8/8/2019 Copy of Measurement Book 20.7
1/76
Name of Contractor : SHRI VAARI ELECTRICALS PVT.LTD., Chennai.
AGT.NO.: 12/PMCS/EC/EE(E)/07-08
Description of Item Nos
Agreement no:12
item no: 1.12.1.1
Floor Lighting Panel
INCOMER
2 set Red/Green ON/OFF indicating lamps
2 set of three White phase indicating lamps
BUS BAR
1set of 80A TP & N Al Bus Bar
OUTGOING
5 nos, 32A TPN MCB with 32A backup fuse 5 Nos
2 nos, 20A TPN MCB with 20A backup fuse 2 Nos
1 no, 25A TPN MCB with 25A backup fuse 1 No.
1 no, 40A TPN MCB with 40A backup fuse 1 No.
FLOOR I 1X1
Agreement no:13
item no: 1.12.1.2
Floor Emergency Lighting
INCOMER
32A, TPN MCB 1 No
2 set Red/Green ON/OFF indicating lamps2 set of three White phase indicating lamps
BUS BAR
1 set of 32A TP & N Al Bus Bar
OUTGOING
20A DP MCB 4 Nos.
25A DP MCB 4 Nos.
FLOOR I 1X1
Agreement no:14
item no: 1.12.1.3
Floor Power Panel
Name of work : Internal Electrical works of College Blockof Perunthalaivar Ka
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-511-1 and specification attached
1 no. 80A, TP& N fixed type MCCB of 25A rating with over current and short circuitreleases 1 No
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-511-1 and specification attached
8/8/2019 Copy of Measurement Book 20.7
2/76
INCOMER
40A, TPN MCB with 40A fuse backup 1 No.
2 set Red/Green ON/OFF indicating lamps
2 set of three White phase indicating lamps
BUS BAR
1 set of 40A TP & N Al Bus Bar
OUTGOING
32A DP MCB with 32A Fuse backup 6 Nos.
FLOOR I 1X1
Agreement no:15
item no: 1.12.1.4
UPS Power Panel
INCOMER
1no, 50A, TPN MCB with 50A fuse backup 1 No.
2 set Red/Green ON/OFF indicating lamps
2 set of three White phase indicating lamps
BUS BAR
1 set of 50A TP & N Al Bus BarOUTGOING
4nos, 32A DP MCB with 32A Fuse backup 4 Nos
2nos, 40A DP MCB with 40A Fuse backup 2 Nos
FLOOR I 1X1
Agreement no:16
item no: 1.12.1.5
Floor AHU Panel
INCOMER
2 set Red/Green ON/OFF indicating lamps
2 set of three White phase indicating lamps
BUS BAR
1 set of 100A TP & N Al Bus Bar
OUTGOING
32A, TPN MCB with 32A fuse backup. 6 Nos.
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-511-3 and specification attached
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-511-3 and specification attached
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-502 and specification attached
100A, TP& N fixed type MCCB of 25A rating with over current and short circuitreleases 1 No.
63A, TP& N fixed type MCCB of 25A rating with over current and short circuitreleases 1 No.
8/8/2019 Copy of Measurement Book 20.7
3/76
25A, TPN MCB with 25A fuse backup. 1 No.
FLOOR I 1X1
Agreement no:17
item no: 1.12.1.6
LIBRARY AHU PANEL
INCOMER
50A, TPN MCB 1 No.
2 set Red/Green ON/OFF indicating lamps
2 set of three White phase indicating lamps
BUS BAR
1 set of 50A TP & N Al Bus Bar
OUTGOING
32A, TPN MCB with 32A fuse backup. 6 Nos.
FLOOR I 1X1
Agreement no:18
item no: 1.12.2.1
Floor Lighting Panel
INCOMER50A TPN MCB with 50A backup fuse 1 No
2 set Red/Green ON/OFF indicating lamps
2 set of three White phase indicating lamps
BUS BAR
1set of 50A TP & N Al Bus Bar
OUTGOING
25A TPN MCB with 25A backup fuse 5 Nos
FLOOR I 1X1
Agreement no:19
item no: 1.12.2.2Floor Emergency Lighting
INCOMER
25A, TPN MCB 1 No.
2 set Red/Green ON/OFF indicating lamps
2 set of three White phase indicating lamps
BUS BAR
1 set of 25A TP & N Al Bus Bar
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mounting
panel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-502 and specification attached
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-512-1 and specification attached
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-512-1 and specification attached
8/8/2019 Copy of Measurement Book 20.7
4/76
16A DP MCB 4 Nos.
20A DP MCB 1 No.
FLOOR II 1X1
Agreement no:20
item no: 1.12.2.3
Floor Power Panel
INCOMER
1no, 40A, TPN MCB with 40A fuse backup 1 No.
2 set Red/Green ON/OFF indicating lamps
2 set of three White phase indicating lamps
BUS BAR
1 set of 40A TP & N Al Bus Bar
OUTGOING
25A DP MCB with 25A Fuse backup 4 Nos.
32A TPN MCB with 32A Fuse backup 2 Nos.
FLOOR II 1X1
Agreement no:21
item no: 1.12.2.4
UPS Power Panel
INCOMER
1no, 40A, TPN MCB with 40A fuse backup 1 No.
2 set Red/Green ON/OFF indicating lamps
2 set of three White phase indicating lamps
BUS BAR
1 set of 40A TP & N Al Bus Bar
OUTGOING
25A DP MCB with 25A fuse backup 4 Nos.
32A TPN MCB with 32A fuse backup 2 Nos.FLOOR II 1X1
Agreement no:22
item no: 1.12.2.5
Floor AHU Panel
INCOMER
2 set Red/Green ON/OFF indicating lamps
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-512-3 and specification attached
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-512-3 and specification attached
Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-502 and specification attached
1 no. 63A, TP& N fixed type MCCB of 25A rating with over current and short circuitreleases 1 No.
8/8/2019 Copy of Measurement Book 20.7
5/76
2 set of three White phase indicating lamps
BUS BAR
1 set of 63A TP & N Al Bus Bar
OUTGOING
32A, TPN MCB with 32A fuse backup. 6 Nos.
25A, TPN MCB with 25A fuse backup. 1 No.
FLOOR II 1X1DISTRIBUTION BOARDS
Various distribution boards as given below:
Agreement no:39
Item no:1.1
INCOMER1# 32A TPN MCB 1 No.
25 DP ELMCB (30mA) 3 Nos.
Supply, installation, testing & commissioning of front operated front access cubicaltype indoor duty dead front wall / recess/ surface mounting, totally enclosed dustand vermin proof ( minimum protection IP 54 ) panels with foamed-in neoprenegasketted hinged doors, fabricated from 2 mm thick CRCA with powder coatedfinish suitable for 415 V, 3-phase, 4 wire, 50 Hz system including suitably ratedinsulated copper busbars, interconnections, neutral bar assembly, phasesegregating barriers, LED indicating lamps for incoming and outgoing feeders,15%spare space for future expansion, knockouts and gland plates for entry of cablesand conduits, all internal wiring using high temperature FRLS wires, independant
terminals for each phase, earthing terminals and including the cost of providingMaster key lock on the door and pad locking facility on door as well as at incomer ,bonding to earth etc. complete as per specification, drawings as required and asunder:
MCBs shall conform to IEC898/IS 8828-1996 and , with breaking capacity 9/10kA,powerloss 40-70% of the stipulated value and suitable for magnetic releases
operating between 1 to 5 In for normal power distribution application and 5 to 10 Infor motor application duty with minimum Electrical endurance of the order of 20000operation cycles
Residual current circuit breaker (RCCB) conforming to IS 12640 / IEC 601008-1shall be provided with 30 mA sensitivity and electrically connected rated currentcapacity MCB for short circuit and over load protection as required
All incomer MCBs of boards /panels shall be provided with NO/NC contacts asspecified in specifications and drawings
All the contactors shall be provided with potential free contacts for remotemonitoring.
Lighting distribution board - LDB-5/Floor-1, LDB-1/ Floor - 2 as perspecification and as per following details.
One lighting distribution board (LDB) unit with respective incoming TPN MCBs, DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
8/8/2019 Copy of Measurement Book 20.7
6/76
1 set of (ON) indicating lamps.
OUTGOINGS
6A SPMCB arranged in three rows and each feeder (ON) indication lamps. 36 Nos
FLOOR II
PART PLAN-I 1X1
PART PLAN-IV 1X1Agreement no:40
Item no:1.2
INCOMER
25A TPN MCB 1 No
20A DP ELMCB (30mA) 3 No1 set of (ON) indicating lamps.
OUTGOINGS
FLOOR II
PART PLAN-I 1X1
Agreement no:45
Item no:1.7
INCOMER
25A TPN MCB 1 No
16A DP ELMCB (30mA) 3 Nos
1 set of (ON) indicating lamps.
OUTGOINGS
6A SPMCB arranged in three rows and with feeder (ON) indication lamps. 24 Nos
FLOOR I
PART PLAN-III 1X1
Agreement no:48
Item no:1.10
INCOMER
Lighting distribution boards East (LDB) LDB-1 / floor - 3 as per specificationand as per following details.
One lighting distribution board (LDB) unit with respective incoming TPN MCBs, DPRCCB and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
36 Nos of 6A SPMCB arranged in three rows and each row controlled by one no.20A DP ELMCB with feeder (ON) indication lamps. 36 Nos.
Lighting distribution board - (LDB) as per specification and as per followingdetails.
One lighting distribution board (LDB) unit with respective incoming TPN MCBs, DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
Lighting distribution boards - (LDB) LDB-3/Floor-2, LDB-6/ Floor - 1 as perspecification and as per following details.
One lighting distribution board (LDB) unit with respective incoming TPN MCBs, DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
8/8/2019 Copy of Measurement Book 20.7
7/76
20A TPN MCB 1 No
16A DP ELMCB (30mA) 3 Nos
1 set of (ON) indicating lamps.
OUTGOINGS
6A SPMCB arranged in three rows and feeder (ON) indication lamps. 18 Nos
FLOOR IIPART PLAN-III 1X1
Agreement no:49
Item no:1.11
INCOMER
20A TPN MCB 1 No16A DP ELMCB (30mA) 3 Nos
1 set of (ON) indicating lamps. 1 No
OUTGOINGS
6A SPMCB arranged in three rows and with feeder (ON) indication lamps. 12 Nos
FLOOR I
LIBRARY 1X1
FLOOR II
PART PLAN-III 1X1
Agreement no:56Item no:1.18
INCOMER
16A DP ELMCB (30mA) 1 No
1 set of (ON) indicating lamps.OUTGOINGS
6A SPMCB with feeder (ON) indication lamps. 6 Nos
FLOOR I
PART PLAN-III 1X1
FLOOR II
PART PLAN-II 1X1
Agreement no:57
Item no:1.19
Lighting distribution boards - (LDB) LDB-4/Floor-4 as per specification andas per following details.
One lighting distribution board (LDB) unit with respective incoming TPN MCBs, DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
Emergency Lighting distribution boards - (ELDB) ELDB-3/Floor- 1as perspecification and as per following details.
One Emergency lighting distribution board (ELDB) unit with respective incoming DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
Emergency Lighting distribution boards - (ELDB) ELDB-4/Floor- 1, ELDB-1/Floor-2, ELDB-3/Floor -3, ELDC-1/ Floor - 4 as per specification and as perfollowing details.
8/8/2019 Copy of Measurement Book 20.7
8/76
INCOMER
10A DP ELCB 1 No
1 set of (ON) indicating lamps.
OUTGOINGS
6A SPMCB with feeder (ON) indication lamps. 6 Nos
FLOOR I
PART PLAN-IV 1X1
FLOOR II
PART PLAN-I 1X1
Agreement no:58
Item no:1.20
INCOMER
25A TPN MCB 1 No
20A DP ELMCB (30mA) 3 Nos
1 set of (ON) indicating lamps.
OUTGOINGS
16A SPMCB arranged in three rows and with feeder (ON) indication lamps 18 Nos
FLOOR I
PART PLAN-IV 1X1
Agreement no:63
Item no:1.25
INCOMER
20A DP ELMCB (30mA) 1 No
1 set of (ON) indicating lamps.
OUTGOINGS
16A SPMCB with feeder (ON) indication lamps 6 Nos
FLOOR I
PART PLAN-II 1X1
PART PLAN-III 1X1
Agreement no:64
Item no:1.26
One Emergency Lighting distribution board (ELDB) unit with respective incoming DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
Power distribution boards - (PDB) PDB-2/Floor- 2, PDB-2/Floor -4, as perspecification and as per following details.
One Power distribution board (PDB) unit with respective incoming TPN MCBs, DPRCCB and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
Power distribution boards - (PDB) PDB-3/Floor- 2, PDB-3 / Floor -2, PDB-1/Floor- 3, PDB-4/Floor-3, PDB-1/Floor-4, PDB-3/Floor-4, PDB-1/Floor-5 as perspecification and as per following details.
One Power distribution board (PDB) unit with respective incoming DP RCCB andoutgoing SP MCBs each having indications for incoming & outgoing feeder status asper specifications and as under :
8/8/2019 Copy of Measurement Book 20.7
9/76
INCOMER
25A TPN MCB 1 No
20A DP ELMCB (30mA) 1 NO
1 set of (ON) indicating lamps.
OUTGOINGS
16A SPMCB arranged in three rows with feeder (ON) indication lamps. 24 Nos
FLOOR I
PART PLAN-III 1X1
FLOOR II
PART PLAN-III 1X1
Agreement no:67Item no:1.29
INCOMER
32A TPN MCB 1 No
20A DP ELMBC (30mA) 3 Nos
1 set of (ON) indicating lamps.
OUTGOINGS
16A SPMCB arranged in three rows with feeder (ON) indication lamps. 12 Nos
FLOOR I
PART PLAN-I 1X1
FLOOR II
PART PLAN-I 1X1
Agreement no:68
Item no:1.30
INCOMER
25A TPN MCB 1 NO
20A DP ELMBC (30mA) 3 Nos
1 set of (ON) indicating lamps.
OUTGOINGS
16A SPMCB arranged in three rows with feeder (ON) indication lamps. 12 Nos
FLOOR II
UPS Power distribution boards - (UPDB) UPDB-2/Floor- 1 as per specificationand as per following details.
One Power distribution board (UPDB) unit with respective incoming TPN MCBs, DPRCCB and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
UPS Power distribution boards - (UPDB) as per specification and as perfollowing details.
One Power distribution board (UPDB) unit with respective incoming TPN MCBs, DPRCCB and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
UPS Power distribution boards - (UPDB) UPDB-1/ Floor -3 as per specificationand as per following details.
One Power distribution board (UPDB) unit with respective incoming TPN MCBs, DPRCCB and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :
8/8/2019 Copy of Measurement Book 20.7
10/76
PART PLAN-I 1X1
PART PLAN-II 1X1
PART PLAN-III 1X1
Agreement no:71
Item no:1.33
INCOMER
25A DP ELMCB (30mA) 1 NO
1 set of (ON) indicating lamps.
OUTGOINGS
16A SPMCB arranged with feeder (ON) indication lamps. 8 Nos
FLOOR IIPART PLAN-IV 1X1
MV CABLING : E.03
Cable Laying Item:1.1
Agreement no:78
Item no:1.1
3 core 6 sq mm CU Conductor
FLOOR-I
PART PLAN I
ELDB to floor -1 Emergency panel 126x1
PART PLAN II
ELDB to floor -1 Emergency panel 81x1PART PLAN III
ELDB to floor -1 Emergency panel 20x1
PART PLAN IV
ELDB to floor -1 Emergency panel 53x1
FLOOR-II
PART PLAN I
ELDB to floor -2 Emergency panel 70x1
Agreement no:79
Item no:1.1
3 core 10 sq mm CU ConductorFLOOR-I
PART PLAN I
UPS Power distribution boards - (UPDB) as per specification and as per
following details.One Power distribution board (UPDB) unit with respective incoming DP RCCB andoutgoing SP MCBs each having indications for incoming & outgoing feeder status asper specifications and as under :
Supply, laying testing and commissioning of 1100 V grade, armoured, FRLS, PVC,aluminium(AL.)/ Copper (CU) conductor cables on existing trays/walls/columns/indoor/ trenches including the cost of supports with suitable clamps, saddles, hooks,bolts etc. and including the cost of proper dressing of cables, markers providingidentification tags,earthing of glands armouring etc. complete as per specifications,as required and as below. (Note: All cables 16sqmm and above are AL conductorunless specified otherwise.
8/8/2019 Copy of Measurement Book 20.7
11/76
PDB to floor-1 power panel 125x1
PART PLAN II
PDB to floor-1 power panel 80x1
PART PLAN III
PDB to floor-1 power panel 20x1
FLOOR-II
PART PLAN IIPDB to floor-2 power panel 117x1
Agreement no:80
Item no:1.1
3 core 16 sq mm CU Conductor
FLOOR-II
PART PLAN IV
UPDB to floor -2 ups power panel 22x1
Agreement no:84
Item no:1.1
4 core 10 sq mm CU Conductor
FLOOR-I
PART PLAN I
UPBD to floor-1 ups power panel 151x1
PDB to floor-1 power panel 95x1
PART PLAN II
LDB to floor -1 lighting power panel 101x1
UPBD to floor-1 ups power panel 117x1
PART PLAN III
LDB to floor -1 lighting power panel 45x1
LIBRARY
LDB to floor -1 lighting power panel 82x1
FLOOR-II
PART PLAN II
PDB to floor-2 power panel 116x1
PART PLAN III
ELDB to floor-2 emergency power panel 54x1
Agreement no:85
Item no:1.1
4 core 16 sq mm CU Conductor
FLOOR-I
PART PLAN I
LDB to floor -1 lighting power panel 143x1
PART PLAN III
UPBD to floor-1 ups power panel 53x1
PDB to floor -1 power panel 22x1
PART PLAN IV
LDB to floor -1 lighting power panel 17x1
PDB to floor -1 power panel 52x1
UPBD to floor-1 ups power panel 22x1
FLOOR-II
PART PLAN I
8/8/2019 Copy of Measurement Book 20.7
12/76
LDB to floor-2 lighting panel 62x1
PDB to floor -2 power panel 63x1
UPBD to floor-2 ups power panel 77x1
PDB to floor -2 power panel 86x1
PART PLAN III
LDB to floor -2 lighting power panel 47x1
PDB to floor -2 power panel 46x1UPBD to floor-2 ups power panel 54x1
PART PLAN IV
LDB to floor -2 lighting power panel 21x1
CABLE TERMINATION Item:1.2
Agreement no:97
Item no:1.2
3 core 6 sq mm CU Conductor
FLOOR-I
PART PLAN I
ELDB to floor -1 Emergency panel 2X1
PART PLAN II
ELDB to floor -1 Emergency panel 2X1
PART PLAN III
ELDB to floor -1 Emergency panel 2X1PART PLAN IV
ELDB to floor -1 Emergency panel 2X1
FLOOR-II
PART PLAN I
ELDB to floor -2 Emergency panel 2X1
Agreement no:98
Item no:1.2
3 core 10 sq mm CU Conductor
FLOOR-I
PART PLAN IPDB to floor-1 power panel 2X1
PART PLAN II
PDB to floor-1 power panel 2X1
PART PLAN III
PDB to floor-1 power panel 2X1
FLOOR-II
PART PLAN II
PDB to floor-2 power panel 2X1
Agreement no:99
Item no:1.23 core 16 sq mm CU Conductor
FLOOR-II
Cable termination of cables as per item no. 1.1 above including the cost of supplyingand fixing crimping lugs, double compression brass glands, insulation tape etc.complete as per specifications, as required and as below.
8/8/2019 Copy of Measurement Book 20.7
13/76
PART PLAN IV
UPDB to floor -2 ups power panel 2X1
Agreement no:103
Item no:1.2
4 core 10 sq mm CU Conductor
FLOOR-I
PART PLAN IUPBD to floor-1 ups power panel 2X1
PDB to floor-1 power panel 2X1
PART PLAN II
LDB to floor -1 lighting power panel 2X1
UPBD to floor-1 ups power panel 2X1
PART PLAN III
LDB to floor -1 lighting power panel 2X1
LIBRARY
LDB to floor -1 lighting power panel 2X1
FLOOR-IIPART PLAN II
PDB to floor-2 power panel 2X1
PART PLAN III
ELDB to floor-2 emergency power panel 2X1
Agreement no:104
Item no:1.2
4 core 16 sq mm CU Conductor
FLOOR-I
PART PLAN I
LDB to floor -1 lighting power panel 2X1
PART PLAN III
UPBD to floor-1 ups power panel 2X1
PDB to floor -1 power panel 2X1
PART PLAN IV
LDB to floor -1 lighting power panel 2X1
PDB to floor -1 power panel 2X1
UPBD to floor-1 ups power panel 2X1
FLOOR-II
PART PLAN I
LDB to floor-2 lighting panel 2X1
PDB to floor -2 power panel 2X1
UPBD to floor-2 ups power panel 2X1
PDB to floor -2 power panel 2X1
PART PLAN III
LDB to floor -2 lighting power panel 2X1
PDB to floor -2 power panel 2X1
UPBD to floor-2 ups power panel 2X1
PART PLAN IV
LDB to floor -2 lighting power panel 2X1
Cable Trays
Item no:2.1
8/8/2019 Copy of Measurement Book 20.7
14/76
Agreement no:115
Item no:2.1
300 mm x 50 mm x 1.6mm
FLOOR I 222x1
FLOOR II 216X1
CONDUIT WIRING
SIS to Agreement No:1
a) First point controlled by one 5A switch / 6A MCB
Supply, fabrication & installation of perforated hot dipped galvanised double bendedcable trays from 2 mm thick GI sheets continuously connected including horizontaland vertical bends, reducers, tees, and other accessories and duly suspended fromthe ceiling with 12 mm dia vertical GI rods supported by 40mm x 40 mm 5 mm GIangle etc. complete as per specifications, as required and as below.
Supply and laying of conduit wiring for the following / ceiling fan / exhaust fan /bracket fan point with 3 X 2.5 sq.mm 1000V grade PVC insulator FRLS copperconductor wires in heavy gauge GI conduit surface run with GI saddles / concelledin wall below false ceiling with 25mm heavy guage PVC conduits including chases
and complete with other accessories etc. including insulated protectivity earth (PE)conductor adn earthing of switch boxes excluding the cost of switches / sockets adnswitch boxes. All walldrops should be concealed with heavy guage PVC conduitpipes, as specified and as under
8/8/2019 Copy of Measurement Book 20.7
15/76
8/8/2019 Copy of Measurement Book 20.7
16/76
SIS to Agreement No: 2
8/8/2019 Copy of Measurement Book 20.7
17/76
Secondary or looping points
wiring as specified in 1.1 above
using 3x2.5 copper (P+N+PE) wires
in 25 dia GI conduit for lights,
fans, socket outletsincluding
providing terminal block, ceiling rose
& other accessories etc as required
(exlcuding the cost of switches,
sockets and switch boxes) as per
specifications and drawings as required.
SIS to Agreement No:3
First socket outlet point controlled by one 15A switch / 16A MCB
SIS to Agreement No:4
SIS to Agreement No:5
aFirst socket outlet point controlled by one 15A / 16A MCBswitch / 16A MCB.
Supply & laying of conduit and wiring for the following 5 /15A socket outlet pointwith 3 x 2.5 sq. mm , 1100 Volt grade PVC insulated FRLS copper condutor wires inheavy gauge GI conduit surface run with GI saddles / concealled in walls belowfalse ceiling with 25mm heavy guage PVC conduits including chases and complete
with other accessories etc. including insulated protective earth (PE) conductor andearthing of switch boxes excluding the cost of switches / sockets and switch boxes.All wa;ll drops should be concealed with heavy guage PVC conduits pipes asspecified and as under
Secondary or looping 5 / 15A socket outlet points wiring as specified in 1.5 aboveusing 3 x 2.5 sq. mm copper (P+N+PE) wires in 25 dia GI conduit in ceiling andconcelled in walls below false ceiling with 25mm heavy guage PVC conduits forsocket outlets including providing terminal block, ceiling rose and other accessoriesetc as required (excluding the cost of switches, sockets and switch boxes) as perspecifications and drawings as required
Supply & laying of conduit and wiring for the following 5 /15A socket outlet pointwith 3 x 2.5 sq. mm, 1100 Volt grade PVC insulated FRLS copper condutor wires inheavy gauge GI conduit surface run with GI saddles / concelled in walls below falseceiling with 25mm heavy guage PVC conduits including chases and complete withother accessories etc. including insulated protective earth (PE) conductor andearthing of switch bozes exluding the cost of switches / sockets and switch boxes.All wall drops should be concealled with heavy guarge PVC conduits pipes asspecified and as under
8/8/2019 Copy of Measurement Book 20.7
18/76
SIS to Agreement No:6
Item No:2.0
Agreement no:122
Item no:2.1
1 # 5A modular switch
Agreement no:123
Item no:2.2
1# 5A switch & 1 # 5A socket
Agreement no:124
Item no:2.3
5/15 Amp Universal socket with 15 amp modular switch
Agreement no:125
Item no:2.4
5/15A Socket with switch control (UPS)
Agreement no:126
Item no:2.5
Agreement no:127
Item no:2.6
3# 5A socket with switch control, neon indication lamp, surge protector.
INDOOR LIGHTING AND FANS :E.05
Item no:1.0
Secondary or looping socket outlet points wiring as specified in 1.5 above using 2 x2.5 (Pipe) + 1 x 4(N) ) sq. mm copper (P+N+PE) wires in 25 dia GI conduit withceiling and concelled in walls below false ceiling with 25mm heavy guage PVCconduits for sockets outlet including providing terminal block, ceiling rose and otheraccessories etc. as required (excluding the cost of switches / socket and switch
boxes as specifications and drawings as required
Supply& installation of following modular grid plat mounted switch/es and socket/setc. on a suitable size mild steel electrogalvanised switch boxes complete in singleor combination on prorata basis complete with the connections, earthing and testingas per specifications and as required:(NOte the grid plate and MS BOX shall beselected suitably as per the requirement to fix the switches and sockets.
3# 5A socket with switch control, neon indication lamp, surge protector & 16A DPELCB (primary point)
8/8/2019 Copy of Measurement Book 20.7
19/76
Agreement no:129
Item no:1.2
Agreement no:130
Item no:1.3
Agreement no:131
Item no:1.4
Item no:2.0
BRACKET FANS
Agreement no:137
Item no:2.2
Exhaust Fan - 300dia, 1200cmh
PROTECTIVE EARTHING E.06
Item no:1.0
Item no:2.0
Supply, installation, testing & commissioning of light fittings including all accessoriese.g. ballast, HPF condensors, lamps, holders, surface/recess mountingarrangement etc. including necessary supports, accessories and hardware as perspecifications & as required at site and as below:
2x36 watt recess mounted fluorescent mirror optic luminaries with digital dimminghigh frequency ballast of specification as mentioned in note below, Philips(Cat. No.WCP 10236 dsi) or equivalent with 36W Trulite / lumilux fluorescent lamps and otheraccessories etc. as required.
1X36 watt surface mounted fluorescent tube mirror optic Luminaire with Philips /Wipro(Cat. No. WVF 41136 dsi)/ Keselec-Schreder(Cat. No. C-T Lux 136 HFD) orequivalent with 36W Trulite / lumilux fluorescent lamps and other accessories etc. as
required.
1 X36 watt fluorescent tube, wall mounting Luminaire with digital dimming highfrequency ballast of specification as mentioned in note below and opal/clear acrylicdiffuser, Philips(Cat. No. TCS 19/136) / Wipro(Cat. No. WRF 21136 dsi)/ Keselec-Schreder(KDF 136 HFD) or equivalent with 36W Trulite / lumilux fluorescent lampsand other accessories etc. as required.
Providing and making pipe earthing station including the cost of 50dia heavy classG.I 3m long with 10mm perforation, CI funnel with wiremesh charcoal/coke , salt, allearth work, masonry enclosure with frame, hinged cover plate having lockingarrangement, Disconnecting links, complete as per IS 3043:1987 for earthing.
8/8/2019 Copy of Measurement Book 20.7
20/76
Agreement no:142
Item no:2.4
35 mm x 4 mm Cu strip
Agreement no:151
Item no:2.13
12mm x 12mm Cu strip
Supply and laying,Testing and commissioning of copper/GI Strips/wire forinterconnecting the earthing stations ,panels,DBs etc. of the following sizes in builtup trenches /surface/wall/ground complete with holes & fixing,jointing / terminatingaccessories as per specifications & drawing as required. (Quantity shall be paid asper the approved drawings as executed, however direct measurement shall notexcced the quantity indicated in drawing approved .
Note :- In case of non availability of any of the sizes mentioned above, next higher
size available in market shall be provided at the same rate.
8/8/2019 Copy of Measurement Book 20.7
21/76
8/8/2019 Copy of Measurement Book 20.7
22/76
CONTENTS AREA OR VOLUME REMARKS AG NO
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
12 F-I
1 No 12 F-I
13 F-I
13 F-I
13 F-I
13 F-I
13 F-I
13 F-I
13 F-I13 F-I
13 F-I
13 F-I
13 F-I
13 F-I
13 F-I
1 No 13 F-I
14 F-I
14 F-I
14 F-I
araj Medical College at Kadhirkamam, Puducherry
8/8/2019 Copy of Measurement Book 20.7
23/76
14 F-I
14 F-I
14 F-I
14 F-I
14 F-I
14 F-I
14 F-I
14 F-I
14 F-I
1 No 14 F-I
15 F-I
15 F-I
15 F-I
15 F-I
15 F-I
15 F-I
15 F-I
15 F-I
15 F-I
15 F-I15 F-I
15 F-I
15 F-I
1 No 15 F-I
16 F-I
16 F-I
16 F-I
16 F-I
16 F-I
16 F-I
16 F-I
16 F-I
16 F-I
16 F-I
16 F-I
16 F-I
16 F-I
8/8/2019 Copy of Measurement Book 20.7
24/76
16 F-I
1 No 16 F-I
17 F-I
17 F-I
17 F-I
17 F-I
17 F-I
17 F-I
17 F-I
17 F-I
17 F-I
17 F-I
17 F-I
17 F-I
1 No 17 F-I
18 F-II
18 F-II
18 F-II
18 F-II
18 F-II18 F-II
18 F-II
18 F-II
18 F-II
18 F-II
18 F-II
18 F-II
1 No 18 F-II
19 F-II
19 F-II19 F-II
19 F-II
19 F-II
19 F-II
19 F-II
19 F-II
19 F-II19 F-II
19
8/8/2019 Copy of Measurement Book 20.7
25/76
19 F-II
19 F-II
1 No 19 F-II
20 F-II
20 F-II
20 F-II
20 F-II
20 F-II
20 F-II
20 F-II
20 F-II
20 F-II
20 F-II
20 F-II
20 F-II
20 F-II
1 No 20 F-II
21 F-II
21 F-II
21 F-II
21 F-II
21 F-II
21 F-II
21 F-II
21 F-II
21 F-II
21 F-II
21 F-II
21 F-II
21 F-II1 No 21 F-II
22 F-II
22 F-II
22 F-II
22 F-II
22 F-II
22 F-II
22 F II
8/8/2019 Copy of Measurement Book 20.7
26/76
22 F-II
22 F-II
22 F-II
22 F-II
22 F-II
22 F-II
1 No 22 F-II23 LDB
23 LDB
23 LDB
23 LDB
23 LDB
23 LDB
23 LDB
23 LDB
23 LDB
39 LDB
39 LDB
39 LDB
39 LDB
39 LDB39 LDB
39 LDB
8/8/2019 Copy of Measurement Book 20.7
27/76
39 LDB
39 LDB
39 LDB
39 LDB
1 No 39 LDB
1 No 39 LDB40 LDB
40 LDB
40 LDB
40 LDB
40 LDB
40 LDB
40 LDB40 LDB
40 LDB
40 LDB
40 LDB
1 No 40 LDB
45 LDB
45 LDB
45 LDB
45 LDB
45 LDB
45 LDB
45 LDB
45 LDB
45 LDB
45 LDB
45 LDB
1 No 45 LDB
48 LDB
48 LDB
48 LDB
48 LDB
48 LDB
8/8/2019 Copy of Measurement Book 20.7
28/76
48 LDB
48 LDB
48 LDB
48 LDB
48 LDB
1 No 48 LDB
49 LDB
49 LDB
49 LDB
49 LDB
49 LDB
49 LDB49 LDB
49 LDB
49 LDB
49 LDB
49 LDB
1 No 49 LDB
49 LDB
1 No 49 LDB
56 ELDB56 ELDB
56 ELDB
56 ELDB
56 ELDB
56 ELDB
56 ELDB56 ELDB
56 ELDB
56 ELDB
1 No 56 ELDB
56 ELDB
1 No 56 ELDB
57 ELDB
57 ELDB
57 ELDB
8/8/2019 Copy of Measurement Book 20.7
29/76
57 ELDB
57 ELDB
57 ELDB
57 ELDB
57 ELDB
57 ELDB
57 ELDB
1 No 57 ELDB
57 ELDB
1 No 57 ELDB
58 PDB
58 PDB
58 PDB
58 PDB
58 PDB
58 PDB
58 PDB
58 PDB
58 PDB
58 PDB
58 PDB
1 No 58 PDB
63 PDB
63 PDB
63 PDB
63 PDB
63 PDB
63 PDB
63 PDB
63 PDB
63 PDB
63 PDB
1 No 63 PDB
1 No 63 PDB
64 UPDB
64 UPDB
8/8/2019 Copy of Measurement Book 20.7
30/76
64 UPDB
64 UPDB
64 UPDB
64 UPDB
64 UPDB
64 UPDB
64 UPDB
64 UPDB
64 UPDB
1 No 64 UPDB
64 UPDB
1 No 64 UPDB
67 UPDB67 UPDB
67 UPDB
67 UPDB
67 UPDB
67 UPDB
67 UPDB
67 UPDB67 UPDB
67 UPDB
67 UPDB
1 No 67 UPDB
67 UPDB
1 No 67 UPDB
68 UPDB
68 UPDB
68 UPDB
68 UPDB
68 UPDB
68 UPDB
68 UPDB
68 UPDB
68 UPDB
68 UPDB
68 UPDB
8/8/2019 Copy of Measurement Book 20.7
31/76
1 No 68 UPDB
1 No 68 UPDB
1 No 68 UPDB
71 UPDB
71 UPDB
71 UPDB
71 UPDB
71 UPDB
71 UPDB
71 UPDB
71 UPDB
71 UPDB
71 UPDB1 No 71 UPDB
74
74
74
78
78
78
78
78
126 mtrs 78
78
81 mtrs 7878
20 mtrs 78
78
53 mtrs 78
78
78
70 mtrs 78
79
79
7979
79
8/8/2019 Copy of Measurement Book 20.7
32/76
125 mtrs 79
79
80 mtrs 79
79
20 mtrs 79
79
79117 mtrs 79
80
80
80
80
80
22 mtrs 80
84
84
8484
84
151 mtrs 84
95 mtrs 84
84
101 mtrs 84
117 mtrs 84
84
45 mtrs 84
84
82 mtrs 84
84
84
116 mtrs 84
84
54 mtrs 84
85
85
85
85
85
143 mtrs 85
85
53 mtrs 85
22 mtrs 85
85
17 mtrs 85
52 mtrs 85
22 mtrs 85
85
85
8/8/2019 Copy of Measurement Book 20.7
33/76
62 mtrs 85
63 mtrs 85
77 mtrs 85
86 mtrs 85
85
47 mtrs 85
46 mtrs 8554 mtrs 85
85
21 mtrs 85
85
85
86
8697 3X6
97 3X6
97 3X6
97 3X6
97 3X6
2 Nos 97 3X6
97 3X6
2 Nos 97 3X6
97 3X6
2 Nos 97 3X697 3X6
2 Nos 97 3X6
97 3X6
97 3X6
2 Nos 97 3X6
98 3X10
98 3X10
98 3X10
98 3X10
98 3X102 Nos 98 3X10
98 3X10
2 Nos 98 3X10
98 3X10
2 Nos 98 3X10
98 3X10
98 3X10
2 Nos 98 3X10
99 3x16
99 3x1699 3x16
99 3x16
8/8/2019 Copy of Measurement Book 20.7
34/76
99 3x16
2 Nos 99 3x16
103 4X10
103 4X10
103 4X10
103 4X10
103 4X102 Nos 103 4X10
2 Nos 103 4X10
103 4X10
2 Nos 103 4X10
2 Nos 103 4X10
103 4X10
2 Nos 103 4X10
103 4X10
2 Nos 103 4X10
103 4X10
103 4X10
2 Nos 103 4X10
103 4X10
2 Nos 103 4X10
104 4X16
104 4X16
104 4X16
104 4X16
104 4X16
2 Nos 104 4X16
104 4X16
2 Nos 104 4X16
2 Nos 104 4X16
104 4X16
2 Nos 104 4X16
2 Nos 104 4X16
2 Nos 104 4X16
104 4X16
104 4X16
2 Nos 104 4X16
2 Nos 104 4X16
2 Nos 104 4X16
2 Nos 104 4X16
104 4X16
2 Nos 104 4X16
2 Nos 104 4X16
2 Nos 104 4X16
104 4X16
2 Nos 104 4X16
105
105
8/8/2019 Copy of Measurement Book 20.7
35/76
105
115 300x50115 300x50
115 300x50
222 Mtrs 115 300x50
216 Mtrs 115 300x50
1 SIS
1 SIS
1 SIS
1 SIS
8/8/2019 Copy of Measurement Book 20.7
36/76
8/8/2019 Copy of Measurement Book 20.7
37/76
1 SIS
1 SIS
2 SIS
8/8/2019 Copy of Measurement Book 20.7
38/76
2 SIS
2 SIS
2 SIS
2 SIS
2 SIS
2 SIS
2 SIS2 SIS
2 SIS
2 SIS
2 SIS
2 SIS
3 SIS
3 SIS
3 SIS
3 SIS
3 SIS
4 SIS
4 SIS
4 SIS
4 SIS
5 SIS
5 SIS
5 SIS5 SIS
5 SIS
8/8/2019 Copy of Measurement Book 20.7
39/76
5 SIS
6 SIS
6 SIS
6 SIS
6 SIS
2
2
122 5A/SW
122 5A/SW
122 5A/SW
122 5A/SW
123 5A SW&SOC
123 5A SW&SOC
123 5A SW&SOC
123 5A SW&SOC124
124
124
124
125
125
125
125
126
126
126
126
127
127
127
127
1
1
1
15A SW&SOC RAW
15A SW&SOC RAW
15A SW&SOC RAW
15A SW&SOC RAW
15A SW&SOC UPS
15A SW&SOC UPS
15A SW&SOC UPS
15A SW&SOC UPS
SURGE PRI
SURGE PRI
SURGE PRI
SURGE PRI
SURGE SEC
SURGE SEC
SURGE SEC
SURGE SEC
8/8/2019 Copy of Measurement Book 20.7
40/76
1
129 2X36 (SQUARE)
129 2X36 (SQUARE)
129 2X36 (SQUARE)
129 2X36 (SQUARE)
130 1X36(2 FEET)
130 1X36(2 FEET)
130 1X36(2 FEET)
130 1X36(2 FEET)
131 1X36(TOILET)
131 1X36(TOILET)
131 1X36(TOILET)131 1X36(TOILET)
137
137 EXHAUST FAN
137 EXHAUST FAN
137 EXHAUST FAN
137 EXHAUST FAN
FANS
FANS
FANS
FANSEARTH ROD
141 EARTH ROD
EARTH ROD
EARTH ROD
COPPER PLATE
8/8/2019 Copy of Measurement Book 20.7
41/76
COPPER PLATE142 COPPER PLATE
142 COPPER PLATE
142 COPPER PLATE
142 COPPER PLATE
151 COPPER PLATE
151 COPPER PLATE
151 COPPER PLATE
151 COPPER PLATE
151 COPPER PLATE
8/8/2019 Copy of Measurement Book 20.7
42/76
8/8/2019 Copy of Measurement Book 20.7
43/76
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANELPANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
8/8/2019 Copy of Measurement Book 20.7
44/76
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANELPANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
8/8/2019 Copy of Measurement Book 20.7
45/76
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANELPANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANELPANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
8/8/2019 Copy of Measurement Book 20.7
46/76
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANELPANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
8/8/2019 Copy of Measurement Book 20.7
47/76
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DBDB
DB
8/8/2019 Copy of Measurement Book 20.7
48/76
DB
DB
DB
DB
DB
DBDB
DB
DB
DB
DB
DB
DBDB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
8/8/2019 Copy of Measurement Book 20.7
49/76
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DBDB
DB
DB
DB
DB
DB
DB
DB
DBDB
DB
DB
DB
DB
DBDB
DB
DB
DB
DB
DB
DB
DB
DB
8/8/2019 Copy of Measurement Book 20.7
50/76
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
8/8/2019 Copy of Measurement Book 20.7
51/76
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DBDB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
8/8/2019 Copy of Measurement Book 20.7
52/76
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DB
DBDB
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYINGCABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYINGCABLE LAYING
CABLE LAYING
8/8/2019 Copy of Measurement Book 20.7
53/76
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
8/8/2019 Copy of Measurement Book 20.7
54/76
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE LAYING
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATIONCABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATIONCABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATIONCABLE TERMINATION
CABLE TERMINATION
8/8/2019 Copy of Measurement Book 20.7
55/76
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TERMINATION
CABLE TRAY
CABLE TRAY
8/8/2019 Copy of Measurement Book 20.7
56/76
CABLE TRAY
CABLE TRAY
CABLE TRAY
CABLE TRAY
CABLE TRAY
CABLE TRAY
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
8/8/2019 Copy of Measurement Book 20.7
57/76
8/8/2019 Copy of Measurement Book 20.7
58/76
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
8/8/2019 Copy of Measurement Book 20.7
59/76
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRINGCONDUIT WIRING
CONDUIT WIRING
8/8/2019 Copy of Measurement Book 20.7
60/76
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
CONDUIT WIRING
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKETSWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
SWITCHES AND SOCKET
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
8/8/2019 Copy of Measurement Book 20.7
61/76
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANSINDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANS
INDOOR LIGHTING & FANSPROTECTIVE EARTHING
PROTECTIVE EARTHING
PROTECTIVE EARTHING
PROTECTIVE EARTHING
PROTECTIVE EARTHING
8/8/2019 Copy of Measurement Book 20.7
62/76
PROTECTIVE EARTHINGPROTECTIVE EARTHING
PROTECTIVE EARTHING
PROTECTIVE EARTHING
PROTECTIVE EARTHING
PROTECTIVE EARTHING
PROTECTIVE EARTHING
PROTECTIVE EARTHING
PROTECTIVE EARTHING
PROTECTIVE EARTHING
8/8/2019 Copy of Measurement Book 20.7
63/76
8/8/2019 Copy of Measurement Book 20.7
64/76
FROM AGREEMENT VICE
ITEM NO 1.1 PART PLAN-I LDB LDB FLOOR II 3P-12
PART PLAN-IV LDB LDB FLOOR II 3P-12
ITEM NO 1.2 PART PLAN-I LDB PDB FLOOR II 3P-12
ITEM NO 1.7 PART PLAN-III LDB LDB FLOOR I 3P-8
ITEM NO 1.10 PART PLAN-III LDB LDB FLOOR II 3P-6
ITEM NO 1.11 LIBRARY LDB LDB FLOOR I 3P-4PART PLAN-III LDB ELDB FLOOR II 3P-4
ITEM NO 1.18 PART PLAN-III ELDB ELDB FLOOR I 1P-6
PART PLAN-II ELDB LDB FLOOR II 3P-4
ITEM NO 1.19 PART PLAN-IV ELDB ELDB FLOOR I 1P-6
PART PLAN-I ELDB ELDB FLOOR II 1P-6
ITEM NO 1.20 PART PLAN-IV ELDB PDB FLOOR I 3P-6
ITEM NO 1.25 PART PLAN-II PDB PDB FLOOR I 1P-6
PART PLAN-III PDB PDB FLOOR I 1P-6
ITEM NO 1.26 PART PLAN-III UPDB PDB FLOOR I 1P-6
PART PLAN-III UPDB UPDB FLOOR II 3P-8ITEM NO 1.29 PART PLAN-I UPDB PDB FLOOR I 3p-4
PART PLAN-I UPDB UPDB FLOOR II 3P-4
ITEM NO 1.30 PART PLAN-I UPDB PDB FLOOR II 3p-4
PART PLAN-II UPDB PDB FLOOR II 3p-4
PART PLAN-III UPDB PDB FLOOR II 3p-4
ITEM NO 1.35 PART PLAN-IV UPDB UPDB FLOOR II 1P-6
8/8/2019 Copy of Measurement Book 20.7
65/76
SASI DONE
SASI DONE
SASI DONE
SASI DONE
SASI DONE
SASI DONESASI DONE
SASI DONE
SASI DONE
SASI DONE
SASI DONE
SASI DONE
SASI DONE
SASI DONE
SASI DONE
SASI DONESASI DONE
SASI DONE
SASI DONE
SASI DONE
SASI DONE
SASI DONE
8/8/2019 Copy of Measurement Book 20.7
66/76
4C-CU-16 LDB 143 FLOOR-I PART PLAN I
3C-CU-6 ELDB 126 FLOOR-I PART PLAN I
3C-CU-10 PDB 125 FLOOR-I PART PLAN I
4C-CU-10 UPDB 151 FLOOR-I PART PLAN I
4C-CU-10 PDB 95 FLOOR-I PART PLAN I
4C-CU-10 LDB 101 FLOOR-I PART PLAN II3C-CU-6 ELDB 81 FLOOR-I PART PLAN II
3C-CU-10 PDB 80 FLOOR-I PART PLAN II
4C-CU-10 UPDB 117 FLOOR-I PART PLAN II
4C-CU-10 LDB 45 FLOOR-I PART PLAN III
3C-CU-6 ELDB 20 FLOOR-I PART PLAN III
3C-CU-10 PDB 20 FLOOR-I PART PLAN III
4C-CU-16 UPDB 53 FLOOR-I PART PLAN III
4C-CU-16 PDB 22 FLOOR-I PART PLAN III
4C-CU-16 LDB 17 FLOOR-I PART PLAN IV
3C-CU-6 ELDB 53 FLOOR-I PART PLAN IV4C-CU-16 PDB 52 FLOOR-I PART PLAN IV
4C-CU-16 UPDB 22 FLOOR-I PART PLAN IV
4C-CU-10 LDB 82 FLOOR-I LIBRARY
4C-CU-16 LDB 62 FLOOR-II PART PLAN I
3C-CU-6 ELDB 70 FLOOR-II PART PLAN I
4C-CU-16 PDB 63 FLOOR-II PART PLAN I
4C-CU-16 UPDB 77 FLOOR-II PART PLAN I
4C-CU-16 PDB 86 FLOOR-II PART PLAN I
3C-CU-10 LDB 117 FLOOR-II PART PLAN II
4C-CU-10 PDB 116 FLOOR-II PART PLAN II
4C-CU-16 LDB 47 FLOOR-II PART PLAN III
4C-CU-10 ELDB 54 FLOOR-II PART PLAN III
4C-CU-16 PDB 46 FLOOR-II PART PLAN III
4C-CU-16 UPDB 54 FLOOR-II PART PLAN III
4C-CU-16 LDB 21 FLOOR-II PART PLAN IV
3C-CU-16 UPDB 22 FLOOR-II PART PLAN IV
8/8/2019 Copy of Measurement Book 20.7
67/76
LDB to floor -1 lighting power panel DONE
ELDB to floor -1 Emergency panel DONE
PDB to floor-1 power panel DONE
UPBD to floor-1 ups power panel DONE
PDB to floor-1 power panel DONE
LDB to floor -1 lighting power panel DONEELDB to floor -1 Emergency panel DONE
PDB to floor-1 power panel DONE
UPBD to floor-1 ups power panel DONE
LDB to floor -1 lighting power panel DONE
ELDB to floor -1 Emergency panel DONE
PDB to floor-1 power panel DONE
UPBD to floor-1 ups power panel DONE
PDB to floor -1 power panel DONE
LDB to floor -1 lighting power panel DONE
ELDB to floor -1 Emergency panel DONEPDB to floor -1 power panel DONE
UPBD to floor-1 ups power panel DONE
LDB to floor -1 lighting power panel DONE
LDB to floor-2 lighting panel DONE
ELDB to floor -2 Emergency panel DONE
PDB to floor -2 power panel DONE
UPBD to floor-2 ups power panel DONE
PDB to floor -2 power panel DONE
PDB to floor-2 power panel DONE
PDB to floor-2 power panel DONE
LDB to floor -2 lighting power panel DONE
ELDB to floor-2 emergency power panel DONE
PDB to floor -2 power panel DONE
UPBD to floor-2 ups power panel DONE
LDB to floor -2 lighting power panel DONE
UPDB to floor -2 ups power panel DONE
8/8/2019 Copy of Measurement Book 20.7
68/76
4C-CU-16 LDB 143 FLOOR-I PART PLAN I
3C-CU-6 ELDB 126 FLOOR-I PART PLAN I
3C-CU-10 PDB 125 FLOOR-I PART PLAN I
4C-CU-10 UPDB 151 FLOOR-I PART PLAN I
4C-CU-10 PDB 95 FLOOR-I PART PLAN I
4C-CU-10 LDB 101 FLOOR-I PART PLAN II3C-CU-6 ELDB 81 FLOOR-I PART PLAN II
3C-CU-10 PDB 80 FLOOR-I PART PLAN II
4C-CU-10 UPDB 117 FLOOR-I PART PLAN II
4C-CU-10 LDB 45 FLOOR-I PART PLAN III
3C-CU-6 ELDB 20 FLOOR-I PART PLAN III
3C-CU-10 PDB 20 FLOOR-I PART PLAN III
4C-CU-16 UPDB 53 FLOOR-I PART PLAN III
4C-CU-16 PDB 22 FLOOR-I PART PLAN III
4C-CU-16 LDB 17 FLOOR-I PART PLAN IV
3C-CU-6 ELDB 53 FLOOR-I PART PLAN IV4C-CU-16 PDB 52 FLOOR-I PART PLAN IV
4C-CU-16 UPDB 22 FLOOR-I PART PLAN IV
4C-CU-10 LDB 82 FLOOR-I LIBRARY
4C-CU-16 LDB 62 FLOOR-II PART PLAN I
3C-CU-6 ELDB 70 FLOOR-II PART PLAN I
4C-CU-16 PDB 63 FLOOR-II PART PLAN I
4C-CU-16 UPDB 77 FLOOR-II PART PLAN I
4C-CU-16 PDB 86 FLOOR-II PART PLAN I
3C-CU-10 LDB 117 FLOOR-II PART PLAN II
4C-CU-10 PDB 116 FLOOR-II PART PLAN II
4C-CU-16 LDB 47 FLOOR-II PART PLAN III
4C-CU-10 ELDB 54 FLOOR-II PART PLAN III
4C-CU-16 PDB 46 FLOOR-II PART PLAN III
4C-CU-16 UPDB 54 FLOOR-II PART PLAN III
4C-CU-16 LDB 21 FLOOR-II PART PLAN IV
3C-CU-16 UPDB 22 FLOOR-II PART PLAN IV
8/8/2019 Copy of Measurement Book 20.7
69/76
LDB to floor -1 lighting power panel DONE
ELDB to floor -1 Emergency panel DONE
PDB to floor-1 power panel DONE
UPBD to floor-1 ups power panel DONE
PDB to floor-1 power panel DONE
LDB to floor -1 lighting power panel DONEELDB to floor -1 Emergency panel DONE
PDB to floor-1 power panel DONE
UPBD to floor-1 ups power panel DONE
LDB to floor -1 lighting power panel DONE
ELDB to floor -1 Emergency panel DONE
PDB to floor-1 power panel DONE
UPBD to floor-1 ups power panel DONE
PDB to floor -1 power panel DONE
LDB to floor -1 lighting power panel DONE
ELDB to floor -1 Emergency panel DONEPDB to floor -1 power panel DONE
UPBD to floor-1 ups power panel DONE
LDB to floor -1 lighting power panel DONE
LDB to floor-2 lighting panel DONE
ELDB to floor -2 Emergency panel DONE
PDB to floor -2 power panel DONE
UPBD to floor-2 ups power panel DONE
PDB to floor -2 power panel DONE
PDB to floor-2 power panel DONE
PDB to floor-2 power panel DONE
LDB to floor -2 lighting power panel DONE
ELDB to floor-2 emergency power panel DONE
PDB to floor -2 power panel DONE
UPBD to floor-2 ups power panel DONE
LDB to floor -2 lighting power panel DONE
UPDB to floor -2 ups power panel DONE
8/8/2019 Copy of Measurement Book 20.7
70/76
CABLET TRAY
FLOOR I 222x1 222 Mtrs DONE
FLOOR II 216X1 216 Mtrs DONE
8/8/2019 Copy of Measurement Book 20.7
71/76
SL.NO ROOMS
PART PLAN-I
1 ANATOMY DEMO-I 10 9
2 ANATOMY DEMO-II 10 9
3 ANATOMY REASEARCH 10 9
4 ANATOMY LIBRARY 5 4
5 NON - TECH & CORRIDOR(NON- TECH) 2 2
6 AIR HANDLING UNIT-(AHU) 2 2
7 CORRIDOR 8 4
8 READER-I 4 3
9 READER-II 3 2
10 READER-III 2 1
11 WASH & TOILET 2 1
12 ASST PROF /READER- CORRIDOR 2 2
13 ANATOMY PROFESSOR & TOILET 3 2
14 ANATOMY DEPT OFF 3 2
15 LADIES TOILET 5 5
16 GENTS TOILET 5 5
17 ANATOMY ASST PROF / LECT 5 4
18 ANATOMY MUSEUM 33 33
19 STORE 4 4
20 PREPARATION 4 4
21 TUTORS 4 4
22 ANATOMY HISTOLOGY 35 35
23 ANATOMY HISTOLOGY PREPARATION
PART PLAN - II
1 ANATOMY DISSECTION HALL 68 68
2 STORAGE TANK 1 1
3 EMBALMING ROOM 4 4
4 COLD STORAGE 7 7
5 CORRIDOR 3 3
6 LADIES TOILET
7 GENTS TOILET8 LOBBY
9 STAIR CASE
PART PLAN-III
1 ADMINISTRATION
2 BIOCHEMISTRY LAB 43 43
3 STORE
TOTALPOINT
TOTALNLPOINT
PRIMARY
8/8/2019 Copy of Measurement Book 20.7
72/76
4 ANTE ROOM FOR PREPARATION
5 GENTS COMMON ROOM
6 GENTS TOILET
7 AIR HANDLING UNIT - AHU 1 1
1 PART PLAN - IV
CORRIDOR
1 PART PLAN-V
2 LECTURE HALL 57 57
3 STAIR CASE
4 PANEL / LV ROOM 3 3
5 LADIES TOILET & LOBBY
6 GENTS TOILET
7 LADIES TOILET
8 BIO CHEMISTRY DEPT OFF 4 3
9 BIO CHEMISTRY PROFFESOT & TOILET 4 3
10 CORRIDOR 8 4
11 BIO CHEMISTRY RESEARCH 10 9
12 BIO CHEMISTRY LIBRARY 2 1
13 BIO CHEMISTRY NON TECH & CORRIDOR 5 5
14 AIR HANDLING UNIT - AHU 4 4
15 LIBRARY CORRIDOR & LOBBY
16 STAIR CASE-I& AHU
17 STAIR CASE-II &STORE
18 LIBRARY CORRIDOR & LOBBY
19 BOOK SORTING & TOILET
20 BOOK BINDER
21 LIBRARIAN AND OTHER STAFFS ROOM
22 STAFF READING ROOM
23 MICRO FILM READING ROOM
24 JOURNAL ROOM
25 COPYING FACILITY
26 VIDEO & CASETTES ROOM
PART PLAN -VI
1 BIO CHEMISTRY DEMO -I 10 9
2 BIO CHEMISTRY DEMO -II 10 9
3 READER -I & TOILET 4 3
4 READER -II & TOILET 4 3
5 BIO CHEMISTRY TUTOR 8 8
6 BIO CHEMISTRY ASST PROF
8/8/2019 Copy of Measurement Book 20.7
73/76
7 BIO CHEMISTRY ASST PROF II
8 MAIN LOBBY
9 PORTICO
10 STAIRCASE I&II
TOTAL
8/8/2019 Copy of Measurement Book 20.7
74/76
FLOOR
I
PART I I
PART I I TOTAL CIRCUIT
PART I I PART -I
PART I I PART-II
PART I I PART-III
PART I I PART-IV
PART I I PART-V
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
PART I I
I
PART II I
PART II I
PART II I
PART II I
PART II I
PART II I
PART II I
PART II IPART II I
PART II I
I
PART III I
PART III I
PART III I
PART III I
8/8/2019 Copy of Measurement Book 20.7
75/76
PART III I
PART III I
PART III I
PART III I
I
PART IV I
PART IV I
I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
PART V I
IPART VI I
PART VI I
PART VI I
PART VI I
PART VI I
PART VI I
PART VI I
8/8/2019 Copy of Measurement Book 20.7
76/76
PART VI I
PART VI I
PART VI I
PART VI I
TOTAL I