17
CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland [email protected]

CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland [email protected]

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

CUBS SGM2, May 13, 2004

Matti HämäläinenCentre for Wireless Communications

University of Oulu, [email protected]

Page 2: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 2

Contents

1. Opening2. Approval of the agenda3. Minutes of the last meeting4. Summary of fulfilled work amounts and costs5. Revision of the research plan6. Contract status7. Summary of CWC’s new UWB activities8. Other business9. Next meeting10.Closing

Page 3: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 3

Minutes of the last meeting• Kick-off: January 27, 2004, 9.15-12.00

– Open items:• update to research plan

– done

• PHY-simulator has been offered to IEEE802.15

– no interests anymore» biased to multiband approach

– no expected simulator release

Page 4: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 4

Summary of fulfilled work amounts and costs

• Work amount from April (4.53 mm)

CUBS, task

0,02

0,15

3,00

0,92

0,34

0,03

0,07

0,00 0,50 1,00 1,50 2,00 2,50 3,00 3,50

Apr

Man months

T6

T5

T4

T3

T2

T1

ADM

Page 5: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 5

Work: 1.1. – 30.4.2004

CUBS - cumulative man months per task

3,0

5,9

9,3

12,3

4,8

9,0

13,8

18,3

0,0

2,0

4,0

6,0

8,0

10,0

12,0

14,0

16,0

18,0

20,0

Jan Feb Mar Apr

Task

Man

mo

nth

s

ADM

T1

T2

T3

T4

T5

T6

Total

Page 6: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 6

Cum. work: 1.1. – 30.4.2004

Planned vs. cumulative fulfilled mms

13,011,0

16,0

7,0 5,0 6,01,0

59,0

0,2 0,4 0,1

18,3

0,50,64,2

12,3

0,0

10,0

20,0

30,0

40,0

50,0

60,0

WP1 WP2 WP3 WP4 WP5 WP6 ADM TOTAL

Planned

Fulfilled

Page 7: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 7

Page 8: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 8

Results from the first third• WP1: Multiband UWB

– literature survey has been started• WP2: Singleband UWB

– office (Tietotalo)• channel models ready

– outdoors (Riihimäki)• channel models ready• link level simulations almost ready

– industry (Stora Enso)• data analysis has not been started yet

– multiband interference + MAI simulations in SV-channel

• first results available

Page 9: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 9

• WP3: Sensor networks– Niina’s work gives the first estimates for PHY

to be used – Energy efficient channel codes for sensor

networks • WP4: Co-existence

– UWB impact on WCDMA and GSM have been measured in co-operation with PULSERS-project

• UMTS• GSM900, GSM1800

• WP5: Capacity– work has been started– analytical work will be done in Finnish

Academy project (CASWI)– results will be reported to CUBS

Page 10: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 10

• WP6: Channel measurements– summer trainee has joined the project

• modification to the measurement system– VNA -> SPA in long range freq. domain sounder

– proposal to Oulu University Hospital has been sent• first response was optimistic • on May 25, JI and MH will visit the hospital

presenting our ideas and sounding systems

– outdoors• first discussions with Heikki

Page 11: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 11

Costs from 1.1. – 30.4.2004

Budget 2004 Realized Left

Work amount 59 18,38 40,62Salary costs %

Salary (11month/year) 143 229 41 171 102 058 Personal side costs 68 97 396 27 996 69 399

Total personal costs 240 625 69 168 171 457 Overheads 75,1 180 709 51 945 128 764 Other costs

Travel 8 000 359 7 641 Equipments and licences (softw) 4 000 850 3 150 Subcontract - - Supplies - - -

Other costs total 12 000 1 209 10 791

PRICE 433 334 122 322 311 012

Page 12: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 12

Outputs• Licentiate thesis accepted May 5, 2004

(Raffaello)• two M.Sc. thesis will be finished at June 2004

(Lassi, Niina)• one paper accepted to IWWAN

– H. Karvonen, Z. Shelby ja C. Pomalaza-Raez: Coding for Energy Efficient Wireless Embedded Networks

• three papers have been submitted to NRS– H. Karvonen, C. Pomalaza-Raez: Coding for Energy Efficient Multihop

Wireless Sensor Networks– N. Laine, M. Hämäläinen, L. Hentilä, J. Iinatti, M. Nenonen, S. Karhu: Outdoor

Ultra wideband radio channel modeling at VHF/UHF band – L. Hentilä, V. Hovinen, M. Hämäläinen: Sub-band analysis in UWB channel

modeling

• two papers will be presented in IWUWBS&UWBST next week (from FUBS)

– M. Hämäläinen, R. Tesi, J. Iinatti: UWB Co-Existence with IEEE802.11a and UMTS in Modified Saleh-Valenzuela Channel

– R. Tesi, M. Hämäläinen, J. Iinatti, I. Oppermann, V. Hovinen: On the Multi-User Interference Study for Ultra Wideband Communication Systems in AWGN and Modified Saleh-Valenzuela Channel

Page 13: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 13

Work deviation• Work amount in WP2 has been exceeded

– analysis of industrial channel data not started

– PHY simulations using own channel models are needed

• Reaction: – WP1: MB-OFDM (13)

• 3 mm -> WP2

– WP4: co-existence (7)• measurement work with EU-projects• 1 mm -> WP2

– WP5: capacity (5)• analytical work to be done in CASWI• 2 mm -> WP2

Increase6 mm to WP2: 11 -> 17 mm

Page 14: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 14

Revision of the research plan

• Updated plan – has been accepted via email discussion

• commenting time ends at Feb 11, 2004• no arguments against the updates were presented

– has been available at CUBS web-page since Feb 11, 2004

• WP6: Channel modelling added to the plan, amount 6 mm.

– hospital » request to hospital has been sent

– supplementary outdoor measurements. » discussion started with Heikki

– summer trainee available (May – Aug)

Page 15: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 15

Contract status

• Comments from Elektrobit has been taken into account– UO has reviewed the comments– contract draft is updated and it is

available at the CUBS web-page

Page 16: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 16

Summary of CWC’s new UWB activities

• UWB-hospital (UHo) – application submitted– Tekes FINWELL-program– feasibility study: UWB in hospital– sponsor: Innocas Medical

• WIreLess Technology in Hospital Operation management (WILHO) – application submitted– Tekes FINWELL-program– UWB in hospital– sponsors: Innocas Medical, Oulun diakonissalaitos,

Ekahau, Yomi, Pfizer• Multi Mode Match Analysis (M3A) – application submitted

– Tekes Phoenix-program– sponsors: Nokia, Polar Elektro– co-operation: Media Team, Kilpa- ja huippu-urheilun

keskus

Page 17: CUBS SGM2, May 13, 2004 Matti Hämäläinen Centre for Wireless Communications University of Oulu, Finland matti.hamalainen@ee.oulu.fi

May 13, 2004 CUBS, the 2nd steering group meeting 17

• Other business

• Next meeting– TSG: June 9– SGM: