21
Corporate Presentation Essencis Soluções Ambientais Brussels – Wednesday 3rd. of February 2010 Copyright, Keppel Seghers, 2010

Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Embed Size (px)

Citation preview

Page 1: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Corporate Presentation

Essencis Soluções Ambientais

Brussels – Wednesday 3rd. of February 2010

Copyright, Keppel Seghers, 2010

Page 2: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

InvestmentsReal EstateOffshore & Marine Infrastructure

KeppelGroup

Page 3: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Listing of Keppel Shipyard

Building of 1st shipyard in Singapore

Privatization of shipyard &

birth of Keppel

Acquisition of Far East Livingston rig building

company

Keppel to focus on:Offshore & MarineProperty Development

Infrastructure

1859

1968

1980

20011973

2002

Acquisition of Seghers Better Technology & restructuring into

Keppel Seghers

2006

Keppel Seghers to focus on large environmental investment projects

Keppel Group – Growth Initiatives

Current Today’s Keppel Offshore & Marine has over 60% of global market share in jackup rigs and is a leader in rig building

Environmental Engineering Solid Waste, Water & Sludge solutions

Next Growth Engine

Page 4: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Keppel Corp’s Financial Highlights

2009 2008

S$ Mio € Mio S$ Mio € MioRevenue 12.247 6.057 10.805 5.695Operating Profit 1.505 744 1.238 525Profit before Tax 1.856 918 1.597 770PATMI 1.265 626 1.097 529EPS (cents) 79.4 39.3 69.0 33.3Return on Equity (ROE) 23.9% 22.4%

Largest Shareholder: Temasek Holding >20% Number of Employees: over 32,000 worldwideGlobal Presence: over 300 companies in 34 countries

Page 5: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Keppel Seghers

Environmental Engineering Specialised Engineering

GE Keppel

Keppel SEA SCAN

GE Keppel

Keppel Prince

Keppel FMO

KIE Group Structure

• Research & Development

• EPC / turnkey contractor

• Supplier of critical process equipment

• Operation & Maintenance

• Investments & Alliances

Keppel Seghers

Page 6: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Keppel Seghers: a clear vision !

“Keppel Seghers aims to become a global leader in environmental technology and engineering and to grow its environmental business while making a

significant contribution to preserving a sustainable environment and investing in

a cleaner future.”

Page 7: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Keppel Seghers: our mission

• To be a valued partner to our customers in:

– Environmental turnkey & technology packages

– Designing and building waste treatment, biosolids and water plants

– DBO,DBOO, BOT, BOOT and PPP projects

• To strengthen our technology leadership through continuous R&D

• To leverage on our extensive engineering experience

• To utilise our global network and strong financial resources

Waste Treatment

Pre-traitment

DANODANO®® drumdrum

Waste-to-Enegery

Flue Gas Cleaning

WtEWtE

Sludge Treatment

Sludge Drying / Pelletising

/ Incineration

Sludge Digestion

HARDPELLETISER HARDPELLETISER

ZEROFUELZEROFUELTMTM

Energy RecuperationEnergy Recuperation

Wastewater Treatment

Water Reuse -

Desalination

CAS, UNITANK CAS, UNITANK ®® & UNIBRANE & UNIBRANE ®®

NEWATER / MEMSTILLNEWATER / MEMSTILL®®

Water TreatmentWaste Treatment

Pre-traitment

DANODANO®® drumdrum

Waste-to-Enegery

Flue Gas Cleaning

WtEWtE

Pre-traitment

DANODANO®® drumdrum

Waste-to-Enegery

Flue Gas Cleaning

WtEWtE

Sludge Treatment

Sludge Drying / Pelletising

/ Incineration

Sludge Digestion

HARDPELLETISER HARDPELLETISER

ZEROFUELZEROFUELTMTM

Energy RecuperationEnergy Recuperation

Sludge Drying / Pelletising

/ Incineration

Sludge Digestion

HARDPELLETISER HARDPELLETISER

ZEROFUELZEROFUELTMTM

Energy RecuperationEnergy Recuperation

Wastewater Treatment

Water Reuse -

Desalination

CAS, UNITANK CAS, UNITANK ®® & UNIBRANE & UNIBRANE ®®

NEWATER / MEMSTILLNEWATER / MEMSTILL®®

Wastewater Treatment

Water Reuse -

Desalination

CAS, UNITANK CAS, UNITANK ®® & UNIBRANE & UNIBRANE ®®

NEWATER / MEMSTILLNEWATER / MEMSTILL®®

Water Treatment

Page 8: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Belgium

SpainUSA

Argentina

Brazil

Germany

UK

Singapore

China

Mexico Hong KongQatar

Antwerp, Atlanta, Beijing, Doha, Düsseldorf, Hong Kong, Madrid, Melbourne,

Mendoza, Puebla, São Paulo, Shanghai, Singapore, Suzhou, Wolverhampton

Keppel Seghers Global Presence

Australia

Page 9: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

DANO® drum

Waste-to-energy plant

Thermal Technologies

• DANO® Waste pre-treatment

– Reduces waste volume

– enhances material recovery

– preparation for final waste treatment

• Waste-to-Energy

– Modular grate combustion concept

– AIR-COOLED & WATER-COOLED GRATE

– For various waste compositions & calorific values

• capacity range: 1.5 - 30 tonnes/hour

• calorific range: 4,000 - 30,000 kJ/kg

– Efficient steam boiler for heat recovery and renewable energy production

• Flue gas cleaning

– Advanced technologies guaranteeing clean air emissions for municipal, industrial and medical waste treatment

– Ahead of the most stringent emission legislation

Page 10: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Wastewater Treatment Solutions

• Conventional Activated Sludge treatment (CAS)

• UNITANK® - aerobic & anaerobic treatment

– Most cost-effective biological treatment process

– For wastewater of industrial and municipal origin

– Compact & modular design

– Operation & maintenance friendly installations

• UNIBRANE® - MBR wastewater treatment

– For stringent discharge regulations

– Minimal footprint

– Internal & external membranes available

Page 11: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Water Reuse Solutions

• AzuRO™ is the brand name for Keppel Seghers’ combined and extended (tertiary) water treatment technologies for water re-use.

• Encompasses the treatment of municipal, industrial waste water, seawater, surface and brackish water for re-use as industrial, process and potable water.

Page 12: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Solutions for biosolids / sludge

• HARDPELLETISER - The Pearl Process®

– Turning sludge into hard, round pellets

– Easy to handle, transport and store

– For use as green fuel ,soil improver or fertiliser

• ZEROFUELTM

– For maximum weight reduction and inertisation of sludge

– Best available technology for combustion of sludge and pasty wastes

– Available with energy recovery system (steam, heat, electricity)

Page 13: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Scope of Activities

• Research & Development

• EPC / turnkey contractor

• Supplier of critical process equipment

• Operation & Maintenance

• Investments & Alliances

Page 14: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Research & Development

• Keppel Seghers’s Centres of Excellence (COE)

– Initiating, managing and conducting R&D and product development

– Engineering process improvement

– Project management improvement

– Knowledge management activities

Page 15: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Research & Development

• Collaboration with leading academic and industrial research institutions around the world :

Nanyang Technological University - Ngee Ann Polytechnic - PUB –National Environment Agency (NEA) Singapore - Stanford University USA -Cranfield University UK - TNO & KIWA Netherlands - Von Karman Institute Belgium

Page 16: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Providing all the technical and management skills needed

to complete a turnkey project successfully!

Engineer-Procure-Construct (EPC) / Turnkey

Waste to EnergyPlantCapacity: 2 x 653 TPDRuncornManchester - UK

Wastewater treatmentand Waterre-use plantCapacity: 439.000m3/dayDoha Qatar

Domestic SolidWaste Management CentreCapacity: 2300 TPDDoha, Qatar

Waste to EnergyPlantCapacity: 2 X 319 TPD1 X 533 TPDBeveren Belgium

Ineos Runcorn TPS LtdIneos Runcorn TPS Ltd

Page 17: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Offering several technology packages, comprising the delivery

of critical plant components with process guarantees

KS BOILER PRISMClient: AZN Moerdijk, The Netherlands

KS WATER-COOLED GRATEClient: Romonta GmbHAmsdorf, Germany

KS DRY SCRUBBERClient: NEASingapore

Supplier of Process Equipment

Page 18: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

HARDPELLETISERClient: Veolia Water NA Chicago, ISA

ZEROFUELClient: Avdøre Spildevantscenter

Copenhagen, Danmark

UNIBRANE MBRClient: Fuji

Tilburg, The Netherlands

DANO DRUMClient: Viridor Waste Management Beddington, UK

Supplier of Process Equipment

Offering several technology packages, comprising the delivery

of critical plant components with process guarantees

Page 19: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Operation & Maintenance (O&M)

• Offering different schemes of O&M services:

– Operation & Maintenance:

• Full performance and operational responsibility for the plant orequipment

– Process Assistance

• On-site and off-site support through remote control

• Feasibility studies with respect to plant improvement and plant upgrades

• Advise regarding process optimisation

• Technical support during major overhauls

• Maintenance recommendations …

– Maintenance Support

• Overhauls at regular intervals for specific equipment

Page 20: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

Keppel Seghers is undertaking two contracts in Qatar: one for the Engineering, Procurement and Construction of an integrated solid waste

management facility, and the second for the Operation and Maintenance of this for 20 years

Investments & Alliances

• At Keppel Seghers, we’re keen on analysing and discussing possibilities offered for long-term participation: DBO - DBOO - DBOFT - BOT- BOOT – PPP - License Agreements - JV

Page 21: Corporate Presentation v1.4 - Esseka- Assessoria … ·  · 2010-10-21Listing of Keppel Shipyard Building of 1st shipyard in Singapore ... Keppel Seghers 2006 Keppel Seghers to focus

© Keppel Seghers Group of Companies, 2010