

The production of the gasoline will be boosted from 9 million liters to 12 millions. The contract will be executed by DAELIM, UHDE, LURGI and the local companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project management consultant. The upgrading involves construction of several units

NORTH WEST UPGRADER PROJECT (GASIFIER UNIT)USD 500 M

The contract covers the design, procurement and construction of a 120 MMcf/d gasification-based hydrogen plant. LURGI has appointed KBR/USA to complete pipe fabrication, module fabrication and field execution

48 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

May 2008 LURGI GERMANY RUSSIA EUROCHEM

June 2008 LURGI GERMANY NETHERLANDS AIR LIQUIDE

December 2008 LURGI GERMANY CHINA

May 2009 LURGI GERMANY RUSSIA TAIF-NK

October 2009 LURGI GERMANY RUSSIA GAZPROM KOMPLEKTATSIYA

June 2007 MAN FERROSTAAL GERMANY VENEZUELA MORON FERTILIZER PLANT PEQUIVEN

October 2008 MAN FERROSTAAL GERMANY VENEZUELA ENELVEN

February 2009 MAN FERROSTAAL GERMANY TRINIDAD GENERATION UNLIMITED

February 2005 SIEMENS GERMANY EGYPT EDEPC

April 2007 SIEMENS GERMANY NETHERLANDS DELTA ENERGY / EDF

October 2007 SIEMENS GERMANY GERMANY

February 2008 SIEMENS GERMANY NETHERLANDS INTERGEN

March 2008 SIEMENS GERMANY PORTUGAL ELECGAS

March 2008 SIEMENS GERMANY GERMANY MAINZ-WIESBADEN AG

September 2008 SIEMENS GERMANY PERU DUKE ENERGY EGENOR

MELAMINE PLANT AT NEVINNOMYSSKY AZOT - USD 139M

Scope : 50,000t/y of melamine - Urea Casale will supply the licenseThe project has an investment value of € 184M, contract value with LURGI is € 92,6M

ROTTERDAM HYDROGEN PLANTUSD 195 M

The plant will produce 130,000 cubic meters per Hour, it will supply hydrogen to the biodiesel plant planned by Neste Oil. LURGI, now part of Air Liquide, will build the plant

HUIZHOU ACRYLIC ACID PLANTEUROS 38 M

CNOOC ENERGY TECHNOLOGY & SERVICES

Scope : capacity of 140,000t/yLURGI's contract covers the license, basic engineering, certain equipment & technical support

TAIF-NK NIZHNEKAMSK REFINERY UPGRADING

the project will increase the capacity of the refiery from 7 Million t/y to 9,1 Million t/yLURGI signed an agreement in May to supply licences for parts of the technology and the complete engineering (procurement ??)

ASTRAKHAN REFINERY MODERNIZATION

Contract to supply engineering & procurement services for a naphtha hydrotreater and a c5/c6 isomerization unit to be integrated to the refinerycontract to be executed with Maveg Industrieausrüstungen GmbH

Scope : an ammonia unit (1800t/d - KBR Technology) - an urea unit (2200t/d - Toyo Technology)Contract won by a consortium including TOYO ENGINEERING, MAN FERROSTAAL and the local VEC INGENIERIA y CONSTRUCCION

TAMARE & BACHAQUERO POWER PLANTS USD 980 M

The Tamare Power plant will have a capacity of 483mw, Bachaquero 516mwMAN FERROSTAAL will provide engineering, procurement & construction in association with FERROSTAAL PROCON DE VENEZUELA and KOCH DE Portugal

TRINIDADTOBAGO

LA BREA POWER PLANTUSD 700 M

Scope : 760mwfull EPC contract for Man Ferrostaal

TALKHA POWER PLANTUSD 500 M

750MW combined cycle power plantALSTOM POWER has the steam turbine package (USD 315M), SIEMENS has the gas turbine package (USD 100M). ORASCOM and BE SIX will carry out the civil works

SLOE POWER PLANT AT VLISSINGEN - USD 750 M

Scope : 870mwSIEMENS has won the turnkey contract with a maintenance agreement during 15 years

LUNEN POWER PLANTUSD 600 M

TRIANEL POWER PROJEKTGESELLSCHAFT

KOHLEKRAFTWERK

Scope : 750mwContract signed with a consortium led by SIEMENS POWER including A-TEC INDUSTRIES/AUSTRIA subsidiary AE&E and IHI/J

RIJNMOND II POWER PLANTUSD 470 M

Scope : 430mw fired with natural gasSIEMENS has won the construction contract as well as a long-service agreement for 12 years

ABRANTES POWER PLANTSUSD 900 M

the two units to be built in Abrantes will have a combined installed capacity of 830mwSIEMENS has won the € 600 M contract and will assume responsibility of the maintenance of the plantsElecgas is a JV between International Power and Endesa/Spain

MAINZ COMBINED HEAT & POWER PLANT - USD 1,5 Billion

the coal-fired combined heat & power plant will have a capacity of 800mw SIEMENS is leading a consortium including the austrian AE&E and the japanese IHI. SIEMENS's share of the contract represents 50%.

LAS FLORES THERMO-ELECTRIC POWER STATION

Scope : capacity of 197mwSIEMENS selected as EPC contractor by Duke Energy

49 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

December 2008 SIEMENS GERMANY BELGIUM T-POWER

May 2009 SIEMENS GERMANY NETHERLANDS ENECOGEN

April 2010 SIEMENS GERMANY NETHERLANDS HEMWEG 9 POWER PLANT NUON

May 2010 SIEMENS GERMANY OMAN GDF SUEZ

July 2009 TECHNIP GERMANY GERMANY EDF / ENBW ENERGIE

August 2009 TECHNIP GERMANY GERMANY CONNECT PROJECT PHASE I SHELL DEUTSCHLAND GmbH

March 2007 UHDE GERMANY IRAN ESFAHAN OIL REFINING CY

June 2007 UHDE GERMANY ALGERIA SORFERT

April 2008 UHDE GERMANY RUSSIA IRKUSK VINYL CHLORIDE PLANT SAYANSKHIMPLAST

June 2008 UHDE GERMANY NETHERLANDS YARA

July 2008 UHDE GERMANY ROMANIA PETROM

October 2008 UHDE GERMANY IRAN NIPC

May 2009 UHDE GERMANY QATAR QAPCO

October 2009 UHDE GERMANY ABU DHABI FERTIL

TESSENDERLO POWER PLANTEUROS 320M

Scope : combined cycle power plant 420mwT POWER is a joint-venture between SIEMENS PROJECT VENTURES, TESSENDERLO CHEMIE and INTERNATIONAL POWERSIEMENS will act as EPC contractor and will maintain the gas turbine under a long-term agreement - Contract confirmed by SIEMENS in March 2009, contract to be executed with FABRICOM GTI and PAUWELS INTERNATIONAL

ROTTERDAM COMBINED CYCLE POWER PLANT - EUROS 700M

Scope : 870mwEnecogen is a partnership between Eneco and Dong Energy/DenmarkTurnkey contract for Siemens who will supply the main components of the plant including gas turbine, steam turbine, entire mechanical equipment

Scope : 435mw, it will replace an old plantTurnkey contract for Siemens + long term maintenance services

BARKA 3 / SOHAR 2 IPP PROJECTSUSD 1,7 B

In May 2010 GDF SUEZ has been awarded the contract for the construction & operation of the two gas-fired power plants, each with a capacity of 744MW. GDF has a 46% stake and is leader of a consortium including the japanese SOJITZ and SHIKOKU and local companies.Named EPC contractors are GS ENGINEERING/SOUTH KOREA and SIEMENS/GERMANY

ETZEL CRYSTAL GAS STORAGE PROJECT

Technip's contract covers engineering, procurement and construction management. The project entails gas compression and treatment facilities for the storage of gas in underground salt caverns

the first phase to be implemented in Wesseling refinery will include modifications of process units (desulphurisation and hydrogen) as well as construction of new facilities. The whole project will connect the Wesseling and Godorf refineries. Contract to be executed by Technip in Dusseldorf

ESFAHAN REFINERY UPGRADINGUSD 1720 M

The production of the gasoline will be boosted from 9 million liters to 12 millions. The contract will be executed by DAELIM, UHDE, LURGI and the local companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project management consultant. The upgrading involves construction of several units

ARZEW FERTILIZER PLANTUSD 1,6 B

Scope : ammonia 4,000t/d - urea 3,250t/dSorfert is a joint-venture between Sonatrach and Orascom/EgyptContract awarded to UHDE to design, develop and construct the complex, OCI ALGERIA will perform all onshore works; The formal contract has been signed mid-april 2008

Scope : 200,000t/y based on Vinnolit TechnologyUHDE will carry out the design, manufacture & supply of equipment - Start up in October 2010

SLUISKIL UREA PLANTUSD 600 M

Scope : capacity of 1,3 Million t/yUhde selected by Yara to design and build the plant

PETROBRAZI REFINERY CLEAN FUELS PROJECT - USD 140M

the gasoline desulfurization unit, based on Axens Technology, will have a capacity of 700,000t/y of low sulfur gasoline

IMAM KHOMEINI PROPANE DEHYDROGENATION PLANT

Scope : capacity of 350,000t/y (project similar to the Egyptian one under construction by UHDE - contract still to be confirmed by UHDE

MESAIEED POLYETHYLENE PLANT (LDPE-3 Pjt)USD 550M

Scope : low density polyethylene capacity 300,000t/y (Basell technology), it will be the third unit to be built at the siteUHDE's scope of contract covers project management, detailed engineering, supply of all equipment and materials TEKFEN won the USD 165M subcontract from Uhde

RUWAIS FERTILIZER PLANT EXPANSION - USD 1,2 B

Scope : a 2,000t/d ammonia unit - a 3500t/d urea unitSAMSUNG has won the contract on a lump sum turnkey basis in partnership with UHDE/GERMANY

50 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

March 2010 UHDE GERMANY GERMANY BAYER MATERIALSCIENCE AG Scope : capacity of 20,000t/y of chlorine

May 2010 UHDE GERMANY SOUTH AFRICA OMNIA

March 2008 METKA GREECE ROMANIA PETROM

July 2009 METKA GREECE SYRIA PEEGT

November 2008 METKA GREECE GREECE

August 2009 METKA GREECE GREECE PUBLIC POWER CORP

October 2009 METKA GREECE TURKEY RWE & TURCAS

July 2009 J&P AVAX GREECE CYPRUS

January 2008 ANSALDO ITALY EGYPT

March 2008 ANSALDO ITALY FRANCE ATEL (3CB)

March 2008 ANSALDO ITALY ITALY ATEL (Progetto EnPlus)

September 2008 ANSALDO ITALY SYRIA PEEGT

July 2009 ANSALDO ITALY ITALY SORGENIA

March 2010 ANSALDO ITALY FINLAND FINGRID

April 2010 BELLELI ITALY FUJAIRAH VOPAK HORIZONS

November 2008 BONATTI ITALY ALGERIA SONATRACH

KREFELD UERDINGEN CHLORINE PLANT

SASOLBURG NITRIC ACID PLANTUSD 176M

Scope : a 1000t/d nitric acid plant and an ammonium nitrate unit + associated facilitiesUHDE selected to supply technology and licenses as well as engineering design and critical components

BRAZI POWER PLANTUSD 600 M

Scope : 860mw gas-fired combined cycleMETKA/GREECE in consortium with GE/USA has won the contract, work to start early 2009

DEIR ALI POWER PLANTUSD 910 M

Scope : 700mw - gas-fired A consortium of METKA and ANSALDO won the contract in september 2008, officially signed in July 09, commissioning within 36 months from the receipt of the LC.METKA leader with 75% share

CORINTH POWER PLANTUSD 360 M

MOTOR OIL HELLASMYTILINEOS

Scope : combined cycle natural gas power station to be built within MOH facilitiesMETKA, part of Mytilineos, will undertake the construction. Work to start in January 2009.the company created between MOH and Mytilineos will be called KORINTHOS POWER

MEGALOPOLIS V CCGT PLANT€ 500 M

Scope : 811mwPPC has decided to award the contract to Metka - Etade SA

DENIZLI POWER PLANT€ 450 M

Scope : 775mw natural gas-fired combined cycle power plantMETKA has won the epc contract, turbines to be supplied by SiemensSIEMENS confirmed the contract in February 2010, value € 110M covering steam turbine, gas turbines, generatorsFinal Investment Decision taken by RWE in May 2010, work to start in June

VASILIKOS POWER PLANT EXPANSION - € 225M

ELECTRICITY AUTHORITY OF CYPRUS

Scope : the 5th phase expansion covers 220mw, in two phases contract won in association with Hitachi Europe GmbH

SIDI KRIER & EL ATF POWER STATIONS -

WEST DELTA ELECTRICITYMIDDLE DELTA ELECTRICITY

Sidi Krier : Ansaldo will supply two 250mw steam turbines and auxiliary systems - the civil works package has gone to ORASCOM CONSTRUCTION INDUSTRIES with BE SIX/BELGIUM (contract value USD 106M)El Atf : Ansaldo will supply the two 250mw steam turbines and the civil works package has been awarded to HASSAN ALLAM & SONS/EGYPT with CCC (USD 102M)total contract value for Ansaldo : Euros 90M

BAYET POWER PLANTUSD 375 M

Scope : 400mw combined-cycleANSALDO ENERGIA has won the turnkey contract + long-term service agreement

SAN SEVERO POWER PLANTUSD 375 M

Scope : 400mw combined-cycleANSALDO ENERGIA has won the turnkey contract + long-term service agreement

DEIR ALI POWER PLANTUSD 910 M

Scope : 700mw - gas-fired A consortium of METKA and ANSALDO has son the contract, commissioning within 36 months from the official signature of the contract

APRILIA POWER PLANT€ 450M

Turnkey contract for a 800mw combined-cycle power plant + a multi-year maintenance contract for the gas turbines & the generators

FORSSA POWER PLANTUSD 101 M

ANSALDO has won the € 75M contract to supply a power-generation unit based on two gas turbines for the new reserve power plant

FUJAIRAH OIL TERMINAL EXPANSION - USD 100M

Scope : addition of 600,000 cubic metres of storage facilitiesepc contract for Belleli

ALRAR POWER PLANT EXPANSION - USD 143M

The extension will boost the capacity by 54mwThe contract has been awarded to BONATTI in association with CARLO GAVAZZI IMPIANTI

51 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

February 2009 BONATTI ITALY SAUDI ARABIA SAUDI ARAMCO

October 2009 BONATTI ITALY ALGERIA SONATRACH/ANADARKO

July 2008 FOSTER WHEELER ITALY GREECE HELLENIC PETROLEUM

July 2008 FOSTER WHEELER ITALY RUSSIA TANECO (TATNEFT)

April 2010 FOSTER WHEELER ITALY ROMANIA PETROM

February 2008 SAIPEM ITALY ITALY OLT LNG

September 2007 SAIPEM ITALY RUSSIA-GERMANY GAZPROM-NORDSTREAM

September 2007 SAIPEM ITALY SAUDI ARABIA SAUDI ARAMCO

March 2008 SAIPEM ITALY NIGERIA TOTAL/ELF PETROLEUM NIGERIA

July 2008 SAIPEM ITALY SAUDI ARABIA SAUDI ARAMCO

July 2008 SAIPEM ITALY ALGERIA SONATRACH

October 2008 SAIPEM ITALY NIGERIA TOTAL E&P NIGERIA

RAS ABU ALI PLANT UPGRADEUSD 158 M

the project includes new water injection systems, a disposal, replacement of three gas turbines

EL MERK FIELD DEVLPT(Pipelines Package) - USD 150M

The lines will run from El Merk to Haoud El Hamra and Gassi Touil : 160km 16" line (LPG) - 160km 18" (condensates) - 70km 20" (oil)

THESSALONIKI REFINERY UPGRADE - USD 170 M

The scope of the project is the production of low sulphur duels : a new 15,000b/d continuous catalytic cracker, modification of the atmospheric distillation unit and revamping of the naphtha hydrofiner and crude light ends processing unit to increase to 26,000b/d the processing capacity for the light products - Contract to be carried out by FWI and its Greek subsidiary

NIZHNEKAMSK REFINERY (FIRED HEATERS)

FWI will engineer and supply the materials for two furnaces for the hydrocracking unit and a charge heater and 3 interheaters for the continous catalytic reformer

PETROBRAZI REFINERY MODERNIZATION

FW will provide FEED and EPCM for the revamp of the atmospheric/vacuum distillation unit and will provide EPCM for a new amine unit and the FEED for the revamp of a delayed coker

LIVORNO OFFSHORE LNG TERMINAL - USD 592,5 Million

the terminal will have a capacity of 3,75 Billion cubic metersOLT LNG is a joint-venture between Iride and Endesa. Saipem has been selected in May 2007, the contract has been officially signed in February 2008, work will involve conversion of the gas tanker Golar Frost acquired recently by Olt Offshore

NORD STREAM PIPELINEUSD 2 BILLION

1200km diam 48" linking Vyborg in Russia to Greifwald on Baltic Sea Coastthe line will have an initial capacity about 27,5 Billion cm of gas per yearSAIPEM selected in september 2007 for the contract, official contract (Euros 1 Billion) announced in June 2008 by Saipem, negotiations on shore approcah, tie-ins are still underway with the client

OFFSHORE MAINTAIN POTENTIAL PROGRAM

Long-term agreement covering the construction, transport and installation of offshore facilities, a minimum workload is guaranteed over 4 years for 16 platforms and 80km of sealines. The contract will be executed with the local companies TAQA and AL RUSHAID

USAN FIELD DEVELOPMENT(URF & OLT PACKAGE)USD 1,3 BILLION

Saipem's contract involves engineering, procurement, construction, installation of the subsea umbilicals (72km), flowlines (61km) and risers connecting the 42 subsea wells to the FPSO along with the oil loading terminal

MANIFA PROJECT (CENTRAL PROCESSING FACILITIES)USD 1,8 BILLION

Scope : engineering, procurement and construction of three gas-oil separation trains with a capacity of 300,000b/d each, gas dehydration, crude inlet manifolds and the flare gas systemLump Sum Turnkey Contract for SaipemCommissioning deferred to 2013 instead of 2011

ARZEW LNG PLANT(GL3Z)USD 4,2 BILLION

Scope : capacity of 4,7 million t/y of LNGSAIPEM/SNAMPROGETTI in joint venture with CHIYODA has been awarded the lump sum turnkey contractIn February 2009, DAEWOO has been awarded a subcontract valued at USD 280,3M for the storage tanks

OML 58 UPGRADE PROJECT PHASE ONEUSD 1160 M

EPCM contract won by SAIPEM, PONTICELLI and DESICON, SAIPEM's share USD 700M - PONTICELLI's share USD 460MThe contract covers EPCM for the revamping of the Flow Station. A new gas treatment train and interconnecting pipelines & utilities to increase gas production to 15,65 MMcm/d as well as implementing condensate stabilisation and upgrading water injection. An additional 2,50MMcm/d capacity will be constructed to supply gas to domestic market

52 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

November 2008 SAIPEM ITALY ALGERIA SONATRACH

March 2009 SAIPEM ITALY ALGERIA SONATRACH/ENI

May 2009 SAIPEM ITALY KAZAKHSTAN AGIP KCO

June 2009 SAIPEM ITALY ALGERIA SONATRACH

July 2009 SAIPEM ITALY ANGOLA KIZOMBA SATELLITES PJT ESSO EXPLORATION ANGOLA

October 2009 SAIPEM ITALY QATAR QAFCO

October 2009 SAIPEM ITALY NIGERIA SHELL NIGERIA

October 2009 SAIPEM ITALY KUWAIT KOC

November 2009 SAIPEM ITALY ITALY ENI

December 2009 SAIPEM ITALY EXXONMOBIL

February 2010 SAIPEM ITALY MEXICO PEMEX

HASSI MESSAOUD LPG FACILITIES - USD 1,6 B

the lumpsum turnkey contract covers engineering, procurement and construction of 3 LPG production trains with a total capacity of 8 million cubic meters a day.the work will also include oil-separators and a pipeline to transport oil to an industrial complexIn March 2009, SHAW GROUP has been selected to provide engineering services, acting as SAIPEM's subcontractor

MLE FIELD DEVELOPMENTUSD 1,8 BILLION

the contract covers EPC on the natural gas gathering systems and processing plant and related export pipelines. The facilities will be able to process 350 million cubic feet of gas per day and 35,000b/d of liquidsENI took control of a 75% share in the field after having acquired First Calgary

KASHAGAN FIELD DEVLP PHASE ONE (HOOK UP)USD 2,6 BILLION

contract won in association with AKER SOLUTIONS for the hook-up and commissioning of the offshore facilities as well as for the inshore completion and prefabrication to be executed in the Kuryk Yard. The marine activities will be carried out using 5 barges converted into temporary living quarters & offices as well as temporary barges which Saipem refurbished under a preliminary contractSaipem's share of the contract is USD 1 Billion

GK-3 PIPELINE (pack 3)USD 580M

package 3 covers 351km between Mechtatine and El Kalathe whole GK-3 pipeline will run from Hassi R'Mel to El Kala on 784km (48")

Scope : engineering, construction, transport & installation of pipelines, umbilicals, risers and subsea systems connecting the Mavacola and Clohas fields to the existing FPSO units at Kizomba A & BIn August 09 PONTICELLI announced that they received a contract for work onshore + offshore hook-up, work will cover installation of 750 tons of piping In September AMEC informed that they will provide detailed design, procurement and logistics support services, work to be carried out by Paragon Angola with support from Amec/Houston (topsides modifications, new production flowlines with receiving, metering and pressure/surge control capabilities.....

QAFCO-IV EXPANSION PJT USD 610M

Scope : a urea unit 3850t/d + associated utilities (urea granules storage, material handling system, steam & power generation facilites and all interconnections between Qafco-6, Qafco-5 and UFC-85contract awarded to the same consortium who is presently carrying out Qafco-V. Saipem in association with HYUNDAI

BONGA NORTH-WEST FIELD SUBSEA DEVELOPMENT

Saipem's contract includes engineering, procurement, fabrication, installation of 13km of production pipe-in-pipe flowlines (10"-12"), 4km of 12" water injection flowlines + related production facilities and the instalaltion of 15km of umbilicals

GAS COMPRESSORS AT GC 7, 8 & 21 - USD 123M

The compressors will replace existing units at GC7, 8 & 21, they will process 4-8 million cubic feet a day of gasSAIPEM has won the USD 123M contract, although second-ranged bidder

AQUILA FPSO€ 1 BILLION

scope : conversion of an oil tanker into a FPSO vessel. It will have a storage capacity of 700,000 barrels and a production capacity of 12,000b/d

PAPUA NEW GUINEA

PNG LNG PROJECT(Offshore Pipeline) USD 450M

Scope : engineering, transportation & installation of 407km 34" gas sealine connecting the Omati River Landfall point to the onshore plant

SALAMANCA & TULA CLEAN FUELS PROJECT - USD 345M

Scope : gasoline desulfurization units and amine regeneration units at both refineries. The project will reduce the sulfur content of gasoline produced at those plantscontract won against Samsung and ICA Fluor. Local content to be maximized

53 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

April 2010 SAIPEM ITALY ABU DHABI ADNOC

April 2010 SAIPEM ITALY ABU DHABI ADNOC

April 2010 SAIPEM ITALY ABU DHABI ADNOC

May 2010 SAIPEM ITALY INDIA TATA CHEMICALS

May 2010 SAIPEM ITALY GABON TOTAL

June 2010 SAIPEM ITALY SURINAME STAATSOLIE

June 2010 SAIPEM ITALY KUWAIT KOC

June 2010 SAIPEM ITALY POLAND POLISH LNG

March 2009 SIIRTEC NIGI ITALY RUSSIA GAZKOMPLEKTIMPEX

SNAM PROGETTI ITALY NIGERIA OLOKOLA LNG PROJECT

November 2007 SNAM PROGETTI ITALY QATAR QAFCO

May 2008 SNAM PROGETTI ITALY KUWAIT KOC

July 2007 TECHINT ITALY NETHERLANDS MAASVLAKTE LNG TERMINAL

June 2010 TECHINT ITALY POLAND POLISH LNG

SHAH GAS PROJECT (Shah Processing Plant)USD 1,9 BILLION

The project will treat 1 billion cubic feet a day of sour gasthe package covers the engineering, procurement and construction of the gas processing plant FLUOR/VECO are the Project Management Contractors

SHAH GAS PROJECT (Shah Sulfur Recovery Units) - USD 1,45 B

The project will treat 1 billion cubic feet a day of sour gasthe package covers the engineering, procurement and construction of the sulfur recovery unitFLUOR/VECO are the Project Management Contractors

SHAH GAS PROJECT (pipelines package ) - USD 196M

The project will treat 1 Billion cubic feet a day of sour gasThe package covers engineering, procurement & construction of 250km of pipelines to transport gas, condensate and NGL from the Shah Gas Plant to Habshan and Asab tie-in pointFLUOR/VECO are the Project Management Contractors

BABRALA FERTILIZER PLANT EXPANSION (urea package)

Scope : 3900t/dSAIPEM selected as technology supplier and EPCM contractor

ANGUILLE FIELD WELLHEAD PLATFORM

The platform calls for 1,050 tonne topside, 650 tonne jacket and 1,250 tonne piles. Fabrication work subcontracted to EIFFEL

PARAMARIBO REFINERY EXPANSION PROJECTUSD 550M

The project will double the capacity of the refinery, to 15,000b/dSAIPEM selected as EPC contractor in June 2010. AKER SOLUTIONS is the Project Management Consultant, FEED don by CB&I LUMMUS

GAS BOOSTER STATION BS-171USD 900M

The station will include three high and low pressure gas trains to produce 234 million cubic feet a day of dry gas and 69,000b/d of condensates, the contract includes also a pipeline network from the gathering centers to the booster station and an intermediate slug catcher.

SWINOUJSCIE LNG TERMINALUSD 903M

Scope : initial capacity of 5 Billion cubic metres per yearSAIPEM in consortium with TECHINT/ITALY and PBG/POLAND selected as EPC contractors

PORTOVAYA GAS TREATMENT UNIT

Scope : the unit will dehydrate 170 million cubic meters of natural gas per daySIIRTEC NIGI will carry out the engineering, and will supply the required materials & equipmentthe project is part of Nord Stream Pipeline

March 2007(unofficial)

OK LNG(NNPC, CHEVRON, SHELL, BG)

Scope : two LNG trains with a capacity of 5,5 Millions t/y each. TECHNIP has been selected in March 2007 with SNAMPROGETTI to carry out the contract. Contract not confirmed by Technip nor SnamProgetti

QAFCO-V EXPANSION PROJECTUSD 3,2 Billion

Scope : two ammonia plants with a total production of 4600t/d and an urea plant with a capacity of 3850t/dwork will start in January 2008 ; the project will also include upgrade of existing facilitiesSAIPEM/SNAM leader of the consortium including HYUNDAI, contract share is € 1,4 Billion

GAS BOOSTER STATION GS 160USD 649 M

The station will consist of two identical trains delivering 250 million cf/d of sour gas. SNAMPROGETTI selected in May, official contract announced by Saipem in June 208

GATE TERMINAL(Vopak/Gasunie)

the terminal will have a capacity of 8-12 billion cmGate terminal has selected a consortium including TECHINT/ITALY, SENER/SPAIN, ENTREPOSE/France and VINCI GRANDS PROJETS for the EPC contract. A final investment decision has been taken in December 2007, and the engineering companies have received notice to proceed in January 08

SWINOUJSCIE LNG TERMINALUSD 903M

Scope : initial capacity of 5 Billion cubic metres per yearSAIPEM in consortium with TECHINT/ITALY and PBG/POLAND selected as EPC contractors

54 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

December 2007 TECNIMONT ITALY RUSSIA TOBOLSK POLIMER

January 2008 TECNIMONT ITALY VENEZUELA POLINTER

January 2008 TECNIMONT ITALY BRAZIL MPX

June 2008 TECNIMONT ITALY GERMANY WILHELMSHAVEN LNG PLANT E.ON

October 2008 TECNIMONT ITALY POLAND PGNIG

March 2009 TECNIMONT ITALY IRAN ASSALUYEH SADAF CHEMICAL CY

April 2009 TECNIMONT ITALY RUSSIA NUGCC (GAZPROM)

June 2009 TECNIMONT ITALY IRAN PETROPARS

July 2009 TECNIMONT ITALY ABU DHABI GASCO

May 2010 TECNIMONT ITALY ABU DHABI

TOBOLSK PDH PLANTUSD 1 Billion

Scope : 510,000t/y of propane dehydrogenation based on UOP TechnologyTecnimont will act as EPC contractor, FLUOR is the project managerFinancing in place in Sept 09 (USD 154M), work to be completed mid-2012 instead of mid-2011Signature of the EPC contract took place on December 3rd 2009, financing through Sace/Italy and russian banks

EL TABLAZO LOW DENSITY POLYETHYLENE PLANT

Scope : 350,000t/y based on Basell TechnologyTecnimont signed a € 90M contract to provide basic engineering services and the procurement of long lead items, contract to be later converted into an EPC contract Polinter is a Pequiven's subsidiary

ITAQI/MARANHAO & PECEM POWER PLANTS - € 1080 M

The first power station (coal-fired) to be built at Itaqi will have a capacity of 360mw, the second will be built near Pecem : 720mwMAIRE TECNIMONT has signed the two contracts, to be followed by MAIRE ENGINEERING DO BRASIL

Scope : capacity of 10,7 Billion cubic metersIn June 2008 Tecnimont selected as "preferred bidder"leader of a consortium including SOFREGAZ, VINCI GRANDS PROJETS and ENTREPOSE CONTRACTING. A final decision has still to be taken (in July/August) by the client, DFTG, a company controlled by E.ON

WIERZCHOWICE GAS STORAGE EXPANSION - USD 526 M

The storage will be increase from 500 Million cubic meters to 1,2 Billion. The contract has been awarded to a consortium including PBG/POLAND, TECNIMONT/ITALY, SOFREGAZ.F, PLYNOSTAV PARDUBICE/CZECH REPUBLIC - Tecnimont's share of the contract is 42% (Euros 161M)

ASSALUYEH ESBR PLANTUSD 340 M

Scope : capacity of 100,000t/y - Polimeri Europa Technologycontract awarded to a consortium including TECNIMONT/ITALY and NARGAN/IRAN

NOVY URENGOY POLYETHYLENE PLANT

Scope : 400,000t/y Basell TechnologyNUGCC = Novy Urengoy Gas Chemical ComplexTECNIMONT has signed in April 2009 a € 15M contract for the provision od detailed engineering services and is negotiating other agreements relevant to the completion of the complex In May 2010 MAIRE TECNIMONT signed a € 100M contract for the provision of equipment and materials with associated facilities and site assistance

SOUTH PARS PHASE 12 (EPC-3)€ 1,3 Billion

scope : a gas treatment plant at Bandar Tombak with a capacity of 3 Billion cubic feet per dayTECNIMONT has received the LOI in June, official contract to be signed in July 09, it will be executed with the local companies NARGAN, DORRIZ, GAMMA

IGD PROJECT (HABSHAN 5 GAS PROCESSING PLANT - USD 4,7 B

scope : engineering, procurement, construction and commissioning of the following core units : Gas Processing Unit (2 Billion cf/d), Sulphur Recovery Units (5000t/d), NGL Recovery unit (1,2 Billion cf/d). Contract won with JGC/JAPAN, who is the leader of the consortiumIn January 2010 KHARAFI/KUWAIT won a USD 700M subcontract and CCC a USD 300M subcontract for civil, mechanical & electrical works.

BOROUGE 3 PROJECT(POLYOLEFINS PACKAGE)USD 1,255 B

BOROUGE(Adnoc/Borealis)

Scope : two polyethylene units, each with a capacity of 540,000t/y and two polypropylene units, each with a capacity of 480,000t/y - BORSTAR technology - Contract won in association with SAMSUNG. TECNIMONT leader of the consortium, its share of the contract is USD 910M for the two packages (see hereunder)

55 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

May 2010 TECNIMONT ITALY ABU DHABI

January 2008 TECHNIP ITALY SINGAPORE NESTE OIL

June 2008 TECHNIP ITALY NETHERLANDS NESTE OIL

August 2008 TECHNIP ITALY CANADA

October 2008 TECHNIP ITALY POLAND GRUPA LOTOS

February 2009 TECHNIP ITALY EGYPT MIDOR

July 2009 TECHNIP ITALY SAUDI ARABIA

July 2009 TECHNIP ITALY SAUDI ARABIA

June 2008 TECHNIP KTI ITALY POLAND LMG PROJECT - USD 789 M PGNIG

June 2010 TECHNIP KTI ITALY SWEDEN NYNAS

November 2009 ROMINSERV KAZAKHSTAN KAZAKHSTAN KAZMUNAIGAZ

August 2009 CB&I LUMMUS NETHERLANDS NETHERLANDS SHELL

BOROUGE 3 PROJECT(LDPE Package) - USD 400M

BOROUGE(Adnoc/Borealis)

Scope : a low density polyethylene unit with a capacity of 350,000t/y - LyondellBasell technology Contract won in association with SAMSUNG. TECNIMONT leader of the consortium, its share of the contract is USD 910M for the two packages (see above)

TUAS BIODIESEL PLANTUSD 818 M

Scope : capacity of 800,000t/y based on Neste TechnologyTECHNIP has been selected as contractor for the engineering, procurement & management, work will start during the 1st half of 2008. The contract will be executed by Technip in Roma and Singaporein September 08 ROTARY ENGINEERING won the contract for the storage tanks and JACOBS ENGINEERING will provide EPCM services for the Power Scope Project (to deliver utilities to the diesel facility from the adjacent Tuas Power Plant)

ROTTERDAM BIODIESEL PLANTUSD 1 BILLION

Scope : capacity of 800,000t/y TECHNIP/ITALY has been selected as the project's main contractor. The contract covers the engineering and the management of procurement and construction activities, the project represents an investment of € 670m

HORIZON EXPANSION PROJECTUSD 195 M

CANADIAN NATURAL RESOURCES Ltd

The contract covers the engineering, procurement, supply of materials & equipment covering four new units : a gas recovery unit, a butane treating unit, sulphur recovery facilities and a carbon dioxide capture unit Contract to be executed by Technip in Roma

GDANSK REFINERY UPGRADING (deasphalting) - USD 90 M

Scope : solvent deasphalting unit with a caapcity of 180 tons per hourEngineering & procurement contract to be executed by Technip in Roma

ALEXANDRIA DELAYED COKER EXPANSION - USD 55 M

The unit, based on ConocoPhillips technology will have a capacity of 30,000b/d - Technip/Roma's scope involves engineering, procurement and supply of equipment & materials on a lumpsum basis

JUBAIL REFINERY(Satorp Project)Pack 2 - Conversion Unit

SAUDI ARAMCOTOTAL

Scope : epc of the hydro and catalytic cracking conversion process units. Contract to be executed by Technip in Italy and France with assistance from the group organization in the Middle East. estimated contract value USD 1,7B

JUBAIL REFINERY(Satorp Project)Pack 5A - Offsites & Utilities

SAUDI ARAMCOTOTAL

Scope : Offsites & Utilities, interconnecting network & process control for the whole refinery contract awarded to Technip with CTCI, estimated contract value : USD 1,3 Bto be executed by Technip in Roma, in Paris with the support from the organization in Middle East

the project involves the development of crude oil & natural gas deposits in the area of Lubitow, Miedzychod and Grotow : construction of near-borehole installations, gathering pipelines connecting the wells to the LMG central facility, construction of the LMG central facility as well as oil & gas pipelines.TECHNIP KTI won the contract in association with PBG/POLAND, THERMO DESIGN ENG/CANADA and MAVERICK ENGINEERING

NYNASHAMM SULFUR RECOVERY UNIT - USD 60 M

Scope : capacity of 24 tonnes/day + a tail gas treatment unit + offsite facilities and interconnecting piping with the units.Technip KTI is now part of Maire Tecnimont

ATYRAU REFINERY MODERNIZATION - USD 27M

Scope : the atmospheric and vacuum distillation units will be rebuilt, project is part of a complete modernization project. Rominserv is a romanian contractor

PERNIS REFINERY DIESEL HYDROTREAT - USD 60M

part of a broader investment program to cost USD 500Mthe unit will increase cleaner-burning, low-sulphur fuels production at the 400 thousand barrels per day refinery.Contract confirmed by CB&I on October 8th, contract value USD 60M

56 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

September 2009 CB&I LUMMUS NETHERLANDS SERBIA NIS

November 2009 FLUOR NETHERLANDS NETHERLANDS TAQA ENERGY

July 2008 NETHERLANDS ANGOLA BP ANGOLA HMC has been awarded the URF-1 Risers and Production Flowlines Contract

August 2008 NACAP NETHERLANDS SAUDI ARABIA SAUDI ARAMCO

April 2009 NACAP NETHERLANDS SAUDI ARABIA RAS TANURA/RIYADH PIPELINE SAUDI ARAMCO

January 2008 SBM OFFSHORE NETHERLANDS BRAZIL PETROBRAS

August 2009 SBM OFFSHORE NETHERLANDS NOBLE ENERGY

April 2008 TECHNIP NETHERLANDS ROMANIA ROMPETROL

August 2008 TECHNIP NETHERLANDS RUSSIA SIBUR NEFTEKHIM

October 2008 TECHNIP NETHERLANDS PORTUGAL REPSOL

November 2009 TECHNIP NETHERLANDS NETHERLANDS ROTTERDAM HYDROGEN PLANT AIR PRODUCTS

PANCEVO REFINERY MODERNIZATION - USD 70 M

The modernization (cost € 396M) will include construction of new units and modernization/revamping of existing unitsThe annual production of motor gasoline will increase to 638,000 tonnes while production of Euro 5 diesel fuel will inrease from 230,000 tonnes to 1,5 millionwork to start in 2010CB&I's contract (USD 70M) covers detailed engineering, procurement services, construction management & commisioning of the Hydrocracker/hydrotreater unit licensed by CHevron Lummus & associated units, auxiliary and offsites

BERGERMEER GAS STORAGE PROJECT

Fluor is responsible for the EPCM of the gas compression and treatment facilities as well as modifications to the well site. Contract followed by the Haarlem office. Commissioning during the second quarter of 2013

HEEREMA MARINE CNTRACTORS

BLOCK 31 (PSVM PROJECT)USD 1 BILLION

MANIFA PROJECT (PIPELINE PACKAGE ) - USD 195 M

Scope : 420km of oil, gas and water pipelines from 24" to 56"NACAP won the contract against korean companies

Scope : 506km 30" pipeline, 3 pump stations, metering systems, substation buildings & maintenance. The line will run from Ras Tanura refnery to Riyadh.JACOBS ENGINEERING in Reading/UK will develop the FEED, the LSTK contract will be then transfered to NACAP SUDROHRBAU who will complete project desig, material procurement, construction and commissioning activities of the projectNovember 2009 :NACAP has officially signed the € 235M contract for the engineering, procurement & construction

P-57 PLATFORMUSD 1,2 BILLION

Scope : the platform will have a capacity of 180,000b/dThe FPSO will be converted in Singapore usine one of SBM's very large carriers, topsides will be integrated in Brazil SBM signed the USD 1,25 Billion in February

EQUATORIAL GUINEA

ASENG FPSOUSD 1,2 B

SBM OFFSHORE has signed an agreement for the lease of the FPSO for the Aseng Field (ex benita). The FPSO will be based on the conversion of a VLCC hull, it will have a processing capacity of 120,000b/d of liquids and a storage capacity of 1,6 million barrels - formal contract signed in October 2009In March 2010 KEPPEL SHIPYARD won the USD 160M subcontract for conversion work : accomodation block extensions, flare tower, internal turret, topside module supports & integration of topside modules

HYDROGEN PLANT AT PETROMIDIA REFINERY - € 65M

Scope : capacity of 40,000 cubic meters per hourROMINSERV, the general contractor of Rompetrol, has awarded the contract to Technip for the supply of technology, engineering, equipment and technical assistance for the installation & commissioning

KSTOVO ETHYLENE EXPANSION PROJECT - EP-300 PJTUSD 284 M

The capacity will be expanded in two phases, the first from 260,000t/y to 360,000 and the second to 450,000t/y. - the ethylene surplus will feed the Rusvinyl project (Sibur-Solvay) - contract officially confirmed by Technip early October, contract value € 45M covering detailed engineering, procurement & supply of main equipment & materials

SINES STEAMCRACKER FURNACES - EUROS 35M

Technip will supply two new furnaces that will expand the ethylene capacity by 160,000t/y (from 410,000 to 570,000t/y). Technip in Zoetermeer will carry out the contract : basic & detailed engineering, procurement & supply of materials, construction & commissioning

Air Products has signed a long-term supply contract with ExxonMobil and will build an hydrogen production unit at Rotterdam refinery, it will be built by Technip through the alliance between Air Products & Technip

57 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

March 2010 VERWATER-AUDEX NETHERLANDS NETHERLANDS EURO TANK TERMINAL BV

September 2007 AKER KVAERNER NORWAY NORWAY BP

July 2008 AKER KVAERNER NORWAY ANGOLA BP ANGOLA

February 2009 AKER KVAERNER NORWAY NORWAY GASSCO

May 2009 AKER SOLUTIONS NORWAY KAZAKHSTAN AGIP KCO

September 2009 AKER SOLUTIONS NORWAY NORWAY ENI

March 2010 AKER SOLUTIONS NORWAY NORWAY EKOFISK 2/4L JACKET CONOCOPHILLIPS

October 2009 BW OFFSHORE NORWAY BRAZIL PETROBRAS

July 2008 SUBSEA 7 NORWAY ANGOLA BP ANGOLA

October 2009 TECHNIP NORWAY NORWAY ENI

April 2010 FOSTER WHEELER POLAND POLAND GDF SUEZ

March 2010 POLIMEX MOSTOSTAL POLAND NETHERLANDS

May 2009 SOMAGUE PORTUGAL PORTUGAL REN ATLANTICO

March 2010 ROMINSERV ROMANIA ROMANIA ROMPETROL

ROTTERDAM TANK TERMINALUSD 159 M

Verwater-Audex, a PEC Ltd/Singapore's affiliate, has won the contract to build a 465,000m3 tank terminalETT is owned by Vitol Tank Terminal International

SKARV TOPSIDESUSD 360 M

Aker Kvaerner has won the contract for detailed engineering, procurement and construction management assistance for the 16,000 topsides of the FPSO being buildby SAMSUNG

BLOCK 31 PSVM PROJECT(Umbilicals) USD 67 M

The contract is for manufacturing and delivery of 48 kilometres of steel tube umbilicals

KOLLSNES GAS PLANT UPGRADE - USD 218 M

EPC contract for AKER SOLUTIONS. engineering and procurement activities to take place at Oslo, the contract includes fabrication and installation of pre-assembly units, pipe-racks, mechanical work, piping tie-ins and installation work

KASHAGAN FIELD DEVLP PHASE ONE (HOOK UP)USD 2,6 BILLION

Contract won in association with SAIPEMScope : offshore hook-up, commissioning, assistance, onshore prefabrication, logistic support and inshore hook-up work + engineering and job carding for prefabrication and installation and vessels preparationAKER's share of the contract is USD 1,6 Billion

GOLIAT FIELD DEVELOPMENT(subsea) - USD 395M

Aker Solutions's contract covers the engineering, procurement & construction for eight four slot subsea templates with manifolds, 24 subsea trees, control systems, 20km of steel tube umbilical, a tie-in & connection system - Contract to be executed from Aker Norway, deliveries to start in 2011 until 2013

EPC contract for AKER SOLUTIONS covering a platform jacket and a bridge support jacket for the new Ekofisk accomodation platform- contract to be executed by Aker in Verdal

PAPA TERRA FPSOUSD 1,3 BILLION

BW OFFSHORE with QUIP CONSORTIUM received the Letter of Intent for the FPSO. BW Offshore will convert the ULCC BW Nisa, hull conversion to be carried out in China and topsides fabrication & integration at Quip's facility in Brazil. The FPSO will have the capacity for handling up to 180,000b/d Chevron takes the Final Investment Decision in January 2010AMEC/USA selected by QUIP to perform the basic engineering services for the topsides of the FPSO

BLOCK 31 PSVM PROJECT(Umbilicals) USD 460 M

Subsea 7's scope of supply comprises project management, engineering and installation services associated with the subsea infrastructure, including umbilicals, pipeline jumpers, flexibles and structures together with testing and pre-commissioning services.

GOLIAT FIELD DEVELOPMENT(infield pipelines) - USD 294M

Scope : supply & installation of the infield pipeline systems including flexible risers, clad production flowlines + installation of the subsea production system

POLIANEC BIOMASS POWER PLANT

Scope : 190mw, it will burn wood and agri-fuelsFW has been awarded the contract for the design, supply & erection of the plant, it will be the world largest biomass plant

ROTTERDAM TANK TERMINALUSD 70 M

DUTCH BOTLEK TANK TERMINAL BV

Scope : capacity of 185,000m3 to store mineral oils, liquid fuelsPolimex Mostostal will be responsible for design documentation, construction works, prefabrication and installation of tanks & pipelines, commissioning. Naftobudowa S.A will act as subcontractor

SINES LNG TERMINAL EXPANSIONEUROS 159 M

scope : expansion of the storage capacity from 240,000cm to 390,000cm and increase of the regasification capacity to 900,000cm/h and a minimum send-out of 1,350,000cm/hSomague has won the EPC contract, TGE GAS ENGINEERING GmbH is the consultant

NAVORADI HIGH DENSITY POLYETHYLENE PLANT EXPANSION

Capacity of HDPE will be boosted from 60,000t/y to 100,000t/yROMINSERV will carry out the contract, MITSUI CHEMICALS will supply the technology

58 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

October 2009 ATOMSTROYEXPORT RUSSIA INDIA HARIPUR NUCLEAR PLANT NULEAR POWER CORP

May 2008 E4 GROUP RUSSIA RUSSIA KRASNODAR POWER PLANT TGK-8

August 2008 E4 GROUP RUSSIA RUSSIA

June 2009 NN-AEP RUSSIA RUSSIA ENERGOATOM

February 2008 STROYTRANSGAZ RUSSIA TURKMENISTAN TURKMENGAS

October 2008 STROYTRANSGAZ RUSSIA SYRIA SYRIAN GAS COMPANY

December 2008 STROYTRANSGAZ RUSSIA GREECE DESFA

May 2010 TECHNOPROMEXPORT RUSSIA RUSSIA OGC-1

February 2009 ACCIONA AGUA SPAIN AUSTRALIA MINISTRY

February 2010 ACS SERVICIOS SPAIN MEXICO CFE

January 2008 COBRA SPAIN CHILE MEJILLONES POWER PLANT

June 2009 DRAGADOS SPAIN MEXICO PEMEX PETROCHEMICALS

June 2009 DURO FELGUERA SPAIN VENEZUELA ELECTRICIDAD DE CARACAS

February 2008 FLUOR SPAIN SPAIN REPSOL

Scope : two 1,000mw reactorsATOMSTROYEXPORT has been awarded the contract, work to start in January 2010

scope : 400mwE4 GROUP selected as general contractor, MHI/JAPAN has received the subcontract to provide the gas turbine

NYAGANSKAYA and TYUMEN TPP2 PROJECTSusd 695 m

TGK-10FORTUM

1) Nyaganskaya thermal power plant will have a capacity of 1200mw (3x400mw), to be built in 3 phases, the first two ones to be commissioned in 2011, the third in 2012 - contract value USD 567,5 M - 2) Tyumen TPP-2, construction of a fifth unit - contract value USD 128,2ME4 Group officially selected as EPC contractor for Nyagan in July 2009.

VOLGODONSK NUCLEAR UNITS 3&4USD 4,8 BILLION

Construction of a third and fourth reactor (each 1000mw)contract awarded to NIZHNIY NOVGOROD ATOMENERGOPROEKT (NN-AEP)

MALAY-BAGTYYARLIK GAS PIPELINE - USD 585 M

Part of the Turkmenistan-China Pipeline, the contract covers a 188km gas line as well as a gas purifying and dehydrating facility and a gas measuring station

ARAB GAS PIPELINE PHASE IIUSD 58 M

Scope : 62km diam 36" from the turkish-syrian border to AleppoSTROYSTRANSGAZ's contract includes also the construction of a metering station (3 million cm/d of gas), scada, control instrumentation….

NEA MESSAMBRIA COMPRESSOR STATION - € 53,4 M

The compressor station will be built along the Kulata-Athens gas pipeline. In addition to the EPC contract, Stroytransgaz will be responsible for assembling equipment, piping connections, instrumentation, cathorid protection - Work to start during the first quarter of 2009 for commissioning 26 months later - contract won in associatin with Prometheus Gas SA.

URENGOI POWER PLANTUSD 855M

capacity 450mw steam gasTECHNOPROMEXPORT selected as general contractor

ADELAIDE DESALINATION PLANTUSD 868 M

The plant will deliver 150,000 cubic meters of water per day, to be located at Port Stanvaca consortium named AdelaideAqua has been named preferred bidder, it includes ACCIONA AGUA/SPAIN and the local McCONNELL DOWELL, ABIGROUP CONTRACTORS and UNITED UTILITIES

MANZANILLO POWER STATION MODERNIZATION - USD 981M

the power plant will be converted to run on natural gascontract won in association with GRUPO COBRA and INELECTRA. Turbines to be supplied by GENERAL ELECTRIC

SUEZ ENERGYANTOFAGASTA MINERALS

Scope 150 mwSUEZ will begin soon construction of its second coal-fired power plant in Mejillones, COBRA is the EPC contractor

LA CANGREJERA AROMATICS PLANT EXPANSION -1ST PHASE

The first phase will cover construction of a platformer unit and other works necessary for the integration of new units that will double paraxylene capacitythe contract has been awarded to a consortium including DRAGADOS, ACS SERCICES and SENERMEX ENGINEERING

TERMOCENTRO COMBINED CYCLE POWER PLANTUSD 1,5 Billion

the plant will be located in Paz Castillo - Duro Felguera will execute the contract as sole contractorthe first gas turbine will come into operation early 2011, the four turbines equipping the plant will come into operation under a simple cycle basis during the second phase of 2011, then into combined cycle in december 2013

CARTAGENA REFINERY EXPANSION - OFFSITES & UTILITIES - USD 1,3B

Fluor has been awarded the project management contract and will provide enginering, management of procurement and construction of the offsites and utilities. The contract will be executed by FLUOR in Madrid and in Gliwice/Poland. TR/SPAIN is the EPC contractor for the main process units

59 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

April 2008 FLUOR SPAIN SPAIN ENAGAS

March 2008 FOSTER WHEELER SPAIN SPAIN REPSOL

November 2007 IBERDROLA INGENIERA SPAIN ALGERIA SONELGAZ

April 2009 IBERDROLA INGENIERA SPAIN LITHUANIA LIETUVOS ELEKTRINE AB

July 2009 IBERDROLA INGENIERA SPAIN VENEZUELA PDVSA

November 2009 INITEC ENERGIA SPAIN UZBEKISTAN UZBEKENERGO

December 2007 ISOLUX CORSAN SPAIN ARGENTINA YACIMIENTO CARBONIFERO

November 2009 SADYT SPAIN ISRAEL MEKOROT

February 2007 TECNICAS REUNIDAS SPAIN SPAIN REPSOL

TECNICAS REUNIDAS SPAIN PORTUGAL GALP ENERGIA

October 2007 TECNICAS REUNIDAS SPAIN RUSSIA ALLIANCE OIL COMPANY

May 2008 TECNICAS REUNIDAS SPAIN GREECE HELLENIC PETROLEUM

June 2008 TECNICAS REUNIDAS SPAIN NETHERLANDS ESSENT

EL MUSEL LNG TERMINALUSD 320 M

The facility will include two 150,000 cubic meter LNG tanks along with a regasification send-out capacity of 800,000cm per hourFLUOR's contract value : USD 320M

CARTAGENA DELAYED COKER COMPLEX

The coking complex consists of a 53,000b/d delayed coker unit, a gas concentration unit and a 90,000b/d vacuum distillation unitFW IBERIA has been awarded the contract for the detailed engineering, procurement services and construction management

KOUDIET EDRAOUCH POWER PLANT - USD 2,1 Billion

Scope : 1200mwGENERAL ELECTRICS/USA with IBERDROLA/SPAIN has won the construction contractIBERDROLA will be responsible for site development, design, equipment procurement, construction and assembly of the plant

COMBINED CYCLE POWER PLANT - USD 432 M

Scope : 444mwIBERDROLA has won the EPC contract against LAVALIN, ALSTOM and SIEMENS. The turbines will be supplied by GE

CUMANA POWER PLANTANTONIO JOSE DE SUCRE PJT

Scope : 1000mwTurnkey contract, contract won in association with Elecnor (60/40)

NAVOI THERMAL POWER PLANTUSD 505 M

Scope : 472mwINITEC ENERGIA, who is the main contractor, has awarded the power generation system to MHI/JAPAN. Construction work to be undertaken by the turkish company CALIK HOLDING

EL RIO TURBIO POWER PLANTUSD 670 M

Scope : 240mwIsolux Corsan has won the contract in association with the local TECNA

ASHDOD DESALINATION PLANT€ 330 M

the reverse osmosis plant will produce 100 million cubic meters of desalinated water per year.SADYT is part of Sacyr Vallehermoso Group

CARTAGENA REFINERY EXPANSION - USD 4,7 Billion

Scope : the capacity of the refinery will be doubled, to 220,000b/d : atmospheric distillation unit (5,5Million t/y) - Hydrocracking unit (2,5 Million t/y) - - desulphurisation unit (3 million t/y) - isomerization unit (300,000t/y), hydrogen plant + additional smaller units, cogeneration plant, storage and interconnection;;;;; REPSOL is doing engineering and will start with the EPC phase in November 2007Repsol approved the € 3,2 Billion investment in January 08

August 2007 SINES REFINERY UPGRADINGUSD 910 M

Scope : a 45,000b/d hydrocracker, a 15,000b/d vacuum distillation unit, a 22,000b/d vacuum flash unitTECNICAS REUNIDAS has received the Letter of Intent in august 2007In December 2009 TR and Galp Energia have reached a final agreement on the conversion to a lump sum turnkey contract

KHABAROVSK REFINERY EXPANSION - USD 800 M

The project will boost the capacity of the refinery from 3,2 million t/y to 3,5M : hydrocracker, hydrotreatment, hydrogen, amine regeneration, acid water, sulphur recovery unitsTecnicas Reunidas has received the Letter of Intent in October, formal contract signed in November In february 2008, FOSTER WHEELER/UK announced that they have been awarded the project management consultancy contract

ELEFSIS REFINERY UPGRADEUSD 1,56 BILLION

Scope : an hydrocracker (40,000b/d) - a flexicoker (20,000b/d) - a vacuum distillation unit (45,000b/d) - a hydrogen unit (120,000cm/h)HELPE signed the contract with TR for the execution of the project, TR has started FEED verification to be followed by engineering work, the project is listed on TR order book

MOERDIJK COMBINED CYCLE POWER PLANT

Scope : 426mwTECNICAS REUNIDAS and GE ENERGY will carry out the FEED during 8 months and will execute the EPC contract, TECNICAS REUNIDAS's share of the contract : € 150M

60 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

August 2008 TECNICAS REUNIDAS SPAIN SAUDI ARABIA SAUDI ARAMCO

August 2008 TECNICAS REUNIDAS SPAIN HUNGARY MOL HUNGARIAN OIL & GAS

October 2008 TECNICAS REUNIDAS SPAIN PORTUGAL SINES POLYETHYLENE PLANT REPSOL

November 2008 TECNICAS REUNIDAS SPAIN AUSTRALIA WATER CORPORATION

December 2008 TECNICAS REUNIDAS SPAIN SPAIN GASCAN

January 2009 TECNICAS REUNIDAS SPAIN ABU DHABI ADCO

June 2009 TECNICAS REUNIDAS SPAIN SAUDI ARABIA

November 2009 TECNICAS REUNIDAS SPAIN MOROCCO SAMIR

November 2009 TECNICAS REUNIDAS SPAIN TURKEY TUPRAS

December 2009 TECNICAS REUNIDAS SPAIN PERU PETROPERU

MANIFA PROJECT (POWER PACKAGE) - USD 500 M

Scope : 400mw combined cycle with 2 gas turbines and one steam turbineTurnkey contract for TRDec 09 : FOSTER WHEELER SPAIN has been awarded the contract to design & supply heat recovery generators and steam generators

SZAZHALOMBATTA HYDROCRACKING COMPLEX

Scope : a hydrocracking unit of high pressure of 1,5 million t/y - an unconverted oil vacuum distillation unit, a gas recovery and LPG treatment unit, amine regeneration and sour water stripping units. TR will execute the open book estimate phase with an option for EPC LSTK conversion

Part of the Sines Petrochemical Expansion Project - the polyethylene plant will have a capacity of 300,000t/y (Ineos Technology)on its website TR is listing the project in its reference list as EPCM contract

SOUTHERN SEAWATER DESALINATION PLANT - USD 620M

The plant will have a capacityy of 50 gigalitres per year, to be expandable to 100 gigalitres.TR leader of a consortium including VALORISA AGUA, a subsidiary of SACYR VALLEHERMOSO, AJ LUCAS and WORLEYPARSONS. The consortium is called Southern Seawater Alliance

GRANADILLA & ARINAGA LNG TERMINALS - € 490 M

Each terminal will cover a 150,000 cubic meters/hour regasification plant, a 150,000l3 storage and a jetty. Granadilla located in Tenerife, Arinaga in Gran Canaria

SAS PROJECT - PACKAGE BUSD 1,3 BILLION

TR's contract (60% share) wil cover oil production flowlines, primary separation through central & satellite degassing facilities, gas compression, transfer lines, oil pumping facilities, main oil pipelines (including 107km 16") and produced water handling. Contract won in association with CCC who will be involved in construction works + connecting pipelines to Asab.Once completed Sahil capacity will increase from 55,000b/d to 75,000b/d while Shah's capacity will increase from 50,000b/d to 60,000b/d

JUBAIL REFINERY(Satorp Project)Pack 1 - Distillation/Hydrotreat

SAUDI ARAMCOTOTAL

Scope : Crude/Vacuum, Naphtha Hydrotreating, High Pressure Hydrodesulphurizers, Low Pressure Hydrodesulphurizers, Hydrogen Generation Units. Units to be arranged in two trainscontract value € 1,2 Billion

MOHAMMEDIA REFINERY TOPPING 4 PROJECT

Scope : a new crude distillation unit (4 million t/y capacity), a kerosene treatment unit and revamping of a LPG Merox unitTR won the design engineering contract in July 2008, contract coverted into a lump sum turnkey contract in November 2009 - Commissioning in March 2012April 2010 : TEKFEN/TURKEY has been awarded a USD 54M subcontract for building & installation works of the topping unit

IZMIT REFINERY UPGRADING PROJECT - USD 1,5 B

Scope : an hydrocracker, vacuum unit, naphtha hydrogenation, diesel desulfurization, hydrogen, sulphur recovery, amine regeneration, sour water stripping unitThe contract has been awarded to TR under an open book model, with future conversion into a lump sum turnkey contract

TALARA REFINERY EXPANSIONUSD 1,2 B

The capacity will be boosted to 95,000b/d from 62,000b/d : modification of existing units + addition of new units such as diesel and naphtha hydrotreating, flexicoker, vacuum distillate, catalytic reformer, hydrogen, sulfuric acid, amines plant and cogenerationTR selected for the FEED cum EPC in december, feed phase until 2012. Commissioning in 2015 ABSG CONSULTING will provide project management consultancy services

61 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

April 2010 TECNICAS REUNIDAS SPAIN ABU DHABI ADNOC

June 2010 TECNICAS REUNIDAS SPAIN BOLIVIA

April 2009 NCC SWEDEN SWEDEN NYNASHAMN GASTERMINAL AB

September 2009 AKER SOLUTIONS UK UK GAIA POWER TEES VALLEY Ltd

January 2007 CBI UK IRAN NIGC

October 2008 CBI UK UK PORTLAND GAS

FLUOR UK PORTUGAL GALP ENERGIA

October 2008 FLUOR UK RUSSIA SIBUR

September 2009 FLUOR UK ITALY ISAB ENERGY

SHAH GAS PROJECT (Gas Gathering Package) - USD 463M

The project will treat 1 Billion cubic feet a day of sour gas - Scope : lump sum turnkey contract covering the design & detailed engineering, supply of all equipment & materials, construction ffor the pipelines interconnecting the wells and the central processing facilities (16" inter-pad lines and 24" transfer lines), including well pads and receIving stationTR will provide engineering, procurement & construction for the Shah Gas Gathering System in association with PUNJ LLOYD/INDIAMARGARITA GAS PROCESSING

PLANT - USD 500MREPSOL YPF / BRITISH GAS

PAN AMERICAN ENERGYthe gas plant will have a capacity of 6 million cubic meters of gas dailyTR will work with carry out the contract with local companies

NYNASHAMN LNG TERMINALUSD 33M

LNG will arrive by cargo ships to the terminal where it will be kept in stock at the terminal in a so-called full containment tank with a capacity of 20,000cm.NCC has the construction contract for the terminal, the tank itself will be built by CRYO AB. DYWIDAG INTERNATIONAL was awarded in December 08 the design & engineering contract for the storage tank

GAIA BIOMASS POWER PLANTUSD 325M

The plant will burn recycled wood chippings to generate 50mw of powerplanning permission during the last quarter of 2009, contract to be followed by Aker in Stockton on Tees

BID BOLAND GAS PROJECT (STORAGE & PIPELINE PORTION)USD 500 M

CBI JOHN BROWN selected with the local TEHRAN JONOOB for the storage and pipeline portion of the project, contract has been officially signed in january 2007. The iranian company is the leader

PORTLAND GAS PROJECTGBP 500 M

The project involve a major gas storage facility with the creation of 14 underground storage caverns totalling 35 billion cubic feet of natural gasCB&I has been awarded the first phase of the EPC contract, to be carried out by CBI in Paddington//London

August 2007 PORTO REFINERY UPGRADINGUSD 455 M

Scope : a 30,000b/d vacuum distillation unit, a 12,000b/d visbreaker, a 12,000b/d vacuum flsh unitIn October 2007 Fluor confirms that it has been awarded the FEED and early procurement services, the contract will be carried out by Fluor in Camberley and in Madrid with the support of portuguese companies.In February 2009 Fluor confirms the EPC contract with USD 400M booked in the last quarter of 2008

NOYABRSK GAS PROCESSION EXPANSION PROJECT

Fluor's project scope includes the EPCM services for the expansion and upgrade of the Vyngayakhinskaya compressor station, the compressor station 3 of the Nizhnevartovsk gas processing complex, and the Vyngapurovsky gas processing plant and associated pipelines, as well as a liquefied petroleum gas storage and loading facility in Noyabrsk.Contract to be executed by FLUOR in Camberley/UK and Manilla/Philippines, together with russian design institutesSTROYTRANSGAZ will take part in the construction

PRIOLO POWER PLANT RECONSTRUCTION - USD 150M

Fluor has won the engineering, procurement & construction contract for the reconstruction of one of its two 266mw combined cycle gas turbine power trains in Priolo/Sicily, damaged one year ago. Contract followed by Fluor in Camberley

62 / 73

FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES

Award date Contractor Project Name End User Scope / SituationContractor's nationality

Final Destination

March 2009 FOSTER WHEELER UK INDIA INDIAN OIL CORP

March 2010 JACOBS ENGINEERING UK UK STORENGY

July 2007 MW KELLOGG UK NORWAY STATOIL

March 2008 PETROFAC UK SYRIA HAYAN PETROLEUM

April 2008 PETROFAC UK SYRIA PETROCANADA

August 2008 PETROFAC UK EGYPT KHALDA PETROLEUM

November 2008 PETROFAC UK KUWAIT KOC

January 2009 PETROFAC UK ABU DHABI ADCO

February 2009 PETROFAC UK SAUDI ARABIA SAUDI ARAMCO

March 2009 PETROFAC UK ALGERIA SONATRACH / ANADARKO

March 2010 PETROFAC UK QATAR QATAR PETROLEUM

May 2009 UK LIBERIA LIBERIA PETROLEUM REFINING CY

PARADIP REFINERY Capacity : 15 Million t/yFW will undertake the role of Managing Project Management Consultant for a major part of the project and will execute EPCM for 15 process units + offsites & utilitiesFW's scope includes the crude distillation, reforming, alkylatio and butane isomerisation units.FW was awarded the FEED in 2007 - Contract to be executed from Reading/UK and from India (Delhi/Kolkata)

STUBLACH STORAGE ABOVE GROUND WORKS

JACOBS will design and install new gas compression, gas treatment facilities and utilities for the storage projectcontract to be followed by Jacobs in Manchester

KARSTO GAS TREATMENT EXPANSION - USD 175 M

MW Kellogg has been awarded the detailed engineering contact, he was the main contractor on the three previous expansion stages. The project, known as KEP2010, aims to make the facilities more robust for safe and efficient operations

JIDAR GAS PROCESSING FACILITIESUSD 454 M

Petrofac has received the Letter of Intent in March 08, the contract covers EPC of the gas processing facilities + LPG recovery system, LPG Storage and loading facility, gas gathering & collection systems, satellite gathering stations, flowlines, gathering pipelines, utilities & offsites

EBLA GAS PROJECTUSD 477 M

The Ebla plant will be designed to produce 88 Million cf/d of gas, 150t/d of LPG. The project includes also pipelines, gas gathering station flow lines and well sites

KHALDA 5th GAS PROCESSING TRAIN

The new train will expand the total capacity by 100 million cf/d of gas to 810 million cf/d and 31,000b/d of condensate - PETROFAC's contract covers engineering & procurement services, to be converted into a full EPC within the next two/four months

PIPELINE BETWEEN BS 131 & MINA AL AHMADI - USD 543M

Scope : 140km diam 40" pipeline running from Booster Station 131 and Mina Al Ahmadi LPG plantPetrofac in charge of engineering design, procurement, construction and commissioning

SAS PROJECT - PACKAGE AUSD 2,3 BILLION

Petrofac's contract covers the Asab Field : upgrading of the facility's capacity to accept production from Sahil, Shah and other fields and to upgrade the associated utilities and water handling facilities. Once completed the production at Asab will increase from 280,000b/d to 310,000b/d

KARAN GAS PROJECT(cogeneration/utilities) USD 500M

Scope : cogeneration unit, utilitiesPetrofac will also upgrade the plant’s process controls, electrical systems and support facilities

EL MERK FIELD DEVLPT(CPF Package) - USD 2,2 B

Scope : the CPF capacity will be 98,000b/d of oil, 29,000 b/d of condensates, 31,000b/d of LPG with an NGL train (600 Million cf/d) + reinjection facilitiesEPC contract for PetrofacIn May 2009 ORASCOM CONSTRUCTION INDUSTRIES/EGYPT has been awarded the civil and structural steel works

MESAIEED & DUKHAN GAS SWEETENING PROJECTSUSD 650 M

Scope : Messaieed : a 750MMcf/d acid gas removal unit, upgrading of a sulphur recovery unit, an amine sweetening unit, a flare gas system - Dukhan : a 450 MMcf/d acid gas removal unitwork to commence shortly with completion within 38 months

ZAKHEM INT CONSTRUCTION

BUSHROD PRODUCT STORAGE TERMINAL EXPANSION -USD 25M

Scope : construction of 3 new tanks and piping networkEPC contract for ZAKHEM

63 / 73

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES

Last Update Contractor Final Destination Project Name End User Scope / Situation

February 2009 ASTRA EVANGELISTA ARGENTINA URUGUAY ANCAP

March 2010 ALUSA BRAZIL BRAZIL PETROBRAS

July 2008 CAMARGO CORREA BRAZIL BRAZIL PETROBRAS

December 2009 CAMARGO CORREA BRAZIL BRAZIL PETROBRAS

July 2008 INTERPAR BRAZIL BRAZIL PETROBRAS

March 2008 MAIRE TECNIMONT BRAZIL BRAZIL PETROBRAS

October 2008 MAIRE TECNIMONT BRAZIL BRAZIL MPX ENERGIA

August 2009 ODEBRECHT BRAZIL ARGENTINA YPF

December 2009 ODEBRECHT BRAZIL BRAZIL PETROBRAS

September 2008 QUEIROZ GALVAO BRAZIL BRAZIL PETROBRAS

October 2009 QUIP CONSORTIUM BRAZIL BRAZIL PETROBRAS

March 2008 SKANSKA BRAZIL BRAZIL PETROBRAS

July 2009 SKANSKA BRAZIL BRAZIL PETROBRAS

March 2010 SKANSKA BRAZIL BRAZIL PETROBRAS

March 2009 SUBSEA 7 BRAZIL BRAZIL PETROBRAS

October 2009 SUBSEA 7 BRAZIL BRAZIL PETROBRAS

Contractor's nationality

LA TEJA REFINERY DESULFURIZATION PROJECTUSD 300 M

Scope : a diesel desulfurisation unit based on Haldor Topsoe technology and a gasoline desulfurisation unit based on Axens technologyASTRA EVANGELISTA has been selected against TECNICAS REUNIDAS and JANTESA/VENEZUELA. Work starting in February 09

COMPERJ REFINERY (UHC PORTION) - USD 824M

UHC = catalytic hydrocracking unitepc contract

REPAR REFINERY UPGRADING(Delayed Coker) - USD 1,5 B

the delayed coker will have a capacity of 5,000 cm/dCamargo Correa will carry out the contract in association with Promon, work will take 3 years and a half

ABREU E LIMA REFINERY(delayed coker units) USD 1,9 B

Scope : delayed coker units including substations and caustic regeneration sections. Contract won in association with CNEC ENGENHARIA (value USD 1,9B)

REPAR REFINERY UPGRADING (Interconnections) - USD 1,4 B

Scope : interconnections between the coker and the other units + storage facilities, utilitiesINTERPAR is a consortium including SETAL, MENDES Jr and MPE

VITTORIA GAS TREATMENT PLANTUSD 241 M

The plant will have a capacity of 2,5 million cubic meters per day. The contract will be carried out by Maire Tecnimont with Alusa and MPE (special purpose company)

PECEM II POWER STATIONUSD 343 M

Scope : 360mwpreliminary contract signed, formal contract to be signed by the end of the month

LA PLATA REFINERY CCR PLANTUSD 348 M

The new continuous Catalytic Reformer plant will allow an increase of premium fuel from 6 Million m3 to 8 million m3, the plant will also produce 200,000t/y of aromatic compounds and 15,000t/y of hydrogen

ABREU E LIMA REFINERY(hydrotreat & atmospheric distillation units)USD 2,6 B

Odebrecht with CONSTRUTORA OAS has won two packages : 1) diesel hydrotreating, naphtha hydrotreating, hydrogen generation for USD 1,8B2)atmospheric distillation units for USD 858MThe offsites pipelines package connecting the refinery to the seaport has been awarded to CONDUTO-EGESA, contract value USD 348M

P 55 PLATFORMUSD 845M

P-55 will be installed in Roncador field - the platform will have a production capacity of 180,000b/dThe 845M contract has been awarded to a consortium including QUEIROZ GALVANO, IESA and UTC ENGENHARIA

PAPA TERRA FPSOUSD 1,3 BILLION

BW OFFSHORE with QUIP CONSORTIUM received the Letter of Intent for the FPSO. BW Offshore will convert the ULCC BW Nisa, hull conversion to be carried out in China and topsides fabrication & integration at Quip's facility in Brazil. The FPSO will have the capacity for handling up to 180,000b/d

REFAP HDS UNITUSD 150 M

Scope : a 5,000cm/d hydrodesulfurization unit at Alberto Pasqualini refinery (Refap)SKANSKA LATIN AMERICA's contract covers detail engineering, purchasing, construction, electro-mechanical installation & start-up

REFAP REFINERY UPGRADING(interconnections) - USD 100M

Scope : partial engineering, construction, procurement, electromechanical assembly of the interconnections linking the gasoline hydrodesulfurization unit with the rest of the refinery. Work to start in August

COMPERJ REFINERY (DAV PORTION) - USD 623 M

Scope : Atmospheric Vacuum Distillation 150,000b/dcontract won in association with PROMON and ENGEVIXSKANSKA's share is USD 250M, leader of the consortium, responsible for design, detailed engineering executions and construction of the facilities, procurement of material & equipment

TAMBAU URUGUA & P-56 DEVPTUSD 200 M

The Tambau Urugua scope is to engineer, install and commission two 12” rigid steel gas flowlines (14,5km long) and associated subsea equipment.The P-56 scope is to engineer, procure, install and commission two 12” rigid steel oil export pipelines (13km long), connecting the P56 platform to the P-38 FPSO and one 10” rigid steel gas export pipeline (8,6km) from the P-56 to the P-51 platform. The pipelines and pipeline end terminations will be supplied by SUBSEA 7.

RONCADOR FIELD (SUBSEA)USD 200M

Scope : one 12" gas export line (38,7km long), one 12" oil export line (42km long) connecting the P55 platform to the PRA-1 Platform, including procurement & installation of associated subsea equipment

64 / 73

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES

Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

March 2010 TECHINT BRAZIL BRAZIL PETROBRAS

November 2009 AKER SOLUTIONS CANADA CANADA TRANSCANADA

June 2010 AKER SOLUTIONS CANADA RUSSIA ILIM GROUP

June 2008 COLT WORLEYPARSONS CANADA CANADA CCRL

April 2008 HORTON CBI CANADA CANADA TERASEN GAS

August 2008 LAVALIN CANADA SOUTH AFRICA PBM

October 2008 LAVALIN CANADA MEXICO BAJA SULPHURIC ACID PLANT

June 2009 LAVALIN CANADA ALGERIA SONATRACH

September 2009 LAVALIN CANADA IRAQ MINISTRY

March 2010 LAVALIN CANADA SOUTH AFRICA SASOL NITRO

September 2009 ABENGOA MEXICO MEXICO PEMEX

August 2009 ICA FLUOR MEXICO MEXICO PEMEX

May 2009 ICA FLUOR MEXICO MEXICO PEMEX

February 2010 ICA FLUOR MEXICO MEXICO PEMEX

April 2010 ISOLUX MEXICO MEXICO PEMEX

February 2008 ACERGY USA CANADA ENCANA

February 2008 AKER KVAERNER USA USA GULF LNG ENERGY

COMPERJ REFINERY (DELAYED COKER ) - USD 1 BILLION

Techint in association with A.GUTTIEREZ selected by Petrobras for the delayed coker,

OAKVILLE POWER PLANTUSD 380M

Scope : 900mw natural gas-fired combined cycle power plantAker Solutions with HDR Corp will execute engineering, procurement and construction work, commissioning by the end of 2013

BRATSK CHLORINE DIOXIDE PLANT - USD 18M

The plant will be built at Ilim's pulp & paper mill, capacity 15t/d. Contract to be executed by Aker in Vancouver with support from the Moscow office

REGINA REFINERY EXPANSIONUSD 1,9 Billion

expansion of the refinery by 30% to 130,000b/d : addition of a fluid catalytic cracker complex, new storage facilities, revamping of several unitsCOLTWORLEYPARSONS has been awarded the contract to provide engineering, procurement and construction management services.The program manager is International Alliance Group (IAG), a subsidiary of Triten Corporation, Mustang Engineering to provide detailed design services to IAG

VANCOUVER LNG PEAK SHAVING PROJECT - USD 150 M

Horton CBI's contract covers the engineering, procurement & construction of a 1,5 Billion cubic feet LNG storage tank, the liquefaction and regasification systems and all related plan structures and systems

KOEBERG PBMR DEMONSTRATION POWER PLANTUSD 242M

Phase II of the Pebble Bed Modular Reactor Demonstration Power PlantIt will supply about 165 MweSNC LAVALIN and MURRAY & ROBERTS will carry out the engineering, procurement and construction.PBMR is owned by Eskom, the South African Industrial Develpt Corporation, the government and Westinghouse

MINERA Y METALURGICA DEL BOLEO

capacity 2400t/dpart of a mining & processing complex to produce copper & cobalt

HAMRA GAS PROCESSING FACILITIES - USD 1,09 B

Lavalin's contract calls for a gas treatment complex including infrastructure to collect raw gas at 4 fields (Rhourde Nouss Central, Rhoude Nouss South/East, Rhourde Adra and Rhourde Adra South), a natural gas processing facility and a facility to process and reinject carbon dioxide into gas fields.

HILLA & AL TAJI POWER PLANTSUSD 170M

SNC LAVALIN will install 2 gas turbines at the Hilla Power Plant (125mw each), URUK GROUP will install four turbines at the al Taji power plant (160mw) - each contract has a USD 85M value

SECUNDA CAN PLANTUSD 96M

Scope : 400,000t/y of calcium ammonium nitrateSNC LAVALIN selected to provide engineering, procurement & construction management services after having carried out the conceptual study and the basic engineering

TABASCO COGENERATION PLANT - USD 633 M

A consortium made of Abengoa Mexico and Abener has been awarded the turnkey construction of the 300mw plant + operation & maintenance for 20 years. Project value USD 633M

CADEREYTA & MADERO CLEAN FUELS PROJECT - USD 638M

ICA FLUOR will be responsible for the epc covering the installation of gasoline desulfurization plants, amone regeneration units, offsites, utilities and integration for both refineries, work to be complete in 44 months

POZA RICA CRYOGENIC PLANTUSD 268M

Contract won with Linde Process Plants. The cryogenic plant will be built at the Poza Rica Gas Processing Complex. The consortium will be responsible for the engineering, procurement, construction, testing and start-up. Work to start in august 09, when commissioned the plant will process 200 million cubic feet of natural gas per day

SALINA CRUZ & MINATITLAN CLEAN FUELS PROJECTUSD 620 M

Scope : construction of gasoline desulfurization units at both refineries. Contrat won against Dragados, Technip, saipem, ABB, Tecnimont with Samsung

SALAMANCA SULFUR RECOVERY UNIT - USD 50M

Scope : 80t/d Contract awarded to ISOLUX with TECNA and TECHNIP. Work to start immediately for commissioning in October 2011

DEEP PANUKE FIELD (SURF PACKAGE) - USD 195M

Scope : installation and tie-in of 17km infield flowlines (8") and umbilicals to four production wells, an acid gas disposal flowline connecting to a Production Field Centre

PASCAGOULA LNG TERMINALUSD 1,1 BILLION

Scope : a 1,5 Billion cf/d terminal, two 160,000cm LNG tanks and a vaporization systemAKER KVAERNER has received the full notice to proceed with the USD 680M contract won in association with IHI/USA

65 / 73

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES

Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

May 2008 AKER KVAERNER USA USA DUPONT

January 2010 AMEC USA USA FLAMBEAU RIVER BIOFUELS

April 2009 BE&K CONSTRUCTION COMPANY USA USA PROGRESS ENERGY FLORIDA

May 2008 BE&K ENGINEERING COMPANY USA USA DUPONT

June 2007 BECHTEL USA NIGERIA BRASS LNG LTD

August 2006 BECHTEL USA USA MOTIVA ENTERPRISES

October 2006 BECHTEL USA USA PEABODY ENERGY

February 2007 BECHTEL USA ANGOLA

January 2008 BECHTEL USA USA DUKE ENERGY

February 2008 BECHTEL USA LIQUID NIUGINI GAS

February 2010 BECHTEL USA AUSTRALIA CURTIS LNG PLANT QGC / BG Group

COOPER RIVER FIBER PLANTUSD 500 M

the new plant will increase global Kevlar production capacity by more than 25% - BE&K Engineering in joint venture with AKER SOLUTIONS selected as EC contract, known as JBEK joint venture.

FLAMBEAU RIVER BIOFUELS PROJECT - USD 250 M

the plant will convert 1,000 dry tons per day of biomass into green electrical power, steam and heat and green diesel fuel and wax.AMEC/HOUSTON and MIRON CONSTRUCTION selected as EPC Contractors

RICHMOND COUNTY POWER PLANT - USD 600 M

Scope : 600mw natural gas-fueled power plantBE&K CONSTRUCTION, part of KBR, will provide general construction services including power generation and auxiliary equipment, piping works

COOPER RIVER FIBER PLANTUSD 500 M

the new plant will increase global Kevlar production capacity by more than 25% - BE&K Engineering in joint venture with AKER SOLUTIONS selected as EC contract, known as JBEK joint venture. Engineering to be done from Wilmington offices

BRASS LNG PROJECTUSD 3,5 BILLION

Scope : two trains, each with a capacity of 5 Million t/yIn november 2004, BECHTEL with the local NETCO has been awarded the FEED, the FEED will be rolled into EPCIn june 2007 BECHTEL has received the project management contract, the EPC contract will start when final investment decision is taken

PORT ARTHUR REFINERY EXPANSIONUSD 7 Billion

the capacity of the refinery will be boosted by 325,000b/d to 600,000b/dContract awarded to BECHTEL in association with JACOBS ENGINEERINGGo ahead given in September 2007 March 09 : Motiva is delaying the completion of the project from end of 2010 to the first quarter of 2012

PRAIRIE STATE ENERGY POWER PLANT - USD 2 BILLION

1500mw coal-fired power plantBECHTEL has signed a Letter of Intent for the EPC services, replacing FLUOR who signed a LOI in 2004, but the contract has not been finalized In June 2007 the EPCM contract has been signed with BECHTEL, contract value USD 2,9B. BABCOCK&WILCOX has the contract for the boiler systems, TOSHIBA for the turbines

SOYO LNG PROJECTUSD 4 BILLION

ANGOLA LNG Scope : a 5,2 Million t/y plantCHEVRON indicates in a press release that a contract for advance engineering & procurement has been awarded to BECHTEL. The project procurement manager is Mike Price in HoustonFebruary 2008 : Final Investment decision has been taken, the plant will use ConocoPhillips's technologyJune 2008 : SAIPEM has won a USD 252M contract from Bechtel to build 5 tanks

EDWARDSPORT POWER STATIONUSD 2 BILLION

Scope : 630mwDuke Energy has received the air permit for the coal gasification power plant, work is expected to start in spring. The plant will use integrated gasification combined cycle technology, a coal gasifiction system to convert coal into a synthesis gas. The contract will be carried out by BECHTEL and GE following an agreement signed several years ago

PAPUA NEW GUINEA

NAPA NAPA LNG PLANTUSD 4 BILLION

Scope : capacity of 5 Million t/yBECHTEL has been selected to undertake the FEED and engineering, procurement and contracting work for the plant, ConocoPhillips will provide the technologthe formal award of the contract is subject to final shareholder approval

Scope : 2 trains 8,5 million t/yBECHTEL has officially signed the EPC contract in February 2010. Full notice to proceed to be given later this yearBechtel has been issued an initial notice to proceed, as part of a US$3 billion commitments, to order long-lead items for the LNG plant such as compressors and storage tanks and to begin preparations for initial site construction

66 / 73

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES

Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

June 2010 BECHTEL USA USA CHENIERE ENERGY

August 2005 BLACK&VEATCH USA USA CPS ENERGY

July 2008 BLACK&VEATCH USA THAILAND GLOW ENERGY

April 2008 CBI USA QATAR QAFCO-V STORAGE PROJECT QAFCO

January 2009 CBI USA CHINA CNOOC FUJIAN LNG Co Ltd

March 2009 CBI USA ECUADOR FLOPEC

July 2009 CBI USA ABU DHABI GASCO

September 2009 CBI USA PANAMA PETROTERMINAL DE PANAMA

October 2009 CBI USA AUSTRALIA CHEVRON/EXXONMOBIL/SHELL

October 2009 CBI USA USA UGI LNG Inc

November 2009 CBI USA COLOMBIA REFICAR

December 2009 CBI USA EXXONMOBIL

May 2010 CBI USA USA OCCIDENTAL OF ELK HILLS

June 2010 CBI USA ABU DHABI TAKREER

August 2008 CICSCO USA IRAQ MINISTRY OF OIL

October 2009 FLOATEC USA BRAZIL PETROBRAS

SABINE PASS LNG TERMINAL EXPANSION

The project will transform the terminal into a bi-directional facility capable of liquefying and exporting natural gas in addition to importing and regasifying LNG; in a first phase construction of two trains with liquefaction capacity of 1 billion cf/d. BECHTEL who built the original receiving terminal has been selected to build the liquefaction facilities. Start of construction depending on regulatory approvals and final investment decision

CALAVERAS LAKE POWER PLANT

Capacity of 750mw, project also known as Unit 2 of the J.K.Spruce Power plant. The contract has been awarded to the consortium "Calaveras Power Partners" including ZACHRY CONSTRUCTION and BLACK&VEATCH. Alstom Power will supply the boilers

COMBINED-CYCLE POWER PLANTUSD 302M

Scope : 380mw to be located at Map Ta Phut/RayongMARUBENI will be responsible for procurement of main equipment of the plant such as gas turbine generator and steam turbine generator from Siemens as well as overall civils and installation works. BLACK&VEATCH will be the technical maanger, responsible for engineering, plant equipment procurement, construction management, start-up & commissioning

Scope : two ammonia storage tanks with a capacity of 50,000 tonsCB&I has been awarded the contract by the main contractor, i.e HYUNDAI/SNAMPROGETTI

FUJIAN LNG TERMINAL EXPANSION PROJECT

CB&I's contract scope includes engineering, procurement and construction of two additional LNG storage tanks (160,000 cubic meters)

MONTEVERDE STORAGE FACILITIES - USD 50 M

Scope : engineering, procurement, fabrication and construction of several refrigerated storage tanks and spheres with a total capacity of 650,000b/d

IGD PROJECT (RUWAIS STORAGE TANKS) - USD 533 M

Scope : engineering, procurement, fabrication and contruction of 6 low temperature/cryogenic storage tanks, two ambient storage tanks and the associated piping, power distribution & civil works

PANAMA TERMINAL EXPANSIONUSD 100M

CB&i's contract includes the design & construction of 5,4million barrels of crude oil storage and the associated civil, mechanical & electrical work at PTP's terminal facilities in Chiriqui Grande and Puerto Armuelles

GORGON LNG PJt (STORAGE TANKS) - USD 550M

CB&I's contract includes engineering, procurement, fabrication & construction of two 180,000cm full containment LNG tanks, four condensate tanks & associated piping, electrical, instrumentation & civil works

TEMPLE LNG EXPANSIONUSD 100M

scope : addition of a new 50,000 cubic meters lng storage tank + related processing facilities designed to provide 150 million cubic feet of natural gas per day during peak demand periods

CARTAGENA REFINERY EXPANSION - USD 1,4 B

CB&I will provide project management and the engineering, procurement services, fabrication and construction of the new plant including crude & vacuum distillation units, fluir catalytic cracker, naphtha hydrotreater, diesel hydrotreater, hydrocracker, hydrogen plant, sulfur plant, delayed coker, HF Alkylation, C4 isomerization, power generation, offsites & utilities.CB&I carried the FEEDIn december 09, FOSTER WHEELER USA selected as PMC for the project

PAPUA NEW GUINEA

PNG LNG PROJECT(Hides Gas Plant)

Scope : Hides Gas Conditioning Plant including nearby wellheads and associated piping and infrastructure.Contract won in association with CLOUGH (CBI 65%)

ELK HILLS GAS PROCESSING PLANT - USD 280M

Scope : engineering, procurement and construction of a 200 million cf/d natural gas processing plant including fractionation, storage tanks and export pipelines

PROPYLENE TANKS AT RUWAIS REFINERY - USD 70M

DAEWOO, the main contractor for the Takreer Refinery Storage Package has subcontracted the propylene tanks to CB&I - contract value USD 70M - Commissioning in 2013

SAMAWAH REFINERY UPGRADING - USD 81 M

The contract covers a new unit that will produce 1200 cubic meters of gasoline per day - Contract to be carried out with VECO (CH2H Hill)www.cicsco.com

PAPA TERRA FLWP P-61USD 1 BILLION

Letter of Intent issued to FLOATEC (JV between Keppel Offshore & Marine Ltd and J.RAY McDermott) for the tension leg wellhead platform. Contract to be signed officially later.Final Investment Decision taken by CHEVRON in January 2010

67 / 73

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES

Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

October 2006 FLUOR USA USA BP

January 2008 FLUOR USA USA MARATHON OIL

March 2008 FLUOR USA USA TOTAL

August 2008 FLUOR USA USA VALERO ENERGY

November 2008 FLUOR USA USA

December 2008 FLUOR USA USA

April 2009 FLUOR USA USA DOMINION VIRGINIA POWER

April 2010 FLUOR USA QATAR QATARGAS

September 2007 FOSTER WHEELER USA SINGAPORE EXXONMOBIL

October 2007 FOSTER WHEELER USA SINGAPORE EXXONMOBIL

August 2008 FOSTER WHEELER USA USA BP

November 2007 GENERAL ELECTRICS USA ALGERIA SONELGAZ

January 2009 J.RAY McDERMOTT USA BHP BILLITON TRINIDAD

August 2006 JACOBS ENGINEERING USA USA MOTIVA ENTERPRISES

April 2007 JACOBS ENGINEERING USA USA BP

October 2008 JACOBS ENGINEERING USA USA FLINT HILLS RESOURCES

WHITING REFINERY UPGRADINGUSD 3,8 BILLION

Fluor will provide the overall program management for the upgrade + independent engineering, procurement & fabrication of 3 major packages : revamping of the crude distillation unit, a gas-oil hydrotreater and the refinery infrastructure facilities. In august 2008 FLUOR announced that detailed engineering & construction work started in July. Fluor will book USD 3,8 Billion into its backlog

DETROIT REFINERY EXPANSIONUSD 1,9 BILLION

Scope : the project will increase the heavy oil processing capacity by 80,000b/d and the total refining capacity by 15% to 115,000b/dFLUOR has been awarded the USD 1,6 billion EPC contractIn February 2009, MARATHON plans to delay the completion of the expansion by about 18 months, i.e mid 2012. Construction will not stop byt will continue at a slower pace

PORT ARTHUR REFINERY EXPANSION - USD 2,2 BILLION

Scope : a 50,000b/d coker, a 64,000b/d desulfurisation unit, a 55,000b/d vacuum distillation unit + other related unitsFLUOR has been awarded the USD 1,9 Billion contract, it will be executed by FLUOR's offices in Aliso Viejo/alifornia, Houston and New Delhi/India

St CHARLES & PORT ARTHUR HYDROCRACKERS - USD 1,2 B

Project called HCU Program Expansion Project - Each hydrocracker to have a capacity of 50,000b/dFLUOR in Houston, Calgary and New Delhi will execute the contractValero is suspending the project in June 2009

JACK COUNTY GENERATING FACILITY UNIT 2 POWER PLANT

BRAZOS ELECTRIC POWER COOPERATIVE

620MW Gas-fired, combined cycle expansion. Contract to be executed by Fluor Irvine - Work to start on site in July 09

WOOD RIVER COKER REFINERY EXPANSION

WRB REFINING CO(CONOCOPHILLIPS/ENCANA)

FLUOR was awarded the contract for the construction & construction management of proces, utility & offistes in connection with the coker expansion. The FEED was done by FLUOR. Work will be executed by teams from Fluor/Calgary, Houston and New Delhi

BEAR GARDEN POWER STATIONUSD 619 M

Scope : 580mw gas-fired combined cycleEPC contract for FLUOR

RAS LAFFAN GAS RECOVERY PROJECT - USD 1 BILLION

project also called "jetty boil-off gas project". It will recover and collect vapors created from the production of LNG and reduce the amount of gas that has to be flared. The project design is based on collection of the LNG boil-off gas from the LNG carriers and transfer of this gas to a central compression area via large diameter stainless steel pipes. At the central compression area, the gas will be compressed and sent to the LNG trains. Contract followed by FLUOR in Texas with a support team based in Qatar

JURONG 2nd PETROCHEMICAL COMPLEX (O&U portion)

FOSTER WHEELER with WORLEYPARSONS are in charge of project coordination & services & infrastructure EPC. They did the FEED

JURONG 2nd PETROCHEMICAL COMPLEX (aromatics&oxo-alcohols)

Besides the project coordination contract, FW will carry out the EPC for modification and expansion of aromatics & oxo-alcohol facilities : a 340,000t/y benzene unit from an aromatics extraction unit, a 125,000t/y oxo-alcohol unit expansion, a 80,000t/y paraxylene expansion

WHITING REFINERY DELAYED COKER

The project is part of the major expansion aimed to increase gasoline production by 1,7 million gallons a dayFW will provide engineering, procurement and fabrication of a 102,000b/d six-drum delayed coker and gas plant facilities

KOUDIET EDRAOUCH POWER PLANT - USD 2,1 Billion

Scope : 1200mwGENERAL ELECTRICS/USA with IBERDROLA/SPAIN has won the construction contract

TRINIDAD TOBAGO

ANGOSTURA GAS EXPORT PLATFORM PROJECT

J.RAY will fabricate a 4,000 ton integrated topside platform, a 800ton four-legged jacket and 1,000 tons of piles. Construction to take place at J.RAY's Morgan City/Louisiana facility

PORT ARTHUR REFINERY EXPANSION

the capacity of the refinery will be boosted by 325,000b/d to 600,000b/dContract awarded to BECHTEL in association with JACOBS ENGINEERINGGo ahead given in September 2007

WHITING SRU & HYDROTREATER PROJECT

one package convers licensing, design and construction of sulfur recovery facilities, project carried out by the Baton Rouge center, the other package includes the revamp of several hydroprocessing units, project carried out by Jacobs in Houston

CORPUS CHRISTI DIESEL DESULFURIZATION UNIT

Part of a USD 250M investment including also a sulfur recovery unitJACOBS's contract covers a diesel desulfurization unit - work's duration : 18 months

68 / 73

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES

Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

January 2009 JACOBS ENGINEERING USA USA EXXONMOBIL

July 2008 KBR USA DENMARK MAERSK OLIE

August 2009 KBR USA SAUDI ARABIA

July 2007 KBR USA ALGERIA SONATRACH

March 2010 KBR USA USA BP-HUSKY

October 2008 KIEWIT ENERGY USA USA JORDAN COVE ENERGY

August 2008 MODEC USA GHANA JUBILEE FPSO TULLOW GHANA Ltd

April 2009 PROENERGY EPC SERVICES USA PAKISTAN WALTERS POWER INT

December 2006 SHAW GROUP USA CHINA SNPTC

April 2007 SHAW GROUP USA USA ENTERGY

April 2007 SHAW GROUP USA USA DOMINION

May 2007 SHAW GROUP USA USA SWEPCO

September 2007 SHAW GROUP USA SINGAPORE EXXONMOBIL

BAYTOWN & BATON ROUGE DIESEL PROJECTS

The two projects will allow the refineries to meet rising diesel demand through the construction of new units and modification of existing facilities.JACOBS ENGINEERING selected to provide engineering, procurement & construction services

HALFDAN PHASE IV PROJECT KBR has been awarded a USD 16,5M contract to provide detailed engineering foa the platform to be built by SMOE SINGAPORE

YANBU REFINERY (UTILITIES PACKAGE)

SAUDI ARAMCOCONOCOPHILLIPS

KBR, who is the FEED and project management contractor has been awarded the contract to provide detailed engineering & procurement services for the utilities package and the interconnecting systems and pipe racks

SKIKDA LNG PLANT RECONSTRUCTION - USD 2,8B

The LNG plant will have a capacity of 4,5 Million t/yKBR selected in association with JGC in june 2005 for the contractIn January 2006, information that the engineering work has started at KBR's office in HoustonIn july 2007 SONATRACH and KBR agreed on a price of USD 2,851 Million after several months of negotiations, work will start in september and will be complete 50 months later In January 2008 AIR PRODUCTS announced that they received an order from KBR to provide process technology and main cryogenic heat exchanger In June 2008 ORASCOM has been awarded the civil works

TOLEDO REFORMER 3 PROJECTUSD 400M

scope : replacement of two existing naphtha reformers and a hydrogen plant with a single reformer. The unit will increase the refinery's gasoline yields.Contract to be followed by KBR in Houston, Monterrey/Mexico

JORDAN COVE LNG TERMINAL JORDAN COVE ENERGY has selected 4 companies to design & build the project : KIEWIT (construction of the terminal), BLACK&VEATCH (engineering design), ENTREPOSE CONTRACTING AND VINCI GRANDS PROJETS/F (LNG tanks). However the project has still to be approved before construction starts.The LNG terminal will have a capacity of 1 Billion cubic feet per day, two storage tanks (160,000cm each)

The FPSO will be able to process 120,000 barrels of oil per day and injecting more than 230,000b/d of water per day and 160 MMcf/d of produced gas

GUDDU & NAUDERO POWER PLANTS - USD 100M

Guddu : 110mw - Naudero 50mwPROENERGY EPC SERVICES has won the EPC contract, engineering work subcontracted to EDG ENGINEERS in Tulsa

CONSTRUCTION OF 4 NUCLEAR PLANTS - USD 8 BILLION

The 1,1 gigawatt plants will use Westinghouse advanced AP 1000 Design. SHAW will provide engineering, procurement and management services - the plants will be located at Sammen in Zhejiang Province and Haiyang in Shangdong provincethe definitive contract has been signed in July 2007

LITTLE GIPSY REPOWER PROJECT - USD 1 BILLION

the work will include replacing an existing natural gas-fired boiler with two new CFB boilers which will supply steam to an existing steam turbine generator. SHAW's EPC contract will also cover the fabricated piping systems and structural steel

SOUTHWEST VIRGINIA POWER PLANT

Scope : 585mw The contract will be executed in two phases, the first one will involve design, engineering, major equipment selection and finalisation of project cost. Upon the necessary regulatory approvals, SHAW will continue with EPC activities

JOHN W.TURK ELECTRIC GENERATING PLANT USD 1,3 BILLION

Scope : 600mw - it will use an ultra supercritical advanced pulverized clean coal combustion technologySHAW has been awarded the USD 700M EPC contract - BABCOCK & WILCOX has won the USD 250M contract for the pressure boiler, to be followed by B&W in Balberton

JURONG 2nd PETROCHEMICAL COMPLEX (Ethylene package)

Scope : capacity 1 million t/ySHAW GROUP has been awarded the contract to provide technology, engineering, procurement & construction services

69 / 73

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES

Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality

September 2007 SHAW GROUP USA SINGAPORE EXXONMOBIL

April 2008 SHAW GROUP USA USA VOGTLE NUCLEAR PLANT GEORGIA POWER CY

May 2008 SHAW GROUP USA USA DUKE ENERGY CAROLINAS

May 2008 SHAW GROUP USA USA SCE&G/SANTEE COOPER

October 2008 SHAW GROUP USA USA NV ENERGY

January 2009 SHAW GROUP USA USA PROGRESS ENERGY FLORIDA

November 2009 SHAW GROUP USA TURKEY ALIAGA ETHYLENE EXPANSION PETKIM

August 2008 TECHNIP USA USA VALERO ENERGY

April 2009 TECHNIP USA USA MARATHON OIL

October 2009 TECHNIP USA GHANA JUBILEE FIELD (subsea) TULLOW GHANA Ltd

October 2009 TECHNIP USA USA LULING HYDROGEN PLANT MONSANTO

February 2010 VECO USA ABU DHABI ADCO

January 2009 WORLEYPARSONS USA SAUDI ARABIA

June 2010 ZACHRY INDUSTRIAL USA USA

JURONG 2nd PETROCHEMICAL COMPLEX (Power plant package)

Scope : capacity 220mwSHAW GROUP has been awarded the contract to provide engineering, procurement & construction

SHAW GROUP and WESTINGHOUSE have been awarded an EPC contract for two Westinghouse API 1000 nuclear units & related facilities at the existing Vogtle plant - capacity 1100mwFull notice to proceed with the EPC contract received in April 2009

CONSTRUCTION OF A GAS-FIRED POWER PLANT

SHAW has been selected to build the plant at Buck Steam Station in North Carolina - the plant will have a capacity of 620mw, in a first phase to be completed by summer 2010 it will start operation in simple cycle, one year later in combined cycle

VC SUMMER NUCLEAR UNITSUSD 9,8 BILLION

SHAW GROUP and WESTINGHOUSE have been awarded an EPC contract for two Westinghouse nuclear units at the existing V.C. Summer Sitecapacity 117mw - commissioning in 2016 and 2019

NEVADA GAS-FIRED POWER PLANT - USD 400 M

Scope : 500mw combined cycle, natural gas-fired, to be built at the existing Harry Allen Generating StationNV Energy is part of Sierra Pacific Resources - EPC contract for SHAW

LEVY COUNTY NUCLEAR PLANTUSD 7,6 BILLION

Scope : two units capacity of 1100mw eachepc contract won with WESTINGHOUSEApril 2009 : the project will be delayed by 20 months as work cannot start before NRC's approval which is expected to be given in 2011 or 2012

Scope : the 520,000t/y plant will be expanded by 10%SHAW will provide engineering & procurement services and addition study work

PORT ARTHUR REFINERY EXPANSION (2 UNITS)

TECHNIP's scope of work includes two processing units including a saturate gas recovery unit and an amine treatment unit + offsites associated with the expansion project.The contract is part of a USD 2,4 Billion expansion.

DETROIT REFINERY HYDROGEN PLANT

AIR PRODUCTS signed in April an agreement to build an hydrogen plant to supply Detroit Heavy Oil Upgrade Project. The plant will have a capacity of 50 million cf/d. It will be built by Technip through the global alliance signed between the two companies

Technip has won 2 contracts, one for flexible risers and one for 48km of production, gas & water injection rigid flowlines + installation of 26km of umbilicals, 9 flexible risers, connection of the flowlines to the wellheads and subsea manifold. The second contract will be executed by Houston

AIR PRODUCTS will build an hydrogen plant at Luling site, it will be built by Technip the the global alliance between the two companies. Production of 100 million cf/d of hydrogen

BIDA EL QEMZAN FIELD DEVELOPMENT - USD 300M

VECO (now CH2M HILL) who acted as management consultant and was working on the detailed engineering, will now order the equipment and materials for the oil gathering & pumping systems, pipeline network, water injection facilities

YANBU REFINERY CLEAN FUELS PROJECTUSD 2 B

SAMREF(Saudi Aramco / ExxonMobil)

Scope : construction of new units such as a 40,000b/d hydrotreater, a sulphur recovery unit, an hydrogenation unit, a sour water splitter and a heavy naphta hydrotreater + offsites & utilitiesWorley Parsons to execute the Front End Engineering Design (FEED) and Detailed Engineering, Procurement & Construction (EPC). Contract to be followed by Monrovia/California office - WorleyParsons's Al Khobar office will provide in-kingdom logistics support

COLETO CREEK 2 POWER PROJECT - USD 1,4 B

INTERNATIONAL POWER SOUTH TEXAS ELECTRIC COOP

Scope : 650mwZACHRY INDUSTRIAL has been selected as EPC contract part of a consortium including BURNS & McDONNELL ENGINEERING and MITSUBISHI POWER SYSTEMS AMERICA. Work to start early 2011

70 / 73

FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS

Last Update Contractor Contractor's nationality Final Destination Project Name End User Situation

May 2007 J.RAY McDERMOTT ABU DHABI SAUDI ARABIA MANIFA FIELD PLATFORMS SAUDI ARAMCO

June 2010 J.RAY McDERMOTT ABU DHABI ABU DHABI ADMA OPCO

May 2009 NPCC ABU DHABI ABU DHABI ADMA OPCO

September 2009 NPCC ABU DHABI INDIA ONGC

December 2009 NPCC ABU DHABI ABU DHABI ADCO

December 2009 NPCC ABU DHABI INDIA ONGC

March 2010 NPCC ABU DHABI QATAR OCCIDENTAL PETROLEUM

May 2010 NPCC ABU DHABI ABU DHABI ADMA OPCO

January 2009 PETROFAC ABU DHABI ABU DHABI ADCO

July 2009 PETROFAC ABU DHABI ABU DHABI GASCO

November 2009 TECHNIP ABU DHABI ABU DHABI GASCO

June 2008 VALENTINE MARITIME ABU DHABI SAUDI ARABIA SAUDI ARAMCO

Scope : construction of 13 new platforms and modifications to 26 existing offshore well platformsJ.RAY McDERMOTT has signed the turnkey contract : engineering, procurement, fabrication, transportation, intallation and hook-up

LOWER ZAKUM FIELD (Platform, water injection) - USD 350 M

Scope : an offshore platform and water injection facilities (2 packages)contract won against Technip

IGD PROJECT (OFFSHORE PORTION) - USD 405M

Scope : a gas processing platform at Um Shaif (8,000/9,000 tonnes), a flare system linked by a bridge to the Umm Shaif Super Complex, a 39km pipeline(42") to Das IslandNPCC selected in May 09 by Adma Opco, a formal contract will be signed soon.

B-22 FIELD DEVELOPMENTUSD 278M

NPCC's contract will cover a wellhead platform, two other wellhead platforms and 90km of pipelines. Contract won against PunjLLoyd and Larsen & Toubro

BAB & QUSAHWIRA FIELDS DEVLPT - USD 1,25 B

Bab : Infrastructure facilities for 53 wells ( Flowlines and pipelines, Water handling systems, Associated utilities)Qusahwira : Infrastructure facilities for 44 wells (GOSP facilities, Gas re-injection facilities) part of the 1,8 Million project Official contract for BAB signed in February 2010 for USD 693MOfficial contract for Qusahwira signed in March 2010 for USD 560M

RS-11 WELL PLATFORMUSD 162 M

Located in Mumbai High FieldNPCC's contract covers design, detailed engineering, procurement, fabrication, transportation, intallation & commissioning

IDD AL SHARGI PIPELINES UPGRADING PJT - USD 82M

Part of the third phase of infrastructure upgrades. Contract won against J.RAY McDermott and GLOBAL INDUSTRIESExact scope to be determined

ZAKUM CENTRAL SUPER COMPLEX DEMOTHBALLINGUSD 350M

Part of the Lower Zakum programme aimed at enhancing the oil production capacity from the Zakum field. NPCC's workscope includes detailed engineering, procurement, construction, commissioning for major complex brown field works on Zakum Central Complex and a new accomodation platform (NAP) comprising a living quarters module

SAS PROJECT - PACKAGE AUSD 2,3 BILLION

Petrofac's contract covers the Asab Field : upgrading of the facility's capacity to accept production from Sahil, Shah and other fields and to upgrade the associated utilities and water handling facilities. Once completed the production at Asab will increase from 280,000b/d to 310,000b/d

IGD PROJECT (RUWAIS 4th NGL TRAIN) - USD 2,1 BILLION

The facility will produce 4761t/d of ethane, 7657t/d of propane, 9364t/d of butane, 5546t/d of paraffinic naphtha and 6712t/d of condensate return.Contract won in association with GS ENGINEERING & CONSTRUCTION SOUTH KOREA

ASAB 3 GAS PROJECTUSD 415 M

Asab3 will be developed to process an additional 150 million cf/d of associated gas from Aab, Shah and Sahil fields. The project involve a new booster station to transport 450 MMcf/f from the Adco facilities and expansion of existing plant (new compression & treatment facilities. A 16" pipeline will also be builtcontract to be executed by Technip in ABu Dhabi

MANIFA FIELD PIPELINESUSD 450 M

Scope : Crude gathering & water injection pipelines, Power & Fibre Optic Cablesthe project will start in July 2008, project followed by VM in Abu Dhabi and in Saudi

71 / 73

FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS

Last Update Contractor Contractor's nationality Final Destination Project Name End User Situation

March 2009 ABB SARPI ALGERIA ALGERIA SONATRACH ANADARKO

June 2009 ABB SARPI ALGERIA ALGERIA SONATRACH

November 2008 COSIDER ALGERIA ALGERIA SONELGAZ

January 2010 DODSAL DUBAI ABU DHABI GASCO

January 2010 DODSAL DUBAI ABU DHABI ELIXIER

June 2009 PETROJET EGYPT ALGERIA SONATRACH

April 2008 ARAS CONSORTIUM IRAN IRAN SOUTH PARS PHASE 12 (EPC1) PETROPARS

December 2008 HAMPA ENGINEERING IRAN IRAN

December 2008 HAMPA ENGINEERING IRAN MALAYSIA EL-ONE RESOURCES

September 2007 IGC IRAN IRAN NIORDC

March 2009 MEHVAR SAZAN IRAN IRAN ASSALUYEH AMMONIA PLANT STAR ARIA AMMONIA CHEMICAL CY

March 2007 NAMVARAN IRAN IRAN ESFAHAN OIL REFINING CY

EL MERK FIELD DEVLPT(flowlines/gathering) - USD 673M

Scope : design & installation of pipelines, field gathering stations, gas ditribution manifolds and flowlines/trunklines as wel as water and gas-reinjection facilities. The pipeline network wil connect oil & gas wells to the processing plant via 10 gathering stations Contract won in association with PETROJET, ABB's share of the contract is USD 490M.

HADOUD BERKAOUI GAS FLARING PJT - USD 233M

The contract include new compressor trains, re-instrumentation of existing gas treatment plants at Haoud Berkaoui, Benkhala and Gellala + an integral control systemABB will be responsible for the engineering, procurement and commissioning of the project while construction activities will be carried out by SARPI

GREO GAS PIPELINE(packages 1 - 2- 3 ) USD 156M

Scope : 263km between Khenchla à M’sila Contract awarded to a consortium including COSIDER, KANAGHAZ, ENCA and ERCIYAS/TURKEY

PIPELINE BETWEEN THAMAMA C and ASAB FACILITIES - USD 85M

Scope : 36" pipeline between the Thamama C Facilities and the Asab facilities, part of the ABBR program

MIRFA/HABSHAN NITROGEN PIPELINE - USD 84M

45km 48" between Mirfa facilities and the Habshan fieldElixier is a JV between ADNOC and LINDE

GK-3 PIPELINE (pack 1 & 2)USD 800M

Scope : pack 1 = 270km between Hassi R'Mel and Chaiba - pack 2 = 163km between Chaiba and Mechtatinethe whole GK-3 pipeline will be 784km long from Hassi R'Mel to El Kala (48")

PETROPARS has awarded the USD 284M contract to the iranian ARAS (Aria Pishro Gharn, Radira, Asphalt Toos, Steam). ARAS will be responsible for constructing 4 metal storage tanks with 90,000cm capacity each, putting liquid gas reserves into operation and setting up fuel, water & fire extinguishing systems

CONSTRUCTION OF 3 AMMONIA UREA COMPLEXES

NIPCNIPC

Zanjan Petrochemical Cy Lordegan Petrochemical CyGolestan Petrochemical Cy

corresponding to the 10th, 11th and 12th Ammonia-Urea Projects to be located in Zanjan, Lordegan and Golestaneach plant will have a capacity of 2050t/d of ammonia (Casale process) and 3250t/d of urea (Stamicarbon). After having done the FEED, HAMPA is moving into the EPC phase

PUTRANA REFINERYUSD 6,8 BILLION

the refinery will have a capacity of 230,000b/d, it represents an investment of USD 6,8 Billion. HAMPA ENGINEERING selected as general contractor for the project, responsible to fulfill all pre-EPCC and EPCC works in relation with the studies, engineering, supply of equipment and materials, construction and commissioning

TEHRAN REFINERY UPGRADING PHASE II - USD 310 M

Scope : a 55,000b/d gas oil HDT, a 31,000b/d kerosene HDT, a 10,000b/d LPG recovery unit, a 112MMcf/d H2 plant - the project will modify the refining process and transform the heavy products to light productsthe EPC contract has been awarded to a consortium of local companies led by IGC, including ODCC and D&I

Scope : capacity of 720t/d on Haldor Topsoe technologyEPC contract awarded to CHINA TIANCHEN CHEMICAL ENGINEERING CORPORATION (CHINA-TCC) with the local MEHVAR SAZAN

ESFAHAN REFINERY UPGRADINGUSD 1720 M

The production of the gasoline will be boosted from 9 million liters to 12 millions. The contract will be executed by DAELIM, UHDE, LURGI and the local companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project management consultant. The upgrading involves construction of several units

72 / 73

FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS

Last Update Contractor Contractor's nationality Final Destination Project Name End User Situation

April 2007 NARGAN IRAN IRAN

March 2009 NARGAN IRAN IRAN ASSALUYEH SADAF CHEMICAL CY

May 2009 OIEC IRAN IRAN NIOC

June 2009 PIDECO IRAN IRAN IRAN LNG

February 2009 J.RAY McDERMOTT JEBEL ALI SAUDI ARABIA SAUDI ARAMCO

March 2010 J.RAY McDERMOTT JEBEL ALI SAUDI ARABIA SAUDI ARAMCO

November 2009 ROCKSON ENG NIGERIA NIGERIA KADUNA POWER PLANT MINISTRY OF POWER

February 2010 ZAKHEM BAYWOOD JV NIGERIA NIGERIA O.U.R GAS PIPELINE TEPNG

July 2008 ARABIAN BEMCO SAUDI ARABIA SAUDI ARABIA SEC

September 2009 ARABIAN BEMCO SAUDI ARABIA SAUDI ARABIA SEC

January 2010 ARABIAN BEMCO SAUDI ARABIA SAUDI ARABIA SEC

July 2009 DAYIM PUNJ LLOYD SAUDI ARABIA SAUDI ARABIA

July 2009 PETRO STEEL SAUDI ARABIA SAUDI ARABIA

July 2009 SAUDI ARABIA SAUDI ARABIA

LORESTAN & MAHABAD POLYETHYLENE PLANTSUSD 628 M

BAKHTAR PETROCHEMICAL CY(NPC's affiliate)

Scope : a 300,000t/y LLDPE/HDPE plant on Basell Technology and a 30,000t/y butene-1 unit on Axens Technology for each siteIn October 2005 TECNIMONT has won the EPC contract in consortium with NARGAN, then it was cancelled due to lack of finance. New signature in April 2007. The contract is coming into force in february 2008, but Tecnimont will only do the engineering

ASSALUYEH ESBR PLANTUSD 340 M

Scope : capacity of 100,000t/y - Polimeri Europa Technologycontract awarded to a consortium including TECNIMONT/ITALY and NARGAN/IRAN

SOUTH PARS PHASE 20 - 21USD 5,5 B

Contract signed on May 31scope : the two phases will produce 50 million cubic meters of gas, 80,000barrels of gas condensates, 400 tons of sulfur per day in addition to 1 million ton of ethane and 1,5 million tons of liquid propane per yearwork will take 52 months

TOMBAK LIQUEFACTION PLANTUSD 1 BILLION

Scope : capacity of 10,8 Million t/y (two trains 5,4 Mmt/y)GS E&C will carry out the contract with the local PIDECO

KARAN GAS FIELD(OFFSHORE PORTIONUSD 1,2 BILLION

Scope : construction of two flare structures, bridges, 10 wellhead platforms, 3 processing platforms and a gas pipeline (36")J.RAY Mc Dermott has reduced its offer by USD 100M

SAFANIYA FIELD UPGRADINGUSD 1 BILLION

Scope : engineering, procurement & installation of a new tie-in platform (STP-20) with a 6,000 tonne topside, a electrical deck module, a 53km 42" pipeline, four in-field laterial flowlines and valve skids, 156km of subsea cable, modification of 9 wellhead platforms

Scope : 200mwROCKSON ENGINEERING in consortium with GENERAL ELECTRIC OIL & GAS (Nuovo Pignone) has won the contract.The contract covers manufacture & supply of 8 GE gas turbines to be manufactured in Florence/Italy, design/engineering/procurement of balance of the plant

45,6km pipeline 42" from Obite to Ubeta and Rumuji.Total Nigeria signed the epc contract on January 29 with ZAKHEM NIGERIA and BAYWOOD CONTINENTAL

PP10 POWER PLANTUSD 3 BILLION

1200 mwARABIAN BEMCO has been selected, financing to be put in place

AL QURAYYAH POWER PLANT CONVERSION PJT - USD 1,85 B

The power plant will be converted into combined-cycle by adding five turbines to the facility with a total capacity of 1,330mwDOOSAN HEAVY will provide the steam turbines, heat recovery steam generators and other eleements for the plant

AL QASSIM POWER PLANT EXPANSION - USD 288M

Scope : addition of four gas turbines with a total capacity of 224mwBEMCO will execute the contract on a fast-track basis, to be completed in June 2010

JUBAIL REFINERY PROJECTPACKAGE 9 - USD 247M

SAUDI ARAMCOTOTAL

Scope : tank farm and vapour recovery system, transfer pipelines, air & sewer system, emergency diesel generator, port operation buildings and loading facilities

JUBAIL REFINERY PROJECTPACKAGE 6 - USD 745 M

SAUDI ARAMCOTOTAL

The package covers the refinery tank farm covering 62 atmospheric storage tanks and 8 bullett tanks. Work outside Saudi to be managed by Rotary Engineering in Singapore (USD 384M) Petro Steel is a joint venture between Rafiq Group and Rotary Eng -

GULF CONSOLIDATED CONTRACTORS

JUBAIL REFINERY PROJECTPACKAGE 8

SAUDI ARAMCOTOTAL

the job will cover 14 pipelinesestimated contract value USD 300M

73 / 73

FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS

Last Update Contractor Contractor's nationality Final Destination Project Name End User Situation

April 2008 PETROFAC SHARJAH KAZAKHSTAN AGIP KCO

July 2009 PETROFAC SHARJAH OMAN PDO

December 2009 PETROFAC SHARJAH TURKMENISTAN TURKMENGAZ

September 2008 FOSTER WHEELER SOUTH AFRICA SOUTH AFRICA SASOLBURG CHEMICAL PLANT SENMIN INTERNATIONAL

March 2010 FOSTER WHEELER SOUTH AFRICA SOUTH AFRICA SASOLBURG WAX EXPANSION SASOL

May 2008 ENKA TURKEY RUSSIA OGK-4

November 2008 GUNSAYIL TURKEY ALGERIA SONELGAZ

KASHAGAN 4th GAS COMPRESSION TRAINUSD 105 M

Petrofac's additional contract is to engineer and procure a fourth sales gas compressor train within the gas and LPG plant and undertake debottlenecking modifications to tranches 1 and 2 of the gas treatment plant. The project is necessary to accommodate the additional gas associated with the processing of the production from the third oil train.

KAUTHER GAS COMPRESSION PROJECT - USD 350 M

Petrofac will undertake the engineering, procurement and construction of the gas compression system and associated facilities at the plant, in addition to undertaking the commissioning and 6 months of initial operations. Petrofac built the existing plantIn september 09 AL HASSAN ENGINEERING/OMAN has ben selected by Petrofac to execute the civil, structural, piping, electrical & instrumentation works (contract value USD 47M)

SOUTH YOLOTEN GAS PJT(gas processing) - USD 3,9 B

in a first phase Petrofac will complete a feed study (USD 100M), the second phase includes engineering, procurement of a 10 Billion cm/y gas processing facililty along with infrastructure and pipelines for the entire 20 BCm development; Total contract value announced by Turkmengaz is USD 3,9 Billion for Petrofac

The facility will produce carbon disulfide and recover sulfur from hydrogen sulfide - EPC contract for FW

the expansion project will double Fischer Tropsch Hard Wax Production.FW will supply detailed engineerin and procurement as well as project construction management. Contract to be executed by FW in South Africa with support from Singapore

YAJVINSKAYA GRES CCGT POWER PLANT - USD 508 M

Scope : 400mw ENKA selected as EPC contractor, the equipment will be supplied by SIEMENS GERMANY

GREO GAS PIPELINE(package 5 ) USD 54M

About 80km (GG1 – Boughezoul)Gunsayil is also expected to take package 4 if it can submit a price of € 43M