Upload
others
View
11
Download
0
Embed Size (px)
Citation preview
Rev 1 / Page 1
Corporate Profile
Rev 1 / Page 2
WHO WE ARE
• History
• Company Structure
• Locations
Agenda
WHAT WE DO
• Core Competences
• Business Units
− New EPC Plants
− Plant Optimization & Services
− Fuel Gas Supply Systems
WHAT WE DID
• References
• Project Highlights
− LNG
− Petrochemcials
• Customers
WHAT IS NEW
• New Projects
• Innovations
SUMMARY
• Highlight Figures
• Your Benefit
• Contact Information
Rev 1 / Page 3Rev 1 / Page 3
WHO WE ARE
Rev 1 / Page 4
TGE INDIA
TGE opens an office in India
LGI BECOMES TRACTEBEL GAS ENGINEERING - TGE
100% take-over by Tractebel Engineering
TGE GAS ENGINEERING
Management buy-out, company name changes to TGE Gas Engineering
FOUNDATION
Liquid Gas International –LGI – established as privately owned company NEW SHAREHOLDING
STRUCTURE
CIMC 60%, Gasfin 40%
1980 1992 1995 1996 2006 2007 2008 2009 2011 2016 2017 2020
SHANGHAI OFFICE
TGE opens the first office in Shanghai
TAIWAN OFFICE
TGE opens the first office in Taiwan
TECHNODYNE
Acquisition of the tank design company Technodyne International Ltd.
SPIN-OFF TGE MARINE GAS ENGINEERING
TGE Gas Engineering (onshore activities)
TGE SAINT PETERSBURG
TGE opens an office in Saint Petersburg
TGE MUNICH
TGE opens a technical office in Munich
NEW BUSINESS UNITS
Reorganization and launch of new Business Units “New EPC Plants”, “Plant Optimization & Services”, “Fuel Gas Supply Systems”
Our History
Rev 1 / Page 5
Company Structure
Operation Unit Europe,
Bonn / Germany
TGE GAS ENGINEERING GMBH, BONN, GERMANY
Subsidiary Technodyne,Eastleigh / UK
Munich / Germany
Operation Unit China,
Shanghai / P.R. China
Branch Offices:
United Kingdom, India, Germany
Project Offices:
Portugal, Norway, Scotland, Sweden, Russia, Belgium, Poland, United Kingdom
Rev 1 / Page 6
MUNICH
BONN
EASTLEIGH
MANCHESTERST. PETERSBURG
SHANGHAI
GURUGRAM
Our Locations
Rev 1 / Page 7Rev 1 / Page 7
WHAT WE DO
Rev 1 / Page 8
From the idea -
Core Competence
- to the first concept - - bringing the project to life
We accompany our customers from the first project idea to the start-up of the plant. In the early project phase, we can support you with authority approvals, environmental impact assessments and other administrative tasks. The handling of the project including the coordination of all disciplines is our core business. After
the completion of the project, we can further assist you with our plant optimization services like maintenance and inspection.
Rev 1 / Page 9Rev 1 / Page 9
Business Unit New EPC Plants
Rev 1 / Page 10
Terminals & Storages for LNG
• Import / export terminals
• Liquefaction plants
• Sizes up to 250,000 m³
• All relevant infrastructure like ship, truck, container loading / unloading
NEW EPC Plants
Terminals & Storages for Petrochemicals
• Cryogenic storage for import, export, buffer or distribution
• Earth covered tanks (ECT) for pressurised liquefied gases
• Horizontal bullet tanks and spheres
ssLNG to Power Plants
• Stand-alone regas-solutions
• Dedicated to an adjacent gas power plant in remote areas
• High level of standardization
• Fast-track and cost-effective delivery
ssLNG Bunkering & Distribution Plants
• LNG plant solutions with a high level of standardization
• Fast-track and cost-effective delivery
• Suitable for remote locations
Rev 1 / Page 11Rev 1 / Page 11
Business UnitPlant Optimization& Services
Rev 1 / Page 12
Plant Conversion
• Product change services
• Activities to increase the capacities
• Debottlenecking
• Creation of new revenue streams
Plant Optimization & Services
Plant Lifetime Assurance & Maintenance
• Qualified inspections
• Predictive maintenance
• Spare parts management
• Direct trades (blue-collar support)
Energy Efficiency & Optimization
• In-tank pump modernization
• Replacement of susceptible material
• Equipment replacement
• Heat integration chlorine liquefaction
Environmental Impact Optimization
• Update to applicable regulations
• CO2 balance optimization
• Emission minimization
• Authority approval support
Rev 1 / Page 13Rev 1 / Page 13
Business Unit Fuel Gas Supply Systems
In an exclusive co-operation with our sister company CIMC Sinopacific Offshore Engineering (SOE) we create unique synergies and customer values by offering turn-key solutions for Fuel Gas Supply Systems for various applications.
Rev 1 / Page 14
How We Work
PROJECT & CONSTRUCTION MANAGEMENT
START-UP / SHUT-DOWN COMMISSIONING
WE UNDERSTAND OURSELF AS
YOUR GENERAL CONTRACTOR FOR EPC PROJECTS
PROVIDING THE FOLLOWING SERVICES:
PROCUREMENTENGINEERING
Rev 1 / Page 15
Engineering
All Disciplines In-House
Procurement Construction
Contracting Project Management Tank Design
Rev 1 / Page 16Rev 1 / Page 16
WHAT WE DID
Rev 1 / Page 17
0
1.000.000
2.000.000
3.000.000
4.000.000
5.000.000
6.000.000
7.000.000
8.000.000
Overall capacity LNG Ethylene / Ethane Propylene, LPG, etc.
LIQUEFIED GAS STORAGE CAPACITY PERFORMED (m³)
Status April 2021
Our References
Rev 1 / Page 18
LNG Terminal Zhoushan
• EPC contract
• 2 x 160,000 m³ tanks
• Full containment tanks
• 6 MTPA terminal capacity
LNG Project Highlights
LNG Terminal Mugardos
• EPC contract
• 2 x 150,000 m³ tanks
• Full containment tanks
• 4.8 MTPA terminal capacity
LNG Terminal Qi Dong City
• EPC contract
• 1 x 160,000 m³ tank
• Full containment tanks
• 3 MTPA terminal capacity
LNG Terminal Vysotsk
• EP+CS contract
• 1 x 40,000 m³ tank
• Full containment tank
• 660,000 ton/year terminal capacity
Rev 1 / Page 19
LNG Peak Shaving Terminal Shenzen
• EPC contract
• 1 x 80,000 m³ tank
• Full containment tank
• 2 MMTPA terminal capacity
LNG Project Highlights
LNG Terminal Guangdong
• EPC contract
• 4 x 160,000 m³ tanks
• Full containment tanks
• 4 MTPA terminal capacity
LNG Terminal Sines
• EPC contract
• 2 x 125,000 & 1 x 150,000 m³ tanks
• Full containment tanks
• 2,6 MTPA terminal capacity
LNG Terminal Hamina
• Owner's engineering contract
• 1 x 30,000 m³ tank
Rev 1 / Page 20
Ethane / Propane Terminal Taixing
• EP+CS contract
• 3 x 160,000 m³ tanks
• Full containment tanks (steel/concrete)
• Ship unloading / loading system
• Propane / ethane liquefaction systems
Petrochemical Project Highlights
Ammonia Terminal Izmit
• EP+CS contract
• 1 x 25,000 mt tank
• Full containment tank (steel/steel)
• Ship loading / unloading system
Ethane Terminal Grangemouth
• EPC contract
• 1 x 60,000 m³ tank
• Full containment tank
• Ship loading / unloading system
Ethane Terminal Stenungsund
• EPC contract
• 1 x 52,000 m³ tank
• Full containment tank
• Process area to supply ethane to cracker
Rev 1 / Page 21
Propane Terminal Ningbo
• EP+CS contract
• 1 x 120,000 m³ tank
• Full containment tank
• Ship loading / unloading system
• Send-out system
Petrochemical Project Highlights
Ethylene Terminal Ningbo
• EPC contract
• 1 x 80,000 m³ tank
• Full containment tank
• 3 BOG oil free reciprocating compressors
Ethylene Terminal Mailiao
• EPC contract
• 2 x 80,000 m³ tanks
• Full containment tanks
• Process facilities for BOG re-liquefaction and send-out evaporation for ethylene
Butadiene / Propylene Terminal Antwerp
• EPC contract
• 4 x 3,000 m³ tanks
• Earth covered tanks (ECT)
• 2 x butadiene tanks
• 2 x propylene tanks
Rev 1 / Page 22
Our Customers
Rev 1 / Page 23Rev 1 / Page 23
▪WHAT IS NEW
Rev 1 / Page 24
Engineering Services for Ethylene Terminal in Russia
• E contract
• 1 x 49,600 m³ ethylene tank
• Full containment tank
• Special technical condition (STC)
Recently Signed Projects
Conversion of LNG Terminal United Kingdom
• EPC contract
• Conversion of LNG peak shaving terminal to LPG terminal
• Installation of 2 earth covered tanks
• Replacement of in-tank pumps
LNG Terminal Poland
• EPC contract
• 1 x 180,000 m³ tank
• Full containment tank
• Terminal expansion project
LNG Terminal Guangdong Province
• EPC contract
• 3 x 200,000 m³ LNG tanks
• Full containment (concrete / steel)
• 10 MTPA terminal capacity
Rev 1 / Page 25Rev 1 / Page 25
Innovation
is a cornerstone of TGE’s success. We are always working to optimize our gas engineering solutions with cutting-edge technology.
Rev 1 / Page 26
Robotics to Plants
We are convinced that todays available robot technology will be common practice during construction phase and maintenance of gas storage terminals. We are currently investigating these applications for welding, supervision, laser scans, material transportation, 3D printing, painting and many more.
Under Development
Hydrogen Infrastructure
We are looking into future cryogenic gas business in new products as hydrogen or CO2 treatment adapting newest environmental standard and regulations.
Rev 1 / Page 27Rev 1 / Page 27
Summary
Rev 1 / Page 28
Installed Tank Sizes for
• Ethylene 80,000 m³
• Propylene 80,000 m³
• LPG 120,000 m³
• Ethane 160,000 m³
• Ammonia 25,000 mt
• LNG 180,000 m³ (200,000 m³ under construction)
Highlight Figures
Additional Features
• Own tank design
• Own certified inspection team
• References for all relevant design codes
• Working expertise in 22 countries around the world
Working Expertise
• 189 tanks installed
• 96 earth covered tanks
• 86 facilities around the globe
• 7 Mio m³ storage capacity built or under construction
Tank Types /Tank Sizes
• Cryogenic storage for import, export, buffer or distribution
• Earth covered tanks (ECT)
• Horizontal bullet tanks and spheres
• Built 1,200 - 180,000 m³
• Designed 1,200 – 250,000 m³
Rev 1 / Page 29
All Disciplines in-house
Our Expertise is your Benefit
Highest HSE Standards
Accurate Time-Planning
All Resources near the Project &
Customer
Minimization of interfaces & Full Design Control
Good Reputation Start-up on TimeTransparent
Project Execution / Communication
Rev 1 / Page 30
40 Years Business Experience
• From initial concept / feasibility study to turn-key lump-sum execution of complete projects as main contractor
We are the Experts
Strong References
• For all relevant design codes
• All tank sizes and terminal concepts
Located in Europe and Asia
• With our offices we are always near to the customer and the projects
• Embedded in a group with strong partners and shareholders
Ready for the Future
• We provide innovative and reliable design, made for the future
Rev 1 / Page 31Rev 1 / Page 31
▪Contact us▪ TGE Gas Engineering
Mildred-Scheel-Str. 153175 Bonn, Germany
▪ +49 228 604480 0▪ [email protected]▪ www.tge-gas.com
Follow us
LINKEDIN@TGE Gas Engineering
TWITTER@TGE_Gas
YOUTUBE@TGE Gas Engineering