Upload
noopur-bhandari
View
196
Download
3
Tags:
Embed Size (px)
Citation preview
KRA RESPONSIBILITY MATRIX
SL.No. BSC Parameter BSC Target KRA Id
** This will be filled once the Stretch Tool has been finalised and communicated for implementation.
Stretch of target **
Note: 1. Each Scorecard (BSC) parameter is to be listed seperately. 2. KRAs for each scorecard (BSC) parameter have to be selected form the KRA masters & populated in the relevant columns against that parameter. 3. The KRAs are to be alloted to Executives by marking in the KRA row under the column alloted to the concerned Executive.
KRA RESPONSIBILITY MATRIX
KRA Target
** This will be filled once the Stretch Tool has been finalised and communicated for implementation.
Description of the relevant KRA taken from KRA master
KAR type O/C
Budget KRA Y /N
Compulsory KRA Y/N
Note: 1. Each Scorecard (BSC) parameter is to be listed seperately. 2. KRAs for each scorecard (BSC) parameter have to be selected form the KRA masters & populated in the relevant columns against that parameter. 3. The KRAs are to be alloted to Executives by marking in the KRA row under the column alloted to the concerned Executive.
KRA RESPONSIBILITY MATRIXKRA Alloted to : Initials / Name of Executive
Ex 1 Ex 2 Ex 3 Ex 4 Ex 5 Ex 6 Ex 7 Ex 8 Ex 9
KRA RESPONSIBILITY MATRIXKRA Alloted to : Initials / Name of Executive
Ex 10 Ex 11 Ex 12
INFORMATION TECHNOLOGY FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description
IFX00100 IFX Completion of targeted projects/ applications within specified time O
IFX00101 IFX Identification/ Planning/ Feasibility study & review of targeted projects OIFX00102 IFX System Analysis & Design of targeted projects OIFX00103 IFX Coding & Testing of targeted projects OIFX00104 IFX Master data creation OIFX00200 IFX Completion of targeted projects/ applications within specified time O
IFX00201 IFX Identification/ Planning/ Feasibility study & review of targeted projects OIFX00202 IFX System Analysis & Design of targeted projects OIFX00203 IFX Coding & Testing of targeted projects OIFX00204 IFX Master data creation OIFX00300 IFX Completion of targeted projects/ applications within specified time O
IFX00301 IFX Identification/ Planning/ Feasibility study & review of targeted projects OIFX00302 IFX System Analysis & Design of targeted projects OIFX00303 IFX Coding & Testing of targeted projects OIFX00304 IFX Master data creation OIFX00400 IFX Completion of targeted projects/ applications within specified time O
IFX00401 IFX Identification/ Planning/ Feasibility study & review of targeted projects OIFX00402 IFX System Analysis & Design of targeted projects OIFX00403 IFX Coding & Testing of targeted projects OIFX00404 IFX Master data creation OIFX00500 IFX Completion of targeted projects/ applications within specified time O
IFX00501 IFX Identification/ Planning/ Feasibility study & review of targeted projects OIFX00502 IFX System Analysis & Design of targeted projects OIFX00503 IFX Coding & Testing of targeted projects OIFX00504 IFX Master data creation O
IFX00600 IFX Completion of adhoc requirements for system development and review O
IFX00601 IFX O
IFX00602 IFX OIFX00603 IFX Coding & Testing of adhoc requirements for system development OIFX00604 IFX Master data creation O
IFX00700 IFX Productivity projects undertaken CIFX00701 IFX Identification & review of targeted improvement projects CIFX00702 IFX System Analysis & Design of applications under productivity projects C
KRA Type
Planning/ Feasibility study & review of adhoc requirements for system development
System Analysis & Design of adhoc requirements for system development
IFX00703 IFX Coding & Testing of applications under productivity projects C
IFX00800 IFX Implementation of targeted applications O
IFX00801 IFX Planning and review for implementation of targeted applications OIFX00802 IFX End user training for implementation of targeted applications O
IFX00803 IFX Trial run & go live for implementation of targeted applications O
IFX00900 IFX C
IFX00901 IFX Migration planning & review of conversion projects CIFX00902 IFX Integration analysis & redesign of targeted conversion projects CIFX00903 IFX Coding & Testing of the targeted conversion projects C
IFX01000 IFX CIFX01001 IFX Planning and review for documentation of targeted applications OIFX01002 IFX Issue of User Documentation for targeted applications OIFX01003 IFX System Documentation for targeted applications O
IFX01100 IFX O
IFX01200 IFX Reply/settlement of Internal Audit paras within specified time (4 weeks) O
IFX01300 IFX O
IFX01400 IFX Timely inputs to unit/corporate finance for BUDGET/ FLASH/ MIRs etc. OIFX01500 IFX Review / Audit of implemented IT Systems as per schedule. C
IFX01600 IFX Introduction of new technology within specified time CIFX01601 IFX Planning for new technology projects & Monitoring C
IFX01602 IFX CIFX01603 IFX Execution of Pilot projects related to new technology C
IFX01700 IFX Asset management of computer hardware and software O
IFX01701 IFX O
IFX01800 IFX C
IFX01801 IFX Planning/ Budget approvals and review for augmentation of IT facilities O
IFX01802 IFX C
IFX01803 IFX PO / Works Contract Placement for targeted IT facilities O
IFX01900 IFX OIFX01901 IFX Planning/ Budget approvals and review for IT consumables O
Conversion of legacy applications to current technology within specified time
Percent completion of targeted documentation as per standards
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliation of accounts
Scanning / learning & Identification of projects for introduction of new technology
Creation and maintenance of asset database and generation of downtime reports
Augmentation of IT facilities including hardware/ software/ networking and other infrastructure
Preparation of Specifications & Indent generation for targeted augmentation of IT facilities
Procurement and control of IT Consumables & AMC's of existing IT resources
IFX01902 IFX Preparation of Specifications & Indent generation for IT consumables C
IFX01903 IFX PO / Works Contract Placement for IT consumables O
IFX02000 IFX O
IFX02001 IFX Planning for Contingency and monitoring of IT facilities C
IFX02002 IFX O
IFX02003 IFX Reporting of problems & Generation of logs of downtime of IT facilities OIFX02100 IFX Availability of Application Systems / Databases O
IFX02101 IFX C
IFX02102 IFX O
IFX02103 IFX OIFX02200 IFX Improving response time to cater to user complaints O
IFX02201 IFX O
IFX02202 IFX Recording of complaints and allocation for resolution OIFX02300 IFX Uptime of power-conditioning/ air-conditioning equipment O
IFX02301 IFX O
IFX02302 IFX O
IFX02303 IFX OIFX02400 IFX Increase in Internal Customer satisfaction score OIFX02401 IFX Planning for survey & Corrective actions OIFX02402 IFX Analysis of internal customer survey results OIFX02403 IFX conduction of internal customer survey OIFX02500 IFX Manpower developed in contemporary IT skill set CIFX02501 IFX Identification of requirements related to skill development CIFX02502 IFX Planning of skill development programs CIFX02503 IFX Execution of skill development plan CIFX02600 IFX Programs conducted for user training at different levels OIFX02601 IFX Identification of user training requirements & monitoring OIFX02602 IFX Finalisation of user training program OIFX02603 IFX Execution of user training programs OIFX02604 IFX Support to users through Help desk O
IFX02605 IFX Effectiveness analysis of training programs OIFX02700 IFX Achieving Business excellence thru' TQM at Deptt. level CIFX02701 IFX Preparation of action plan based on Position report O
IFX02702 IFX C
IFX02800 IFX C
Management of IT facilities (Servers/Workstations/ Network equipment )
Improving complaint resolution time through better coordination with maintenance staff for upkeep of IT facilities
Planning for Contingency and monitoring of application systems and databases
Improving complaint resolution time through better coordination with DBA and system developer
Reporting of problems & generation of log related to applications and database
Periodic review of complaints records and monitoring of critical complaints
Periodic review of complaints records and monitoring of critical complaints related to power equipment/ air-conditioning
Allocation and coordination for resolution of complaints related to power/ air-conditioning
Recording and reporting of complaints related to power/ air-conditioning
Implementation of Improvement projects identified in the Position Report as per schedule
Finalisation & issue of IT related policies/ strategic plans & their implementation
IFX02801 IFX CIFX02802 IFX Preparation of action plan for implementation of IT related policies C
IFX02803 IFX C
IFX02900 IFX Issue of targeted policy documents within specified time CIFX02901 IFX Issue of final Policy Documentation CIFX02902 IFX Draft Document Preparation for IT related policies CIFX02903 IFX Study of national / international standards C
IFX03000 IFX C
IFX03001 IFX O
IFX03002 IFX CIFX03003 IFX Study of systems & practices of collaborator/ partner C
IFX03100 IFX Identification of business area for IT related business by targetted date. OIFX03101 IFX Identification of business partner for joint working CIFX03102 IFX Finalisation of MOU / JV with business partner within a specified time OIFX03103 IFX Draft MOU/JV Document Preparation OIFX03200 IFX Business generated from new IT initiatives O
IFX03201 IFX C
IFX03202 IFX OIFX03203 IFX Development of targeted products CIFX03204 IFX Marketing of targeted products O
IFX03300 IFX Finalisation of Functional scorecard by specified date
OIFX03400 IFX Increase effectiveness of Quality Circles in the deptt. CIFX03500 IFX Development of Knowledge management Portal OIFX03600 IFX Contributing case studies etc.for Knowledge Management Portal CIFX03700 IFX Completion of KM Projects as per schedule C
IFX03800 IFX C
IFX03900 IFX C
IFX04000 IFX C
IFX04100 IFX C
IFX04200 IFX C
Formulation of IT related policy guide lines/ plan document & issue policy document within specified time
Implementation of action plan for IT related policies within specified time.
Projects developed/completed with technology/best practices absorbed from collaborators/partners
Develop time bound plan & monitoring of projects related to absorption of technology/ best practices of collaborator/ partner
Project monitoring & issue of documents containing assimilated knowledge of collaborator/ partner within specified time.
Identification of IT products for joint development and assessment of market potential
Issue of technical recommendations and manpower planning for joint projects with business partners within specified time
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
IFX04300 IFX C
IFX04400 IFX C
IFX04500 IFX C
IFX04501 IFX C
IFX04502 IFX C
IFX04503 IFX C
IFX04600 IFX CIFX04700 IFX Completion of milestones for availing Advisory/ Consulting services. C
IFX04701 IFX CIFX04702 IFX Queries raised to advisor and their closing within specified time CIFX04703 IFX Organizing workshops/conferences with advisor. O
IFX04704 IFX C
IFX04800 IFX Improvement in Employee Satisfaction Score OIFX04900 IFX Increase in no. of active Quality Circles in the deptt. O
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Completion of milestones for appointment of Advisory/ Consulting services for IT initiatives/ Projects
Finalising the terms of reference and deliverables for Selection and Appointment of advisor / Consultant
Preparation of documents and issue of tenders for appointment of Consultant by specified date
Finalisation of Contract and issue of appointment order for consultant by specified date
Building of systems for Compliance to IT Related Statuatory Regulations.
Study and sharing of Reports on key strategic topics with interested groups.
Raising Reports/Action plans based on Queries/Reports/Conferences with Advisor / consultant within specified time.
INFORMATION TECHNOLOGY FUNCTION KRA MASTER - 2006-07
Unit of Measurement
%Completion with weightages Y N N H
Y N N H
Time Index Y N N M
Time Index Y N N L
Time Index Y N N L%Completion with weightages Y N N H
Y N N H
Time Index Y N N M
Time Index Y N N L
Time Index Y N N L%Completion with weightages Y N N H
Y N N H
Time Index Y N N M
Time Index Y N N L
Time Index Y N N L%Completion with weightages Y N N H
Y N N H
Time Index Y N N M
Time Index Y N N L
Time Index Y N N L%Completion with weightages Y N N H
Y N N H
Time Index Y N N M
Time Index Y N N L
Time Index Y N N L
%Completion Y N N H
Y N N H
Time IndexY N N L
Time Index Y N N L
Time Index Y N N L
Total Savings Y N N HNumber N N N H
Time Index N N N L
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA (Y/N)
Suggested Weightage for category
A B C
S(%X*Wx) %X=%completion of project X/ Wx= Weightage of Project X
S(%X*Wx) %X=%completion of project X/ Wx= Weightage of Project X
S(%X*Wx) %X=%completion of project X/ Wx= Weightage of Project X
S(%X*Wx) %X=%completion of project X/ Wx= Weightage of Project X
S(%X*Wx) %X=%completion of project X/ Wx= Weightage of Project X
%Completion= S(%X)/A A=Total number of applications Targeted %X= % completion of project X
Time Index N N N L
%Completion with weightages N N N H
N N N H
Time Index N N N L
Time IndexN N N L
%Completion with weightages N N N H
N N N H
Time Index N N N L
Time Index N N N L
N N N M
Time Index N N N M
Time Index N N N M
Time Index N N N L
% Y N Y M
% Y N Y M
Time IndexY N Y M
Time IndexY N Y M
Time Index Y N N M
N N N H
Time Index N N N H
No of projects identified N N N M
Time Index N N N M
N N N M
Average response Time N N N M
%Completion with weightages N N N H
Time IndexN N N H
Time IndexN N N M
Time IndexN N N M
% completion with weightages N N N H
Time Index N N N H
S(%X*Wx) %X=%completion of project X Wx= Weightage of Project X
S(%X*Wx) %X=%completion of project X Wx= Weightage of Project X
(A-B)*100/A A=Total number of targeted documents B= Number of documents not issued)
% completion with Weighted average of Targeted applications
S((A-DT)/A*Wx) A=Total Hrs available DT=Down Time WX= Weightage factor in %
Time IndexN N N M
Time IndexN N N M
% Uptime with weightages N N N H
N N N H
Complaint resolution time N N N M
N N N L% Uptime with weightages N N N H
N N N H
Complaint resolution time N N N L
N N N LPercent of complaints resolved with in specified time N N N H
Percent of complaints resolved with in specified time N N N H
N N N LPercentage uptime over targeted base value N N N H
Percent of complaints resolved with in specified time N N N H
Average complaint resolution time N N N L
Average response time N N N LScore N N N HAchievement of targeted score N N N H
Time Index N N N M
Time Index N N N M% Completion of Targeted Training Programs N N N H
No. of days delayed from scheduled date N Y N H
No. of days delayed from scheduled date N Y N H
Time Index N N N MNumber of programs conducted. N N N M
No. of days delayed from scheduled date N Y N H
No. of days delayed from scheduled date N Y N L
Time Index N N N LAverage response time N N N M
User satisfaction Score N N N LTQM Score Y N Y H
No. of days delayed from scheduled date Y Y Y X
No. of days delayed from scheduled dateY Y Y X
N N N H
S((A-DT)/A*Wx) A=Total Hrs available DT=Down Time WX= Weightage factor in %
Average response time = S RTx / Number of complaints RTx=Response Time
S((A-DT)/A*Wx) A=Total Hrs available/ DT=Down Time/ WX= Weightage factor in %
Average response Time =S RTx / Number of complaints RTx=Response Time
Average response Time =S RTx / Number of complaints RTx=Response Time
% completion with Weighted average of targeted features implemented.
No. of days delayed from scheduled dateN Y N H
Time Index N N N M
Time IndexN N N H
N N N H
Time Index N N N H
Time Index N N N H
Time Index N N N H
N N N L
Time IndexN N N H
Time IndexN N N L
Time Index N N N L
No. of days delayed from scheduled dateN Y N H
Time Index N N N H
Time Index N N N H
Time Index N N N LRevenue earned Y N N H
Number of products developed during specified time Y N N H
Time IndexY N N H
Time Index Y N N HValue of orders received within specified time Y N N H
No. of days delayed from scheduled dateY Y N H
Number of projects submitted by quality circles N N N M
No. of days delayed from scheduled date Y Y Y LNumber N N Y M
Time Index Y N Y X
No. of days delayed from scheduled date
N Y N H
No. of days delayed from scheduled date
N Y N H
No. of days delayed from scheduled date
N Y N H
No. of days delayed from scheduled date
N Y N H
No. of days delayed from scheduled date
N Y N H
% completion with weighted average of targeted documents
% completion with Weighted average of Targeted projects
No. of days delayed from scheduled date
N Y N H
Balanced Scorecard Rating (5/4/3/2/1) Y N N H
Time IndexY N N H
No. of days delayed from scheduled dateY Y N L
No. of days delayed from scheduled dateY Y N L
No. of days delayed from scheduled dateY Y N L
No. of days delayed from scheduled dateY Y N H
Time Index Y N N H
No. of Reports studied and shared. Y N N H% of Queries closed within specified time. Y N N HNo. of Conferences/Workshops Organized. Y N N L
No. of days delayed from scheduled date
Y Y N H
Score Y N Y MNumber of new circles Y M
INFORMATION TECHNOLOGY FUNCTION KRA MASTER - 2006-07
KRA Remarks
H H Completion certificate
H L Completion certificate H M SRS documentM H Completion certificateL H System logH H Completion certificate
H L Completion certificate H M SRS documentM H Completion certificateL H System logH H Completion certificate
H L Completion certificate H M SRS documentM H Completion certificateL H System logH H Completion certificate
H L Completion certificate H M SRS documentM H Completion certificateL H System logH H Completion certificate
H L Completion certificate H M SRS documentM H Completion certificateL H System log
H H Completion certificate
H L Completion certificate
H M SRS documentM H Completion certificateL H System log
H HH L Completion ReportH M SRS document
Suggested Weightage for category
A B C
Source of Data For Measurement
Completion report / Vetting by finance & user
M H Completion certificate
H H
M LH M Training Record
M H
H H Completion certificate
H L Conversion planH M review by AppraiserM H Test certificate
H M DocumentationH L Manuals issuedM H DocumentationL H Documentation
L L
L L
L L
L LH H Records -
H HH M Milestone dates
M H ReportH H Completion report
H H Complaint log
H H Complaint log
H L Installation certificates
M L Installation certificates
H M Indent dates
H M
H LL L Approval dates
Record / certificate by user
Record / certificate by user
Record / certificate by user
Record maintained by Audit deptt.
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Record maintained by Audit deptt.
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Completion certificate and review by Appraiser
PO dates/ Works contract date
Stock record and AMC dates
H M Indent dates
H M
H H Review of logs
H L Daily system logs
H H Call sheets
M H Call sheetsH H Reporting system
H L Reporting system
H M Reporting system
M H Reporting systemH H Records
M L Reporting system
L H Reporting systemH H Maintenance of log
L L Records
H M Records
L H RecordsM L Survey resultsM L Survey resultsH L Records H H Records H H Training RecordM L RecordsH L RecordsH H Records M M Training RecordM L RecordsH M RecordsM H Records M H Log
H LX X Quality Deptt.M X Action plan document
X M Project report
H H Audit by interunit team
PO dates/ Works contract date
User feedback after training program
M L Policy documentH L Action plan document
H H Audit by inter unit team.
L X Final policy documentL X Milestone datesL X Milestone datesL X Milestone dates
M M Completion certificates
M L Project plan document
H M Documents issuedM H Plan document
M L Plan documentM L Plan documentM L Signing of MOU / JVM H Draft documentM L EVA calculations
M M Documentation
H H Plan documentH H Product ReleaseM L Actual orders
M LM M Unit QA/QCM HM MM H Project report
H H Project report
H H Project report
H H Project report
H H Project report
H H Project report
Record maintained by Unit Head/Unit P&D
H H Project report
H X
M L Records -
M H Records -
M H Records -
M H Records -
M M Records -M M Records -
M L Records -M M Records -L L Records -
M M Records -
X X Survey ReportX X Unit QA/QC
Rating declared at year end by Corporate / Unit Management
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
CENTRAL DESPATCH CELL FUNCTION KRA MASTER - 2006-07 (previously TFX)
KRA ID Function KRA Description
CDC00100 CDC O % Reduction Y
CDC00101 CDC O Number Y
CDC00102 CDC O % Y
CDC00103 CDC O % increase Y
CDC00104 CDC O % Y
CDC00105 CDC Provide wooden tooling O
Time Index
N
CDC00106 CDC O N
CDC00107 CDC OTime Index
N
CDC00108 CDC packing within specified time O % nonconformility N
CDC00200 CDC O % Reduction Y
CDC00201 CDC O Rs in Lakhs Y
KRA Type
Unit of Measurement
Critical KRA (Y/N)
Packaging cost/ shop turnover to be kept within limits
Planning/ indenting & co-ordination for packing materials
% Reduction in the average packing box providing period
Increase in Cost saving through contract for recovery of wood/ GI sheet etc. from used boxes & packing.
Packaging materials cost as % of turnover to be kept within limits
Organise annual packing/ loading / unloading works cantract in time at competitive rates
Index (Refer remarks column)
Timely availability of packing and transport fixtures drawings
Transportation cost/ shop turnover to be kept within limits
Transportation cost to be kept within limits.
CDC00202 CDC O Y
CDC00203 CDC O Y
CDC00204 CDC O % Y
CDC00205 CDC O N
CDC00206 CDC Placement of wagon for loading O N
CDC00207 CDC O Y
CDC00208 CDC O N
CDC00209 CDC O % Y
CDC00210 CDC O Index Y
CDC00300 CDC O Y
CDC00301 CDC O % Y
CDC00302 CDC O
Time Index
Y
CDC00303 CDC O % N
Contract review of ODC & heavy consignment as per DWI
Index (Refer remarks column)
Ensure placement of vehicle of suitable capacity & proper quality
Index (Refer remarks column)
% of vehicles placed within specified time of requisition
Obtaining ODC sanction from railways in time
Index (Refer Remarks column)
Index (Refer remarks column)
Periodic review & implementation of transporter performance rating through computerization
Index (Refer remarks column)
Freight bill receipts/ Frieght confirmation letter( to pay consignments)/ verification and timely forwarding to finance dept for release of payment
Index (Refer remarks column)
% of transportation rate contracts awarded within specified time
Cost savings through competitive transportation contract rates.
Meeting despatch target of the unit
Index (Refer remarks column)
% Reduction in No. of days of dispatchable inventory
Timely dispatch of items for contract closing projects
Maximizing dispatches by railway wagon
CDC00304 CDC O Y
CDC00305 CDC O Time Index Y
CDC00306 CDC O % Y
CDC00307 CDC O Y
CDC00308 CDC O % N
CDC00309 CDC O % Y
CDC00310 CDC O N
CDC00311 CDC O % N
CDC00400 CDC C Number Y
CDC00401 CDC C % Y
CDC00402 CDC C
Time Index
N
CDC00403 CDC C % N
CDC00404 CDC O Rs in Lakhs N
Keeping the loco in running condition
Index (Refer Remarks column)
Despatch completion of 100% projects for delivery at site.
% Achievement of delivery vis-à-vis norm for delivery at site
Uptime availability of special wagons
Index (Refer Remarks column)
% Reduction in demurrages paid to railways
% Reduction in No. of complaints as per DWI
Maximum receipt of inwards goods by wagon/rail tankers
Index (Refer Remarks column)
Document preparation connected with Despatches
No. of technology initiatives undertaken to reduce cost or improve services
Development/ maintenance & use of computerized transporters performance evaluation system.
% Of IT application developed within the specified targeted time
% Of new IT systems developed put to use
Saving accrued through various improvement projects
CDC00405 CDC O N
CDC00406 CDC C Number N
CDC00407 CDC O Number N
CDC00500 CDC C N
CDC00501 CDC C man days N
CDC00600 CDC O Number Y
CDC00601 CDC O % N
CDC00602 CDC O % Y
CDC00603 CDC O % Y
CDC00604 CDC O % Y
CDC00605 CDC O Number N
CDC00606 CDC O No. of days Y
CDC00607 CDC O % Y
CDC00700 CDC O % Y
CDC00701 CDC O % Y
CDC00702 CDC O % N
CDC00703 CDC Reduction in fuel & lub oil cost O Rs in Lakhs N
Development /maintenance of home page for CDC
Index (Refer remarks column)
No. of accepted suggestions implemented
Implementation of 5S in the Deptt.
% improvement in average competency score of employee as identified n MAP
% improvement in man days of training
Training needs plan implemented
Ensure nil show cause notices from jurisdictional excise authorities
Reduction in pending disputed cases by follow up & persuasion including adjudication cases.
100% Availing of CENVAT credit on input & capital goods
% Reduction of debit of duty for sub-contracting jobs-materials outstanding for more then 180 days.
Ensure 100% liquidation of duty debits in physical exports and stock transfer with in prescribed time limits
Timely filing of periodical returns / MIRs
Excise sealing and documentation of export consignments
Finalisation of Provisional Assessments
Ensure smooth running of internal transport function
% Improvement on internal customer satisfaction
% Reduction in break down time of vehicles
CDC00704 CDC O Rs in Lakhs N
CDC00800 CDC O % Y
CDC00900 CDC O % Y
CDC01000 CDC O Y
CDC01100 CDC O Y
CDC01200 CDC O Y
CDC01300 CDC O Score Y
CDC01301 CDC O
Time Index
Y
CDC01400 CDC O N
CDC01500 CDC C TQM Score Y
CDC01501 CDC O Y
CDC01502 CDC C
Time Index
Y
CDC01600 CDC O Y
CDC01700 CDC C Number N
CDC01800 CDC CTime Index
Y
CDC01900 CDC C N
Maintenance cost reduction/ optimisation
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
No. of days delayed from scheduled date
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
No. of days delayed from scheduled date
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Number of circles in the deptt.
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
CDC02000 CDC C N
CDC02100 CDC C N
CDC02200 CDC C N
CDC02300 CDC C N
CDC02400 CDC C N
CDC02500 CDC O % of total N
CDC02501 CDC O % of total N
CDC02502 CDC Settlement of NCRs of OHSAS O % of total N
CDC02503 CDC O % of total N
CDC02600 CDC C Y
CDC02700 CDC O N
CDC02800 CDC O N
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Settlement of NCRs of ISO 9001/ OHSAS/ ISO 14000 etc.
Settlement of NCRs of ISO 9001
Settlement of NCRs of ISO 14000
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
NUMBER OF DAYS FOR SEALING OF EXPORT CONSIGNMENTS
NUMBER OF DAYS
NUMBER OF DAYS DELAY IN CONSIGNMENTS DUE TO EXCISE ISSUES
NUMBER OF DAYS
CENTRAL DESPATCH CELL FUNCTION KRA MASTER - 2006-07 (previously TFX)
N N H X X
N N X X M Departmental Records
N N X X M
N N X M X Departmental Records
N N X H X Departmental Records
N N X X M
N N X H X Departmental records
N N X X M Departmental Records
N N X X M Departmental Records
N N H X X Departmental Records
N N X H X
Special KRA (Y/N)
Universal KRA
(Y/N)
Suggested Weightage for category
A B C
Source of Data For Measurement
Departmental Revenue Expense record available on-line
Packing Demand Record
Monthly Production Programme
computed on last year record
N N X M X Despatch Programme
N N X X H Vehicle Demand
N N X X M Departmental Records
N N X X L
N N X X M Demand Register
N N X H X Review Records
N N X X M Freight Bill Register
N N H H H Departmental Plan
N N X H X Contracts Record
N N H H H Unit despatch target
N N H H H
N N X M X Annual Plan Record
N N X M X
ODC Sanction request record
Warehouse Inventory Register
Departmental Action Plan
N N X X H Failure Reports Record
N N M X X Annual Plan Record
N N H M H
N N X X M
N N X M X Departmental Data
N N X H X Complaint Register
N N H H M Departmental Plan
N N X X M Departmental records
N N M X X PIP/QIP Action plans
N N X H X Departmental Plan
N N H M H Departmental Plan
N N X M X Departmental Records
N N X X M Productivity Figures
Contract clauses and Freight Bill Register
WEX Maintenance Schedule
N N H H M Departmental Plan
N N X M X Departmental Records
N N X M X Departmental Records
N N H X X Departmental Plan
N N X M X Departmental Plan
N N H X X Departmental Records
N N H M H Departmental Records
N N X X M Departmental Records
N N X X M Departmental Records
N N X X M Departmental Records
N N X X M Departmental Records
N N X X M Departmental Records
N N X X M Departmental Records
N N M X X Departmental Records
N N X H X Survey Report
N N X X M
N N X X M Departmental Records
WEX Maintenance Records
N N X X M Departmental Records
N Y M L L
N Y M L L
Y Y M L L
Y Y M L L
Y Y H M L
N Y M X X Survey Report
N Y X M M Project report
N Y M X X Unit QA/QC
N Y H X X Quality Deptt.
Y Y X M X Action plan document
N Y X X M Project report
Y Y L M H
N Y M M M
N Y X M H Project report
Y N H H H Project report
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Y N H H H Project report
Y N H H H Project report
Y N H H H Project report
Y N H H H Project report
Y N H H H Project report
N N M X X Departmental Records
N N X M X Departmental Records
N N X M X Departmental Records
N N X M X Departmental Records
N N H H X
N N H H H ARE-1/ INVOICE
N N H H H INVOICE/OBD
Rating declared at year end by Corporate / Unit Management
CENTRAL DESPATCH CELL FUNCTION KRA MASTER - 2006-07 (previously TFX)
KRA Remarks
X=Packing Cost /Shop turn-over; Reduction in % = {(X2-X1)*100}/X1; X1 = last year ratio; X2 = current year ratioNo of emergency PIs acceptable in a year L5 L4 L3 L2 L1 0 2 3 6 12X2 - X1 X 100
X X2 average
box providing period fo current year x1=
average box provding period of last year
{(X2 - X1) * 100}/X1 X1- last year saving X2- current year saving
{(X2 - X1) * 100}/X1 X1- last year cost per Crore values of dispatches X2- current year cost per Crore values of dispatches
Ia = (Nos) Provided /Demanded Ib = (No. of days); Required/Provided L5 L4 L3 L2 L1 1.0 0.9 0. 8 0.7 0.6
Actual / Planned L5 L4 L3 L2 L1 1.04 1.05 1.06 1.07 1.08
L5 L4 L3 L2 L1 0 0.8 0.6 0.4 0.2
% of packing delayed beyond departmental specified norm L5 L4 L3 L4 L1 10 8 7 6 5X= Freight payment /Shop turn-over Reduction in % = {(X2-X1)*100} / X1 X1 = last year ratio; X2 = current year ratioTransportation cost per Rs Crore value of dispatch. Best of last year ratio and budgetted ratio to be taken as L3.
No. Reviewed /No.Planned L5 L4 L3 L2 L1 1.0 0.98 0.97 0.96 0.95 Supplies made / Supplies committed L5 L4 L3 L2 L1 1.0 0.9 0.8 0.7 0.6 {[( VD-VP)*100]/ VD}/12 VD= vehicles demanded VP= vehicles placed Monthly percentage No Obtained/ No Applied L5 L4 L3 L2 L1 1.0 0.9 0.8 0.7 0.6 No. placed/No. planned L5 L4 L3 L2 L1 1.0 0.9 0.8 0.7 0.6Index= No of reviewed / No of planned L5 L4 L3 L2 L1 1.0 0.99 0.98 0.97 0.96
Index = (Total bills processed with intime/ Total no of bills received) L5 L4 L3 L2 L1 1.0 0.99 0.98 0.97 0.96
L5 L4 L3 L2 L1 1.04 1.05 1.06 1.07 1.08
Despatch Value / Cleared despatch value L5 0.98 L4 0.96 L3 0.94 L2 0.92 L1 0.90 ? monthly index ÷ 12 To start with this should be monthly (12) to be improved to weekly (52).
Ia x Ib where Ia = No. of projects completed/No. of projects planned. And Ib = No. of days of delay/No. of total delays. {(X2-X1)*100 }/ X1 X1= MT dispatched last year X2= MT dispatched in current year. (Based on economic consideration)
No of days available/ No of days planned L5 L4 L3 L2 L1 1.0 0.98 0.97 0.96 0.95 (Considering maintenance schedule)L5 L4 L3 L2 L1 1.0 0.9 0.8 0.7 0.6
Index = {( X1 - X2) * 100} / X1 where X1- Total No. of LR/RR & X2-Total No. of LR/RR payment with penalty/demurrage L5 100 L4 98 L3 96 L2 94 L1 92No. of periodic overhaul completed / No. of periodic overhaul planned L5 L4 L3 L2 L1 1.0 0.8 0.7 0.6 0.5{(X2-X1)* 100} / X1 X1= last year payment. X2= current year payment. Index = {(X2 - X1)*100} / X1 L5 L4 L3 L2 L1 1.0 0.9 0.8 0.7 0.6Index = MT Achieved / MT Planned L5 1.0 L4 0.9 L3 0.8 L2 0.7 L1 0.6
No. of documents prepared against GRs in a day
Number; Minimum target 0.5 per executives{( X2 - X1 )* 100} / X1 X1 =No. of evaluation planned X2 - No. of evaluation done Application developed / Application development planned L5 1.0 L4 0.9 L3 0.8 L2 0.7 L1 0.6(No of put to use / Total no of development) * 100 L5 L4 L3 L2 L1 100 90 80 70 60 In Rs Lakhs; At least 1 improvement projects per executive. Timely completion in No. of months delay L5 L4 L3 L2 L1 0 1 2 3 4
Number
Nos. completed
No. of defaults
Vehicles provided/vehicles demanded
Rs. Lakhs saved
Index = No of times updated / No of time planned L5 1.0 L4 0.9 L3 0.8 L2 0.7 L1 0.6 Generally every month to be updated.
X2 - X1 X 100
X 2
L5 L4 L3 L2 L1 0 1 2 3 4
(No availed / Total No ) * 100 L5 L4 L3 L2 L1 100 99 98 97 96
(No of cases liquidated / Total no of cases) * 100 L5 L4 L3 L2 L1 100 99 98 97 96
L5 L4 L3 L2 L1 1 2 3 4 5
L5 L4 L3 L2 L1 100 90 80 70 60
{( X2 - X1) * 100}/ X1 X1 = last year % X2 - current year % (model survey format is appended){(X2 - X1 ) * 100 } / X1 X1 - Last years figure; X2 - Current Year Figure L5 L4 L3 L2 L1 2.0 1.5 1.0 0.5 0
Rs. Lakhs saved
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Questionnaire developed by CQA to be adopted .
No. of NCRs settled/Total NCRsX100
No. of NCRs settled/Total NCRsX101
No. of NCRs settled/Total NCRsX102
No. of NCRs settled/Total NCRsX103
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
f
GENERAL MANAGEMENT FUNCTION KRA MASTER - 2006-07 KRA ID Function KRA Description Unit of Measurement
GMX00100 GMX C
GMX00200 GMX O
GMX00300 GMX C
GMX00400 GMX O
GMX00500 GMX O
GMX00501 GMX C
GMX00600 GMX Effective Office Management O Appraisers feed backGMX00601 GMX Maintaining Office records O Appraisers feed backGMX00602 GMX Administrative support O Appraisers feed backGMX00603 GMX C Appraisers feed back
GMX00604 GMX O Appraisers feed back
GMX00700 GMX C No. of reports
GMX00800 GMX O Time Index
GMX00900 GMX O Appraisers feed back
GMX01000 GMX C Appraisers feed back
GMX01100 GMX O
GMX01101 GMX O
GMX01102 GMX Timely consolidation of Unit budget O
GMX01103 GMX Final presentation in MCM O
GMX01200 GMX O Time Index
KRA TYPE
Achieving the parameters as laid down in Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
Improvement in Internal Customer satisfaction score
ICPS (Internal Customer Perception Survey) Score
To carry out special assignments within specified time
No. of days delayed from scheduled date
Number of new initiatives conceptualised/ implemented within specified time
No. of days delayed from scheduled date
Improving response to customers & top management queries
ICPS (Internal Customer Perception Survey) Score
Develop system within specified time to ensure quick response to queries
No. of days delayed from scheduled date
Planning and execution of special assignments
Maximising usage of office automation
Scanning & dissemination of information related to business environment including reporting to top management
Co-ordination with various agencies to ensure on time availability of materials & inputs required
Provide support to top management on policy matters on new initiatives
Implementation of Computerised mail management system
Timely compilation of revenue budget for approval by Board
No. of days delayed from scheduled date
Timely identification of issues for Directors/Budget discussions
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Timely submission of physical/ financial turnover reports
GMX01300 GMX O Time Index
GMX01400 GMX O
GMX01401 GMX O
GMX01402 GMX O
GMX01500 GMX O
GMX01600 GMX C Time Index
GMX01601 GMX C
GMX01602 GMX Evaluation of each visit O As per formatGMX01700 GMX O
GMX01701 GMX Finalisation of schedule O
GMX01702 GMX O
GMX01703 GMX Assessment of year end turnover C %age Variance over LEGMX01800 GMX O Time Index
GMX01900 GMX C
GMX02000 GMX O
GMX02100 GMX O
GMX02101 GMX O
GMX02102 GMX O Time Index
Timely submission of Agenda papers for MCM
Finalisation of Balanced Score Card (BSC) within specified time.
No. of days delayed from scheduled date
Follow-up for timely receipt of calculations on BSC from units
No. of days delayed from scheduled date
Evaluation and submission of final calculation to top management for approval in JCM
No. of days delayed from scheduled date
Timely compilation and analysis before submission of flash results to Board
No. of days delayed from scheduled date
Physical assessment/ through visits/ of status of manufacturing for identifying constraints/ critical issues for achieving year end budget
Designing a system within specified time for assessing visit effectiveness
No. of days delayed from scheduled date
Timely organising half yearly review of operation for assessment of year end turnover
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Submission of agenda paper with issues and issue of minutes
No. of days delayed from scheduled date
Timely submission of reports to Board/ Govt.
Designing and implementation of a system for hosting MC/MIR information through web
No. of days delayed from scheduled date
FORMULATION OF ANNUAL PLAN FOR SUBMISSION TO GOVT. FOR THEIR APPROVAL WITHIN SPECIFIED SCHEDULE
No. of days delayed from scheduled date
TIMELY COMPLETION OF ANNUAL PLAN
No. of days delayed from scheduled date
EVOLVE CORPORATE GUIDE-LINES BY SCHEDULED DATE SPECIFYING THRUST AREAS FOR INVESTMENT
No. of days delayed from scheduled date
SUBMISSION OF ANNUAL PLAN BY UNITS/ ORGANISE CAPITAL BUDGET DISCUSSIONS WITH CORPORATE TEAM / PRESENTATION TO DIRECTORS AS PER PLAN.
GMX02103 GMX O
GMX02104 GMX O
GMX02105 GMX O
GMX02200 GMX O Time Index
GMX02201 GMX O Time Index
GMX02202 GMX O Time Index
GMX02203 GMX O Time Index
GMX02204 GMX O Time Index
GMX02300 GMX O Time Index
GMX02301 GMX O Time Index
GMX02302 GMX O Time Index
GMX02400 GMX O
GMX02500 GMX O Time Index
TIMELY COLLECTION OF DATA & RECOMMENDATION OF VARIOUS CORP. AGENCIES
No. of days delayed from scheduled date
ANNUAL PLAN CONSOLIDATION & SUBMISSION. APPROVAL OF CMD / BOARD WITHIN SPECIFIED TIME
No. of days delayed from scheduled date
COMMUNICATION TO UNITS WITHIN SPECIFIED TIME
No. of days delayed from scheduled date
APPRAISAL & APPROVAL OF CAPITAL INVESTMENT PROPOSALS >5 CRORES/ IDENTIFIED IN ANNUAL PLAN
INITIATION OF INTERACTION WITH UNITS IN FREEZING FACILITIES/ BROAD SPECIFICATIONS & FINALISING PROPOSALS (>5 CRORES)
APPRAISAL & OBSERVATIONS ON DRAFT PROPOSALS (>5 CRORES)
RECEIPT OF FINAL PROPOSALS (>5 CRORES) AS PER CAPITAL BUDGET MANUAL AND PROCESSING FOR APPROVAL BY CMD / BOARD
COORDINATE FOR TIMELY COMPLETION OF APPROVED CAPITAL SCHEMES / ITEMS
APPRAISAL & APPROVAL CAPITAL INVESTMENT PROPOSALS <5 CRORES/ IDENTIFIED IN ANNUAL PLAN
APPRAISAL & OBSERVATIONS ON DRAFT PROPOSALS (<5 CRORES)
RECEIPT OF FINAL PROPOSALS (<5 CRORES) AS PER CAPITAL BUDGET MANUAL AND PROCESSING FOR APPROVAL BY CMD & COMMUNICATION TO UNITS
TIMELY FINALISATION OF FACILITIES FOR FORMULATION & APPROVAL OF RECONDITIONING & RETROFITTING BUDGET OF UNITS
No. of days delayed from scheduled date
FOLLOW-UP FOR TIMELY COMPLETION OF AGREED MILESTONES FOR MOU SCHEMES
GMX02600 GMX O Time Index
GMX02700 GMX O Time Index
GMX02800 GMX C Time Index
GMX02900 GMX C Time Index
GMX03000 GMX C Time Index
GMX03100 GMX O Time Index
GMX03200 GMX O Time Index
GMX03201 GMX O Time Index
GMX03202 GMX O Time Index
GMX03203 GMX O
GMX03300 GMX O
GMX03400 GMX C Time Index
GMX03401 GMX O Time Index
GMX03402 GMX O Time Index
GMX03403 GMX O Time Index
GMX03500 GMX C
Monitoring physical / financial progress of implementation of Capital Schemes & status reporting to MCM/ Board/ Govt.
Timely compilation & analysis of Annual Flash & actual results on Capital Investment before submitting to Management / Board
Technology Scanning & dissemination. Organise / preparation of presentations.
To carry out special assignments within specified time-3rd repeat
To carry out special assignments within specified time-4th repeat
ON RECONDITIONING OF P&M; TIMELY RECEIPT OF MIR / CONSOLIDATION. PROGRESS / STATUS REPORTING TO MCM
OPTIMUM UTILISATION OF CRITICAL MACHINE TOOLS
TIMELY RECEIPT OF MIR/ CONSOLIDATION/ DOWNTIME ANALYSIS & REPORTING TO MCM
IDENTIFY MACHINES HAVING UTILISATION <50%/ REPORTING IN MCM FOR DISCUSSIONS ON INTER UNIT LOAD SHARING
UPDATION OF DIRECTORY OF CNC MACHINES IN BHEL WITHIN SPECIFIED TIME
No. of days delayed from scheduled date
TIMELY APPROVAL FOR DISPOSAL OF SURPLUS ITEMS OF P&M AFTER EXPLORING THEIR ALTERNATE USE IN BHEL / PSUs
No. of days delayed from scheduled date
IMPLEMENTATION OF OEE ON CRITICAL MACHINES
CREATING AWARENES IN UNITS THRU' WORKSHOPS
IDENTIFICATION OF MACHINES & EVOLVING METHODOLOGY FOR IMPLEMENTATION
ENSURE IMPLEMENTATION BY UNITS
ORGANISE INTER UNIT MEET ON MANUFACTURING TECHNOLOGY FOR EXPERIENCE SHARING BY SPECIFIED DATE
No. of days delayed from scheduled date
GMX03600 GMX O %
GMX03700 GMX O %
GMX03800 GMX O Time Index
GMX03900 GMX O Time Index
GMX04000 GMX O
GMX04100 GMX O Score
GMX04101 GMX O Time Index
GMX04200 GMX O Number of new circles
GMX04300 GMX C TQM Score
GMX04301 GMX O
GMX04302 GMX C Time Index
GMX04400 GMX C
GMX04500 GMX C Number
GMX04600 GMX C Time Index
GMX04700 GMX C
GMX04800 GMX C
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
GMX04900 GMX C
GMX05000 GMX C
GMX05100 GMX C
GMX05200 GMX C
GMX05300 GMX O Time Index
GMX05301 GMX O Time Index
GMX05302 GMX O Time Index
GMX05303 GMX O
GMX05400 GMX C
GMX05500 GMX C
GMX05600 GMX O
GMX05700 GMX O
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Review and Finalisation of Unit/ functional Balanced scorecards
Finalisation of Unit level Balanced scorecards in consultation with the Corporate functions and Business sectors by a specified date
Finalisation of Balanced scorecards of Corporate functions/ Unit NC's/Functions/ departments in line with Strategy map by a specified date
Finalisation of Calculation of Stretch in the Unit/ NC/ functional/ departmental Scorecards by specified date.
No. of days delayed from scheduled date
Development and implementation of R&D Management System
No. of days delayed from scheduled date
Development of system for interaction with academic and research institutions
No. of days delayed from scheduled date
Timely evaluation of excel award proposals.
No. of days delayed from scheduled date
Formulation and finalisation of MOU Criterion related to engineering and R&D
No. of days delayed from scheduled date
GMX05800 GMX O Time Index
GMX05900 GMX O
GMX06000 GMX C
GMX06100 GMX C
GMX06200 GMX O
GMX06300 GMX O
GMX06400 GMX O
GMX06401 GMX O Appraiser feedback
GMX06500 GMX C
GMX06600 GMX O %satisfaction of Appraiser
GMX06601 GMX O %satisfaction of Appraiser
GMX06700 GMX O %satisfaction of Appraiser
GMX06800 GMX O % satisfaction of appraiser
GMX06900 GMX O % satisfaction of appraiser
Appraisal and approval of R&D projects(> Rs10 lakhs) identified in various Product Committees.
Creation of database of BHEL executives visiting abroad for attending Conference/Paper Presentation/Training/Pre-despatch Inspection etc.
No. of days delayed from scheduled date
Dev. of PC based system by specified date for on-line scheduling of appointments, meetings, tours, tasks using Microsoft Outlook
No. of days delayed from scheduled date
Completion of KM roadmap for manufacturing areas by specified date
No. of days delayed from scheduled date
Improvement in functioning of product and technical committees.
%variance from calendar date planned at year beginning.
Approval of PIRs within specified time.
% of approvals obtained within specified time.
Ensuring timely disposal of legal issues, vigilance & disciplinary matters requiring CMD approval
% of cases disposed off within specified time
Analyze, discuss & prepare recommendations on legal issues
To design and implement a system to capture and retrieve information related to environmental changes impacting BHEL for quick reference by top management.
No. of days delayed from scheduled date
Preparing the background material and inputs for meetings and presentations with customers and VIPs.
Arranging and verification of data/ status/ drafts/ technical info etc. from concerned departments
Providing technical assistance to top management on Commercial and Technical matters.
Providing inputs to CMD / Directors for discussions in fora like FICCI, CII, ASSOCHAM & various Committees to present BHEL view point.
Analysis of Operations monitoring reports of various units and suggest corrective measures for timely intervention of the top management.
GMX06901 GMX O Time Index
GMX07000 GMX C %redressal
GMX07001 GMX O %resolution
GMX07002 GMX O Time Index
GMX07003 GMX Put up exception report to CMD O %resolutionGMX07100 GMX O Time Index
Analysis of DO letters, apprise exceptions
Designing a system for tracking and redressal of customer/ other complaints received at the level of CMD / Director (as applicable).
Implementation and use of the system for quick disposal of complaints.
Periodic review and follow up and putting up exception reports to meet the commitments made at CMD / Director level.
Periodic review of small units by Review Committee of Small Units (RCSU)
GENERAL MANAGEMENT FUNCTION KRA MASTER - 2006-07
Y N N H X X
N N N H X X Internal Customers
Y Y N H X X
Y Y N H X X Record
Y N N H H H Internal Customers
N Y N H H H Measured Data
N N N H H H Assesment DataN N N M M M Assesment DataN N N M M M Assesment DataN N N M M M Assesment Data
N N N M M M Assesment Data
N N N H H H Report generated
Y N N M M M Milestone Dates
N N N H M L Assesment Data
N N N H H H Assesment Data
Y Y N H H X Report
Y Y N H H X Report
N Y N H H X Report
N Y N H H X Report
N N N M M X Report
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA
(Y/N)
Suggested Weightage for category
A B C
Source of Data for Measurement
Rating declared at year end by Corporate / Unit Management
N N N H H X Report
Y Y N H H X Report
N Y N H H X Report
N Y N H H X Report
Y Y N H H X Report
Y N N H H X Milestone
Y Y N H H X Milestone
N N N H H X VisitY Y N H H X
N Y N H H X
N Y N H H X Milestone
Y N N H H X LEN N N H H X Report
Y Y N H H X Milestone
N Y N M H X Milestone Dates
Y Y N H H X Milestone Dates
N Y N H H X Milestone Dates
Y N N X H X Milestone Dates
N Y N X H X Milestone Dates
Y Y N H H X Milestone Dates
N Y N M H X
Y N N H H X Milestone Dates
N N N M H X Milestone Dates
N N N L H X Milestone Dates
Y N N H H X As per Milestone
N N N L M X Milestone Dates
N N N H H X Milestone Dates
N N N L H X Milestone Dates
Y N N H H X Milestone Dates
N Y N H H X Milestone Dates
Y N N H H X
Within 1 week of approval
AS PER MOU SCHEDULE
N N N M H X Milestone Dates
N N N M H X Milestone Dates
N N N H H X Milestone Dates
Y Y N H H X Milestone Dates
Y Y N H H X Milestone Dates
N N N M H X
N N N H H X
N N N M H X
Y N N M H X
Y Y N M H X ANNUAL
N Y N H H X
Y N N H H X 20% M/Cs.
N N N H H X Milestone Dates
N N N H H X Milestone Dates
N N N H H X Milestone Dates
Y Y N H H X Milestone Dates
1 WEEK PRIOR TO MCM
1 WEEK PRIOR TO MCM
1 WEEK PRIOR TO MCM
1 WEEK PRIOR TO MCM
ANNUAL (as per Corp. Proce-dure)
Y N Y M L L
Y N Y M L L
Y N Y M L L
Y N Y M L L
Y Y Y H M L
Y N Y M X X Survey Report
Y N Y X M M Project report
N N Y M X X Unit QA/QC
Y N Y H X X Quality Deptt.
Y Y Y X M X Action plan document
Y N Y X X M Project report
Y Y Y L M H
N N Y M M M
Y N Y X M H Project report
N Y N H H H Project report
N Y N H H H Project report
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
N Y N H H H Project report
N Y N H H H Project report
N Y N H H H Project report
N Y N H H H Project report
Y N N H M M Records
Y N N H M L Records
Y N N H M L Records
Y Y N H M L Records
Y Y N H H H Departmental records
Y Y N M M M Departmental records
N Y N M M M As per BHEL Plan
N Y N M L L CEPD records
Y N N H M L
N Y N M M L Departmental record.
N Y N L L L Department record.
N Y N M L L
N N N M M L
N N N M M L
N N N M M M Assessment data
N N N L L L Assessment data
N Y N M L L records
N N N M M L Appraisers feedback
N N N M M L Appraisers feedback
N N N H M L Appraisers feedback
N N N M M M Appraisers feedback
N N N H M L Appraiser feedback
CEPD records/identified milestones for approval process
Roadmap report of mfg units.
Records of meetings held.
Records of approval date.
N N N M M L Milestone dates
N N N H M M Records
N N N H M L Milestone dates
N N N H M L Milestone dates
N N N M M L records.N N N H H H Generations of Minutes
of Meeting.
GENERAL MANAGEMENT FUNCTION KRA MASTER - 2006-07 KRA Remarks
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Questionnaire developed by CQA to be adopted .
nil
nil
nil
nil
-
Uniform company wide guidelines will be developed which will simplify taking up joint R&D projects with academic and research institutions
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-Units to be reviewed by CMD by exception.
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Uniform company wide guidelines will be developed which will simplify taking up joint R&D projects with academic and research institutions
MEDICAL FUNCTION KRA MASTER - 2006-07
KRA ID Function ID KRA Description
MEDICAL
HSX00100 HSX C % Y
HSX00200 HSX O Y
HSX00300 HSX O Y
HSX00400 HSX Implementation of OHS activities. O
HSX00500 HSX O
KRA Type
Unit of measurement
Critical KRA (Y/N)
Percentage Improvement in Quality and accuracy of diagnosis/ treatment
Customer Satisfaction Survey(Regular & Retired and NE Patients)
Customer satisfaction score
Reduction in cost of treatment without compromising Quality. A) In house treatment B) Referral treatment CONTAINMENT in cost of treatment without compromising quality A)In house treatment B)Referral treatment.
Percentage reduction as compared to last year OR %escalation as compared to last year
No of OHS activities implemented
Implementation of Family welfare and immunization programs
Numbers of Programes OR Number of beneficiaries
HSX00600 HSX Reduction in inventory O Y
HSX00700 HSX O
HSX00800 HSX O Y
HSX00900 HSX C
HSX01000 HSX C
HSX01100 HSX C
HSX01200 HSX C
HSX01300 HSX No. of Academic activities C
ADMINISTRATIVE
HSX01400 HSX O
No of days of inventory
Increase in no of community health programs
Programme Hours (numbers of programs X number of Hrs)
Increase in Revenue generation from NE/ERNE patients
% increase over previous year
Increase in no of Preventive Health Programs & awareness programs/work shops/camps
Programme Hours (numbers of programs X number of Hrs)
Adaptation of new health care practices
Numbers of new programs introduced.
Increase in No. of Education Programs conducted for paramedical staff
Programme Hours (numbers of programs X number of Hrs)
Increase in no of Quality circles/OHSAS/ISO/5S implementation
Programme Hours (numbers of programs X number of Hrs)
No. of talks, papers presented/published no. of CME hrs. attended
Conducting annual Medical Audit as per Corporate guidelines & submission of report to CMS/CO by 28th February of the financial year .
No. of days delayed from scheduled date
HSX01500 HSX C
HSX01600 HSX C
HSX01700 HSX C Saving in Rs.
HSX01800 HSX Vision for joint ventures C
HSX01900 HSX C
HSX02000 HSX O
HSX02100 HSX O
HSX02200 HSX O Time Index
HSX02300 HSX O
HSX02400 HSX O
HSX02500 HSX C TQM Score
HSX02600 HSX C
HSX02700 HSX C Number
HSX02800 HSX C Time Index
Computerisation of basic health data of all employees in the unit by specified date.
% completion by specified date
Increase in no. of new/ special procedures/ surgeries conducted over previous year.
Number conducted
Introduction of cost effective new techniques in medical purchases
No. of joint ventures.
Implementation of new programes of Hospital Management System in Medical department
No. of new activities
Reply to Govt. Audit queries, Inspection report paras, Action Taken Reports etc. furnished within specified time (2 weeks)
% responses sent within specified time
Reply/settlement of Internal Audit paras within specified time (4 weeks)
% responses sent within specified time
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Increase in no. of active Quality Circles in the deptt.
Number of new circles
Achieving Business excellence thru' TQM at Deptt. level
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
HSX02900 HSX C
HSX03000 HSX C
HSX03100 HSX C
HSX03200 HSX C
HSX03300 HSX C
HSX03400 HSX C
PARA-MEDICAL
HSX03500 HSX O
HSX03600 HSX O
HSX03700 HSX C
HSX03800 HSX O Saving in Rs.
HSX03900 HSX Maintenance of inventory record. O
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Providing and supervising qualitative patient care in the concerned area.
Customer Satisfaction Score
Preparation of Reports/Data as per plan.
No. of Reports generated
Health care best practices implemented as per plan.
No. of innovative programmes
Reduction in cost of patient care without compromising quality.
Value of stock inventory
HSX04000 HSX O
HSX04100 HSX Safe disposal of bio-medical waste O Satisfaction score
HSX04200 HSX O
HSX04300 HSX C
HSX04400 HSX C
HSX04500 HSX C Number
HSX04600 HSX C
HSX04700 HSX O
HSX04800 HSX C
HSX04900 HSX C
HSX05000 HSX C
HSX05100 HSX O Time Index Y
HSX05200 HSX O Time Index Y
HSX05300 HSX O Y
HSX05400 HSX C Time Index Y
HSX05500 HSX C Y
Preventive community health programmes
No. of Programmes
Timely indent and distribution of material
No. of emergency indents made
Quality improvement initiative as per plan
Number of initiatives
Reduction in waiting time for investigative procedures
% reduction in time
No. of educational programmes for subordinates
No. of quality systems incorporated QC/5S/TQM / OHSAS
No. of programmes
Upkeep & maintenance of equipments
No. of days of break down
Quality & accuracy of patient care Nurses/Technicians / Physiotherapists
Satisfaction score in %
Quality & upkeep of Hospital/Dispensaries
Satisfaction score in %
Participation in implementation of Computerisation
No. of Programmes
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Implementation of Improvement projects identified in the Position Report as per schedule
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
MEDICAL FUNCTION KRA MASTER - 2006-07
MEDICAL
H H H
H H H
H H M
X X M
L M H Title of the programs
Special KRA (Y/N)
Universal KRAs (Y/N)
Suggested Weightage for category
A B C
Source of Data for Measurement
Verfication of 20 random records 50% OP& 50% IP by MS/Reviewer. Keeping in mind clinical documentation, relevant investigations & provisional diagnosis with final treatment, response to the treatment. Remarks Clinical Examination of patients. Documentation of Clinical notes, investigation. Diagnosis Provision/Final. Relevance of Treatment. Format to be formed Remarks To set base line Cleanliness 5 -S, disposal of biomedical waste. Records Remarks 1. Judicious referrals 2. Judicious prescription. 3. Reduction in frequency of follow up visits. 4. Title of the programsRemarks Organisation participation & maintenance Health Data
H H H
H M M
H H H
M H H
M H H
L M H Title of the programs
H H M Title of the programs
L M H Title of the Papers/talks/CME
ADMINISTRATIVE
Y H H M
Records Remarks 1. Reduction local purchase 2. Judicious use of Drugs & investigation 3. Minimal Title of the programs Remarks 1. E-mail Communications, publicity.
Records Remarks publicity of hospital profile Competitive tariffs Empanelments of non BHEL Title of the programs remarks Awareness programs at work place Public lectures
Title of the programs Remarks Minimal Invasive surgery
Audit to be conducted as per guidelines issued by CMS/CO. Audot report duly signed by Unit Medical Head & sent to CMS/CO.
L M H
H M L Details of the procedure
H H L
H M L
H M L
Y M L L
Y M L L
Y M L L
Y Y H M L
Y M X X Unit QA/QC
Y H X X Quality Deptt.
Y Y L M H
Y M M M Case Document
Y X M H Project report
Records Remarks auto indenting ecom/reverse action, central purchasing. QUE (Quality Uniformity Economy)
Diagnostic centres &hospital entered for joint ventures
Number of new data generated through Hospital Management System
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit Head/Unit P&D
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
PARA-MEDICAL
N X X H
N X X M
N X X L
N X X H
N X X H
Source is data of satisfactory score parameter outlined in the format.
Periodical evaluation of sectional performance
Title of the adopted best practice
Judicious use of consumables and energy.
Periodic verification of inventory records.
N X X L Title of the programmes
N X X L Format of satisfactory score
N X X H
N X X L Tile of the innovation
N X X L
N X X L Titles
N X X L Titles
N X X M
N X X L 360º Appraisal
N X X L As per satisfactory format
N X X L
Y M L L
Y X M M Project report
Y Y X M X Action plan document
Y X X M Project report
N N H H X
Verification by Appraiser for availability of items.
As per satisfactory format and 360 Appraisal.
Timely initiative measures taken for rectification
Title of programmes and implementation
Record maintained by Unit/Corp. Finance deptt.
Rating declared at year end by Corporate / Unit Management
MEDICAL FUNCTION KRA MASTER - 2006-07
KRA Remarks
MEDICAL
ADMINISTRATIVE
PARA-MEDICAL
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
MARKETING FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description Unit of Measurement
MKX00100 MKX Order Booking as per Budget % Score = Actuals/TargetMKX00101 MKX
MKX00102 MKX
MKX00103 MKX % Score = Actuals/Target
MKX00104 MKX
MKX00105 MKX
MKX00200 MKX
MKX00300 MKX Orders booked through negotiated route
MKX00301 MKX
MKX00302 MKX
Timely obtaining & preparation of three tier estimates: *
Delay in Days vs Norm (NORM FOR OBTAINING ESTIMATES IN NO. OF DAYS PRIOR TO DUE DATE - PRODUCTS = 3 DAYS; PROJECTS = 7 DAYS) Total Score = SIGMA of (Scores)/ No. of Bids
Preparation & furnishing clarifications to Customers on the proposal as per Time Specified by Customer
% of Total Clarifications Submitted in Time; Total Score = SIGMA of (Scores)/ No. of Bids
Secure business for RLA / R & M / Consultancy /other services
Timely preparation/ submission of Techno-Commercial proposals *
Avg delay in days from scheduled dates; Measurement Criteria : L5 L4 L3 L2 L1 delay days 0 1 2 3 4
Timely finalization of strategic vendors/service providers* Specified Time = 7 days before Submission date
% X1/X2 x 100 X1 = Total time taken; X2 = Specified Time
Price Recommendation Accuracy - Projects where price recommended by marketing Dept is within range {90% of L2 (for Bids won} / 110% of L1 (for Bids lost)}
As a % of qualified evaluated bids Product / Projectwise accuracy range as per Dept Plan
% Score = (Orders Booked thru Negotiation / Target)
Submission of Technical Parameters/ scope & commercial terms of offer as per Time Specified by Customer*
% X1/X2 x 100 X1 = No of offers submitted on time. X2 = Total No of Offers; Total Score = SIGMA of (Scores)/ No. of Offers
Preparation & furnishing clarifications to Customers on the proposal within Customer Specified Time*
% X1/X2 x 100 X1 = No of Clarifications submitted on time. X2 = Total No of Clarifications; Total Score = SIGMA of (Scores)/ No. of Offers
MKX00400 MKX
MKX00401 MKX
MKX00500 MKX
MKX00600 MKX
MKX00700 MKX
MKX00800 MKX
MKX00900 MKX
MKX01000 MKX Bringing the lost customer back in BHEL fold
MKX01100 MKX
Finalising / Signing of P.O / Contract document within specified time {Specified time = Within 30% of delivery /Contract Period}
%Score= X1/X2 x 100 X1 = Total time taken from LOA date. X2 = Specified Time; Total Score = SIGMA of (Scores)/ No. of Contracts
Preparation of Draft Contract / P.O within 75% of Specified Time *{Specified time = Within 30% of delivery /Contract Period}
% Score = X1/X2 x 100 X1 = Total time taken; X2 = Specified Time; Total Score = SIGMA of (Scores)/ No. of Contracts
Placement of Internal Order within 1 week of receipt of P.O / LOA/ LOI
% Score = X1/X2 x 100 X1 = Total days taken; X2 = 7 Days; Total score = Sigma of score / No of orders
Conversion of anticipated orders to firm orders as per schedule to achieve T.O budget of Unit/Regions
% Score = X1/X2 x 100 X1 = Value of Anticipated Orders converted on time; X2 = Target
Good Contracting -(No. of contracts signed with 90% payment realisation on Supply & balance 10% on completion of warrantee period and/or a LD cap on delivery @ 10% of the Contract Price)
%Score = Actuals/Target Measurement Criteria : L5 L4 L3 L2 L1 Criteria = 50% 45% 40% 30% 20% Criteria definition : 50% of all contracts signed in a year by a particular section/group with such payment terms and/or LD cap will constitute the Target
Increase in Success Rate (Success Rate=Orders Won/ Bids Submitted) *
% Measurement Criteria = 100x{(X1-X2)/X2} where X1=Current Year Success Rate X2=Average Success Rate of Last 5 Years
Increase in Bids Attempted to Total Potential (Vis-à-vis Bids Attempted/ Total Potential Last Year)
% Measurement Criteria = 100x{(X1-X2)/X2} where X1=Current Year Bids Attempted/ Total Bids Potential X2=Last Year Bids Attempted / Total Bids Potential
% X1/X2 x 100 X1 = Actual; X2 = Target
Additional business secured through strategic tie-ups
As a percent of total orders received
MKX01101 MKX
MKX01200 MKX % Score = Actuals/Target
MKX01300 MKX Entry in New Market/New Customers % Score = Actuals/TargetMKX01400 MKX
MKX01500 MKX % Score = Actuals/Target
MKX01600 MKX % Score = Actuals/Target
MKX01700 MKX Promotional activities completed % Score = Actuals/TargetMKX01800 MKX % Score = Actuals/Target
MKX01900 MKX Reduction in delivery of Overdue Spares
MKX02000 MKX % Score = Actuals/Target
MKX02001 MKX % Score = Actuals/Target
MKX02100 MKX
MKX02200 MKX
MKX02300 MKX Analysis of tender enquiries not participated.
MKX02400 MKX % Score = Actuals/Target
MKX02500 MKX
MKX02600 MKX % Score = Actuals/Target
Timely Negotiation/ Finalization of agreement with strategic partners * Specified Time = 15 days before Submission date
% X1/X2 x 100 X1 = Total time taken; X2 = Specified Time
Order booking from new products/technology/services against target
Increase in success rate of Pre-Qualification bids over previous year
% Score = X1/X2 x 100 X1 = No of prequalifications secured; X2 = Total No. of Pre Q secured in previous year
Creating Market Report -by specific date (Country reports/ Competitors profile/ Customer Profiles/ Product reports/ demand forecast e.t.c)
Highlighting of Identified Issues in Seminars/ Business Forums/ Trade Bodies / Adm. & Concerned Ministries
Contribution by Business Sector/ Groups in Product Committees & subsequent follow-up till its implementation.
% Score = X1/X2 x 100 X1 = No. of day by which reduced; X2 = Target
New Marketing / business development initiatives undertaken
Identify & introduce new Product /Service in the Market
Proactive action to get BHEL qualified prior to bidding
% Score = X1/X2 x 100 X1 = No of tenders got qualified; X2 = Total No of tenders attempted for qualification
Analysis of tenders lost & strategy building based on lessons learnt.
% reduction in tender lost over previous year
% reduction in enquiries not participated over previous year
Enhance Customer relations & secure commendations
Market share enhancement for competitive products
% Measurement Criteria = 100x{(X1-X2)/X2} X1=Current Year Success Rate; X2=Average Success Rate of Last 3 Years
Create market /increase business through Long-Term-Contracts{LTSA/ Rate contracts e.t.c}
MKX02700 MKX Timely collection of market intelligence
MKX02800 MKX Increase in bids attempted over previous year
MKX02900 MKX % Score = Actuals/Target
MKX03000 MKX As a % of Revenue Budget
MKX03001 MKX
MKX03002 MKX
MKX03100 MKX BG reduction as per target % Score = Actuals/TargetMKX03200 MKX Cash collection as per target
MKX03201 MKX
MKX03300 MKX
MKX03400 MKX
MKX03500 MKX
MKX03501 MKX
Time (Days for completion) / No. of days delayed from scheduled date
% Measurement Criteria = 100x{(X1-X2)/X2} X1=Current Year Bids Attempted; X2=Last Year Bids Attempted
Long term strategic tie-ups for JVs/Consortium/Representations/sub-contractsCash Collection from Advance / Progress payments w.r.t Budget
Submission of BGs / Required documents incl. Invoice to Customer . *
%Score = X1/X2 x 100 X1 = Total time taken; X2 = Specified Time(as per LOA / Contract)
Timely invoicing of final payments (Initial Operations/ Guarantee test )
%Score = X1/X2 x 100 X1 = Total time taken; X2 = Specified Time(as per LOA / Contract); Total score = Sigma of score / No of Orders
%Score = X1/X2 x 100 X1 = Actual Collection; X2 = Target
Facilitating Timely Reconciliation of outstandings between units and Customers*
% Score = X1/X2 x 100 X1 = No of MUs for whom settlement achieved; X2 = Total No of Units involved per contract; Total score = Sigma of score / No of Contracts
Amount realised out of verified (other than withheld) outstanding payments as at beginning of financial year.
% Score = X1/X2 x 100 X1 = Actual Collection; X2 = Target
Balance recovered from closed / commissioned projects vs targets incl withheld outstandings
% Score = X1/X2 x 100 X1 = Actual Collection; X2 = Target
Timely approval of Billing break up as per schedule / LC opening as per plan
% Score = X1/X2 x 100 X1 = Total time taken; X2 = Specified Time(as per LOA / Contract); Total score = Sigma of score / No of Orders
Review & check billing schedule w.r.t payment terms & timely submission for approval
% Score = X1/X2 x 100 X1 = Total time taken; X2 = Specified Time(as per LOA / Contract); Total score = Sigma of score / No of Orders
MKX03600 MKX
MKX03700 MKX
MKX03800 MKX
MKX03801 MKX
MKX03802 MKX
MKX03803 MKX BG discharge of what is due*
MKX03900 MKX Settlement of Govt. Audit Paras
MKX03901 MKX
MKX04000 MKX
MKX04100 MKX
MKX04200 MKX Resolution of Customer complaints
MKX04300 MKX %
MKX04400 MKX %
Obtaining documents / PAC from customer for Project Import / Duty Exemption Entitlement Certificate / Advance license as per agreed schedule with internal customer
% Score = X1/X2 x 100m X1 = Total time taken; X2 = Specified Time agreed with internal customer; Total score = Sigma of score / No of Orders
Obtain Proposals for write-off from units/ Review & Check Completeness and co-ordinate for final approval of competent authority
% Score = X1/X2 x 100 X1 = Actual amount written-off; X2 = Target
Contracts Closed within X Months reckoned from Date of Expiry of Warranty Period X = 6 months after technical closure
% Score = 100 x [Total Contracts Closed / Total Contracts targeted for Closure]
Contracts Closed beyond X Months reckoned from Date of Expiry of Warranty Period X = 6 months after technical closure
% Score = 100 x [Total Contracts Closed / Total Contracts targeted for Closure]
Obtaining No Dues Certificate from Units (after Financial Reconciliation)
% Score = X1/X2 x 100 X1 = Actual; X2 = No of Contracts for which No-Due-Cert as targeted
% X1/X2 x 100 X1 = Actual value of BG discharged; X2 = Value of BGs due for discharge
% X1/X2 x 100 X1 = Actual Nos settled; X2 = Total Nos. due for settlement
Preparation of Draft Reply in Consultation with internal Audit
% X1/X2 x 100 X1 = Actual; X2 = Total Nos. of draft reply to be prepared
Resolution of contractual issues specified within time
% Score = X1/X2 x 100 X1 = Total time taken; X2 = Time specified by external / Internal customers
Success rate in time extensions/ LD reduction etc
% Score = (Actual/Target) x 100
% Score = (No. of complaints resolved/Total No. of complaints) x 100
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
MKX04500 MKX Time Index
MKX04501 MKX Time Index
MKX04502 MKX
MKX04600 MKX Time Index
MKX04601 MKX
MKX04602 MKX
MKX04700 MKX
MKX04800 MKX Time Index
MKX04900 MKX Time Index
MKX05000 MKX
MKX05100 MKX Improvement in Employee Satisfaction Score Score
MKX05101 MKX Time Index
MKX05200 MKX
MKX05300 MKX
MKX05400 MKX % Score = Actuals/Target
MKX05401 MKX No. of Training Mandays per Year * Actual No / targetsMKX05500 MKX % Score = Actuals/Target
MKX05600 MKX Actual No / targets
Preparation & submission of Monthly MIRs / Broad Objective & Flash Result within specified time Specified Time = 3 days before Submission date
Timely preparation of Draft MIRs/ B.O/ Flash results*Specified Time = 4 days before Submission date
Providing data and inputs for AS-7 by the scheduled date.
Delay in days from the due date the information provided L5=0 L4=0.5 L3=1 L2=1.5 L1=2
Formulation of Budget parameters/ Flash Results/ MOU/ Annual & Strategic plans within Specified Time Specified Time = 3 days before Submission date
Timely preparation of Budget for Review & Presentation by scheduled date Specified Time = 3 days before Submission date
No. of days delayed from scheduled date
Inputs to Corporate Office for preparation of Strategic & Annual Plans by specified date. Specified Time = Submission date
No. of days delayed from scheduled date
Finalisation Balance Score Card by specified date
No. of days delayed from scheduled date
Timely inputs to unit/corporate finance for inter-unit re-conciliation of accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Percent increase in offers Submitted on Electronic Media ( Offers submitted on electronic media / Total No of Offers)
% Score = X1/X2 x 100 X1 = Offers submitted on electronic media; X2 = Total No. of offers
Increase in contributions from various orders booked over previous year
% Score = Current Year Avg of contribution/ Avg of last three years
Identifying & Organising Training Needs for Capability Enhancement
Providing inputs for Quality Improvement Initiatives (TQM; Certifications; Quality audits e.t.c) by due date
Providing inputs for Development of Knowledge Management system as per plan
MKX05700 MKX Development of IT Initiatives as per MOU Actual No / targets
MKX05800 MKX Number of new circles
MKX05900 MKX TQM Score
MKX05901 MKX
MKX05902 MKX Time Index
MKX06000 MKX Suggestions for improving productivity
MKX06100 MKX
MKX06200 MKX Number
MKX06300 MKX Completion of KM Projects as per schedule Time IndexMKX06400 MKX
MKX06500 MKX
MKX06600 MKX
MKX06700 MKX
MKX06800 MKX
MKX06900 MKX
Increase in no. of active Quality Circles in the deptt.
Achieving Business excellence thru' TQM at Deptt. Level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
% Score = Actual nos accepted / Target
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc. for Knowledge Management Portal
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
MKX07000 MKX Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
MARKETING FUNCTION KRA MASTER - 2006-07
Suggested Weightage
A B CO Y N N H H H BudgetO N N N M M M Commercial Register
O N N N M M M Commercial Register
O Y N N L M H Budget
O N N N X X M Departmental Plan
O N N N X L H Departmental Plan
O Y N N H M X Commercial Register
O N N N M M M
O N N N L M M Commercial register
O N N N L M M Commercial register
KRA Type
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA (Y/N)
Source of Date for Measurement
Commercial Register / Dept Plan
O Y N N M M H Commercial register
O N N N L M H Commercial register
O N N N X M H Commercial register
O N N N M M M MIR/ Revenue Budget
O N N N M M M Commercial Register
O N N N M M X Commercial Register
O Y N N M H H Commercial Register
O N N N H M M Departmental Plan
O N N N M H X As per Dept Plan
O N N N M H X As per Dept Plan
O Y N N L H H As per Dept Plan
O N N N M H M BudgetO N N N M M M As per Dept Plan
O N N N X M M As per Dept Plan
O N N N M M X As per Dept Plan
O N N N L M M As per Dept PlanO N N N M M X
O N N N M M M MIR
O N N N M H M Dept Plan
O N N N M M L As per Dept Plan
O N N N M M M Commercial Register
C N N N M M X Commercial Register
C N N N M M X Commercial Register
O N N N L H M Departmental Plan
C N N N M M M Departmental Plan
O N N N M M M Departmental Plan
Dept Plan & Product Committee Minutes
O N N N X M M Project report
O N N N M H H Commercial Register
C N N N H M L Departmental Plan
O Y N N L M M MIR/ Revenue Budget
O N N N X L M Commercial register
O N N N L L M Commercial register
O N N N M L M Dept PlansO Y N N M M L
O N N N L L M Dept Plan
O N N N L M M
O N N N M M L Budget
O N N N X L M Commercial register
O N N N X L L Commercial register
Cash Collection Budget
Dept. Cash Collection Plan
O N N N X M M Commercial register
O N N N L M L MIR/ Departmental Plan
O N N N M M X Unit Score card
O N N N M M X Unit Score card
O N N N X M M Departmental Plan
O N N N M M M
O N N N L M L
O N N N X M M
O N N N M M M Commercial Register
O N N N L H M Departmental Plan
O N N N L L M Commercial Register
O N N Y M L L
O N N Y M L L
As per Dept Plan/ Finance
Finance Records/ Departmental Plan
Finance Records/ Departmental Plan
Record maintained by Audit deptt.
Record maintained by Audit deptt.
O N N N X M X Departmental Plan
O N N N X M H Departmental Plan
C N Y N H H H Department register
O Y N N H M X Departmental Plan
O N Y N H X X Departmental Plan
O N Y N M L L Departmental Plan
O N Y N M H L Budget /MOU
O Y N Y M L L
O Y N Y M L L
O Y Y Y H M L
O Y N Y M X X Survey Report
O Y N Y X M M Project report
C N N N L M H MIR
O N N N M M M
C N N N H H H As per Dept Plan
O N N N L L L As per Dept PlanC N N N L L L CQA & DP
C N N N L L L Corporate Engg.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Revenue budget & Finance
C N N N M H H
O N N Y M X X Unit QA/QC
C Y N Y H X X Quality Deptt.
O Y Y Y X M X Action plan document
C Y N Y X X M Project report
O Y N N L M H Departmental Plan
C Y Y Y L M H
C N N Y M M M Departmental Plan
C Y N Y X M H Project reportC N Y N H H H Project report
C N Y N H H H Project report
C N Y N H H H Project report
C N Y N H H H Project report
C N Y N H H H Project report
C N Y N H H H Project report
Corporate IT/ Dept Plan
C Y N N H H X Rating declared at year end by Corporate / Unit Management
MARKETING FUNCTION KRA MASTER - 2006-07
KRA Remarks
This KRA is not apprearing for C level appraisee.
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
MANUFACTURING / PRODUCTION FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description
MFM00100 MFM Cycle time reduction for a product / assembly/Process C
MFM00101 MFM C
MFM00102 MFM C
MFM00200 MFM C
MFM00201 MFM C
MFM00300 MFM O
MFM00400 MFM Savings accured through various improvement projects O
MFM00401 MFM O
MFM00500 MFM C
MFM00501 MFM C
MFM00502 MFM C
MFM00600 MFM Increase in productivity by relevant initiatives C
MFM00700 MFM C
MFM00701 MFM C
MFM00800 MFM Development of new weld processes C
MFM00900 MFM C
KRA Type
Timely identification of number of activities having maximum contribution towards cycle time within a specified time period.
Timely Implementaion of action plan in identified activities for time reduction
Timely identification of new technology and its implementation.
Value created through new / improved technologies within a time frame.
Increase in Employee satisfaction in parameters related to production
Identification of critical areas for improvement and implementation of action plan drawn
Development of System for time reduction in issue of process sheets
Area identification and implimentation of action plan for reduction of time in issue of process sheets
Timely issue of process sheets for different products/ assemblies
Timely establishment of additional facilities/ improvement in existing facilities as per plan
Timely analysis of existing facilities against productivity/ Quality/ load projection/ establising the requirement and implementing within a specified period
No. of New Processes implemented within a specified period
MFM00901 MFM C
MFM00902 MFM C
MFM01000 MFM C
MFM01100 MFM C
MFM01101 MFM C
MFM01102 MFM C
MFM01200 MFM C
MFM01300 MFM Strengthening of Quality circle movement O
MFM01301 MFM Setting-up of quality circles and defining their role clearly O
MFM01302 MFM O
MFM01400 MFM C
MFM01401 MFM C
MFM01500 MFM C
MFM01501 MFM C
MFM01502 MFM Action Plans implemented C
MFM01600 MFM C
Timely analysis of processes in operation/ detailing the need for improvement and redesigning the process
Ensuring the availability of inputs for New process in time
Percentage Increase in implimented suggestions / employee.
Introduction of latest testing techniques and accredition / recognition wherever necessary
Timely analysis of existing techniques for their short comings / advantages and establishing the need for improvement
Time bound plan for actions required to improve upon / procurement of new items
Identification and implimentation of action plan for upgradation of CNC hardware / software for machine tool
Monthly review meetings/ monitoring progress and submission of reports
Number of fresh welders qualified for additional position and customers
Pooling up of data and firming up the requirement/execution of action plan for qualification.
Development/ Implementation and monitoring of moulding process Technology
Timely identification of various factors/ viz. Qulity/ safety/ Process time/ and drawing improvement plan
Measurement of process capability of machines and finalising the action plan for improvement
MFM01601 MFM Action Plan implemented and final report submitted C
MFM01700 MFM C
MFM01701 MFM C
MFM01702 MFM Timely Implementation of action plan and final report C
MFM01800 MFM Improvement projects implemented in a time scale C
MFM01900 MFM C
MFM02000 MFM Reduction in variety of cutting tools. C
MFM02100 MFM C
MFM02200 MFM Increase in no.of active Quality Circles in the deptt. OMFM02300 MFM C
MFM02301 MFM C
MFM02302 MFM O
MFM02400 MFM Completion of KM Projects as per schedule CMFM02401 MFM Development of Knowledge management Portal C
MFM02402 MFM C
MFM02500 MFM C
MFM02600 MFM C
Analysis of existing methodology of welding vis-a-vis quality of output and drawing an action plan for automation of welding process
Automation in welding processes by procuring new / improved technologies
Indeginisation of technology / components within a specified period
Development of systems for tracking online Shopfloor progress through L4-L5 chart
Achieving Business excellence thru' TQM at Deptt. Level
Implementation of Improvement projects identified in the Position Report as per schedule
Preparation of action plan based on Position report as per schedule
Contributing case studies etc. for Knowledge Management Portal
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
MFM02700 MFM C
MFM02800 MFM C
MFM02900 MFM C
MFM03000 MFM C
MFM03100 MFM C
MFM03200 MFM C
MFM03300 MFM C
MFM03400 MFM Shop turnover (Physical & / or Financial) O
MFM03401 MFM O
MFM03402 MFM Follow-up for the timely inputs as per plan O
MFM03403 MFM O
MFM03404 MFM O
MFM03405 MFM O
MFM03406 MFM O
MFM03500 MFM O
MFM03600 MFM Total WIP as a % of GTO less excise duty. O
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Development of system for reduction of consumption of ferro-alloys/ graphite electordes/ flour spar/ etc. to optimise the cost of production.
Development of new products namely OR 60/ V - 738/ Stallite bushes/ Strainer housings for 500 MW sets and similar items.
Development of a system for enhancing overall equipment effectiveness.
Timely preparation of Quarterly / monthly plan against L3-network.
Monitoring day-today output and course correction ensuring timely despatch.
Physical/Financial achievement vis-à-vis issued monthly plan
Timely Finalisation of plans for sub-contracting / manufacturing inside.
Preparation of machine loading plan/ follow up/ course correction and ensuring timely out.
Reduction in material consumption as a % of GTO less excise duty.
MFM03601 MFM Follow up for timely inputs and ensuring its availability. O
MFM03700 MFM Reduction in cost quality (Reject/ rework) OMFM03701 MFM O
MFM03702 MFM O
MFM03800 MFM O
MFM03900 MFM O
MFM04000 MFM O
MFM04100 MFM O
MFM04200 MFM O
MFM04201 MFM O
MFM04202 MFM O
MFM04300 MFM % Reduction in No.of Days of inventory OMFM04400 MFM O
MFM04500 MFM % adherence to production plan on a periodic basis O
MFM04600 MFM O
MFM04700 MFM % supplies completed in sequence O
MFM04701 MFM O
MFM04800 MFM Turnover from New products O
MFM04900 MFM Increase in efficiency of direct workers O
Periodic Review of Rework / Rejection reports/ identification of area of concern and action plan.
Timely implementation of action plan and course correction if required.
% of installed capacity utilised.( Work shop capacity like shop capacity / Critical installations)
Implementation of recommendations of Apex TQM Council
Reduction in customer complaints. Internal & external with respect to previous year.
% reduction in response time to resolve customer complaints.
Delivery performance (ratio of milestone deliveries on time / total deliveries due)
Time bound planning for outsourcing against shop capacity with respect to PPC plan.
Timely machine loading/ periodic review and course correction
% of Contracts for which all the items get despatched within stipulated time.
Reduction in indirect material consumption vis-à-vis shop turnover
Ensuring sequencial input of raw-materials to shop / sub-contractor's works in time
MFM04901 MFM O
MFM05000 MFM O
MFM05100 MFM Reduction in failure due to testing errors O
MFM05200 MFM O
MFM05300 MFM O
MFM05400 MFM O
MFM05500 MFM Reduction in downtime of test plant OMFM05600 MFM Timely delivery of assemblies as per schedule for testing O
MFM05601 MFM Follow up for sequencial receipt of components in time O
MFM05700 MFM Liquidation of shortages within stipulated time O
MFM05800 MFM Adherence to dockets delivery commitment O
MFM05801 MFM O
MFM05802 MFM O
MFM05900 MFM O
MFM06000 MFM Reduction in No. of audit NCRs (ISO/ HSE/ 5S) O
MFM06001 MFM Reduction in No. of audit NCRs for ISO. O
MFM06002 MFM Reduction in No. of audit NCRs for HSE. O
MFM06003 MFM Reduction in No. of audit NCRs for 5 S. O
MFM06100 MFM Reduction in average handing over time O
Identification of the cause responsible for low efficiency and implementation of action plan
testing targets achieved vis-à-vis plan and time schedule
Reduction in customer complaints w.r.t. Testing aspects
Average reduction in testing cycle time of all machines planned for the year.
Value achieved through disposal of obsolete / surplus equipment
Follow-up with concerned agencies for receipt of documents (e.g. part list from engg.) in time as per schedule.
generation of required documents and handing over in time..
Time reduction in generation of indents for subcontracting as stipulated.
MFM06200 MFM Reduction in NCRs O
MFM06201 MFM O
MFM06202 MFM Implementation of corrective action in time. O
MFM06300 MFM O
MFM06301 MFM O
MFM06302 MFM O
MFM06303 MFM O
MFM06400 MFM Turnover from spares and service O
MFM06401 MFM O
MFM06402 MFM O
MFM06500 MFM O
MFM06600 MFM O
MFM06700 MFM Availability of calibrated measuring instruments on time O
MFM06800 MFM Number of testing problems solved successfully in time. O
MFM06900 MFM Indigenization of input raw materials as per plan OMFM07000 MFM Reduction in consumption of energy and fuel OMFM07001 MFM O
MFM07100 MFM Preventive maintenance as per schedule OMFM07200 MFM O
MFM07201 MFM O
Timely Collection of past data for similar NCRs and indepth analysis for root cause
Implementation of HSE through monitoring of OCP's identification and completion of OHSEMPs.
Identification of training needs/ maintaining health records/ communication of learning points out of accidents..
Ensuring regular usage of PPE's/ providing/ maintaining and trainning on usage of first-aid boxes/ firefighting equipment etc.
Achieving the targets set for identified key parameters of HSE.
Timely preparation of machine loading schedule and identifying sub-contract need
Follow-up for timely induction of raw-material/Documents/ manufacturing the items as per plan/review and course correcion.
Reduction in slow moving/ non-moving inventory over previous year
Increase in machine tool utilization through better planning
Planned identification of potential sources of wastages of energy and fuel/ solutions and its implementation to reduce wastages.
Implementation of Tool Calibration instrumentsManagement system
Ensuring availability of calibrated instruments and cutting tools in ready to use condition
MFM07202 MFM Ensuring economic usage of consumable toolings. O
MFM07300 MFM Reduction of defects in welding jobs undertaken O
MFM07400 MFM Yield achieved vis-à-vis target yield O
MFM07500 MFM O
MFM07600 MFM O
MFM07700 MFM Increase in post kiln operation recovery OMFM07800 MFM O
MFM07801 MFM O
MFM07900 MFM Number of reconditioning / retro fitting as per plan O
MFM08000 MFM Number of Multiskilled work centers developed. OMFM08100 MFM Disposal of surplus / condemned facilities O
MFM08101 MFM O
MFM08102 MFM Timely implementation of action plan for disposal O
MFM08200 MFM Increase in online mfg. process availability. O
MFM08300 MFM Increase in salvage of tooling / jigs / fixture etc. O
MFM08400 MFM O
MFM08500 MFM O
MFM08501 MFM Adherance to delivery schedule to interanl customer O
Implementation of Training programs for skilled technician
Timely available of welding accessories in good condition
Increase in timely supply of material to shop vis-à-vis Prodn. Schedule
Follow-up with concerned agencies for timely (as per L3-network) release of W.O./ Engg/ Doc./ Purchase indent etc./ and raising of exception reports for course corection.
Timely identification of surplus / condemned facilities and preparation of action plan
Jobs which clear customer inspection in first check
Timely preparation of schedules for delivery / services to internal customer
MFM08600 MFM Quality of planning and review of e-MAP of assesees OMFM08700 MFM Preparation of Direct & Indirect material budget O
MFM08800 MFM Issue and monitoring of periodic production plan OMFM08900 MFM Intershop material movement O
MFM09000 MFM Waste segregation and disposal O
MFM09100 MFM Vendor development for shop technological items O
MFM09200 MFM Availability of ready to use special toolings in store OMFM09300 MFM Root cause analysis for all reported non-conformity O
MFM09400 MFM Conversion of material Requisition plan to indent OMFM09500 MFM Ensuring proper storage / issue of shelf life items. O
MFM09600 MFM O
MFM09700 MFM Timely issue of subcontract scope O
MFM09800 MFM Preparation of Technological work instructions O
MFM09900 MFM Reduction in cycle Time for designing jigs & fixtures O
MFM10000 MFM O
MFM10100 MFM Updation of personnel for special process O
MFM10200 MFM Increase in Number of Heat Treatement cycles O
MFM10300 MFM O
MFM10400 MFM O
MFM10500 MFM O
MFM10600 MFM O
MFM10700 MFM Finalisation of Functional scorecard by specified date O
MFM10800 MFM Improvement in Employee Satisfaction Score O
Monitoring and reporting of KAMP (Key Activity measurement parameters) like No of Stock out items
Reduction in time taken for process planning and time estimation for Repair jobs / Design change advice / change proposals
Reply to Govt. Audit queries/Inspection report paras/Action Taken Reports etc. Furnished within specified time (2 weeks)
Reply / settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliation of accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
MFM10900 MFM O
MFM11000 MFM O
MFM11100 MFM C
MFM11200 MFM O
MFM11300 MFM C
MFM11400 MFM C
MFM11500 MFM O
MFM11600 MFM O
MFM11700 MFM C
MFM11800 MFM Development of Forgings through ESR Route CMFM11900 MFM O
MFM12000 GMX O
MFM12100 GMX O
MFM12200 GMX O
MFM12300 GMX Increase in no. of active Quality Circles in the deptt. O
Close monitoring of preproduction activities w.r.t L2 network to avoid delay in initiat stage of production.
Pre planning for availability of commercial work order/ engineering/ Technological documentation to relevent groups.
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Percentage Increase in production of liquid metal through secondary refining route(VAD).
Modify / Retrofit the existing item/ equipment for improved usage.
Establish new test facilities to enhance System testing capabilities.
Enhancing the process quality levels for MAX control modules.
Conductin audit for ISO-9000, ISO-14000, ISO-18000 & SA-8000 as internal auditor
Technical support for Fabriction and machining to development projects/ commercial projects.
Adherence to safety regulations in shop floor / use of safety devices, equipments etc.
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
MANUFACTURING / PRODUCTION FUNCTION KRA MASTER - 2006-07
Unit of Measurement
% reduction N N N M H H
% Delay N N N L M M
% Delay N N N M H H
Number Y N N H M L
MV N N N X H X
% Increase in Score Y N N L L L
N N N L X X
Number N N N L M H
Number N N N L L L
Number N N N L L L
Time Index N N N L M H
N N N M M M
Time Index N N N M M M
% Delay N N N M M M
Number Y N N M X X
Number N N N M X X
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA (Y/N)
Suggested Weightage for category
A B C
% Achievement of target
Composite index in productivity saving
% Delay N N N X H X
Availability Index N N N X X M
% N N N L L L
Number Y N N H M M
Time Index N N N X M M
% N N N X X M
Number N N N X M X
Implementation Index N N N X L M
Number alive N N N X L X
Time Index N N N X X L
Number N N N X M M
Number N N N X X M
Number Y N N M M M
Number N N N X L L
Time Index N N N X X L
Number Y N N X H H
Time Index N N N X M M
Number N N N L L L
Number N N N X L L
Time Index N N N X X M
Time Index N N N M M L
Time Index N N N M H L
Variety Index N N N L L H
Y N N M M M
Number N N N M X XTQM Score N N Y M X X
Time Index N N Y X M M
N Y Y X L M
Date / Time Index N N Y X M HN Y Y L M H
Number N N Y M M M
N Y N H H H
N Y N H H H
To be mutually decided by appraiser and appraisee.
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
N Y N H H H
N Y N H H H
N Y N H H H
N Y N H H H
Number N N N M L L
Time Index N N N H M M
N N N M H H
Y N N M H H
Time Index N N N X X H
Index N N N X H X
% N N N X X H
% N N N M M M
Time Index N N N X M X
Index N N N X X M
Index Y N N H X L
Index Y N N M X X
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Average % of OEE of selected machines
Money value/ Numbers/ Tonne.
Index N N N X X M
Ratio Y N N M X XDelay N N N X M X
Delay N N N X X M
% Y N N H H H
N N N L M M
Y N N M M M
% Reduction Y N N L L L
Time Index Y N N M X X
Index N N N X M X
Index N N N X X M
% Reduction Y N N M L L% Y N N M L L
Time Index Y N N H H H
% Y N N M M L
% Y N N H X X
Time Index N N N X H X
Rupees Y N N M L L
% Y N N M X X
% Implementation of recommendations
Percentage of complaints reduced.
Number N N N X H X
% Y N N M M M
% N N N L L M
% N N N M L L
% Y N N M M M
Money value N N N L L L
% N N N M L LTime Index Y N N M X X
availability index N N N X M X
Number N N N L L L
Time Index N N N M X X
Time Index N N N X M X
Time Index N N N L X X
Time Index N N N L X X
% N N N H M M
% N N N H M M
% N N N H M M
% N N N H M M
N Y N L L LNo. of days delayed from scheduled date
% N N N M X X
Time Index N N N X M X
Time Index N N N X X M
Nos. completed N N N H X X
N N N X X H
No.of defaulters N N N X H X
Targets N N N X X H
Money Value Numbers Y N N H M X
% Delay N N N X H H
Time Index N N N X M H
% Y N N M L L
% N N N M M M
Time Index N N N L L L
Time Index N N N L L L
MV N N N M M L% reduction Y N N H M MIn KWH / liters N N N X X M
Number Y N N L M MTime Index N N N H X X
No of defaults N N N X M X
No.of activities implemented
N N N X X M
% N N N L M M
% N N N H H H
Number N N N L L L
Time Index N N N L L L
% N N N L M MTime Index N N N H H H
Time Index N N N X X H
Time Index N N N L L L
Number N N N L L LNumber N N N L X X
% N N N M M X
% N N N L M L
% N N N L L L
Number N N N L L L
N N N H M M
% N N N X M X
% N N N X X H
% reduction in consumption over last year
Cleared in first attempt / Jobs offered
Time Index N N N M M M% N N N L H H
Time Index N N N H H H% N N N L M L
% N N N L M M
Number N N N L M L
Complaints N N N X L L% N N N L M L
Ratio N N N L L LNumber N N N X L L
% Delay N N N H M L
Time Index N N N L L M
Ratio N N N L L L
Index N N N L L M
% reduction N N N L L L
Number N N N L M L
% Increase N N N L M M
% N N Y M L L
% N N Y M L L
Time Index N N Y M L L
Time Index N N Y M L L
N Y Y M M L
Score N N Y M X X
No. of days delayed from scheduled date
Time Index N N N M M M
Time Index N N N M M M
Y N N H H X
Metric Tons N N N M M M
No. of items N N N H H H
N N N H H H
Six sigma scale N N N H H H
No of day N N N H H H
N N N H H H
Time Index N N N H H HNo. of NCRs N N N M M M
% Y N Y M L L
% Y N Y M L L
Time Index Y N Y M L L
Number of new circles N Y M X X
Balanced Scorecard Rating (5/4/3/2/1)
No. of facility established
Number of components.
MANUFACTURING / PRODUCTION FUNCTION KRA MASTER - 2006-07
Source of Data For Measurement KRA Remarks
(Present score - Previous score) / previous score
Actual Savings / Projected savings
L5 L4 L3 L2 L1
Reduction in % = 1 Tc = Time mentioned in contract / L2 chart ; Ta = Actual Time L5 L4 L3 L2 L1
((d/N)* 100) Delay = 1 n = No. of activities delayed ; d = Delay in no. of days N = Total no. of days agreed at the beginning of the year L5 L4 L3 L2 L1
Delay = 1 n = No. of activities delayed ; d = Delay in no. of days N = Total no. of days agreed at the beginning of the year L5 L4 L3 L2 L1
x = No. of new technologies planned to be implemented in the year L5 L4 L3 L2 L1
x = Planned value of savings in Rs. at the begining of the year L5 L4 L3 L2 L1
x = No. of actions plans planned to be implemented in the year L5 L4 L3 L2 L1
x = No. of systems planned to be developed in the year L5 L4 L3 L2 L1
x = No. of actions plans planned to be implemented in the year L5 L4 L3 L2 L1
Delay ; D = Ia * Ib q Ia = No. of delayed processes issued / Total no. of planned processes to issue Ib = Cummulative no. of days of delay / Cummulative total time planned in days L5 L4 L3 L2 L1
CP ; Ip = 1 S = Saving in each project ; N = No. of projects L5 L4 L3 L2 L1
Delay ; D = Ia * Ib q Ia = No. of facilities delayed / Total no. of facilities proposed at the begining of the year Ib = Cummulative no. of days of delay / Cummulative total time planned in days L5 L4 L3 L2 L1
x = No. of welding processes planned to be developed in the year L5 L4 L3 L2 L1
x = No. of productive processes planned to be implemented in the year L5 L4 L3 L2 L1
L5 L4 L3 L2 L1
Ia = 1 - 1 X2 = No. of items planned for the year X1 = No. of items actually made available L5 L4 L3 L2 L1
% = 1 X2 = No. of actually implemented suggestions per employee for current year X1 = No. of actually implemented suggestions per employee for preceeding year L5 L4 L3 L2 L1
x = No. of latest techniques / accredition planned to be implemented in the year L5 L4 L3 L2 L1
Delay ; D = Ia * Ib q Ia = No. of techniques identified / Total no. of techniques planned for the year Ib = Cummulative no. of days of delay / Cummulative total time planned in days L5 L4 L3 L2 L1
%=1-(X2-X1)/X2 X2= No of items planned for the year, X1= No of Items actually procured L5L4L3L2L1
x = No. of upgradations planned and implemented in the year L5 L4 L3 L2 L1
Index ; I = P1 / 1 P2 P2 = No. of Improvement Projects planned to be implemented for the year P1 = No. of Improvement Projects actually implemented L5 L4 L3 L2 L1
Target ( X ) to be decided between Appraisee and Appraiser q L5 L4 L3 L2 L1 X 0.8X 0.7X 0.6X 0.5X
Delay ; D = Ia * Ib Ia = No. of progress reports submitted / Total no. of planned submission of progress reports Ib = Cummulative no. of days of delay / Cummulative total time planned in days L5 L4 L3 L2 L1
Target ( X ) to be decided between Appraisee and Appraiser q L5 L4 L3 L2 L1
x = No. of actions planned to be implemented in the year L5 L4 L3 L2 L1
x = No. of new / improved moulding processes planned to be implemented in the year L5 L4 L3 L2 L1
x = No. of factors planned to be identified in the year L5 L4 L3 L2 L1
Delay ; D = Ia * Ib q Ia = No. of action plans implemented / Total no. of planned action plans to be implemented Ib = Cummulative no. of days of delay / Cummulative total time planned in days L5 L4 L3 L2 L1
x = No. of action plans planned to be identified in the year L5 L4 L3 L2 L1
To be mutually decided by appraiser and appraisee.
Unit QA/QCQuality Deptt.
Project report
Project report
Project report
Project report
Project report
Delay ; D = Ia * Ib , Ia = No. of action plans implemented / Total no. of action plans planned to be implemented Ib = Cummulative no. of days of delay / Cummulative total time planned in days L5 L4 L3 L2 L1
x = No. of equipments / processes planned to be identified in the year w L5 L4 L3 L2 L1
x = No. of equipments / processes planned to be procured in the year w L5 L4 L3 L2 L1
Delay ; D = Ia * Ib Ia = No. of action plans implemented / Total no. of planned action plans to be implemented Ib = Cummulative no. of days of delay / Cummulative total time planned in days L5 L4 L3 L2 L1
Delay ; D = Ia * Ib Ia = No. of Improvement Projects implemented / Total no. of planned Improvement Projects to be implemented Ib = Cummulative no. of days of delay / Cummulative total time planned in days L5 L4 L3 L2 L1
Delay ; D = Ia * Ib Ia = No. of technologies or components indeginised / Total no. of technologies or components planned to be indeginised Ib = Cummulative no. of days of delay / Cummulative total time planned in days L5 L4 L3 L2 L1
Ia = X1 / X2, X2 = No. of cutting tools planned for the variety reduction in the year X1 = No. of variety reductions actually achieved L5 L4 L3 L2 L1
Project report
Project report
Project report
Project report
L5 L4 L3 L2 L1 5 4 3 2 1
WIP as % of GTO L5 L4 L3 L2 L1
Time index = Ia * Ib Ia = No. of products delayed / Total no. of products planned Ib = Cummulative no. of days of delay / total time planned in days L5 L4 L3 L2 L1 0 0.05 0.1 0.15 0.2
Average Percentage of OEE L5 L4 L3 L2 L1 90% 85% 80% 75% 70%
Turnover against target set in score card L5 L4 L3 L2 L1
Index = Ia x Ib Number of plans provided in time Ia = Total Number of plans to be made Cummulative number of days of delays Ib = Cummulative total time planned in days L5 L4 L3 L2 L1
Number of inputs in time = -------------------------------- Total inputs planned L5 L4 L3 L2 L1 ? (Output achieved ) = ------------------------------------------------------------- x 100 Total output planned L5 L4 L3 L2 L1
% of total packages achieved / financial achievement L5 L4 L3 L2 L1 95 90 85 80 75
Plan issued by PPC
Delay = Ia x Ib Ia = No.of plans delayed / Total No.of plans Ib = Cummulative No.of days of delay / Comulative total time planned in days L5 L4 L3 L2 L1
? (output of each facility ) = ----------------------------------------------- Total output planned. L5 L4 L3 L2 L1
Reduction in material consumption in Rs. = ----------------------------------------------------- x 100 Gross Turnover L5 L4 L3 L2 L1
1-(x1/x2)
L5 L4 L3 L2 L1
% achieved L5 L4 L3 L2 L1
L5 L4 L3 L2 L1
X = Target set for the unit L5 L4 L3 L2 L1 L5 L4 L3 L2 L1
L5 L4 L3 L2 L1
No.of inputs in time = --------------------------------- Total inputs planned L5 L4 L3 L2 L1
? (d1 + d2 + d3 + . . . . . . . . ) di = No.of days by which action plan delayed beyond 30 days of occurence of RJ/RW L5 L4 L3 L2 L1
? (d1 + d2 + d + . . . . . . . . . ) di = No.of days by which implementation delayed beyond 60 days of occurence of RJ/RW L5 L4 L3 L2 L1
Number of complaints replied to within 6 days x = ----------------------------------------------------------- x 100 Total number of complaints L5 L4 L3 L2 L1
Dealy D = Ia x Ib Ia = Number of deliveries delayed / Total Deliveries Ib = Cummulative Number of days of delay / cummulative Total time planned in days L5 L4 L3 L2 L1
Ia = x2 - x1 x 100 x2 X2 = No.of Items planned for outsourcing x1 = Number of items moved in time L5 L4 L3 L2 L1
? (Output of each facility in std.hrs.) = ----------------------------------------------- Total output planned in std. hrs. L5 L4 L3 L2 L1
Delay = Ia x Ib Number of items delayed (against Production Plan) Ia = Total items planned Cummulative number of days delayed Ib = Cummulative total time planned in days L5 L4 L3 L2 L1
Total Number of Supplies - Number of supplies sequencially x = -----------------------------------------------------------------------x 100 Total number of projects L5 L4 L3 L2 L1
D = Ia x Ib Number of inputs supplied sequencially as per plan Ia = Total number of inputs planned Cummulative number of days of delay Ib = Cummulative Total time planned. L5 L4 L3 L2 L1
x = Turnover planned from new products in Rs. L5 L4 L3 L2 L1
The increase in efficiency of work centre over previous year L5 L4 L3 L2 L1
Testing targets achieved / Testing targets planned
Reduction over previous year L5 L4 L3 L2 L1
Reduction over previous year L5 L4 L3 L2 L1
Delay in days. L5 L4 L3 L2 L1
x = Number of action plans implemented within stipulated time L5 L4 3 L2 L1
Reduction in failures over prev. year L5 L4 L3 L2 L1
Reduction in complaints over prev. year L5 L4 L3 L2 L1
x =Planned value of savings at the begining of the year L5 L4 L3 L2 L1
D = Ia x Ib Ia = Number of assemblies delayed / Total assemblies Ib = Cummulative Number of days of delay / cummulative Total time planned in days L5 L4 L3 L2 L1
x1 - ----------- x2 x2 = Number of items planned x1 = Number of items actually made available L5 L4 L3 L4 L1
No of projects for which Items not despatched for each product in time L5 L4 L3 L2 L1
Delay D = Ia x Ib Numbers of delayed dockets issued Ia = Total Number of planned dockets to issue Cummulative number of days of delay Ib = Cummulative total time planned in days L5 L4 L3 L2 L1 0 0.05 0.1 0.15 0.2
Delay D = Ia x Ib Numbers of delayed documents received Ia = Total Number of planned documents to receive Cummulative number of days of delay Ib = Cummulative total time planned in days L5 L4 L3 L2 L1
D=Ia x Ib. Ia = No. of documents dispatched / total No. of documents planned. Ib = cum. No. of days of delay / cum. Total time planned in days.
D=Ia x Ib. Ia = No. of indents delayed / total No. of indents planned. Ib = cum. No. of days of delay / cum. Total time planned in days.
X = (X1 -X2)/X1 x 100 X1= NCR raised for previous audit . X2 = NCR raised for the dept. this year.
X = (X1-X2)/X1 x 100 X1= NCR raised for previous audit . X2 = NCR raised for the dept. this year.
X = (X1-X2)/X1 x 100 X1= NCR raised for previous audit . X2 = NCR raised for the dept. this year.
X = (X1-X2)/X1 x 100 X1= NCR raised for previous audit . X2 = NCR raised for the dept. this year.
x = No. of EMPs planned for completion in this year.
Turnover against target set on score card
(Delay / No of days planned) * 100
x = Planned value of Indigenisation.x = Planned value.Savings over previous years
X = No of machines planned to be completed
X = No of defaults
X=((Last year's NCR - Present NCR's) / Last Year's NCRs. X 100)
x = Ia / Ib. Ia = No. of days delayed for collection and analysis. Ib = Total No. of days planned for collection and analysis.
D=Ia x Ib. Ia = No. of corrective actions done / Total No. of corrective actions planned for this year. Ib = cum. No. of days of delay / cum. Total time planned in days.
x = No. of (Training needs + health records planned for maintaining + communication of learning points out of accidents)
x = ensuring No. of defaulters to wear PPEs by providing training and also usage of first aid boxes and fire fighting equipments.
x = No. of key parameters planned for achieving the set target.
Delay; D = Ia * Ib Ia = No. of components delayed/Total No. of components planned. Ib = Cum. No. of days of delay/Cum. Total days planned.
% reduction = Ip-Ic / Ip x 100. Ip = Non-moving Inventory Previous year; Ic = Current year Non-moving inventory.
% increase = Cy - Ly (In percentage) Cy = Current year percentage; Ly = Last year percentage.
Delay; D = Ia * Ib; Ia = No. of Instruments delayed in calibration / Total No. of instruments planned for calibration . Ib = Cum. No. of days delay / Cum. Total time planned in days.
Delay; D = Ia * Ib; Ia = No. of testing delayed / Total No. of testing planned . Ib = Cum. No. of days delay / Cum. Total time planned in days.
Time Index = Ia x Ib Ia = No of requirements not met / Total no of reqts planned Ib = Cum. no days of delay / cum.total time planned in days
% recovery
No.of multi skilled work centers L5 L4 L3 L2 L1
X = Value of Savings identified L5 = 'X' / L4 = 0.95'X' / L3 = 0.90'X' / L2 = 0.85 'X'/ L1 = 0.80'X'
% reduction = [% defect of last year -% defect of this year / % defect of last year ] L5 = 2%/ L4 = 1.5%/ L3 = 1.0% L2 = 0.5%/ L1 = 0.25%
% Yield achieved=100 -[Matl consumed - (Finished product wt + Process allowance) / Matl consumed] L5 = 90%/ L4 = 88%/ L3 = 85%/ L2 = 82%/ L1 = 80%
No.of Trg.programes = SUM of[Trg. program conducted X No of skilled Technician attended X duration in days / Total no. of technicians avl in dept./section ] L5 = 4.5 Mandays / Emp./ L4 = 4.0/ L3 = 3.5/ L2 = 3.0/ L1 = 2.5
Time index= Ia X Ib Ia = No of accessories in bad condition/Total no of accessories required. Ib = Cum. No days of Delay / Cum. Total time planned in days L5= 0.05/ L4 = 0.10/ L3 = 0.15/ L2 = 0.20/ L1 = 0.25
Matl. reqd. month 'A' =(Planned month - Product cycletime in months) L5 = 8 weeks ahead of 'A'/ L4 = 6 weeks ahead of 'A'/ L3 = 4 weeks ahead of 'A'/ L2 = 2 weeks ahead of 'A'/ L1 = 1 week ahead of'A'
Matl. reqd. month 'A' =(Planned month - Product cycletime) L5 = 8 weeks ahead of 'A'/ L4 = 6 weeks ahead of 'A'/ L3 = 4 weeks ahead of 'A'/ L2 = 2 weeks ahead of 'A'/ L1 = 1 week ahead of 'A'
Time Index = Ia X Ib Ia = (No of m/c not Reconditioned/Retrofitted / No of m/cs planned ) Ib = Cum no days of delay / cum total time planned in days
No.of surplus / condemned facilities disposed L5 L4 L3 L2 L1
Delay in days Delay = ------------------ x 100 Planned days L5 L4 L3 L2 L1
Delay in days Delay = ------------------- x 100 Planned days L5 L4 L3 L2 L1
Availability of process on line for manufacturing L5 L4 L3 L2 L1
Number of tools / jigs / fixtures salvaged L5 L4 L3 L2 L1
X=(Total jobs offered - No. of jobs reworked / No. of jobs rejected) / Total jobs offered.
Delay in days Dealy = ------------------ x 100 Planned days L5 L4 L3 L2 L1
On time delivery of items to interanl customer L5 L4 L3 L2 L1
L5 L4 L3 L2 L1
L5 L4 L3 L2 L1
Number of complaints in a month L5 L4 L3 L2 L1
Number of Indents/ No of requisitions
Record maintained by Audit deptt.
Record maintained by individual / deptt.
Record maintained by Unit/corp. Finance deptt.
Record maintained by Unit Head / Unit P&D
Survey Report
Delay in days Delay = ------------------ x 100 Planned days L5 L4 L3 L2 L1
( (Actual time in hrs.- Planned hours) / Planned hours ) * 100
Waste Disposal in Kgs. Disposal % = ---------------------------------------- x 100 Waste Generated in Kgs. L5 L4 L3 L2 L1
Number of vendors developed L5 L4 L3 L2 L1 5 4 3 2 1
No.of processes modified ' -------------------------------------- x 100 Number of non-conforming process L5 L4 L3 L2 L1
Number of items for which shelf life expired L5 L4 L3 L2 L1
Delay in days Delay = ------------------ x 100 Planned days L5 L4 L3 L2 L1
Delay = Ia x Ib Number of scopes delayed Ia = Total Number of scopes Cummulative number of days of delay Ib = Cummulative total time planned in days L5 L4 L3 L2 L1
(Number of work instruction issued) / (Number of work instructions planned) L5 L4 L3 L2 L1 1.0 0.9 0.8 0.7 0.6
Planned Time - Actual Time = ---------------------------------------- x 100 Planned Time (All Times in days) L5 L4 L3 L2 L1 10% 8% 6% 4% 2% Fraction to be converted to whole Number
( (Planned days - Actual Days ) / planned days) * 100
Reduction in NCR's on special processes L5 L4 L3 L2 L1
( ( Actual cycles - Planned cycles) / Planned cycles) * 100
Targets to sets as follows; 100% case L5; 95-99% cases - L4;8. 94% cases. L3; 75-84% cases - L2; <75% cases-L1
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
-
Report nil
Documents. nil
ICT report Measured for Max control modules.
Schedule Issued by MR Complte the audit as per schedule.
Supported to number of components. A:X, B:X, C:M
Delay in development The forgings developed through ESR route have not been included in KRA master list. Development of Forgings thorugh ESR route are included in Forge Shop Balance Score Card.
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Unit QA/QC
Time Index = Ia x Ib Ia = Number of activities delayed / Total no activity planned. Ib = Cummulative no of days delayed/ total no of days.
Time Index = Ia x Ib Ia = Number of documents delayed / Total no of documents required Ib = Cummulative no of days delayed/ total no of days.
Rating declared at year end by Corporate / Unit Management
Percentage Increase of VAD liquid metal produced from 2004-05.
No. of NCRs in Safety audit L5 L4 L3 L2 L1 0 1 2 3 4
Audit report of audit conducted by head of shop every six
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
The forgings developed through ESR route have not been included in KRA master list. Development of Forgings thorugh ESR route are included in Forge Shop Balance Score Card.
The forgings developed through ESR route have not been included in KRA master list. Development of Forgings thorugh ESR route are included in Forge Shop Balance Score Card.
COMMERCIAL FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description Unit of Measurement
CMX00100CMX O
AS A % OF BUDGET
CMX00101
CMX
L2 - SUCCESS RATE OF OFFERS
O
CMX00102
CMX O
Time Index
CMX00200CMX O
CMX00201
CMX O
Time Index
CMX00202
CMX O
Time Index
CMX00300
CMX O
CMX00400
CMX O
CMX00500CMX O
Time Index
CMX00501
CMX O
Time Index
KRA Type
ORDER BOOKING FOR MAIN EQUIPMENT
VALUE OF OFFERS CONVERTED INTO ORDERS/TOTAL VALUE OF OFFERS SUBMITTED
L3 - TIMELY PREPARATION OF ESTIMATES & SUBMISSION OF COMPLETE OFFER
ORDER BOOKING THROUGH NEGOTIATED ROUTE
AS A % OF TOTAL ORDER BOOKED
L2 - FINALISATION OF TECHNICAL PARAMETERS/SCOPE AND COMMERCIAL CONDITIONS AS PER PLAN
L3 -TIMELY PREPARATION AND FURNISH CLARI-FICATIONS SOUGHT BY CUSTOMERS ON THE PROPOSAL SUBMITTED.
TENDERS PARTICIPATED WHERE PRICE ASSESSMENT BY COMMERCIAL IS WITHIN RANGE OF +/- 5% FOR STANDARD PRODUCTS OF QUALIFIED EVALUATED L1 OR L2 BIDDER .
AS A % OF QUALIFIED EVALUATED BIDS
TENDERS PARTICIPATED WHERE PRICE ASSESSMENT BY COMMERCIAL IS WITHIN RANGE OF + OR - 7% FOR HYDRO PROJECTS OF QUALIFIED EVALUATED L1 OR L2 BIDDER.
AS A % OF QUALIFIED EVALUATED BIDS
FINALISATION / SIGNING OF PO/ CONTRACT WITHIN SPECIFIED TIME
L2 -REVIEW & FINALISATION OF CONTRACT TERMS WITH CUSTOMER WITHIN 30% OF SPECIFIED TIME
CMX00502
CMX O
Time Index
CMX00600CMX O
CMX00601
CMX O
Time Index
CMX00700CMX O
CMX00800CMX O
AS A % OF BUDGET
CMX00801
CMX O
CMX00802
CMX O
Time Index
CMX00900CMX O
Time Index
CMX01000
CMX O
Time Index
CMX01001CMX O
Time Index
CMX01100CMX O
Time Index
CMX01200
CMX O
Time Index
CMX01201
CMX O
Time Index
CMX01300
CMX O
Time Index
L3 - PREPARATION OF DRAFT CONTRACT WITHIN 50% OF SPECIFIED TIME
ANTICIPATED ORDER CONVERTED INTO FIRM ORDERS WITHIN TIME FRAME
AS A % OF TOTAL ANTICIPATED ORDERS
L2 - PREPARE AND FURNISH CLARIFICATIONS SOUGHT BY CUSTOMERS ON THE PROPOSAL SUBMITTED.
SUCCESS RATE OF PREQUALIFICATION BIDS PREPARED AND SUBMITTED
% OF TOTAL PQ BIDS SUBMITTED
ORDER BOOKING FOR SPARES/ R&M/ O&M SERVICES.
L2 - ENHANCE SUCCESS RATE OF OFFERS
VALUE OF OFFERS CONVERTED INTO ORDERS/TOTAL VALUE OF OFFERS SUBMITTED
L3 - TIMELY PREPARATION OF ESTIMATES/ TECHNO-COMMERCIAL BID
ISSUE OF WORK ORDERS/Contract memo as per schedule
Arrange AMA approvals within specified schedulefor aniticipated orders to initiate Advance action of Long lead materials for meeting tight delivery schedules.
Preparation of AMA proposals within specified schedules
Timely preparation and dissemination of CIS
APPROVAL OF L1/L2 NETWORKS WITHIN SPECIFIED TIME IN THE CONTRACT
L3 - PREPARE/CONSOLIDATE & SUBMIT L1/L2 NETWORKS WITHIN 75% OF SPECIFIED TIME.
DRAWINGS APPROVAL WITHIN SCHDULED TIME
CMX01400
CMX O
Time Index
CMX01500
CMX O
Time Index
CMX01501
CMX O
Time Index
CMX01502
CMX O
Time Index
CMX01600
CMX O
Time Index
CMX01601
CMX O
Time Index
CMX01700
CMX O
CMX01800
CMX O
Time Index
CMX01900CMX O
AS A % OF BUDGET
CMX01901
CMX O
Time Index
CMX01902
CMX O
Time Index
CMX02000
CMX O
Time Index
CMX02100CMX O
VENDORS/QAP / TEST SCHEDULE APPROVAL WITHIN SCHEDULED TIME AS APPLICABLE
TIMELY APPROVAL OF BILLING BREAK UP AS PER SCHEDULE
L2 -REVIEW AND CHECK BILLING SCHEDULE COMPLIANCE WITH TERMS OF PAYMENT/SUBMIT & OBTAIN APPROVAL TIMELY
L3 - PREPARE BILLING SCHEDULE WITHIN 75% OF SCHEDULED TIME IN LINE WITH CONTRACT TERMS.
OBTAINING DOCUMENTS FROM CUSTOMER FOR PROJECT IMPORT/DUTY EXEMPTION ENTITLEMENT CERTIFICATE.(AS PER AGREED SCHEDULE WITH INTERNAL CUST.)
L3 -PREPARE AND SUBMIT DRAFT DOCUMENTS TO CUSTOMER FOR OBTAINING DEEC / PI DOCUMENTS WITHIN 75% OF SPECIFIED TIME
OBTAINING DOCUMENTS FROM CUSTOMERS FOR AVAILING EXPORT INCENTIVE WITHIN 6 MONTHS FROM RECEIPT OF PAYMENT
AS A % OF COLLECTION OF ALL DOCUMENTS DUE
SUBMISSION OF ALL FINAL DOCUMENTS INCLUDING AS BUILT DRGS./ O & M/ MANUALS ETC.WITHIN CONTRACT PERIOD/ AS PER CONTRACT SCHEDULE
TO ACHIEVE GROSS BILLING WITH RESPECT TO BUDGET TARGET
L2 -ARRANGE CUSTOMERS CLEARANCE FOR DESPATCH ( WITHIN 1 MONTH OF HANDING OVER/ CONTRACT SCHEDULE WHICHEVER IS LATER)
L3 -ARRANGE BILLING AND SUBMIT BILLS TO CUSTOMER WITHIN 7 DAYS OF BILLABLE
SUBMISSION OF FINAL SUPPLY/SERVICES BILLS WITHIN 30 DAYS OF COMPLETION OF ACTIVITIES.
CASH COLLECTION FROM ADVANCE/ PROGRESS. PAYMENT W.R.T. BUDGET
AS A % OF REVENUE BUDGET
CMX02101
CMX O
Time Index
CMX02200CMX O
CMX02201
CMX O
Time Index
CMX02202
CMX O
Time Index
CMX02300CMX O
CMX02301
CMX O
Time Index
CMX02302
CMX O
Time Index
CMX02400
CMX O
Time Index
CMX02500CMX O
CMX02501
CMX O
Time Index
CMX02502
CMX O
Time Index
CMX02600CMX O
CMX02601
CMX O
CMX02602CMX O
CMX02700CMX O
L3 -TIMELY ARRANGE BG's/REQUIRED DOCUMENTS INCLUDING INVOICE AND SUBMIT TO CUSTOMERS WITHIN 1 WEEK OF DUE DATE .
CASH COLLECTION FROM CURRENT YEAR'S BILLING.W.R.T BUDGET
AS A % OF REVENUE BUDGET
L-2 TIMELY VERIFICATION OF INVOICES FOR REALISATION OF PAYMENTS (WITHIN 45 DAYS OF RECEIPT OF BILL)
L3 - TIMELY FORWARDING OF INVOICE'S ALONG WITH REQUIRED DOCUMENTS (WITHIN 7 DAYS OF BILLABLE)
CASH COLLECTION FROM YEAR END COLLECTABLE OUTSTANDING
AS % OFYEAR END OUTSTANDINGS
L2 - IDENTIFY REASONS FOR NON PAYMENT/ CLEAR BOTTLENECKSOF UNVERIFIED BILLS LATEST BY END OF 1ST QUARTER.
L3 - ARRANGE VERIFICATION OF UNVERIFIED INVOICE'S LATEST BY END OF 2 ND QUARTER.
BILLING OF DEFERRED DEBTS WITHIN 30 DAYS OF BECOMING DUE AS PER CONTRACT
REALISATION OF MORE THAN 1 YEAR OLD DUES
AS A % OF 1 YEAR OLD DUES
L2 - IDENTIFY REASONS FOR NON PAYMENT/ CLEAR BOTTLENECKS OF UNVERIFIED BILLS LATEST BY END OF 1ST QUARTER.
L3 - ARRANGE VERIFICATION OF UNVERIFIED INVOICE'S LATEST BY END OF 2 ND QUARTER.
INITIATION OF PROPOSALS FOR WRITE OFF
AS A % OF TOTAL VALUE DUE FOR WRITE OFF
L-2 REVIEW AND CHECK COMPLETENESS OF PROPOSAL & FINALISE AND CO-ORDINATE WITH CONCERNED AGENCIES FOR FINAL APPROVAL.
AS A % OF TOTAL VALUE DUE FOR WRITE OFF
L3 - PREPARE DRAFT PROPOSALS WITH ALL REQUIRED SUPPORTING DOCUMENTS AS PER SCHEDULE.
AS A % OF TOTAL VALUE DUE FOR WRITE OFF
REALIZATION OF WITHHELD DUES/LIQUIDATION
AS A % OF TOTAL WITH HELD DUES
CMX02701
CMX O
CMX02702CMX O
CMX02800CMX
RETRIEVAL OF BANK GUARANTEESO
CMX02900
CMX O
CMX02901CMX O
CMX03000CMX O
CMX03100CMX O
CMX03200CMX
COLLECTION OF C/D/E1 FORMSO
AS A % OF TOTAL DUE
CMX03300
CMX O
Time Index
CMX03301
CMX O
Time Index
CMX03400CMX O
Time Index
CMX03500CMX O
Time Index
CMX03600 CMX Timely raising PVC & ERV claims O Time IndexCMX03601
CMX OTime Index
CMX03700 CMX Additional claim for extra work O Rs. CroresCMX03701
CMX OTime frame
CMX03800 CMX Turn over against set completion O % of budgetCMX03900 CMX Turnover for SAS work O Rs Crs.CMX04000
CMX ONo. of days
CMX04100
CMX O
Rs. Crs.
L2 - IDENTIFY PENDING ISSUES AND REACH SETTLEMENT WITH CUSTOMERS FOR GETTING PAYMENTS.
AS A % OF TOTAL WITH HELD DUES
L3 - FULFILMENT OF SETTLEMENTS REACHED AND FOLLOW UP FOR REALISATION OF PAYMENTS.
AS A % OF TOTAL WITH HELD DUES
AS A % OF TOTAL VALUE OF BG's DUE FOR RETRIEVAL
NUMBER OF PROVISIONAL INSURANCE CLIAMS CONVERTED INTO FINAL CLAIMS DURING THE YEAR
AS A % OF TOTAL NO. OF PROVISIONAL CLAIMS LODGED
L3 - ARRANGING DOCUMENTS FOR LODGING FINAL CLAIMS
AS A % OF TOTAL NO. OF PROVISIONAL CLAIMS LODGED
% OF CLAIMS SETTLED OUT OF TOTAL CLAIMS DUE
AS A % OF TOTAL CLAIMS DUE
COLLECTION OF TDS CERTIFICATES FROM CUSTOMERS W.R.T.DUE
AS A % OF TOTAL TDS DUE
FINALISATION OF PROJECT INSURANCE AS PER SCHEDULE
L3 - PREPARATION OF INSURANCE TENDER IN LINE WITH CONTRACT REQUIREMENTS 30 DAYS PRIOR TO FINALISATION OF PROJECT INSURANCE TENDER
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Preparation of monthly cash collection/ verification/ & old & w/h plan and reconciliation plan
VERIFICATION OF PVC BILLS WITHIN SPECIFIED PERIOD
Preparation & submission of claims for extra work
Time taken for cash collection of current year billing
Linking of Payments with in 30 days after receiving payment receipts from customer end to ensure proper accounting.
CMX04200
CMX O
Time Index
CMX04201
CMX O
Time Index
CMX04300
CMX O
Time Index
CMX04301
CMX O
Time Index
CMX04400
CMX O
Time Index
CMX04401
CMX O
Time Index
CMX04402
CMX O
Time Index
CMX04500CMX O
Time Index
CMX04600CMX O
CMX04700CMX O
CMX04701CMX O
Time Index
CMX04800CMX O
CMX04900
CMX O
CMX04901CMX
L2 -CLOSURE OF PUNCH POINTS O
TIMELY REVIEW & SUBMISSION OF MONTHLY PROGRESS REPORTS TO BOTH INTERNAL & EXTERNAL CUSTOMERS( BY 1ST WEEK OF EVERY MONTH)
L3 -PREPARE PROGRESS REPORTS AS PER SCHEDULE.(3 DAYS BEFORE SUBMISIION)
PREPARATION OF MIR AS PER SCHEDULE INCLUDING BROAD OBJECTIVE & FLASH RESULTS.
L3 - TIMELY PREPARATION OF DRAFT MIR's
FORMULATION OF STRATEGY FOR FIXING BUDGET PARAMETERS & PRESENTATION TO MANAGEMENT
L2 - TIMELY PREPARATION OF BUDGET FOR REVIEW & PRESENTATION
L3 - TIMELY COLLECTION/COMPILATION AND PROVIDING DATA FOR PREPARATION OF BUDGET.
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
No. of units commissioned as per Balanced Score Card
No. of units commissioned/No. of units planned
To identify and monitor requirement of inputs for all the commissioning projects
Timely preparation & monitoring Department Balanced Score Cards
No. of days delayed from scheduled date
" CONTRACTS CLOSED WITHIN ""X"" MONTHS RECKONED FROM EXPIRY OF WARANTEE PERIOD( 'X"" MEANS 6 MONTHS AFTER TECHNICAL CLOSURE)"
AS A % OF TOTAL CONTRACT DUE FOR CLOSURE
AS A % OF TOTAL PUNCH POINTS DUE FOR CLOSURE
CMX04902
CMX O
CMX05000
CMX O
CMX05001CMX
L2 -CLOSURE OF PUNCH POINTS O
CMX05002
CMX O
CMX05100CMX O
% OF MDRs/SARs/CARs
CMX05200CMX O
CMX05300CMX O
CMX05301CMX O
CMX05400CMX O
Rs lakhs
CMX05401CMX O
Time frame
CMX05500CMX O
No. of projects
CMX05501CMX O
CMX05600CMX O
Time Index
CMX05700CMX O
%
CMX05800CMX O
%
CMX05900CMX O
CMX06000CMX O
CMX06001CMX O
CMX06100CMX O
L-3 PHYSICAL & FINANCIAL RECONCILLIATION/ OF CONTRACTS AND ARRANGE RAISE BILLS AND VERIFICATION WHERE REQUIRED.
AS A % OF TOTAL CONTRACT DUE FOR CLOSURE
"CONTRACTS CLOSED BEYOND ""X"" MONTHS RECKONED FROM EXPIRY OF WARANTEE PERIOD('X"" MEANS 6 MONTHS AFTER TECHNICAL CLOSURE)"
AS A % OF TOTAL CONTRACT DUE FOR CLOSURE
AS A % OF TOTAL PUNCH POINTS DUE FOR CLOSURE
L-3 PHYSICAL & FINANCIAL RECONCILLIATION/ OF CONTRACTS AND ARRANGE RAISE BILLS AND VERIFICATION WHERE REQUIRED.
AS A % OF TOTAL CONTRACT DUE FOR CLOSURE
LIQUIDATION OF ALL SHORTAGES / DAMAGES FOR ERECTION & COMMISSIONING OF EQUIPMENT
SUCCESS RATE OF DELIVERY EXTN. OBTAINED FROM CUSTOMER.
AS A % OF VALUE OF CASES SUBMITTED
Meeting emergency/Forced Shut Down requirements of customers.
% request met w.r.t total No. request received
Identify & monitor emrgency requirements of customers
% emergency requirements met
War on wastage by salvaging Site return material.
Identify & monitor high value site returnable materials
Supply completions of projects as per target
Prepare & monitor critical supplies required for completion of projects
% critical supplies ensured for project completion
Replacement action for rejection/shortage/wrong supply within specified time
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Review/ Updating of documents for ISO audits
No. of days delayed from scheduled date
UPDATION OF SPARES CATALOGUE BY END OF FIRST QUARTER
No. of days delayed from scheduled date
L3 - PREPARATION OF SPARES CATALOGUE WHERE NOT AVAILABLE BY END OF FIRST QUARTER
No. of days delayed from scheduled date
Preparation and updation of Product brochures
No. of days delayed from scheduled date
CMX06200CMX O
CMX06201CMX
L2 - TO RESOLVE TECHNICAL ISSUESO
CMX06202CMX O
CMX06300CMX O
CMX06301
CMX O
Time Index
CMX06400CMX O
Score
CMX06401CMX O
Time Index
CMX06500CMX O
Time frame
CMX06600 CMX Customer/New entrants training O No of TrainingsCMX06700 CMX Arranging RLA/NFT Studies & Testing. O No. of projectsCMX06701
CMX O
CMX06800CMX O
% of Total FGI
CMX06900 CMX liquidation of overdue spares O % of overdue sparesCMX06901
CMX O
CMX07000CMX O
% of total value
CMX07001CMX O
CMX07100CMX O
Time Index
CMX07200CMX
Percentage of installed capacity utilisation.O
% of utilization
CMX07300CMX C
CMX07301
CMX C
CMX07302CMX C
RESOLUTION OF CUSTOMER COMPLAINTS AS PER SYSTEM
No of complaints Resolved/(Total No of complaints)
AS A % OF TOTAL NO. OF TECHNICAL ISSUES
L3 - TO RESOLVE MATERIAL SUPPLYISSUES
AS A % OF TOTAL NO. OF MATERIAL SUPPLY ISSUES
IMPROVEMENT IN CUSTOMER SATISFACTION INDEX ON PRE-IDENTIFIED COMMERCIAL ISSUES
AS A %IMPROVEMENT IN CSI
L2- IMPLEMENT ACTION PLAN FOR IMPROVEMENT BASED ON CUSTOMER SURVEY REPORT WITH IN 3 MONTHS OF GETTING SURVEY REPORT
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Managing & maintaining Knowledge Management Portal
Preparation of RLA/NFT study reports by specified date
No. of days delayed from scheduled date
liquidation of finished goods inventory (FGI)
Preparation of list for critical overdue spares by specified date
No. of days delayed from scheduled date
liquidation of non-moving/slow moving/site returned modules/ materials
Preparation of high value list of non-moving/slow moving/ site returned modules/ materials by specified date
No. of days delayed from scheduled date
Vendor approval from Customers as per schedule
CREATING DATA BASE OF CRITICAL INFORMATION OF COMPETITORS WITHIN SPECIFIED TIME
% COMPLETION OF DATA
L1 - CREATE FORMAT & DEVELOP SYSTEM FOR COLLECTION & UPDATION OF INFORMATION WITHIN 3 MONTHS
No. of days delayed from scheduled date
L2 - COLLECTION OF INFORMATION OF COMPETITORS WITHIN SPECIFIED TIME
% COMPLETION OF DATA
CMX07303CMX C
CMX07400
CMX C
NO OF MODELS
CMX07401CMX C
NO OF MODELS
CMX07500CMX C
CMX07600CMX C
CMX07700
CMX C
CMX07800CMX C
% COMPLETED
CMX07900CMX C
% COMPLETED
CMX08000
CMX O
CMX08100CMX
NEW CUSTOMERS ADDED O
Number
CMX08200CMX C
CMX08300CMX C
% OF TENDERS LOST
CMX08400CMX C
CMX08500CMX C
CMX08600CMX C
% COMPLETION
CMX08700
CMX C
CMX08800CMX C
L-3 HALF YEARLY UPDATION OF INFORMATION WITHIN SPECIFIED TIME
% UPDATION OF DATA
TO DEVELOP MODEL FOR ASSESSING PREVALANT MARKET PRICE LEVEL(PRODUCT WISE/PROJECT WISE)
L2-GENERATE AND UPDATE DATA BASE FOR ABOVE MODEL
OBTAINING ORDERS FROM NEW TECHNOLOGY/PRODUCTS/SERVICES
AS A % OF TOTAL ORDER BOOK BUDGET
ADDITIONAL BUSINESS SECURED THROUGH STRATEGIC TIE UP (MOU)
AS A % OF TOTAL ORDER RECEIVED
PROACTIVE ACTION TO GET BHEL QUALIFIED PRIOR TO BIDDING
RATIO OF NO OF TENDERS GOT QUALIFIED TO NO OF TENDERS ATTEMPTED FOR QUALIFICATION
COMPLETION OF IDENTIFIED IMPROVEMENT PROJECTS
TIMELY COMPLETION OF IDENTIFIED IT INITIATIVE PROJECTS
% INCREASE IN RETENTION OF CUSTOMERS OVER PREVIOUS YEAR
RATIO OF NO OF CUSTOMERS RETAINED TO NO OF CUSTOMERS RETAINED IN PREVIOUS YEAR
DEVELOPMENT OF SYSTEM BY SPECIFIED DATEFOR ONLINE OFFER SUBMISSION
No. of days delayed from scheduled date
DETAILED ANALYSIS OF TENDERS LOST & LEARNINGS
ANALYSIS OF TENDER ENQUIRIES NOT PARTICIPATED
% OF TOTAL ENQUIRIES NOT PARTICIPATED
DEVELOP SYSTEM FOR CAPTURING TOTAL ACTUAL PROJECT COST IN SPECIFIED TIME
No. of days delayed from scheduled date
SYSTEM FOR ACHIEVING PAPERLESS COMMERCIAL OFFICE
% INCREASE IN MARKET PENETRATION OVER PREVIOUS YEAR
RATIO OF TOTAL ENQUIRIES ATTEMPTED TO TOTAL ENQUIRIES AVAILABLE
ANALYSIS OF INSURANCE CLAIMS DISSALLOWED
%AGE OF TOTAL INSURANCE CLAIMS DISALLOWED
CMX08900CMX O
Number oof new circles
CMX09000CMX C
TQM Score
CMX09001CMX C
CMX09002CMX C
Time Index
CMX09100CMX C
CMX09200CMX C
Number
CMX09300CMX
Completion of KM Projects as per scheduleC
Time Index
CMX09400
CMX C
CMX09500
CMX C
CMX09600
CMX C
CMX09700
CMX C
CMX09800
CMX C
CMX09900
CMX C
CMX10000CMX C
Time frame
CMX10100CMX C
Time frame
Increase in no. of active Quality Circles in the deptt.
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Development/ Maintainance and Updation of ERP Systems
Creation & Updation of database for PGMA based monitoring for billing/ cash collection.
CMX10200
CMX C
Time Index
CMX10300CMX C
Time Index
CMX10400CMX C
CMX10500CMX C
CMX10600CMX C
CMX10700CMX C
Nos. trained
CMX10800CMX C
CMX10900CMX C
CMX11000CMX C
CMX11100CMX C
CMX11200CMX C
CMX11300CMX C
CMX11400CMX C
CMX11500
CMX C
CMX11600CMX O
CMX11700CMX O
CMX11800CMX C
time frame
CMX11900
CMX C
Creating database for customer's complaints regarding critical quality aspects-- recording the cause/ remedial action taken and generating monthly report.
Analysis of critical points/issue pertaining to important /major contracts including quality issues within specified time
Study/ analysis and preparation of plan for growth of Business for various products by specified date
No. of days delayed from scheduled date
Generate database for clearing PVC & ERV claims by specified date
No. of days delayed from scheduled date
Create database of PREVIOUS YEARS prices of OF SPARES bu specified date
No. of days delayed from scheduled date
Provide training/ guidance and help to Contract Managers in Primavera.
To prepare a model & create data for benchmarking by specified date
No. of days delayed from scheduled date
Development of Online Customer Complaint System by specified date
No. of days delayed from scheduled date
Develop system for ONLINE RECEIPT OF DAY BOOK NO. DETAIL FROM SITE TO RAISE MRC INVOICES by specified date
No. of days delayed from scheduled date
Development of system for Contract Closing of short cycle delivery products/ spares/ services by specified date
No. of days delayed from scheduled date
Development of ONLINE billing sytem for BOIs by specified date
No. of days delayed from scheduled date
To develop a user friendly computerised system to monitor erectability for ongoing projects by specified date
No. of days delayed from scheduled date
Conversion of legacy system applications to current technology within specified time.
No. of days delayed from scheduled date
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
Implementation of box-wise on-line despatch system by specified date.
No. of days delayed from scheduled date
Implementation of on-line debtors management system by specified date
No. of days delayed from scheduled date
analysis of MDRs and giving proposals for remedial action
"Capability to quote competitively for EPC contracts-Development of Data bank for market price level
Number of Offers made to Sectors for STG based EPC'S.
CMX12000
CMX C
CMX12100
CMX C
Time Index
Roll out of implementation Plan based on Pilots of cost effectiveness Initiatives- PSM for PED & GT
Entering into MOU with Vendors as per schedule
To evolve strategic approach for EPC business together with IS and corporate P&D
COMMERCIAL FUNCTION KRA MASTER - 2006-07
Y N N H X X
Y N N H H X
RECORDS
Y N N X X H
RECORDS
N N N H X X
N N N X H X
RECORDS
N N N X X M
RECORDS
N N N H H X
AS PER RECORDS
N N N H H X
AS PER RECORDS
N N N H H HCONTRACT/PO
N N N X M X
RECORDS
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA
(Y/N)
Suggested Weightage for category A B C
Source of Data for Measurement
REVENUE BUDGET/MIR
ORDER BOOK/ INTERNAL ORDERS
N N N X X H
RECORDS
N N N H X XBUDGET& MIR
N N N X M X
RECORDS
N N N X M MAS PER RECORDS
Y N N H X X
Y N N X M X
RECORDS
Y N N X X M
RECORDS
Y N N X H HContract/PO
N N N H H M
Records
N N N X H HRecords
N N N X M MContract
N N N X M X
CONTRACT/ PO
N N N X X H
RECORDS
N N N H H H
ORDER BOOK / INTERNAL ORDERS
DRG. SUBMISSION SCHEDULE
N N N X X L
QAP / TEST
N N N X M X
N N N X L X
RECORDS
N N N X X M
RECORDS
N N N X M X
CONTRACTS
N N N X X M
RECORDS
N N N X M H
AS PER RECORDS
N N N X X M
AS PER ORDER
Y N N M X X
Y N N X M X
RECORDS
Y N N X X M
RECORDS
N N N X M M
CONTRACT
N N N X M X
CONTRACTS/RECORDS
REVENUE BUDGET/MIR
REVENUE BUDGET/MIR
N N N X X M
Y N N M X X
Y N N X M X
RECORDS
Y N N X X M
RECORDS
Y N N H X XMIR
Y N N X H X
RECORDS
Y N N X X H
MIR
N N N X M M
CONTRACT
Y N N H X XMIR
Y N N X H X
RECORDS
Y N N X X H
MIR
N N N M X XMIR/RECORDS
N N N X M X
MIR/RECORDS
N N N X X MMIR/RECORDS
N N N M X XMIR/RECORDS
CONTRACT/RECORDS
REVENUE BUDGET/MIR
N N N X M X
MIR/RECORDS
N N N X X MMIR/RECORDS
N N N X X HRECORDS
N N N X H X
AS NPER RECORDS
N N N X X HAS NPER RECORDS
N N N X H X
N N N X X M
N N N X X M
N N N X H X
CONTRACT
N N N X X H
RECORDS
Y N Y M L L
N N N M M MRecords
N N N X H H Contract
N N N X H HContract
N N N M H H Contract
N N N X M MContract
N N N M M H RecordsN N N H H H MIR
N N N M H HRecords
N N N X M H
Records
AS PER SITE RECORDS
AS PER FIN.RECORDS
AS PER FIN. RECORDS
Record maintained by individual/ deptt.
N N N X M X
RECORDS
N N N X X M
Y N N X H X
RECORDS
Y N N X X H
RECORDS
N N N H X X
RECORDS
N N N X H X
RECORDS
N N N X X H
RECORDS
Y N Y M L L
Y Y Y H M L
Y N N H H MUnit scorecard
N N N X H HRecords
Y Y N H M MUnit scorecard
N N N H X X
UNIT SCORE CARD
N N N X H X
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
LIST OF PUNCH POINTS
N N N X X H
LIST OF CONTRACTS
Y N N H X X
UNIT SCORE CARD
Y N N X H X
Y N N X X H
LIST OF CONTRACTS
N N N X M HAS PER RECORDS
N N N M M MAS PER RECORDS
N N N H H MRecords
N N N X H HRecords
N N N H H HRecords
N N N X M MRecords
N N N H H HRecords
N N N X M MRecords
N N N M H HRecords
Y N Y M L L
Y N Y M L L
N Y N H H HAs per Finance records
N Y N X M XAS PER RECORDS
N Y N X X HAS PER RECORDS
N Y N M H HRecords
LIST OF PUNCH POINTS
Record maintained by Audit deptt.
Record maintained by Audit deptt.
N N N H X XRECORDS
N N N X H XRECORDS
N N N X X HRECORDS
N N N H X X
N N N X H X
RECORD
Y N Y M X XSurvey Report
Y N Y X M MProject report
N N N X L M
N N N X M M Contract/RecordsN N N H H M Records
N Y N X M MRecords
N N N M H HRecords
N N N M H M Records
N Y N X X MRecords
N N N M H MRecords
N Y N X X MRecords
N N N M H HVendor list
N N N H H MRecords
N N N H X XRECORDS
N Y N M X X
RECORDS
N N N X H XRECORDS
CUSTOMER SATISFACTION SURVEY
N N N X X HRECORDS
N N N H X X
RECORDS
N N N X H XRECORDS
N N N H H HRECORDS
N N N H M XRECORDS
N N N H H H
TENDER ENQUIRIES
N N N M M H
N N N M M HDEPT. SCORE CARD
N N N H H M
RECORDS
N N N H H MRECORDS
N Y N M H HRECORDS
N N N H H XRECORDS
N N N H H XRECORDS
N Y N H H XRECORDS
N N N H H XRECORDS
N N N H H H
RECORDS
N N N H H XRECORDS
PRODUCTIVITY IMPROVEMENT PLAN
N N Y M X XUnit QA/QC
Y N Y H X XQuality Deptt.
Y Y Y X M XAction plan document
Y N Y X X MProject report
Y Y Y L M H
N N Y M M M
Y N Y X M HProject report
N Y N H H H
Project report
N Y N H H H
Project report
N Y N H H H
Project report
N Y N H H H
Project report
N Y N H H H
Project report
N Y N H H H
Project report
N N N H H HRecords
N N N H H HRecords
N N N H H H
Records
N N N H H HRecords
N Y N H H HRecords
N Y N H H HRecords
N Y N H H HRecords
N N N H H HRecords
N Y N H H HRecords
N Y N H H HRecords
N Y N H H HRecords
N Y N H H HRecords
N Y N H H HRecords
N Y N H H HRecords
N Y N H H HRecords
Y N N H H X
N Y N L M HRecords
N Y N L M HRecords
N N N H H Hreview
N N N H H H
Rating declared at year end by Corporate / Unit Management
Based on Enquiry receipt
N N N H H H
N N N H H H
The PSM initiative aims at reducing the Cycle time for procurement and the gains of Purchasing.
Recommendation for EPC group
COMMERCIAL FUNCTION KRA MASTER - 2006-07
KRA Remarks
Prepare system to finalise schedule for Product & Project.Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
Plan to meet schedule required by customer. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
Plan to meet schedule required by customer. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
Proposed uniform measurement over scale of 5: >80%--5/ 70-80%--4/ 60-70%--3/50-60%--2/ 40-50%--1. Comparison with L2 bidder if order won and L1 bidder if order lost
Proposed uniform measurement over scale of 5: >80%--5/ 70-80%--4/ 60-70%--3/50-60%--2/ 40-50%--1. Comparison with L2 bidder if order won and L1 bidder if order lost
Events are i) Finalisation of technical portion ii) Finalisation of commercial portion. Define time for each event. Specified time - within 15% of delivery period. Where Ia= No.of No of events is i) Finalisation of technical portion ii) Finalisation of commercial portion. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is i) Finalisation of technical portion ii) Finalisation of commercial portion. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is i) Technical clarification ii) Commercial clarification. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
Prepare system to finalise schedule for Product & Project.Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is i) L1 network ii) L2 network. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is i) L1 network ii) L2 network. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
Events are no. of drgs requiring approval. Scheduled time shall be w.r.t each drg/a lot of drg. Define time for each. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days for all events
No of events are i) QAP ii) Test schedule. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events are billing break up. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events are billing break up. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events are billing break up. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events are no of documents. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events are no of documents. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of documents. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events are no of despatch clearances. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events are no of bills. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is i) No of BG's and invoices ii) No of documents. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of invoices. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of invoices. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of invoices. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of invoices. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of invoices. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of invoices. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of invoices. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of tenders. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of tenders. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events are no of reports (identify). Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events are no of reports (identify). Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of MIR/Reports. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of MIR/Reports. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of products. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of products. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
No of events is No of products. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
System shall mean the current system prevalant in the unit/region/business sector
No of events is No of points/issues to be improved. Define time for each event. Where Ia= No.of events delayed/Total no of events. Ib=No days of delay/Total time planned in days
Questionnaire developed by CQA to be adopted .
SPECIFIED TIME CAN BE 6 MONTHS FROM DATE OF CREATION OF SYSTEM
SPECIFIED TIME CAN BE 5 MONTHS FROM DATE OF CREATION OF SYSTEM
SPECIFIED TIME CAN BE 1 MONTH FROM DATE OF BECOMING DUE
TO DEFINE NEW TECHNOLOGY/PRODUCTS/ SERVICES
STRATEGIC TIE-UP TO INCLUDE JV'S AND CONSORTIUM
AS PER REWARD SCHEME CIRCULAR TO BE ISSUED
RETAINED CUSTOMER MEANS ONE WHO HAS NOT PLACED ANY ORDER ON OUR COMPETITORS FOR LAST 3 CONSECUTIVE TENDERS FOR THE PRODUCT/PROJECT/SERVICE
NEW CUSTOMER MEANS ONE WHO IS IN BUSINESS & HAVE PLACED ORDER ON BHEL AFTER A MINIMUM OF 3 YEARS
TIME FRAME MEANS EXPECTED COMPLETION OF SYSTEM DEVELOPMENT
ACTION PLAN TO INCLUDE PRACTICING OF LEARNINGS IN FUTURE TENDERS
ACTION PLAN TO INCLUDE PRACTICING OF LEARNINGS IN FUTURE TENDERS
ACTION PLAN TO INCLUDE PRACTICING OF LEARNINGS IN FUTURE INSURANCE CLAIMS
IT (1900)
IT (12000)
new initiative
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
As there is no cohesive group in place to address this Business , Extensive efforts are made to make
As this is a company vide initiative and part fo the balance score card the same is to be included.
This is a part of capability building effort emphasised in balance score card.
MATERIALS MANAGEMENT FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description
MMX00100
MMX
O
MMX00200MMX
O
MMX00300MMX
O
MMX00400MMX
O
MMX00500MMX
O
MMX00600MMX
O
MMX00700 MMX O
MMX00800
MMX
O
MMX00900MMX
O
MMX01000MMX
O
MMX01100MMX
O
MMX01200MMX
O
MMX01300
MMX
O
MMX01400MMX
O
MMX01500MMX
O
KRA Type
Placement of PO / Contract within specified days of receipt of PI./ request (days to be specified in Action plan box)
Issue of enquiry within specified days of receipt of PI
% of Material procured (by value) as per PO delivery schedule & terms.
% Reduction in rejections over previous year.
% Clearance of bills under objection within specified time
% achievement of BOIs / Subcontract itemsT/O vis a vis the target.
Number of Rate contracts / long term contracts / MOU's entered w.r.t. target.% of cases where Documents/test certifcates (specified in P.O.) for material procured are readily available and accountal of material is not held up.
% increase in liquidation of rejected material compared to earlier year.
Cost reduction through economic buying w.r.t. Target set for the year.
% reduction of advance outstanding with vendors / contractors at the year end
Direct material consumption as % of GTO net of excise.
% reduction in number of items where bin stock does not match actual stock compared to earlier year.
% reduction in no. of stockouts of stock items
% achievement of scrap sales / surplus disposal against the target for the year.
MMX01600
MMX
O
MMX01700MMX
O
MMX01800MMX
O
MMX01900
MMX
O
MMX02000MMX
O
MMX02100MMX
O
MMX02200MMX
O
MMX02300
MMX
O
MMX02400MMX
O
MMX02500MMX
O
MMX02600MMX
O
MMX02700MMX
O
MMX02800MMX
O
MMX02900MMX
O
MMX03000 MMX % closure of customs' bonds in time. O
MMX03100MMX
O
MMX03200MMX
O
MMX03300MMX
O
MMX03400MMX
O
% Reduction of average number of days from DB/CN/DRS ( receipt at the first point in the plant/site) to SRV clearances in the year
% Reduction in average time taken to settle insurance claims compared to previous year.
% reduction of cut bits / scrap during the year (by value).
% reduction of cycle time for issue of materials(including to sub contractors) [Issue voucher stage to issue accountal stage)
% consignments collected from transporters' godown within specified time after retirenment of LR (L3 only)
% Stock verification completed within specified time (For L3 only)
Procurement of capital equipment as per schedule planned / budgetted.
Errection / Commissioning by vendor of major capital facilities / BOI's purchased/ acquired as per schedule.
% of Air consignments cleared within free time
% of Sea consignments cleared within free time
% availment (by value) of all applicable duty concessions.
% of duty free licenses (including EPCG) obtained within specified target time.
Project imports registered with custom within specified time.
% reduction in demurrage paid over previous year.
% of customs/insurance/excise cases settled in the year.
Reduction in Material inventory as no of days of Shop Material Consumption.
Reduction of Old Production inventory (WIP/FG) w.r.t opening Production inventory
% Reduction in inventory of non moving (NM) items.
MMX03500MMX
O
MMX03600MMX
O
MMX03700MMX
O
MMX03800MMX
O
MMX03900
MMX
C
MMX04000MMX
O
MMX04100MMX
O
MMX04200MMX
O
MMX04300MMX
O
MMX04400MMX
O
MMX04500MMX
C
MMX04600MMX
C
MMX04700MMX
C
MMX04800MMX
C
MMX04900
MMX
O
MMX05000MMX
C
MMX05100MMX
C
MMX05200MMX
C
MMX05300MMX
C
MMX05400
MMX
C
% Reduction in inventory of slow moving (SM) items
% liquidation of year end SIT/material with fabricators.
% of indents raised within specified time
% material availability with reference to 100% completion / commissioning projects
Arrange advance manufacturing action/ Stocking proposals within specified time
% Material clearance with reference to Plan / CCSR
% Material Matching with reference to Turnover Budget
% reduction of indirect material consumption w.r.t. budget.
% Reduction in no. of NCRs reported in Audits
Timely generation/Submission of Management Information Reports(MIR)
% of eligible vendors registered within 6 months of application
% increase of A & A1 vendors as a % of total number of vendors
% increase of material categories that have at least 3 vendors.
Updation of product Material Directory as per schedule
Number of reverse / forward auctions conducted.
Reduction in delivery time for identified Subcontracting items
Identification of new items for bulk buying for common rate contract at corporate level.
No. of new IT initiatives introduced in MM function.
Implementation of identified (by Corporate MM)best MM practice in the year.
No. of items for which Technical & commercial terms finalised with vendors w.r.t. total items.
MMX05500MMX
C
MMX05600MMX
C
MMX05700MMX
C
MMX05800MMX
C
MMX05900
MMX
O
MMX06000MMX
O
MMX06100MMX
O
MMX06200MMX
O
MMX06300MMX
O
MMX06400MMX
O
MMX06401MMX
O
MMX06500MMX
O
MMX06600MMX
C
MMX06601MMX
O
MMX06602MMX
C
MMX06700MMX
O
MMX06800MMX
C
MMX06900MMX
C
MMX07000
MMX
C
Organise professional lecture/seminars.
Digitization of vendor records (out of total registered vendors) for inter-unit usage.
Arrange / Participate in Exhibition / Product display for development of new sources.
Integration of existing IT Systems/Sub-systems on scheduled date
Reply to Govt. Queries/ Audit Paras / Inspection report/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
MMX07100
MMX
C
MMX07200
MMX
C
MMX07300
MMX
C
MMX07400
MMX
C
MMX07500
MMX
C
MMX07600MMX
Timely finalisation of material budget. O
MMX07700MMX
O
MMX07800MMX
O
MMX07900MMX
C
MMX08000MMX
C
MMX08100MMX
O
MMX08200
MMX
C
MMX08300
MMX
O
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Timely completion of BOI contracts for closure of customer contracts.
Compliance with system on management of hazardous waste
Timely finalisation of long term contracts / MOU
Identification and implemetation of 5S projects
Compliance with system on management of shelf-life materials.
Critical review of identified Policies / Systems / Procedures / Practices with a view to improve MM function
Timely renewal of statutory licences for storage of explosives / inflamables / hazardous materials.
MMX08400
MMX
C
MMX08500
MMX
Import substitution of critical items. O
MMX08600
MMX
O
MMX08700MMX
O
MMX08800MMX
C
MMX08900
MMX
O
MMX09000MMX
O
MMX09100MMX
O
MMX09200
MMX
C
MMX09300
MMX
O
MMX09400
MMX
C
MMX09500
MMX
C
% improvement of vendor satisfaction index.
Ensure timely receipt of engineering doucments from vendors
% of SAR's / CAR's w.r.t. BOIs resolved within specified time.
Development of PVC formula for high value items on rate contract.
Preparation of contract agreements & coordination with sub-contractors for signing in time.
Resolution of contractual issues / disputes in time.
% of BOI amendment proposals to PO's / Contracts cleared in time.
Identification of inactive vendors and weeding out / delisting of such vendors to maintain healthy vendor base
Rationalisation and updation of material category list of vendors for indirect materials as per schedule
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Conducting Vendor satisfaction survey and preparing action plan for implementation by specified date
MMX09600MMX
O
MMX09700MMX
O
MMX09800MMX
O
MMX09900
MMX
C
MMX10000MMX
O
MMX10100MMX
C
MMX10200MMX
O
MMX10300MMX
O
MMX10400
MMX
C
MMX10500
MMX
O
Tiimely Arrangement of annual sanctions for items, such as coal, from Government.
Obtaining in time NOC from Ministry of Shipping (Transchart)
Secure in time Technical Clearance from DGFT/ Ministry of HI for Import.
Quarterly analysis and review of Performance Rating of Vendors having "B" & "C" rating (below 80 %)for remedial measures
Reduction in cost of BOIs as a % of material budget
Development of additional vendors for single source items
ESTABLISHING AWAY CENTRE FABRICATION
% of vendors' / transporters' / contractors' bills processed and sent to finance in specified time
Enlistment during the year of additional Sources / Vendors for identified items / services
% CASES OF TRANSIT DAMAGES REPORTED WITHEN IN 7 DAYS OF RECIEPT
MATERIALS MANAGEMENT FUNCTION KRA MASTER - 2006-07
Unit of Measurement
Time Index
Y N N X H H
Time IndexY N N X X H
% Y N N M H H
% N N N X L L
% N N N X X L
% achieved / target Y N N H M M
N N N M H M
% of consignments N N N X L M
% N N N L M L
% reduction/ target Y N N H M M
% N N N X L X
% N N N H M M
% N N N L M M
% Y N N L M H
% Y N N M H M
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA
(Y/N)
Suggested Weightage for category
A B C
% rate contracts finalised/ target
N N N L M H
% N N N M M M
% N N N X L M
% reduction over last year N N N L M H
% N N N X X M
% N N N X X M
N Y N H H H
N Y N M M M
% Y N N L M H
% Y N N L M H
% Y N N L M H
% N N N L M H
% N N N L M M
% N N N L X X
% N N N M X X
% N N N X L L
Days Y N N M M M
Rs.Lakhs Y N N M X X
% Y N N M M M
% reduction in days over last year
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% N N N M M M
% N N N M M M
% N N N X L M
% N N N M M M
N Y N M M M
% N N N M M M
% N N N M M M
% N N N L L L
% N N N L L L
N Y N X M M
% N N N H M L
% Y N N H M X
% Y N N H M M
Y Y N X M L
No. of auctions N N N M M X
No of items N N N M M X
No. of items Y N N X M X
Number N N N M M X
Number N N N M M M
No. of items Y N N H H M
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Number N N N M M X
% N N N L L M
Number N N N M M L
N Y N H H H
% Y N Y M L L
% Y N Y M L L
Time IndexY N Y M L L
Time IndexY N Y M L L
Y Y Y H M L
Score Y N Y M X X
Time IndexY N Y X M M
Number of new circles N N Y M X X
TQM Score Y N Y H X X
Y Y Y X M X
Time IndexY N Y X X M
Y Y Y L M H
Number N N Y M M M
Time IndexY N Y X M H
N Y N H H H
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
N Y N H H H
N Y N H H H
N Y N H H H
N Y N H H H
N Y N H H H
N Y N L M L
N Y N H H M
No. of NCRs. N N N L M H
N Y N H M L
Number N N N M M M
No. of NCRs. N N N X M M
Number N N N H M X
N Y N L H M
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% N N N M M L
Rs. Lakhs N N N H H M
N Y N L H M
% N N N L H M
Number N N N H M L
N Y N L M M
N Y N H M L
% N N N M H M
Number N N N L L L
N Y N M M M
Y N N H H X
Y Y N H M X
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Balanced Scorecard Rating (5/4/3/2/1)
No. of days delayed from scheduled date
Y Y N H H H
Y Y N L M M
Y Y N H H H
No. of vendors reviewed N N N M M M
% of material budget N N N H H H
number of identified items Y N N H H H
NUMBER OF VENDORS Y N N H H H
% N N N X X M
no of firms. N N N H H H
% N N N M M H
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
MATERIALS MANAGEMENT FUNCTION KRA MASTER - 2006-07
KRA Remarks
Computer report
Department report.
Source of Data For Measurement
Finance report.
Department Reports
Survey Report
Project report
Unit QA/QC
Quality Deptt.
Project report
Project report
Project report
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Action plan document
Project report
Project report
Project report
Project report
Project report
Section report
Departmental record
Vendors have been getting registered since several years.In order to maintain healthy and capable vendor base , it is also necessary to weed out / delist inactive vendors in a planned manner.
Source Development Cell report
a) So far there has been thrust on direct materials. It is proposed to provide impetus to PMD activity for indirect materials also. b) KRA required for "Buying" and "Vendor Development" departments.
Rating declared at year end by Corporate / Unit Management
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
This will help in finding out vendors' level of satisfaction and their expectations from BHEL in order to bridge the gap and achieve business excellence.
Amount realised -
-
-
Section report -
-
PMD -
-
DEPTT RECORD
No of firms added.
DEPTT RECORD
NOC( for ports & units) taken from Transchart
% increase over last year achievement.
PO values and turnover completion
REPORTS /APPROVALS
ERECTION & CONSTRUCTION FUNCTION KRA MASTER - 2006-07KRA id KRA Description Unit of Measurement
CSX00100 CSX O Time Index
CSX00101 CSX O
CSX00102 CSX O
CSX00103 CSX O Time Index
CSX00200 CSX O Time Index
CSX00201 CSX O Time Index
CSX00202 CSX O Time Index
CSX00203 CSX O Time Index
CSX00300 CSX C
CSX00301 CSX O
Function ID
KRA Type
Establishing the new sites as per plan
Preparation of resource planning within 'X' days of LOI
Time taken for completion / Time allocated ('X' days) X 100
Deployment of resources as per plan ('X' days)
Time taken for completion / Time allocated ('X' days) X 100
Establishment of site infrastructure as per schedule
Timely finalisation of sub-contracts
Submission of sub-contract(s) specifications for tendering 75 days before commencement of work as per L2 schedule
Finalisation of tender document(s) for floating NIT 70 days before planned commencement of work at site
Floating of tender enquiries/ evaluation of technical & price bids and finalisation of sub-contracts
Optimisation of number of vendors in Services where number of vendors are less than seven
Total increase required in identified Services / Total no. of services X 100
Identification of potential vendors in services where the number of vendors are less than seven and subsequent enlistment as per procedure
Total number of potential vendors identified / Total number of minimum potential vendors to be identified X 100
CSX00400 CSX O Time Index
CSX00401 CSX O Time Index
CSX00500 CSX O
CSX00501 CSX O
CSX00502 CSX O
CSX00503 CSX O
CSX00504 CSX O
CSX00505 CSX O
CSX00506 CSX O
CSX00507 CSX C
CSX00600 CSX O
Submission of Annual Performance Reports of Vendors
Review of Performance Evaluation Reports received from site and updation of vendors list as per Policy guidelines
% increase in number of milestones achieved in a project with respect to project schedule
[(No. of milestones achieved / No. of milestones planned) - 1] X 100
Timely preparation and review of action plan for the milestones which can be advanced
Time taken for completion / Time allocated
Timely implementation of action plan for advancement of identified milestones
Time taken for implementation / Time allotted
Erection checks of equipment and systems for completion
No. of days saved / No. of days planned
Reporting of non-conformities to MUs within three days of occurrence
Average no. of days of delay for reporting after the occurrence
Assess and prioritise integration of inputs (including customer inputs) for erection activities/ ahead of plan
No. of days saved / No. of days planned
Preparation of joint protocols (after ensuring adherence to quality plans) of the equipment/ systems erected)
No. of protocols completed / No. of protocols to be completed X 100
% Success rate of milestones advanced
No. of milestones advanced / No. of milestones planned for advancement X 100
No. of units commissioned as per Balanced Score Card
No. of units commissioned / No. of units planned for commissioning X 100
CSX00601 CSX O
CSX00602 CSX O
CSX00603 CSX O
CSX00604 CSX O Time Index
CSX00605 CSX C
CSX00700 CSX C
CSX00701 CSX C No. identified
CSX00702 CSX C
CSX00703 CSX C
CSX00800 CSX C Increase in CSI
CSX00801 CSX O No. of Meets
CSX00802 CSX C
CSX00803 CSX O
CSX00804 CSX C
CSX00805 CSX O
CSX00900 CSX O
CSX00901 CSX O
Finalisation of erection/ commissioning procedures and obtaining their approval from customer/ consultants
Nos. approved / Nos. planned X 100
Finalisation of erection/ commissioning check list as per plan
Nos. finalised / Nos. planned X 100
Deployment of T&P and IMTEs at site for erection/ commissioning as per plan
No. of T&Ps and instruments deployed / Total No. planned X 100
Planning of inputs for course correction for erection and commissioning the projects as per schedule
Outsourcing of expert services for erection/ commissioning as per requirement
No. of requirements met / No. of requirements as per plan X 100
Reduction in cycle time of identified processes
Days reduced / Previous best X 100
Identification of processes targeting cycle time reduction
Evaluation of alternatives to existing processes/ to achieve cycle time reduction
Nos. evaluated / Nos. identified X 100
Timely execution of action plan for cycle time reduction
Days reduced / Previous best X 100
Enhancement in customer satisfaction score
No. of Customer meets conducted
% of feedback incorporated resulting out of customers meets
No. of feedback implemented / No. of feedback accepted for implementation X 100
Registration/ followup and resolution of customer complaints
No. of complaints resolved / Total no. of complaints registered X 100
Implementation of Improvement Projects
No. of projects implemented / No. of projects planned X 100
Proactive customer visits to enhance customer relationship
No. of visits undertaken / No. of visits planned X 100
Completion of Reliability Run / Trial operation of the Unit(s) as per target
No. of reliability run completed / No. of reliability run planned X 100
Resolution of non-conformities observed during trial operation
No. of Non conformities resolved / Total no. of non-conformities X 100
CSX00902 CSX O
CSX00903 CSX C
CSX01000 CSX O Time Index
CSX01100 CSX O Time Index
CSX01101 CSX O Time Index
CSX01102 CSX O Time Index
CSX01200 CSX O
CSX01201 CSX O
CSX01202 CSX O % of total claims settled
CSX01300 CSX Settlement of audit paras O % of audit paras settledCSX01400 CSX O Time Index
CSX01401 CSX O
CSX01402 CSX O
CSX01403 CSX O
CSX01500 CSX O
CSX01501 CSX O Time Index
CSX01502 CSX O
Resolution of technical issues for system stabilization
No. of Systems stabilized / No. of systems requiring stabilization X 100
Resolution of generic erection issues
No. of issues resolved / No. of issued identified X 100
Preparation and submission of project completion reports 30 days before site closing
% reduction in time for budgetted monthly cash collection
Submission of Erection/ Construction/ supply invoices within 10 days of completion of activities
Timely verification of invoices for realisation of payment
No. of provisional insurance claims converted to final claims during the year
% of total no. of provisional claims lodged
Arranging documents for lodging final claims
% of total no. of final claims lodged
% of claims settled out of total claims due
Timely closing of sub-contracts as per plan
Material reconciliation as per plan
No. of days delayed from scheduled date
Obtain time extension as applicable as per plan
No. of days delayed from scheduled date
Processing and verification of final bills as per plan
No. of days delayed from scheduled date
% reduction in time for achieving site closure with respect to plan
No. of days reduced / No. of days planned X100
Identification of 80% pending points within 25 days of completion of trial operations and balance 20% progressively within 60 days
Preparation of action plan for resolution within 7 days of identification of pending points
No. of days delayed from scheduled date
CSX01503 CSX O
CSX01504 CSX O
CSX01505 CSX O Time Index
CSX01506 CSX O Time Index
CSX01600 CSX % reduction in wastages O % of amount of BSC
CSX01601 CSX C Number
CSX01602 CSX Optimisation of T&P deployment O
CSX01700 CSX IT Initiatives taken C % completed
CSX01800 CSX C Nos. accepted
CSX01900 CSX O % increase in budget
CSX01901 CSX O % of Budget
CSX01902 CSX O
CSX01903 CSX C No. of initiatives
CSX02000 CSX O % of Budget
CSX02100 CSX O % amount realized
CSX02200 CSX C % reduction
Liquidation of pending points within 90 days of action plan
No. of days delayed from scheduled date
Diversion of surplus materials as per contract within 120 days from completion of trial run
No. of days delayed from scheduled date
Timely release of manpower as per plan
Timely submission of as-built marked up drawings
Number of improvements in erection processes
Total no. of days actually utilised / Total No. of days of availability
Suggestions given for system/ product improvement
Enhancement of physical turnover
Acheivement of physical turnover
Preparation and finalisation of quarterly resource plan within specified days
Actual days taken / Specified days
Initiatives taken for enhancement of physical turnover
Achievement of financial turnover
Identification and realization of unpaid old outstandings
% reduction in downtime of Cranes by implementing MMS (Mandatory Maintenance System) over the prescribed 'X' days
CSX02201 CSX O
CSX02202 CSX O
CSX02203 CSX C No. of action plans prepared
CSX02204 CSX O
CSX02300 CSX C Nos. developed / Nos. planned
CSX02301 CSX O
CSX02400 CSX C Nos. developed / Nos. planned
CSX02401 CSX O
CSX02500 CSX Timely submission of MIRs O % submissions delayedCSX02600 CSX O % utilised against sanction
CSX02700 CSX O %
CSX02800 CSX O %
CSX02900 CSX O Time Index
Updation of history cards of all Cranes incorporating details of breakdown maintenance/ overhauls and quarterly submission to Hq. within first 10 days of each quarter
No. of days delayed from scheduled date
Preparation and submission of details to Hqrs/ in the prescribed format/ of routine maintenance carried out on Cranes before 10th of every month.
No. of days delayed from scheduled date
Preparation of action plans after analysing the updated history cards and reports of cranes for breakdown/ overhaul and routine maintenance within specified time
Implementation of action plans within specified time (quarterly)
% of action plans implemented as identified for every quarter
Development of Standard L2 Network for EPC contracts
Timely conversion of standard L2 network for EPC contract to site specific
No. of days delayed from scheduled date
Development of Standard L3 Network for EPC contracts
Timely conversion of standard L3 network for EPC contract to site specific
No. of days delayed from scheduled date
Utilisation of Capital Budget (Planned / Non-Planned)
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
CSX03000 CSX O Time Index
CSX03100 CSX O
CSX03200 CSX O Score
CSX03201 CSX O Time Index
CSX03202 CSX O Number of new circles
CSX03300 CSX C TQM Score
CSX03301 CSX O
CSX03302 CSX C Time Index
CSX03400 CSX O
CSX03500 CSX C Number
CSX03600 CSX C Time Index
CSX03700 CSX C
CSX03800 CSX C
CSX03900 CSX C
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA)
Ia = No. of projects planned Ib = Sum of No. of days delay / Sum of total No. of days planned
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
CSX04000 CSX C
CSX04100 CSX C
CSX04200 CSX C
CSX04300 CSX O
CSX04301 CSX O
CSX04302 CSX O
CSX04303 CSX O
CSX04304 CSX O
CSX04305 CSX O
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Achieveing Materials Management Effectiveness
Effectiveness index = 1/n (ΣCn)
Regularisation in Road Permits Form Counterfoils within X days
No. of forms regularised within stipulated time (X days) /Total no of consignment received in X days
Reduction in Demmurages/Wharfage in consignments within X days
No. of consignments not incuring demmurage in X days / Total no of consignment received in X days
Generation of Pending Materials List within "X" days
No. of reports generated within stipulated time (X days) / Total no of reports required to be generated
Material verification within "X" days of receipt
No. of consignments verified within stipulated time (X days) /Total no of consignment received
Raising of MDRs within "X" days of verification
No. of MDRs raised within stipulated time (X days) /Total no of MDRs raised
CSX04400 CSX O % Reduction in time
CSX04401 CSX O Time Index
CSX04402 CSX O Time Index
CSX04500 CSX O %
CSX04501 CSX O
CSX04502 CSX C
CSX04503 CSX O
CSX04504 CSX O % submissions delayed
CSX04600 CSX O % reduction in defective joints
Percentage reduction in time taken in submission of technical information and relevant data (project plans, manpower, infrastructure, T&P, sub-contracting, etc) for tender preparation by Marketing
Reduction in time towards collection of the key data required for techno commercial ofers and its compilation with respect to time schedule
Reduction in time towards preparation of technical information (estimation of manpower, infrastructure, T&P and sub-contracting requirements) with respect to time schedule
Percentage reduction in outages of T&P / Erection Equipment
Regular updation of history cards of cranes and lifting tackles and submission by 7th of every month
No. of days delayed from scheduled date
Development of MMS tool for preventive maintenance of erection T&P as per plan
No. of days delayed from scheduled date
Implementation of Mandatory maintenance systems (MMS) for erection T&P and heavy duty cranes
No. of equipments covered under MMS
Regular updation of history cards of electrical equipment like welding generator, transformer rectifier and submission by 7th of every month
Effective control in the area of welding, heat treatment and NDT by reducing a number of defective joints through monitoring, improved procedures and resource planning
CSX04601 CSX C Time Index
CSX04602 CSX O Time Index
CSX04603 CSX O %
CSX04604 CSX O Time Index
CSX04605 CSX O % reduction in defective joints
CSX04700 CSX O % amount saved
CSX04800 CSX O Time Index
CSX04900 CSX C No. of skills added
CSX05000 CSX O % of complaints resolved
CSX05001 CSX O Number
CSX05002 CSX O % resolved
Timely preparation of project/ work specific procedures for welding, NDT and heat treatment for their effective implementation
Timely availability of resoruces for welding, NDT and heat treatment works (I.e., deployment of equipments and consumables)
% Deployment of approved welders on the job by ensuring welders test
Timely replacement of non-performing welders, identified during reviews, as per plan
Review the process of welding, NDT, heat treatment to ascertain % reduction in defective joints
% saving in cost by providing experts for short periods for SAS/ Construction Jobs to avoid deputation of supervisory personnel on a regular basis
Timely interaction with advocates/ legal experts for resolution of legal matters/ arbitration pertaining to contractrs
Acquiring additional technical skills for multi-skilling
Resolution of customer complaitns, including observations as per prevailing system
Segregation of customer complaints and observations
Preparing relevant reply to the observations and responding to customer withing specified period as per plan
CSX05003 CSX O % complaints dispositioned
CSX05004 CSX O % complaints resolved
CSX05100 CSX O
CSX05200 CSX
C
Analysing complaints area-wise/ function-wise and interacting with concerned engineers/ engineering centre for proper disposition
Responding to customers for given disposition
Preparation of customer project related capital investment budget as per schedule
No. of days delayed from scheduled date
Accomplishment of targets of Unit/NC/Function/Department
level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
ERECTION & CONSTRUCTION FUNCTION KRA MASTER - 2006-07
Y H M X
M H M
X M H Deployment plan
H M L Deployment plan
Y M H L
Y L H M
H M M
X H M
H M X Approved vendors list
X H M Approved vendors list
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA (Y/N)
Suggested Weightage for category A B
C
Source of Data for Measurement
Customer order / L1 schedule
Customer order / L1 schedule
Deployment plan as per sl.no.3
Deployment plan as per sl.no.3/ L2 schedule
Deployment plan as per sl.no.3/ Site Plan
Deployment plan as per sl.no.3/ Site Plan
M H X
L M H
Y H H M L2/ L3 schedule
X M H L2/ L3 schedule
X M H L2/ L3 schedule
X M H Action plan
X L M SAR/ CAR/ Other reports
M L X L2/ L3 schedule
X L H FQPs
H H H L2/ L3 schedule
Y H X X L2/ L3 schedule/ BSC
Approved vendors list/ Evaluation reports
Approved vendors list/ Evaluation reports
Y L M M
Y X M M
X M M Departmental Procedure
M M X
Y M M X Deployment plan
Y M H X Benchmark/ Report
L H M Analysis of benchmarks
L H M Project review reports
X M H Benchmark/ Report
Y H M X
H X X Plan/ Compliance Report
Y H H M
L H H
H H H
H M X Feedback report
Y M H H Final protocol
Y M H H Customer punch list
Controlled Documents as per ISO
Controlled Documents as per ISO
L2/ L3 schedule/ Catchup plan
Customer Perception Survey Report/ Feedbacks through Customer Meets
Feedback report/ Status report
Customer Complaint databank/ SOMS
Improvement Projects plan/ BSC/ Customer Perception Survey Report
Y L M M Customer punch list
Y H M X
M M M Site execution documents
M H L Budget / BSC
X M M Departmental Procedure
X M H Departmental Procedure
Y X H M Site records
Y X M H Site records
X M L Site records
H H M Audit records
M H H Regional Plan
Y X M H Contract closing plan
Y L M H Contract closing plan
Y M M H Contract closing plan
H M L Site closing plan
M H H Site closing plan
Y L H M Site closing plan
Customer punch list/ Feedback from other projects
Y Y L H H Action Plan
Y Y L H H Site Action Plan
M X X Regional Plan
L M L Site Action Plan
M M H BSC
M M X Completion reports
M M X T&P Log
Y M M L BSC
L M M BSC/ Records
Y H H H Regional Budget
Y M M M Regional budget
X M M Site Plan
X M H Site Plan
M M M Regional budget
Y L H M Finance records
H H M History cards
Y X M H History cards
Y L M H Monthly reports
X H M
L M H Action Plans
Y H M M
Y M H M Standard L2 network
Y H M M
Y M H M Standard L3 network
L M M RecordsY H M M Approved Capital budget
Y Y M L L
Y Y M L L
Y Y M L L
History cards and monthly reports
Available site specific L2 schedule and records
Available site specific L3 schedule and records
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Y Y M L L
Y Y Y H M L
Y Y M X X Survey Report
Y Y X M M Project report
Y M X X Unit QA/QC
Y Y H X X Quality Deptt.
Y Y Y X M X Action plan document
Y Y X X M Project report
Y Y Y L M H
Y M M M
Y Y X M H Project report
N Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
X H M
X M H
X H H
X M H
X M H
X M H
Material despatch documents
Material despatch documents
Material despatch documents
Material despatch documents
Material despatch documents
Material despatch documents
X H M Tender schedule
Y X H M
X H M Tender schedule
Y M H M Departmental Procedure
Y X M H History Cards
Y Y X H M Manufacturer's Guidelines
Y X M H MMS Manual
X L H History Cards
M M H Project Schedule
Manufacturing Units and Marketing
L M H Site Action Plan
L H H
X M H
X L H
L M M Erection Schedule
M H M SAS/ Customer requirement
M H X
X M H Site development plans
H M X Departmental Plan
M H X Complaint Register
X M L Complaint Register
Deployment Plan and site requirement
Deployment Plan and site requirement
Deployment Plan and site requirement
Legal cases/ arbitration issues
L M L Complaint Register
L M L Complaint Register
Y H M L Project Schedule
Y N N H H X
Rating declared at year end by Corporate / Unit
Management
ERECTION & CONSTRUCTION FUNCTION KRA MASTER - 2006-07Remarks
Where Ia = Total no. of sites delayed in opening / Total no. of sites to be opened. Ib = Total no. of days of delay / Total time planned in days
X' days will be decided as per contractual requirementsPro-active measures where required to be covered under the same KRA
X' days will be decided as per planResources: HR/ T&P/ vendors/ sub-contractorsNote: CFX to communicate Deployment Plan to SCP & Sites.
Infrastructure includes Office/ Stores/ Open Stores/ Residential accommodation/ communication/ transport/ field hostel/ Watch & Ward and banking arrangements/ etc.
Where Ia = Total no. of sub-contracts delayed in finalisation / Total no. of sub-contracts to be finalised. Ib = Total no. of days of delay / Total time planned in days
Where Ia = Total no. of specifications delayed in submission / Total no. of specifications to be submitted. Ib = Total no. of days of delay / Total time planned in days
Where Ia = Total no. of tender documents delayed in finalisation/ Total no. of tender documents to be finalised. Ib = Total no. of days of delay Where Ia = Total no. of tenders delayed in finalisation / Total no. of tenders to be finalised. Ib = Total no. of days of delay / Total time planned in days
Services means vendors doing E&C of Boiler/ TG etc. and also suppliers of different products.
Example: No. of Services = 3 (Boiler/ TG/ C&I)Existing Vendors (5/ 3/ 2 respectively)Min. Required vendors = 7 in each serviceHence/ Gap = 2/ 4/ 5 respectivelyPotential vendors identified = 0/ 3/ 5 respectivelyTotal no. of potential vendors identifie
Ia = No. of vendors evaluated / Total no. of vendors working Ib = Sum No. of days of delay / Sum No. of days planned
Ia = No. of Vendor List updated / No. of List planned for updation!b = Sum of delays in days / Sum of the planned days
Site will prepare and review an Integrated Action Plan for all the milestones identified for advancement
Site will prepare an Integrated Action Plan for all the milestones identified for advancement
As per reward scheme circular to be issued
Where Ia = Total no. of inputs delayed / Total no. of inputs to be given. Ib = Total no. of days of delay / Total time planned in days
Conductance of Customer Perception Survey by an external agency
This
Ia = Actual cash collection / Budgeted cash collection. Ib = Total no. of days delayed in collection / Total time allocatedNote: The time allocated is defined in the contract
Where Ia = total no. of invoices delayed / total no. to be invoiced. Ib = total no. of days delayed / total days planned
Where Ia = total no. of verification of invoices delayed / total no. invoices to be verified. Ib = total no. of days delayed / total days planned
Where Ia = total no. of sub-contracts closure delayed / total no. sub-contracts to be closed. Ib = total no. of days delayed / total days planned
Where Ia = Total No. of pending points delayed for identification / Total no. of pending points to be identified. Ib = Total no. of days delayed / total days planned (60 days)
Nos. accepted by HoF
Budget as finalised by the Regional Hqrs.
Budget as finalised by Corporate Office
Every quarter the resource plan must be reviewed
Budget as finalised by the Regional Hqrs.
Where Ia = Total No. of manpower release delayed/ Total no. of manpower identified for release. Ib = Total no. of days delayed / total days planned
Where Ia = Total No. of marked up drawings delayed in submission/ Total no. of marked up drawings to be submitted. Ib = Total no. of days delayed / total days planned
Annual overhaul period/ if any/ will not be accounted as downtime.'X' days to be picked up from downtime details as furnished by CFX for respective cranes
#NAME?
As per Departmental Procedure
- Prescribed formats will be furnished by CFX along with history card of Crane- Prescribed formats for the old running cranes will be furnished by CFX latest by 10th of July 2004
Standard L2 Network (on Primavera) to be developed for different Unit capacities
Timely conversion means one week ahead of contractual commitment for submission
Standard L3 Network (on Primavera) to be developed package-wise for different Unit capacities
Timely conversion means the readiness of the L3 networks two weeks ahead of start of erection activities in respective packages
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
DropDropDropDrop
Deleted
Cn=Factor from the Child KRA and n= total no of child KRAs selected
Factor for Cn in KRA CSX4400'X days' is as defined in the DP
Factor for Cn in KRA CSX4400'X days' is as defined in the DP
Factor for Cn in KRA CSX4400'X days' is as defined in the DP
Factor for Cn in KRA CSX4400'X days' is as defined in the DP
Factor for Cn in KRA CSX4400'X days' is as defined in the DP
(Σ CSX04501 + CSX04502) X 100
Ia = Total no. of inforamtion and data collected / total No. of information to be collectedIb = Total no. of days reduced / total no. of days planned
Ia = Total no. of data prepared / Total no. of data to be prepared Ib = Total no. of days reduced / total no. of days planned
L5 = 100%L1 = 80%% reduction in outages = (1-total No. of equipment under breakdown in one month / total no. of equipment available at site) X 100
L5 = Four days early L3 = As per Schedule (no delay)L1 = 4 days delay
L5 = Four days early L3 = As per Schedule (no delay)L1 = 4 days delay
L5 = 100% coveredL1 = 80% covered
L5 = Four days early L3 = As per Schedule (no delay)L1 = 4 days delay
Total no. of defective joints / total no. of joints welded X 100
No. of skills developed to work independently
Where Ia = No. of procedures implemented / total no. of procuedures to be implementedIb = Total no. of days of delay / total days planned for making procuedures
Where Ia = No. of resoruces deployed / total no. of resources to be deployedIb = No. of days delayed for deployment / total no. of days allotted for deployment
No. of approved welders deployed / No. of welders to be deployed X 100
Total no. of welders replaced / total no. of welders to be replaced X No. of days delayed / total no. of days for replacement as per plan
Total no. of defective joints / total no. of joints welded X 100
Amount saved = (1-Cost of Deputation for short periods / Cost of deputation to be incurred in case of posting) X 100
Ia = No. of documents or replies prepared / Total no. of documents or replies to be preparedIb = No. of days delayed in preparing documents / total no. of days available
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be
assigned a weightage upto 100%
ENGINEERING / DESIGNING FUNCTION KRA MASTER - 2006-07
KRA_ID Function KRA Description
EDE00100 EDE Proposal/Tender Engineering/ Estimates completed in time OEDE00101 EDE Design/selection of equipments/ system OEDE00102 EDE Preparation of schemes/layout drgs. OEDE00103 EDE Preparation of technical offer OEDE00104 EDE Estimation O
EDE00105 EDE Computerisation of Tender Proposals C
EDE00106 EDE Computerisation of proposal Engineering CEDE00107 EDE Finalisation of performance guarantee schedule for proposals O
EDE00200 EDE O
EDE00201 EDE Average response time to customer Technical queries on proposals OEDE00300 EDE Standard proposals prepared and submitted as per plan CEDE00301 EDE Design/selection of equipments/ system for standard proposal CEDE00302 EDE Preparation of schemes/ layout drgs. for standard proposal CEDE00303 EDE Preparation of technical offer for standard proposal CEDE00304 EDE Estimation of standard proposal C
EDE00400 EDE Ratio of orders received to tenders submitted and decided O
EDE00500 EDE O
EDE00600 EDE O
EDE00601 EDE O
EDE00602 EDE C
EDE00700 EDE O
EDE00800 EDE Business acquired through RLA/ R&M / Consultancy services O
EDE00801 EDE Review of customer requirements in time O
EDE00802 EDE Organising site performance data & results of RLA studies in time O
EDE00803 EDE Preparation of technical offer & estimate in time O
EDE00804 EDE C
EDE00900 EDE O
KRA Type
Reduction in Technical Queries on offers submitted for tenders having detailed specifications
Technical support to Proposal/Tender Engineering/ Estimates for timely completion.
Reduction in time to submit technical offer/ tender document/ Estimates
Creation/Updation of Engineering Cost Data for tendering / Estimation
Documenting for KM Portal the process change adopted to achieve time reduction within specified time schedule
Technical acceptance of offers by customer for In house developed products.
Developing checklists& computerisation of procedure for RLA studies within specified time schedule
Input information settled with other products/ engineering groups as per agreed schedule
EDE00901 EDE Finalisation of information flow schedule with other BHEL Unit O
EDE00902 EDE O
EDE00903 EDE O
EDE01000 EDE O
EDE01001 EDE Finalisation of list of information required from customer O
EDE01002 EDE O
EDE01100 EDE O
EDE01200 EDE O
EDE01300 EDE OEDE01400 EDE Completion of contract Engg. Documents in time. OEDE01401 EDE Completion of Project /Lay out Engineering in time O
EDE01402 EDE O
EDE01403 EDE C
EDE01404 EDE C
EDE01500 EDE Timely issue of Engg inputs to sites for erection as per schedule OEDE01600 EDE Obtaining customers approval on Engg. Drgs.// Documents in time OEDE01601 EDE Preparation / Finalisation of Vendors / Sub-Vendors list in time. OEDE01602 EDE Finalisation of quality plan OEDE01603 EDE Finalisation of Computerised Engg. Drgs. O
EDE01604 EDE C
EDE01700 EDE Engineering information issued as per manufacturing plan. O
EDE01701 EDE O
EDE01702 EDE Issue of Enineering Indent in time O
EDE01703 EDE O
EDE01800 EDE O
EDE01801 EDE C
EDE01900 EDE Timely arranging of ODC sanction from railway for transportation O
EDE02000 EDE Statutory approval obtained as per schedule O
Releasing input information to other BHEL unit as per information flow schedule
Average time taken for review & commenting of drawings/ documents from other BHEL Unit
Interface information arranged from/to customer/consultant as per project schedule
Average time taken for review & commenting of customer drawings/ documents
Project milestones achieved by monitoring group for engg. documents and interface information
Average time taken to resolve contractual issues related to scope and specification
Average time taken for issue of L3 schedule (indents/drawings/ documents)
Contract drawing/ document/ O&M Manuals/ E & C documents submitted in time
Computerisation of Project/Layout Engg. within specified time schedule
Computerisation of Contract drawings/documents/O&M and E&C documents/manuals within specified time schedule
Computerisation of Customer Approvals on Engg. Drawings/documents within specified time schedule
Issue of Manufcaturing documents as per schedule ( Drawings/GMS/CBOM/GIS/MID/PGMA/Engg. Spec. etc.)
Issue of Packing/Shipping documents/ completion schedules as per schedule
Design calculation/ analysis/ documentation completed as per schedule
Computerisation of design calculation & analysis within specified time schedule
EDE02100 EDE Deviation from tender material cost w.r.t. final design material cost O
EDE02200 EDE Number of PIR proposals approved in TC/PC & initiated C
EDE02201 EDE C
EDE02202 EDE O
EDE02203 EDE O
EDE02204 EDE Timely initiation of PIRs OEDE02300 EDE Completion of approved PIR as per schedule OEDE02301 EDE Preparation of development plan OEDE02302 EDE Conceptual design against development project OEDE02303 EDE Detailed Design against development project OEDE02304 EDE Design Review against development project OEDE02305 EDE Proto type manufacturing/ Assy OEDE02306 EDE Routine Tests against development project OEDE02307 EDE Type testing/Performance testing OEDE02308 EDE Project completion report C
EDE02400 EDE New products/ services introduced as per schedule OEDE02500 EDE No. of designs validated within the year O
EDE02600 EDE No. of type test conducted / organised successfully during the year OEDE02700 EDE Completion of MOU projects in time OEDE02800 EDE No. of products variant added during the year O
EDE02900 EDE No. of product standards/ specification reviewed O
EDE03000 EDE C
EDE03100 EDE O
EDE03101 EDE C
EDE03200 EDE O
EDE03300 EDE No. of customer training programs/ technical presentations O
EDE03400 EDE Timely review & updation of PMD. O
EDE03500 EDE O
EDE03600 EDE O
EDE03700 EDE Average time taken for approval of vendor drawing / documents O
No of documents generated by state-of-the-art technology scanning & loaded on KM Portal
Timely preparation of product development plan & identification of PIRs
Timely approval of proposed PIRs by organising review in TC/PC meetings
No. of new design methods / calculations carried out during the year and captured as procedure for KM Portal
Response/recommendations to customer query/complaint within targeted time
Documenting for KM Portal within specified time schedule the responses to customer complaints
Technical support provided to customer for resolving operational problems
Release of Material forecast/ Procurement specifications/ indents in time
Average time for technical recommendations for purchase/bought out items
EDE03800 EDE Reduction in no. of items with less than three vendors CEDE03900 EDE Rate contract entered as per plan O
EDE04000 EDE OEDE04100 EDE No. of shop problem studied and resolved during the year O
EDE04101 EDE C
EDE04200 EDE O
EDE04300 EDE O
EDE04400 EDE Average Time taken for completion of as-built drawings OEDE04500 EDE No. of Site problem attended and resolved during the year O
EDE04501 EDE CEDE04600 EDE No. of PG /PE Tests conducted & reports prepared OEDE04601 EDE Proposals for PG /PE Tests prepared in time OEDE04602 EDE Preparation of test procedure & scheme OEDE04603 EDE Organising site operation data OEDE04604 EDE Timely calibration of PG test instruments OEDE04605 EDE Test conducted & report submitted in time O
EDE04606 EDE C
EDE04700 EDE No. of system testing / commissioning completed O
EDE04800 EDE Reduction in test cycle time O
EDE04900 EDE No. of new test methods established CEDE05000 EDE No. of online spare catalogues generated. C
EDE05100 EDE Completion of new design of tooling as per emerging technologies CEDE05200 EDE % of tooling activity completed as per schedule O
EDE05300 EDE % success of the tooling designed during the year O
EDE05400 EDE Reduction in engineering cycle time O
EDE05401 EDE Identification of projects &deciding action plan as per schedule O
EDE05402 EDE C
EDE05403 EDE No. of Special IT initiatives implemented C
EDE05404 EDE C
EDE05500 EDE C
Value of non moving inventories/ site returned material utilized during the year
Documentation of shop problems resolved for KM portal within specified time
Technical support provided for Erection & Commissioning of prototype equipments
Average time taken to recommend resolution to engineering punch points related to contract closing
Documentation of site problems resolved for KM portal within specified time
Documentation of PG/PE tests for KM Portal within specified time schedule
Increase in Drawings/ models generated through special softwares like IDEAS/ PROE/PDS/ PDMS/ CFD/ etc
Documenting for KM Portal within specified time schedule the procedure for achieving reduction in Engg.cycle time
Special assignment (other than normal identified responsibility) to be completed during the year (Details of assignments & milestone targets to be given in action plan)3
EDE05600 EDE Cost saving due to Engg. efforts O
EDE05601 EDE Identification of cost saving projects & deciding action plan O
EDE05602 EDE O
EDE05700 EDE improvement of Internal customer satisfaction score O
EDE05701 EDE Conducting Survey in time O
EDE05800 EDE CEDE05900 EDE Increase in number of suggestions O
EDE06000 EDE House Keeping / 5S implementation OEDE06100 EDE Implementation of identified training needs C
EDE06200 EDE No. of improvement projects/ QIP/ JIP/ SIP/ PIP etc. completed O
EDE06300 EDE C
EDE06400 EDE O
EDE06500 EDE O
EDE06600 EDE O
EDE06700 EDE Reduction in customer complaints O
EDE06701 EDE O
EDE06702 EDE O
EDE06703 EDE O
EDE06800 EDE O
EDE06900 EDE O
EDE07000 EDE Validation of computer programs O
EDE07100 EDE Milestones on knowledge management project completed C
EDE07200 EDE New technologies/ systems absorbed/ introduced as per plan C
EDE07300 EDE Patents/ copyrights filed as per schedule C
Total savings due to VE/ Economic Buying / Alt. source/ Productivity/ Indigenisation/Alternate Material
No of action plans identified & implemented for TQM / ISO/ NABL/HSE in time
Standardisation projects completed as per schedule (Individual level)
Reduction in no. of Design/ drawing/ drafting changes due to engineering errors
Average time taken to dispose off NCRs (DCNs/ DCRs/ concessions/ deviations)
No of equipment for which feed back/performance data obtained during the year
Corrective & preventive actions implemented through DRC/RCA meetings
Corrective & preventive actions implemented through analysis of SAR/CAR
No. of corrective/ preventive actions recommended from feedback on performance of products
No. of system deficiencies identified and accepted by the auditee during pre-commissioning/ commissioning/ post-commissioning audits.
Average resolution time for computer hardware and software complaints
EDE07400 EDE No. of technical paper presented/published C
EDE07500 EDE O
EDE07600 EDE O
EDE07700 EDE O
EDE07800 EDE Timely inputs to unit/corporate for BUDGET/FLASH/MIRs etc. O
EDE07900 EDE Finalisation of Functional scorecard by specified date O
EDE08000 EDE Improvement in Employee Satisfaction Score O
EDE08001 EDE OEDE08100 EDE Increase in no. of active Quality Circles in the deptt. OEDE08200 EDE Achieving Business excellence thru' TQM at Deptt. level C
EDE08201 EDE Preparation of action plan based on Position report O
EDE08202 EDE C
EDE08300 EDE Development of Knowledge management Portal OEDE08400 EDE Contributing case studies etc.for Knowledge Management Portal CEDE08500 EDE Completion of KM Projects as per schedule C
EDE08600 EDE C
EDE08700 EDE C
EDE08800 EDE C
EDE08900 EDE C
EDE09000 EDE C
EDE09100 EDE CEDE09200 EDE No of A4 equivalent Drgs digitised as per plan CEDE09300 EDE Outsourcing of Design/Engg/Drafting activities as per schedule OEDE09301 EDE Indenfication/ Evaluation and Finalisation of Vendors as per plan O
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Implementation of Improvement projects identified in the Position Report as per schedule
Implementation of Improvement projects identified in the Position Report as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
EDE09302 EDE OEDE09303 EDE Review of drawings/document submitted by vendor OEDE09400 EDE No of vendor Evaluation carried out during the year OEDE09500 EDE No of new Product/Plant standard/Specification generated O
EDE09600 EDE Finalisation of scope and issue of engg information for Repair W.O. OEDE09700 EDE Number of engineering highlights presented in MCM O
EDE09800 EDE Timely completion of R&D budget for approval of Board O
EDE09900 EDE C
EDE10000 EDE Organising timely clearance of PIR proposals. O
EDE10100 EDE OEDE10200 EDE Organising completion of Collaboration milestones as per shedule. O
Preparation and issue of Specification and recommendation for placement of order..
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Timely preparation of yearly KM-Budget as per KM-policy guide lines.
ENGINEERING / DESIGNING FUNCTION KRA MASTER - 2006-07
Unit of Measurement
Time IndexY N N M X
Time Index N N N X M H
Time Index N N N X X H
Time Index Y N N X X H
Time Index Y N N X X H
Y Y N X X H
Y Y N X X H
Time Index N N N X X L
% reduction over last year N N N X L X
Average No. of days Y N N M M
Time Index N N N M X
Time Index N N N X X M
Time Index N N N X X M
Time Index N N N X X M
Time Index N N N X X M
% success Y N N M M X
Time Index
N N N L L L
% reduction over last year Y N N X L M
N Y N X L L
Y Y N M H H
% offers accepted/ submitte N N N H M X
Rs. Lacs N N N H X X
N Y N X H X
N Y N X X M
Y Y N X X M
Y Y N M H H
Time IndexY N N X M M
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA (Y/N)
Suggested Weightage for category
A B C
L
No. of days delayed from scheduled date
No. of days delayed from scheduled date
L L
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
N Y N X L M
Time IndexN N N X L M
% reduction in Av. Time over N N N X L M
Time IndexY N N X L M
N Y N X L M
N Y N X L M
Time IndexN N N X M M
Y Y N X M M
N Y N X L L
Time Index Y N N L X
Time Index N N N X X H
Time IndexY N N X M H
Y Y N L M H
Y Y N H H H
Time IndexN N N X L L
Time Index Y N N X L X
Time Index N N N X X L
Time Index N N N X X L
Time Index N N N X X L
Y Y N M H H
Time IndexY N N L M H
Time IndexN N N X L M
Time IndexN N N X L M
Time IndexN N N X L M
Time IndexN N N X M H
Y Y N X H H
N Y N X X L
N Y N X M M
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
L
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% deviation N N N X X M
NumberY N N H M X
NumberN N N X X L
N Y N X M X
N Y N M X X
N Y N X X L
Time Index Y N N M X X
Time Index N N N X M X
Time Index N N N X M H
Time Index N N N X X M
Time Index N N N X M X
Time Index N N N X X M
Time Index N N N X X L
Time Index N N N X X M
Time Index N N N X X L
Time IndexN N N H M L
Number N N N X M M
NumberN N N X X M
Time Index N N N M H H
Number Y N N X L M
Number
Y N N X L L
NumberN N N X M M
Time Index
Y N N M M
Time IndexY N N M H H
%N N N M M
NumberN N N L L L
Y Y N M X X
Time IndexY N N X L M
% reduction in Av. Time over N N N X L L
% reduction in Av. Time over N N N X X L
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
L
L
No. of days delayed from scheduled date
%
Y N N X L M
Time Index N N N X M L
Rs. Lacs N N N X L M
Number N N N X M M
Y Y N M H H
% provided / requests N N N X M M
% reduction in Av. Time over Y N N M M
% reduction in Av. Time over N N N X X L
Number N N N X M M
Y Y N M H H
Number N N N X L X
Time Index N N N X X M
Time Index N N N X X L
Time Index N N N X X L
Time Index N N N X X L
Time Index N N N X X M
Y Y N M H H
NumberN N N X X M
%
N N N X X M
NumberN N N X X M
Number N N N X M M
Time IndexN N N X M H
Time Index N N N X L X
%N N N X M M
% reduction Y N N L X X
N Y N X M X
%N N N X L M
NumberY N N X L M
Y Y N M H H
Time Index
N N N H H H
No. of days delayed from scheduled date
L
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Rs Lacs Y N N L X X
N Y N X M X
Rs. Lacs Y N N X M H
%
Y N N M X X
Y Y N X M X
Y Y N H H M
% N N N X X
Score Y N N L L L
% N N N L L X
Time IndexY N N H X X
Time Index
N N N X L M
% reduction over last year Y N N X L M
Reduction in average time ov Y N N X L L
% obtained / planned N N N X M M
% reduction over last year N N N X X
% implemented / planned Y N N X M X
% implemented / planned N N N X M M
NumberN N N X M M
No. of deficiencies identified N N N X L L
Av. Time in Hours N N N X M
% validated/ planned N N N X X M
Time IndexY N N M M H
Time Index
N N N H M L
Time IndexN N N H H H
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
L
L
L
Number
N N N M M M
%
Y N Y M L L
%
Y N Y M L L
Time IndexY N Y M L L
Time IndexY N Y M L L
Y Y Y H M L
Score Y N Y M X X
Time IndexY N Y X M M
Number of new circles N N Y M X XTQM Score Y N Y H X X
Y Y Y X M X
Time IndexY N Y X X M
Y Y Y L M HNumber N N Y M M M
Time Index Y N Y X M H
N Y N H H H
N Y N H H H
N Y N H H H
N Y N H H H
N Y N H H H
N Y N H H H% digitised / planned N N N X X M
Time Index N N N M M X
Time Index N N N M M X
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Time IndexN N N X M M
Time Index N N N X L M
Number N N N X L L
Number N N N X L L
Time IndexN N N X M M
Number N N N L L M
N Y N L M M
Balanced Scorecard Rating ( Y N N H X X
N Y N M M M
N Y N M M M
Time Index N N N M H H
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
ENGINEERING / DESIGNING FUNCTION KRA MASTER - 2006-07
Source of Data For Measurement KRA Remarks
As per engg plan As per engg plan As per engg plan As per engg plan
As per engg plan
As per engg planAs per agreed schedule
Proposal / tender files
Data to be maintained by individualsAs per engg plan As per engg plan As per engg plan As per engg plan
With respect to agreed schedule
Deptt. Records / CEPD records
WRT No of offers submitted
As per agreed sch
As per agreed sch
As per agreed sch
Deptt. Records / CEPD records
Critical to project Engg Group
Proposal/ Tender submission as per schedule
Data maintained by individuals in proposal/tender files/Computer data base
wrt tender finalised for established products/ Data to be maintained by tendering group
Submission of technical data / information in time. Data to be maintained by individual.
wrt previous year's average / Data to be captured from computer database
During the year/ data to be maintained by individuals
As per L2/ preponed schedule/ Data to be maintained by individuals
With respect to project zero date
As per agreed schedule
As per agreed schedule
Critical to Project Engg Group
With respect to project zero date
With respect to project zero date
Critical to project Engg Group
Date of receipt of orderAgreed schedule ( ex.L2/ L3 Network)Agreed schedule ( ex.L2/ L3 Network)
Agreed schedule ( ex.L2/ L3 Network) Critical to Manufacturing units only
Deptt. Records / CEPD records
Deptt. Records / CEPD records
As per L2/L3 schedule.As per Engg. Schedule As per Engg. scheduleAs per Engg. schedule
Deptt. Records / CEPD records
Critical to Manufacturing units only
Deptt. Records / CEPD records
Completion as per schedule
wrt project schedule/ Data to be maintained by individual/ data base
of schedule milestone/ Data to be maintained by individuals
Date of receipt of order/ Data to be maintained by individuals
As per planned schedule. Individual to maintain the record
wrt agreed schedule/ Data to be captured from computer database
wrt agreed schedule/ Data to be captured from computer database
wrt agreed schedule/ Data to be captured from computer database
wrt agreed schedule/ Data to be captured from computer database
wrt project schedule/ Data to be maintained by individuals
As per schedule. Individual to maintain data base
Individual to maintain record/CEPD records
As per Engg. Schedule
As per Engg. Schedule
As per Engg. schedule wrt approved schedulewrt approved schedule wrt approved schedule wrt approved schedule wrt approved schedule wrt approved schedule wrt approved schedule wrt approved schedule wrt approved schedule
Individual to maintain record.
Individual to maintain record.As per scheduleData to be captured from Data Base Critical to Manufacturing units only
Data to be maintained by individuals
Deptt. Records / CEPD records
wrt request from customer
As per guide lines Critical to Manufacturing units only
Agreed schedule Critical to all Manufacturing units
Average for all the WOs executed during the year. Final design material cost to be captured from MID.
Project initiated during the year/ Data to be maintained by individuals
Index will be calculated based on milestone achived.
Specification reviewed during the year. Data to be captured from computer database through no. of revision of specification/ product standard
Target to be decided in no. of days by each Engg. Group/ Computer Data base to be maintained by individuals/unit
No. of programs during the year/ Data to be maintained by individuals
Data maintained by individuals & PO files/data base
Date of receipt of vendor drg/ document/ Data to be maintained by individual
wrt to plan
Data to be maintained by individualsIndividual to maintain record.
Deptt. Records / CEPD records
Critical to Project Engg Group
Individual to maintain record.
Deptt. Records / CEPD recordsData to be maintained by individualsAs per schedule As per schedule As per schedule As per schedule As per schedule
Deptt. Records / CEPD records
As per data base
Individual to maintain record.
As per Engg schedule
Deptt. Records / CEPD records
Alternate source developed during the year/ Data to be captured from PMD Database
Data to be maintained by individuals/ during the year
Date of receipt of punch points/ to be maintained by individuals
Receipt of marked up document from site/shop
Data to be maintained by individuals/ during the year
wrt previous year/ Test cycle time= (Available working days/ No. of product tested during the year )
During the year/ data to be maintained by individuals
As per planned schedule. Data to be maintained by individuals
wrt total no of tool designed during the year/ Data to be maintained by individuals
Average compared to previous year/ Data to be captured from computer database
WRT last year. Data to be captured from Computer Data Base
IT projects completed during the year/ Data to be maintained by individuals.
Mile stone completion. These can be identified and agreed at beginning/during the year
Actual saving during the year
As per Engg. schedule
As per schedule
wrt to last year data
Evaluation audit wrt check lists & guide linesData base
"For L2 and L3 level
No. obtained to planned
With reference to No.identified
Data to be maintained by individuals
Data to be maintained by individuals
Computer data base
Actual saving during the year wrt tender EFC / Data to be maintained by individuals
Survey to be conducted and satisfaction index to be worked out by each engg. Group
No completed. Data to be maintained by individuals
Projects completed during the year. Data to be maintained by individuals.
Milestone of the projects to listed out and Database to be maintained by individuals. Index Calculation will be based on no of milestones achieved
% of last year to this year/ Data to be captured from Computer Data Base
Target to be decided in no. of days by each Engg. Group/ Computer Data base to be maintained by individuals/unit
wrt last year/ No of complaints received during the year/ Data to be captured from database With reference to No.identified
No of programs validated Vs planned. Individual to maintain the record
Project initiated and mile stone completed/ Data to be maintained by individuals
Technology development plan and schedule to be prepared at the beginning of the project
Index will be calculated based on no of milestone achieved.
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
To delete finance
Record maintained by Unit Head/Unit P&D
Survey Report
Project reportUnit QA/QCQuality Deptt.
Action plan document
Project report
Project report
Project report
Project report
Project report
Project report
Project report
Project report
No of papers presented/published during the year/ Data to be managed by individuals
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Record maintained by Unit/Corp. Finance deptt.
Questionnaire developed by CQA to be adopted . To delete the KRA
CEPD Records -
CEPD Records -
Record -
CEPD plan -As per plan. -
Rating declared at year end by Corporate / Unit Management
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
C0MMISSIONING / TECHNICAL SERVICES FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description
TSX00100 TSX Commissioning of units as per Site Plan O
TSX00101 TSX O
TSX00102 TSX O
TSX00103 TSX O
TSX00104 TSX O
TSX00105 TSX O
TSX00106 TSX O
TSX00200 TSX C
TSX00201 TSX C
TSX00202 TSX C
TSX00300 TSX C
TSX00301 TSX O
TSX00302 TSX Reduction in cycle time of RLA activities at site C
TSX00303 TSX Reduction in time taken for submission of RLA reports O
TSX00304 TSX Reduction in time taken for execution of R&M works at site C
TSX00400 TSX O
KRA Type
Timely planning/ monitoring/ and controlling inputs for commissioning activities to achieve the targets
Erection/Pre-Commissioning checks of equipments and systems for conducting trial runs/ as per plan
Timely reporting of non-conformities to manufacturing units within specified time
Assess and prioritise for integration of inputs (including customer's inputs) for starting pre-commissioning/milestone activities/ ahead of plan
Completion of milestone and commissioning activities/ as per plan
Preparation of joint protocols (after ensuring adherence of performance to specifications) of the equipments/systems commissioned.
Reduction of time taken for re-commissioning of units after overhaul/ performance evaluation and troubleshooting/ post-warranty jobs
Reduction of time taken for re-commissioning of units after overhauling jobs
Reduction in response time for performance evaluation and troubleshooting activities
Improvement over contractual time for execution of RLA / R&M services
Reduction in response time for preparation and submission of technical specifications for RLA jobs
Optimisation/ Preparation and Conductance of PG/PE Test as per plan
TSX00401 TSX O
TSX00402 TSX O
TSX00403 TSX O
TSX00404 TSX Conductance of functional tests as per contract. O
TSX00500 TSX No. of units commissioned as per Balanced Score Card O
TSX00501 TSX O
TSX00502 TSX Finalization of commissioning checklists as per plan C
TSX00503 TSX O
TSX00504 TSX O
TSX00505 TSX O
TSX00506 TSX OTSX00600 TSX Reduction in Cycle Time of identified Processes C
TSX00601 TSX Identification of processes targetting cycle time reduction C
TSX00602 TSX CTSX00603 TSX Timely execution of Action Plan for cycle time reduction C
TSX00700 TSX Enhancement in customer satisfaction score C
TSX00701 TSX Number of Customer Meets conducted O
TSX00702 TSX % of feedback incorporated resulting out of customer meets C
TSX00703 TSX Registration/ follow-up and resolution of customer complaints O
TSX00704 TSX CTSX00705 TSX Extending support to customer for Optimising O&M practices C
TSX00706 TSX C
TSX00800 TSX O
Procedure for TG Performance Guarantee/Performance Evaluation Tests - Preparation/ Submission and approval by Customer/Consultant
Finalisation of procedure with customer and for Conductance of functional tests as per contract.
Deployment of Instruments and ensure comprehensive system readiness at site for PG/PE test conductance as per plan
Finalization of commissioning procedures and obtaining their approval from customer / consultant
Assessment of IMTEs requirement at site for commissioning and deployment as per plan
Planning of inputs and course correction for commissioning the projects as per schedule
Release of project specific erection/ commg manual as per plan.
Outsourcing of expert services for commissioning as per requirements
Evaluation of alternatives to existing processes/ to achieve cycle time reduction
Implementation of O&M improvement projects/ in consultation with Customer
Proactive planned customer visits to enhance customer relationship
Completion of reliability run / trial operation of the units/ as per target
TSX00801 TSX Resolution of non conformities observed during commissioning O
TSX00802 TSX O
TSX00803 TSX O
TSX00804 TSX O
TSX00900 TSX C
TSX01000 TSX O
TSX01100 TSX Inputs to manufacturing units for as built drawings O
TSX01200 TSX O
TSX01300 TSX O
TSX01301 TSX O
TSX01400 TSX Arranging Purchase of T&P/ IMTEs etc. as per plan O
TSX01500 TSX C
TSX01501 TSX C
TSX01600 TSX C
TSX01601 TSX C
TSX01602 TSX O
TSX01603 TSX O
TSX01604 TSX O
TSX01700 TSX National / International Accreditations achieved/ revalidated C
TSX01800 TSX O
TSX01900 TSX C
Resolution of technical issues during Erection / Commissioning / Unit Stabilization
Optimisation of the equipment/system to achieve performance specifications
Completion of reliability run of the equipment/system/unit as per target
Suggestions to MUs/PEM/Region/Site/TS(HQ) for improvement in products/systems
Man-hours of customer training conducted as per contracts/plan
Preparation and submission of unit completion reports within specified time
Optimal utilization of expert services of the Group for commissioning/recommissioning/ trouble shooting/overhauling jobs/PG/PE Tests
Assistance to sites for commissioning/ overhauling/PG/PE Tests
Development of expertise within the Group to meet the current and future needs in identified areas
Develop multi-skilled manpower through training and work experience/ to optimise human resources
Upgradation of facilities (IMTE & PG Test instruments) to meet new standards
Identification of facilities needing upgradation to meet new standards
Processing/ submission of IMTE/ T&P budget proposals for timely procurement
Calibration/ rectification /upgradation and arranging procurement of IMTEs/PG Test instruments as per plan
Timely disposal of unusable/obsolete instruments & material through CMTD (Corporate Office) & MSTC Ltd.
Upgradation of EDP/IT infrastructure to meet operational requirements
Development/ improvement of products with vendor partnerships
TSX01901 TSX O
TSX02000 TSX C
TSX02100 TSX C
TSX02200 TSX C
TSX02201 TSX C
TSX02202 TSX C
TSX02203 TSX O
TSX02204 TSX C
TSX02300 TSX OTSX02301 TSX Web-based reporting of performance of BHEL sets O
TSX02302 TSX O
TSX02303 TSX OTSX02304 TSX Timely submission of MIRs / Query-Based Replies O
TSX02305 TSX C
TSX02306 TSX O
TSX02307 TSX Performance monitoring of BHEL supplied Hydro Power Plant O
TSX02308 TSX O
TSX02309 TSX O
TSX02400 TSX Development of knowledge management system as per plan C
TSX02401 TSX C
TSX02402 TSX C
TSX02403 TSX C
TSX02404 TSX C
Evaluation of Vendor Performance as per plan/ and generation of feedback
Formation of strategic business alliance as per plan/ with detailed breakup of activities
Number of accepted suggestions given for system / product improvement
Technology and Process Improvements for Erection/ Commissioning/ Trouble-Shooting/ PG/PE Tests/ Servicing/ R&M/ Performance Monitoring
Completion of Special Improvement Projects in the processes as per plan/ incorporating new technologies
Identification/ application of new tools/ technologies for execution of processes
Cost saving through Process Improvements/ Productivity Measures
Promote HSE Management Programmes for process improvements
Performance monitoring of BHEL supplied thermal / gas / nuclear sets
Proactive assistance to customers/ based on performance monitoring reports / feedbacks
Generation of Failure analysis reports for incorporating improvement in the processes/ products and systems
Upgradation/ Development of Software for faster data processing and analysis of Performance Monitoring of BHEL sets
Performance monitoring of BHEL supplied Captive Power Plant
Performance monitoring of BHEL supplied Gas based Power Plant
Performance monitoring of BHEL supplied Overseas Project Power Plant
Number of programmes / workshop conducted for knowledge sharing
No of technical papers presented (Inhouse/ National/ International fora) / published (in Journals)
Dissemination of status of projects/ and innovative technologies implemented at sites/ through in-house publications
Capturing the Best Practices within (of) the organization / competitors / Consultants / Customers
TSX02405 TSX C
TSX02406 TSX OTSX02500 TSX Patenting New Technology CTSX02600 TSX Generation of business in new areas C
TSX02601 TSX Execution of AMC and O&M contracts/ as per plan O
TSX02602 TSX Execution of Slow Speed Balancing contracts as per plan O
TSX02603 TSX OTSX02604 TSX Order booking for O&M and LTSA contracts O
TSX02605 TSX Execution of New Business Contracts as per plan O
TSX02606 TSX New Marketing initiatives undertaken O
TSX02607 TSX O
TSX02700 TSX Technical inputs /assistance for SAS/ PPI/ R&M/ O&M jobs O
TSX02800 TSX Project cycle time reduction through re-visiting exercises C
TSX02900 TSX O
TSX03000 TSX O
TSX03001 TSX O
TSX03100 TSX OTSX03200 TSX Number of papers edited / approved / published CTSX03201 TSX Publication of 'Feedback' journal O
TSX03300 TSX Preparation and issue of technical documentation C
TSX03301 TSX Preparation and issue of product-specific Erection Manuals C
TSX03302 TSX C
TSX03303 TSX Preparation and issue of product-specific Servicing Documents O
TSX03304 TSX Web-hosting of technical documents C
Sharing and adoption of Best Practices and implementing the same succesfully/ as per plan
Imparting advanced technical education to internal / external customers
Pre-outage survey / health monitoring / condition assessment conducted at operating units
Timely Preparation of estimates and Offer submission to Customer
Assistance to sites for resolution of technical issues leading to contract closing
Planning/ Conducting of Milestone /Quality / Safety Audits as per Plan
Recommendation of corrective actions based on Milestone /Quality / Safety Audit Reports
No. of design audits conducted for new products / systems / services
Preparation and issue of product-specific Commissioning Documents
TSX03305 TSX Preparation and issue of HSE Manuals C
TSX03400 TSX C
TSX03500 TSX Resolution of generic problems C
TSX03501 TSX O
TSX03502 TSX O
TSX03503 TSX C
TSX03600 TSX O
TSX03700 TSX O
TSX03800 TSX O
TSX03900 TSX O
TSX04000 TSX Finalisation of Functional scorecard by specified date O
TSX04100 TSX Improvement in Employee Satisfaction Score O
TSX04101 TSX CTSX04200 TSX Increase in no. of active Quality Circles in the deptt. OTSX04300 TSX Achieving Business excellence thru' TQM at Deptt. level C
TSX04301 TSX Preparation of action plan based on Position report O
TSX04302 TSX C
TSX04400 TSX Development of Knowledge management Portal C
TSX04500 TSX CTSX04600 TSX Completion of KM Projects as per schedule C
TSX04700 TSX C
TSX04800 TSX C
Preparation and issue of repair & maintenance procedures for tools & plants
Formulation of Action Plan for resolution of identified generic problems
Implementation of Action Plans for resolution of generic problems
Performance analysis of the equipment / system after implementation of Action Plan for resolution of generic problem
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Implementation of Improvement projects identified in the Position Report as per schedule
Implementation of Improvement projects identified in the Position Report as per schedule
Contributing case studies etc.for Knowledge Management Portal
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
TSX04900 TSX C
TSX05000 TSX C
TSX05100 TSX C
TSX05200 TSX C
TSX05300 TSX C
TSX05400 TSX C
TSX05500 TSX C
TSX05600 TSX O
TSX05700 TSX Issues resolution through task force and action plan finalisation O
TSX05800 TSX Study of tender documents and submission of comments O
TSX05900 TSX C
TSX05901 TSX Benchmarking of project activities O
TSX06000 TSX O
TSX06100 TSX O
TSX06200 TSX O
TSX06300 TSX O
TSX06400 TSX O
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Timely preparing inspection procedures and conducting inspections for the precision instruments & calibration equipments
Preparation of Technical specifications for advance instrumentation to meet new standards.
Performance monitoring of NON -BHEL supplied Power Plant in India and Abroad for Bench marking BHEL Sets Performance
Interaction with CEA/PGCIL/CERC / Heavy Industry / MOP and other Govt. Agencies to resolve issues
Process improvements based on Benchmarking of project activities
Timely commissioning of BOP packages in BHEL scope as per plan
Timely preparation and submission of Project completion reports
Development of Detailed Project Specific Erection/Commissioning L3 Networks
Timely Pre-Commissioning /Commissioning of Boiler Sub systems
Timely Pre-Commissioning /Commissioning of Turbine Sub systems
TSX06500 TSX O
TSX06600 TSX O
TSX06700 TSX O
TSX06800 TSX O
TSX06900 TSX C
TSX07000 TSX O
TSX07100 TSX O
TSX07200 TSX O
TSX07201 TSX Identification of Customers for Slow speed balancing O
TSX07202 TSX O
TSX07300 TSX O
TSX07400 TSX Technical scrutiny/making of technical specification of MMDs O
TSX07401 TSX Scrutiny of technical offers of MMDs/Instruments O
TSX07402 TSX O
TSX07403 TSX Inhouse / Outside repair of MMDs O
TSX07404 TSX Calibration /Rectification /Procurement of PG Test Instruments O
TSX07500 TSX Microfilming of drawings/documents. O
TSX07600 TSX Number of Standardization Meetings conducted/Attended O
TSX07700 TSX Scanning of drawings/documents and creating soft copy O
Timely Pre-Commissioning /Commissioning of generator Sub systems
Timely Pre-Commissioning /Commissioning of Electricals Sub systems
Timely Pre-Commissioning /Commissioning of C&I Sub systems
Extending Assistance to customer to meet contactual obligations regarding O&M/ Availability
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
% of commissioning action request resolved within specified time. (Time to be specified in action plan box)
Execution of CONTRACTUAL CONDITION MONITORING through vibration.noise and other accessable techniques
Completion of slow speed balancing jobs to satisfaction of customer
Execution and completion of Slow speed balancing job to satisfaction of customer
Preparation of estmates for construction power and estimates for electrical and C & I jobs for sites
Inspection /testing of new procured MMDs/Instruments and repaired MMDs
TSX07800 TSX Timely supply of prints to users O
TSX07900 TSX OSystem administration of Drawing Management System and On-line Print Requisition System
C0MMISSIONING / TECHNICAL SERVICES FUNCTION KRA MASTER - 2006-07
Unit of Measurement
Time IndexY N N H X X
%
Y N N M H X
Time IndexY N N X M H
Time IndexY N N X M L
Days Y N N M L X
Time Index
Y N N X M H
%
Y N N X L H
No. of days reduced Y N N M M X
No. of days reduced N N N X M H
%
N N N X M H
%
Y N N H M M
%
N N N M H L
%
N N N L M H
%
Y N N L H H
%
Y N N X M H
%
Y N N M H H
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA
(Y/N)
Suggested Weightage for category
A B C
Number
Y N N M H M
%Y N N X M M
%
Y N N X M H
%Y N N X M M
%
Y N N H X X
%Y N N L M M
%Y N N X M M
%Y N N X L M
%Y N N M M X
%Y N N L M L
%N N N M M X
% N N N M H M
NumberN N N M M X
%N N N M H X
% N N N X M L
%
Y N N L M X
Number Y N N H M M
%
Y N N M L L
%
Y N N M M L
%N N N L M M
Days N N N L M M
%Y N N M L X
%Y N N M H H
%Y N N L M M
%Y N N L M M
%Y N N L H H
%Y N N H M M
Number N N N H M L
%Y N N X M M
%Y N N X L M
Time IndexY N N M M M
Y N N L X X
%
Y N N X M M
%Y N N L L L
Y N N L L X
Y N N L L X
%
Y N N M M X
%
Y N N M M X
Time IndexY N N X M L
%Y N N X M M
%Y N N X M H
%N N N L L L
%N N N L L L
Number N N N H M L
% Mandays utilised / available
% Expertise developed / areas identified
% manpower trained in more than one skill
%
N N N X L L
%Y N N H L L
%N N N L M M
%
Y N N H M L
%
Y N N M H H
%Y N N M M X
Rupees Y N N M M M
%
N N N M M X
No.of reports generated Y N N H X X
% Y N N X M M
Number Y N N M M L
Number Y N N M L L
Time Index Y N N M M L
%
Y N N L H M
Number Y N N L L M
Number Y N N L L M
Number Y N N L L M
Number Y N N M M H
%Y N N H M M
%Y N N M M L
NumberY N N H H H
Number
Y N N M H H
%
N N N M M X
%N N N X L L
%Y N N M M X
Number N N N H H XRupees Y N N M X X
Rupees Y N N M H L
Rupees Y N N M H L
No.of Sites Y N N M H LRupees Y N N M M X
Rupees Y N N M H L
%Y N N H H H
%Y N N M H H
%Y N N L L L
%Y N N M H L
%Y N N M M M
%
Y N N M H M
Y Y N M H L
Number Y N N H M L
Number Y N N L M L
Number Y N N L H M
%
Y N N H X X
%
N N N L M M
%
N N N L M M
%
N N N L M M
%
Y N N M L L
No. of days delayed from scheduled date
%Y N N L M M
Number N N N X L L
%Y N N H M X
%
Y N N L L M
%
Y N N X L M
%
Y N N M M M
%
Y N Y M L L
%
Y N Y M L L
Time IndexY N Y M L L
Time Index
Y N Y M L L
Y Y Y H M L
Score Y N Y M X X
Time IndexY N Y X M M
Number of new circles N N Y M X XTQM Score Y N Y H X X
Y Y Y X M X
Time IndexY N Y X X M
Y Y Y L M H
NumberN N Y M M M
Time Index Y N Y X M H
N Y N H H H
N Y N H H H
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
N Y N H H H
N Y N H H H
N Y N H H H
N Y N H H H
%
Y N N L H L
Number Y N N L H L
Number
Y N N H H H
%Y N N H M L
%Y N N H H M
%
Y N N H H X
%
Y N N H H X
%
Y N N M H L
%
Y N N H H X
Time IndexY N N M M M
NumberY N N M M M
%
Y N N L M M
%
Y N N L M M
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
%
Y N N L M M
%
Y N N L M M
%
Y N N L M M
%N N N X X H
Balanced Scorecard Rating (5 Y N N H H X
%N N N L M H
Number of jobs Y N N L L M
No of rotors Y N N L M H
Number of rotors Y N N L L M
No of rotors Y N N L M H
Time IndexY N N L M H
Time Index
Y N N L M H
Time Index
Y N N L M H
Time Index
Y N N L M H
% repairs completed within sp Y N N L M H
Time Index
Y N N L M H
Number N N N L M H
Number
N N N L L H
No.of pages N N N L M H
% in specified targeted time N N N L M H
% availability of system N N N L M H
C0MMISSIONING / TECHNICAL SERVICES FUNCTION KRA MASTER - 2006-07
KRA Remarks
[2 -(Actual time / Scheduled time)] x 100
No of days saved
Protocols
Protocols No. of days saved
Protocols No. of days saved
[Nos conducted / Total planned] x 100
Source of Data for Measurement
L2/L3 schedule / SOMS / Site Plan
L2/L3 schedule / SOMS / Score Card
Completion Report / Protocols
SAR/CAR/Other Reports
No of days after occurrence to be specified
Completion schedule / SOMS
L2 network/ Balance Score Card
[No of protocols completed / No of trial runs completed] x100
Benchmark data / Completion Reports
Average of [{(Prev.3 Years Average - No. of days taken to respond) / Prev.3 Years Average}] x 100
External / Internal Work Orders/ Completion Reports
[2 - (Cumulative no. of days taken/Cumulative no. of days as per schedule)] x 100
Benchmark data/ Job Completion Reports
Average of [(Benchmark time - No. of days taken to respond) / Benchmark time x 100]
Benchmark data/ Job Completion Reports
[2 - (No. of days taken/No. of days as per schedule)] x 100
Benchmark data/ Job Completion Reports
[2 - (No. of days taken/No. of days as per benchmark)] x 100
Benchmark data/ Job Completion Reports
[2 - (No. of days taken/No. of days as per schedule)] x 100
Annual Plan/Balanced Score Card
Procedure Report
DP/ L1/L2 schedule
Protocols
[Nos. approved / Nos. planned] x 100
[Nos. finalised / Nos. planned] x 100
DP/ L1/L2 schedule
[No. released / No. planned] x 100
Deployment planBench Mark/Report [Days reduced/Previous best] x 100
Nos. identified
[Nos. evaluated / Nos. identified] x 100Bench Mark/Report [Days reduced/Previous best] x 100
[Increase in Score / Previous Score] x 100
No of meets
Completion ReportReport No. of days of support extended
Report
Protocols
Document Issue Register
No. of documents approved by customer / consultant
[No of Procedure finalised / No of tests as per contract]x 100
[2 - (Cumulative actual time taken / Cumulative time required as per norms)] x 100
[No of tests conducted / No of tests as per contract] x 100
L2/L3 schedule / SOMS / Balanced Score Card
[No. of units commissioned / No of units planned for commissioning] x 100
Document Issue Register
Document Issue Register
(No of instruments deployed / Total no to be deployed as per plan)x 100
L2/L3 Net work/Daily Report
[2 - (Actual time taken / Scheduled time)] x 100
Document Issue Register
[No. of requirements met / No. of requirements as per plan] x 100
Analysis of BenchMarks
Project Review Reports
Customer satisfaction survey report/ Feedbacks received through Customer Meets
Plan / Compliance Report
Feedback / status Report
[No. of feedbacks implemented / No. of feedbacks accepted for implementation] x 100
Customer Complaint register / SOMS
(No of complaints resolved / Total no of complaints registered) x 100
[No of projects implemented / No of projects planned] x 100
[No of visits undertaken / No of visits planned] x 100
[No. of reliability runs completed / No. of reliability runs planned] x 100
Completion Report (Nos. completed / Nos. envisaged) x 100
Completion Report (Nos. completed / Nos. envisaged) x 100
Suggestion Reports No of suggestions given
Training Reports
Markedup drawings
Completion reports
SAR/CAR/Other Reports
(No of non- conformities resolved/Total no of non- conformities reported) x 100
Punch Lists (internal & external)
[No of issues closed/ No of issues raised] x 100
[Man hrs achieved/ Man hrs planned] x 100
[2 - (No. of days taken / No. of days planned)] x 100
Unit Completion Report
Job completion reports/ Protocols
[No. of days deployed / No. of days requested] x 100
Completion Reports/ Balance score Card
[No of site man-days assisted / No of site man-days planned] x 100
Plan/ Indents/ Inspection reports
{No. of items purchased/No. of items planned} x 100
Annual Plan/ Training Reports
[No. of expert capabilities developed / No. of expert capabilities planned to be developed] x 100
Plans/ Training Reports/ Departmental reports
[No of persons developed / No planned] x 100
Budgetary approvals/ IMTE inventory register
[Capital budget spent / Capital budget sanctioned] x 100
Current Standards/ Current Contract Conditions/ NCRs/ Inventory Status
[No. of facilities identified for upgradation / No. of facilities not meeting new standards] x 100
Proposals/ Approvals
L2/L3 schedule/ IMTE / T&P register
[2- (Actual time taken / Scheduled time)] x 100
DISPOSAL REPORT
[2- (Actual time taken / Scheduled time)] x 100
Accreditation Certificates
(No of accreditations obtained / No of accreditations planned) x 100
Project status Report
[No. of projects completed / No. of projects planned] x 100
No of new products (or/ variants) introduced
[No. accepted / No. submitted] x 100
[No executed / No planned] X 100
Financial Reports Budget
Completion Report
No. of Reports generatedSystem Log On-line availability of system
MIRs No. of responses
No. of reportsCopy of MIRs
No. of Reports generated
No. of Reports generated
No. of Reports generated
No. of Reports generated
Plan/ KMOs' report
Training reports
Individual report No. of papers presented
No. of journals published
Plan Document/ Vendor Performance Feedback Reports
[Improvement in vendor rating / Previous year's vendor rating] x 100
Strategic business alliance reports
[No. of activities completed / No. of activities planned] x 100
Annual Plan/MSX Report
Annual Plan/ Balance Score Card
[Number achieved / Number planned] x 100
Annual Plan/Balance Score Card
[Projects completed/Projects Planned] x 100
Execution / completion Reports
[No of imrovement projects implemented / No of imrovement projects planned] X 100
Daily/monthy/annual Reports
Failure analysis reports
Implementation / Status Reports
[No. of activities completed in time / No. of activities planned] x 100
Daily/monthy/annual Reports
Daily/monthy/annual Reports
Daily/monthy/annual Reports
Daily/monthy/annual Reports
[No. of activities completed / No. of activities planned] x 100
[No.of programmes conducted / No of programmes planned] x 100
Copies of in-house journals
Implementation Report
[No. of Best Practices captured / No. of Best Practices planned to be captured] x 100
ReportsList of patents No. of patents applied forFinancial Report Turnover from new businesses
Turnover from AMC & O&M Contracts
Assessment reportsBalance Score card Value of orders received
Turnover from New Business Contracts
Reports
Offer Report
MIRs/ MoMs [No. of responses / No. of requests] x 100
Report
Report No of days after completion of audit
Audit ReportsPublications No of papersPlan / Journal No. of issues
System Log/ Plan
Implementation Report
[No. of Best Practices implemented / Nos. planned] x 100
[Man hrs achieved/ Man hrs planned] x 100
Plan/ Financial Report
Plan/ Financial Report
Turnover from Slow Speed Balancing Contracts
No.Of Units where Survey/Condition Assessment conducted
Plan/ Financial Report
[No. of Initiatives Taken/ No. of Initiatives Planned] x 100
(No. of Offers submitted in time / No. of Offers) x 100
[Days reduced / Currently benchmarked time cycle] x 100
Protocols/ Balance Score card
[Mandays executed / Mandays planned] x 100
Audit Plan/ L2/L3 Network/ Audit Report
[No of audits conducted / No of audits planned] x 100
[No of audits conducted / No of audits planned] x 100
Document Issue Register
[No. of documents issued / No. of documents to be issued as per plan] x 100
Document Issue Register/ Document Issue Plan
[No. of product-specific Erection Manuals issued / Nos. to be issued as per Plan] x 100
Document Issue Register/ Document Issue Plan
[No. of product-specific Commissioning Documents issued / Nos. to be issued as per Plan] x 100
Document Issue Register/ Document Issue Plan
[No. of product-specific Servicing Documents issued / Nos. to be issued as per Plan] x 100
[No. of documents hosted / Total no. of documents to be hosted as per Plan] x 100
(2-(Actual time/Scheduled time)) X 100
Copy of Procedures No. of procedures
Completion Report
[Nos. analysed / Nos. implemented] x 100
Survey Report
Project reportUnit QA/QCQuality Deptt.
Project report
Project report
Project report
Project report
Document Issue Register
[No of issues resolved / No. of issues identified] x 100
Generic problems register/ Action Plan documents
[No. of Action Plans formulated / No. of generic problems identified] x 100
Implementation Reports/ Action Plans
[No. of Action Plans implemented / Nos. formulated] x 100
Analysis Reports/ Implementation Reports
Record maintained by Audit deptt.
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Record maintained by Audit deptt.
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Questionnaire developed by CQA to be adopted .
Action plan document
Project report
Project report
Project report
Project report
No. of Reports generated
MOM / Replies
Task force report
Reports
Reports
Reports
No of days after trial operation
L3 Network Nos. developed
PROCEDURE DOCUMENTS
(NO. OF DOCUMENTS PREPARED/DOCUMENTS PLANNED)X100
SPECIFICATION SHEETS
(NO. OF SPECF PREPARED/ PLANNED)X100
monthy/annual Reports
(No. of issues resolved / No of issues referred) x 100
(No. of action plans finalised / No of issues referred) x 100
(Number of documents submitted after comments)/(Number of document received for comments)x100
(Number of process improvement completed/ Number of process improvement planned )x100
(Number of activities Bench Marked)/(Number ofactivities Planned to be Bench Marked )x100
L2/L3 schedule / SOMS / Site Plan
[No. of Packages commissioned / No of Packages planned for commissioning] x 100
Project Completion Report
Annual Plan/MSX Report
[2 - (Cumulative actual time taken / Cumulative time required as per norms)] x 100
Annual Plan/MSX Report
[2 - (Cumulative actual time taken / Cumulative time required as per norms)] x 100
Site records
-
-
-
-
-
Number achieved -
-
-
-
-
-
Mother KRA
For customers/other BHEL units
Annual Plan/MSX Report
[2 - (Cumulative actual time taken / Cumulative time required as per norms)] x 100
Annual Plan/MSX Report
[2 - (Cumulative actual time taken / Cumulative time required as per norms)] x 100
Annual Plan/MSX Report
[2 - (Cumulative actual time taken / Cumulative time required as per norms)] x 100
(No. of days services provided / No. of days planned) x 100
Rating declared at year end by Corporate / Unit Management
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
CAR received from site
Number of job executed / under progress
Completion of balancing.
No of rotors/customers identified
No of rotors balanced.
Relevant records being maintained for this purpose
Relevant records being maintained for this purpose
Relevant records being maintained for this purpose
Relevant records being maintained for this purpose
Relevant records being maintained for this purpose
No. of microfilms produced.
Departmental Records
In these meets Standards are reviewed and collective decisions are taken for revision/reaffirmation.
Number of drawings/documents scanned
For various user departmentsDepartmental records
Availibility of system for use
On-line submission of drawings and print requisitions
RESEARCH & DEVELOPMENT FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description KRA Type
RDE00100 RDE C Y Y N
RDE00101 RDE C N Y N
RDE00102 RDE O N Y N
RDE00103 RDE O N Y N
RDE00104 RDE C N Y N
RDE00105 RDE C N Y N
RDE00200 RDE C Y Y N
RDE00201 RDE C N Y N
RDE00202 RDE O N Y N
RDE00203 RDE O N Y N
RDE00204 RDE C N Y N
Unit of Measurement
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA
(Y/N)
Timely completion of R&D project(#1) of capability-building nature for R&D function (completion date as in project target (PIR's)
No. of days delayed from scheduled date
Design finalisation as per schedule
No. of days delayed from scheduled date
Specification and procurement of project material / eqpt./prototype
No. of days delayed from scheduled date
Fabrication /Assembly of prototype as per schedule
No. of days delayed from scheduled date
Testing and modification as per schedule
No. of days delayed from scheduled date
Documentation of develoment process as per schedule
No. of days delayed from scheduled date
Timely completion of R&D project(#2) of capability-building nature for R&D function as per schedule
No. of days delayed from scheduled date
Design finalisation as per schedule
No. of days delayed from scheduled date
Specification and procurement of project material / eqpt./prototype
No. of days delayed from scheduled date
Fabrication /Assembly of prototype as per schedule
No. of days delayed from scheduled date
Testing and modification as per schedule
No. of days delayed from scheduled date
RDE00205 RDE C N Y N
RDE00300 RDE C Y Y N
RDE00301 RDE C N Y N
RDE00302 RDE O N Y N
RDE00303 RDE O N Y N
RDE00304 RDE C N Y N
RDE00305 RDE C N Y N
RDE00400 RDE C Y Y N
RDE00401 RDE C N Y N
RDE00402 RDE C N Y N
RDE00403 RDE O N Y N
RDE00500 RDE C Y Y N
Documentation of develoment process as per schedule
No. of days delayed from scheduled date
Timely completion of R&D project(#3) of capability-building nature for R&D function as per schedule
No. of days delayed from scheduled date
Design finalisation as per schedule
No. of days delayed from scheduled date
Specification and procurement of project material / eqpt./prototype
No. of days delayed from scheduled date
Fabrication /Assembly of prototype as per schedule
No. of days delayed from scheduled date
Testing and modification as per schedule
No. of days delayed from scheduled date
Documentation of develoment process as per schedule
No. of days delayed from scheduled date
Timely development of software packages/ modules(#1) for improving R&D capability as per schedule
No. of days delayed from scheduled date
Formulation of requirements specification as per schedule
No. of days delayed from scheduled date
Coding and testing as per schedule
No. of days delayed from scheduled date
Implementation and modifications as per schedule
No. of days delayed from scheduled date
Timely development of software packages/ modules (#2) for improving R&D capability as per schedule
No. of days delayed from scheduled date
RDE00501 RDE C N Y N
RDE00502 RDE C N Y N
RDE00503 RDE O N Y N
RDE00600 RDE C Y Y N
RDE00601 RDE C N Y N
RDE00602 RDE C N Y N
RDE00603 RDE O N Y N
RDE00700 RDE C Y N N
RDE00800 RDE C Y Y N
RDE00900 RDE C Y Y N
RDE01000 RDE C Y Y N
RDE01100 RDE C Y Y N
Formulation of requirements specification as per schedule
No. of days delayed from scheduled date
Coding and testing as per schedule
No. of days delayed from scheduled date
Implementation and modifications as per schedule
No. of days delayed from scheduled date
Timely development of software packages/ modules(#3) for improving R&D capability as per schedule
No. of days delayed from scheduled date
Formulation of requirements specification as per schedule
No. of days delayed from scheduled date
Coding and testing as per schedule
No. of days delayed from scheduled date
Implementation and modifications as per schedule
No. of days delayed from scheduled date
Identification of advanced technology programmes through Networking/ Collaborative research
No. of projects identified
Preparation of long-term vision and road map for new areas as per schedule
No. of days delayed from scheduled date
Bench marking / Feasibility study / Forecasting / Literature Survey / Technology scanning
No. of days delayed from scheduled date
No. of projects/ related milestones completed for modernization & upgradation of testing facilities as per schedule
No. of days delayed from scheduled date
No. of processes updated as per schedule
No. of days delayed from scheduled date
RDE01200 RDE C Y N N
RDE01300 RDE C
Time Index
Y N N
RDE01400 RDE C N Y N
RDE01500 RDE O N N N
RDE01600 RDE C N Y N
RDE01700 RDE C N Y N
RDE01800 RDE C N Y N
RDE01900 RDE C N Y N
RDE02000 RDE C N Y N
RDE02100 RDE C N Y N
RDE02200 RDE O Y Y N
Reduction in cycle time through improvements in technology/ process/ tools
% reduction in cycle time
New testing procedures/ standards/ equipment/ processes established
Documentation for technology transfer process as per schedule
No. of days delayed from scheduled date
Development of new jigs and fixtures for new equipment/ machines
Number of items developed as per target dates
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Timely completion of R&D project(#1) for product/process development as per schedule
No. of days delayed from scheduled date
RDE02201 RDE O N Y N
RDE02202 RDE O N Y N
RDE02203 RDE O N Y N
RDE02204 RDE O N Y N
RDE02205 RDE C N Y N
RDE02300 RDE O Y Y N
RDE02301 RDE O N Y N
RDE02302 RDE O N Y N
RDE02303 RDE O N Y N
RDE02304 RDE O N Y N
RDE02305 RDE C N Y N
RDE02400 RDE O Y Y N
Design finalisation as per schedule
No. of days delayed from scheduled date
Specification and procurement of project material / eqpt./prototype
No. of days delayed from scheduled date
Fabrication /Assembly of prototype as per schedule
No. of days delayed from scheduled date
Testing and modification as per schedule
No. of days delayed from scheduled date
Documentation of develoment process as per schedule
No. of days delayed from scheduled date
Timely completion of R&D project(#2) for product/process development as per schedule
No. of days delayed from scheduled date
Design finalisation as per schedule
No. of days delayed from scheduled date
Specification and procurement of project material / eqpt./prototype
No. of days delayed from scheduled date
Fabrication /Assembly of prototype as per schedule
No. of days delayed from scheduled date
Testing and modification as per schedule
No. of days delayed from scheduled date
Documentation of develoment process as per schedule
No. of days delayed from scheduled date
Timely completion of R&D project(#3) for product/process development as per schedule
No. of days delayed from scheduled date
RDE02401 RDE O N Y N
RDE02402 RDE O N Y N
RDE02403 RDE O N Y N
RDE02404 RDE O N Y N
RDE02405 RDE C N Y N
RDE02500 RDE O Y Y N
RDE02501 RDE O N Y N
RDE02502 RDE O N Y N
RDE02503 RDE O N Y N
RDE02600 RDE O Y Y N
RDE02601 RDE O N Y N
RDE02602 RDE O N Y N
RDE02603 RDE O N Y N
Design finalisation as per schedule
No. of days delayed from scheduled date
Specification and procurement of project material / eqpt./prototype
No. of days delayed from scheduled date
Fabrication /Assembly of prototype as per schedule
No. of days delayed from scheduled date
Testing and modification as per schedule
No. of days delayed from scheduled date
Documentation of develoment process as per schedule
No. of days delayed from scheduled date
Timely completion of commercial project(#1) activities and milestones as per target as per schedule
No. of days delayed from scheduled date
Assimilation of all project related data and information as per schedule
No. of days delayed from scheduled date
Planning and timely procurement of required inputs as per schedule
No. of days delayed from scheduled date
Timely completion of targeted activities and milestones as per schedule
No. of days delayed from scheduled date
Timely completion of commercial project(#2) activities and milestones as per target as per schedule
No. of days delayed from scheduled date
Assimilation of all project related data and information as per schedule
No. of days delayed from scheduled date
Planning and timely procurement of required inputs as per schedule
No. of days delayed from scheduled date
Timely completion of targeted activities and milestones as per schedule
No. of days delayed from scheduled date
RDE02700 RDE O Y Y N
RDE02701 RDE O N Y N
RDE02702 RDE O N Y N
RDE02703 RDE O N Y N
RDE02800 RDE O Y Y N
RDE02801 RDE O N Y N
RDE02802 RDE O N Y N
RDE02803 RDE O N Y N
RDE02804 RDE C Y Y N
RDE02900 RDE O Y Y N
RDE03000 RDE O Y Y N
RDE03100 RDE O N Y N
Timely completion of commercial project(#3) activities and milestones as per target as per schedule
No. of days delayed from scheduled date
Assimilation of all project related data and information as per schedule
No. of days delayed from scheduled date
Planning and timely procurement of required inputs as per schedule
No. of days delayed from scheduled date
Timely completion of targeted activities and milestones as per schedule
No. of days delayed from scheduled date
Product/System Improvements as required by Business Sector/ Units as per schedule
No. of days delayed from scheduled date
Finalisation of improvements planned through benchmarking with competing products as per schedule
No. of days delayed from scheduled date
Timely completion of improvement activities as per schedule
No. of days delayed from scheduled date
Implementation of improvements at Units/ sites as per schedule
No. of days delayed from scheduled date
Making procedure & documenting the improvement for KM portal as per schedule
No. of days delayed from scheduled date
Preparation and submission of development project proposals as per schedule
No. of days delayed from scheduled date
Preparation and submission of commercial project proposals as per Customer requirements
No. of proposals submitted in required time
Timely development of software packages/ modules for external use as per schedule
No. of days delayed from scheduled date
RDE03101 RDE O N N N
RDE03102 RDE O N Y N
RDE03103 RDE O N Y N
RDE03200 RDE C Y Y N
RDE03201 RDE C N Y N
RDE03202 RDE O N Y N
RDE03203 RDE O N Y N
RDE03300 RDE O Y N N
RDE03400 RDE O Y N N
RDE03500 RDE O N N N
RDE03600 RDE C N N N
RDE03700 RDE O N N N
Formulation of requirements specification as per schedule
Completion Date as per target / No. of days delayed from scheduled date
Coding and testing as per schedule
No. of days delayed from scheduled date
Implementation and modifications as per schedule
No. of days delayed from scheduled date
New technological capability building as per schedule
No. of days delayed from scheduled date
Identification of scheme and preparation of project report
No. of days delayed from scheduled date
Planning and procurement of inputs as per schedule
No. of days delayed from scheduled date
Implementation of scheme as per schedule
No. of days delayed from scheduled date
Achieving target of direct commercialization of R&D products & services
% achievement of targeted turnover
Marketing efforts for commercialization of new developments
No. of presentations to prospective customers
Implementation of system improvement projects as per schedule
No. of days delayed from scheduled date
Cost savings through value engg. projects/ new processes/ sub-contracting
% saving achieved vis-à-vis target
Analysis and modelling of systems / Product / process
Number of analysis reports issued vis-à-vis target
RDE03800 RDE O N N N
RDE03900 RDE O N N N
RDE04000 RDE O Y N N
RDE04100 RDE O
Time Index
N N N
RDE04200 RDE C Y Y N
RDE04300 RDE C N N N
RDE04400 RDE C Y N N
RDE04500 RDE O Y Y N
RDE04600 RDE C Y Y Y
RDE04700 RDE C
Number
N N Y
RDE04800 RDE C
Time Index
Y N Y
RDE04900 RDE O Y N N
RDE04901 RDE O N Y N
RDE04902 RDE O N Y N
Test & analysis reports issued vis-à-vis envisaged
Number of reports issued vis-à-vis target
Maintenance and calibration of Lab/ Plant equipment/ Instrument/ accessories
% availability over targeted value
Maintenance and upkeep of accredited labs
Renewal of certificates as per schedule
Raising objections/contesting competetors' patents
Projects for capturing expertise for Knowledge Management System as per schedule
No. of days delayed from scheduled date
Assimilation of know-why of product designs obtained through collaboration
Number of know-why reports generated
Documentation of new learnings and concepts from executed projects for strengthening R&D process
No of documents generated as per target
Timely completion of project / milestones on absorption of product technology (know why) as per schedule
No. of days delayed from scheduled date
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Investigation and recommendations for resolution of Plant/ Site/ Customer problems
% of referred problems solved
Understanding and resolution of the problem as per schedule
No. of days delayed from scheduled date
Implementation and feedback from site as per schedule
No. of days delayed from scheduled date
RDE05000 RDE O Y N N
RDE05100 RDE O
% uptime
N N N
RDE05200 RDE O Y N N
RDE05300 RDE O Y N N
RDE05400 RDE OTime Index
Y N N
RDE05500 RDE O Y Y N
RDE05501 RDE O Y Y N
RDE05600 RDE O N N N
RDE05700 RDE O Y N N
RDE05800 RDE O Y Y N
RDE05900 RDE O
%
Y N Y
RDE06000 RDE O
%
Y N Y
RDE06100 RDE O
Time Index
Y N Y
RDE06200 RDE O
Time Index
Y N Y
RDE06300 RDE O Y Y Y
No. of problems resolved through networking with national/iinternational experts
%. of problems resolved
Field support to new products at customer site
No of technical papers in journals
No. of papers submitted
No of technical papers in conferences
No. of papers submitted
Preparation of Capital Budget- Proposals
Achievement of Capital Budget as per schedule
No. of days delayed from scheduled date
Specification and procurement of capital material / equipment
No. of days delayed from scheduled date
Imparting structured training
No of training programmes completed
Skills development for self and subordinates in key technological areas
Number of hours used for training
Timely completion of Technology Audit in identified areas as per schedule
No. of days delayed from scheduled date
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
RDE06301 RDE O
Score
Y N Y
RDE06302 RDE C
Time Index
Y N Y
RDE06400 RDE C N N Y
RDE06500 RDE C
TQM Score
Y N Y
RDE06501 RDE O Y Y Y
RDE06502 RDE C
Time Index
Y N Y
RDE06600 RDE O N Y N
RDE06700 RDE O N N N
RDE06800 RDE C N N N
RDE06900 RDE O
No. of runs
N N N
RDE07000 RDE O N Y N
RDE07100 RDE O N Y N
RDE07200 RDE O Y Y N
RDE07300 RDE O Y N N
RDE07301 RDE O N N N
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Number of new circles
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Facilitating funding of R&D projects form external sources as per schedule
No. of days delayed from scheduled date
Conducting market survey for new products as per schedule
No. of days delayed from scheduled date
Vendor development for new products
Number of vendors
Operating existing processes/ plants for collection/ assimilation and analysis of operating data
Technical support to other Units/ Departments as per schedule
No. of days delayed from scheduled date
Planning and organization of "Standardization Programme of BHEL" as per schedule
No. of days delayed from scheduled date
Review of earlier work and preparation of basic working guidelines for the near future
No. of days delayed from scheduled date
Review of Standards / Specs and follow up with respect to WGs.
Number of documents
Review of Standards / Specs and follow up with respect to Electrical /Electronics work groups
Number of documents
RDE07302 RDE O N N N
RDE07303 RDE O N N N
RDE07304 RDE O N N N
RDE07400 RDE O Y N N
RDE07401 RDE O N N N
RDE07402 RDE O N N N
RDE07403 RDE O N N N
RDE07500 RDE O Y Y N
RDE07600RDE O
No. of PagesY N N
RDE07700
RDE O
No. of Pages
Y N N
RDE07800
RDE O
No. of Pages
Y N N
RDE07900
RDE O
No. of Pages
Y N N
RDE08000RDE O
No. of issuesY N N
RDE08100
RDE O
No. of docs
Y N N
RDE08200
RDE C Y N N
RDE08300RDE O Y N N
Review of Standards / Specs and follow up with respect to Metallurgy workgroup.
Number of documents
Review of Standards / Specs and follow up with respect to Mechanical work group
Number of documents
Review of Standards / Specs and follow up with respect to other work groups.
Number of documents
Review of standards /specs and follow-up with respect to MRCs
Number of documents
Review of standards /specs and follow-up with respect to electrical items
Number of documents
Review of standards /specs and follow-up with respect to metallurgical items
Number of documents
Review of standards /specs and follow-up with respect to mechanical items
Number of documents
Tracking changes of National/International standards, in the areas of relevance to BHEL and Preparation of Agenda and Issue of MOMs as per schedule
No. of days delayed from scheduled date
Number of new drafts/ revisions circulated
Number of new standards/specifications proposed and discussed
Issue of Corporate Standards, Specs and MCCs
Identification of new areas for standardization, Unification and taking follow up action
Preparation and Issue of Standards Bulletin
Development of Systems / Methods as per schedule
Conceptualisation and preparation of IPR Policy / IPM Manual / Development of Methods & Systems / Creation of IPRs
%comp. of target
Converting IPR applications to IPRs
%comp. of target
RDE08301RDE O
No. of IPRsN N N
RDE08400
RDE O Y N N
RDE08401
RDE O N N N
RDE08402
RDE C N N N
RDE08500RDE O Y N N
RDE08600 RDE IPR Protection C %No. of IPRs Y N N
RDE08601RDE O N N N
RDE08602RDE
IPR OppositionC N N N
RDE08603RDE
IPR InfringementC N N N
RDE08604
RDE O N N N
RDE08700
RDE C
No. of docs
Y N N
RDE08701RDE O
No. of eventsN N N
RDE08800
RDE O
No. of Issues
Y N N
RDE08900RDE C Y N N
RDE08901
RDE O
No. of docs
N N N
RDE09000RDE
Patent IntelligenceC Y N N
RDE09001RDE C N N N
RDE09002 RDE Patent Search C No. of docs N N N
RDE09003
RDE O
No. of docs
N N N
RDE09100
RDE C Y N N
RDE09200RDE C
No. of reportsY N N
Filing of new IPR applications
Meeting the BSC parameters through geneartion of reports on various data, analysis and actual implementation.
No. of paraameters
Data validation and hosting of IPR information on VPN site, e-conversion of BHEL patents/abstracts and hyper linking
%comp. of target
Shortlisting/ Facilitating & Submission of award entries for Corporate/ Unit level IPR awards
%comp. of traget
MIRs and Exception reports
%comp. of target
Patent Office Journal Scan
No. of issues covered
%comp. of target
%comp. of target
Agreements/Payments to Attorneys and related agencies in IPR area
%comp. of target
Information dissemination in the area of IPM
Organising seminars and programmes on IPM
IPM Bulletin, data collection/preparation / editing and issue
Deciding Maintainability of IPRs
%comp. of target
Obtaining information on Commercialisation / value addition / Utilisation of patents
%comp. of target
Product / Area wise Patent Mapping
%comp. of target
Downloading of patents required during the process related to IPRs
Identification of patents of relevance in the areas of interest to BHEL for buying.
No of product serviced
Intellectual property assessment
RDE09300
RDE C Y N N
RDE09400
RDE C N Y N
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
Technical Finalisation of Tenders for procurement of New Facilities of capital nature.
No. of days delayed from scheduled date
RESEARCH & DEVELOPMENT FUNCTION KRA MASTER - 2006-07
KRA Remarks
L H H
M M M Deptt. records
M M M Deptt. records
X M M Deptt. records
L M M Deptt. records
L M M Deptt. records
L H H
M M M Deptt. records
M M M Deptt. records
X M M Deptt. records
L M M Deptt. records
Suggested Weightage for category
A B C
Source of Data for Measurement
Project status reports submitted to PMS Deptt. & TC/PC
Project status reports submitted to PMS Deptt. & TC/PC
L M M Deptt. records
L H H
M M M Deptt. records
M M M Deptt. records
X M M Deptt. records
L M M Deptt. records
L M M Deptt. records
L H H
L M H
X L H
X L H
L H H
Project status reports submitted to PMS Deptt. & TC/PC
Depart- mental records
Depart- mental records
Depart- mental records
Depart- mental records
Depart- mental records
L M H
X L H
X L H
L H H
L M H
X L H
X L H
H M L
H M L
H M M Deptt. records
L M M
L L L
Depart- mental records
Depart- mental records
Depart- mental records
Depart- mental records
Depart- mental records
Depart- mental records
Depart- mental records
Divisional records
Divisional records
Divisional records
Divisional records
L L M
L M M
L M M
X L M
H H H Project report
H H H Project report
H H H Project report
H H H Project report
H H H Project report
H H H Project report
L H H
Divisional records
Divisional records
Divisional records
Departmental records
Project status reports submitted to PMS Deptt. & TC/PC
M M M Deptt. records
M M M Deptt. records
X M M Deptt. records
L M M Deptt. records
L M M Deptt. records
L H H
M M M Deptt. records
M M M Deptt. records
X M M Deptt. records
L M M Deptt. records
L M M Deptt. records
L H H
Project status reports submitted to PMS Deptt. & TC/PC
Project status reports submitted to PMS Deptt. & TC/PC
M M M Deptt. records
M M M Deptt. records
X M M Deptt. records
L M M Deptt. records
L M M Deptt. records
L M H
X L L Dept. records
X M M
X H H
L M H
X L L Dept. records
X M M
X H H
Comml Deptt. reports
Divisional records
Divisional records
Comml Deptt. reports
Divisional records
Divisional records
L M H
X L L Dept. records
X M M
X H H
L M H
X L L
X M H
X M H
M H H
L M M
L M M
L H H
Comml Deptt. reports
Divisional records
Divisional records
Reports submitted to respective units
Divisional records
Divisional records
Divisional records
Divisional records
Plg & Mgmnt Services Deptt. Records
Comml. Deptt. records
Depart- mental records
L M H
X L H
X L H
H H L
H H L
L M H
L M H
M H H Comml. Deptt.
L M M
L M M
L M M
M M M
Depart- mental records
Depart- mental records
Depart- mental records
Divisional records
Divisional records
Divisional records
Divisional records
Comml. Deptt. records
Divisional records
Divisional records
Departmental records
X L M Deptt. records
X M M Deptt. records
X L M
L M M
L M M
L L M
L H H
M M H
L M H
M M M
X M H Project report
M M H
X L M
X L M
Departmental records
Records of Patents deptt.
Divisional records
Divisional records
Divisional records
Divisional records
Depart- mental records
Depart- mental records
Depart- mental records
M M H
L L M
L L L HR Deptt.
L L L HR Deptt.
L M L
L M L
M M L Deptt. records
X L M
L M M Deptt. records
M M H
M L L
M L L
M L L
M L L
H M L
Record of problems referred
Departmental records
Divisional records
Divisional records
Divisional records
Divisional records
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
M X X Survey Report
X M M Project report
M X X Unit QA/QC
H X X Quality Deptt.
X M X
X X M Project report
M M L
L M M
L M M
L M M
X M M
H H H Deptl. Records
M H H Deptl. Records
H H H Deptl. Records
L L L Deptl. Records
Action plan document
Departmental records
Departmental records
Departmental records
Departmental records
Departmental records
L L L Deptl. Records
L L L Deptl. Records
L L L Deptl. Records
H H H Deptl. Records
L L L Deptl. Records
L L L Deptl. Records
L L L Deptl. Records
H H H Deptl. Records
L M H Deptl. Records
L M H Deptl. Records
L M M Deptl. Records
M H H Deptl. Records
H H H Deptl. Records
H H H Deptl. Records
H H H Deptl. Records
H H H Deptl. Records
H H H Deptl. Records
H H H
L L L Deptl. Records
L M H Deptl. Records
L M H Deptl. RecordsM H H Deptl. Records
L M H Deptl. Records
H H H Deptl. Records
H H H Deptl. Records
M M H Deptl. Records
H H H Deptl. Records
L M H Deptl. Records
H H H Deptl. Records
M M M Deptl. Records
L M M Deptl. Records
H H H Deptl. Records
H H H Deptl. RecordsH H H Deptl. Records
L L L Deptl. Records
H H H Deptl. Records
H H H Deptl. Records
Rating declared at year end by
Corporate / Unit Management
H H X
H H H
Rating declared at year end by Corporate / Unit Management
Departmental plan and record.
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
RDE09700
PUBLICITY/PUBLIC RELATIONS FUNCTION KRA MASTER - 2006-07
KRA ID Function ID KRA Description Unit of Measurement
PRX00100 PRX O
PRX00101 PRX O %
PRX00102 PRX O %
PRX00103 PRX O
PRX00104 PRX AIR-TIME COVERAGE O
PRX00105 PRX TOP MANAGEMENT INTERVIEWS O NO. OF INTERVIEWS
PRX00200 PRX O
PRX00201 PRX O Number
PRX00300 PRX O Number
PRX00301 PRX RELEASE OF ADVERTISEMENTS O Number
PRX00302 PRX O
Time Index
PRX00400 PRX O Number
PRX00401 PRX C Number
PRX00402 PRX O RUPEES
PRX00403 PRX O Number
PRX00500 PRX O Number
PRX00501 PRX O Number
PRX00600 PRX O Number
KRA Type
MEDIA COMMUNICATION PLAN TO ESTABLISH LONG TERM TRUST AMONGST STAKEHOLDERS
No. of days delayed from scheduled date
% INCREASE IN +ve MEDIA COVERAGE OVER LAST YEAR
% INCREASE IN RATIO OF +ve MEDIA COVERAGE TO -ve MEDIA COVERAGE OVER LAST YEAR
RELEASE OF PRESS NOTES & ENSURING MEDIA COVERAGE
RS. EARNED (NOTIONAL)
RS. EARNED (NOTIONAL)
CONCEPTUALIZATION & FINALIZATION OF PUBLICITY PLAN BY SPECIFIED DATE
No. of days delayed from scheduled date
IMPLEMENTATION OF APPROVED PLAN
CONCEPTUALIZATION OF ADVERTISEMENTS
RELEASE OF STATUTORY NOTICES/TENDERS WITHIN SPECIFIED TIME
IDENTIFYING EXHIBTIONS FOR PARTCIPATION FOR BUSINESS GROWTH
NUMBER OF NEW/SPECIFIC EXHIBITS (MODELS/DISPLAY PANELS ETC.) CREATED
SAVINGS IN SETTING OF EXHIBITIONS THRU IN-HOUSE DESIGNSNUMBER OF BUSINESS ENQUIRIES GENERATEDCONCEIVING OF NEW CORPORATE FILMSCOMPLETION OF NEW CORPORATE FILMS
IDENTIFYING THE NEED OF COMMUNICATION THRU PUBLICATIONS
PRX00601 PRX O Number
PRX00602 PRX OTime Index
PRX00603 PRX O Number
PRX00604 PRX O
Time Index
PRX00605 PRX O Number
PRX00606 PRX OTime Index
PRX00607 PRX O Number
PRX00608 PRX O
Time Index
PRX00609 PRX O % ON TIME
PRX00610 PRX O %
PRX00700 PRX O % SATISFACTION
PRX00701 PRX O %
PRX00702 PRX O Number
PRX00703 PRX O %
PRX00704 PRX O %
PRX00705 PRX O RUPEES
PRX00706 PRX O %
PRX00800 PRX O %
DATA COLLECTION FOR DIRECT MAILERS TO CUSTOMERS
LAYOUT/ DESIGN/ PRINTING & DISPATCH OF DIRECT MAILER DATA COLLECTION FOR ENGG. NEWS LETTER
LAYOUT/ DESIGN/ PRINTING & DISPATCH OF ENGG. NEWS LETTERDATA COLLECTION FOR IN-HOUSE JOURNALS
LAYOUT/ DESIGN/ PRINTING & DISPATCH OF IN-HOUSE JOURNALS
DATA COLLECTION FOR PRODUCT / CORPORATE PUBLICATIONS
LAYOUT/ DESIGN/PRINTING OF PRODUCT/CORPORATE PUBLICATIONS
VALUE ADDITION TO TECHNICAL ARTICLES CONTRIBUTED TO NATIONAL/INTERNATIONAL JOURNALS WITHIN SPECIFIED TIME
% SATISFACTION LEVEL IN READERSHIP SURVEY (MIN. SAMPLE SIZE 1% OF CIRCULATION)
HOSPITALITY & PROTOCOL FOR SATISFACTION OF STAKEHOLDERS TO BUILD LONG TERM RELATIONSHIP
% INCREASE IN COMFORT LEVEL BASED ON GUEST FEEDBACK (FEEDBACK BASED ON MIN. 20% OF OCCUPANCY)CORRECTIVE ACTION FINALIZED FOR IMPROVING GUESTS' COMFORT% CORRECTIVE ACTION IMPLEMENTED/TAKEN BASED ON FEEDBACK SURVEY
% OCCUPANCY ON BUSINESS/OFFICIAL VISITS OF GUEST HOUSES/TRANSIT FLATS
TOTAL MONEY SAVED ON HOTEL BILLS BY LODGING EMPLOYEES IN GUEST HOUSES/TRANSIT FLATS WHILE ON TOUR% SATISFACTION LEVEL IN STAKEHOLDERS FOR CONDUCTING THEIR VISITS% SATISFACTION THROUGH RANDOM SURVEY OF PARTCIPANTS DURING EVENT MANAGEMENT
PRX00801 PRX C
PRX00900 PRX C
PRX01000 PRX C
PRX01001 PRX NUMBER OF PHOTOS ON-LINE C Number
PRX01002 PRX MEDIA PRESS NOTES ON-LINE C Number
PRX01003 PRX MEDIA REPORTING ON-LINE C
PRX01004 PRX PRODUCT CATALOGS/CDs ON-LINE C Number
PRX01005 PRX O
Time Index
PRX01006 PRX O %
PRX01100 PRX O Number
PRX01101 PRX C NumberPRX01102 PRX PERCENT UP-TIME O %
PRX01103 PRX HOSTING TIME OF CONTENT O TIME IN MINS.
PRX01104 PRX NO. OF WEB BASED QUERIES O Number
PRX01105 PRX O %
PRX01200 PRX O %
PRX01300 PRX O
Time Index
SYSTEM FORMULATION WITHIN SPECIFIED TIME FOR IMPROVEMENT IN SATISFACTION LEVEL BASED ON FEEDBACK FROM PARTICIPANTS DURING THE EVENT
No. of days delayed from scheduled date
CREATING NEW SYSTEMS WITHIN SPECIFIED TIME FOR BETTER DOWNWARD/UPWARD COMMUNICATION WITHIN THE
No. of days delayed from scheduled date
CREATION OF LAN DATABASE WITHIN SPECIFIED TIME FOR INFORMATION SHARING
No. of days delayed from scheduled date
COL.CM. OF REPORTAGE/DAY
HOSTING OF INHOUSE JOURNALS ONLINE
% Updations of On -line information available for the BHEL employees (telephone directory, fax Nos., Mobile Nos. , public utility Nos. etc.) carried out within specified time of the change/event.
NEW ON-LINE COMMUNICATION INITIATIVESNO. OF WEB BASED APPLICATIONS DEVELOPED
USER SATISFACTION LEVEL OF WEB SURFERS ON WEB PAGE QUALITY (FEEDBACK TO BE BASED ON MI. 20% HITS TO ON-LINE FEEDBACK FORM)
% SATISFACTION LEVEL OF COMFORT IN HOLIDAY HOMES (FFEDBACK SURVEY BASED ON MIN. SAMPLE SIZE OF 20% OCCUPANCY)
DATA COLLECTION/ LAYOUT/ PRINTING & DISPATCH OF TELEPHONE DIRECTORY/ GREETING CARDS/ DIARY & CALENDARS
PRX01400 PRX O
PRX01401 PRX O
Time Index
PRX01402 PRX O
Time Index
PRX01403 PRX O
Time Index
PRX01404 PRX O
Time Index
PRX01500 PRX O Number
PRX01501 PRX O
PRX01502 PRX O
PRX01503 PRX O Number
PRX01600 PRX C % COVERED
PRX01700 PRX C
PRX01800 PRX O %
PRX01900 PRX O %
PRX02000 PRX OTime Index
PRX02100 PRX O
Time Index
PRX02200 PRX O
PRX02300 PRX O
Time Index
CONCEIVING AND PLANNING FOR CORPORATE IDENTITIES FOR ANNUAL DISTRIBUTION BY SPECIFIED DATE
No. of days delayed from scheduled date
DATA COLLECTION/ LAYOUT/ PRINTING AND DESPATCH OF DIARY
DATA COLLECTION/ LAYOUT/ PRINTING AND DESPATCH OF CALENDARS
DATA COLLECTION/ LAYOUT/ PRINTING AND DESPATCH OF TELEPHONE DIRECTORY
DATA COLLECTION/ LAYOUT/ PRINTING AND DESPATCH OF GREETING CARDS
NUMBER OF MEMENTOS CORPORATIZEDON-SCHEDULE PROCUREMENT & DISTRIBUTION OF CORPORATE MEMENTOS BY SPECIFIED DATE.
No. of days delayed from scheduled date
EMPANELMENT OF SUPPLIERS BY SPECIFIED DATE FOR PROCUREMENT OF SOUVENIRS
No. of days delayed from scheduled date
DEVELOPMENT OF DESIGN FOR CORPORATISED MEMENTOS
IMPROVING COMPETENCIES OF EMPLOYEES THROUGH TRAINING PROGRAMMESSYSTEM DEVELOPMENT BY SPECIFIED DATE FOR INFORMATION SHARING/REPORTING
No. of days delayed from scheduled date
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
PRX02400 PRX O Number of new circles
PRX02500 PRX C TQM Score
PRX02501 PRX O
PRX02502 PRX C
Time Index
PRX02600 PRX O
PRX02700 PRX C Number
PRX02800 PRX CTime Index
PRX02900 PRX C
PRX03000 PRX C
PRX03100 PRX C
PRX03200 PRX C
PRX03300 PRX C
PRX03400 PRX C
Increase in no. of active Quality Circles in the deptt.
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
PRX03500 PRX C
PRX03600 PRX C
PRX03700 PRX C
PRX03701 PRX O RS SAVED
PRX03800 PRX C
PRX03900 PRX O
PRX04000 PRX C Number
PRX04100PRX O Score
Achieving ISO 9000:2000 certification at Deptt. level by specified date
No. of days delayed from scheduled date
DEVELOPING CRITERIA FOR EMPANELMENT & EVALUATION OF AGENCIES/SERVICE PROVIDERS BY SPECIFIED DATE
No. of days delayed from scheduled date
DEVELOPMENT OF SYSTEM BY SPECIFIED DATE FOR ENHANCING NEGOTIATION CAPABILITIES LEADING TO COST REDUCTION
No. of days delayed from scheduled date
COST SAVING EFFECTED THROUGH NEGOTIATIONS
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
% satisfaction level of authors regarding editorial improvements effected on their articles for publishing
% satisfaction level of 100% author base
Creating a resource bank for sharing of resources like hi-resolution images, digitized blow-ups/ posters with Units (Rs.2,000/- each)to synergize the PR function across various units
Improvement in Employee Satisfaction Score
PUBLICITY/PUBLIC RELATIONS FUNCTION KRA MASTER - 2006-07
Y Y N H X X DEPTT. RECORDS
Y N N H X X NEWS COVERAGE
Y N N H X X NEWS COVERAGE
N N N X X M
N N N X X M DATA LOG
N N N H X X DATA LOG
Y Y N H X X DEPTT. RECORDS
N N N X M H PUBLICITY PLAN
Y N N X H X
N N N X X M DATA LOG
N N N X X M
N N N M X X
Y N N M H X DATA LOG
N N N X H X
N N N X X M DATA LOG
N N N X M X DATA LOG
N N N X X H DATA LOG
Y N N H X X DATA LOG
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA (Y/N)
Suggested Weightage for category A B C
Source of Data for Measurement
NEWSPAPERS CARRYING PRESNOTES
PERFORMANCE DATA
RELEVANT NEWSPAPERS CUTTING
TRADE/BUSINESS BODIES & ASSOCIATIONS
COST COMPARISON WITH MARKET RATE
N N N X M X DATA LOG
N N N X X M
N N N X M X DATA LOG
N N N X X M DATA LOG
N N N X M X DATA LOG
N N N X X M DATA LOG
N N N X M X DATALOG
N N N X M X DATALOG
N N N X M X DATALOG
Y N N H X X SURVEY FEEDBACK
N N N H X X
Y N N X H X SURVEY FEEDBACK
N N N X M X DATA LOG
N N N X H X DATA LOG
N N N X H X DATA LOG
N N N X H X DATA LOG
Y N N M H X
N N N M H X DATA LOG
Y Y N H H X
Y Y N H X X DATA LOG
N Y N X H X DATALOG
N N N X X M DATA LOG
N N N X X M DATA LOG
N N N X X M DATA LOG
N N N X X M DATA LOG
Y N N X M H DATALOG
N N N L L M Data log
N N N X H X
Y N N X H XX DATA LOGN N N X M X DATA LOG
N N N X M X DATA LOG
N N N X M X DATA LOG
Y N N M X X DATA LOG
N N N X H X DATA LOG
N N N X X M DATA LOG
N Y N H M X DATA LOG
N N N X M H
N N N X M H
N N N X M H
N N N X M H
N N N X M X DATA LOG
N Y N X X M DATA LOG
N Y N X M H
N N N X M H
Y N N M X X DATA LOG
N Y N M M X DATA LOG
Y N Y M L L
Y N Y M L L
Y N Y M L L
Y N Y M L L
Y Y Y H M L
Y N Y X M M Project report
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
N N Y M X X Unit QA/QC
Y N Y H X X Quality Deptt.
Y Y Y X M X Action plan document
Y N Y X X M Project report
Y Y Y L M H
N N Y M M M
Y N Y X M H Project report
N Y N H H H Project report
N Y N H H H Project report
N Y N H H H Project report
N Y N H H H Project report
N Y N H H H Project report
N Y N H H H Project report
Y Y N H X X Quality Deptt.
N Y N X H X
N Y N X H X
N N N X H M
Y N N H H X
N N N L H L Feedback from Authors
Y N N L M H
Y Y M X X Survey Report
Rating declared at year end by Corporate / Unit Management
Level 5: 200, Level 4: 190, Level 3: 180, Level 2: 170, Level 1: 160
PUBLICITY/PUBLIC RELATIONS FUNCTION KRA MASTER - 2006-07
KRA Remarks
-
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
-
-
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
PROJECT MANAGEMENT FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description
PMX00100PMX O Time Index Y N
PMX00101PMX Preparation of Draft L1 network O Time Index Y N
PMX00102PMX O Time Index N N
PMX00200PMX O Time Index Y N
PMX00201PMX Preparation of Draft L2 network O Time Index N N
PMX00202PMX O Time Index Y N
PMX00300PMX O Y N
KRA Type
Unit of Measurement
Critical KRA (Y/N)
Special KRA (Y/N)
Timely finalisation of L1 Network with customer
Finalisation of Draft L1 network with concerned executing agencies
Timely finalisation of L2 Network with customer (matching with L1)
Finalisation of Draft L2 network with Executing agencies
Monitoring/follow up of Engineering drawings/Documents submission and raise timely alarms for preventing delay
% of alarms (exception reports raised within prescribed norm for corrective action
PMX00301PMX O Time Index Y N
PMX00302PMX O Time Index N N
PMX00303PMX O Time Index N N
PMX00304PMX O Time Index Y N
PMX00305PMX O N N
PMX00400PMX O Y N
PMX00401PMX O Time Index N N
PMX00402PMX O Time Index N N
Ensuring timely submission of master list of Engineering drawings/Documents
Reviewing/Finalising Engineering drawings/Documents submission schedule with executing agencies
Finalise Engineering drawings/Documents/O&M manuals/final documents submission schedule with cutomer
Submission of engineering drawings/documents to customer
Follow up with customer for approval/comments of drawings/documents from customer (on exception basis)
percentage of drawings approved/ commented
Monitoring/follow up O & M manuals and all final documents submission and raise timely alarms for preventing delay
% of alarms (exception reports raised within prescribed norm for corrective action
Ensuring timely submission of master list of O & M manuals
Reviewing/Finalising O & M manuals and all final documents submission schedule with executing agencies / customer
PMX00500PMX O Y N
PMX00501PMX O Y N
PMX00502PMX O Y N
PMX00503PMX O Y N
PMX00600PMX O Y N
PMX00601PMX O Y N
PMX00602PMX O Y N
Monitoring/follow up Supplies from units and raise timely alarms for preventing delay
% of alarms (exception reports raised within prescribed norm for corrective action
Regular monitoring/follow up with manufacturing units and raise timely alarms in respective areas
% of alarms (exception reports raised within prescribed norm for corrective action
Review of detailed manufacturing plan of units and raise timely alarms
% of alarms (exception reports raised within prescribed norm for corrective action
Coordination with customers intradeptt for timely Inspection at units/BO
Percentage of inspection arranged in time
Monitoring/follow up BOI/BOP Supplies and raise timely alarms for preventing delay
% of alarms (exception reports raised within prescribed norm for corrective action
Coordination with customers/suppliers/intradeptt for timely Inspection at venders works
Percentage of inspection arranged in time
Regular monitoring/follow up with concerned agencies and raise timely alarms in respective areas
% of alarms (exception reports raised within prescribed norm for corrective action
PMX00700PMX O N N
PMX00701PMX O N N
PMX00800PMX O Y N
PMX00801PMX O Y N
PMX00802PMX O Y N
PMX00900PMX O Y N
PMX00901PMX O Time Index N N
PMX00902PMX O Y N
Follow up for Resolution of Interface inputs and raise timely alarms for preventing delay
% of alarms (exception reports raised within prescribed norm for corrective action
Finalise Interface inputs submission schedule with concerned,Regular monitoring/follow up with concerned agencies and raise alarms
% of alarms (exception reports raised within prescribed norm for corrective action
Monitoring/follow up of construction milestones and raise timely alarms for preventing delay
% of alarms (exception reports raised within prescribed norm for corrective action
Identify critical pending inputs (supply/ cutomer inputs/ drawing document etc) for milestones within specified time
% of inputs identified within specified time
Regular monitoring/follow up with concerned agencies and raise alarms
% of alarms (exception reports raised within prescribed norm for corrective action
Ensuring Timely submission of Reports to Customer/Ministry as per scheduled/agreed dates
% of reports submitted within agreed dates
Freezing of format/content of progress report within specified time
Ensuring Timely availability of reports from executing agencies for submission to customers
% of reports availability within prescribed norm
PMX01000PMX O N N
PMX01001PMX O N N
PMX01100PMX O N N
PMX01101PMX O N N
PMX01102PMX O N N
PMX01103PMX O N N
PMX01104PMX O N N
Acievement of Budgeted Physical Turnover
% age achievement-actual/Budget
Regular monitoring/follow up with concerned agencies and raise alarms
% of alarms (exception reports raised within prescribed norm for corrective action
Acievement of Budgeted financial Turnover
% age achievement-actual/Budget
Regular monitoring/follow up with concerned agencies and raise alarms
% of alarms (exception reports raised within prescribed norm for corrective action
Engineering Support for Turnover
% age achievement-actual/target
Engineering Support to Turnover
% age achievement-actual/target
Engineering support for Turnover
% age achievement-actual/target
PMX01200PMX Acievement of Billing O N N
PMX01201PMX O Time Index N N
PMX01202PMX O N N
PMX01203PMX O N N
PMX01204PMX O N N
PMX01300PMX Acievement of cash collection O N N
PMX01301PMX O N N
PMX01302PMX O Rs crores N N
PMX01303PMX O N N
PMX01400PMX O Time Index N N
% age achievement-actual/Budget
Ensuring timely submission/approval of billing schedule from customer
Ensuring timely availability of documents from concerned for raising bills within specified no. of days from completion of activity
% of documents availability within prescribed norm
Ensuring timely submission of Equipment Performance BG as per format agreed with customer (7 days before raising bill)
% submission within prescribed norm.
Regular monitoring/follow up with concerned agencies and raise alarms
% of alarms (exception reports raised within prescribed norm for corrective action
% age achievement-actual/Budget
Ensuring timely verification of bills
% of Bills verified within prescribed norm
Cash collection for withheld outstandings ( as at end of previous year)
Regular monitoring/follow up with concerned agencies and raise alarms
% of alarms (exception reports raised within prescribed norm for corrective action
Ensuring Timely availability of inputs for floating of enquiries for erection subcontracts
PMX01500PMX O N N
PMX01501PMX O N N
PMX01502PMX O N N
PMX01600PMX O N N
PMX01601PMX O N N
PMX01602PMX O N N
PMX01700PMX O Time Index N N
PMX01701PMX O N N
Coordinating and monitoring for timely PG Test of BHEL/BOP packages and raising timely alarms
% of alarms (exception reports raised within prescribed norm for corrective action
Coordination and monitoring for timely submission/approval of PG test procedure
% of alarms (exception reports raised within prescribed norm for corrective action
Follow up with concerned agencies for Ensuring early liquidation of punch points for taking up PG test and raise timely alarms
% of alarms (exception reports raised within prescribed norm for corrective action
Ensuring Technical closure of identified contracts
% age achievement-actual/planned
Consolidation/communication of punch points of all concerned agencies within 2 months of trial operation of set
% Communication done within prescribed norm
Regular review and follow up with concerned regarding contract closing and raise timely alarms for preventing delay
% of Alarms (exception reports) raised within prescribed norm for corrective action
Ensuring Timely shipment of material from Port to overseas projects by Coordination with mfg units/ROD
Ensuring timely submission of package details for shipment and finalisation of shipping arrangement by ROD ( one month before shipment)
% Arranged within prescribed norm
PMX01702PMX O N N
PMX01703PMX O N N
PMX01704PMX O N N
PMX01705PMX O N N
PMX01800PMX O Time Index N N
PMX01900PMX O Time Index N N
PMX02000PMX O N N
PMX02001PMX O N N
PMX02100PMX O N N
PMX02200PMX O N N
Follow up with concerned agencies for ensuring timely availability of identified packages for each shipment and raising alarm signals
% of alarms (exception reports raised within prescribed norm for corrective action
Ensuring Timely availability of all documents for customs clearance of cargo(4 days before arrival of ship)
% Availability of documents within prescribed norm
Ensuring timely finalisation of insurance/ECGC cover.(within 15 days before shipment)
% finalisation within prescribed norm
Ensuring approval of statutory authority as required(within 15 days before shipment)
% Approvals within prescribed norm
Ensuring timely Submission/approval of Contract coordination procedure
Ensuring Timely availability of required inputs for preparation of technical specifications/ procedures from other agencies
Ensuring Timely response to customers enhancing customer satisfaction ( Initial Response to go within 3 days)
% Initial responses within prescribed norm
Contact concerned agencies for quick feedback within 2 days of receipt of letter
% Contact established within prescribed norm
Improvement in customer satisfation index (CSI) wrt previous year
Percentage of action points taken/total action points
Reduction in no. of customer complaints
% Reduction over last year
PMX02201PMX O N N
PMX02300PMX O N N
PMX02301PMX O Time Index N N
PMX02302PMX O Time Index N N
PMX02400PMX O Time Index N N
PMX02500PMX O N Y
PMX02600PMX O Time Index N N
PMX02601PMX O N Y
PMX02700PMX C Time Index N N
PMX02701PMX C N Y
PMX02702PMX C N Y
PMX02703PMX C N Y
PMX02800PMX C N Y
Analyse/ communication to concerned agencies and putting action plan for implementation
% complaints for which action plan implemented
Ensuring Timely review/resolution of critical issues and putting up focussed issues for MCM
Percentage of issues resolved/total issues reviewed in PRE-MCM review
Preparation/Communication of PRE-MCM agenda points to concerned 15 days before MCM
Preparation/Communication of MCM agenda points to concerned(at least 7 days before MCM)
Review and submission of various MIRs like monthly DHI reports/ fortnightly reports to CMD on projects.
Coordination with various units for signing of MOU for PP & SIP
No. of days delayed from scheduled date
Organizing review meetings with CEA as per schedule
Coordination with various executing agencies for consolidating project information as per CEA format 1 week before Meeting date
No. of days delayed from scheduled date
Developing IT based systems for enhancing Project management capability
Identification of systems to be developed and Preparation of action plan for development of system by specified date
No. of days delayed from scheduled date
Develop the system by scheduled date
No. of days delayed from scheduled date
Implementation of system by scheduled date
No. of days delayed from scheduled date
Develop systems by scheduled date for sharing of Knowledge
No. of days delayed from scheduled date
PMX02801PMX C Number N N
PMX02900PMX C N Y
PMX03000PMX C N Y
PMX03001PMX C N Y
PMX03002PMX O N Y
PMX03003PMX C N Y
PMX03100PMX C N Y
PMX03101PMX C N Y
PMX03102PMX O N Y
PMX03103PMX C N Y
PMX03200PMX C N Y
PMX03300PMX C N Y
Documenting unique experiences during project execution which can be shared with others for their benefit (At least 1 per project)
Develop a system within specified time for Documentation of project history record of delays and conflicts and its resolution
No. of days delayed from scheduled date
Development of system by specified date for improving External customer satisfation index (CSI)
No. of days delayed from scheduled date
Development of questionaire with consultant
No. of days delayed from scheduled date
Identify list of customers to be covered and conductance of survey by consultant
No. of days delayed from scheduled date
Analysis of customer feedback and development of action plan for improvenment
No. of days delayed from scheduled date
Development of system for improving Internal customer satisfation index (CSI)
No. of days delayed from scheduled date
Development of questionaire with consultant
No. of days delayed from scheduled date
Conductance of survey by consultant
No. of days delayed from scheduled date
analysis of feedback and development of action plan for improvenment
No. of days delayed from scheduled date
Develop a system for registering/resolution of customer complaints
No. of days delayed from scheduled date
Develop a system for early contract closing
No. of days delayed from scheduled date
PMX03400PMX O Y N
PMX03500PMX O Y N
PMX03600PMX O Time Index Y N
PMX03700PMX O Y N
PMX03800PMX O Y Y
PMX03900PMX O Number N N
PMX04000PMX C TQM Score Y N
PMX04001PMX O Y Y
PMX04002PMX C Time Index Y N
PMX04100PMX C Y Y
PMX04200PMX C Number N N
PMX04300PMX C Time Index Y N
PMX04400PMX C N Y
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
% of Replies within prescribed norm
Reply/settlement of Internal Audit paras within specified time (4 weeks)
% of Replies within prescribed norm
Timely inputs to unit/corporate finance for inter-unit re-conciliation of accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
% Inputs furnished in time
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Increase in no. of active Quality Circles in the deptt.
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
PMX04500PMX C N Y
PMX04600PMX C N Y
PMX04700PMX C N Y
PMX04800PMX C N Y
PMX04900PMX C N Y
PMX05000PMX C N Y
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Develop system for capturing total actual project cost in specified time
No. of days delayed from scheduled date
PMX05100PMX O Time Index N N
PMX05200PMX O N N
PMX05300PMX C Y N
PMX05400PMX C Time Index Y N
PMX05500PMX C Time Index Y N
PMX05600PMX O Score Y
ISO coordination work in projects deptt/assistance in audit
Organising customer training programme as per contractual obligation
% adherence to contractual requirement
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
ABSORPTION OF NEW TECHNOLOGY WITH RESPECT TO TURBO GENERATOR SUPPLIED FOR KUDANKULAM NUCLEAR POWER PROJECT - 2 X 1000 MWe.- SUPPLIES BY RUSSIA
ABSORPTION OF NEW TECHNOLOGY WITH RESPECT TO KAIGA NUCLEAR PROJECT UNITS 3 & 4 - SUPPLY BY M/S. OJSC TURBOATOM, UKRAINE.
Improvement in Employee Satisfaction Score
PROJECT MANAGEMENT FUNCTION KRA MASTER - 2006-07
KRA Remarks Taskforce Recommendations
N H X X
N X H X
N X H X
N H X X
N X H X
N X H X
N H X X
Universal KRA
(Y/N)
Suggested Weightage for category
A B C
Source of Data for Measurement
As per agreed schedule and actual dates as per record to be maintained by appraisee
As per agreed schedule and actual dates as per record to be maintained by appraisee
As per agreed schedule and actual dates as per record to be maintained by appraisee
As per agreed schedule and actual dates as per record to be maintained by appraisee
As per agreed schedule and actual dates as per record to be maintained by appraisee
As per agreed schedule and actual dates as per record to be maintained by appraisee
Record Criteria : fortnightly ecception reports to be generated by appraisee (with or without exceptions)
N X H X Record
N X H X Record
N X H X Record
N X H X
N X H X
N L X X
N X L X Record
N X L X Record
As per record of receipt and forwarding note Criteria: drawings to be forwarded to customer within 48 hrs of receipt from concerned agency
As per record of receipt of exception report Criteria : comments/approval within 10 days of receipt of exception report from concerned agency
Record Criteria : fortnightly ecception reports to be generated by appraisee (with or without exceptions)
N H X X
N X H X Record
N X H X Record
N X M X Record
N H X X
N X M X Record
N X H X Record
Record Criteria : fortnightly ecception reports to be generated by appraisee (with or without exceptions)
Record Criteria : fortnightly ecception reports to be generated by appraisee (with or without exceptions)
N H X X
N X H X Record
N H X X
N X H X Record
N X H X Record
N L X X
N X L X
N X L X
Record Criteria : fortnightly ecception reports to be generated by appraisee (with or without exceptions)
To be renumbered as PMX00701
Record Criteria : fortnightly ecception reports to be generated by appraisee (with or without exceptions)
as per agreed date
as per agreed date
as per agreed date
N M X X Budget
N X M X
N M X X Budget
N X M X
N H H H
N H H H Approved BBU
N H H H
Record Criteria : monthly ecception reports to be generated by appraisee (with or without exceptions)
Record Criteria : monthly ecception reports to be generated by appraisee (with or without exceptions)
Approved Billing Schedule
Earlier E-MAP included above KRA. Hence this request for new KRA.
Unit of Measurement to be changed to "% age achievement-actual/target
Above KRA was used in earlier eMaps
Unit of Measurement to be changed to "% age achievement-actual/target
Approved Billing Schedule
Earlier Emap cycles included the above KRA. Hence this request for New KRA
Unit of Measurement to be changed to "% age achievement-actual/target
N M X X Budget
N X M X
N X M X Record
N X L X
N X M X
N M X X Budget
N X M X Record
N X M X Record
N X M X
N M M X
as per agreed schedule
as per agreed date
Record Criteria : monthly ecception reports to be generated by appraisee (with or without exceptions)
Record Criteria : monthly ecception reports to be generated by appraisee (with or without exceptions)
Sch.input date and Record of actual dates
N M X X
N X M X Record
N X M X Record
N M X X
N X M X
N X M X Record
N M X X Record
N X M X Record
Agreed sch date and record of actual datesRecord
To be renumbered as PMX01502.
Plan given by Marketing group
Prtocol signed with customer at site
To be Renumbered as PMX01701.
N X M X
N X M X Record
N X L X Record
N X L X Record
N L L X
N M M X
N M X X
N X M X Record
N H H X
N M X X
Alarms raised to be recorded systematically by appraisee
To be Renumbered as PMX01702.
To be Renumbered as PMX01703.
To be Renumbered as PMX01704.
To be Renumbered as PMX01705.
Scheduled contractual date and Record for actual date
Agreed input schedule and Record for actual dates
Record of letters received from customer
Record Criteria : Customer survey reportRecord Criteria : Letters addressed to ED/GGM.
N X M X Record
N M X X Record
N X M X Record
N X M X Record
N M M X Record
N M M X Record
N X M X Record
N X M X Record
N H X X Record
N M X X Record
N X M X Record
N X H X Record
N H X X Record
N X M X
N X M X
N H X X
N M X X Record
N X L X Record
N X M X Record
N M X X
N X M X Record
N X L X Record
N M X X Record
N M M X Record
N M M X Record
Record Criteria : at least one per person during the yearRecord
Record Criteria :CQA to appoint agency and questionnaire to be approved by D(HR)
Record Criteria :CQA to appoint agency and questionnaire to be approved by concerned
Y M L L
Y M L L
Y M L L
Y M L L
Y H M L
Y M X X Unit QA/QC
Y H X X Quality Deptt.
Y X M X
Y X X M Project report
Y L M H
Y M M M
Y X M H Project report
N H H H Project report
Record maintained by Audit deptt.
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Record maintained by Audit deptt.
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Action plan document
N H H H Project report
N H H H Project report
N H H H Project report
N H H H Project report
N H H H Project report
N H H H Project report
N M M M
N M M M Project report
N H H X
N H H H Project schedule -
N H H H -
Y M X X Survey Report
As per deptt.record
Since coordination work will involve more than 1 result area, Unit of measurement has to be Time Index.
Rating declared at year end by Corporate / Unit Management
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
This project specific. Clarification to be given by PSSR as to how this will be measured.
Schedule as agreed in action plan
This project specific. Clarification to be given by PSSR as to how this will be measured.
Taskforce Recommendations
PSSR
PSSR
VIGILANCE FUNCTION KRA MASTER - 2006-07 KRA ID Function KRA Description
VGX00100 VGX O % Yes N
VGX00200 VGX O % Yes N
VGX00300 VGX O % Yes N
VGX00400 VGX O % Yes N
VGX00500 VGX O Number Yes N
VGX00600 VGX C Number Yes N
VGX00700 VGX O Number Yes N
VGX00800 VGX C Number Yes N
VGX00900 VGX O Number Yes N
VGX01000 VGX O Number Yes N
VGX01100 VGX O Number Yes N
VGX01200 VGX O Time Index Yes N
VGX01300 VGX O Time Index Yes N
VGX01400 VGX Updation of Vigilance Home page O Number Yes N
VGX01500 VGX C Number Yes N
VGX01600 VGX O % Y N
VGX01700 VGX O % Y N
VGX01800 VGX O Time Index Y N
KRA Type
Unit of Measurement
Critical KRA (Y/N)
Special KRA (Y/N)
Percentage of complaints processed within 1 month of its receipt.
Percentage of investigations completed within 6 months from the date of registration.
Percentage of investigation reports processed for FSA within 1 month of its receipt.
Percentage of enquiry reports processed for SSA within 1 month of its receipt.
No. of Vigilance inspections / surprise checks completed vis-à-vis annual plan.
Completion of System Study during the year vis-à-vis annual plan
Number of training programmes conducted vis-à-vis annual plan.
Inspection of purchase orders / contracts as per the guidelines suggested by CTE/CVC.
Identifying employees working in sensitive areas for period more than 10 years and taking up with the Unit Management (under intimation to CVO) on a monthly basis for their rotation.
No. of Vigilance Committee Meeting minutes sent to CVO
No. of Property Returns scrutinised
Timely submission of Monthly/Quarterly/Annual reports
Timely processing of vigilance clearance within specified time
Identifying material codes with less than 3 registered vendors and taking up with the Unit Management on a montlhy basis for registration of additional vendors.
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
VGX01900 VGX O Time Index Y N
VGX02000 VGX O Y Y
VGX02100 VGX O Score Y N
VGX02200 VGX O Time Index Y N
VGX02300 VGX O N
VGX02400 VGX C TQM Score Y N
VGX02500 VGX O Y Y
VGX02600 VGX C Time Index Y N
VGX02700 VGX C Y Y
VGX02800 VGX C Number N
VGX02900 VGX C Time Index Y N
VGX03000 VGX C N Y
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Number of new circles
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
VGX03100 VGX C N Y
VGX03200 VGX C N Y
VGX03300 VGX C N Y
VGX03400 VGX C N Y
VGX03500 VGX C N Y
VGX03600 VGX C Y N
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
VIGILANCE FUNCTION KRA MASTER - 2006-07 KRA Remarks
N H H H Complaint Register -
N H H H Case Register -
N H H H Case Register -
N H H H Case Register -
N H H H Annual Plan -
N M M M Annual Plan -
N M M M Annual Plan -
N H H H Annual Plan -
N H H H -
N H H H Annual Plan -
N M M M Annual Plan -
N M M M Annual Plan -
N L L L -
N L L L Annual Plan -
N H H H -
Y M L L
Y M L L
Y M L L
Universal KRA
(Y/N)
Suggested Weightage for category A B C
Source of Data for Measurement
Monthly Performance Report
Record maintained by Department
Monthly Performance Report
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Y M L L
Y H M L
Y M X X Survey Report
Y X M M Project report
Y M X X Unit QA/QC
Y H X X Quality Deptt.
Y X M X
Y X X M Project report
Y L M H
Y M M M
Y X M H Project report
N H H H Project report
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Action plan document
N H H H Project report
N H H H Project report
N H H H Project report
N H H H Project report
N H H H Project report
N H H X Rating declared at year end by Corporate / Unit Management
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
PRODUCTIVITY / MS FUNCTION KRA MASTER - 2006-07
KRA Id Function KRA Description
MSX00100 MSX C Y
MSX00200 MSX C Y
MSX00201 MSX O N
MSX00202 MSX O Y
MSX00300 MSX C Y
MSX00301 MSX O N
MSX00302 MSX O Y
MSX00303 MSX O Y
MSX00400 MSX O Y
MSX00500 MSX O Y
MSX00501 MSX O N
KRA Type
Unit of Measurement
Critical KRA (Y/N)
Organising Theme based drives/ Suggestors & IMPRESS Workshops/ Productivity Competitions/ Award functions etc
Nos. of programmes
Creation, implementation, operation and refinement of the on-line system for registration of Suggestions
Nos. of suggestions registered.
Monitoring the status of suggestions through periodic exception reports, generated as per schedule.
Nos of reports issued
Processing of Suggestions & award payment within specified Time.
% awarded within specified time
Creation, implementation, operation and refinement of the on-line system for registration of Improvement Projects
Nos. of projects registered.
Monitoring the status of Improvement Projects through periodic exception reports, generated as per schedule.
Nos of reports issued
Processing and evaluation of Improvement projects & award payment within specified Time.
% awarded within specified time
Cost reduction thro projects undertaken in Productivity Thrust Areas viz. Value engineering/ Economic Buying/ material Utilisation/ Energy Conservation/ Scrap Reduction/ War on Wastage, etc.
Total Savings as % of Budget value
Analysis & Feedback on Productivity related performance parameters within specified time, including timely trend reports.
No. of days delayed from scheduled date
Shortlisting/ Facilitating & Submission of award entries for Corporate/ State/ National level awards viz. Excel/ VRP/ SV/ NPC/ INSSAN etc.
Targetted Nos. of entries
Scanning of opportunities and organising Targetted No. of Entries
Targetted Nos. of proposals
MSX00502 MSX O N
MSX00600 MSX C Y
MSX C N
MSX00602 MSX O % Area covered N
MSX00700 MSX O Y
MSX00800 MSX O Y
MSX00801 MSX O Mandays Y
MSX00802 MSX C Y
MSX00900 MSX C Y
MSX01000 MSX O Y
MSX01100 MSX C Y
MSX01200 MSX C Y
MSX01300 MSX C Y
MSX01400 MSX O Y
MSX01500 MSX C Number Y
Screening / Refinement and Submission of Entries
Days before due date for submission
Formulate/ Issue & implemention of Productivity function related policy/ Guidelines viz. Award Scheme for Improvement Projects.
No. of days delayed from scheduled date
MSX00601 Development & Issue of productivity related policy guidelines
No. of days delayed from scheduled date
Follow up Implementation of productivity related policy guidelines.
Processing of entries from different units, for Excel awards, within specified period for function in Nov
No. of days delayed from scheduled date
Awareness generation to imbibe productivity culture amongst employees
Nos of initiatives planned
Imparting specialised inputs through training programmes/ inter unit exchange
Scanning best practices and sharing case-studies.
No. of case studies hosted on the Knowledge sharing portal
Create a system for capturing the savings from PIP's and suggestions
No. of days delayed from scheduled date
Preparing a compendium of award winners
No. of days delayed from scheduled date
Maintaining a knowledge sharing portal for Productivity issues
No. of days delayed from scheduled date
Creating a web based system to track the progress of productivity projects
No. of days delayed from scheduled date
Development of new systems/ Mgmt. Instruction within specified time.
No. of days delayed from scheduled date
System Modifications within specified time
No. of days delayed from scheduled date
Form Design/ Improvement/ Simplification
MSX01600 MSX O N
MSX01601 MSX O N
MSX01700 MSX O Y
MSX01701 MSX O N
MSX01702 MSX O N
MSX01800 MSX O Y
MSX01900 MSX C N
MSX01901 MSX Norms Development IE O N
MSX01902 MSX Revalidation of Time Standards O N
MSX02000 MSX O N
MSX02100 MSX C Y
MSX02200 MSX O Y
MSX02201 MSX O N
MSX02300 MSX O Y
MSX02301 MSX O N
MSX02302 MSX O N
MSX02400 MSX O Y
Organise Pre-Audit* preparedness review.
% closing of MI related NCRs, raised during previous Audit.
Auditing targetted number of MIs by the systems' group
% achievement of target
Evaluation of 'Works Contract' proposal based on norms & Target within specfied time
No. of WC proposals evaluated.
Building & Updating database for evaluation
No. of days delayed from scheduled date
Proposal Scrutiny & Recommendation
No. of days delayed from scheduled date
Recommendation for Redeployment of manpower to deficit area
% recommendations met
Plan/ Conduct & Finalise studies for Review/ Development of Norms
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Savings through IE studies/scrutiny in areas viz Indirect material/ Maintenance/ Spares/Tooling etc
% achieved / targeted
Plan/ Conduct & Implement Studies for Methods / Systems Improvement
No. of days delayed from scheduled date
Post Investment Evaluation of Schemes / Major Capital Items within specified time
% evaluations completed wrt planned.
Facilitating Improvement in utilization of critical M/cs
% improvement achieved
Development/ Approval & Implementation of Proposal for Relocation of Plant & M/cs / office area.
No. of days delayed from scheduled date
Developing Alternative layouts Plant and M/c and office
No. of days delayed from scheduled date
Implementation of Approved Relocation Plan in specified time.
No. of days delayed from scheduled date
Recommendation/ Approval for disposal of Redundant Plant & M/cs
No. of days delayed from scheduled date
MSX02401 MSX O N
MSX02402 MSX O N
MSX02403 MSX O N
MSX02500 MSX C Time Index N
MSX02600 MSX O Index/ Score N
MSX02601 MSX O N
MSX02602 MSX O Number N
MSX02700 MSX O N
MSX02800 MSX O Y
MSX02900 MSX O % Y
MSX03000 MSX O % Y
MSX03100 MSX O Time Index Y
MSX03200 MSX O Time Index Y
MSX03300 MSX O Y
MSX03400 MSX O Score Y
Identification of redundant facilities
No. of days delayed from scheduled date
Formulation of proposals for approval of disposal of redundant facilities within specified time
No. of days delayed from scheduled date
Facilitating transfer/ disposal of surplus/ Condemned Plant & M/cs
No. of days delayed from scheduled date
Completion of Special Assignments as per request
Achievement of 'Unit Level' targets for major improvement initiatives like '5S' Implementation
Facilitating Implemenation of 5-S- specific milestones
100XNos. of areas covered / Nos. planned
Audit & Computation of 5-S Index in areas covered.
Review of BIS standards ( and like documents ), as per specified time schedule
No. of days delayed from scheduled date
Implementation of Productivity Linked Incentive scheme / Approval of proposal of Extended hours
No. of days delayed from scheduled date
Reply to Govt. Audit queries, Inspection report paras, Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/ corporate finance for inter-unit re-conciliation of accounts
Timely inputs to unit/ corporate finance for BUDGET/ FLASH/ MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Improvement in Employee Satisfaction Score
MSX03401 MSX C Time Index Y
MSX03500 MSX O N
MSX03600 MSX C TQM Score Y
MSX03601 MSX O Y
MSX03602 MSX C Time Index Y
MSX03700 MSX C Y
MSX03800 MSX C Number N
MSX03900 MSX C Time Index Y
MSX04000 MSX C N
MSX04100 MSX C N
MSX04200 MSX C N
MSX04300 MSX C N
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Number of new circles
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
MSX04400 MSX C N
MSX04500 MSX C N
MSX04600 MSX C Y
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
PRODUCTIVITY / MS FUNCTION KRA MASTER - 2006-07
KRA Remarks
N N H H H Score Card
N N M M H
N N L M H
N N M M H
N N M M H IMPRES
Y N L M H On-line system
N N M M H On-line system
N N H H M
Y N H H H
N N H H M
N N L M H Nomination Proposals
Special KRA (Y/N)
Universal KRA
(Y/N)
Suggested Weightage for
category A B
C
Source Of Data For Measurement
Score CardOn-line system MIR
Manual registration, to be switched to on-line system.
As per PlanDeptt records
Deptt. Record / Mgmt. Instruction
Score CardOn-line system MIR
Score CardOn-line system MIR
As per PlanDeptt records
As per PlanDeptt records
N N M M H Deptt. Record
Y N H H M As per Deptt plan
Y N M H M
N N M H M
Y N H M M As per plan
N N H H M As per Plan
N N H H M As per Plan
N N H H M As per Plan
Y N H H H Certification by HOD
Y N L M H Departmental record
Y N H H H On-line record
Y N H H H Certification by HOD
Y N H M L As per Plan
Y N M H H Departmental record
N N M H H System file
As per implementation plan
As per implementation plan
may be deleted in 07-08
may be deleted 07-08
N N M H H Audit report
N N M H H As per plan
N N H M L WC Proposals
Y N L H H As per Plan
Y N H H M As per Plan
N N M H H
Y N H H M As per Plan
Y N L H H As per Plan
Y N M H M As per Plan
N N H H M
Y N H H M As per Plan
N N M H H Depttal records
N N M H H BSC & MIR 20.2
Y N H M H Proposals
Y N M M H Proposals
Y N M H H Proposals
Y N H H M As per Plan
Redeployment plan Actual Posting
Budget proposals study Reports
Y N H H M As per Plan
Y N M M H Proposal records
Y N M M L As per Plan
N N M H M Reports
N N H M M BSC/ Audit Document
N N M H H Departmental plan
N N M H H Audit sheets
Y N M M L Departmental records
Y N M H L Proposal records
N Y M L L
N Y M L L
N Y M L L
N Y M L L
Y Y H M L
N Y M X X Survey Report
Record maintained by Audit deptt.
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Record maintained by Audit deptt.
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance
deptt.
Record maintained by Unit Head/Unit P&D
Questionnaire developed by CQA to be adopted .
N Y X M M Project report
N Y M X X Unit QA/QC
N Y H X X Quality Deptt.
Y Y X M X Action plan document
N Y X X M Project report
Y Y L M H
N Y M M M Case Document
N Y X M H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
N N H H X Rating declared at year end by Corporate / Unit Management
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
QUALITY FUNCTION KRA MASTER - 2006-07
KRA id KRA Description
QAX00100 QAX O Y N
QAX00200 QAX O Y N
QAX00300 QAX O Y N
QAX00400 QAX O Y N
QAX00500 QAX C N
QAX00600 QAX C N
QAX00700 QAX C N
QAX00701 QAX O % as per plan N
QAX00702 QAX C N
QAX00703 QAX C Date N
QAX00704 QAX O % as per plan N
QAX00705 QAX O % as per plan N
Function KRA Type
Unit of Measurement
Critical KRA (Y/N)
Special KRA (Y/N)
Timely disposition of Product NCRs/ SDRs as per Department Plan/Procedure
% Cleared as per norms
First time clearance in Inspection/Testing by Third Party Inspection Agency/ Customer
% requests cleared in first time
Timely inspection/testing during inprocess/ final stages of Manufactured/ BoI's
% Cleared as per norms
Timely issue of Inspection/ Testing Reports for manufactured/ BoI's
% Cleared as per norms
Reduction in time taken to clear inspection/ calibration/ testing requisitions through improvement in planning process.
% based on previous year
Improvement in time taken to submit quality documentation/ Inspection reports/ Log sheets etc.
% based on previous year
Improvement in number of stages for Self inspection (checked by task performer)
% over previous year
Identification of new self inspection stages to be introduced.
Training & Qualification of task performers of identified stages.
% Eligible Task Performers trained
Development and implementation of training and qualification modules for task performers of identified stages.
Pilot Implementation of self inspection by qualified task performer
Surveillance of self-inspection stages as per plan
QAX00800 QAX O N
QAX00900 QAX C Y N
QAX01000 QAX O % compliance Y N
QAX01100 QAX O Time Index Y N
QAX01200 QAX O Y N
QAX01300 QAX O N
QAX01400 QAX C N
QAX01500 QAX O % as per plan N
QAX01600 QAX C Y
QAX01700 QAX O N
QAX01800 QAX O Rs. Lakhs N
QAX01900 QAX O Y N
QAX02000 QAX O Y N
Coordination with Statutory /Customer agencies for necessary clearance as per schedule
% Cleared as per norms
Review of Risk/ Hazard Analysis to establish safety standards during inspection and testing
% reviewed as per plan
Compliance to safety standards during inspection/testing
Planning/ organising/ monitoring timely inspection of BOIs
Measuring instruments calibrated in time as per department plan/procedure
% calibrated within specified time
Calibration of Non BHEL instruments/ gauges within specified time
% calibrated within specified time
Interlab Testing/ Proficiency Testing as per schedule
z value/ En Value
Procurement of equipment / consumables
Development of systems to assess uncertainty of measurement during calibration and testing
No. of days delayed from scheduled date
Evaluation of uncertainty of identified measurements/ calibration and testing
% of identified measurements
Generation of external business from Lab/Testing/Caliberation facilities
Timely disposition of SARs/ CARs/ SFRs/ SSARs as per Department Plan/Procedure
% Cleared as per norms
Product/Milestone/Process audit as per plan (Inter Unit/ In-house/ Vendor/ Site/ Subcontractor etc.)
% Agreed improvement opportunities to identified
QAX02100 QAX C Y N
QAX02200 QAX O Y N
QAX02300 QAX O Y N
QAX02400 QAX O Time Index N
QAX02500 QAX O Y N
QAX02600 QAX C Y
QAX02700 QAX C Y
QAX02800 QAX C Y
QAX02900 QAX C N
QAX03000 QAX C Time Index N
QAX03001 QAX Development of System C Y
QAX03002 QAX C Y
QAX03003 QAX C Y
QAX03100 QAX C Time Index N
Organising System audit (Intra/Inter Unit/Divn.) to bring out improvement at Unit/Divn. Levels
Timely closure of System NCRs ensuring CA/PA
Participation in System audit as per plan
% participated to plan
Improvement in number of "Active" Quality Circles.
% over previous year
Organising/ undertaking Quality Circle related activities including QC Convention
Release of Quality documentation (eg: Vendor list/ Type Test reports/ Procedures QP/FQP etc.) with due customer approval (if required) within specified time.
% released as per plan
Development of identified quality systems and documentation within specified time as per plan
No. of days delayed from scheduled date
Development of System to measure effectiveness of Third Party Inspection Agencies
No. of days delayed from scheduled date
Achieving New Quality accreditations/ certificates and awards.
No. of days delayed from scheduled date
Development of New measurement techniques including automation / Testing procedures/ standards/ processes, as per plan
% completed as per plan
Computerization of identified projects / Systems as per plan
No. of days delayed from scheduled datePilot implementation of
computerisationNo. of days delayed from scheduled date
Institutionalisation of computerised system as per plan
No. of days delayed from scheduled date
Development of System to measure Quality Index of products/processes (Eg. QTM)
QAX03101 QAX C Y
QAX03102 QAX C Time Index N
QAX03103 QAX C Y
QAX03104 QAX O Y
QAX03105 QAX C Y N
QAX03200 QAX C Y Y
QAX03300 QAX C Number N
QAX03400 QAX C Time Index Y N
QAX03500 QAX O % as per norms Y N
QAX03600 QAX O N
QAX03700 QAX C N
QAX03701 QAX O Y
QAX03702 QAX C Y
QAX03703 QAX O N
QAX03800 QAX C N
Study of Systems in practice at other places as per plan
No. of days delayed from scheduled date
System Design and development including computerisation as per milestones/plan
Pilot Implementation and course correction of System
No. of days delayed from scheduled date
Institutionalisation of the system as per plan
No. of days delayed from scheduled date
Development of quality systems in line with ISO 9001 requirements as per plan
% completed as per plan
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Timely disposition of (Quality function related attributes) of Customer Complaints as per Department Plan/Procedure
Investigation of Customer Complaints/ Customer related Quality Issues assigned to individual/ individual as part of a team.
% Issues resolved and remedial measures implemented
Improvement of Internal (Intra Unit/ Division) Customer Perception score related to Quality Function
% Improvement in Internal Customer Satisfaction Score
Analysis of feedback of Internal Customer Perception Survey (ICPS)
No. of days delayed from scheduled date
Develop time-bound plans for corrective/ preventive actions
No. of days delayed from scheduled date
Implementation of action plans
% of planned actions implemented
Quality function personnel (NDT/ Auditors etc) trained and certified/ recertified as per plan.
% trained to total planned
QAX03900 QAX C Y N
QAX03901 QAX C Y Y
QAX03902 QAX Data Compilation as per plan O Y Y
QAX03903 QAX C Y N
QAX03904 QAX C Y N
QAX03905 QAX O Y N
QAX03906 QAX O Y N
QAX04000 QAX C Y N
QAX04001 QAX C Y Y
QAX04002 QAX C Y Y
QAX04003 QAX O Y Y
QAX04100 QAX C Y N
QAX04101 QAX O Y Y
Improvement in systems and processes to reduce product nonconformances like MDRs, SARs, CARs, SDRs & SSARs
% based on previous year
Development of system for data capturing/ root cause analysis and identification of corrective/preventive actions
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Root Cause Analysis of nonconformities raised during identified period.
% NCRs covered
Develop time-bound plans for corrective/ preventive actions covering identified Root Causes of product NCRs
% root causes covered
Monitor Implementation of action plans to reduce nonconformities
% of planned actions implemented
Effectiveness of action plans to reduce product non-conformances attributed to Quality Function.
% of repeat NCRs attributed to Quality Function
Improvement in systems and processes to reduce Cost of rework/ rejection
% based on previous year
Development of system for data capturing of the cost of rework and rejection
No. of days delayed from scheduled date
Develop time-bound plans for corrective/ preventive actions through Root Cause Analysis of rework/rejection
No. of days delayed from scheduled date
Implementation of action plans to reduce cost of rework/rejection
No. of days delayed from scheduled date
Improvement in systems and processes to reduce customer complaints attributed to Quality Function
% reduction based on previous year
Data Compilation of Customer Complaints as per plan
No. of days delayed from scheduled date
QAX04102 QAX C Y N
QAX04103 QAX C Y N
QAX04104 QAX O Y N
QAX04200 QAX C N
QAX04201 QAX O Y
QAX04202 QAX O Y
QAX04203 QAX C N
QAX04300 QAX C Y
QAX04400 QAX C Y
QAX04500 QAX C Y
Root Cause Analysis of Customer Complaints
% Customer complaints covered
Develop time bound plan for Corrective and Preventive actions covering identified root causes.
% root causes covered
Implementation of action plans to reduce Quality function related Customer Complaints
% of planned actions implemented
Improvement in Quality Index (QI) of identified processes of Quality function (QTM level).
% based on QI at the beginning of year after including new characteristics
Analysis of Quality Index data to identify potential areas for improvement as per plan
No. of days delayed from scheduled date
Develop time bound plan for bringing improvement in identified areas of Quality Index
No. of days delayed from scheduled date
Implementation of action plan for improving Quality Index
% implemented as per plan
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
% Implemented to identified
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
QAX04600 QAX C Y
QAX04700 QAX C Y
QAX04800 QAX C Y
QAX04900 QAX C Time Index
QAX05000 QAX C Time Index Y
QAX05100 QAX C Time Index Y
QAX05200 QAX C
QAX05201 QAX C Y
QAX05202 QAX O Time Index
QAX05203 QAX C Time Index
QAX05204 QAX Implementation of action plans O
QAX05300 QAX O Y
QAX05400 QAX
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Process/Product improvements through SQC/Six Sigma Projects (as indicated in action plan)
Process/Product improvements through FMEA/ QFD Projects (as indicated in action plan)
Improvements through implementation of 5S in Quality function
Process/Product improvements through Benchmarking projects
Number of processes/ products
Collect and document best practices
No. of days delayed from scheduled date
Gap analysis of identified processes w.r.t. best practices
Development of time-bound action plans for improvement
% of planned actions implemented
Organising management reviews for review and resolution of issues
%issues implemented to identified
Organising Annual TQ assessment to bring out improvements at Units/ Divisions as per schedule
C % completed as per schedule
QAX05500 QAX C TQ Score Y
QAX05501 QAX C Y Y
QAX05502 QAX O Y
QAX05503 QAX Preparation of Position report O Y Y
QAX05504 QAX O Y Y
QAX05600 QAX C Y
QAX05700 QAX O Y
QAX05800 QAX C
QAX05900 QAX C
QAX05901 QAX O
QAX05902 QAX O Time Index
QAX05903 QAX C Time Index
QAX05904 QAX O
QAX06000 QAX O
QAX06100 QAX O
QAX06200 QAX O % Availability Y
Achieving Business Excellence through improvement in Key Business Processes
Preparation of Action plan based on TQ Feedback report and other initiatives
No. of days delayed from scheduled date
Review and monitoring of action plans
% of planned actions implemented
No. of days delayed from scheduled date
Dissemination of Position report and preparation for site visit as per schedule
No. of days delayed from scheduled date
Development of modules for bringing TQ Culture/ improving TQ Status
No. of days delayed from scheduled date
Publication of journals/Technical reports/MIR s
No. of days delayed from scheduled date
Number of Papers presented/published in National/International Seminars/Journals
Number of Papers
Enhancing maturity Level of Quality Systems
% Systems improved
Identify critical systems impacting on business results/ customer satisfaction
Number of Systems
Gap analysis of identified critical systems through review of adequacy and compliance
Development of time-bound action plans for improvement
Implementation of action plans
% of planned actions implemented
Vendor development/ assessment as per requests
% completed as per scheduleSupport to other
departments/site on specialised services (Eg: RLA/ Site support/ Testing/ IT/ Tenders etc) as per schedule.
% completed as per schedule
Uptime (Availability) of testing equipment/ Instrument and guages (including master gauges)
QAX06300 QAX C
QAX06400 QAX O Y
QAX06401 QAX O Y
QAX06402 QAX O Y
QAX06500 QAX O Y
QAX06600 QAX O
QAX06700 QAX O Y
QAX06800 QAX O
QAX06900 QAX C
QAX07000 QAX C Number Y
QAX07001 QAX Identification of Needs O Y Y
QAX07002 QAX C Y Y
QAX07003 QAX Organise training programmes O Number Y
QAX07004 QAX O Number Y
Enhancement of capability of identified measurement/ testing/ calibration facilities/processes
% completed as per plan
Outsourcing identified Services (Example: Third Party Inspection agencies/ Service providers like Agency for undertaking Customer Satisfaction Survey etc.) as per schedule
No. of days delayed from scheduled date
Preparation of tender specification as per schedule
No. of days delayed from scheduled date
Techno-commercial evaluation of offers as per schedule
No. of days delayed from scheduled date
Implementation of CTQs/Special Contract requirements
% Implemented to identified
Updation of database/Information (like PERT/ Intranet sites etc.) in System
% completed as per plan
Identification/incorporation of CTQs/Special Contract requirements in documents like work instructions, check lists, quality plans, purchase documents etc.
No. of Exceptions
Monitoring Performance of Service Provider(Third Party Inspection Agencies appointed by BHEL and other service providers/ sub-contractors
Performance Index = 0.3(Time Index) +0.7 (No.of errors/No. of
Increase in no. of active Quality Circles in the deptt.
Number of new circles
Enhance Skill/Awareness on Quality/BE initiatives
No. of days delayed from scheduled date
Development of Training Modules
No. of days delayed from scheduled date
Facilitate Improvement initiatives/activities
QAX07100 QAX O % Y N
QAX07200 QAX O % Y N
QAX07300 QAX O Time Index Y N
QAX07400 QAX O Time Index Y N
QAX07500 QAX O Y Y
QAX07600 QAX O Score Y N
QAX07700 QAX O Time Index Y N
QAX07800 QAX C TQM Score Y N
QAX07900 QAX O Y Y
QAX08000 QAX C Time Index Y N
QAX08100 QAX C Y N
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
QUALITY FUNCTION KRA MASTER - 2006-07
N X L L
N L L M Reports of QC/Labs
N L L M
N L L M
N L L M Data log
N X L M Data log
N M M M Data log
N L L X List of stages
N X M M Test Records
N M H H
N X M M
N X L L Surveillance Report
Universal KRA
(Y/N)
Suggested Weightage for category A B
C
Source of Data For Measurement
MIR/ Computer generated Database
Process Sheets/ Inspection requests
Inspection Reports/ Register
Pilot Implementation Records
N X L M Reports/ Feedback
N X M H Safety Reports
N X L M Safety Audits
N H H H Planning Schedule
N X L M Data log of labs
N X L M Requests received
N M M M Test Report
N L L L MIRs/Budget report
N L M H Lab Systems
N L M H Lab Reports
N M M X Lab Reports
N X L L
N M M M Audit reports
MIR/ Computer generated Database
N M M X Audit reports
N M M M Audit reports
N M M H Quality Circle data
N L L M Quality Circle Reports
N X L L Database/ MIRs
N M M X List of identified systems
N H H X List of identified systems
N M M X
N L M H
N L M M MIR/Reports
N X M X Action plan & report
N X L M Validation report
N L X X List of areas planned
N H H X Project completion Report
Department Plan and accreditations
Department Plan and Reports
N M M X Study Report
N X M M Reports
N X M M Implementation Records
N X L L System Documentation
N H H X Department Plan
Y L M H
Y M M M
Y X M H Project report
X M M
H H X Investigation Reports
M M M
X M M
M M H
M M H
X L L Certification records
MIR/ Computer generated Database
Internal Customer Satisfaction Score
M M X Product NCRs
M M X List of identified systems
X X L
M M X Analysis report
M M X Action Plan
M M X Status reports
M M X NCR Data
M M X
M M X List of identified systems
M M X
M M X Status reports
H H X
X X L
Data Compilation records/ Computer generated records
MIR on cost of Rework/Rejection
Analysis report and action plans
Customer complaint MIRs/ computer generated data
Data Compilation records/ Computer generated records
M M X Analysis report
M M X Action Plan
M M X Status reports
H H X QTM records of computer
X M X QTM records
M M X Analysis report
M M M Status reports
H H H Project report
H H H Project report
H H H Project report
H H H Project report
H H H Project report
H H H Project report
H H H MIRs
H H H MIRs
L M H MIRs
H H H MIRs
L L L MIRs
M M M Review reports
M M M Action Plans
M M M Action Plans
M M X Review records
H H X Assessment Schedule
H H H Feedback Report
M M M
M M X Status reports
X H H
M M X Schedule
H H H TQ Status
M M M Reports/ Feedback
M M M Publications/MIR s
H H H Audit/review reports
M M M Review reports
M M M Review reports
M M M Action Plans
M M M Action Plans
X L L
L M M MIR / Report
L M M Data log of labs
Feedback Report/ BSC/ Unit plans
Unit reports/ Highlights/ MIR
Vendor Development/ Assessment reports
H H H MIRs
M M X Contract
X M M Tender specification
X L L
X L L
X L L MIRs/Feedback
X L L Feedback
X M M
Y M X X Unit QA/QC
N H H X MIR
N M M M Letters/Feedback/ Review
N H H H Training materials
N L L L Training schedule
N H H H MIR/Reports
Comparitive Statement of offers
Inspection Reports/ NCRs/ Feedback
Reports of Service Provider
Y M L L
Y M L L
Y M L L
Y M L L
Y H M L
Y M X X Survey Report
Y X M M Project report
Y H X X Quality Deptt.
Y X M X Action plan document
Y X X M Project report
N H H X
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Rating declared at year end by Corporate / Unit Management
QUALITY FUNCTION KRA MASTER - 2006-07
KRA Remarks
1. Department Plan/ Procedure to be prepaared (if not available) reflecting period of disposition.2. NCRs for Mfg. Units/ Engg. Centres and SDRs for Power Sector Regions. 3. Not applicable to Corporate Quality
Department plan/ Procedure to be prepared (if not available) reflecting period required for undertaking inspection/ testing.
Department plan/ Procedure to be prepared (if not available) reflecting period required for issue of reports.
Schedule to be prepared by the department.
Schedule to be prepared by the department.
1. Department plan/ Procedure to be prepared (if not available) reflecting category-wise period required for undertaking calibration2. Not applicable to Corporate Quality
Target to be based on Z value or En Value as applicable
Schedule to be prepared by the department.
1. Department Plan/ Procedure to be prepaared (if not available) reflecting period of disposition.2. SFRs/ SSARs and SARs wherever applicable for PS-Regions. 3. Not applicable to Corporate Quality
Effectiveness of audit is measured by agreed improvements by the auditee. Targets could be for example like: 100%/ 90%/ 80%/ 70% etc.
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Schedule to be prepared by the department
1. It is the responsibility of auditor department for timely closure of system NCRs through follow-up with auditee departments. 2. Standard time for closure of NCRs to be given in DPs (if not existing)2. Not applicable to Corporate Quality
Schedule to be prepared by the department.
Schedule to be prepared by the department.
Schedule to be prepared by the department.
Applicable where isnpection activity is outsourced
Schedule to be prepared by the department.
Schedule to be prepared by the department.
1. Milestone Schedule to be prepared by the department.2. Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
All corporate functions
1. Department Plan/ Procedure to be prepaared (if not available) reflecting period of disposition.2. Not applicable to Corporate Quality
Department to measure internal Customer Satisfaction Score/ if not available.
Planned to be prepared by department covering personnel to be trained.
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
1. Milestone schedule/ Plan to be prepared by the Department. 2. NCR for Mfg. Units/ Engg. Centres & SDR for PS Regions.3. Not applicable to Corporate Quality
1. Applicable where system does not exist 2. System to be computerised and preferably made online
1. NCR for Mfg. Units/ Engg. Centres & SDR for PS Regions. 2.Not applicable to Corporate Quality
1. NCR for Mfg. Units/ Engg. Centres & SDR for PS Regions. 2. Not applicable to Corporate Quality
1. Milestone schedule/ Plan to be prepared by the Department.2. Not applicable to Corporate Quality
1. Applicable where system does not exist 2. System to be computerised 3. System to be in line with Corporate System
1. Milestone schedule/ Plan to be prepared by the Department.2. Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Department Plan/ Procedure to be prepared (if not available) reflecting period required for analysis.
Schedule to be prepared by the department.
Schedule to be prepared by the department.
Time Index based on identified processes
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Not applicable to Corporate Quality
Time Index based on identified systems
Not applicable to Corporate Quality
1. Department to prepare schedule of activities2. Not applicable to Corporate Quality
Facilitaion to other Units/Divns as assigned to the individual
Schedule to be obtained from indenting department (if not provided)
Schedule to be obtained from related deparment/ if not available
CTQs wherever applicable.
Schedule to be prepared by the department
Schedule to be prepared by the department.
Schedule to be prepared by the department.
For Third Party Inspection Agencies/ sub-contractors appointed by BHEL - Performance Index = 0.3 (Time Index) + 0.7 (No. of errors/ No. of opportunities). For other service providers Performance
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
GROUP Description
1
2 Calibration and Management of LABS
3 Quality Assurance, Quality Audits/Reviews
4
5
6 Training
7
8 TQM, Quality Management activities
9 Support to other functions
Quality Control - Inspection, Testing (including BOIs)
Certifications, New Systems, New Measurement techniques
Enhancing customer satisfaction (Internal/ External)
Quality Improvement activities - Initiatives & Improvements to reduce NCRs, Rework, Rejection, Customer Complaints, SARs etc
HUMAN RESOURCES / ADMINISTRATION FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description
HRX00100 HRX C Y
HRX00200 HRX O N
HRX00300 HRX O N
HRX00301 HRX O N
HRX00302 HRX O N
HRX00400 HRX O
%
N
HRX00500 HRX C N
HRX00600 HRX C N
HRX00700 HRX O N
HRX00800 HRX O % delayed/ total N
HRX00900 HRX O N
HRX01000 HRX O Y
HRX01001 HRX O Y
HRX01002 HRX O Y
HRX01100 HRX OTime Index
N
HRX01200 HRX O N
HRX01300 HRX OTime Index
N
KRA TYPE
Unit of Measurement
Critical KRA (Y/N)
Design/ implementation and maintenance of IT enabled HRIS as per plan.
No. of days delayed from scheduled date
Timely allocation of interest subsidy on housing/vehicle loan.
No. of days delayed from scheduled date
Reduction in subsidy of social overheads. Eg. Canteen/ School etc against score card/Plan.
% reduction over last year
Reduction in subsidy by review of existing canteen rates/ menu/ preparation practices etc.
% reduction / overall cost
Implementation of subsidy reduction measures.
No. of days delayed from scheduled date
Percentage of feedbacks on which initiatives taken to improve the canteen services.
Timely development of a system for evaluation of quality of raw materials.
No. of days delayed from scheduled date
Implementation of intiatives to increase satisfaction level of consumers of canteen as per schedule.
No. of days delayed from scheduled date
Number of decisions taken in Canteen Mgt. Committee implemented within the timeframe.
% implemented in time/ total decision taken
% of disciplinary cases delayed w.r.t to the target time.
% of grievance cases settled within the target time. % settled in time/ total
Working days lost due to absenteeism as a % of total working days as per plan.
% days lost/ total available days
Identifying the chronic cases of absenteeism and root cause analysis of the same. (individualy)
No. of cases identified and RCA done
Remedial action like counselling and institutional measures for the attendance improvement of chronic absenteeism cases.
% improvement in attendance
Maintenance of HRIS-updation of data every month by specified date
Timely completion of promotion cycle as per plan
No. of days delayed from scheduled date
Monthly updation of employee data base as per schedule
HRX01400 HRX O N
HRX01500 HRX OTime Index
N
HRX01501 HRX O
Time Index
N
HRX01502 HRX O N
HRX01503 HRX O N
HRX01600 HRX O Satisfaction score N
HRX01700 HRX O N
HRX01800 HRX O % of employees N
HRX01801 HRX ONumber
N
HRX01802 HRX ONumber
N
HRX01900 HRX C Y
HRX01901 HRX C Y
HRX01902 HRX C Y
HRX01903 HRX O Y
HRX01904 HRX O
%
Y
HRX02000 HRX C N
HRX02100 HRX O Y
Timely resolution of issues referred to HR (Time limit to be specified in action plan)
% issues not resolves within specified time
Ensuring timely delivery of HR Deliverables
Finalising the case of review employees on attaining the age of 55/58 years.
Timely settlement of pay fixation/pay anomaly issues within specified time
% anomalies not settled within specified time
Timely completion of P-Map cases within specified time as announced by Corp. office
% cases not completed in the specified time
Timely administration/processing of RECHS- satisfaction level to be judged by survey
Processing and settlement of terminal benefits within specified time of seperation.
% cases not settled in the specified time
Employee participation in excellence award scheme/suggestions/ PIP/QC/ improvement projects in HR function.
Number of PIP and improvement projects undertaken in HR.
Number of active Quality Circles in HR.
No. of improvement projects /new initiatives/new systems implemented on employee internal communication.
No. of projects planned and completed.
Formulation of system and action plan for meeting the communication gaps.
No. of days delayed from scheduled date
Implementaion of action plan on communication.
No. of days delayed from scheduled date
Timely arrangement of open forum/Mgt - Employee Communication Meetings (MECOM)
No. of days delayed from scheduled date
Percentage of issues raised in the Mgt Employee Communication Meetings resolved.
HR practices such as Training/ Recruitment etc bench marked and improved as per schedule.
No. of days delayed from scheduled date
Cost saving in HR services w.r.t plan/target as per departmental score card.
Actual savings in Rs./ target
HRX02101 HRX O Y
HRX02102 HRX O Y
HRX02200 HRX O Y
HRX02300 HRX O Y
HRX02400 HRX O Y
HRX02500 HRX C N
HRX02501 HRX C N
HRX02502 HRX C N
HRX02503 HRX C N
HRX02600 HRX C Y
HRX02601 HRX C Y
HRX02602 HRX C Y
HRX02700 HRX O N
Fixing a target/ identifying and preparing action plan for cost saving thru' wastage reduction/ economic buying/ rationalisation of services etc.as per schedule
No. of days delayed from scheduled date
Implementation of action plan to meet target on cost saving through wastage reduction/ economic buying/ rationalisation of services etc.as per schedule
No. of days delayed from scheduled date
No. of services/contracts reviewed for Rationalisation/ rating of vendors for utilities/servicesas per schedule.
No. of days delayed from scheduled date
No. of works completed without cost overruns as per target.
Index= No. works with cost overrun/ Total works * Cost overrun/ Budget cost
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Completion of improvement and OD projects/HR initiatives undertaken aligned to strategic plan/ balance score card as per schedule.
No. of days delayed from scheduled date
Identification of improvement projects aligned to strategic plan/ balance score card as per schedule.
No. of days delayed from scheduled date
Preparation of action plan for implementation of identified improvement projects aligned to strategic plan/ balance score card as per schedule.
No. of days delayed from scheduled date
Implementation of action plan for identified improvement projects aligned to strategic plan/ BSC as per schedule.
No. of days delayed from scheduled date
No. of new initiatives implemented as per schedule to improve Organisation Work Culture and mile stones to be reached with in the year.(Few aspects from the list to be selected)
No. of days delayed from scheduled date
Identification as per schedule initiatives/ formulation of system and action plan for improving the work culture.
No. of days delayed from scheduled date
Implementation of action plan on work culture improvement initiatives as per schedule.
No. of days delayed from scheduled date
Conducting leadership effectiveness survey as per schedule
No. of days delayed from scheduled date
HRX02701 HRX O N
HRX02702 HRX O N
HRX02703 HRX O N
HRX02800 HRX ONumber
N
HRX02900 HRX C N
HRX03000 HRX O N
HRX03100 HRX O
Time Index
N
HRX03200 HRX O N
HRX03300 HRX O N
HRX03400 HRX O N
HRX03500 HRX O N
HRX03600 HRX O N
HRX03700 HRX O No's reduced N
HRX03701 HRX O N
HRX03702 HRX O N
HRX03703 HRX O N
Design of questionnaire for conducting Leadership Effectiveness Survey as per schedule.
No. of days delayed from scheduled date
Administering survey questionnaire to assess the Leadership Effectiveness Survey and analysis of data as scheduled.
No. of days delayed from scheduled date
Implementation of action plan as per schedule to improve the Leadership Effectiveness Survey.
No. of days delayed from scheduled date
Number of agrieved employees counselled.
Development of centralised coding and standardisation of works contract as per schedule.
No. of days delayed from scheduled date
% productive hours lost due to strikes/ lockouts and labor unrest.
% hours lost/ total hours
Holding structured meetings of Unions/Associations with Head of Unit/GM/AGM(HR) as per schedule
Percentage of issues resolved out of the ones agreed in various structured meetings with unions/associations.
% issues resolved/ total issues discussed
Percentage of meetings of bi-partite fora organised as per plan.
No. of days delayed from scheduled date
Percentage of issues resolved out of the ones agreed in the meetings of bi-partite fora.
% issues resolved/ total issues discussed
Timely and effective conduct of elections.
No. of days delayed from scheduled date
Timely and effective conduct of various sports/games events as per schedule.
No. of days delayed from scheduled date
Reduction in number of contract labour through various initiatives like enhanced outsourcing/ VRS etc.
Organising workshops with line managers on the various aspects and issues on Contract Labour as scheduled.
Time frame / No. of days delayed from scheduled date
Identifying the areas and action plan for reducing the number of contract labour jointly with line managers.
No. of days delayed from scheduled date
Implementation of action plan for reduction of contract labour as scheduled.
No. of days delayed from scheduled date
HRX03800 HRX O No's redeployed. N
HRX03801 HRX O N
HRX03802 HRX C N
HRX03900 HRX C Y
HRX03901 HRX O Y
HRX03902 HRX C Y
HRX03903 HRX C N
HRX04000 HRX O Y
HRX04001 HRX O Y
HRX04002 HRX O Y
HRX04100 HRX O N
HRX04101 HRX O N
HRX04102 HRX O N
HRX04103 HRX O N
HRX04200 HRX O%
Y
HRX04201 HRX C Y
HRX04202 HRX O Y
No. of employees redeployed consequent upon outsourcing of services and non-core activities as per plan.
Identification of activities to be outsourced as per schedule.
No. of days delayed from scheduled date
Finalisation of methodology for outsourcing by specified date.
No. of days delayed from scheduled date
Development of a system for manpower planning by specified date
No. of days delayed from scheduled date
Gathering input on present system by specified date
No. of days delayed from scheduled date
Finalising the revised system by specified date
No. of days delayed from scheduled date
Issue Guidelines for 'Core' & 'Non-Core' activities by the Units
No. of days delayed from scheduled date
Identification of manpower requirement at unit level and getting the sanction to fill up the posts by specified date.
No. of days delayed from scheduled date
Generation of data on category and skillwise manpower gap by specified date.
No. of days delayed from scheduled date
Submission of proposal on manpower requirement to Corporate Office after proper analysis & complete in all respects
No. of clarifications sought by Corp office
Induction of manpower as per plan/ with in the specified time.
No. of days delayed from scheduled date
Preparation/review of norms/criteria for various aspects of the recruitment process and sharing the same with all concerned by specific date.
No. of days delayed from scheduled date
Notifying the vacancies/ getting the applications/ screening and shortlisting candidates for selection by specific date.
No. of days delayed from scheduled date
Organising the selection process for positioning by specified date.
No. of days delayed from scheduled date
% of employees assessed for skill inventory.
Designing a system for collecting data for compiling skill inventory by specific date.
No. of days delayed from scheduled date
Implementing and maintaining the system developed for skill inventory by specific date.
No. of days delayed from scheduled date
HRX04300 HRX O No. redeployed Y
HRX04400 HRX O N
HRX04500 HRX O Y
HRX04501 HRX C Y
HRX04502 HRX O Y
HRX04503 HRX O Y
HRX04600 HRX O
Number
Y
HRX04700 HRX O N
HRX04701 HRX O N
HRX04702 HRX O N
HRX04800 HRX O N
HRX04900 HRX O No.done/ No. planned N
HRX05000 HRX O N
HRX05100 HRX O Y
HRX05200 HRX O
Number
N
HRX05300 HRX O
Number
N
HRX05400 HRX O
Number
N
No. of employees redeployed as a part of HR optimisation as per plan.
Induction of fixed tenure appointees by specified date.
No. of days delayed from scheduled date
No. of improvement projects implemented as per plan based on Township residents Satisfaction survey.
No. implemented/ total
Preparation and administering survey questionnaire to assess the satisfaction score of Township residents as per schedule.
No. of days delayed from scheduled date
Identification of areas for improvement and action planning to improve the satisfaction score of township residents as per schedule.
No. of days delayed from scheduled date
Implementation of action plan to improve the satisfaction score of township residents as per schedule.
No. of days delayed from scheduled date
No. of projects undertaken and implemented on rain water harvesting and energy conservation.
Increase in revenue through township facilities.
% increase over last year
Review of norms for rent/lease rent for township facilities for outsiders by specified date.
No. of days delayed from scheduled date
Increase in collection of rent from non-BHEL residents.
% increase over last year
% of unauthorised occupants evicted in township.
% evicted/ total to be evicted
No. of jhuggies/ unauthorized construction removed/rehabilitated.
Average cycle time from EO court order to execution/ compliance
% reduction in Av. Cycle time
Plantation of trees/shrubs/lawns as per target.
% of total plantation area covered
Number of social/national festivals/functions organised in township/project sites.
No. of Community Development initiaves like Medical Camps/ Blood donation/ upgrading of school facilities in neighbouring villages/ literacy programmes etc.
No. of participant mandays on programs on official language implementation including Hindi on Computers.
HRX05500 HRX ONumber
N
HRX05600 HRX ONumber
N
HRX05700 HRX O
%
N
HRX05800 HRX O%
N
HRX05900 HRX O
%
N
HRX06000 HRX O N
HRX06100 HRX O N
HRX06200 HRX O Y
HRX06201 HRX O Y
HRX06202 HRX O Y
HRX06300 HRX O
Number
Y
HRX06301 HRX C Y
HRX06302 HRX C Y
HRX06400 HRX O
%
Y
HRX06401 HRX O Y
HRX06402 HRX O
Time Index
Y
HRX06403 HRX O N
HRX06500 HRX O
Time Index
N
Number of seminars conducted on official language act for PSUs.
Number of participants in Hindi competition .
Percentage compliance of Sec 3(3)/ Rule 5/6 & 11of Official Languages Act/ 1963 and Rules 1976.
Percentage increase in Hindi Correspondence
Percentage compliance of the assurance(s) given to various inspection agencies of Rajbhasha including Parliament Committees.
Publication of annual souvenoir on Rajbhasha as per schedule
No. of days delayed from scheduled date
Timely updation of roster on Hindi knowledge
No. of days delayed from scheduled date
No. of Training man days per employee per year
Trg. Mandays/ employee
Revisiting the system for training need identification at all levels by specific date.
No. of days delayed from scheduled date
Designing and organising training programmes as per the identified training needs by specific date.
No. of days delayed from scheduled date
No. of persons trained in Technical Skills including multi-skill training as per plan.
Revisiting the present system of multiskilling by specific date to enhance its effectiveness.
No. of days delayed from scheduled date
Implementation of the revised multi skill training programme by specific date.
No. of days delayed from scheduled date
% completion of training programs as identified in MAP for executives and other employees as per present system in units.
Designing training programmes as per the identified training needs by specific date.
No. of days delayed from scheduled date
Organising training programmes as per the identified training needs as per schedule.
Planning and Preparation of Annual Training Programme Calendar by specified date
No. of days delayed from scheduled date
New training programs developed & implemented in the year as per schedule.
HRX06600 HRX O Av. Marks N
HRX06700 HRX O Y
HRX06701 HRX O Y
HRX06702 HRX O
Time Index
Y
HRX06800 HRX C Y
HRX06900 HRX O
Number
N
HRX07000 HRX O Rs./Tonnage N
HRX07100 HRX O N
HRX07101 HRX O
Number
N
HRX07102 HRX O Rs. N
HRX07200 HRX C Y
HRX07201 HRX C Y
HRX07202 HRX C Y
HRX07203 HRX C Y
HRX07300 HRX O N
Improvement in the performance of Trade Apprentices with reference to the average marks scored by them in the National Trade Test.
No. of joint training programmes with customers/suppliers/institutes as per plan.
No. & Training Effectiveness index
Identifiy the partners for conducting joint training programmes and designing the programme by specific date.
No. of days delayed from scheduled date
Organising joint training programmes with customers/suppliers/institutes as per schedule.
Devpt.and implementation of new training module for promotee supervisors/Executives by specific date.
No. of days delayed from scheduled date
No. of awards won in National and Regional Level competitions by Apprentices.
Production completion with reference to the budget. (For HRDC workshop)
Increase in revenue through HRDC/HRDI programmes for non-BHEL participants.
% increase over last year
Number of programmes planned & conducted for other organisations at their place.
Revenue through consultancy in the area of expertise.
Development of a system for competency mapping/ as per schedule.
No. of days delayed from scheduled date
Finalisation of approach for competency mapping by specified date.
No. of days delayed from scheduled date
Piloting of competency mapping system at one major unit as per schedule.
No. of days delayed from scheduled date
Deployment of the competency mapping system across the organisation to E6 and above levels by specific date.
No. of days delayed from scheduled date
Timely implementation of ET training mudules as per schedule.
No. of days delayed from scheduled date
HRX07301 HRX O
Time Index
N
HRX07400 HRX O
Number
N
HRX07500 HRX O Feedback rating N
HRX07600 HRX O
Time Index
Y
HRX07700 HRX ONumber
N
HRX07800 HRX O N
HRX07900 HRX O N
HRX08000 HRX C N
HRX08001 HRX O N
HRX08002 HRX C N
HRX08100 HRX C N
HRX08200 HRX O Y
HRX08300 HRX O N
HRX08400 HRX O Y
HRX08500 HRX O N
HRX08600 HRX O N
HRX08700 HRX O N
Setting up of Question Papers, Evaluation of Answer Sheets and Evaluation of Project Reports submitted by Engineer/ Executive Trainees
Number of projects useful for BHEL identified and completed through In-plant trainees/Vocational trainees
Percentage inprovement in feedback ratings by the participants of training programmes
Procurement and issue of Gift items/ uniform cloth/ shoes and other items by specific date.
No. of Workers Education Programmes organised as plan.
Announcement regarding various awards like Swasth Karmachari/ Excel etc as per schedule.
No. of days delayed from scheduled date
Ensuring compliance to various statutory provisions
No. of non compliances reported
Redesign of MAP system for next cycle as per schedule
No. of days delayed from scheduled date
Compilation & analysis of feedback for redesign of MAP as per schedule
No. of days delayed from scheduled date
Review & redesign specific module(s) as per requirement by specified date. Module to be mentioned in action plan box.
No. of days delayed from scheduled date
Communication & training of MAP co-ordinators for implementing modified system at units by specified date
No. of days delayed from scheduled date
Updation of MAP database - all changes to be incorporated within 30 days of event
% cases updated within specified time
Review & re-design of KRA Masters & incorporating changes in the system by specified date
No. of days delayed from scheduled date
Organising & conducting Roll-out workshops at unit level for MAP changes as per schedule
No. of days delayed from scheduled date
Implementing design changes for current year MAP cycle as per schedule
No. of days delayed from scheduled date
Responding to queries on HELP DESK within specified time
% queries responded within specified time
Finalising of Corporate/ unit level Balanced Score Cards by specified date
No. of days delayed from scheduled date
HRX08800 HRX OTime Index
N
HRX08900 HRX O
Time Index
Y
HRX09000 HRX O
%
Y
HRX09100 HRX O % replied Y
HRX09200 HRX CNumber
Y
HRX09201 HRX C Y
HRX09202 HRX O Y
HRX09203 HRX O Y
HRX09204 HRX C Y
HRX09300 HRX O ICPS Score Y
HRX09301 HRX C Y
HRX09302 HRX O Y
HRX09303 HRX C Y
HRX09400 HRX O
Time Index
Y
HRX09500 HRX O O.A. Factor N
HRX09600 HRX O Rs. N
Evaluation of unit level Scorecards by specified date
Compilation & submission of various SC/ST/OBC/PH/Ex-Sevicemen etc. Returns as per schedule
% of grievances related to SC/ST remaining unresolved at the end of the year including ones received during the current year
% of VIP references replied within specified time.
No. of improvement initiatives implemented based on EPS results.
Design of questionnaire for conducting employee perception survey by specified date.
No. of days delayed from scheduled date
Administering survey questionnaire to assess the Employee perception and analysis of data as per schedule.
No. of days delayed from scheduled date
Identification of areas for improvement and action planning to improve the EPS score by specific date.
No. of days delayed from scheduled date
Implementation of action plan to improve the EPS score by specific date.
No. of days delayed from scheduled date
Improvement in the employee satisfaction score on HR deliverables measured through internal customer perception survey.
Preparation and administering by specific date survey questionnaire to assess the satisfaction score on HR deliverables.
No. of days delayed from scheduled date
Identification of areas for improvement and action planning to improve the satisfaction score on HR deliverables by specified date.
No. of days delayed from scheduled date
Implementation of action plan to improve the satisfaction score on HR deliverables by specific date.
No. of days delayed from scheduled date
No. of 5S projects identified and deployed as per plan in HR department as per schedule.
Operating availability of fire safety equipments.
Cost savings through rationalization of security personnel.
HRX09700 HRX C
Number
N
HRX09701 HRX C N
HRX09702 HRX C N
HRX09800 HRX O
%
Y
HRX09900 HRX O
%
Y
HRX10000 HRX O
Time Index
Y
HRX10100 HRX O
Time Index
Y
HRX10200 HRX O Score Y
HRX10201 HRX C
Time Index
Y
HRX10300 HRX O N
HRX10400 HRX C TQM Score Y
HRX10401 HRX O Y
HRX10402 HRX C
Time Index
Y
HRX10403 HRX O Y
HRX10500 HRX C Y
HRX10600 HRX CNumber
N
HRX10700 HRX CTime Index
Y
Designing & implementing new initiatives to safe guard Company Properties by specified date.
Identification of initiatives/ formulation of system and action plan for protecting company properties.
No. of days delayed from scheduled date
Implementaion of action plan by specific date for protecting company properties.
No. of days delayed from scheduled date
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Number of new circles
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Writing & getting the approval of the relevant chapters of enablers / results of TQM position report for the unit within specified date.
No. of days delayed from scheduled date
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
HRX10800 HRX C N
HRX10900 HRX C N
HRX11000 HRX C N
HRX11100 HRX C N
HRX11200 HRX C N
HRX11300 HRX C N
HRX11400 HRX C No. of articles N
HRX11500 HRX C
Number
Y
HRX11600 HRX ONumber
N
HRX11700 HRX C Y
HRX11800 HRX O N
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
No. of Professional articles & papers contributed in media/ conferences.
No. of abstracts made after reading books / journals / articles in the area of resopnsibility / job being performed for improving and updating knowledge / skills
Number of initiatives pertaining to WIPS
Finalising system for evaluation of training effectiveness by specified date
No. of days delayed from scheduled date
Review and finalisation of Normalisation design as per schedule
No. of days delayed from scheduled date
HRX11900 HRX C Y
HRX11901 HRX C N
HRX11902 HRX C N
HRX12000 HRX OTime Index
Y
HRX12100 HRX O Y
HRX12200 HRX O
Number
Y
HRX12201 HRX Acquisition of Books ONumber
Y
HRX12202 HRX Acquisition of Periodicals ONumber
Y
HRX12203 HRX ONumber
Y
HRX12300 HRX Technical processing of documents ONumber
YHRX12301 HRX Classification and Cataloguing O Number Y
HRX12302 HRX O Percentage of work N
HRX12400 HRX C Number/percentage Y
HRX12401 HRX C Percentage of work N
HRX12402 HRX Automation of circulation system C N
HRX12403 HRX C Percentage of work N
HRX12500 HRX O Y
HRX12600 HRX Maintenance of systems O Number of systems Y
HRX12601 HRX O N
Review and revision of specific HR systems to align with business requirements eg. Manpower planning/ recruitment/ etc (to be mentioned in action plan box)/ by specific date.
No. of days delayed from scheduled date
Preparation of revised policy/ scheme (details to be given in action plan) for approval by specific date
No. of days delayed from scheduled date
Isuue of detailed guidelines for implementation of revised scheme (details to be given in action plan) by specific date
No. of days delayed from scheduled date
Adminstration and implementation of MAP as per schedule
Budget proposals/ Allocation and Judicious spending Number of documents
Acquisition of various documents:modern methods to enable faster availability of the documents. Collection building activity
Acquisition of Standards/ Patents/ Reports/ Photocopies etc.
Online catalogue (OPAC). Provision and maintenance for sharing within the Unit/Outside units
Modernisation and Automation of library/information services
Automation of library house keeping operations
Number of documents
Online catalogue. Conversion of card catalogue
Maintenance/administration/upkeep of various library/information operation Number of documents
Stock verification and auditing of library collection as per schedule
No. of days delayed from scheduled date
HRX12700 HRX O N
HRX12701 HRX O
Number
N
HRX12702 HRX ONumber
NHRX12703 HRX Administration of LAN/VPN services O Timely updation N
HRX12800 HRX C
Number
N
HRX12801 HRX ONumber
N
HRX12802 HRX ONumber
N
HRX12803 HRX C Timely updation N
HRX12804 HRX O
Number
N
HRX12900 HRX C N
HRX12901 HRX O N
HRX12902 HRX O N
HRX12903 HRX O N
HRX12904 HRX O Number of programs N
HRX12905 HRX O%
Y
HRX13000 HRX Computerisation of documents O Y
HRX13100 HRX O Y
HRX13200 HRX O Y
HRX13300 HRX O Y
HRX13400 HRX C N
Interaction with other units of BHEL for information resource sharing
Number of queries attended
Interlibrary lending of documents(manual/electronic methods
Acquisition of databases at central location for online resource sharing
Harnessing Internet Sites for exploring new avenues in literature sources. E-governance and e-delivery
Methods of e-delivery of documents(procurement)
Downloading of free documents(e-journals)
Automated methods in dissemination of information
Current awareness services:library bulletin/ information brochures on new services
Planning and development of digital library as per schedule
No. of days delayed from scheduled date
Digitisation of existing resources as per schedule
No. of days delayed from scheduled date
Acquisition of e-books as per schedule
No. of days delayed from scheduled date
Replacing print versions with e-versions of journals as per schedule
No. of days delayed from scheduled date
Training and education of users in e-versions
% Improvement in internal customer satisfaction score
Number of pages converted into soft copy vis-à-vis target in a year
Completion of translation of technical documents
Number of pages translated vis-à-vis target in a year
Formatting/ Proof Reading and preparing final version of translation for despatch
Number of pages formatted vis-à-vis target in a year
Editing of translation job done by others
Number of pages edited vis-à-vis target in a year
Collection of subject specific terminology from day to day translations and development of subject specific glossary to do any future jobs more efficiently
Number of words compiled
HRX13500 HRX C Y
HRX13600 HRX O Y
HRX13700 HRX C Y
HRX13800 HRX C Y
HRX13900 HRX C N
HRX14000 HRX O N
HRX14100 HRX O N
HRX14200 HRX C Y
HRX14300 HRX O N
HRX14400 HRX C
Time Index
Y
HRX14401 HRX O N
HRX14402 HRX O N
HRX14403 HRX O N
HRX14500 HRX CTime Index
Y
HRX14501 HRX C Y
Creation of database for Translation jobs as per schedule
No. of days delayed from scheduled date
Database Maintenance and Data Entry as per schedule
No. of days delayed from scheduled date
Identification of OCR software/ test use and installation on server for use by various departments/Labs and initial guidance as per schedule
No. of days delayed from scheduled date
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
Development of an on-line system by specified date for RECHS Data Management
No. of days delayed from scheduled date
Classification of activities as 'Core'& 'non-core' in accordance with Corp. guidelines within specified days of receipt of guidelines
No. of days delayed from scheduled date
Issue of Guidelines relating to benefits payable for the suspension period treated as on duty on reinstatement.
No. of days delayed from scheduled date
Finalisation of stakeholder Grievance Redressal system.
No. of days delayed from scheduled date
Reduction in time in review and updation of BHEL CDA Rules in accordance with instructions of Central Vigilance Commission and Department of Public Enterprises
No. of days delayed from scheduled date
Completion of all milestone for finalization of an approach paper on career planning in BHEL
To identify, collate and document literature from various studies, reports, journal paper, magazine articles, and library collection.
No. of days delayed from scheduled date
To interact with various organization and get details of the contemporary career planning practices in those organizations.
No. of days delayed from scheduled date
Compilation of inputs and draft approach paper for approval by specified date.
No. of days delayed from scheduled date
Preparing a career planning scheme for implementation
Preparing career paths of different functions
No. of days delayed from scheduled date
HRX14502 HRX C Y
HRX14600 HRX O Y
HRX14601 HRX O Y
HRX14602 HRX O Y
HRX14603 HRX O Y
HRX14700 HRX O N
HRX14800 HRX C Y
HRX14900 HRX C N
HRX15000 HRX C N
HRX15100 HRX O Saving in Rupees N
HRX15200 HRX C N
HRX15201 HRX O N
HRX15202 HRX O N
Compilation of inputs and draft report for implementation by specified date.
No. of days delayed from scheduled date
Running Normalisation after carrying out design changes, if required, and posting results on e-MAP as per schedule
No. of days delayed from scheduled date
Timely sanitisation of data on all the decentralised servers and merging on the central server
No. of days delayed from scheduled date
Conducting Test run and verifying results by specified date before the final run
No. of days delayed from scheduled date
Analysis of output of final run and setting right abberations thru manual over ride and posting of final results on e-MAP by specified date
No. of days delayed from scheduled date
Timely processing of Community Development Initiatve proposals received from Units for approval of budget & Processing of donations/financial assistance and grants to various bodies within the specified time.
% cases processed within specified time
Preparing a scheme for competency enhancement of HR personnel by specified date
No. of days delayed from scheduled date
Review of Personnel Manual by specified date to weed out redundant rules and create a system for regular updation of the print and soft versions
No. of days delayed from scheduled date
Formulate strategy for classroom-cum-distance learning - develop CBT module
No. of days delayed from scheduled date
Timely processing of Imports Ocean freight/air freight/air agencies bills involving huge amounts (involving crores of value - audit resulting in savings in lacs of rupees viz.. classification , currency exchange rates etc..)
Appointment of implementation partner by specified date for HRMS including finalization of RFPs and deliverables.
No. of days delayed from scheduled date
Finalization of tender document for identification of implementation partner for ERP-HR
No. of days delayed from scheduled date
Evaluation of tender & Selection of Implementation partner for ERP-HR
No. of days delayed from scheduled date
HRX15300 HRX O Y
HRX15400 HRX O
Time Index
N
HRX15500 HRX O Y
HRX15600 HRX C Date N
HRX15700 HRX O Number of activities N
HRX15800 HRX O%
N
HRX15900 HRX O No of days. N
HRX16000 HRX O Timely organised N
HRX16100 HRX O % completion on time N
HRX16200 HRX O
Time Index
N
HRX16300 HRX C
Time Index
N
HRX16400 HRX C N
HRX16500 HRX O
Time Index
N
HRX16600 HRX C Nos. of presentations N
HRX16700 HRX O
Time Index
N
HRX16800 HRX C
Number
N
HRX16900 HRX O Nos. of NCRs N
HRX17000 HRX O Nos. of Sessions. N
Processing of representation received by CMD/Director during their visits to Units & putting up recommendation within 15 days of each Quarter.
% recommendations put up within specified time
Clearance of model contract proposal received from Units within specified time
Facilitation and implementation of the system of assessing effectiveness of trg. progs.
% of trg.progs. covered by new system
Creation of FAQ related to employee benefits
Planning of activities related to house keeping for the changing needs.
Management of small assets and furniture within the budget
Processing of proposals under BHEL Land Use Policy
Employees transportation arrangement
Management of central mailing, speed post and courier services
Timely ensuring the setting of Question papers, evaluation of Answer Sheets of Examination of Apprentices / ETs.
System for introducing Knowledge / Experiences sharing and Presentations forum for PASAA Trade Apprentices.
Study and preparation of eMaterial for training programmes.
Nos. of slides / pages of Material.
Timely preparation and submission of results of AITT examination to RDAT Kanpur.
Facilitating and Guiding Syndicate Presentations in training programmes
Pre-processes conductance for startup of On-the-job training of Apprentices.
NOs. OF CUSTOMER / SPECIAL TRAINING PROGRAMMES DESIGNED AND ORGANIZED
MAINTENANCE OF ISO / HSE SYSTEMS
Nos. of faculty sessions delivered in training programmes.
HRX17100 HRX C
Time Index
N
HRX17200 HRX O N
INFRASTRUCTURE UPGRADATION AS PER PLAN
Submission of Forms to Provident Fund organisation to obtain National Social security Number to employees
No. of days delayed from scheduled date
HUMAN RESOURCES / ADMINISTRATION FUNCTION KRA MASTER - 2006-07
KRA Remarks
Y N X M M IT Initiatives
Y N X M H Reports Subsidies
N N M X X HOD
N N M M X CANTEEN
Y N X M M OTHERS
N N M M H CANTEEN
Y N X M M Report CANTEEN
Y N X H H Report CANTEEN
N N M H H Report CANTEEN
N N X M M ESTB.
N N X M M ESTB.
N N X M M MIR on attendance. ESTB.
N N X M M ESTB.
N N X X M ESTB.
N N X M H ESTB.
Y N L M H ESTB.
N N X L M ESTB.
Special KRA (Y/N)
Universal KRA
(Y/N)
Suggested Weightage for category
A B CSource of Data for Measurement
Status report on the project.
MIR/ Monthly subsidy payments.
Feedback register & report
Report from Section head.
Report from Section head.
N N L M H ESTB.
N N L M M ESTB.
N N L L M ESTB.
N N L L M ESTB.
N N L L M ESTB.
N N X M H FINAL SETTLEMENT
N N X M H Report FINAL SETTLEMENT
N N M X X MIR HOD
N N X M M HOD
N N X X M HOD
N N M X X HOD
Y N M H X HOD
Y N X M H HOD
Y N M M M Report HOD
N N M M M Report HOD
Y N H M L HOD
N N H H X HOD
Questionnaire to be administered to retired employees
Report by the section head.
Report by the Section I/C
MIR/Reports from Finance.
Y N H H X HOD
Y N M M H HOD
Y N H M X HOD
N N M H H HOD
Y Y H M L HOD
Y N H X X HOD
Y N H M X HOD
Y N X M M HOD
Y N X M M HOD
Y N H X X HOD
Y N H M X HOD
Y N X M M HOD
Y N L M H
Report by Section head.
Report from Finance on estimated cost and actual.
Record maintained by Unit Head/Unit P&D
Balance Score Card/ report by the section head.
Concerned Section/HR head
Y N X M H Report HOD
Y N X M H Report HOD
Y N M M M Report HOD
N N X M M Report HOD
Y N M H M Report HOD
N N M H H IR
N N M M M IR
N N M M M IR
Y N X M M MIR IR
N N X M M IR
Y N L M M Status report IR
Y N X H H Status report SPORTS
N N M X X CONT. LAB
N N M M X CONT. LAB
Y N M H X CONT. LAB
Y N X X M CONT. LAB
MIR on man days lost.
Report of each meeting duly signed by Unit HR head to be prepared for reference
Report of each meeting duly signed by Unit HR head to be prepared for reference
Report of each meeting duly signed by Unit HR head to be prepared for reference
MIR on contract labour.
N N M X X MPP & RECTT
Y N M M X MPP & RECTT
Y N M M X MPP & RECTT
Y N H M X MPP & RECTT
Y N X M X MPP & RECTT
Y N X M X MPP & RECTT
Y N H M M Guidelines issued -
Y N M X X Mile stone chart MPP & RECTT
Y N X H X MPP & RECTT
N N X H X MPP & RECTT
Y N H X X MPP & RECTT
Y N H M X MPP & RECTT
Y N X M H MPP & RECTT
Y N X M H MPP & RECTT
N N H X X MPP & RECTT
Y N H X X MPP & RECTT
Y N X H H MPP & RECTT
Office orders issued/ MIR on HR & report by assessee.
Report from Section head.
Approval for induction/ joining of incumbent/ Report from the Section Head.
Report by Section head.
N N M X X MPP & RECTT
Y N X M M Status report MPP & RECTT
N N M M X TOWNSHIP
Y N X M M TOWNSHIP
Y N M H X TOWNSHIP
Y N X X M TOWNSHIP
N N M M X TOWNSHIP
N N M X X Finance TOWNSHIP
Y N M X X TOWNSHIP
N N X M M TOWNSHIP
N N X M H TOWNSHIP
N N M M H MIR on evictions. TOWNSHIP
N N X M H TOWNSHIP
N N X L M TOWNSHIP
N N X M M Report TOWNSHIP
N N M M H Status report TOWNSHIP
N N X M H RAJBHASHA
Office orders issued/ MIR on HR & report by assessee.
Report by Section head.
Report by Sectio head on the milestones achieved.
MIR on unauthorised occupants.
Report on date of order and date of implementation.
Report by Section head
Report on number participants.
N N X M H RAJBHASHA
N N X M M RAJBHASHA
N N M M M Qtrly Progress report RAJBHASHA
N N M M M Qtrly Progress report RAJBHASHA
N N M M M Report RAJBHASHA
Y N M M M Report RAJBHASHA
Y N M M M MIR RAJBHASHA
N N M X X MIR on training. TRAINING
Y N H H X TRAINING
Y N M H H TRAINING
N N H X X MIR TRAINING
Y N H H X TRAINING
Y N X X M TRAINING
N N M M X TRAINING
Y N M M X TRAINING
N N X M M TRAINING
Y N M M L -
N N H M X TRAINING
Report on number participants.
Report on number participants.
MIR on no. of trg. Programmes identified and completed.
Date of Issue of Annual Training Programme Calendar
Report by Section head.
N N X M H TRAINING
N N H X X TRAINING
Y N H M X TRAINING
N N X M M TRAINING
Y N M X X TRAINING
N N X M H TRAINING
N N M H H MIR TRAINING
N N M X X TRAINING
N N M M X TRAINING
N N M M X TRAINING
Y N H X X TRAINING
Y N H X X TRAINING
Y N H M X TRAINING
Y N H M X TRAINING
Y N X M H Report TRAINING
Result decalred by RDAT.
Report by Section head and Score card.
Report on the mile stones achieved.
Results declared by the concerned agencies.
Finance/Report by section I/C
Report on the developed system and status as per mile stone.
N N L M M -
N N L M H Report TRAINING
N N M M M Report TRAINING
N N M M M WELFARE
N N X M M Report WELFARE
Y N M M M Report WELFARE
N N H H H Report WELFARE
Y N H M L Feed back report OTHERS
Y N H H M OTHERS
Y N H H M OTHERS
Y N H H H Feedback Report OTHERS
N N X M H Dept. records OTHERS
Y N H H H OTHERS
Y N M H M OTHERS
Y N M H H OTHERS
N N X L M OTHERS
Y N H H X OTHERS
No. of days taken from request received
Report from Section head.
N N H H X OTHERS
N N X M H Dept. records OTHERS
N N H H M Dept. Records OTHERS
N N H H M OTHERS
N N M X X MIR OTHERS
Y N M X X OTHERS
Y N X M H OTHERS
Y N M H X OTHERS
Y N X M H OTHERS
N N M X X OTHERS
Y N X H M OTHERS
Y N M H X OTHERS
Y N X X H OTHERS
N N L M M OTHERS
N N X X H OTHERS
N N M M X OTHERS
Dept. record to be maintained for receipt & despatch
Internal customer perception survey.
Audit committee as per system developed by Haridwar.
Report on number of equipments installed and their availability.
MIR on Security man power strength.
N N M X X OTHERS
Y N M M X OTHERS
Y N X M M OTHERS
N Y M L L OTHERS
N Y M L L OTHERS
N Y M L L OTHERS
N Y M L L OTHERS
N Y M X X Survey Report OTHERS
N Y X M M Project report OTHERS
N Y M X X Unit QA/QC OTHERS
N Y H X X Quality Deptt. OTHERS
Y Y X M X Action plan document OTHERS
N Y X X M Project report OTHERS
Y N L M M -
Y Y L M H OTHERS
N Y M M M OTHERS
N Y X M H Project report OTHERS
Report from Section head.
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Date of finalisation of Application document (position report)
Y N H H H Project report OTHERS
Y N H H H Project report OTHERS
Y N H H H Project report OTHERS
Y N H H H Project report OTHERS
Y N H H H Project report OTHERS
Y N H H H Project report OTHERS
N N M M M Publications OTHERS
N N M M M Records OTHERS
N N X M M Report OTHERS
Y N H M M TRAINING
Y N H H L OTHERS
Y N H H M OTHERS
Y N H H M OTHERS
Y N H H M OTHERS
N N L M H OTHERS
N N H L L LIBRARY
N N L M H LIBRARY
N N L M H LIBRARY
N N L M H LIBRARY
N N L M H LIBRARY
N N L L M LIBRARYN N L L M Catalogue/Shelf list LIBRARY
N N H M M Database LIBRARY
N N H L L Database LIBRARY
N N X L M Database LIBRARY
N N X L H Database LIBRARY
N N X M M Database LIBRARY
N N H L L LIBRARY
N N L L L LIBRARY
Y N L L L Audit records LIBRARY
Acquisition Records/Budget file
Acquisition/accession records
Acquisition/accession records
Acquisition/accession records
Acquisition/accession records
Accession Register/Catalogue
Service records/users feedback
Service records/users feedback
N N M L L LIBRARY
N N X L L TIC records LIBRARY
N N M L L TIC records LIBRARYN N H L L Log files LIBRARY
N N M M M TIC Records LIBRARY
N N H M M TIC Records LIBRARY
N N L M H TIC Records LIBRARY
N N M L L LAN/VPN log files LIBRARY
N N H M M TIC Homepage LIBRARY
Y N M L L TIC Records/Report LIBRARY
Y N M M M TIC Records/Report LIBRARY
Y N M L L TIC Records/report LIBRARY
Y N M M H TIC Records/Report LIBRARY
N N H L L TIC Records LIBRARY
N N H H M Questionnaire LIBRARY
N N L M H Deptl. Database TRANSLATION
N N L M H Deptl. Database TRANSLATION
N N L M H Deptl. Database TRANSLATION
N N L M H Deptl. Database TRANSLATION
N N L M H Deptl. Database TRANSLATION
Requests from units/services rendered
Y N L M H Deptl. Database TRANSLATION
Y N X L H Deptl. Database TRANSLATION
Y N L L H Deptl. Database TRANSLATION
N N H H X
Y N M M M -
Y N M M M -
Y N M M M -
Y N H H M Issue of Circular -
Y N M M L -
N N H M M Final Document -
Y N L L M -
Y N L L M -
Y N L L M Draft Paper -
N N H M M -
Y N H M M Relevant document Eight major functions would be covered and their activities identified to make individual functional cases and then draw out a generic model of career planning scheme for the company.
Rating declared at year end by Corporate / Unit Management
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
System implementation date as per unit balance score card
Date as prescribed by C.O.
circulation of guidelines
Circulation of revised CDA Rules
Records/Relevant document
Records/Relevant document
Approval of Finalized Scheme
Y N H M M Final Document -
Y N H H M Records -
Y N M M M -
Y N M M M Records -
Y N M M M Records -
N N M M M Relevant records -
Y N M M M Scheme document -
Y N M M M Record -
Y N M M L -
N N H H M Payment Records -
Y N H M L -
Y N H H M Status Report -
Y N H H M Status Report -
No. of days delayed from scheduled date
Preparation of module by target date
Status Report on the Project
N N M M M Quarterly Reports -
N N M M L Date of approval -
N N M H H Records -
N N H H H -
N N H H H Report Need based requirements.
N N H H H Report Furniture is procured and distributed depending on departmental requirements based on SAC approval
N N H H H Corporate EMX
N N H H H Report essential service
N N H H H Report Essential service
N N H H H It is major activity and has dependency on other departments. It requires extensive chasing and monitoring.
N N H H H Documentation New key activity. This will inculcate learning and sharing culture.
N N H H H Developmental activity for enhancing quality and avaiability of material to participants.
N N H H H It is Key activity of Training Workshop.
N N H H H Very useful process in learning.
N N H H H Activity duration. It is Key activity to initiate training.
N N M M M THESE ARE IMPORTANT PROGRAMMES.
N N H H H Audit Outcome IT IS ESSENTIAL REQUIREMENT.
N N M M M Faculty records. Promote and motivate trainer competency.
Date of issue of the FAQ
date on which complete proposal is received
Process Completion Dates.
Slides / pages of Materal.
Nos. of days taken from date of examination to sending of result.
Soft / Hard copies of presentations
PROGRAMME CONDUCTANCE DOCUMENTS
N N H H H CRITICAL KRA
Y N M M H Map system a new activity entrusted by Provident Fund organisation
COMPLETION OF PLANNED UPGRADATION
Eight major functions would be covered and their activities identified to make individual functional cases and then draw out a generic model of career planning scheme for the company.
Furniture is procured and distributed depending on departmental requirements based on SAC approval
It is major activity and has dependency on other departments. It requires extensive chasing and monitoring.
New key activity. This will inculcate learning and sharing culture.
Developmental activity for enhancing quality and avaiability of material to participants.
It is Key activity of Training Workshop.
Very useful process in learning.
It is Key activity to initiate training.
THESE ARE IMPORTANT PROGRAMMES.
IT IS ESSENTIAL REQUIREMENT.
Promote and motivate trainer competency.
a new activity entrusted by Provident Fund organisation
Eight major functions would be covered and their activities identified to make individual functional cases and then draw out a generic model of career planning scheme for the company.
HEALTH / SAFETY / ENVIRONMENT FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description
HSE00100 HSE Carryout External audit of ISO 14001 / OHSAS 18001for compliance. O
HSE00101 HSE Monitor compliance of HSE audit NCRs with the depts. O
HSE00200 HSE O
HSE00201 HSE Provide technical inputs to Deptt. to prevent Hazards O
HSE00300 HSE Improvement projects on fire protection systems. C
HSE00301 HSE C
HSE00302 HSE Monitor the fire protection system and evaluate the effectivenes. C
HSE00400 HSE Savings through Health/ Safety/ Environmental (HSE) measures. O
HSE00401 HSE Identify new HSE projects O
HSE00402 HSE Execute and commission HSE projects O
HSE00500 HSE HSE Improvement projects/ Management programmes C
HSE00501 HSE HSE project for waste minimisation C
HSE00600 HSE HSE Consultancy Services/ Projects to other units and industries O
HSE00601 HSE O
HSE00602 HSE Completion of HSE consultancy works as per schedule O
HSE00700 HSE HSE Knowledge Management portal C
HSE00800 HSE Organising HSE Seminar(s) O
HSE00801 HSE Mobilising nominations/ faculty/ infrastructure for HSE Seminar(s) O
HSE00802 HSE Conducting HSE seminar and documenting new learnings C
HSE00900 HSE C
KRA TYPE
Risk/ Hazard analysis thro' Safety Management Tools on hazardous operations.
Provide technical inputs for Establishment of project for fire protection system
Preparation and submission of Technical offers for HSE Consultancy Projects
Development of HSE manuals/ posters/ training modules/ safety instructions/ web site information
HSE01000 HSE Introduction/ revision of WMI C
HSE01100 HSE Improvement in PPE specification C
HSE01200 HSE Standardisation of system for tracking HSE performance C
HSE01201 HSE Collecting HSE data for tracking of HSE performance O
HSE01202 HSE O
HSE01300 HSE Publishing technical papers on HSE C
HSE01400 HSE Presenting Techinical Papers on HSE at Symposia / Seminars C
HSE01500 HSE Getting Factory/ Environmental Licenses in time O
HSE01501 HSE Complying all conditions for Factory License O
HSE01502 HSE Complying all conditions of Water Consent O
HSE01503 HSE Complying all conditions of Air Consent O
HSE01504 HSE Complying all conditions of Hazardous waste Rules O
HSE01600 HSE Compliance with HSE Statutory requirements O
HSE01601 HSE Settlement of HSE non compliances from Statutory authorities O
HSE01700 HSE Compliance follow up of work environment findings O
HSE01800 HSE Updating of HSE legislations as and when changes occur O
HSE01900 HSE Performance of HSE inspections O
HSE02000 HSE Statutory inspection of Cranes and Pressure Vessels O
HSE02001 HSE O
HSE02002 HSE Report generation of Cranes and Pressure Vessels inspection O
HSE02003 HSE Compliance followup of Cranes and Pressure Vessels O
HSE02100 HSE O
HSE02200 HSE Mock Drills for Emergency Plan O
HSE02201 HSE Performance of Safety function in the mock drill O
HSE02202 HSE Performance of Health Services function in the mock drill O
Compilation of HSE data and reporting for improvement/ conservation
Preparing calender of inspections and physical inspections of Cranes and Pressure Vessels
Carrying out Internal audits of ISO 14001/ OHSAS 18001/ Fire/ Electrical/ Radiation/ etc
HSE02203 HSE Performance of Fire Services function in the mock drill O
HSE02300 HSE Investigation of accidents / incidents O
HSE02301 HSE O
HSE02302 HSE O
HSE02400 HSE Quality inspection of Safety items at suppliers works/ inplant. O
HSE02500 HSE O
HSE02600 HSE Organisation of H/S/E promotional celebrations O
HSE02700 HSE O
HSE02800 HSE Participation in safety awards at National / State levels O
HSE02900 HSE Updation of HSE L1/ L2/ L3 and other documents O
HSE03000 HSE O
HSE03100 HSE CSC meetings as per requirements O
HSE03200 HSE Management reviews performed O
HSE03300 HSE Finalisation of Functional scorecard by specified date O
HSE03301 HSE C
HSE03400 HSE O
HSE03500 HSE Increase in no. of innovative health care practices C
HSE03600 HSE Improvement in quality of OHS tests for better repeatability C
HSE03700 HSE O
HSE03701 HSE Conduct study, Analyse results and suggest remedial measures O
HSE03702 HSE Performance Monitoring of ETPs & STPs O
HSE03703 HSE Performance Monitoring of Ambient Air and Stack emissions O
HSE03704 HSE Performance Monitoring of Drinking water quality O
Analysis of root causes of accidents / incidents and communication to departments
Monitoring implementation of remedial measures of accidents / incidents
Programs conducted for employee/ customer/ supplier/ contractor training
Creating awareness through competitions/ seminars/ posters/ ciruculars/ multimedia/ intranet etc.
Updation of database/Information (like Databases / Intranet sites etc.) in System
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Increase in no of Preventive Health Programs & awareness programs/work shops/camps
Work environment monitoring of physical & chemical hazards in workplace
HSE03705 HSE Report Status of Env. Monitoring to Departments O
HSE03800 HSE Conduct study, Analyse results and suggest remedial measures O
HSE03900 HSE Carry out radiological investigations as per plan O
HSE04000 HSE Carry out ECG investigations as per plan O
HSE04100 HSE Carry out toxicological investigations as per plan O
HSE04200 HSE Carry out biochemical investigations as per plan O
HSE04300 HSE Ensuring Occupational Health check up for workers O
HSE04301 HSE Planning of OHS activities & cascading down to the levels. O
HSE04302 HSE Execution Occupational Health screening activities O
HSE04303 HSE O
HSE04400 HSE Environmental Monitoring of Work Areas O
HSE04401 HSE Performance Monitoring of ETPs & STPs O
HSE04402 HSE Performance Monitoring of Ambient Air and Stack emissions O
HSE04403 HSE Performance Monitoring of Drinking water quality O
HSE04404 HSE Report Status of Env. Monitoring to Departments O
HSE04500 HSE Identify Occupational Hazards at Work Place O
HSE04501 HSE Monitor occupational hazards at work place O
HSE04502 HSE Report Corrective Actions on occupational hazards at work place O
HSE04600 HSE O
HSE04700 HSE O
HSE04800 HSE O
HSE04900 HSE O
HSE05000 HSE C
HSE05100 HSE Implementation of PPE usage C
HSE05200 HSE O
Analysis of Occupational Health screening data/ preparation of reports
Reduction in prevalence of occupational health deviation in high noise exposed groups
Reduction in prevalence of occupational health deviation in statutory groups exposed to respiratory hazards
Reduction in prevalence of occupational health deviation in other statutory hazard exposed groups
To uphold BHEL's commitment to UN's Global Compact Programme on Human Rights,Labour,Environment & Anti-corruption and promote sustainable growth beside encouraging good corporate citizenship.
Improvement in HSE performance through controls/ Operational Control Procedures/ improvement projects
Projects for conservation of natural resources (e.g.specific consumption (per unit of production) of water/ power/ paper/ oil /wood/ copper etc.)
HSE05201 HSE Implementation of the projects for conservation of natural resources O
HSE05202 HSE Project for waste minimisation and management O
HSE05300 HSE O
HSE05301 HSE Implementation of control measures for accident prevention C
HSE05400 HSE O
HSE05500 HSE Compliance of Inspection/ Audit NCRS O
HSE05600 HSE Compilation of HSE performance data and submission to HSE dept. O
HSE05700 HSE Compliance of HSE statutory requirements O
HSE05800 HSE Compliance of HSE non conformances from statutory authorities O
HSE05900 HSE HSE Training O
HSE06000 HSE O
HSE06001 HSE Performance of ETPs O
HSE06002 HSE Performance of STPs O
HSE06003 HSE Performance of Recovery systems O
HSE06100 HSE Organising and conducting a certified HSE training course O
HSE06200 HSE O
HSE06300 HSE O
HSE06400 HSE O
HSE06500 HSE Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc. O
HSE06600 HSE Improvement in Employee Satisfaction Score O
HSE06700 HSE O
HSE06800 HSE Increase in no. of active Quality Circles in the deptt. O
HSE06900 HSE Achieving Business excellence thru' TQM at Deptt. level C
HSE07000 HSE Preparation of action plan based on Position report O
HSE07100 HSE C
HSE07200 HSE Development of Knowledge management Portal C
HSE07300 HSE Contributing case studies etc.for Knowledge Management Portal CHSE07400 HSE Completion of KM Projects as per schedule C
HSE07500 HSE C
Investigation of accidents and incidences/ analysis and implementation of recommendations
Redeployment of persons as indicated by occupational health evaluation.
Operation and Maintenance of treatment plants and recovery systems
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Implementation of Improvement projects identified in the Position Report as per schedule
Implementation of Improvement projects identified in the Position Report as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
HSE07600 HSE C
HSE07700 HSE C
HSE07800 HSE C
HSE07900 HSE C
HSE08000 HSE C
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
HEALTH / SAFETY / ENVIRONMENT FUNCTION KRA MASTER - 2006-07
Unit of Measurement
Y N H H M
100XNo.complied/ Total No. Y N L H M
100X No. Analyed / No. planned Y N H H M
Y N H H M
Y N H H M
N N L H M
N N L M H
100 X savings realised/ Benchmark N N H M L
N Y H M L
N Y M H H
100 X projects implemented/ planned N N H M L
100 X projects implemented/ planned N N H M L
Time Index N N H M L
N Y M H L
N Y H M H
N Y H M L
N Y H M L
N Y M H L
N Y H H L
N Y H M L
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA
(Y/N)
Suggested Weightage for category A B
C
100XNo.conducted/ No. required to be conducted
100 x No. of technical guidance provided/ nos planned
100 X No. of projects completed / No. planned
100 x No. of technical guidance provided/ nos planned
% reduction in cases of fire over last year
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
N Y H H L
100 X No. improved/ No. planned N N M H H
Time Index Y N H M L
Time Index Y N M H H
Time Index Y N L H M
Nos publised/nos planned N N H H L
nos presented/nos planned N N H H L
Y N H M L
100 X No. complied/ No. reported Y N M H L
100 X No. complied/ No. reported Y N M H L
100 X No. complied/ No. reported Y N M H L
100 X No. complied/ No. reported Y N M H L
100 X No. complied/ No. reported Y N M H L
100 X No. complied/ No. reported Y N H M L
100 X No. complied/ No. reported Y N M M H
100 X No. updated/ No. changed Y N M H M
% completed / planned N N M M H
Nos. completed/ Nos planned Y N M M H
N Y M H L
N Y L L H
Nos complied/ Total nos. Y N L L H
Nos completed/ nos planned. Y N H M L
No. conducted/ No. planned Y N M H L
Y N H H L
Y N H H L
No. of days delayed from scheduled date
No.of licenses delayed from Zero date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% of non performance/ required performance rate
% of non performance/ required performance rate
Y N H H L
No. investigated / total occurences Y N L M H
N Y M M H
nos monitored/ nos to be monitored N N M H H
Delayed days/days for inspection N N M M H
100 X No. conducted/ No. planned N N H M L
N Y H M L
% no. completed / no. as per plan N N M H L
N N H M L
N Y H M L
N Y L M H
no. held / no. required to be held N N H M L
No. performed/ No. required Y N H M L
Y Y H M L
Y N H H X
% increase N N M H H
% increase N N M H H
% improvement N N H M L
Y N L H H
N N L M H
100 X Surveys conducted/ Planned Y N L M H
100 X Surveys conducted/ Planned Y N L M H
100 X Surveys conducted/ Planned Y N L M H
% of non performance/ required performance rate
No. of days delayed from scheduled date
No. of days delayed from scheduled date
no. participated / no. eligible for participation
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Balanced Scorecard Rating (5/4/3/2/1)
No. of tests conducted/ nos as per schedule
No. of tests conducted/ nos as per schedule
N Y L M H
N N L M H
% completed/ planned N N L M H
% completed/ planned N N L M H
% completed/ planned N N L M H
% completed/ planned N N L M H
% completed/ planned N N M H M
N Y H M M
No. screened/ No.to be screened N N L H H
N Y L H H
100 X Surveys conducted/ Planned N N L M H
100 X Surveys conducted/ Planned Y N L M H
100 X Surveys conducted/ Planned Y N L M H
100 X Surveys conducted/ Planned Y N L M H
N Y L M H
No. of Deptt's covered/ nos planned Y N M H L
Y N L M H
Y N L M H
N N H H M
N N H H M
N N H H M
Number N N H H H
% improvement/ Benchmark N N H M L
% implemented/ total N N H M L
% Savings realised/ Benchmark N N H M M
No. of days delayed from scheduled date
No. of tests conducted/ nos as per schedule
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Nos complied/ Total no of non compliance
Nos complied/ Total no of non compliance
Occ. Health Deviation Prevalence Index (Noise)
Occ. Health Deviation Prevalence Index (Respiratory)
Occ. Health Deviation Prevalence Index (General)
N Y H M M
N Y H M M
Y N M H M
% implemented/ planned N N H M L
Y N H M M
% compliance Y N H M L
N N M H M
% compliance Y N H M L
% compliance Y N H M L
Nos conducted/ nos planned N N M H M
% improvement/ Benchmark Y N L H M
% improvement/ Benchmark Y N L M H
% improvement/ Benchmark Y N L M H
% improvement/ Benchmark Y N L M H
N Y L M H
% Y M L L
% Y M L L
Time Index Y M L L
Time Index Y M L L
Score Y M X X
Time Index Y X M M
Number of new circles Y M X X
TQM Score Y H X X
Y Y X M X
Time Index Y X X M
Y Y L M H
Number Y M M MTime Index Y X M H
Y Y H H H
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% accidents investigated within specified time
% redeployed/ required to be redeployed
Nos sent in time/ Total nos to be sent
Number of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Y Y H H H
Y Y H H H
Y Y H H H
Y Y H H H
Y Y H H H
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
HEALTH / SAFETY / ENVIRONMENT FUNCTION KRA MASTER - 2006-07
KRA Remarks
Records
Records
Records
Records
Records
Records
Records
Finance data/ MIRs
Records Days delayed
Records Days delayed
Records
Records
Records Nos given/ nos planned
Records Days delayed
Records Days delayed
Records
Records
Records Days delayed
Records Days delayed
Records Days delayed
Source of Data for Measurement
(Nos. conducted/ Nos required)x100
(Nos complied/ Total Nos) x 100
(Nos of hazardous operations analysed/ Nos of hazardous operations planned for analysis) x 100 No.of safety instructions/ standards issued
(No of projects completed/ Nos planned ) x 100
Nos of technical inputs given
Reduction of fire as compared to last year.
(Savings realised/ Savings planned) x 100
No. implemented / No.Planned
Nos completed/ nos planned
Nos conducted/ nos planned
Records
Records No. improved / no. planned
Records Days delayed
Records Days delayed
Records Days delayed
Title of the papers
Title of the papers/talks
License copy
Records
Records
Records
Records
Legislations/ records
Records
Records
Records
Records % completed / planned
Records
Records Completion date
Records
Records Nos complied/ Total nos.
Records
Audit report
Audit report
Audit report
Nos introduced or revised/ nos planned
No. of papers published v/s planned
Score L5: 4 L4: 3 L3: 2 L2: 1 L1: 0
No.of licenses delayed from Zero date
Nos.complied / Nos.reported
Nos.complied / Nos.reported
Nos.complied / Nos.reported
Nos.complied / Nos.reported
Reports submitted/ Reports to be submitted
L5=100% cases/ L4= 95-99%/ L3=85-94%/ L2= 75-84%/ L1=<75%Nos complied/ Total non conformances
Nos updated / Nos. changed
Nos. completed/ Nos planned
Delayed days/days for report generation
Nos completed/ nos planned.
No Completed/ No. Planned
Audit report
Records
Records Delayed days
Records % implemented / total
Records
Training Records No. of programs conducted
Records
Records
Records
Records
Records
Minutes of meeting
Minutes of meeting
Delayed days
Title of the programs
Title of the programs
Records Test-retest repeatability
Records
Time frame As per plan
Records
Records
Records
No. investigated / total occurences
Delayed days/days for inspection
no. organised / mo. Planned (National Safety/ Environment/ Occupational Health/ Road Safety/ Fire % no. completed / no. as per plan
participated / no. eligible for participation (Includes preparation of participation)Nos updated in time/ Total nos.
Schedule to be prepared by the department.
no. held / no. required to be heldNo. performed/ No. required
Record maintained by Unit Head/Unit P&D
Rating declared at year end by Corporate / Unit Management
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
Score L5: 4 L4: 3 L3: 2 L2: 1 L1: 0 remarks Awareness programs at work place Public lectures.Score L5: 4 L4: 3 L3: 2 L2: 1 L1: 0 Remarks Minimal Invasive surgery
Annual plan to be developed for total monitoring of workplace hazards/ including
No.of surveys conducted/ Nos.planned
No.of surveys conducted/ Nos.planned
No.of surveys conducted/ Nos.planned
Records
Time frame As per plan
Records % completion
Records % completion
Records % completion
Records % completion
Records
Records As per plan
Records
Records As per plan
Records
Records
Records
Records
Records
Records Nos identified/ No of depts
Records
Records
Records
Records
Records
Records
Records
Records Environmental indices
Nos reported/ Nos generated
No. checked/No.to be checked
index = No. screened/ No.to be screened
No.of surveys conducted/ Nos.planned
No.of surveys conducted/ Nos.planned
No.of surveys conducted/ Nos.planned
No.of surveys conducted/ Nos.planned
Nos reported/ Nos generated
Nos complied/ Total nos of Non compliances
Nos complied/ Total nos of Non compliances
Presbycusis correction to be applied. Weighting to be given for severe / profound hearing loss. If If there are more than one respiratory hazard exposed groups/ average of OHDPI for the groups to be If there are more than one general hazard exposed groups/ average of OHDPI for the groups to be No. of Convention
/Workshops/Seminars organised by G.C.Society
BHEL has taken leading role as its nominee is Secretary to G.C.Society & representing at national/international levels % Improvement = No. of parameters showing improvement *100/ Total no. of parameters identified% of employees wearing recommended PPEs
Records
Records
Records
Records
Records
Records Nos complied/ Total nos
Records
Records Nos complied/ Total nos
Records Nos complied/ Total nos
Records
Records
Records
Records
Records
-
Survey Report
Project report
Unit QA/QC
Quality Deptt.
Action plan document
Project report
Project report
Project report
Example L5 -on time/ L4 - 5 days delay and so on
Example L5 -on time/ L4 - 5 days delay and so on
Nos completed/ Total occurences
Nos completed/ nos planned% of persons redeployed / persons required to be redeployed
Nos sent in time/ Total nos to be sent
Nos conducted/ nos plannedNo.of samples complied / Nos.analysed
No.of samples complied / No.of samples analysedNo.of samples complied / Nos. analysedNo.of samples complied / Nos.analysed
Records from Individual and from Department
Record maintained by Audit deptt.
Record maintained by Audit deptt.Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Project report
Project report
Project report
Project report
Project report
PLANNING & DEVELOPMENT FUNCTION KRA MASTER - 2006-07
KRA ID FUNCTION KRA Description
PDX00100 PDX O
PDX00200 PDX O Time Index
PDX00300 PDX O
PDX00400 PDX O
PDX00401 PDX O
PDX00500 PDX O
PDX00600 PDX O
PDX00700 PDX Operations Planning & Monitoring O
PDX00701 PDX O
PDX00702 PDX O
PDX00703 PDX O
PDX00704 PDX O
PDX00800 PDX Assessment of Plant Performance/ SIP O
KRA Type
KRA Unit of Measurement
Development of Company/ Unit /Product/Function level Balanced Score Card by specified date.
No. of days delayed from
scheduled date
Monitoring - Balanced Score Card- Quarter-wise Data to be finalised by 7th of subsequent month
Formulation of Broad Objectivesfor CO/Unit/Prod/Function by specified date.(To be selected while fixing targets)
No. of days delayed from
scheduled date
Formulation of Revenue Budget for CO/ Unit/ Div/Prod/Func by specified date. (To be selected while fixing targets)
No. of days delayed from
scheduled date
Preparation of monthwise budget after Board approval.
No. of days delayed from
scheduled date
Half Yearly Review of Operations for CO/ Unit/ Div/Product / Function/ Dept (To be selected while fixing targets)
% of shortfall made up in LE
Flash Report CO/Unit/ Div (To be selected while fixing targets)
Variation in Flash Vs Board-
adopted figures in April
Achievement Vs Targets.
Operations planning & monitoring Turnover for CO/ Unit/ Div/Product / Function/ Dept (To be selected while fixing targets)
Achievement Vs Targets.
Operations planning & monitoring Project deliveries for CO/ Unit/ Div/Product / Function/ Dept (To be selected while fixing targets)
Achievement Vs Targets.
Operations planning & monitoring Materials for CO/ Unit/ Div/Product / Function/ Dept (To be selected while fixing targets)
Achievement Vs Targets.
CLEARANCE OF LETTER OF CREDITS (LCs) BY P&D within specified time.
% of LC's cleared in the specified
time
Achievement Vs Targets.
PDX00900 PDX O Time Index
PDX00901 PDX O Time Index
PDX01000 PDX O Time Index
PDX01001 PDX O Time Index
PDX01002 PDX O Time Index
PDX01100 PDX O
PDX01200 PDX O
PDX01300 PDX O
PDX01400 PDX O
PDX01401 PDX O
PDX01402 PDX O
PDX01500 PDX O
PDX01600 PDX O
PDX01601 PDX O
PDX01700 PDX Capital Budget monitoring O
PDX01701 PDX O
PDX01702 PDX O
Submission of Management Information Reports as per schedule.
Status of billing & valuation of Reciept cum despatch report( RDR) by specified time.
Techology Gaps-Identification and bridging of gaps
Identification of Technology Gaps & preparing Business plans for identified Products within specified schedule.
Bridging of Technology / Business Gaps through introduction of TCAs/PIRs/JVs/ Mergers & Acquisitions Projects.
Formulation of Strategic / Business/ Divisional/Product Plan by specified date.
No. of days delayed from
scheduled date
Revisiting and Review of Strategic / Divisional/Business/Product/ Functional Plans by specified date.
No. of days delayed from
scheduled date
Environmental Information Compilation & Analysis for Business Impact by specified date.
No. of days delayed from
scheduled date
Benchmarking of Company/Unit/Product Performance
No. of days delayed from
scheduled date
Analysis of company performance through Benchmarking against international / national companies
No. of days delayed from
scheduled date
Development of action plan for improvement.Detailed action plan for each criteria with milestone dates to be prepared by specified date.
No. of days delayed from
scheduled date
Development /formulation of Feasibility Reports (FRs)/Investment proposals for CO/ Unit/Product/ Function level
Number of FRs prepared Vs
Target
Annual Plans Formulation (Capital) for CO/Unit/Product/Function by specified date.
No. of days delayed from
scheduled date
Formulation of Minor Capital Budget by specified date ( including manufacturing technology development) .
No. of days delayed from
scheduled date
Acheivment Vs Targets
Capital Budget monitoring - Schemes / M&R Items
Acheivment Vs Targets
Monitoring of Minor Capital Budget including manufacturing technology development.
Acheivment Vs Targets
PDX01703 PDX Capitalisation of facilities by specified date O
PDX01800 PDX Procurement of Capital equipment O Time IndexPDX01801 PDX O
PDX01802 PDX O
PDX01803 PDX O
PDX01804 PDX O
PDX01805 PDX O
PDX01900 PDX O Time Index
PDX01901 PDX O Time Index
PDX01902 PDX O Time Index
PDX01903 PDX Coordination for deputation of experts O
PDX01904 PDX O
PDX01905 PDX O
PDX02000 PDX O
PDX02001 PDX Submission of draft MOU to Govt. of India O
PDX02002 PDX O
PDX02003 PDX O
PDX02004 PDX O
No. of days delayed from
scheduled date
Freezing Specification and raisal of Procurement Indents
Acheivment Vs Targets
Tender Evaluation & final recommendation to release PO.
Acheivment Vs Targets
Co-ordination for Installation of major facilities in stipulated time
No. of days delayed from
scheduled date
Planning/ indenting/ procurement co-ordination and allocation Office furniture to fulfill requirements of executives within the allocated budget
No. of Indents converted to
SRV.
Small assets planning/ budgeting/ monitoring etc. to fulfill plant requirement within the allocated budget
% of budgetted amount
committed
Finalising Technology / Collaboration (including MOUs/NDAs) agreement
Execution & Monitoring of TCAs(including TCAEE)/ MOUs/ NDAs including amendments/ extensions/ Purchase of Module documentation/ Royalty payment
Deputation of Engineers to Foreign countries to Collaborators/ Business/ Training/ Sites etc.
No. of experts deputed
Co-ordination for Design deviations/design vetting/Queries
No. of designs changed
Maintenance of computerized database of documents received from collaborator
% of documents computerised
Finalising MOU with Govt. of India by specified date.
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
Defending MOU criteria/ targets/ finalisation & approval for signing readiness.
No. of days delayed from
scheduled date
Submission of MOU performance evaluation report for previous year (provisional/ audited) and/ or with case for possible score/ rating improvement (as necessary)
No. of days delayed from
scheduled date
Monitoring MOU parameters to achieve the MOU performance.
Achievement Vs Targets.
PDX02100 PDX O Time Index
PDX02200 PDX O Time Index
PDX02300 PDX O
PDX02400 PDX O Time Index
PDX02401 PDX O
PDX02402 PDX O
PDX02403 PDX O
PDX02404 PDX O Time Index
PDX02405 PDX O Time Index
PDX02406 PDX O
PDX02407 PDX C
PDX02408 PDX C
PDX02409 PDX C
PDX02410 PDX C
PDX02411 PDX C
PDX02500 PDX O %
PDX02600 PDX O %
Preparation and sending replies for Parliament questions to DHI & other Ministries
Preparation of briefs for CMD/ Directors for their evidence before Parliamentary committees at Parliament house
Effective planning of Parliamentary Committees visits to BHEL Units/ finalization of logistics and preparation of briefs.
Appraisers Satisfaction
Score
Organising Management Committee Meetings
Finalisation of MCM calendar & formulation of Monthly Agenda by specified date
No. of days delayed from
scheduled date
Compilation & uploading of MCM Agenda folder
No. of days delayed from
scheduled date
Anaysis/ preparation of MCM backup papers/ presentations/ and appraising Unit Head
No. of days delayed from
scheduled date
Regular monitoring with concerned agencies for resolution of action points raised in previous MCMs and presentation of pending issues.
Preparation/ issue/ and dissemination of MCM Minutes within specified time .
Smooth administration of Management Committee meetings
Appraisers Satisfaction
Score
Development of systems by specified date to improve the efficiency of MCM Secretariat.
No. of days delayed from
scheduled date
Development of systems by specified date to enable MC focus on long term/ critical company isues.
No. of days delayed from
scheduled date
Designing of a systemby specified date to interlink the existing MIRs and generate backup material for MCM.
No. of days delayed from
scheduled date
Improving the MC Website through better facilities/ content management/ and updations/ modifications for effective management of MC Meetings.
Satisfaction Score (to be
obtained from CMD&Directors)
Updation and review of operations review formats by specified date for the MC Meetings based on feedback from MC Members and other users.
No. of days delayed from
scheduled date
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
PDX02700 PDX O Time Index
PDX02800 PDX O No. of NCRs
PDX02900 PDX C
PDX03000 PDX O No. of NCRs
PDX03100 PDX O Time Index
PDX03200 PDX O
PDX03201 PDX O
PDX03202 PDX O
PDX03300 PDX O
PDX03400 PDX O
PDX03500 PDX O Time Index
PDX03600 PDX O
PDX03700 PDX C TQM Score
PDX03701 PDX O
PDX03800 PDX C
PDX03900 PDX C Number
PDX04000 PDX Completion of KM Projects as per schedule C Time Index
PDX04100 PDX C
Timely inputs to unit/corporate finance for inter-unit re-conciliation of accounts
Preparation for audit of the department for ISO 9000 / TQM by internal as well as external auditors.
Co-ordination for SMI's revision/ updating etc.
No. of SMIs reviewed
1st level 5S audit (Internal self-assessment) for P&D/ KWX department
Presentations for Investors/ other stake holders/ agencies as per schedule
Facilitating Govt policies/ guidelines in Company's favour
% decided in Company favour /
no. attempted
Preparation & submission of Pre-budget memorandum by specified date
No. of days delayed from
scheduled date
Mobilising support through Industry associations on various company issues
No. of issues resolved vis-à-vis
target
Annual press Conference/ AGM - Finalisation of CEO speech/ Material for Q&As etc.
Satisfaction Score (to be
obtained from CMD&Directors)
Quality Inputs on Q&A/ Speeches/ Directors Report/ Corporate-Profile etc for Top Management
Satisfaction Score (to be
obtained from CMD&Directors)
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Number of new circles
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from
scheduled date
Development of Knowledge management Portal
No. of days delayed from
scheduled date
Contributing case studies etc.for Knowledge Management Portal
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from
scheduled date
PDX04200 PDX C
PDX04300 PDX O
PDX04400 PDX Implementation of DTC O
PDX04401 PDX C
PDX04402 PDX Collection and analysis of data for DTC O
PDX04500 PDX Implementation of PSM O
PDX04501 PDX C
PDX04502 PDX Collection and analysis of data for PSM O
PDX04503 PDX O
PDX04600 PDX C
PDX04601 PDX O
PDX04602 PDX C
PDX04700 PDX O
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating
(5/4/3/2/1)
Completion of pilot on DTC at Bhopal for Transformers including Jhansi range in association with the consultant and submission of report to Steering Committee
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
Preparation of Process Manual for DTC for implementation in units/products.
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
Preparation of Process Manual for PSM for implementation in units/products.
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
Providing inputs within specified time for preparation of Process Manual for PSM
No. of days delayed from
scheduled date
Completion of pilot on Lean Mfg and submission of report to steering committee
No. of days delayed from
scheduled date
Collection and analysis of data for lean manufacturing
No. of days delayed from
scheduled date
Preparation of Process Manual for LM for implementation in other units/products.
No. of days delayed from
scheduled date
Implementation of PSM for Castings and forgings
No. of days delayed from
scheduled date
PDX04800 PDX O
PDX04900 PDX O
PDX05000 PDX O Time Index
PDX05100 PDX O
PDX05200 PDX O Satisfaction score
PDX05300 PDX C
PDX05400 PDX O
PDX05401 PDX O
PDX05500 PDX C
PDX05501 PDX C
PDX05502 PDX C
PDX05600 PDX O
PDX05601 PDX C
Preparation of Road map and submission to Directors on Business and organisation Initiatives in line with recommendations of Task forces
No. of days delayed from
scheduled date
Pre award discussion with Consultant , Finalisation of Deliverables, Obtaining internal approvals and Placement of LOA on Consultant
No. of days delayed from
scheduled date
Submission of monthly progress reports to top management, Orientation Programmes at units, Structuring of initiative Teams/ Steering Committees
Resolving interface issues within specified time as per schedule of initiatives
% issues resolved within specified time
Liaison with consultant, arranging meetings, co-ordination regarding programmes/ visit schedules of different initiatives under implementation with concerned Champions
Development of Departmental Procedures within specified time for the processes identified.
No. of days delayed from
scheduled date
Providing timely inputs for comprehensive examination of BHEL by Parliamentary Committee on Public Undertakings (COPU) by specified time after due approval of competent authority.
Percentage Submission of
inputs to COPU in time as per their demand.
Providing basic data, information etc to Corp.P&D for comprehensive examination of BHEL by Parliamentary Committee on Public Undertakings (COPU)before specified time.
Percentage Submission of inputs to Corp.
P&D before specified time.
Development of Strategy Map of the Company.
No. of days delayed from
scheduled date
Identification of Strategic Initiatives to be pursued for meeting the targeted strategic objectives.
No. of days delayed from
scheduled date
Mapping of interlinkages of the initiatives to achieve the strategic objectives.
No. of days delayed from
scheduled date
Conducting in-depth assessment including determining the compatibility and worth of the identified source.
No. of days delayed from
scheduled date
Formation & coordination of internal task force to supervise the process of due diligence including defining the essential requirements of the process.
No. of days delayed from
scheduled date
PDX05602 PDX C
PDX05603 PDX O
PDX05604 PDX Timely preparation of Valuation report. C
PDX05700 PDX O
PDX05701 PDX O
PDX05702 PDX O
PDX05703 PDX C Satisfaction score
PDX05704 PDX C
PDX05705 PDX C
PDX05800 PDX O Time Index
PDX05801 PDX C
PDX05802 PDX O
PDX05803 PDX O
PDX05804 PDX C
PDX05900 PDX C Time Index
Establish requirement of consultants for Legal/ Finance/ technology functions etc, receive offers from shortlisted firms & appoint consultants to assist in due diligence.
No. of days delayed from
scheduled date
Quantify the degree of synergy between BHEL and the target company , submit EOI/ NBB and perform due diligence.
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
Finalisation of the contours of the offer and closure of the transaction for acquisition/ strategic alliance.
No. of days delayed from
scheduled date
Timely Negotiation/ Finalization of agreement with strategic partners, as required.
No. of days delayed from
scheduled date
Negotiate with owners of target company for finalisation of Share Purchase Agreement & Share Holders Agreement.
No. of critical observations by
BoD
Negotiate the Term sheet of the financing package to the best possible advantage of BHEL.
Negotiate with lenders of the target company so as to improve upon the existing terms & conditions.
Satisfaction Score
Submission of complete offer, incorporating terms & conditions, special caveat etc.
No. of days delayed from
scheduled date
Finalising Strategic Alliances including taking financial stake to fulfill Strategic Objectives as per plan.
Development of systems & procedures to establish the process of forming Strategic Alliances
No. of days delayed from
scheduled date
Identifiy & establish business gaps (technology, market access, market share etc.), analyse alternatives & prepare proposal for further action to establish a strategic alliance.
No. of days delayed from
scheduled date
Obtain clearance of the Board of Directors and GOI (where necessary)
No. of days delayed from
scheduled date
Formation of specialist vehicle for the acquisition, including SPVs, JVs etc.
No. of days delayed from
scheduled date
Timely completion of Special Assignments as identified in the year-beginning/ mid-year and final review stages
PDX06000 PDX O
PDX06100 PDX O Time Index
PDX06200 PDX O Time Index
PDX06300 PDX O
PDX06400 PDX O
PDX06500 PDX O
PDX06600 PDX O
PDX06700 PDX O
PDX06800 PDX O
PDX06900 PDX O
PDX07000 PDX C
PDX07100 PDX O
PDX07200 PDX Monitoring utilisation of capital T&P budget O
PDX07300 PDX Renewal of wireless licence(s) O
PDX07400 PDX C
PDX07400 PDX O
Providing supporting data and additional inputs to the Parliament Secretariat and Ministries as per their requirement with respect to various Parliamentary / Ministries activities for better management BHEL interface.
Percentage Submission of all
information & documents in
time as per their demand.
Vetting of Technical Specification of Capital items.
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from
scheduled date
Preparation of Power Sector Annual Capital Budget proposal for T&P items
No. of days delayed from
scheduled date
Preparation of Power Sector Annual Capital Budget proposal for Enabling Works (EW)
No. of days delayed from
scheduled date
Preparation of Power Sector Supplementary Capital Budget proposal for T&P items
No. of days delayed from
scheduled date
Preparation of Power Sector Supplementary Capital Budget proposal for Enabling Works (EW)
No. of days delayed from
scheduled date
Allocation and intimation of Sanction Nos. after approval of the Budget for T&P items
No. of days delayed from
scheduled date
Allocation and intimation of Sanction Nos. after approval of the Budget for EW
No. of days delayed from
scheduled date
Renewal of hiring rates for T&P items: - Inter Regional - BHEL Sub-contractors and outside agencies
No. of days delayed from
scheduled date
Periodic updation of inventory items (Major T&Ps) on quarterly basis [web enabled system]
No. of days delayed from
scheduled date
Improvement in utilisation
No. of days delayed from
scheduled date
Preparation/modification of standard T&P deployment modules
No. of days delayed from
scheduled date
Preparation of deployment chart of major T&P items (own or hired)
No. of days delayed from
scheduled date
PDX07500 PDX C
PDX07600 PDX O Score
PDX07700 PDX O Time Index
PDX07800 PDX C
PDX07900 PDX C
PDX08000 PDX C
PDX08100 PDX C
PDX08200 PDX C
Special assignment on capability building in Construction / Services technology
No. of days delayed from
scheduled date
Improvement in Employee Satisfaction Score
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from
scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from
scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from
scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from
scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from
scheduled date
PLANNING & DEVELOPMENT FUNCTION KRA MASTER - 2006-07
N Y N H H H
Report sent to CO
N N N M M L
N Y N H M M
Date sent to CO
N Y N H M M
Date sent to CO
Y Y N M M M
N N N H M M
LE Finalised
N N N M M L
Board adopted figures
N N N M M LMCM Report
N N N M M M
MCM Report
N N N X H M
N N N X H M
N N N L M M
N N N X M XReports sent to CO
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA (Y/N)
Suggested Weightage for category
A B C
Source of Data for Measurement
Reports / Score Card(s)
report to Corporate Office
Document forwarded to Finance
N N N X X M
N N N M M M
H X X
N N N H X X
Business reports
N N N H X X
Business reports
N Y N H X X
Date of submission
N Y N H X X
N Y N X H X
Documents
N Y N X H X
Reports
N Y N X H X
Reports
N Y N X H X
Reports
N N N X H X
Reports
N Y N X H X
Date of completion
N Y N X M X
Date of sanction
N N N X X HMIRs
N N N X X HMIRs
N N N X X M
MIRs
Date of reports sent to CO
MIR to unit Finance,Purchase and Commercial(MIR)
Approval of System by approving Authority
N Y N X H M
N N N X H MN N N X H M
MIRs
N N N X H MMIRs
N Y N X M H
N N N X M L
N N N X H M
N N N H X X Reports
N N N X X M
Reports
N N N X M L
N N N X H M
N N N X M L
N N N X M L
N Y N X M X
Date of signing
N Y N X M X
Reports
Y Y N X M M
Reports
Y Y N X H M
Reports
Y N N X H M
Y N N X H M
Y N N H H M
N N N H H M
N N N X H X
Y Y N X H M
Y Y N X M M
Y Y N X H M
Y N N X H M
N N N X H M
N N N X H M
N Y N X H M
N Y N X H M
N Y N X H M
N N N X H M
N Y N H H H
Y Y Y M L L
Y Y Y M L L
Approved Calendar & Agenda
Questionnaire for obtaining feed back to be designed by the deptt. by August'05
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Y Y Y M L L
N N N X M L
N N N X H M
N N N X H M
Y N N X H M
Y N N X H M
Y Y N X H M
Y N N X H M
Y N N X H M
Y N N X H M
Y N Y X M M
Project report
N N Y M X XUnit QA/QC
Y N Y H X XQuality Deptt.
Y Y Y X M X
Action plan document
Y Y Y L M H
N N Y M M M
Y N Y X M HProject report
N Y Y H H H
Project report
Record maintained by individual/ deptt.
Questionnaire for obtaining feed back to be designed by the deptt. by August'05
Questionnaire for obtaining feed back to be designed by the deptt. by August'05
Y N N H H X
N Y N H L L
N Y N H H M
N Y N L M H
N Y N L M H
N Y N H H M
N Y N L M H
N Y N L M H
N Y N L M H
N Y N L M H
N Y N L M H
N Y N L M H
N Y N H H M
Rating declared at year end by Corporate / Unit Management
Reports & records in corporate meetings and discussions
Reports & records of corporate steering committee meetings and discussions
Reports & records of corporate meetings and discussions
Records of steering committee meetings
Reports & records of corporate steering committee meetings and discussions
Reports & records of corporate meetings and discussions
Records of steering committee meetings
Reports & records of corporate meetings and discussions
Reports & records of corporate meetings and discussions
Reports & records of corporate meetings and discussions
Reports & records of corporate meetings and discussions
Reports & records of corporate meetings and discussions
N Y N H H L
N Y N H H M
N N N H H M
N N N H H H
N N N L M H
Y Y N M M M
Date of submission
Y N N M M M
Appraiser
Y N N M M M
Appraiser
Y Y N M M M
Report.
N Y N M M M
Y Y N M M M
Y Y N M M M
Report
Y Y N M M M
Report
Reports & records of corporate meetings and discussions
Reports & records of corporate meetings and discussions
Reports & records of corporate meetings and discussions
Reports & records of corporate meetings and discussions
Reports & records of corporate meetings and discussions
Clearance of Corp. Office.
Clearance from Corp. Office.
Y Y N M M M
LOI
Y Y N M M M
Report
Y Y N M M M
Report
Y Y N M M M
Submission of bid.
Y Y N M M M
Signing of agreement.
Y N N M M M
Y N N M M M
Y N N M M M
N Y N M M M
Y N N H H H
Report
Y Y N H H H
Y Y N H H H
Report
Y Y N H H H
Date of clearance.
Y Y N H H H
Date of clearance.
N N N H H H
Documents
Approval of Management.
Approval of Management.
Approval of Management.
Date of submission of bid.
System approved by competent authority
Y N N M M M
Appraiser
N N N L M H
M L L
Y H M L
Y L H L
Proposal submission
Y L H L
Proposal submission
Y L H L
Proposal submission
Y L H L
Proposal submission
Y L H L
Y L H L
Y L H L
Y L H L
Web Properties
L H LFinance report
Y L H L
Y L H L
Issue date of module
Y L H L
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Intimation to Region and Budget Approval
Intimation to Region and Budget Approval
Letter from Finance Deptt
Timely Submission of remittance fee
Deployment chart issue date
Y H H H
Report
Y Y M X X Survey Report
Y Y M L L
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Record maintained by individual/ deptt.
PLANNING & DEVELOPMENT FUNCTION KRA MASTER - 2006-07
-
-
KRA Remarks
-
Prefix "Development of " to KRA-DS
-
-
-
-
-
-
-
-
-
-
-
-
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SERVICE AFTER SALES FUNCTION KRA MASTER - 2006-07KRA ID Function KRA Description
SAX00100 SAX O Rs in Lacs
SAX00200 SAX O %
SAX00201 SAX O Time Index
SAX00202 SAX O
SAX00203 SAX O
SAX00204 SAX C Time Index N
SAX00205 SAX C N
KRA Type
Unit of Measurement
Critical KRA (Y/N)
Turnover as per Budget (inclusive of Servicing/ RLA and R&M)
% increase in order booking (Rs in Lacs) over previous year
Completion of survey and submission of report in time on market availability of SAS business as per plan (INCREASE IN MARKET SHARE IN EXISTING PRODUCT)
Timely review of survey reports/ assessment of market potential available and submission of action plan (INCREASE IN MARKET SHARE IN EXISTING PRODUCT)
% As defined under Remarks
Column
Review of action plan for increase in market share from existing and implementation as per plan (INCREASE IN MARKET SHARE IN EXISTING PRODUCT)
% As defined under Remarks
Column
Completion of survey and submission of report in time on New area in servicing business as per plan (ENTRY INTO NEW AREA IN SERVICING BUSINESS)
Timely review of survey reports/ assessment of New area business availablity and preparation of action plan (ENTRY INTO NEW AREA IN SERVICING BUSINESS)
% As defined under Remarks
Column
SAX00206 SAX C
SAX00300 SAX O
SAX00301 SAX O
SAX00302 SAX C
SAX00400 SAX O
SAX00401 SAX O
SAX00402 SAX O
SAX00500 SAX % of customers retained O
SAX00501 SAX C
SAX00502 SAX O
SAX00503 SAX O Time Index
Review of action plan for Entry into new area in servicing business and implementation as per plan (ENTRY INTO NEW AREA IN SERVICING BUSINESS)
% As defined under Remarks
Column
% increase in price for repeat job from customer as per plan
% As defined under Remarks
Column
Timely capture of data for increase in offered price to customer
% As defined under Remarks
Column
Negotiation with customer against offer
% As defined under Remarks
Column
% achievement of orders against offers submitted in competetive bidding as per plan
% As defined under Remarks
Column
Analysis of orders lost in competetive bidding in previous year(s)
% As defined under Remarks
Column
Implementation of analysis in offers submitted in bidding
% As defined under Remarks
Column
% As defined under Remarks
Column
Timely preparation of repository of customers who have awarded jobs to SAS on a regular basis
% As defined under Remarks
Column
Timely review of repository of customers who have awarded jobs to SAS on a regular basis
% As defined under Remarks
Column
Timely preparation and implementation of action plans for retention of targetted customers in the year
SAX00600 SAX O
SAX00601 SAX O
SAX00602 SAX O
SAX00700 SAX C
SAX00701 SAX O
SAX00702 SAX O Time Index
% reduction in time for submission of techno commercially correct offer from the date of receipt of enquiry as per plan
% As defined under Remarks
Column
% reduction in time from defined time in preparation of job details and estimate for Customer offer
% As defined under Remarks
Column
% reduction in time from defined time in review of job details/ estimate and submission of offer to Customer
% As defined under Remarks
Column
KRA : % reduction in Transfer-in over previous year as per plan
% As defined under Remarks
Column
Collection of data of "Transfer In" services in previous year(s) in targetted area and preparation of action plan for reduction of "Transfer In"
% As defined under Remarks
Column
Timely review and approval of action plan for reduction in "Transfer In"
SAX00703 SAX C
SAX00800 SAX O
SAX00801 SAX O
SAX00802 SAX O
SAX00803 SAX O Time Index
SAX00804 SAX O Time Index
Achievement of success by task perfomer in targetted area bringing reduction in "Transfer In"
% As defined under Remarks
Column
% reduction in time in award of subcontract from defined time as per plan
% As defined under Remarks
Column
Reduction in time from defined time in preparation of job details and estimate for subcontracting
% As defined under Remarks
Column
% reduction in time from defined time in review of subcontracting job details and estimate and release to indenting department
% As defined under Remarks
Column
% reduction in time for floating of tender enquiry to submission of Comparative Statement of Tenders (CST) received
KRA :Timely floating of tender enquiry/evaluation and placement of LOI on vendor.
SAX00900 SAX O
SAX00901 SAX O Time Index
SAX00902 SAX O Time Index
SAX01000 SAX O %
SAX01001 SAX O
SAX01100 SAX O
SAX01101 SAX C
SAX01102 SAX C Time Index
SAX01103 SAX O
% Improvement in performance of targetted vendors from "Satisfactory" to "Good" as per plan
% As defined under Remarks
Column
Timely identify and prepare MOM with target vendor(s) for performance improvement
Assess target vendor(s)'s performance result after job performance and submit report
% increase in number of vendors where number of regd. Vendors are less than five
Timely preparation/ getting approval of action plan and implementation for increase in number of vendors where number of regd. Vendors are less than five
% As defined under Remarks
Column
% reduction in cycle time of overhauling of a product / system wrt contract schedule as per plan
% As defined under Remarks
Column
Capture data and submit report in time for determining potential products / systems for reduction in cycle time
% As defined under Remarks
Column
Timely Review of report and submission of action plan for reduction in cycle time of overhauling of a product / system wrt contract schedule
Implementation of action plan(s) resulting in % reduction in time cycle
% As defined under Remarks
Column
SAX01200 SAX O %
SAX01201 SAX C Time Index
SAX01300 SAX O
SAX01301 SAX C
SAX01302 SAX C Time Index
SAX01303 SAX O
SAX01400 SAX O
SAX01401 SAX C Time Index
SAX01402 SAX C Time Index
SAX01403 SAX O
SAX01500 SAX O
SAX01501 SAX C Time Index
SAX01502 SAX C Time Index
% reduction in response time to resolve technical/contractual problem(s)
Timely analysis/ preparation & communication of action plan for resolution of problem(s)
% reduction in number of defects over previous year in post overhaul operation resulting in outage during Defect Liability Period/ as per plan
% As defined under Remarks
Column
Timely capture of data for preparation of action plan(s) to achieve reduction in number of defects over previous year
% As defined under Remarks
Column
Timely preparation of action plan(s) for achieving reduction in number of defects over previous year
Implementation of action plan for achieving reduction in number of defects over previous year
% As defined under Remarks
Column
% improvement in number of trouble shooting jobs completed successfully in first attempt/ wrt previous years
% As defined under Remarks
Column
Capture data and submit report(s) in time for all troubleshooting jobs attempted in previous year(s)
Timely Review of report and submission of action plan(s) for troubleshooting jobs which failed in first attempt
% of trouble shooting jobs completed successfully in first attempt
% As defined under Remarks
Column
% increase in number of customer complaints resolved over previous year(s)/ as per plan
% As defined under Remarks
Column
Timely collection of data on customer complaints in previous year(s) and submit report
Timely evolve action plan(s) for achieving planned reduction in customer complaints
SAX01503 SAX O %
SAX01600 SAX O %
SAX01601 SAX C Time Index
SAX01602 SAX C Time Index
SAX01603 SAX O Time Index
SAX01700 SAX O
SAX01701 SAX Timely raising bills on customer O Time Index
SAX01702 SAX O Time Index
SAX01703 SAX O
SAX01800 SAX % reduction in non realisables O
SAX01801 SAX O
Implementation of action plan(s) by task performer for reduction of customer complaints
% improvement in average resolution time of customer complaints with respect to previous year
Timely collection of data on delayed resolution of customer complaints in previous year(s) and submit report(s)
Timely evolve action plan(s) for achieving improvement in resolution time of customer complaints
Analysis of problem and implementation of action plan by task performer
% adherence to monthly target of cash collection as per target
% As defined under Remarks
Column
Timely verification of bills from customer
Timely cash collection against verified bills
% As defined under Remarks
Column
% As defined under Remarks
Column
Proposal for write off / withdrawals for closing of non realisables
% As defined under Remarks
Column
SAX01900 SAX O %
SAX01901 SAX O
SAX01902 SAX O Time Index
SAX02000 SAX O
SAX02001 SAX C
SAX02002 SAX C Time Index
SAX02003 SAX O
SAX02100 SAX O Time Index
SAX02101 SAX O
SAX02102 SAX O Time Index
SAX02200 SAX O
% improvement in timely processing of subcontractor bills for set overhauled/ as per plan
Timely capture information regarding time taken in processing of subcontractor bills from the date of receipt for the job in previous year(s) and submit action plan
% As defined under Remarks
Column
Implementation of action plan by task performer for improvement
% reduction in number of reworks to total number of service jobs executed in the current year/ compared to previous year as per plan
% As defined under Remarks
Column
Timely compilation of report and release thereafter of Technical Instruction to avoid recurrence
% As defined under Remarks
Column
Timely preparation of action plan for reduction in number of reworks to previous year
Implementation of action plan by task performer for reduction in number of reworks as per plan
% As defined under Remarks
Column
% improvement in timely availability of calibrated IMTEs/ T&Ps as per site execution plan
Timely capture of data on non availability of calibrated IMTE/T&Ps at site in previous year(s)
% As defined under Remarks
Column
Timely prepare and implement action plan to ensure 100% availability of calibrated IMTE/T&P as per site execution plan
% Reduction in reduntant/ obselete/beyond economic repairs T&P/IMTE as per plan
% As defined under Remarks
Column
SAX02201 SAX O
SAX02202 SAX O
SAX02203 SAX O
SAX02300 SAX C
SAX02301 SAX C
SAX02302 SAX C Time Index
SAX02400 SAX O
SAX02401 SAX C Time Index
SAX02500 SAX O
SAX02501 SAX C Time Index
SAX02600 SAX C Time Index
SAX02601 SAX O Time Index
Timely audit of T&P/IMTE and prepare list of reduntant/ obsolete/beyond economic repairs T&P/IMTE
% As defined under Remarks
Column
Timely review the list & submit proposal for disposal of reduntant/ obselete/beyond economic repairs T&P/IMTE
% As defined under Remarks
Column
Disposal of reduntant/ obselete/beyond economic repairs T&P/IMTE as plan
% As defined under Remarks
Column
Upgradation of T&P/IMTE as per plan
% As defined under Remarks
Column
Submit report on T&P/IMTE for upgradation in time
% As defined under Remarks
Column
Timely review report & finaliseT&P/IMTE for upgradation & submit proposal(s)
Procurement of new T&Ps / IMTEs as per plan
% As defined under Remarks
Column
Timely identification and submission of proposal for procurement of new T&Ps / IMTEs for procurement
Identification of Non-Plan T&Ps/ IMTEs for procurement
% As defined under Remarks
ColumnSubmission of proposals for procurement of Non-Plan T&P/IMTE as per plan
Timely review and release of new technical instructions/ procedures
Timely identification and preparation of new technical instructions / procedures
SAX02700 SAX O Time Index
SAX02701 SAX O
SAX02800 SAX O
SAX02801 SAX O
SAX02900 SAX O Time Index
SAX02901 SAX O
SAX02902 SAX O Time Index
SAX03000 SAX O Time Index
SAX03001 SAX O Time Index
SAX03002 SAX O Time Index
Timely availability of service / repair procedures/ drawings/ manuals/ QPs etc. in deptt
Timely identification and submission of list of documents not available in deptt compared to master list(s)
% As defined under Remarks
Column
% increase in digitisation of drawings/documents for servicing as per plan/target
% As defined under Remarks
Column
Timely creation of list of drawings/documents pending digitisation
% As defined under Remarks
Column
% improvement in time for submission of "Service Protocols" over previous year(s) from defined time as per plan
Timely collection of data on delay in submission of "Service Protocols" from defined time in previous year(s) and submission of action plan
% As defined under Remarks
Column
Implementation of action plan by task performer for improvement as per plan
% improvement in time for submission of "Completion Report" over previous year(s) from defined time as per plan
Timely collection of data on delay in submission of Completion reports from defined time in previous year(s) and submission of action plan
Implementation of action plan by task performer for improvement as per plan
SAX03100 SAX C
SAX03101 SAX C Time Index
SAX03102 SAX C Time Index
SAX03103 SAX C Time Index
SAX03200 SAX O
SAX03201 SAX O
SAX03202 SAX O
SAX03300 SAX O
SAX03301 SAX O
SAX03302 SAX O
SAX03400 SAX O
SAX03401 SAX O
SAX03500 SAX O
% achievement in no of Systems undertaken for Improvement as per plan
% As defined under Remarks
Column
Timely identification of systems for improvement
Timely preparation of action plan for system improvement
Timely implementation of action plan for system improvement and feedback
% reduction in number of financial audit paras over previous year(s) as per plan
% As defined under Remarks
Column
Preparation of report on issues involved/ brought out in financial audit paras in previous year(s) and submit action plan in time
% As defined under Remarks
Column
Implement action plan in time for reduction in number of financial audit paras as per plan
% As defined under Remarks
Column
% reduction in number of quality audit paras over previous year as per plan
% As defined under Remarks
Column
Preparation of report on issues involved/ brought out in quality audit paras in previous year (s) and submit action plan for eliminating recurrence of quality para(s) in time
% As defined under Remarks
Column
Implement action plan in time for reduction in number of quality audit paras as per plan
% As defined under Remarks
Column
Timely review of Quality Systems for SAS for determining revision requirement
% As defined under Remarks
Column
Timely revision of identified Quality Systems for SAS
% As defined under Remarks
Column
Organising Training of SAS personnel
% As defined under Remarks
Column
SAX03501 SAX C
SAX03502 SAX C
SAX03600 SAX C
SAX03700 SAX Overhauling of sets as per schedule O Number
SAX03800 SAX O Number
SAX03801 SAX O Time Index
SAX03802 SAX Timely conductance of RLA studies O Time Index
SAX03900 SAX O Y
SAX04000 SAX O Y
SAX04100 SAX O Time Index Y
SAX04200 SAX O Time Index Y
SAX04300 SAX O Y
SAX04400 SAX O Score Y
SAX04401 SAX C Time Index Y
SAX04500 SAX O Number
SAX04600 SAX C TQM Score Y
SAX04601 SAX O Y
Timely identification of training needs of SAS personnel
% As defined under Remarks
Column
Training imparted by task performer to BHEL/SAS personnel
% As defined under Remarks
Column
No of technical articles contributed in In-house / National / International journals
% As defined under Remarks
Column
No of RLA studies conducted as per plan
Timely subcontracting for RLA studies
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
% As defined under Remarks
Column
Reply/settlement of Internal Audit paras within specified time (4 weeks)
% As defined under Remarks
Column
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
SAX04602 SAX C Time Index Y
SAX04700 SAX C Y
SAX04800 SAX C Number
SAX04900 SAX C Time Index Y
SAX05000 SAX C
SAX05100 SAX C
SAX05200 SAX C
SAX05300 SAX C
SAX05400 SAX C
SAX05500
SAX
C
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
SAX05600 SAX C YAccomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
SERVICE AFTER SALES FUNCTION KRA MASTER - 2006-07
L M H Budget
L M H
X L M
X M X
X H X
X M X
X M X
Special KRA (Y/N)
Universal KRA
(Y/N)
Suggested Weightage for category
A B C
Source of Data for Measurement
Ratio of Current year's order booking to Previous year's actual order booking
Index= (Total no of action plans accepted / Total no of action plans submitted ) X (Total no of action plans submitted in time / Total no of action plans submitted Best = 1 (L5)/ Worst = 0 (L1)
% = {(No of orders as per plan - No of orders received) / No of orders as per plan)}
Index= (Total no of action plans accepted / Total no of action plans submitted ) X (Total no of action plans submitted in time / Total no of action plans submitted Best = 1 (L5)/ Worst = 0 (L1)
X H X
M X X
X L X
M M M
L X X
X L X
X M X
L X X
X X L
X L X
X L X
% = {(No of orders as per plan - No of orders received) / No of orders as per plan)}
% =100 X (New price - Old price) / Old price
Ratio of time taken to defined time
%= (Sum total of offered prices - Sum total of received prices) / Sum total of offerred prices Note : for assigned customers
Ratio of Orders received to Offers submitted in competetive bidding
Ratio of number of analysis accepted on first submission to Total numbers submitted
Ratio of Orders received to Offers submitted in competetive bidding Ratio of number of customers retained to number targetted Ratio of time taken to defined time
Ratio of time taken to defined time
I = (No of action plans delayed in implementation/ Total no of action plans required to be implemented) X ( Total delay / Total time as per norms)
X M X
X L M
X M X
L X X
X L X
L X X
% = (No of days taken for submission of techno commercially correct offer from enquiry receipt date - Defined time) / Defined time Note** : Offers resulting in customer queries related to offer shall be evaluated equivalent to L1 in criteria level
% = (No of days taken for preparation of techno commercially correct offer from enquiry receipt date - Defined time) / Defined time Note** : Offers resulting in customer queries related to offer shall be evaluated equivalent to L1 in criteria level
% = (No of days taken in review of techno commercially correct offer from receipt date - Defined time) / Defined time Note** : Offers resulting in customer queries related to offer shall be evaluated equivalent to L1 in criteria level
(TIPrsnt - TIPrvs) / TIPrvs TI="Transfer In" in targetted area
Ratio of No of plans approved to number of plans submitted
X M H
X M X
X X L
X L X
X M M
X M X
Sum total of (Target of reduction assigned - Target of reduction achieved) / Target of reduction assigned
Index = (No achieved on or before time / Total targetted nos) X (Total achieved time / Total target time) Note : Best=1/ Worst=0
% = (No of days taken for preparation of job details and estimate from receipt of customer's scope of work - Defined time) / Defined time Note ** : Documents returned with comments after review will be considered at L1 level
Sum total of (Target of reduction assigned - Target of reduction achieved) / Target of reduction assigned Note** : Reviewed jobs which later result in issues raised by subcontractor within the ambit of overall scope / terms and conditions etc/ of the contract will be considered at L1 level
Index= ( Total no of tenders delayed in finalization/ Total no of tenders to be finalised) x ( Total no of days of delay/ Total time planned in days)
L X X
X L X
X L X
L X X
X M X
M X X
X L L
X M X
X H H
Ratio of vendor performances improved to Total no of vendors targetted
I = (No of MOMs delayed from targetted time/ Total no of targetted vendors) X (Total delay / Total time as per norms) Best = 0
I = (No of reports delayed from defined time/ Total no of reports) X (Total delay / Total time as per norms) Best = 0
% = No of vendors added toTotal no of existing vendors
Index=(Time taken / Defined time) + (Registration to be increased as per plan - No of new registrations) / Registration to be increased as per plan Best : 1
Ratio of Reduction in completion time to Scheduled time
Ratio of time taken to defined time
I = ( No of action Plans delayed/ Total no of action plans to be made) x ( Total delay / Total time as per Norms)
[Sum total of {(Target of % reduction to be achieved - Target of % reduction achieved) / Target % reduction to be achieved}] / Total no of target product and or systems assigned Best= 0
L X X
X H X
L X X
X L L
X L X
X M X
M X X
X L L
X M M
X H H
H X X
X L L
X M X
% Reduction of average response time / Average response time of previous year
100 * ( DPrvs - DPrsnt) / DPrvs D=post overhaul defect Best = 100
Ratio of time taken to defined time
100 * ( DPrvs - DPrsnt) / DPrvs D=post overhaul defect Best = 100
(Nos successful in first attempt) / (Total attempted numbers )
I = (No of action plans delayed/ Total no action plans) X (Total delay / Total time as per norms)
(Nos successful in first attempt) / (Total attempted numbers )
Ratio of No of customer complaints registered and resolved in present year to that of previous year(s)
I = (No of reports delayed/ Total no reports) X (Total delay / Total time as per norms)
I = (No of action plans delayed/ Total no action plans) X (Total delay / Total time as per norms)
X H H
M X X
X L L
X M X
X H H
H X X
X L X
X M M
H H H
M X X
X M X
(Customer complain in current year - Customer complain in previous year ) / Customer complain of previous year
% = (Previous year resolution time - Present resolution time) / (Previous year resolution time
I = (No of reports delayed/ Total no reports) X (Total delay / Total time as per norms)
I = (No of action plans delayed/ Total no action plans) X (Total delay / Total time as per norms)
I = (No of action plans delayed in implementation/ Total no of plans) X (Total delay / Total time as per norms)
Ratio of cash collection on monthly basis to Monthly target
I = (No of bills delayed/ Total no of bills raised) X (Total delay / Total time as per norms)
I = (No of bill verifications delayed/ Total no of bills) X (Total delay / Total time as per norms)
Ratio of cash collected on monthly basis to As assigned on Monthly basis
(Numbers closed) / (Number planned)
Ratio of No of proposals submitted and got approved to Total no of proposals submitted
L X X
X L L
X L L
M X X
X X L
X M X
X M M
X M X
X L L
X L L
L X X
%= (Average time last year - average time in current year ) / Average time in last year
Ratio of time taken to defined time
I = (No of bills delayed/ Total no of bills raised) X (Total delay / Total time as per norms)
Ratio of number of reworks done in the current year to that of the previous year
Ratio of time taken to defined time
I = (No of action plan preparations delayed/ Total no action plans to be made) X (Total delay / Total time as per norms)
%= (Sum total of Assigned nos - Sum total of achieved nos) / Sum total of Assigned nos Best = 0; Worst 1
I = (No of IMTE and T&P delayed/ Total nos issued) X (Total delay / Total time as per norms)
Ratio of time taken to defined time
I = (No of IMTE and T&P delayed/ Total nos issued) X (Total delay / Total time as per norms)
Ratio of no of T&P disposed to Total identified for disposal
X L X
X L X
X M X
M X X
X M X
X M X
M X X
X M X
M X X
X M X
X L X
X L L
Ratio of time taken to defined time
Ratio of time taken to defined time
Ratio of no of T&P disposed to Total identified for disposal
No upgraded by no planned
Ratio of time taken to defined time
I = (No of proposals delayed/ Total no of proposals) X (Total delay / Total time as per norms)
(Nos procured) / (Nos planned)
I = (No of T&P/IMTE proposals submitted/ Total no of proposals as per plan) X (Total delay / Total time as per norms)
No of proposal submitted to Nos identified
No of proposal submitted to No of proposal planned
I = (No of releases delayed/ Total no of instructions released) X (Total delay / Total time as per norms)
I = (No of tech instruction or procedure preparation delayed / Total no identified) X (Total delay / Total time as per norms)
X L X
X X L
X M X
X X M
X L L
X X L
X L L
X L X
X X L
X L L
I = (No of documents delayed/ Total no of documents) X (Total delay / Total time as per norms)
Ratio of time taken to defined time
Ratio of no of drawings or documents digitised to total no as per plan
Ratio of time taken to defined time
I = (No of Service Protocols delayed/ Total no of Service Protocols) X (Total delay / Total time as per norms)
Ratio of time taken to defined time
I = (No of implementations delayed/ Total no of implementations) X (Total delay / Total time as per norms)
I = (No of Completion reports delayed/ Total no of Completion reports) X (Total delay / Total time as per norms)
I = (No of Completion reports delayed/ Total no of Completion reports) X (Total delay / Total time as per norms)
I = (No of implementations delayed/ Total no of implementations) X (Total delay / Total time as per norms)
M X X
X M X
X M X
X X H
M X X
X M X
X M X
M X X
X M X
X M X
X L X
X X L
L X X
(Number achieved) / (Number planned)
I = (No of systems identified for improvement/ Total no as per plan) X (Total delay / Total time as per norms)
I = (No of action plan preparations delayed/ Total no of action plans to be prepared) X (Total delay / Total time as per norms)
I = (No of action plan implementation delayed/ Total no assigned) X (Total delay / Total time as per norms)
(ParaPrevs - ParaCurrent) / ParaPrevs
Ratio of time taken to defined time
(ParaPrevs - ParaCurrent) / ParaPrevs
(ParaPrevs - ParaCurrent) / ParaPrevs
Ratio of time taken to defined time
(ParaPrevs - ParaCurrent) / ParaPrevs
Ratio of time taken to defined time
Ratio of time taken to defined time
(Number organised) / (Number planned)
X L X
X L X
H M M
H X X
H X X
X M X
X M X
Y M L L
Y M L L
Y M L L
Y M L L
Y Y H M L
Y M X X Survey Report
Y X M M Project report
Y M X X Unit QA/QC
Y H X X Quality Deptt.
Y Y X M X Action plan document
Ratio of defined time to time taken for identification
(Number imparted) / (Number planned)
Number Contributed / Number targetted
Nos as per Unit / Deptt Balanced Score Card
Nos as per Unit / Deptt Balanced Score Card
I = (No of subcontracting delayed/ Total no of subcontracts) X (Total delay / Total time as per norms)
I = (No of RLA studies delayed/ Total no of RLA studies) X (Total delay / Total time as per norms)
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Y X X M Project report
Y Y L M H
Y M M M
Y X M H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y
Y
H H H Project report
N N H H XRating declared at year end by Corporate / Unit Management
SERVICE AFTER SALES FUNCTION KRA MASTER - 2006-07KRA Remarks
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
FINANCE & ACCOUNTS FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description
FAX00100 FAX C Y
FAX00101 FAX O N
FAX00102 FAX C N
FAX00103 FAX C N
FAX00200 FAX O Y
FAX00300 FAX CTime Index
Y
FAX00301 FAX C N
FAX00302 FAX L2 Review of operating results O N
FAX00303 FAX O N
FAX00400 FAX O
% reports delayed
N
KRA Type
Unit of Measurement
Critical KRA (Y/N)
Creating a databank of post Audit queries/ issues, latest Accounting standards, updations of accounting policy & manual and Account closing instructions to eliminate qualifications in statutory/CAG audit
No. of days delayed from scheduled date
L3 Consolidation of Data on past years/ Qualification and issues/relevant accounting standards applicable. Implementation of advice and feedback
No. of days delayed from scheduled date
L2 Analysis of Data receipt/ classification / codification and creation of Data Base.Review and action on feedback.
No. of days delayed from scheduled date
L1 Evaluation of issues/ decide on improvement advice for corrective action and ensure compliance through feedback and continuous updation and monitoring
No. of days delayed from scheduled date
Timely Finalisation of tax audit report without adverse comments
No. of days delayed from scheduled date
Web enabling of financial data flow between BHEL divisions
L3 Development of software and the Compilation for linking trial balance for quarterly operations with Corporate
No. of days delayed from scheduled date
No. of days delayed from scheduled date
L1 Analyse the reasons for variance and submit for Board¿s approval and disseminate the decision of the Board
No. of days delayed from scheduled date
Timely completion of Monthly / Qly / Annual Accounts
FAX00500 FAX C
Time Index
Y
FAX00600 FAX O
% reports delayed
Y
FAX00601 FAX O N
FAX00602 FAX O N
FAX00603 FAX O N
FAX00700 FAX O N
FAX00701 FAX O N
FAX00702 FAX O N
FAX00800 FAX O N
FAX00900 FAX O N
FAX00901 FAX C No.of Days
FAX01000 FAX O N
FAX01001 FAX L2 Acturial Valuation and finalisation O N
FAX01002 FAX O N
Improvement of system for forecasting of financial parameters (including operating results) for planning/ capital budgeting and evaluation of impairment
Completion of statutory audit / Quarterly Limited review within a specified time.
L3 Preparation of schedules/ Valuation of FG and WIP/Link sheet preparation
No. of days delayed from scheduled date
L2 Checking up by Internal Audit/ vetting by Statutory Audit /Audit under Sec 619(3)
No. of days delayed from scheduled date
L1 Review of Initial observation/ making necessary changes and Audit report Finalisation
No. of days delayed from scheduled date
Deviation from qtrly/ half-yrly/ annual unaudited published results wrt SEBI norms
No. of days delayed from scheduled date
L2 Compilation of deviation with reasons
No. of days delayed from scheduled date
L1 Analyse and submit the report to SEBI after due approval wherever necessary and disseminate information for future compliance
No. of days delayed from scheduled date
Reduction in time taken for Inter-Unit reconciliations within specified no. of days from final inter-unit meet
No. of days delayed from scheduled date
Appointment of Statutory Branch & Foreign Auditors by C&AG and fixation of their remuneration within specified time. Appointment of auditors for limited review & cost audit and fixation of their remuneration.
No. of days delayed from scheduled date
Interaction and Finalisation of detailed Audit Plan and Schedule of Audit
Data collection and processing within specified time in respect of Gratuity/ Medical & Retirement benefits
No. of days delayed from scheduled date
No. of days delayed from scheduled date
L3 Collection of data and processing within specified time
No. of days delayed from scheduled date
FAX01100 FAX C Y
FAX01200 FAX C Y
FAX01201 FAX O N
FAX01202 FAX O N
FAX01203 FAX C N
FAX01300 FAX C Y
FAX01301 FAX C N
FAX01302 FAX O N
FAX01400 FAX OTime Index
N
FAX01500 FAX O N
FAX01501 FAX OTime Index
N
FAX01502 FAX O
Time Index
N
FAX01600 FAX O N
FAX01601 FAX OTime Index
N
Transformation of Accounting System to US GAAP in stages
No. of days delayed from scheduled date
Introduction of system for compiling schedules for Balance Sheet items and profit and loss account items and continuous upgradation and modification
No. of days delayed from scheduled date
L3 Review of accounts logical grouping/ development of software for linking of account head with grouping/ listing of the Schedules.
No. of days delayed from scheduled date
L2 Review the system check the correctness of grouping/ ensure periodical upgradation.
No. of days delayed from scheduled date
To develop a system for concurrent Booking of Incidental charges for Valuation of Receipts(SRVs)by specified date.
No. of days delayed from scheduled date
Maintenance and ugradation of system for segmental accounting in terms of Accounting Standards 17.
No. of days delayed from scheduled date
L3 Identify the segments/ grouping of various account heads for segments/ develop software/ linking account heads with the segmental grouping.
No. of days delayed from scheduled date
L2 Review the systems ensure correctness of classification and accounting.
No. of days delayed from scheduled date
Settlement of Internal Audit Points & Audit Queries
Settlement of Outstanding IA Paras / Draft Paras through replies at Audit Committee Meeting of Govt. Audit and thru discussions with RAOs
No. of days delayed from scheduled date
L2 Compilation of outstanding IR Paras and finalise reply for Audit Committee
L1 Settle the Paras with Audit Committee
Preparation & Implementation of Annual Internal Audit Programme
% of completion of Corp.Targets
L2 Timely completion of audit assigned and issue of audit report
FAX01602 FAX O
Time Index
N
FAX01700 FAX C No.of studies N
FAX01701 FAX O N
FAX01702 FAX O N
FAX01800 FAX O Absolute amount N
FAX01900 FAX O N
FAX01901 FAX C N
FAX01902 FAX C N
FAX01903 FAX L1 Review and implementation O N
FAX02000 FAX C N
FAX02001 FAX C N
FAX02002 FAX C N
FAX02100 FAX C N
FAX02200 FAX O N
FAX02300 FAX C N
L1 Approval of audit program from Dir(F) / BLAC and ensure completion of 100% audit program and feedback to BLAC on important IA Paras
Procedure / System Studies and Improvement on recommendation of ULAC and BLAC during Internal Audit
L2 Identification of weakness in system / procedure and recommend modifications / improvement
No. of days delayed from scheduled date
L1 Review the system study report and ensure compliance with due approval
No. of days delayed from scheduled date
Specific Savings effected based on finding of Internal Audit
Computerisation of Bank Reconciliation and manually fine tuning to enable complete Reconciliation & avoid blocking of funds.
No. of days delayed from scheduled date
L3 Develop software to match entries of Company¿s bank book with that of Bank¿s bank book and identify/categorise the mismatches
No. of days delayed from scheduled date
L2 Follow-up and settle the mismatches with bank and corrective action
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Development of system for periodical review of various elements of working capital to facilitate decision making and reduction in working capital
No. of days delayed from scheduled date
L2 Developing software for various components of Working Capital
No. of days delayed from scheduled date
L1 System for Integrating various components of Working Capital to facilitate decision making
No. of days delayed from scheduled date
Improvement in System for Online Budgetary control of Misc. Expenses .
No. of days delayed from scheduled date
Preparation of MOU performance evaluation alternatives & adjustments for rating improvement to best possible (if necessary)
No. of days delayed from scheduled date
Evolving a System for EVA as a regular performance monitoring measure within time specified
No. of days delayed from scheduled date
FAX02301 FAX C N
FAX02302 FAX O N
FAX02400 FAX O Y
FAX02401 FAX O N
FAX02402 FAX O N
FAX02403 FAX O N
FAX02500 FAX O N
FAX02600 FAX O N
FAX02700 FAX C Y
FAX02701 FAX C Y
FAX02702 FAX L2 Analysis of Data wrt Audit Issues O Y
FAX02703 FAX O % Completion Y
FAX02800 FAX C Y
FAX02900 FAX C N
L2 Updation of template for compilation of EVA and also gathering information
No. of days delayed from scheduled date
L1 Analysis and preparation of performance report
No. of days delayed from scheduled date
Preparation of budget / flash results. Updation of systems for preparation of budget / flash reports.
No. of days delayed from scheduled date
L3 Collection/ compilation of data through system integration
No. of days delayed from scheduled date
L2 Analysis of data and preparation of Budget/flash formats
No. of days delayed from scheduled date
L1 Review of system deficiency and improve after considering the suggestion by feedback and finalise for presentation to Board
No. of days delayed from scheduled date
Improvement & Maintenance of Data Bank for Finance and Non-Financial parameters and circulation of trends for last 10 years to facilitate decision making.
No. of days delayed from scheduled date
Timely submission of information for MOU / Scorecard
No. of days delayed from scheduled date
Creation of a compendium of past Issues/ decisions taken etc for reference in future to avoid re-examination
No. of days delayed from scheduled date
L3 Compilation of Data on past IA issues/ decisions taken etc
No. of days delayed from scheduled date
No. of days delayed from scheduled date
L1 Evaluation of shortlisted Audit Issues with a focus on avoiding their repetition
Cost system improvement for identifcation of cost at DU/product/project and allocation of common expenses on rational basis
No. of days delayed from scheduled date
Computeration of cost accounting records/forms and complying with the cost accounting rules
No. of days delayed from scheduled date
FAX03000 FAX O % reduction N
FAX03100 FAX C N
FAX03200 FAX C N
FAX03300 FAX C N
FAX03400 FAX C N
FAX03500 FAX O Rs in Lakhs N
FAX03600 FAX C N
FAX03700 FAX O N
FAX03800 FAX Preparation of system audit manual O N
FAX03900 FAX O N
FAX04000 FAX C N
FAX04100 FAX O N
Review of sundry creditors' old balances and reduction thereof (reduction in opening balance of more than 3 years' old outstanding)
Introduction of systems audit by enhancing skill of the internal auditors/new software packages/training/ cross functional teams
Number of system audits conducted
Developing a system to monitor pension cases of transferee employees for easy transfer of pension account from one region to other and to facilitate finalistaion of pension cases
No. of days delayed from scheduled date
Improvement in system of customer collection at site and accountal thereof including co-ordination with customer for TDS certificate/ concessional forms at site
No. of days delayed from scheduled date
Facilitation of financial system upgradation from existing platform to ERP platform by planned guidelines/user manuals and data transfer for switch-over/initialisation
No. of days delayed from scheduled date
Increase in effective utilisation of company's resources from Internal Audit findings i.t.o. absolute amount of miscellaneous income
System for effective management review and monitoring of all type of LCs
No. of days delayed from scheduled date
Updation of manuals pertaining to accounts and finance function
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Facilitate quick decision of vendor registration by evaluating financial soundness and recommendations thereof within specified time
No. of days delayed from scheduled date
Improvement in system for monitoring fixed assets movement
No. of days delayed from scheduled date
Web enabled Foreign Exchange Exposure Information System
No. of days delayed from scheduled date
FAX04200 FAX O N
FAX04201 FAX O
% plans delayed
N
FAX04202 FAX O
Time schedule
N
FAX04300 FAX O Absolute Amount N
FAX04301 FAX C N
FAX04302 FAX C N
FAX04303 FAX C N
FAX04400 FAX O N
FAX04500 FAX O N
FAX04600 FAX O N
FAX04601 FAX O N
FAX04602 FAX O N
FAX04603 FAX O N
FAX04700 FAX O N
FAX04800 FAX O N
Reduction in interest cost and financial charges. Monitoring and review of bank charges for their rates & applicability.
Reduction w.r.t previous year
L2 Preparation of rolling cash inflow outflow plan on monthly basis as per schedule for ensuing quarter L1 Matching inflows and outflows periodically with projections as per schedule and deploy / borrow at optimum rates
Analysis of information relating to Forex and Financial Markets and updating management for taking important decisions like Forward Covers/ Options/ Swaps etc
L3 Collection of market data and exposure of BHEL as per time schedule
Time Schedule as per policy
L2 Review of movements in the market with respect to benchmark rates and submit detailed analysis of risks and its coverage
Time Schedule as per policy
L1 Decide to cover the risk with appropriate banker
Time Schedule as per policy
Savings in import / export bills through better FOREX rates through negotiations with different bankers
% of imports/ exports.
Timely filing of online trade returns for ensuring eligibility criterion for import / export
% returns filed within due date
Assessment and Finalization of Fund Based and Non-Fund Based Limits through consortium of bankers within specified time at an optimum cost
No. of days delayed from scheduled date
L3 Collection and compilation of data for various facilities
No. of days delayed from scheduled date
L2 Review of data and prepare the case for various limits in standard formats prescribed by the bank
No. of days delayed from scheduled date
L1 Finalise the terms and conditions/ limits/ rates/performance analysis of banks and share among the banks
No. of days delayed from scheduled date
Optimum utilization of Fund/Non-Fund Based limit to facilitate reduction in interest and bank charges
No. of delays on account of non-availability of limits
Timely review with consortium of banks within specified schedule .
No. of days delayed from scheduled date
FAX04900 FAX O Y
FAX05000 FAX C Interest Income Y
FAX05100 FAX O Y
FAX05200 FAX O Rating Obtained N
FAX05300 FAX O Funds Arranged N
FAX05400 FAX C Tie-ups completed Y
FAX05500 FAX System for E-Remittances to Suppliers C Y
FAX05600 FAX O N
FAX05700 FAX O N
FAX05800 FAX C N
FAX05900 FAX O N
FAX06000 FAX O N
FAX06100 FAX C N
Evaluation of Lease Finance Proposal for carrying out cost-benefit analysis over outright purchase
No. of delays on account of non-availability of limits
Maximise return at minimum risk for company's surplus funds by Investment
Analysis/ submission and obtaining sanction from banks/FI's for project financing of customers
Sanction letter at optimum rate
Timely Obtaining Best Credit Rating for BHEL from Rating Agencies
Arranging Long-Term funds at optimum rates
Specialised financial arrangements like Equity/ Dis-investment/ Dividend Policy Joint-venture / Export Credit etc
No. of days delayed from scheduled date
Timely arranging of Bank Guarantees for customers
No.Of days from request
Timely remittance of funds to overseas offices / sites to avoid hold-up in operations
No. of complaints received from overseas offices / sites
Improvement in system for Timely preparation of statement of customer allocation and preparation of monthly accounts under centralised cash credit system
No. of days delayed from scheduled date
Determination of advance tax liability judiciously with reference to budgeted figures and payment thereof with a view to avoid Interest / Penalty
Interest savings in Absolute amount
Developing format for collecting information for ensuring availment of tax concessions and timely finalisation / submission of income tax and wealth tax return
No. of days delayed from scheduled date
Developing data bank for timely submission of relevant information for expeditious completion of assessment / queries by IT deptt./Excise/Central Excise/Sales Tax/Service Tax (Within one month of receipt of letter from relevant deptt. )
No. of days delayed from scheduled date
FAX06200 FAX O N
FAX06300 FAX OTime Index
Y
FAX06301 FAX O
Time Index
N
FAX06302 FAX O
Time Index
N
FAX06400 FAX C N
FAX06500 FAX C
Time Index
N
FAX06501 FAX O
Time Index
N
FAX06502 FAX O
Time Index
N
FAX06503 FAX C N
FAX06600 FAX O N
FAX06700 FAX C N
FAX06800 FAX O N
Collection/remittance/assessment of TDS
No. of days delayed from scheduled date
Timely collection of Export Incentive claims
L3 Collection of PAC and lodgement of claims within time schedule and obtain approval of claims.
L2 Demand from JDGFT to DGFT for fund allocation against approved claims and get the fund allocated from DGFT
Web enabled system detailing the formats for realisation of export incentives by specified date
No. of days delayed from scheduled date
To introduce a system to ensure supplier / sub vendor avail export incentive benefit for terminal excise duty / duty drawback to avoid initial cash outflow.
L3 while scrutining the purchase proposal/ identify the Pos where Project import benefits are available/ evaluate the porposal to ensure the supplier / sub vendor avail the concessional benefits.
L2 Review Purchase Order and check the benefits are claimed as per EXIM Policy.
Creating database of Non moving & slow moving items as per corporate guidline,generation of report and comparision with departmental balance score card on monthly basis.
% reduction wrt Opening balance
Effective handling of Appeals before Appellate and settlement thereof
No of appeals settled and disposed in BHEL's favour
Upgradation and Maintenance of Intranet site for interactive resolution of : i) Exim Policy : ii) Customs Duty : iii) Service Tax iv) Sales Tax;v) Excise Duty, vi) Income Tax
No. of days delayed from scheduled date
Providing online clarification on Indirect Taxation to business sectors/Units through e-mail/Intranet
No. of days delayed from scheduled date
FAX06900 FAX O N
FAX07000 FAX OTime Index
N
FAX07001 FAX O
Time Index
N
FAX07002 FAX O
Time Index
N
FAX07100 FAX O N
FAX07101 FAX O N
FAX07102 FAX O N
FAX07103 FAX O N
FAX07200 FAX O Y
FAX07300 FAX O N
FAX07400 FAX C N
FAX07401 FAX C N
FAX07402 FAX C Absolute Amount N
FAX07500 FAX C N
Liaising with ministries on problem faced by the Units and expeditious resolution of such issues
Percentage of issues resolved over total issues
Completion of Tax Assessment : IT/ Excise/ Sales Tax/Service Tax
L3 Compilation of necessary data from units/consolidation and preparation of return in format
L1 Review and analyse the data wrt compliance/adequacy and accuracy and submit the return offer clarification / details and follow up for assessment
Refund / Claims settled pertaining to Direct/ Indirect Taxes
% of total pending claim amount
L3 Compilation of data for supporting claims and refunds as per return
No. of days delayed from scheduled date
L2 Analyse and ensure conformance/arranging expert opinions in case of disputes/correctness and validity of claims
No. of days delayed from scheduled date
L1 Review and submit the claims in time and expedite refunds by successfully defending with IT authorities
No. of days delayed from scheduled date
Submission of Statutory Returns within specified time limits as per respective statute
% submissions delayed
Replies to queries from tax authorities : IT/ Excise/ Sales tax/Service Tax within specified days from date of receipt of query
% replies within specified time
Introducing a system for tax planning - indirect taxes by specified date
No. of days delayed from scheduled date
L3 Find out the areas for improvement and collecting the relevant data for further process
No. of days delayed from scheduled date
L2 Analyse the data and refer the relevant case loss and tax provisions. Prepare the assessment/refund claims return submissions etc for submitting same to the tax Officials.
Online Compendium of Tribunal/Supreme Court judgments on Direct and Indirect tax matters byspecified date
No. of days delayed from scheduled date
FAX07600 FAX Availment of CENVAT within due date O Loss of MODVAT N
FAX07700 FAX O No.Of Paras N
FAX07800 FAX Submission of Final Excise Return. O N
FAX07900 FAX C Freight saved N
FAX07901 FAX O Freight saved N
FAX07902 FAX O Freight saved N
FAX07903 FAX O Freight saved N
FAX08000 FAX O % of sales value N
FAX08100 FAX O N
FAX08200 FAX O N
FAX08300 FAX O Y
FAX08400 FAX System for cost estimation C Y
FAX08401 FAX C
Time Index
N
FAX08402 FAX C
Time Index
NFAX08403 FAX L1 Advise corrective action C Time Index N
Reduction in Adverse Comments CERA & Excise Audit
No. of days delayed from scheduled date
To upgrade the system to avoid transport and handling charges/ cycle time reduction/ for input sent to subcontactors in consultation with excise department.
L3 Identify the goods of the subcontactors for which no further manufacturing activity is required at our factory in consultation with Ancillary Development.
L2 To approach Excise Department for necessary permission by submitting require documents / forms / report etc.
L1 Discuss with the Commissionor for getting speedy approval for each financial year.
Availing of Concessional Tax in Sales in course of Imports / Others
Finalisation of Tax Provision and adjustment of deferred tax and provision thereof in accounts
No. of days delayed from scheduled date
Timely computation/ creation and withdrawal of Foreign Project reserve under IT Act within specified time of Annual Accounts
No. of days delayed from scheduled date
Computation of Deferred Tax Assets and Liabilities
No. of days delayed from scheduled date
No. of days delayed from scheduled date
L3 Collect / estimate cost details for various components under various codes/ collection of actual cost data and preparation of cost statement and furnishing the same to Business sectors as per AS-7
L2 Analyse the actual cost with estimate to find out the reason for variance
FAX08404 FAX C
Time Index
N
FAX08500 FAX O No. of comments N
FAX08501 FAX O N
FAX08502 FAX O N
FAX08503 FAX O N
FAX08600 FAX Web Enabled AS-7 accounting system C Y
FAX08601 FAX L2 Integration of inputs from other depts C N
FAX08602 FAX C N
FAX08700 FAX C N
FAX08701 FAX C N
FAX08702 FAX L2 Analyse risk vis-à-vis return C N
FAX08703 FAX C N
FAX08800 FAX Implementation of NSSN O N
FAX08900 FAX O No.of NCR Y
FAX09000 FAX O N
FAX09100 FAX O N
Development of system for automatic Computation of Direct labour hour rate, engineering rates and overhead recovery rates and their reconciliation with financial records.
Reduction in No.of cost audit comments.
L3 Collection and compilation of cost audit comments
No. of days delayed from scheduled date
L2 Analyse comments/ check from cost records and give suggestions for improvements
No. of days delayed from scheduled date
L1 Review of analysis and the implementation of selected suggestions
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
L1 Designing inputs and outputs and the system
No. of days delayed from scheduled date
Optimise return on investment of gratuity / PF trust funds
% increase over Govt. of India Bond Interest Rate
L3 Review of directory of approved fund managers and collection of quotations and compare it with market rates within prescribed time schedule
No. of days delayed from scheduled date
No. of days delayed from scheduled date
L1 Select proper investment with respect to overall portfolio objective
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Timely Submission of Report and Compliance of PF Act
Completion of annual a/cs of PF Trust / Gratuity /Acs within due date and issuance of PF statement
No. of days delayed from scheduled date
Bulk filing of Income Tax Returns of employees by specified date
No. of days delayed from scheduled date
FAX09200 FAX O N
FAX09300 FAX C N
FAX09400 FAX O N
FAX09401 FAX C N
FAX09402 FAX O N
FAX09500 FAX O N
FAX09600 FAX C % reduction N
FAX09700 FAX C % reduction N
FAX09800 FAX O N
FAX09900 FAX C 100% realisation N
FAX09901 FAX O N
Number of errors in disbursements as a % of number of employees
% reduction compared to previous year
System for On-Line information for employee related payments
No. of days delayed from scheduled date
Systematic follow up and Facilitation for realisation of sundry debtors including liquidation of Old and Withheld o/s by furninshing of necessary information to commercial for reconciliation and settlement
% reduction wrt opening balance.
L3 Preparation of age-wise analysis of statement and update data/additional information for reconciliation.
% reduction wrt opening balance.
L2 review meeting with customer and reconcile the difference to enable early settlement of outstanding.
No. of days delayed from scheduled date
Facilitating the Collection of TDS certificates and Accountal thereof for claiming credit
Non-claiming TDS certificate ¿ in absolute value
Reduction in average cycle time for Raising of invoices on customer
Reduction in average cycle time for final Contract price reconciliation to facilitate raising of final bill on customers
Facilitate Collection of Concessional Sales Tax Forms from Customer/Suppliers.
Extra amt paid due to non-collection
Develop data bank on customer contract terms and conditions for optimisation of revenue realisation and improvement in future contracts.
L3 Study the terms and condtions of the contract/ identify terms of the finance implication. Compile and analyse the data.
No. of days delayed from scheduled date
FAX09902 FAX O N
FAX10000 FAX O
Time Index
N
FAX10001 FAX C
Time Index
N
FAX10002 FAX C
Time Index
N
FAX10100 FAX O N
FAX10200 FAX O Y
FAX10300 FAX C Y
FAX10301 FAX C
Time Index
N
FAX10302 FAX C
Time Index
N
FAX10303 FAX C
Time Index
N
FAX10400 FAX O N
FAX10401 FAX C N
L2 Review the data/ obtain clarification for ambigous terms and conditions. Ensure realisation/ suggest improvement in terms and conditions for better realisation of revenue in exisiting contracts as well as future contracts.
No. of days delayed from scheduled date
Continuous review of Billing Rate Schedule to optimise cah in flow together with accommodating the total excise duty payments over the entire supplies.
L3 Periodical compilation of data on billing/ compare with estimated rate/ suggest for rate revision.
L2 Review the suggestion check the data/ interact with the Commercial group to revise the rate per kg and obtain approval from the customer.
Reduction of Bank Guarantees for proportionate execution of work against advances from customers
Reduction in Guarantee
Maintenance of system for identifying expired Bank Guarantees and facilitating return thereof
No. of days delayed from scheduled date
Maintenance and improvement of system that would reduce time cycle in passing of suppliers bills/service bills/freight bills and any other bills
No. of days delayed from scheduled date
L3 Review the existing System. Identify areas in which delys are taking place and submit report to section head.
L2 Analyse the reason for delay/ identify the causes/ suggest for elemination of factors that causes delay/ submit recommendation.
L1 Review the recomandation/ accept/modify the recommdation and ensure implementaion.
System to recover LD imposition from suppliers
No. of days delayed from scheduled date
L3 Development of suitable Software linking SRV and Purchase Order finding out the delay in supply calculating the LD
No. of days delayed from scheduled date
FAX10402 FAX C N
FAX10403 FAX C N
FAX10500 FAX C N
FAX10501 FAX C N
FAX10502 FAX C N
FAX10503 FAX L1 Review the system effectiveness C N
FAX10600 FAX O N
FAX10700 FAX O N
FAX10800 FAX C N
FAX10801 FAX O N
FAX10802 FAX O N
FAX10803 FAX L1 Review and Approve as per DOP O N
FAX10900 FAX OTime Index
Y
FAX11000 FAX O % of expiring BGs. N
FAX11100 FAX Automatic Bill passing through system. C N
FAX11101 FAX C N
L2 Review the softwar developed Ensure recovery of LD from payment
No. of days delayed from scheduled date
L1 Periodical Review for the effectiveness of the system as well as recovery of the LD
No. of days delayed from scheduled date
Maintenance and improvementof system for integration of issue and accountal of Concessional sales tax forms
No. of days delayed from scheduled date
L3 Development of Software for compiling Purchase Order information requiring 'C' Form issue.
No. of days delayed from scheduled date
L2 Implementation of system and issue of 'C' Form
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Cycle time reduction for Issue of TDS Certificates under Income-Tax Act.
No.of days from year end
Final Material Accounting Statement for material lying with sub-contractors and Recovery
No of days from the job completion .
Cycle time reduction in Passing of sub-contractor Running and Final Bill
No. of days delayed from scheduled date
L3 Detailed scrutiny and checking with contract & other relevant records
Avg No. of days from submission of bill
L2 Review of passed amount wrt to records and approve as per DOP
Avg No. of days from submission of bill
Avg No. of days from submission of bill
Timely remittance of statutory deductions/ collections
Bank guarantees renewed/ lodged for claim before expiry (applicable to supplier/ sub-contractor's BG)
No. of days delayed from scheduled date
L3 Identify areas for computerisation/ sudy the system/ develop the software.
No. of days delayed from scheduled date
FAX11102 FAX C N
FAX11200 FAX C N
FAX11300 FAX C N
FAX11301 FAX C N
FAX11302 FAX C N
FAX11400 FAX C N
FAX11401 FAX C N
FAX11402 FAX C N
FAX11500 FAX O N
FAX11600 FAX C N
FAX11700 FAX C N
FAX11701 FAX C N
FAX11702 FAX C N
L2 Review the functioning of the system/ improve/ modify on a continous basis.
No. of days delayed from scheduled date
Review and Liquidation of Advances and deposits paid to Suppliers/deposits to various authorities
% of Liquidation on total advance outstanding for more than one year
Introduction of computerised measurement book for Civil / Electrical Work to reduce cycle time in preparation and passing of Bills.
No. of days delayed from scheduled date
L3 Study the exisiting system/ develop software in consultation with Civil / Eelectrical Department
No. of days delayed from scheduled date
L2 Review the System to ensure cycle time reduction.
No. of days delayed from scheduled date
Developing online system for collection of revenue like rent/ water charges/ electricity charges/ shop rent/ to enable quicker realisation of revenue.
No. of days delayed from scheduled date
L3 Review the existing system/ develop the software in coordination with HR (Estate adminstration)
No. of days delayed from scheduled date
L2 Review the system developed to ensure information inforation available on online and for correctness of data.
No. of days delayed from scheduled date
Reduction in opening balance of suspense head by periodical review
% reduction over last year
Review of PSL from the end of month for price trend analysis for decision making in respect of procurement and sales estimation
No. of days delayed from scheduled date
Reduction in Insurance Premium through systematic study of the insured property/ risk needed/ fire prevention measures and effective negotiation.
% of total insured value compared to prev. year
L3 Compilation of Insurance Property clasification of property identification of risk report of the fire prevention system tabulation of rates
No. of days delayed from scheduled date
L2 Review the list of property in the risk to be covered analyse the rate negotiate put up recommendation
No. of days delayed from scheduled date
FAX11703 FAX C N
FAX11800 FAX C Areas Added / Time Y
FAX11900 FAX C Y
FAX12000 FAX O N
FAX12100 FAX O NFAX12200 FAX Stock verification within specified time O Time Index N
FAX12300 FAX C N
FAX12301 FAX C N
FAX12302 FAX C N
FAX12400 FAX C N
FAX12500 FAX Completion of special assignments CTime Index
N
FAX12600 FAX C N
FAX12700 FAX C N
FAX12701 FAX C N
FAX12702 FAX C N
L1 Review the recommendation negotiate if necessary approve the proposal.
No. of days delayed from scheduled date
Identification of New Areas of Insurance needs at an optimum premium on time
System / Procedure for Timely arrangement of Insurance Coverage
No. of days delayed from scheduled date
Insurance claim settled as % of final claim lodged
% value of insurance claim amount.
Reduction in unpriced Stores Receipt Voucher
% w.r.t. total no. of SRVs
Mechanisation of Fixed Asset Verification system by introducing Bar Coding system for all equipments (Fixed assets) to ensure 100 % verification.
No. of days delayed from scheduled date
L3 list out all plant and equipment for bar coding pasting bar code in all equipments/ verify the assests with the help of the barcode reader linked with the computer.
No. of days delayed from scheduled date
L2 Reconcile the difference and take appropriate action for nonreconciled items.
No. of days delayed from scheduled date
Cost Reduction in Material/ Indirect Material / Sub-Contracting & war on wastages due to Finance Initiative
Increase in % of savings of Total Matl cost / sub-cont cost over Pr.Year
Savings through productivity improvement projects of finance department
Absolute Value Rs. in lakhs
Identification of Critical Improvement Areas through Internal Perception survey of employees / Internal customers
No.of Areas identified and agreed
L3 Prepare survey questionnaire and get response
No. of days delayed from scheduled date
L2 Analyse the survey report/ prepare areas for Improvement
No. of days delayed from scheduled date
FAX12703 FAX L1 Action for improvement C N
FAX12800 FAX C N
FAX12801 FAX C N
FAX12802 FAX C N
FAX12900 FAX C N
FAX13000 FAX C N
FAX13100 FAX O No.Of W/Shops N
FAX13200 FAX O N
FAX13300 FAX O ROI N
FAX13400 FAX OTime Index
Y
FAX13500 FAX C
Time Index
Y
FAX13600 FAX C Y
No. of days delayed from scheduled date
Improvement of system to enable cycle time reduction in clearance of purcahse proposal and other proposals for financial concurrence
Reduction in avg no. of days wrt previous year
L3 Compile procedure guidelines issued by various agencies and classify them. Preparation of check list wrt to prevailing guidelines and scrutiny/ where DOP provides concur.
No. of days delayed from scheduled date
L2 Review and accord concurrence as per DOP
No. of days delayed from scheduled date
Number of man hours saved through computerisation.
Targetted Man hour saved
Improvement of Tender conditions (GTC) for cost reduction/ improved service and risk mitigation by specified date
No. of days delayed from scheduled date
Workshops/Technical forum discussion for addressing issues like Accounting/Taxation/ Auditing/ Fiancial/Legal/ Risk Mitigation and cost management
Completion of arbitration cases within the specified time
% completion w.r.t total
Evaluation of Capital Investments¿ vis-à-vis DPR
Evaluation of capital proposals for preparation of Annual Plan.
Compilation and submission through a web enabled MIR, data of sectorwise/ project wise, order receipt/ execution & outstanding position, for the purpose of reconciliation of orders received & outstanding in the records of Business sectors & units
Review and implementation of New / revised accounting standards / changes in SEBI guidelines / Companies Act with respect to its impact on BHELs results and development & issue of guidelines / clarifications by specified date.
No. of days delayed from scheduled date
FAX13700 FAX O % Y
FAX13800 FAX O % Y
FAX13900 FAX OTime Index
Y
FAX14000 FAX O
Time Index
Y
FAX14100 FAX O Y
FAX14200 FAX O Score Y
FAX14201 FAX O
Time Index
Y
FAX14300 FAX O N
FAX14400 FAX C TQM Score Y
FAX14401 FAX O Y
FAX14402 FAX C
Time Index
Y
FAX14500 FAX O Y
FAX14600 FAX C Number N
FAX14700 FAX CTime Index
Y
FAX14800 FAX C N
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
Reply/settlement of Internal Audit paras within specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Number of new circles
Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
No. of days delayed from scheduled date
Implementation of Improvement projects identified in the Position Report as per schedule
Development of Knowledge management Portal
No. of days delayed from scheduled date
Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
FAX14900 FAX C N
FAX15000 FAX C N
FAX15100 FAX C N
FAX15200 FAX C N
FAX15300 FAX C N
FAX15400 FAX C Rs in Lakhs N
FAX15500 FAX O N
FAX15600 FAX C N
FAX15601 FAX O N
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
Correction in turnover/ Profit due to timely pointing out of errors in accounting entries in schedule audit.
Verification and vetting of - Write off proposals/ Productivity improvement projects (more than 10 lakhs) / Gratuity / other assignments referred to IA.
No. of days delayed from scheduled date
Development of system for issue of quarterly financial status reports for projects, calculation of actual engg and tss hourly rates for previous year and pre-determined engg and tss hourly rates for current financial year.
No. of days delayed from scheduled date
updation of projects master, outlay master and budget master to facilitate fsr run.
No. of days delayed from scheduled date
FAX15700 FAX C N
FAX15800 FAX C Y
FAX15900 FAX C N
FAX16000 FAX O N
FAX16100 FAX Preparation of systems audit manual C N
FAX16200 FAX C Y
FAX16300 FAX O N
FAX16301 FAX O N
FAX16400 FAX O No. of comments Y
FAX16500 FAX Revision of Internal Audit Manual C N
FAX16600 FAX C N
FAX16700 FAX C N
FAX16800 FAX C N
Development of system for Reconciliation of admitted accounts and cash receipt control accounts.
No. of days delayed from scheduled date
System for timely submission of e-TDS(Quarterly/Annually) for Income Tax and Employment Tax Return
No. of days delayed from scheduled date
Development of system for automatic Updation of fixed assets records and preparation of depreciation schedule inline with relevant Accounting standards.
No. of days delayed from scheduled date
Identification of weaknesses in system / procedure and recommended modification /improvement
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
MONITORING ACCOUNTING OF EXPENDITURE BOOKED TO PROJECTS IDENTIFIED UNDER ACCOUNTING STANDARD 26
NO. OF PROJECTS
IDENTIFYING PIRS AND OBTAINING JUSTIFICATION FOR INCLUSION AND RETENTION UNDER AS-26
NO. OF PROJECTS & VALUE
Comments by Statutory Auditors on adequacy of coverage by IA.
No. of days delayed from scheduled date
Developing a system by specified date for capturing comments of Statutory Auditors on adequacy of coverage by IA.
No. of days delayed from scheduled date
Development of template/application package by specified date for preparation and issue of IA Report, monitoring/tracking and disposal of the report para wise.
No. of days delayed from scheduled date
Intra-Net site development by specified date for status of Works Bills giving details of Party, Contract, etc. in coordination with Computer Deptt
No. of days delayed from scheduled date
FAX16900 FAX O N
FAX17000 FAX C N
FAX17100 FAX C N
FAX17200 FAX C N
FAX17300 FAX O N
FAX17301 FAX OTime Index
N
FAX17400 FAX O % N
FAX17500 FAX O Saving in Rupees N
FAX17600 FAX C
Time Index
N
FAX17601 FAX O
Time Index
N
FAX17700 FAX O
Time Index
NFAX17800 FAX O Auditors perception N
FAX17900 FAX O N
FAX18000 FAX C Timely completion N
Data collection and timely Remittance /Reimbursement of Statutory deduction /court attachment and other out side Financial Agency/ Bank /Housing Finance Companies/Club/Socities payments within specified time
% remittances/ reimbursements done within specified time
Development of system for online Priced store ledger by specified date
No. of days delayed from scheduled date
Development of online System for Bank guarantees accepted by BHEL from Fabricators by specified date.
No. of days delayed from scheduled date
Development of Computer System for timely resolution of Employees/Dept/Contract related issues on Pay, Time & Wages, TA/LTC/PF, Works Bills and Miscellaneous bills by specified date
No. of days delayed from scheduled date
Review and follow up of collectible sundry debtors to reduce the amount of outstandings
% of Target Amount achieved
Consolidation of O/s report on monthly basis and review of billing plan
Reduction / Liquidation of BGs as a percentage of what is due.
Timely processing of Imports Ocean freight/air freight/air agencies bills involving huge amounts (involving crores of value - audit resulting in savings in lacs of rupees viz.. classification , currency exchange rates etc..)
DEVELOPMENT OF WEB BASED MIR SYSTEM FOR DEBTORS MANAGEMENT
COLLECTION AND INTEGRATION OF DATA AND SUBMISSION TO CORPORATE OFFICE AS PER SCHEDULE
Development of system for early issue of Annual P.F.Statements to members.Effective interaction with Statutory/Govt Auditors for Audit plan and work
Timely Completion and release of Directors' Report
No. of days Prior to Board Meeting
Monitoring of PR/BOI wrt billing and cost
FAX18100 FAX O N
FAX18200 FAX C No. of days N
FAX18300 FAX O N
FAX18400 FAX C N
FAX18500 FAX C
Time Index
N
FAX18600 FAX C N
FAX18700 FAX C N
FAX18800 FAX O N
FAX18900 FAX O N
FAX19000 FAX O N
FAX19100 FAX O No of cases N
Preparation of Cost Proforma and Annexures for Completion of Cost Audit
No. of days delayed from scheduled date
Issuing Guidelines / Clarifications on Forex Issues and Foreign Currencies Rates
Number of Non-Compliance of Statutory Provisions, Management Policies & Procedures pointed out.
Number of Non-Compliances pointed out
Coordination of Monthly DO for Director / Finance
No. of days delayed from scheduled date
Development of system of remittances of TDS/TCS through internet banking facility
Improvement in impementation of e-remittances/EFT
Target date / Months for implementation.
System improvement to adhere to changes in statutory provisions relating to Payroll,PF etc.
Number of months to modify the program
System improvement to adhere to changes in Cormpan policies relating to Payroll,PF etc.
Number of days taken to modify the program
Planning of fund for meeting the loan requirement & final settlement
Number of times the shortage of fund
Receipt of interest on investment & maturity amount
Date of payment of Interest & maturity date
Transfer of PF accumulations and settlement of pension
FAX19200 FAX O Time Schedule N
FAX19300 FAX O N
FAX19400 FAX O N
FAX19500 FAX O N
FAX19600 FAX O % N
FAX19700 FAX O N
FAX19800 FAX C Time Schedule Y
FAX19900 FAX C Time Schedule Y
FAX20000 FAX C Time Schedule Y
FAX20100 FAX C Time Schedule Y
FAX20200 FAX C Time Schedule Y
Calculation of pre-determined hourly rates, periodical review of utilized hours vis-a-vis budgeted hours and calculation of final absorption rate.
Issue of quarterly Financial Status Reports in respect of completed, ongoing and terminated projects.
number of days since receipt of time booking for the last month of the quarter, budget and outlay inputs in respect of new projects added.
System improvement for prompt scrutiny and admission of bills from employees against Departmental Advances for settlement and recoupment of imprest cash account.
number of days from the date of submission of bills.
System improvement for prompt scrutiny and payment of bills from subcontractors/ fabricators.
No. of days from which bills are received.
System improvement for clearance of advances within specified time.
System improvement for Checking and vetting of Insurance, Security,Transport, AMC and other Misc. proposals.
No. of days from the date of receipt of all clear proposals
Development of systems and procedure for VAT
Development of systems and procedure for Service Tax
Development of systems and procedure for Fringe Benefit Tax
Facilitating introduction/implementation of e-procurement / Reverse Auction
Facilitating the improvement of Vendor Base to reduce the dependence on Single/very few sources of suppliers
FINANCE & ACCOUNTS FUNCTION KRA MASTER - 2006-07
Y N H M L Audit Report
Y N X X L Register
Y N X M X Data Base
Y N H X X Report
Y N M H L Report
N N M H M System
Y N X X M System
Y N X H X Operating Results
Y N M X X Board Approval
N N X M H Trial Balance
Special KRA (Y/N)
Universal KRA (Y/N)
Suggested Weightage for category A B
C
Source of Data for Measurement
N N M H M System
N N L M M Audit Report
Y N X X M
Y N X M X
Y N L X X Audit Report
Y N H M X Audit Report
Y N X M X
Y N H X X Deviation Report
Y N L M M Register.
Y N H M X
H H M
Y N X M M Input Data
Y N X M X REM
Y N X X M REM
Completed Schedules
Completed Schedules duly initial by Internal Audit.
Unaudited Accounts
Appointment Order.
Y N M M L Accounts
Y N X M M System
Y N X X M System
Y N X M X System
Y N H H H
Y N X M M System
Y N X X M System
Y N X M X System
N N M X M Register
Y N H X M
N N H H M Register
N N H X X
N N M M X
N N X M X M I R
Actual booking of Incidental expences Vs Provisional Booking.
Minutes of the Audit Committee Meeting
Minutes of the Audit Committee Meeting
Approved Annual Audit Programme.
N N M X X M I R
N N H M X Audit Report
Y N X M X Audit Report
Y N H X X Audit Report
N N L L M Register
Y N L M M System
Y N X X M System
Y N X M X System
Y N L X X REM
Y N M L X System
Y N X L X System
Y N M X X System
Y N X X M System
Y N H X X
Y N H M X System
MOU Evaluation Report
Y N X M X System
Y N H X X
Y N H M L Booklet
Y N X X L Booklet
Y N X M X Booklet
Y N H X X Booklet
Y N M M L Booklet
Y N H M L MOU / Scorecard
Y N L M M IA Report
Y N X X M Database
Y N X M X Report
N N L X X REM
Y N H H H Cost Reprots
Y N L M H System
EVA Performance Report
N N L L M Accounts Ledger
N N H M L Reports
Y N H M L System
Y N M M L System
Y N H H H System
N N M H H
Y N L M H System
Y N L M H System
Y N L M H System
Y N L M H Updated Manual
Y N L M H System
Y N L M H System
Register of miscellaneous income
N N H M X Ledger
N N X M X MIR
N N H X X MIR
N N H M L Register
N N X X L Register
N N X M X Analysis Report
N N H X X Action Report
N N X X M Register
N N M L M
Y N H H L Agreement
Y N X X L Register
Y N X H X Standard Format
Y N H X X Approval Letter
N N X M X Register
Y N H M L MOM
Acknowledgement from DGFT
N N H M L proposals of users
N N H M L
N N H M L Project Report
N N L M H Credit Rating
N N L L M Financial Position
N N H M L REM
Y N L H M System
N N M M L Bank Guarantee
N N L M L Register
Y N L M M System/ Register
N N H M L Approved Budget
Y N H M M
Y N H M M
Deployment of Surplus
Acknowledgement from IT Dept
Acknowledgement from IT Dept
Y N L M L
N N X M H System
N N X X H Register
N N X M X
Y N H M X System
N N X M H System
N N X X H System
N N X M X System
N N H H H
N N H M M Register
Y N H L X System
Y N H M X System
Relevant Documents
Correspondence with DGFT
Reduction in Slow & non moving Inventory.
N N H M X Register
N N H M M Assessment Order
N N X X M Return
N N H X X Assessment order
N N H M M Refund Order
Y N X X M Data Sheet
Y N X M X
Y N H X X Refund Order
N N L L L Returns
N N L M H
Y N H H M
Y N X X M
N N X H X
Y N H M X System
Refund Claim Letter
Correspondence file
Assessment/Refund Order
Assessment/Refund Order
Assessment/Refund Order
N N M M H Returns
N N X M H Register
Y N L M H Register
N N M H M Register
N N X X M Register
N N X H X Register
N N M X X Register
N N X X M Register
Y N H M L
Y N L M H Actual Date
Y M H L
Y N H M L Cost Report
N N X X L Cost Report
N N X M X Cost Report N N H X X Cost Report
Consolidated Annual Accounts
N N H H M Time Index
N N H M L Audit Report
Y N X X L Register
Y N X M X Analysis Report
Y N H X X Analysis Report
Y N H L X Completion Date
Y N X X X REM
Y N H X X REM
N N H M L M I R
Y N X X L Report
Y N X M X Report
Y N H X X Approval Note
Y N X M H NSSN Regn
N N L M H
Y N M M H Audit Report
Y N M M H Tax Return
PF Inspection Report
N N L M H System
Y N L H M System
N N H M L Ledger
N N X X L
Y N X M X
N N X X H Register.
N N L M H System
N N M H H Register
N N M M H Assessment Order.
N N X H M Ledger
Y N X X M Analysis Report
Reconciliation Statement
Liquidation of Withheld outstanding
Y N X H X Review Report
N N X H M
N N X X M
N N X H X
N N L L M
Y N L L M System
Y N H M L System
N N X X L Report
N N X M X
N N H X X System
Y N H M L System
Y N X X L System
Variation Rate per Kg.
Rate Revision Letter
Approval Letter from Customer
Periodic Invoices for completion
Recommendation Note
Y N X M X System
Y N H X X System
Y N L M L System
Y N X X L System
Y N X M X C' Form Register
Y N L X X System
N N L L M System/ Register
N N M M H SRV/Register
Y N L M H Register.
N N X X H Register.
N N X M X Register.
N N L X X Register.
N N L M H Cash Book
N N L L M Register
Y N X M L System
Y N X X L System
Y N X M X System
N N L H M System
Y N X M L System
Y N X X L System
Y N X M X System
Y N X M L System
Y N X X L System
Y N X M X System
N N L H M REM
Y N X M H Ledger
N N H M L Ledger
Y N X X L Register
Y N X M XRecommendation Report
Y N H X X Approval Note
N N H M L Covers Obtained
Y N M M L Policy
N N M M H Register
N N L M H SystemN N L M H MIR
Y N X M L Verification Report
Y N X X L Verification Report
Y N X M X
N N H M L Register
N N H M L Register
N N X M H Register
N N H M L Survey Report
Y N X X L Survey Report
Y N X M X
Reconciliation Statement
Feed back on Survey Report
Y N H X X
N N H M L
Y N X X L Check List
Y N X M X Proposal Approval
N N X X H MIR
Y N L M H Format
N N M M H Decisions
N N X H X Register.
N N H M L
N N X M H Annual Plan
N N H H H MIR
Y N H H H Guidelines issued
Action Taken Report
Computerised File Movement System
Capital Budget Report.
N Y M L L
N Y M L L
N Y M L L
N Y M L L
Y Y H M L
N Y M X X Survey Report
N Y X M M Project report
N Y M X X Unit QA/QC
N Y H X X Quality Deptt.
Y Y X M X
N Y X X M Project report
Y Y L M H REM
N Y M M M Case Document
N Y X M H Project report
Y Y H H H Project report
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Action plan document
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
Y Y H H H Project report
N N H H H
Y N H M M
Y N H H M
Y N H H H
Based on the observations made during balance sheet ( Schedule ) audit
Documents from Commercial,IED and HR
FSR - quarterly FSR engg & tss hourly rates - Note for obtaining the approval of the competent authority.
Quarterly FSR report
Y N H H M General ledger
Y N H H M
Y N H H M
Y N M M M system
Y N H H H
N N H H X
N N M M M
N N M M M APPROVED PIRS
N N H H M
Y N H H H
Y N H H M
Y N H H H
Y N H H H Report
Acknowledgement from IT/ET dept
Register/computer system
Submission of Systems audit manual for approval
Rating declared at year end by Corporate / Unit Management
APPROVED PIRS & VALUE
Report 619(3A)/ CARO
Date of completion of job against target
Balance sheet and 619(3A) report by Statutory Auditor.
Actual and satisfactory implementation of computer package.
N N H H H Records
Y N H H H
Y N H H H
Y N H H M System
N N H H M MIRs
N N H H M MIRs
N N H H H MIRs
N N H H M Payment Records
N N H H H SYSTEM
N N H H H SYSTEM
N N M M HN N H H H Auditors
N N H H H
N N H H H Report
Satisfactory implementation of the System
Satisfactory implementation of the system.
System / Statement issue date
Date of Board Meeting
Y N H H H
N N H H H
N N H H H Audit Report
Y N H H H
N N H H H e-tax remittance
N N H H H
N N H H H
N N H H H
N N H H H
N N H H H
N N H H H
Schedule given by Corproate Finance
As per past experience.
Copies of DO Letters
Correspondence with banks.
Latest amended Income Tax Act, 1961 as well as departmental circular issued by establishment section
from the date of receipt of hr circular in computer section
Loan request of members & Claim for Final settlement
Covering letter, counterfoil of cheque receipt
request for transfer of PF & Receipt of claim with the required documents for pension
N N H H H
N N H H H
N N H H H
N N L M H
N N H H H Advance register
N N H H H
N N H H H
N N H H H
N N H H H
N N M M L
N N M M L
Receipt of approved R&DBudget/Availability of Final Ledger of Final Accounts/Completion of Govt. Audit.
FSR quarterly output.
identified vouchers for this purpose.
identifying the respective vouchers.
Record of receipt of proposals
KRA Remarks
Action to be taken by Unit Finance with the help of other functions and coordinated by Internal Audit with Statutory Auditors wrt adequacy of Internal Audit Coverage/ Qualifications in Annual Accounts etc
31st October for Corp & 1st September for Unit
Action taken by all units with support from Information Technology Group
Approval of Concerned Debit Accepting Department Consent to be obtained and to be sent only with Inter Unit Accounts.
To follow up with CAG's Office/ Co-ordination with Board.
Unit HR / Fin to furnish the data to Corporate Office for consolidation and submission to Actuary-Provide required clarification to Actuary..
-
-
Streamlining the information for enabling conversion with the help of Consultant
Classification of Revenues/ expenses/ assets & liabilities according to segments.
This KRA has to be taken care by all depts to ensure compliance.
This is an attempt to settle audit paras remaining after replies at RAO level with Higher Govt. Authority viz./Audit Committee
AAP has to be approved by BLAC. Once approved any change requires consent from BLAC/ hence the importance
During BLAC meetings specific system studies are required to be made and reported to BLAC
These are direct contributions emanating from Audit Observations
Very useful in identifying errors of bank charges on time and quick remedial actions result in savings of interest
Used for optimising the extent of working capital requirement to maximise EVA
To take immediate corrective action before incurrence of expenditure
For defending the Organisations level of achievement vis-à-vis MOU parameters
EVA recognise one of the most important ratio for performance analysis
Budget / Flash summary results is a major role in performance improvement / enhancing stake holders value.
Scheduled date will be no. of days from completion of Govt. Audit
(Timely submission of MOU Score Card)
Scheduled date being end of the month
Earlier than 31st October
Streamlining the system for expediting completion of Assessments
Early resolution of issues
-
To take up with supplier for availing Duty Drawback / Terminal Excise Dutyand pass on the benefits to BHEL by way of deductions in Bill amount.
Releasing cash in-flow from blocked funds
End of the month
No. of days from the end of the contract.
within 3 days from balancesheet finalisation
December
Critical in nature,all costing and price estimated are based on these information.
Realisation of withheld & outstanding debts will enhance profit by reversal of provisions which would have been made for such debts and also reduce sundry debtors.
Non-collection of Concessional Sales Tax Forms will attract additional tax which will affect the profitability of the Company. The comml support is reqd.
Non-scrutiny of the sales contract in some cases will result in non-realisation of revenues further in certain cases the terms and conditions should be interpretated correctly so to avoid short collection of sales revenue.
Some of the Units follow raising of invoice on rate per kg. (TO BE COMPLETED)
In most of the sale contracts customers are levying LD for delay in supply/erection. In order to pass on the LD to our suppliers this KRA is suggested.
MM to take up with Sub Contracting for furnishing final Material Accounts Reconcilatin Statement.
Avg No. of days from receipt of complete Bill in accounts dept.
Major Units are having Township where the recovery of rent/ electricity/ water charges another dues forms an important works of Accounts Section. This development of system would ensure 100% recovery as well as quicker realisation.
Development of System
Since material Cost on Sub-Contracting forms a substantial part of revenue, its reduction will enhance profitability. Every Fin. dept. will mantain a seperate register to record savings through such efforts.
HOD with Assign Special Assignments
..
Financial concurrence is the most important activity of Finance. All proposals involving financial implications require financial concurrence.
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Questionnaire developed by CQA to be adopted .
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
-
-
-
-
-
-
-
-
-
-
-
.
Nil
--
Nil
MAINTENANCE FUNCTION KRA MASTER - 2006-07
KRA ID Function KRA Description
MWX00100 MWX Implementation of the identified improvement projects as per plan.
MWX00101 MWX
MWX00102 MWX Execution of projects as per schedule
MWX00200 MWX
MWX00201 MWX
MWX00202 MWX
MWX00300 MWX
MWX00301 MWX
MWX00302 MWX MWX00303 MWX Execution of projects.
MWX00400 MWX
MWX00401 MWX
MWX00402 MWX Execution of plan as per schedule.MWX00500 MWX Savings from Indegenisation/import substitution of spare parts.
MWX00501 MWX
MWX00502 MWX Initiation of procurement actions by specified date.
Identification of improvement projects/ Formulation of scheme and Monitoring the progress for timely completion
% of modernisation/ up-gradation/ reconditioning/ retrofitting jobs of identified m/c tools/ equipment/ plant facilities done within specified time, with reverse engg., manufacture of parts, schedule optimisation using prima vera.
Identification of M/c & equipments through RCA / Past performance / Behaviour for modernisation / up-gradation / reconditioning / retrofitting projects & documentation there.Formulation of scheme/ getting approval for implementation of modernisation/ upgradation/ reconditioning/ retrofitting projects by scheduled date and monitoring for timely completion.
Processing for external support / enquiry/ evaluation of offers and award of work contract / placement of PO by scheduled date
Implementation of the identified energy conservation projects including technological up-gradation and documentation as per plan.
Identification of energy conservation projects and resource management by scheduled date.
Formulation of scheme and getting approval. Monitoring the progress of projects for timely completion
Implementation of 5-S technique activities in identified areas by specified date.
Identification of areas/ development of plan/ monitoring progress for timely completion for implementation of 5-S technique by specified date
Survey/ identification of possible sources & feasibility study and documentation of identified parts by specific date
MWX00600 MWX Development & Implementation of special IT initiatives as per plan.
MWX00601 MWX
MWX00602 MWX
MWX00603 MWX Develop application and ensure implementation by specified date.
MWX00700 MWX Identification/ development and implementation of facility projects.
MWX00701 MWX
MWX00702 MWX MWX00703 MWX Execution of projects as per schedule.
MWX00800 MWX Conceptulisation & implementing the concept of OEE by specific date
MWX00801 MWX
MWX00900 MWX
MWX00901 MWX
MWX00902 MWX MWX00903 MWX Implementation of the projects as per plan.
MWX01000 MWX
MWX01001 MWX
MWX01002 MWX Take corrective actions by specific date
Identification of key areas where applications are to be developed and monitor their implementation as per schedule.
Formulate strategy and coordinate with designated agencies for design and development of the applications identified by specified date.
Identification of facility improvement projects/ Formulation of scheme and monitoring progress as per schedule.
Formulation of scheme and getting approval. Monitoring the progress of projects for timely completion as per schedule.
Develop a plan and scheme for the implementation of the OEE on the identified machines / Plants & Equipment by specified date
Savings from In-house development & utilisation of rectification techniques for specialised jobs -( PCBs / modules / drives / servo motors / telephone exchange / instrumentation etc.)
Analysis of bottlenecks/ identification and formulation of plans of required techniques and monitoring for timely completion
Identification of the required techniques/ Regular Review and assistance in execution of the projects as per plan.
Condition Monitoring for identified machine tools/ Service Plants & submission of report by scheduled date.
Identification of the deviations and ascertain the required parameters to be maintained and arrange for the execution by scheduled date.
MWX01100 MWX
MWX01101 MWX
MWX01102 MWX
MWX01200 MWX
MWX01201 MWX
MWX01202 MWX MWX01300 MWX Savings accrued through various improvement projects.
MWX01301 MWX Regular review for achieved savings and corrective action as per plan.
MWX01302 MWX
MWX01400 MWX
MWX01401 MWX
MWX01402 MWX
MWX01403 MWX MWX01500 MWX Savings accrued through various energy Conservation projects.MWX01501 MWX Regular review for achieved savings and corrective action as per plan.
MWX01502 MWX MWX01600 MWX Implementation of training plan.MWX01601 MWX Coordinate for the deputation of concerns for identified training needs.
MWX01700 MWX MWX01701 MWX Periodic review of PM schedules and priortise the work on criticality.MWX01702 MWX Arranging the timely PM completion as per the schedules.
MWX01800 MWX
MWX01801 MWX Periodic review of PM schedules and priortise the work on criticality. MWX01802 MWX Arranging the timely PM completion as per the schedules.
% of reconditioning / modification / Overhaul / major repair of Construction Equipment / mobile cranes/ Vehicles/ Serv. & AC plant / machine / system etc as per plan. (Reverse engg/ development of spares drawings/ etc)
Analysis/ identification/ Regular review and coordination for implementation of reconditioning / retrofitting works and documentation by specific date.
Regular monitoring and coordination to ensure implementation of reconditioning / retrofitting projects by specified dates.
Increase in Mean Time Between Failure (MTBF) of identified Critical & Important Plant and Machinery.
Root cause analysis of breakdowns of identified machines/ corrective & preventive measures/ resource management and documentation by specified date
Initiate timely corrective & preventive measures & resource management for execution as per plan.
Monitoring/ arranging for vetting and preparation of statement by specified date for savings achieved.
% Reduction in consumption of raw materials/ for power & fuel/ and other consumables per unit of Output (GTO-ED) / Shop turnover
Review the performance of equipments and consumption of raw materials/ power/ fuel/ and consumables by specified date.
Generation of awareness for optimal use of plant/ equipment and raw material for energy conservation.
Regular maint. to avoid leakages and ensuring operation of the plant efficiently / near rated capacity.
Monitoring/ arranging for vetting and preparation of statement of savings achieved by specific date.
% of preventive maintenance jobs completed effectively on time ( Machines / equipment ).
% of preventive maintenance jobs completed on time ( services plant / AC plant & equipment ).
MWX01900 MWX
MWX01901 MWX Periodic review of PM schedules and priortise the work on criticality.
MWX01902 MWX Arranging the timely PM completion as per the schedules.
MWX02000 MWX
MWX02001 MWX Monitoring review and arranging the suitable compliance to resolve the NCR.MWX02002 MWX Taking corrective and preventive action for resolution/MWX02100 MWX % achievement of capitalization targets for plant and equipment.MWX02101 MWX Review of the targeted completions
MWX02102 MWX
MWX02200 MWX
MWX02201 MWX
MWX02202 MWX
MWX02300 MWX
MWX02301 MWX
MWX02302 MWX
MWX02400 MWX
MWX02401 MWX
MWX02402 MWX
MWX02403 MWX Resolution of complaints within specified time.MWX02500 MWX % of work contract completed as per schedule
MWX02502 MWX
MWX02503 MWX
% of preventive maintenance jobs completed on time (Services / Crane & rail track).
Reduction in number of NCRs issued due to non compliance of statutory and other related rules and regulations.
Take the action for the timely capatilization of the projects. Generation of the periodic reports.
Time reduction in awarding the work/ after approval from the competent authority as per plan.
Periodic monitoring for pending proposal. Coordinate with the associated sections/ Deptt. for resolution of the bottlenecks.
Initiate action for the timely award of the work. Report generation of the pending status by specified date.
% of Maintenance jobs completed as per schedule (like Communication/ Annex / Over Head Elect .Maint / CMWS / FE PROJECTS etc.)
Periodic review of pendancy of complaints. Management and coordination with associated agencies.
Daily review of complaints & resource management & meeting the requirements at the earliest and documentation. Resolution of complaints within specified time
% of Maintenance jobs completed as per schedule (Vent system / AC/ WC/DC etc.)
Periodic review of pendancy of complaints. Management and coordination with associated agencies .
Daily review of complaints & resource management & meeting the requirements at the earliest and documentation..
monitoring for pending Work . Coordinate with the associated sections/ Deptt. for resolution of the bottlenecks.
Initiate action for the timely completion of the work. Report generation of the pending status
MWX02600 MWX % of major maint. jobs ( major overhaul) completed as per target.
MWX02601 MWX
MWX02602 MWX MWX02603 MWX Implementation of projects as per plan.MWX02700 MWX % utilization of allocated budget.
MWX02701 MWX
MWX02702 MWX
MWX02800 MWX MWX02801 MWX Review the vulnerable / accident prone areas.
MWX02802 MWX
MWX02803 MWX
MWX02900 MWX
MWX02901 MWX
MWX02902 MWX
MWX03000 MWX MWX03001 MWX Analysis & regular review of complaints
MWX03002 MWX Resolution of complaints within specified time.
MWX03100 MWX Compliance to statutory rules / acts and regulations in all relevant areas..MWX03101 MWX Review the status of compliance wrt to rules.
MWX03102 MWX
MWX03200 MWX
Identification of m/c & equipments for major overhauls. Formulation of scheme/ getting approval for major overhauls by specific date.
Floating of the enquiry/ evaluation of offers and award of work contract / PO by scheduled date.
Periodic review of utilisation of the Allocation/ commitments made. Coordination with the Fin and other Deptt.
Regular review for pending Work . Coordinate with the associated agencies/Deptt. for resolution of the bottlenecks for utilisation of the budget. Report generation of the staus of the utilisation of the budget by specified date.
Reduction in accidents during erection / commissioning activities / prod. Shop and other maintenance works by strict adherence to safety provisions.
Ensurance of the usage of PPE/ work permit system / generation of the safety awareness
Analysis of the past accidents and take precautionary measures to avoid repetition. Put up analysis by specific date
% of repair/ modification/ erection/ maintenance of pipe lines & ventilation system as per schedule.
Analysis & regular review of maintenance of pipe lines & ventilation system by specific date
Daily monitoring maintenance of pipe lines & ventilation system & resource management for early resolution of breakdowns. coordination with associated agencies and documentation.
% Resolution of complaints as per schedule (Electrical -BM / telecom/ Civil/ gases/AC/WC/DC etc)
Take corrective action for compliance & status report of compliance submitted to the higher ups by specified date.
Resolution of NCR's issued with respect to ISO 9001/ ISO 14001 & OHSAS 18001 within specific time.
MWX03201 MWX Taking corrective and preventive action for resolution as per plan
MWX03300 MWX
MWX03400 MWX % clearance of SRVs/ ACCEPTANCE within specified time.
MWX03401 MWX
MWX03402 MWX
MWX03500 MWX
MWX03501 MWX
MWX03502 MWX MWX03600 MWX % completion of reclamation of oils as per plan.MWX03601 MWX Review the quantity of the oil reclaimed as per plan.MWX03602 MWX Collection of the oil and sending to the reclamation center.
MWX03700 MWX
MWX03800 MWX
MWX03801 MWX MWX03802 MWX Activity completion as per plan. Online data generation.MWX03900 MWX No of machines covered under OEE as per plan
MWX03901 MWX Identify the machines for OEE. Review of the performance by specified date.
MWX03902 MWX MWX04000 MWX % of bills cleared within specified time.
MWX04001 MWX Periodic review of pending bills. Coordination with other Deptt.as per schedule
MWX04002 MWX Resolution of the bottlenecks after consultations with concerned departments.
MWX04100 MWX
MWX04200 MWX Reply/settlement of Internal Audit paras within specified time (4 weeks)
MWX04300 MWX Timely inputs to unit/corporate finance for inter-unit re-conciliation of accounts
MWX04400 MWX Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
MWX04500 MWX Finalisation of Functional scorecard by specified dateMWX04600 MWX Improvement in Employee Satisfaction Score
Initiate action for the timely clearance of the bills as per plan. Status generation for perusal.
Periodic review for pending SRVs . Coordinate with the associated sections/ Deptt. for clearing the SRVs.
Report generation of the pending status. Initiate action for the timely clearance of SRVs
% reduction in downtime of critical AC plant / Cranes / construction equipment / mat. handling equipment / Loco engines etc as compared to total productive time.
Regular review of breakdown and coordination with associated agencies as per schedule.
Quick resolution of breakdowns and preparation status report as per schedule.
Suggestions generated / received & implemented (create conducive environment)
% improvement of relevant quality measurement parameters (QTM) from target
Review and monitoring the QTM index for defined parameters and suggest course correction by due date.
Prepare the implementation plan for the identified machines and its implementation.
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
MWX04601 MWX MWX04700 MWX Increase in no. of active Quality Circles in the deptt.MWX04800 MWX Achieving Business excellence thru' TQM at Deptt. level
MWX04801 MWX Preparation of action plan based on Position report
MWX04802 MWX MWX04900 MWX Development of Knowledge management PortalMWX05000 MWX Contributing case studies etc. for Knowledge Management PortalMWX05100 MWX Completion of KM Projects as per schedule
MWX05200 MWX
MWX05300 MWX
MWX05400 MWX
MWX05500 MWX
MWX05600 MWX
MWX05700 MWX
MWX05900 MWX
MWX06000 MWX MWX06100 MWX % increase in turnover from products/services offered to external agencies
MWX06200 MWX
MWX06300 MWX
MWX06400 MWX
MWX06500 MWX Develop vendors for outsourcing (selective tie-up) as per plan
MWX06600 MWX Development/implementation of reward scheme for OEE as per plan
Implementation of Improvement projects identified in the Position Report as per schedule
Implementation of Improvement projects identified in the Position Report as per schedule
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. and other details of project to be specified in the boxes provided against the KRA
Measurement and monitoring of environmental parameters (stack emissions/ sound levels/ radiation/ etc) and corrective/ preventive actions for sustenance
Preparation of specifications/ evaluation of offers for all capital items by specified date
RLA study of Plant and Machinery (Boilers/ turbines/ generators/ etc) and corrective actions as per plan
Conducting periodic audits of identified OEE machines/ review of practices and propose areas of improvement/corrective actions
Development of Area-wise Action Plan (AAP)/ Departmental action plan (DAP)/ balance score card within stipulated time
MWX06700 MWX Implementation of the identified technology development projects as per plan.
MWX06800 MWX
MWX06801 MWX
MWX06802 MWX MWX06900 MWX Reduction in % breakdown time of other important machines.
MWX06901 MWX
MWX06902 MWX Resolution of breakdowns in the specified time.
MWX07000 MWX
MWX07001 MWX MWX07002 MWX Quick resolution of breakdowns as per schedule.
MWX07100 MWX
MWX07101 MWX
MWX07102 MWX
MWX07200 MWX
MWX07300 MWX
MWX07400 MWX
MWX07401 MWX
MWX07402 MWX reduction in time for resolution of breakdowns.
MWX07500 MWX Adoption of Eco-friendly Air conditioning & refrigeration system.
MWX07501 MWX MWX07502 MWX Implementation of projects.
MWX07600 MWX
Reduction in Mean Time To Repair (MTTR) of identified Critical & Important Plant and Machinery.
Root cause analysis of breakdowns of identified machines and documentation by specified date.
Execution of corrective and preventive measures and documentation by specified date.
Analysis & regular review of breakdown of m/cs and documentation by specified date.
% reduction in breakdown of CNC / Critical and important machine as per plan.
Analysis & regular review of breakdown of m/cs and documentation by specified date.
% reduction in downtime of Panel AC / oil chillers of CNC machines as compared to total productive time.
Regular review of breakdown of ACs /plants / chillers & documentation of analysis by specified date.
Quick resolution of breakdowns and preparation status report as per schedule.
Generation of part programs for new components and validation of the program (Tool path simulation) by specified date
% Availability of DNC networking and associated equipment for networking of machine tools
Reduction in % breakdown time for electronic / CNC breakdown on CNC machines as a % of total productive time.
Analysis & regular review of breakdown of m/cs and documentation by specified date.
Analysis/ identification/ Regular review the Eco-friendly Air conditioning & refrigeration system and put up report by specified time.
Generation of power from DG Set / Thermal Power Station as per requirement to restrict Max. Demand / penalty charge.
MWX07601 MWX
MWX07602 MWX
MWX07700 MWX
MWX07701 MWX
MWX07702 MWX
MWX07800 MWX
MWX07801 MWX
MWX07802 MWX Quick resolution of breakdowns..
MWX07900 MWX
MWX07901 MWX
MWX08000 MWX
MWX08100 MWX
MWX08200 MWX
MWX08201 MWX
MWX08202 MWX
MWX08300 MWX
MWX08301 MWX
MWX08302 MWX
MWX08400 MWX Issuance of available drawings within 24 hours
Regular review for power generation/ equipment health and raw material as per plan.
Upkeep & operation of equipments/ adhering to PM schedules/ timely procurement actions for raw material & record generation. Adherence to statuary rules and regulations.
Availability of utility services at optimal level (Power generation/ Distribution and other electrical services etc. )
Regular review of availability of service / plants & coordination with associated agencies for ensuring the availability of raw material / input.
Quick resolution of breakdowns / repair. Optimum / efficient utilisation of services & plants. Timely readiness of standby equipments to meet emergency requirement.
% Reduction in downtime of electrical power supply to production blocks and other installations.
Analysis & regular review of electrical Power supply to production blocks and other installations put up report as per schedule.
Reduction in restoration time of TPS / DG set as per plan after planned shutdown.
Arranging the resources and ensuring scheduled completion within specified time.
Conducting timely Energy Audits as per statutory requirement and taking adequate measures to realise planned objectives
Development of new drawings for damaged parts by reverse engineering as per mutually agreed plan
Erection and commissioning of new machines / plant / facilities as per plan. Documentation of test records/ corrective action for problems faced
Arranging drawing / foundation detail and other infrastructural facilities required. Get the layout approval as per schedule
Arranging site for machine / plant installation. resource management and coordination with concerned agencies for timely completion of activities for timely completion of activities.
% of machines / plant / facilities (old /re-location / up-rooting etc) erected and commissioned as per plan
Arranging drawing / foundation detail and other infrastructural facilities required. Get the layout approval by specified date.
Arranging site for machine / plant Installation. resource management and coordination with concerned agencies for completion of activities by specified date
MWX08500 MWX
MWX08501 MWX
MWX08600 MWX Availability of utility services at max. level of requirement( All Gases / air etc. )
MWX08601 MWX
MWX08602 MWX
MWX08700 MWX Ensuring safe operation of boilers/service plants as per statutory requirements
MWX08800 MWX Achieving 100% calibration of temp. & pressure instruments as per schedule.
MWX08900 MWX MWX09000 MWX % availability of all exchanges.
MWX09001 MWX
MWX09002 MWX Resolution of breakdowns within specified time and preparation status reportMWX09100 MWX % availability of PA systems/FAX machines
MWX09200 MWX
MWX09300 MWX
MWX09301 MWX
MWX09400 MWX
MWX09401 MWX
MWX09500 MWX
MWX09501 MWX
MWX09600 MWX System development for identification of training need within specified time.
% adharance to quality of gases with respect to purity and pressure as per standard norms.
Arrange samples for testing to ascertain the quality of gases. prepare the status report. Initiate corrective and preventive action to avoid non-conformity ascertain the quality of gases.
Regular review of availability of service / plants & coordination with associated agencies for ensuring the availability of raw material / input.
Quick resolution of breakdowns / repair. Optimum / efficient utilisation of services & plants. Timely readiness of standby equipments to meet emergency requirement.
Timely calibration of master lab Equipment/ instruments & other associated accessories.
Regular review of breakdown of and Coordination with associated agencies and documentation as per schedule.
Leveling/alignment /machining/ scrapping of CI bed plates in-situ condition as per plan
Timely issuance & monitoring of monthly/ quarterly PM schedules by given date.
Arranging the timely issuance of PM the schedules and modify check list/ if required.
Development of system for approved contractors list category-wise & value-wise by specified date
Development of transparent system covering capability/ statuary and performance of the contractors by specified date
Development of the system for continuous evaluation of contractor's performance.
Development of transparent system for performance evaluation of the contractors.
MWX09700 MWX
MWX09701 MWX
MWX09800 MWX
MWX09801 MWX
MWX09900 MWX
MWX09901 MWX Analyze report and take appropriate action for reduction of stock outs.
MWX09902 MWX
MWX10000 MWX
MWX10001 MWX MWX10002 MWX Conversion of the material requisition to PI.
MWX10100 MWX MWX10200 MWX Upgradation of public utility services with quality standard
MWX10201 MWX Identification/ allocation of the resource management by scheduled date MWX10202 MWX Execution of projects as per plan.
MWX10300 MWX
MWX10301 MWX
MWX10302 MWX
MWX10400 MWX
MWX10401 MWX
MWX10402 MWX
Development/Updation of category-wise & value-wise approved contractors list for increasing the contractor base.
Arranging the performance feedback. Analysis and initiate corrective action. Addition / deletion of the contractor based on analysis.
Optimal maintenance spares inventory as a %age of Gross Block as per target.
Generate section-wise inventory list and analyse it w.r.t. Budget in given time identify and analyse the slow moving & non moving items by specified date.
Reduction in number of stock-outs for Fast Moving Stock items through auto indenting system.
Identify the stockouts and prepare the analysis of the consumption pattern. Modify the ordering pattern.
% Reduction in cycle time from Material Purchase Requisition/ Purchase Indent to PO stage.
Periodic monitoring for conversion of PI to PO and generate report by specific date
Design of civil foundations for special machines and other structures as per plan
Structural stability analysis & upgradation of structures in the plant and building as per schedule.
Identification of competent person / agency and award of work by specified date.
Execution & obtain the report for taking corrective action/ if any. and documentation by specified date
% of foundation laying jobs through in-house efforts / with external support for machines completed as per the plan
Arranging drawing / foundation detail and other infrastructural facilities required. Get the layout approval as per schedule.
Arranging site for machine / plant installation. Resource management and coordination with concerned agencies for timely completion of activities as scheduled.
MWX10500 MWX
MWX10501 MWX
MWX10502 MWX MWX10600 MWX Savings by producing manure as per plan.
MWX10700 MWX Identification & implementation of rain water harvesting projects as per plan.
MWX10800 MWX
MWX10900 MWX
MWX11000 MWX Developing system for reduction in no. of reportable accidents w.r.t prev. year.MWX11001 MWX Root cause analysis of accidents reports to be put up within specified time.
MWX11002 MWX Implementation of corrective and preventive measures as per schedule.MWX11100 MWX % Reduction in down time of vehicles.
MWX11101 MWX Analysis & review of breakdown of vehicles documentation as per schedule.
MWX11102 MWX Quick resolution of breakdowns.
MWX11200 MWX
MWX11201 MWX
MWX11202 MWX Initiate corrective & preventive measures/ if required by specific dateMWX11300 MWX % of average availability of vehicles in running condition on monthly basis
MWX11400 MWX
% completion of assigned civil work through in-house efforts / with external support as per plan ensuring adherence to quality checks .
Arranging drawing / foundation detail and other infrastructural facilities required. Get the layout approval as per schedule.
Arranging site for machine / plant installation. resource management and coordination with concerned agencies for timely completion of activities.
Development & implementation of system to prevent roof leakage / building seepage as per schedule.
Clean and Green environment by upgrading horticulture activities / tree plantation (aesthetic improvement).
Assess effectiveness in increase in Mileage (km/litre) on vehicles after overhauled / reconditioned (Av. of Test drives)
Analysis of fuel consumption pattern and initiate corrective and preventive measures as per plan.
Repair & overhauling of jobs as per agreed plan for motors/ generators / servo motors / welding set / transformers/ coils etc. as per agreed plan
MWX11500 MWX
MWX11600 MWX
MWX11700 MWX
MWX11701 MWX Formulation of the scheme & monitor their implementation in stipulated time
MWX11702 MWX Develop application and implement.
MWX11800 MWX
MWX11801 MWX
MWX11802 MWX Execution of measurements and report generation as per schedule.
MWX11900 MWX
MWX11901 MWX Identification of improvement projects and resource management.
MWX11902 MWX Execution of projects as per schedule.
MWX12000 MWX
MWX12001 MWX MWX12002 MWX Measurement of Geometrical accuracies.
MWX12100 MWX
MWX12200 MWX
MWX12201 MWX MWX12300 MWX Tonnage of scrap collection / utilized for reuse.MWX12301 MWX Identify the unclaimed scraps and despatch for further use.
Rewinding jobs done as per norm / agreed plan for motors/ generators / servo motors / transformers/ coils etc. (by reverse engg and documentation of the same)
Inspection/testing of lifting tackles (wire rope slings/ etc) and lifting machines (cranes/ lifts/ etc) as per statutory requirements
Development of IT initiatives to track machine performance (breakdown records & repair undertaken etc) and creation of history card.
% achievement of accuracy on the reconditioned machines on all parameters as per test charts/ agreed norms through system / quality improvement initiatives.
Formulation of the accuracy test requirement and initiate corrective action and documentation.
Identification & implementation of Water / oil conservation projects as per schedule.
Geometrical/Position accuracy measurement for identified machine tools through in-house efforts / external support.
Identification of the deviations and ascertain the required parameters to be maintained and arrange for the execution.
% Breakdown time after reconditioning / retrofitting within specified time (6 Months after stabilisation period of 3 months)
No. of non-conformity in the quality of potable / DM water to standards / norms.
Arrange samples for testing to ascertain the quality of water. prepare the status report. Initiate Corrective and preventive action to avoid non-conformity.
MWX12400 MWX Repair of Machine Tool Accessories / portable tools within specified time.
MWX12500 MWX
MWX12600 MWX Adherence and compliance to safety norms of gas cylinders/pressure vesselsMWX12700 MWX Manufacture of lifting tackles (wire rope slings) as per requirement
MWX12800 MWX
MWX12900 MWX Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
MWX13000 MWX Contributing case studies etc.for Knowledge Management Portal
Improvement in surroundings / aesthetic look of the areas as per plan (changing look/improving appearance indoor/outdoor).
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
MAINTENANCE FUNCTION KRA MASTER - 2006-07
C % Completion Y N N H H H
C % Completion N N N H H H
C % Completion N N N H H H
O % Completion Y N N H H H
O
Time Index
N N N H H H
OTime Index
N N N H M X
C % Completion N N N X X H
O N Y N H H H
CTime Index
N N N H H HO Time Index N N N H H H
O Y Y N H H H
O N Y N M M H
O N Y N M M HO Rs.lakhs Y N N X X H
O N Y N L M X
O N Y N X M M
KRA Type
Unit of Measurement
Critical KRA (Y/N)
Special KRA (Y/N)
Universal KRA (Y/N)
Suggested Weightage for category
A B C
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
C % Completion Y N N X X H
C N Y N M M H
C N Y N M X X
C N Y N X M M
C % completion Y N N X X H
C N Y N M H H
C N Y N M H HO Time Index N N N X H X
C Y Y N X X H
C N Y N M M X
O Y N N M M X
O N Y N M H H
C N Y N M H XC Time Index N N N X H X
C Y Y N X X H
C N Y N M M M
C N Y N X M X
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Savings/ Rs. Lakhs
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
O % Completion Y N N X X M
O N Y N M H H
OTime Index
N N N M X X
O Y N N X H X
O N Y N H H H
O N Y N H H XO Rs.lakhs Y N N X H X
O N Y N M M M
O N Y N M X X
O % reduction Y N N X M X
O N Y N M M H
O N Y N M X X
O N N N X H XO Kwh Y N N X X HO Time Index N N N M M M
O N Y N M X XO % N N N X M XO % N N N L L M
O % completion Y N N X X MO Time Index N N N M M HO Time Index N N N M X X
O % completion Y N N X X H
O N Y N M M HO Time Index N N N M X X
No. of days delayed from scheduled date
Increase of MTBF in 'Hrs.
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% operational efficiency achieved
No. of days delayed from scheduled date
No. of days delayed from scheduled date
O % completion Y N N X X H
O N Y N M M H
OTime Index
N N N M X X
O No. of NCR's Y N N X X H
O N Y N M M MO Time Index N N N X M XO % achievement Y N N X X MO Time Index N N N M H H
OTime Index
N N N M X X
O N N N X X H
OTime Index
N N N M M M
O N Y N X M X
O
Time Index
Y N N X X M
O N Y N M H H
O N N N M X X
O
Time Index
Y N N X X H
O N Y N M H H
OTime Index
N N N M X X
O N N N X H XO % completion N N N X X H
OTime Index
N N N L X X
O%
N N N X M X
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% reduction in days over last year
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% complaints resolved in specified time
No. of days delayed from scheduled date
% complaints resolved in specified time
O % completion Y N N X X H
OTime Index
N N N M H H
OTime Index
N N N M M XO Time Index N N N X H HO % Y N N X X H
OTime Index
N N N M M H
O
Time Index
N N N M X X
O Y N N X X HO Time Index N N N M M H
O N N N M X X
O N Y N X M X
O
Time Index
Y N N X X H
O N Y N M M H
O N N N M X X
O % completion Y N N X M XO Time Index N N N M M H
O N N N M X X
O % compliance Y N N X X HO Time Index N N N M H H
O N Y N M X X
OTime Index
Y N N X X H
% reduction over last year
No. of deviations reported
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Reduction in average time to resolve breakdowns
% complaints resolved in specified time
No. of days delayed from scheduled date
O Time Index N N N M H H
O%
N N N X X H
O
%
Y N N X X H
OTime Index
N N N M M H
OTime Index
N N N X M X
O % reduction Y N N X X H
OTime Index
N N N M M H
OTime Index
N N N M X XO % reclaimed N N N X X HO % reclaimed N N N M M XO % N N N M X X
O Y N N X M X
C % improvement Y N N M M M
C N Y N M H HO Time Index N N N M X XO Number Y N N X X H
O N Y N X H H
OTime Index
N N N X H XO % Y N N M M H
OTime Index
N N N M M H
O % bills not cleared N N N M X X
O%
Y N Y X M X
O%
Y N Y M L L
OTime Index
Y N Y M L L
O
Time Index
Y N Y M L L
O Y Y Y M L LO Score Y N Y H M L
No. of suggestion / employee
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
OTime Index
Y N Y M X XO No of new Circles N N Y X M MC TQM Score Y N Y M X X
O Y Y Y H X X
CTime Index
Y N Y X M XO Time Index Y N Y X X MC Number N N Y L M HC Time Index Y N Y M M M
C N Y Y X M H
C N Y Y H H H
C N Y Y H H H
C N Y Y H H H
C N Y Y H H H
C N Y Y H H H
O % compliance Y N N H H H
O Y Y N H H HO % N N N H M M
O Y Y N M M M
OTime Index
N N N H H H
O Y Y N H H H
C N N N H H H
C N Y N H H H
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of new vendors developed
No. of days delayed from scheduled date
CTime Index
N N N H M M
O Y N N H H H
O N Y N H H H
O N Y N H X XO % reduction Y N N X X H
O N Y N M H H
O N N N M X X
O % reduction Y N N X X H
O N Y N H H HO Time Index N N N H X X
O % reduction Y N N X X H
O N Y N M M H
O N N N M X X
C N Y N X X H
O%
N N N M H H
O % reduction Y N N M M H
O N Y N M H H
O N N N M X X
O % completion Y N N X X H
O N Y N M M MO Time Index N N N M X X
O Kwh Y N N X X M
Reduction of MTTR in 'Hrs.
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% resolved in specified time
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% reduction in time over last year
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% reduction over last year
No. of days delayed from scheduled date
OTime Index
N N N M M H
O % downtime N N N M X X
O
%
Y N N X X H
OTime Index
N N N M H H
O
%
N N N M X X
O % availability Y N N X X H
OTime Index
N N N M H H
O N N N M X X
O Reduction in Days Y N N X X H
OTime Index
N N N M H H
OTime Index
Y N N X X H
C % completion Y N N H H H
C % Completion Y N N X M H
O N Y N M H H
O N N N X H X
OTime Index
Y N N X X H
O N Y N M M M
O N Y N X M X
O
%
Y N N X X H
% reduction in time over last year
No. of days delayed from scheduled date
% of job Completed as per schedule
No. of days delayed from scheduled date
No. of days delayed from scheduled date
O % achievement Y N N X M M
O
%
N N N X M H
O
%
Y N N X X H
OTime Index
N N N M H H
O
%
N N N M X X
O Y N N X X H
O % completion Y N N L M H
C Y Y N X M HO % Y N N X M M
OTime Index
N N N M H H
O%
N N N M X XO % N N N X X H
C%
N N N L M M
O
Time Index
Y N N H H H
OTime Index
N N N L M H
C N Y N X X H
C N Y N X M M
C N Y N X M M
C N Y N M M M
C N Y N M M M
No. of deviations reported
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
O Y Y N M M M
O Y Y N M M M
O Y N N M H H
O N Y N M M H
O % reduction Y N N X X H
O N Y N M H H
O N Y N X H X
O % reduction Y N N X X H
O N Y N H H HO % N N N X H X
O Y Y N X X HO % N N N H H H
O N Y N M M MO Time Index N N N M X X
OTime Index
Y N N X X M
O N Y N M M M
O N Y N X H X
O % completion Y N N X X H
O N Y N M H H
O N Y N X H X
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% Inventory/ gross block
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
O % completion Y N N X X H
O N Y N M H H
O N Y N X M XO Savings/ Rs. N N N X X H
O
%
N N N L L M
O % completion Y N N M M H
O % completion N N N M M H
C Y Y N X M MO Time Index N N N M M H
O N Y N M X XO % reduction Y N N X X H
O N Y N M M H
O N N N M X X
O % Improvement Y N N X X H
O N Y N X M H
O N Y N M M HO % availability Y N N X X M
O % completion Y N N M M H
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% reduction in average breakdown time
No. of days delayed from scheduled date
No. of days delayed from scheduled date
O % completion Y N N M H H
O % completion Y N N M H H
C Y Y N H H H
C N Y N M M H
C N Y N M X X
O % achievement Y N N X X H
C N Y N X M H
O N Y N X M X
O N Y N X X H
O N Y N L M H
O N Y N L X X
ONumber
Y N N X X H
O N Y N M H HO Number N N N X H X
O%
Y N N X X H
ONumber
Y N N M H H
O
Number
N N N X M MO Tones N N N X X MO Tones N N N X M M
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
O Y Y N X M M
O No. of areas Y N N X M H
O%
Y N N M M HO % N N N M H H
C Y N N H H X
Time Index Y Y M L L
C Number Y M M M
No. of days delayed from scheduled date
Balanced Scorecard Rating (5/4/3/2/1)
MAINTENANCE FUNCTION KRA MASTER - 2006-07
KRA Remarks
..
As per plan
As per plan
Source of Data for Measurement
S (%X * Wx) X - % Project completedWx - Average weightage
S (X-Wx)*100/XX - Mile stonesWx - Milestone not comp.
S (%X * Wx) % X - % Project completedWx - Average weightage
As per plan
As per plan
S (X-Wx)*100/XX - System Developped / ImlementedWx - Not comp. / imlemented in time
S (%X * Wx) %X - % Project completedWx - Average weightage
As per plan
As per plan
As per plan
As per plan
As per plan
S (%X * Wx) % X - % Project completedWx - Average weightage
As per plan
As per plan
As per plan
As per plan
S (X-Wx)*100/XX - No. of complaintsWx - No. of complaints delayed
S (X-Wx)*100/XX - No. of complaintsWx - No. of complaints delayed
As per plan
S (X-Wx)*100/XX - No. of milestonesWx - No. of milestones delayed
Audit report from safety deptt.
S (X-Wx)*100/XX - No. of complaintsWx - No. of complaints delayed
S (X-Wx)*100/XX - No. of complaintsWx - No. of complaints delayed
As per audit observation
As per audit observation
As per plan
As per plan
RMX report
As per plan
As per plan
Report generated
Survey Report
S (X-Wx)*100/XX - No. of SRVsWx - No. of SRVs delayed
Record maintained by Audit deptt.
Record maintained by Audit deptt.
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Project reportUnit QA/QCQuality Deptt.
Action plan document
Project report
Project report
Project report
Project report
Project report
Project report
Project report
Project report
As per plan
As per plan
As per plan
As per plan
As per plan
As per plan
S (X-Wx)*100/XX - No. of projectsWx - Project not completed
As per plan
S (X-Wx)*100/XX - Planned hrs.Wx - Non available Hrs.
S (X-Wx)*100/XX - No. of drawings developped Wx - No. of delay
S (%X * Wx) %X - % Project completedWx - Average weightage
S (X-Wx)*100/XX - No. of drawings issued Wx - No. of delay
As per plan
As per plan
As per plan
As per plan
S (X-Wx)*100/XX - No. of samplesWx - No. of samples below norms
S (X-Wx)*100/XX - Planned hrs.Wx - Non available Hrs.
S (X-Wx)*100/XX - No. of instrument dueWx - No. of instruments delayed
S (X-Wx)*100/XX - No. of instrumentWx - No. of delayed cases
On line issuance of PM schedule & check lists
As per plan
Stock out as per plan
As per plan
As per plan
As per plan
Deviation from min. level
S (X-Wx)*100/XX - No. of milestonesWx - No. of milestones delayed
As per plan
As per plan
As per plan
As per test report
As per plan
S (X-Wx)*100/XX - No. of milestonesWx - No. of milestones delayed
S (X-Wx)*100/XX - No. of projectsWx - No. of projects delayed
S (X-Wx)*100/XX - No. of milestonesWx - No. of milestones delayed
S (X-Wx)*100/XX - No. of milestonesWx - No. of milestones delayed
S (X-Wx)*100/XX - No. of jobs.Wx - Job not completed on due date.
As per plan
As per plan
As per plan
As per plan
S (X-Wx)*100/XX - No. of jobs.Wx - Job not completed on due date.
S (X-Wx)*100/XX - No. of parametersWx - No. of deffective parameters
Report generated from sample testing
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
S (X-Wx)*100/XX - No. of jobs.Wx - Job not completed on due date.
S (X-Wx)*100/XX - No. of projectsWx - Project not completed
Rating declared at year end by Corporate / Unit Management
Record maintained by individual/ deptt.
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be assigned a weightage upto 100%
LAW / LEGAL FUNCTION KRA MASTER - 2006-07KRA ID Function KRA Description Unit of Measurement
LWX O Y
LWX O Y
LWX O Y
LWX O %cases completed in 7days. Y
LWX O Y
LWX O Y
LWX O Y
LWX O Y
LWX O Number of appearances N
LWX O N
LWX C Y
LWX O Time Index N
LWX C Y
LWX C N
LWX O Time Index Y
LWX O Time Index Y
KRA Type
Critical KRA (Y/N)
LWX00100
Vetting/drafting of legal documents within specified time
% of cases cleared within scheduled time.
LWX00101
Drafting / vetting of commercial contracts/ legal instruments such as gurantee bonds/ POAs/ BGs/ undertakings etc. within specified time
% of cases completed in (7) days
LWX00102
Identification of legal issues and providing applicable case laws within seven days required for vetting/drafting of legal documents
% of cases not completed in (7) days.
LWX00200
Legal Opinion/Advice Rendered within specified time
LWX00201
Analysis of the facts and the determination of issues involved within specified time
% of cases completed in 7 days.
LWX00202
Identification of various applicable laws inclusive of case laws within specified time for rendering legal opinion
% of cases completed in 5 days
LWX00300
Timely and accurate drafting/vetting of petitions/ plaints/ applications/ replies/ returns/ written statements/ claim statements/ rejoinders/ affidavits etc.
% of cases cleared within scheduled time
LWX00301
Identification of legal issues and providing applicable case laws required for finalising of petitions/replies etc.
% of cases completed in 7 days.
LWX00302
Appearing before the Quasi-judicial Authorities
LWX00304
Extending adequate assistance to Management for resolving disputes through mediation and compromise.
Number of disputes handled for resolution.
LWX00400
Preparation/updation of database regarding court cases/legal matters as per schedule.
No. of days delayed from scheduled date
LWX00401
Monitoring and follow up of Important Court Cases at Units and providing necessary assistance and guidance within given time frame
LWX00500
Number of innovative practices proposed for adoption on the basis of case laws / new legislation with reference to the enlisted areas with a
No. of new practices proposed
LWX00600
Publishing of legal compendium as per schedule by end of Feb.
No. of days delayed from scheduled date
LWX00700
Conducting meetings viz. Board Meetings/ Annual General Meeting/ Audit Committee Meetings/ Investor Grievance Committee Meetings/
LWX00701
Collection of information / documents pertaining to Agenda for the aforesaid Meetings by specified date.
LWX O Time Index Y
LWX O Y
LWX O Time Index Y
LWX O Time Index Y
LWX O N
LWX O Y
LWX O Y
LWX O % grievances redressed/ total Y
LWX O % deviations noted Y
LWX O Time Index Y
LWX O Y
LWX00702
Timely circulation of Notice & Agenda for conducting meetings of the Board of Directors/ Board Level Audit Committee and Investors / Shareholders Grievance Committee as per schedule.
LWX00703
Preparation & issue of Notice calling the AGM & Annual Report as per scheduled date
No. of days delayed from scheduled date
LWX00800
Timely preparation of minutes of the meetings of AGM / Board / BLAC / SGC / STC Committees.
LWX00900
Timely compliance with all related provisions of Companies Act including filing of statutory returns and forms.
LWX00901
Updation & maintenance of Statutory Registers and Records
No. of days delayed from scheduled date
LWX01000
Compliance with corporate governance provisions as per SEBI guidelines
No. of deviations pointed out by authorities
LWX01100
Timely compliance with listing agreements with stock exchanges
No. of days delayed from scheduled date
LWX01200
Monitoring of shareholder grievances redressal
LWX01300
Timely compliance with all other related laws other than Companies Act.
LWX01400
Timely compliance with provisions of Depository Laws/ NSDL and CDSL Business Rules.
LWX01500
Timely appointment of bankers/ printing of dividend warrants and dispatch of dividend
No. of days delayed from scheduled date
LWX O Score (Assessment by users) Y
LWX O % Y
LWX O % Y
LWX O Y
LWX C Number N
LWX C Y
LWX C N
LWX C N
LWX C N
LWX C N
LWX01600
Advising Management on matters relating to Company Law and other related laws
LWX01700
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks).
LWX01800
Reply/settlement of Internal Audit paras within specified time (4 weeks)
LWX01900
Development of Knowledge management Portal
No. of days delayed from scheduled date
LWX02000
Contributing case studies etc.for Knowledge Management Portal
LWX02100
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
LWX02200
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
LWX02300
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
LWX02400
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
LWX02500
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
LWX C N
LWX O Time Index Y
LWX O Time Index Y
LWX O Y
LWX O Score Y
LWX O Number of new circles N
LWX C TQM Score Y
LWX C Time Index Y
LWX O Y
LWX C Y
LWX O % Y
LWX C Time Index Y
LWX02600
Implementation of Special Improvement Projects taken under IMPRESS as per schedule (Registration No. & other details of project to be specified in the boxes provided against the KRA)
No. of days delayed from scheduled date
LWX02700
Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts
LWX02800
Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.
LWX02900
Finalisation of Functional scorecard by specified date
No. of days delayed from scheduled date
LWX03000
Improvement in Employee Satisfaction Score
LWX03100
Increase in no. of active Quality Circles in the deptt.
LWX03200
Achieving Business excellence thru' TQM at Deptt. level
LWX03201
Implementation of Improvement projects identified in the Position Report as per schedule
LWX03202
Preparation of action plan based on Position report
No. of days delayed from scheduled date
LWX03300
Accomplishment of targets of Unit/NC/Function/Department level Balance Score Card
Balanced Scorecard Rating (5/4/3/2/1)
LWX03400
Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports etc. furnished within specified time (2 weeks)
LWX03500
Completion of KM Projects as per schedule
LAW / LEGAL FUNCTION KRA MASTER - 2006-07Source of Data for Measurement
N N H X H
N N H H H
N N H H H
N N H H H
N N H H H
N N H H H
N N H H H
N N H H H Concerned Unit/ Department.
N N H H H Case files
N N H H H Records of meetings
Y N M M H
N N M M M Completion of assignment
N N H H H
Y N M M M
N N H H H
N N H H H
Special KRA (Y/N)
Universal KRA (Y/N)
Suggested Weightage for category A
B C
Concerned Unit/ Department from whom references are received
Concerned Unit/ Department from whom references are received
Concerned Unit/ Department from whom references are received
Concerned Unit/ Department from whom references are received
Concerned Unit/ Department from whom references are received
Concerned Unit/ Department from whom references are received
Concerned Unit/Department/ advocates engaged.
Concerned Units\Departments.
Activity Chart for Meetings in line with Secretarial Standards & Companies Act.Secretarial Standards / provisions of Companies Act & Listing Agreement.
N N H H H
Y N H H H
N N H M H
N N H H H
Y N H H H
N N H H H
Y N H H H Provisions of Listing agreement
N N H H H
N N H H H Legal provisions
N N H H H
Y N H H H
Secretarial Standards / provisions of Companies Act & Listing Agreement.
21 clear days as per Companies Act
Within 30 days after the concerned meeting in compliance with the statutory provisions provided under Companies Act.
As per the provisions of Companies Act
As per the provisions of Companies Act and SEBI Rules & Regulations.
Within the stipulated time as per listing agreement
Listing agreement & SEBI requirement
Provisions of Depository Laws and Business rules of NSDL & CDSL
Provisions of Companies Act & Listing Agreement
N N H M M
N Y M L L
N Y M L L
Y Y L M H
N Y M M M
Y Y X M H
Y N H H H
Y N H H H
Y N H H H
Y N H H H
Questionairre to be designed and feedback taken from Director's & ED's (at least 10)
Y N H H H
N Y M L L
N Y M L L
Y Y H M L
N Y M X X Survey Report
N Y M X X Unit QA/QC
N Y H X X Quality Deptt.
N Y X M M Project report
Y Y X M X Action plan document
N N H H X
Y M L L Record maintained by Audit deptt.
Y X M H Project report
Record maintained by individual/ deptt.
Record maintained by Unit/Corp. Finance deptt.
Record maintained by Unit Head/Unit P&D
Rating declared at year end by Corporate / Unit Management
LAW / LEGAL FUNCTION KRA MASTER - 2006-07KRA Remarks
-
-
All activities relating to implementation of companies act and coordination of
-
-
-
"1. Forms / Returns from the Directors. 2. Board / AGM Resolutions."
To be prepared based upon Secretarial records & factual information relating to Board / BLAC etc.
"a) Forms / Returns from the Directors b) Finance data from Corporate Finance c) Board agenda & minutes."
RTA is required to provide the data.
Information from all the Units / Divisions / Departments
RTA is required to provide the data.
1. Finance dept. in arranging funds for distribution of dividend. 2. RTA
-
Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1
Questionnaire developed by CQA to be adopted .
This KRA will be taken by Head of Unit /Function / Department , if