Upload
others
View
7
Download
0
Embed Size (px)
Citation preview
CROSS-LAMINATED T IMBER (CLT)STAIRWELL & ELEVATOR SHAFTS
POPLAR OFFICE BUILDINGPhotos courtesy of Lara SwimmerPhotography (also cover image)
2
Our mission at SMARTLAM is to bring speed and efficiency to commercial construction. We accomplish this by compressing
construction time and reducing cost, as well as risk.
In 2016, we created the first Cross-Laminated Timber (CLT) elevator shaft in the US. Since then, we have
become the leader in Cross-Laminated Timber (CLT) stairwells and elevator shafts. Our SmartShaft is simple to integrate into conventionally framed buildings, and our customers achieve
dramatic reductions in construction cycle times. You do not have to be constructing a mass timber structure to benefit from the
amazing time saving you get from a SMARTLAM SMARTSHAFT.
Cross-Laminated Timber (CLT) is the sustainable building solution - sequestering carbon in every cubic foot. Proudly manufactured in
the USA, we procure our lumber from regional sawmills that follow certified, sustainable forestry practices - in fact,
all of our lumber is SFI or FSC certified.
Additionally, our Cross-Laminated Timber (CLT) is federally certified as a Bio-Preferred product with the USDA. We
manufactured the first Bio-Preferred Cross-Laminated Timber (CLT) in the United States for a USDA Forest Service Supervisor’s
Office, including an elevator shaft.
[email protected] | 406.892.2241
3
SmartLam’s CLT shafts are “massive time and money savers.”
Drew Wing, COO Zachau Construction
C
L
T
C
M
U
INSTALLATION
TRADES
INSPECTIONS
COMPONENTS
POTENTIAL WEATHER IMPACT
Hours
One
One
Panelized Design
Minimal
3-4 weeks
Multiple
Multiple
Thousands
Significant
SMARTLY COMPARED
CROSS-LAMINTED TIMBER (CLT) VS CONCRETE MASONRY UNITS (CMU)
4
FINGER JOINTINGProcessing short boards into long boards called lamellas
PLANINGLamellas run through a 4-sided planer to achieve
Simple, panelized design reduces the number ofpieces to install
Meets or exceeds fire and acoustic code requirements
Precision CNC cut panels reduces labor and exposure to risk
Straight, square, and dimensionally stable ensures proper fit every time
Reduces construction time resulting in financial benefits for contractors & owners
Improved jobsite noise
Fewer inspections required during and after installation
SMARTLY BENEFICIAL
5
POPLAR OFFICE BUILDINGPhotos courtesy of Lara SwimmerPhotography (also cover image)
SERVICES AND SOLUTIONS
ENGINEERING AND DESIGNOur engineering and design team provides services during all phases of a project including conceptual design, schematic design, design development, construction document creation, deferred submittals, shop/fabrication drawing creation, and construction support services. We are equipped with the tools and expertise to optimize engineering, detailing, and the fabrication process.
CONSULTINGOur team of experts can assist you through every step of the project including code interpretation, assembly options, engineering services, drafting services, logistics, and more. We are solution driven and committed to satisfying your project requirements.
VALUE ADDED SERVICESAt SmartLam, we are dedicated to the success of the project. Navigating the challenges associated with large scale construction and developing practical solutions is what we do. To facilitate successful completion of a project, we encourage an environment of communication with the design team and installers through pre-construction meetings. Additionally, our experience allows us to provide recommendations for rigging/lifting, and temporary shoring/bracing among other installation means and methods.
ROOF PANEL TO PANEL PLYWOOD SPLINE
ELEVATOR HOIST BEAM POCKET
CLT WALL BASE CONNECTION
CLT ROOF TO CLT WALL
CLT WALL TO WALL
VERTICAL CLT WALL PANEL SPLICE
SMARTLY CONNECTED
6
Plywood or Lumber SplinePlywood or Lumber Spline Partially Threaded Partially Threaded Screw or NailsScrew or Nails
CLT Joint - Pulled TightCLT Joint - Pulled Tight
Partially Threaded ScrewPartially Threaded Screw
Hoist BeamHoist Beam
Beam PocketBeam Pocket
Installation Installation ToleranceTolerance
Hoist BeamHoist BeamPartially Threaded ScrewPartially Threaded Screw
Clear HoistwayClear Hoistway
Tole
ranc
e G
apTo
lera
nce
Gap
Partially Threaded Partially Threaded ScrewScrew
Bent Steel PlateBent Steel Plate
Leveling GroutLeveling Grout
Concrete Concrete FoundationFoundation
Cast-in-Place or Cast-in-Place or Post Installed Post Installed Concrete AnchorConcrete Anchor
Pressure Treated Pressure Treated Sill PlateSill Plate
Partially Threaded ScrewPartially Threaded Screw
Partially Threaded ScrewPartially Threaded Screw
Partially Thread-Partially Thread-ed Screwed Screw Half Lap JointHalf Lap Joint
SMARTLY INSTALLED
HOIST WITH CRANE
3SEQUENCED DELIVERY
2BASE PLATES
1
7
SCREW TO SECURE
6BRACE PANELS
5FLY INTO PLACE
4
Our CLT is a Bio-Preferred Product through the USDA. This program includes voluntary labeling for federal contractors and agencies.
[email protected] | 406.892.2241
If you have any further questions please feel free to reach out. We will provide you the information you need to get started.
MONTANA FACILITYC O L U M B I A FA L L S
ALABAMA FACILITYD O T H A N
SPF – V2M5 • SPF-S – V4M1 • DF/L – V1M2 HF/WF – V5M1, V5M2
SYP – V3
A N S I / A PA P R G 3 2 0P R O D U C T C E R T I F I C AT I O N S
MANUFACTURING DIVISION LOCATIONS