12
REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE NO. 3 BULACAN 1ST DISTRICT ENGINEERING OFFICE Tikay, City of Malolos, Bulacan C.Y. 2021 PROJECT DETAILED ENGINEERING DESIGN PLAN FOR CONSTRUCTION OF MULTI - PURPOSE BUILDING (SENIOR CITIZEN BUILDING) at BARANGAY BABATNIN, MALOLOS , BULACAN MALOLOS CITY, BULACAN SUBMITTED: DATE: APPROVED: HENRY C. ALCANTARA OIC-DISTRICT ENGINEER DATE: RECOMMENDED: ARISTOTLE B. RAMOS ASSISTANT DISTRICT ENGINEER DATE: NORBERTO L. SANTOS CHIEF, DESIGN and PLANNING SECTION Annex "B - 1"

CONSTRUCTION OF MULTI - PURPOSE BUILDING (SENIOR … · 2021. 1. 24. · combined footing detail schedule of footing tb - 1 detail. fin. floor line. t d. nat. grd. ln. l l. x - bars

  • Upload
    others

  • View
    31

  • Download
    0

Embed Size (px)

Citation preview

  • REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    C.Y. 2021 PROJECT

    DETAILED ENGINEERING DESIGN PLAN FOR

    CONSTRUCTION OF MULTI - PURPOSE BUILDING (SENIOR CITIZEN BUILDING)

    at BARANGAY BABATNIN, MALOLOS , BULACAN

    MALOLOS CITY, BULACAN

    SUBMITTED:

    DATE:

    APPROVED:

    HENRY C. ALCANTARA

    OIC-DISTRICT ENGINEER

    DATE:

    RECOMMENDED:

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, DESIGN and PLANNING SECTION

    Annex "B - 1"

  • SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    PERSPECTIVE VIEW

    SITE DEVELOPMENT PLAN

    VICINITY MAP

    TABLE OF CONTENTS

    MARK LESTER S. CASTRO

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACANOIC, DISTRICT ENGINEER

    DATE:

    ROJEANE ANN R. DE LEON

    ENGINEER I

    PAUL JAYSON F. DUYA

    ENGINEER II

    MECHANICAL

    ELECTRICAL

    SANITARY

    STRUCTURAL

    ARCHITECTURAL

    LINE and GRADE

    LAND USE and ZONING

    TABLEOF

    CONTENTS

    REPUBLIC OF THE PHILIPPINES

    OFFICE OF THE CITY / MUNICIPALENGINEERING / BUILDING OFFICIAL

    DISTRICT / CITY / MUNICIPALITY

    A - 1 PERSPECTIVE VIEW

    SUMMARY OF QUANTITIES

    SITE DEVELOPMENT PLAN

    VICINITY MAP

    TABLE OF CONTENTS

    A - 2 GROUND FLOOR PLAN

    SECOND FLOOR PLAN

    FRONT ELEVATION

    REAR ELEVATION

    SCHEDULE OF FLOOR FINISHES

    A - 3 LEFT SIDE ELEVATION

    RIGHT SIDE ELEVATION

    SCHEDULE OF DOORS & WINDOWS

    STAIR DETAILS

    A - 4 REFLECTED CEILING PLAN

    PERSPECTIVE CEILING

    SECTION (CEILING)

    S - 1 FOUNDATION PLAN

    SCHEDULE OF COLUMN

    COMBINED FOOTING SECTION

    SCHEDULE OF FOOTING

    TB - 1 DETAIL

    S - 2 SECOND FLOOR FRAMING PLAN

    SCHEDULE OF BEAM

    TYPICAL BEAM DETAIL

    SCHEDULE OF SLAB

    TYPICAL SLAB DETAIL

    S - 3 GENERAL CONSTRUCTION NOTES

    S - 4 GENERAL CONSTRUCTION NOTES

    E - 1 GROUND FLOOR LIGHTING LAYOUT

    GROUND FLOOR POWER LAYOUT

    GENERAL NOTES

    SCHEDULE OF LOADS

    ELEC'L LEGEND

    PANEL BOARD DIAGRAM

    CIRCUIT BREAKER DIAGRAM

    P - 1 FLOOR WATER LAYOUT

    FLOOR PLUMBING LAYOUT

    LEGEND

    GENERAL PLUMBING NOTES

    DPWH PROJECT BILLBOARD

    COA PROJECT BILLBOARD

    BUNKHOUSE DETAIL

    PERSPECTIVE VIEW1

    A-1

    SCALE: NTS.

    SITE DEVELOPMENT PLAN2

    A-2

    SCALE: NTS.

    1

    11

    1

    A 4

    B A R A N G A Y R O A D

    S C H O O L H A L L W A Y

    VICINITY MAP3

    A-3

    SCALE: NTS.

    SUMMARY QUANTITIES

    BARANGAY HALL

    BABATNIN

    ELEMENTARY

    SCHOOL

    DAY

    CARE

    CENTER

    DATE: 01/19/2021

    DATE: 01/19/2021

    AutoCAD SHX TextTHE SITE

  • EL+ 625

    EL+ 600

    EL+ 3600

    A

    1

    B

    2

    3

    UP

    EL+ 1400

    EL+ 575

    DN

    3400

    1400

    2600

    16

    49

    26

    00

    52

    00

    10

    00

    10

    00

    20

    00

    2000

    UP

    95

    1

    A

    1

    B

    2

    3

    52

    00

    3400

    950

    FD

    60

    03

    00

    01

    20

    0

    F.F.L

    N.G.L

    00

    3600

    SECOND FFL.

    600

    60

    03

    00

    01

    20

    0

    F.F.L

    N.G.L

    00

    3600

    SECOND FFL.

    600

    A B

    A B

    FD

    SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    OIC, DISTRICT ENGINEER

    DATE:

    PAUL JAYSON F. DUYA

    ENGINEER II

    2

    11

    2

    A 4

    GROUND FLOOR PLAN

    SECOND FLOOR PLAN

    FRONT ELEVATION

    REAR ELEVATION

    SCHEDULE OF FLOOR FINISHES

    FF - 1

    SCHEDULE OF FLOOR FINISHES

    FF - 2

    60cm x 60cm CERAMIC UNGLAZED TILES

    FF - 3

    CEMENT FLOOR FINISH w/ WATER PROOFING

    30cm x30 cm CERAMIC UNGLAZED TILES

    GROUND FLOOR PLAN

    4

    A-1

    SCALE: 1:80mts.

    SECOND FLOOR PLAN

    5

    A-2

    SCALE: 1:80mts.

    150mm thk CHB WALL PLAIN

    PLASTER and PAINT FINISH

    150mm thk CHB WALL PLAIN

    PLASTER and PAINT FINISH

    FRONT ELEVATION6

    A-3

    SCALE: 1:80mts.

    REAR ELEVATION7

    A-4

    SCALE: 1:80mts.

    MARK LESTER S. CASTRO

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACAN

    ROJEANE ANN R. DE LEON

    ENGINEER I

    150mm thk CHB WALL PLAIN

    PLASTER and PAINT FINISH

    150mm thk CHB WALL PLAIN

    PLASTER and PAINT FINISH

    150mm thk CHB WALL PLAIN

    PLASTER and PAINT FINISH

    CONCRETE SUN BREAKER

    DATE: 01/19/2021

    DATE: 01/19/2021

    AutoCAD SHX TextFF-

    AutoCAD SHX Text1

    AutoCAD SHX TextD

    AutoCAD SHX Text1

    AutoCAD SHX TextD

    AutoCAD SHX Text2

    AutoCAD SHX TextFF-

    AutoCAD SHX Text3

    AutoCAD SHX Text1

    AutoCAD SHX TextW

    AutoCAD SHX Text2

    AutoCAD SHX TextW

    AutoCAD SHX TextFF-

    AutoCAD SHX Text2

  • MARK:

    TYPE:

    ALUMINUM GLASS DOOR w/ COMPLETE

    HARDWARE AND ACCESSORIES

    LOCATION:MAIN DOOR TOILET

    QUANTITY: 1 SET 1 SET

    FFL

    PVC DOOR w/ COMPLETE HARDWARES AND

    ACCESSORIES

    MARK:

    TYPE:

    LOCATION:

    QUANTITY:

    FFL

    ALUMINUM GLASS WINDOW (AWNING TYPE)

    w/ COMPLETE HARDWARES AND

    ACCESSORIES

    FRONT ELEVATION

    1 SET

    TOILETS

    1 SET

    2100

    900

    2100

    600

    2100

    400

    400

    400

    400

    2100

    ALUMINUM GLASS WINDOW (AWNING TYPE)

    w/ COMPLETE HARDWARES AND

    ACCESSORIES

    900

    33 2

    60

    03

    00

    01

    20

    0

    F.F.L

    N.G.L

    00

    3600

    SECOND FFL.

    600

    3 32

    60

    03

    00

    01

    20

    0

    F.F.L

    N.G.L

    00

    3600

    SECOND FFL.

    600

    600

    3000

    1200

    800

    900

    1000 2300 1200

    150

    1000

    SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    OIC, DISTRICT ENGINEER

    DATE:

    PAUL JAYSON F. DUYA

    ENGINEER II

    3

    11

    3

    A 4

    LEFT SIDE ELEVATION

    RIGHT SIDE ELEVATION

    SCHEDULE OF DOORS & WINDOWS

    STAIR DETAILS

    SCHEDULE OF DOORS & WINDOWS

    10

    A-3

    SCALE: 1:80mts.

    RIGHT SIDE ELEVATION

    9

    A-2

    SCALE: 1:80mts.

    STAIRS DETAILS

    11

    A-4

    SCALE: 1:80mts.

    MARK LESTER S. CASTRO

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACAN

    ROJEANE ANN R. DE LEON

    ENGINEER I

    150mm thk CHB WALL PLAIN

    PLASTER and PAINT FINISH

    150mm thk CHB WALL PLAIN

    PLASTER and PAINT FINISH

    150mm thk CHB WALL PLAIN

    PLASTER and PAINT FINISH

    150mm thk CHB WALL PLAIN

    PLASTER and PAINT FINISH

    TUBULAR RAILINGS

    50mm x 50mm

    TUBULAR RAILINGS

    50mm x 50mm

    LEFT SIDE ELEVATION8

    A-1

    SCALE: 1:80mts.

    CONCRETE SUN BREAKER

    DATE: 01/19/2021

    DATE: 01/19/2021

    AutoCAD SHX TextD

    AutoCAD SHX Text1

    AutoCAD SHX TextD

    AutoCAD SHX Text2

    AutoCAD SHX Text1

    AutoCAD SHX TextW

    AutoCAD SHX Text2

    AutoCAD SHX TextW

  • 5200

    3400

    C-1

    A

    1

    B

    2

    3

    CH = 2.60M

    C-1CH = 2.60M

    400

    400

    400400

    1200

    1200

    1200

    1200

    1200

    TYPICAL CEILING DETAIL

    SCHEDULE OF FINISHES

    C - 1

    4.5mm THK. FIBER CEMENT BOARD

    SUSPENDED ON METAL FRAME, PAINTED

    FINISH

    PRE FORMED

    WIRE CLIP

    PRIMARY CHANNEL

    4.5mm THK FIBER CEMENT

    BOARD

    (PAINTED FINISH) ON METAL

    FURRING CHANNELS @ 400mm

    O.C

    CEILING FURRING SECTION

    ROD SUSPENSION HANGER WITH ADJUSTMENT SPRING

    REFLECTED CEILING PLAN12

    A-1

    SCALE: 1:80mts.

    SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    OIC, DISTRICT ENGINEER

    DATE:

    PAUL JAYSON F. DUYA

    ENGINEER II

    4

    11

    4

    A 4

    REFLECTED CEILING PLAN

    PERSPECTIVE CEILING

    SECTION (CEILING)

    ROD SUSPENSION HANGER

    WITH ADJUSTMENT SPRING

    METAL DOUBLE FURRING CHANNEL (NAILER)

    12mm x 38mm x 5m x 0.8mm THK. @ 400mm O.C.

    METAL CARRYING CHANNEL (CEILING JOIST)

    12mm x 38mm x 5m x 0.8mm THK. @ 1200mm O.C.

    4.5mm THK FIBER CEMENT BOARD

    (PAINTED FINISH) ON METAL FURRING

    CHANNELS @ 400mm O.C

    13

    A-2

    PERSPECTIVE (CEILING)

    NOT TO SCALE

    14

    A-3

    NOT TO SCALE

    SECTION (CEILING)

    MARK LESTER S. CASTRO

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACAN

    ROJEANE ANN R. DE LEON

    ENGINEER I

    DATE: 01/19/2021

    DATE: 01/19/2021

  • 100mm thk. SLAB 100mm thk. SLAB

    52

    00

    3400

    A

    1

    B

    2

    3

    WF - 2

    TB - 1

    WF - 2

    WF - 2

    TB - 1

    TB - 1

    TB - 1

    C1 / CF1

    WF - 1

    WF - 1

    TB - 1

    TB - 1

    TB - 1

    C1 / CF1

    C1 / CF1

    WF - 2

    20

    00

    ELEVATION

    10mm Ø STIRRUPS SPACED AS SHOWN

    3 @ 50mm, 10@ 100mm REST @ 150mm

    FOOTING FOOTING

    1000

    TB - 1 DETAIL17

    S-3

    SCALE: 1:40mts.

    400

    SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    OIC, DISTRICT ENGINEER

    DATE:

    PAUL JAYSON F. DUYA

    ENGINEER II

    5

    11

    1

    S 4

    FOUNDATION PLAN

    SCHEDULE OF COLUMN

    COMBINED FOOTING DETAIL

    SCHEDULE OF FOOTING

    TB - 1 DETAIL

    FIN. FLOOR LINE

    T

    D

    NAT. GRD. LN

    L

    L

    W

    X - BARS

    Y - BARS

    X - BARS

    Y - BARS

    100mm thk. GRAVEL

    BEDDING

    75mm thk. CONCRETE

    COVER

    SCHEDULE OF FOOTING

    FOOTING

    MARK

    REINFORCEMENTREMARKS

    CF - 12300 300 9 - 16mmØ

    COMBINED

    FOOTING

    DEPTH

    (D)

    X - BARS

    FOOTING DIMENSIONS (mm)

    3400 1200

    LENGTH

    (L)

    WIDTH

    (W)

    TOPBOTTOM

    Y - BARS

    TOPBOTTOM

    2300 3002700 1200

    9 - 16mmØ 24 - 16mmØ

    CF - 29 - 16mmØ 9 - 16mmØ 19 - 16mmØ

    COMBINED

    FOOTING

    THICKNESS

    (T)

    24 - 16mmØ

    19 - 16mmØ

    MAIN BARS: 6 - 16mm Ø VERT. BARS

    TIES: 10mm Ø TIES SPACED @

    1 - 0.05m, 3 - 0.10m, 5 - 0.15m

    REST 200mm

    COVER: 40mm thk. CONCRETE COVER

    SCHEDULE OF COLUMN

    LEVEL

    GR

    OU

    ND

    F

    LO

    OR

    TO

    R

    OO

    F

    DE

    SC

    RIP

    TIO

    N

    C1

    M

    C

    T

    300

    300

    FOUNDATION PLAN15

    S-1

    SCALE: NTS.

    COMBINED FOOTING DETAIL16

    S-2

    SCALE: NTS.

    MARK LESTER S. CASTRO

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACAN

    ROJEANE ANN R. DE LEON

    ENGINEER I

    SLAB ON FILL 100mm thk.

    SLAB,10mm Ø TEMP. BARS

    SPACED @ 0.4m B.W.

    DATE: 01/19/2021

    DATE: 01/19/2021

  • 10mmØ @ 300 E.W BOTTOM BARS

    10mmØ @ 300 E.W TOP BARS

    10mmØ @ 300 E.W BENT BARS

    10mmØ @ 300 E.W BENT BARSL1

    L 1/3

    L1/6

    L 1/3 L 2/3L2

    L 1/5 L2/5

    GB - 1

    GB - 1

    GB

    - 1

    GB

    - 1

    GB

    - 1

    GB

    - 1

    GB - 2

    S-2

    5200

    3400

    A B

    2

    3

    2550

    2650

    S-2

    1

    L

    L/3 L/3

    3 @ 100, 3 @ 150, REST @ 200 O.C.

    TYPICAL STAIR DETAIL

    21

    S-4

    SCALE: 1:50mts.

    TYPICAL BEAM DETAIL

    19

    S-2

    SCALE: NTS

    250

    200

    1

    5

    0

    12mm Ø MAIN BARS

    12mm Ø MAIN BAR

    12mm Ø RSB SPACED @

    300mm

    12mm Ø RSB SPACED @

    300mm

    100

    100 300 100

    3 - 12mm Ø

    CONT. LONG

    BARS

    12mm Ø REBARS

    TYPICAL

    TY

    PIC

    AL

    SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    OIC, DISTRICT ENGINEER

    DATE:

    PAUL JAYSON F. DUYA

    ENGINEER II

    6

    11

    2

    S 4

    SECOND FLOOR FRAMING PLAN

    DETAIL OF STAIR BEAM

    SCHEDULE OF BEAM

    TYPICAL BEAM DETAIL

    SCHEDULE OF SLAB

    TYPICAL SLAB DETAIL

    SCHEDULE OF SLAB

    SLAB MARKSPACAING in mm.

    THICKNESS in mm.

    S - 1

    FLOOR LVL.

    1ST 100

    REMARKS

    ONE WAY SLAB

    w/ 500mm thk.

    embankment

    400

    REBAR SIZE

    10mm Ø

    S - 22ND 150 10010mm Ø TWO WAY SLAB

    SECOND FLR. FRAMING PLAN18

    S-1

    SCALE: NTS.

    SCHEDULE OF BEAM

    GB - 1

    GB - 2

    LEVEL MARK

    A B

    SIZE

    REBAR STIRRUPS

    TOP BOTTOM

    LEFT

    TOP BOTTOM

    MID SPAN

    TOP BOTTOM

    RIGHT

    300 400 16mm Ø

    16mm Ø 5 3 3 5 5 3300 400

    300 400 16mm ØTB - 1

    10mmØ 3 @ 50mm, 5 @

    100mm, rest @ 150mm

    2 2 3 3 23

    10mmØ 3 @ 50mm, 5 @

    100mm, rest @ 150mm

    10mmØ 3 @ 50mm, 5 @

    100mm, rest @ 150mm

    GR

    OU

    ND

    F

    LO

    OR

    3 3 3 3 3 3

    TYPICAL R.C. SLAB DETAIL

    20

    S-3

    SCALE: NTS

    MARK LESTER S. CASTRO

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACAN

    ROJEANE ANN R. DE LEON

    ENGINEER I

    DATE: 01/19/2021

    DATE: 01/19/2021

  • SHOWN IN FIG. B-2 UNLESS SPECIFIED ELSEWHERE.

    TWO STIRRUPS SHALL BE PROVIDED AT ALL SPLICES.

    BETWEEN TWO LAYERS OF BARS.

    5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES SHALL BE AS

    SPACED AT 1.0M ON CENTER. IN NO CASE SHALL THERE BE LESS THAN TWO (2) SEPARATORS

    UNLESS SPECIFIED IN PLAN. TOP BAR SHALL NOT BE SPLICED WITHIN THE COLUMN OR

    3. IF THE BEAM REINFORCING BARS END IN A WALL THE CLEAR DISTANCE FROM THE BAR TO

    4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USE 25mmØ BAR SEPARATORS

    WITHIN A DISTANCE TWICE THE MEMBER DEPTH FROM THE FACE OF THE COLUMN. AT LEAST

    BE AS SHOWN IN A TABLE 'A' FOR TENSION BARS AND TABLE 'B' FOR COMPRESSION BARSTHE FARTHER FACE OF THE WALL NOT BE LESS THAN 25mm. EMBEDMENT LENGTH SHALL

    ALLOWED TO BE SPLICED THEREIN.STRENGTH OF THE BAR. NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION ISWELDED SPLICES SHALL DEVELOP IN TENSION AT LEAST 125 % OF THE SPECIFIED YIELDOCCUR, SPLICES WHERE SO PERMITTED SHALL BE INDICATED IN THE TABLE 'A' AND 'B'.

    7. GENERALLY NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING STRESSES

    FORCING BAR SHALL BE SYMMETRICAL ABOUT CENTER LINE WHENEVER POSSIBLE.6. WHEN A BEAM CROSSES A GIRDER, REST BEAM ON TOP OF GIRDER BARS, BEAM REINF-

    SHOWN IN FIG. B-1.

    20mm FOR EVERY 3.0M OF FREE SPAN.

    2. TYPICAL BARS BENDING AND CUTTING DETAILS FOR BEAMS SHALL BE AS

    AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER BUT IN NO CASE LESS THAN FOR EVERY 4.50M OF SPAN , EXCEPT CANTILEVERS FOR WHICH THE CAMBER SHALL BE

    1. UNLESS , OTHERWISE NOTED IN PLANS, CAMBER ALL BEAMS AND GIDER AT LEAST 6mmØ

    LAPPED SPLICED IN MILLIMETERS

    NOTE : TOP PLAIN BARS , MULTIPLY VALUE BY 2

    28mm Ø

    25mm Ø

    20mm Ø

    16mm Ø

    12mm Ø

    32mm Ø

    BAR SIZE(DEFORMED)

    10mm Ø

    6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB (TWO ADJACENT DISCONTINUOUS

    4-Ø 12@ 1800 LONG TOP BARS BENDBARS MIN. OF 1,200 (4'-0") INTO BARS.

    DOWN INTO EDGE BEAM. EXTENDED

    TYPICAL CORNER SLAB DETAIL

    7. CONCRETE SLAB REINFORCEMENTS SHALL BE PROPERLY SUPPORTED WITH 10mmØ STEELCHAIR OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS

    EDGES) AS SHOWN BELOW.

    --------------------------------------------

    3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENTS SHALL BE 75mm CLEAR

    2. FOOTING SHALL REST AT LEAST 1500mm BELOW NATURAL GRADE LINE UNLESS OTHERWISE

    1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE SOIL BEARING PRESSURE OF 96

    FOR CONCRETE DEPOSITED THE GROUND AND 50mm FOR CONCRETE

    SOIL CONDITIONS UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE

    KPa ( 2000 psf). CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING, THE ACTUAL

    DEPOSITING CONCRETE.

    DEPOSITED AGAINST A FORMWORK.

    INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL.

    POURING FOR APPROVAL.

    8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THECONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE

    9. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS AND SHORINGS UNTIL THECONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH.

    ---------------------------------------------

    ---------------------------------------------

    -----------------------------------------

    IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING6. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS

    7. STRIPPING OF FORMS AND SHORES:

    SUSPENDED SLAB EXCEPT WHENADDITIONAL LOADS ARE IMPOSED

    COMPOUNDS OR OTHER APPROVED METHODS.

    COLUMNS

    FOUNDATION

    BEAMSWALLS

    -----------------------------

    600

    600

    600

    21 DAYS

    24 HRS.

    21 DAYS8 DAYS

    14 DAYS

    OPENING DET.

    OPENINGSLAB

    MID-DEPTH OF SLABØ12x1000 LONG AT

    AT EACH CORNER

    BARS UP TO BEAM SUPPORTIN TWO WAY SLAB EXTEND

    OPENING IS FRAMED BY BEAMOMIT TRIMMER BARS WHERE

    TYPICAL SLAB

    400

    4-Ø12 BOTT. BARS

    400

    BOTT. BARS1-Ø12 TOP &

    38mm CLEAR

    ALTERNATE BARS SHOULD BEAT ANY LEVEL NO MORE THAN

    TWO ADJACENT BARS SPLICESSPLICED. MIN. DISTANCE BET.

    AT MID SPAN

    EXTRA TOP BARS@ SUPPORT

    BOTTOM BARS

    REQ'D. BOTT. BARS @ SUPPORT

    TOP BARS @ SUPPORT (CONT.)

    TYP. DETAIL OF COL. LAP SPLICE& EXT. GIRDER TO COL. CONNECT.

    JT. R

    EIN

    F.

    SPLICE

    HA

    LF O

    F "

    H"

    WIT

    HIN

    CE

    NT

    ER

    L/4

    LAP SPLICE LENGTH:

    SHALL BE 600mm. ht

    D. NON-LOAD BEARING WALL PARTITIONS, BEDDED SLABS, FLOOR & ROOF SLABS,

    2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE WITH

    A. FOOTINGS, FOOTING BEAMS AND GIRDERS

    1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD STRENGTH OF REINFORCING BARS SHALL BE:

    ASTM A 706. BARS SMALLER THAN 10mm MAY BE PLAIN.

    B. COLUMNS AND SHEAR WALLS

    PARAPETS, CATCH BASIN, SIDE WALK.

    C. BEAMS AND GIRDER

    5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED

    WITH 10mm Ø AT 250mm O.C EACH WAY TO CENTER OF SLAB AND CONSTRUCTIONJOINTS FOR SAME SHALL NOT BE LESS THAN 3.65 METER APART

    2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS ELEVATED SLAB SHALL

    1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM

    4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION

    3. IF SLABS ARE REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED

    AND SHALL NOT BE LESS THAN 0.0025 x GROSS CROSS-SECTIONAL AREA (Ag) OF THE SLAB

    STRIPS SHALL NOT BE MORE THAN ONE AND A HALF (1 1/2) SLAB THICKNESSFOR REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMNBELOW THOSE ALONG THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN

    BE CUT AS FOLLOWS:

    THE TOP OF SLAB.

    SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE. W/ TABLE A & TABLE B (TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE

    3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE

    9. ALL RESULTS OF MATERIAL TESTING FOR CONCRETE, REINFORCING BARS, & STRUCTURALSTEEL MUST BE NOTED & APPROVED BY THE STRUCTURAL DESIGNER.

    APPROVAL BEFORE FABRICATION.

    7. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS,

    6. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE

    MISCELLANEOUS IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS

    SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.

    OF DRAINS ETC.

    BOTH THE STRUCTURAL ENGINEER AND THE ARCHITECT.

    THE STRUCTURAL PLANS, AND ARCHITECTURAL DRAWINGS, THE CONTRACTOR SHALL NOTIFY3. IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS, AND ELEVATIONS BETWEEN

    WITH THE LOCAL BUILDING CODE REQUIREMENT.

    CODE REQUIREMENTS FOR REINFORCED CONCRETE AND ALL STRUCTURAL STEEL WORK4. ALL CONCRETE WORK SHALL BE DONE IN ACCORDANCE WITH THE ACI.318 95 BUILDING

    5. ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC TO AMERICAN INSTITUTE OF STEEL

    ACCORDING WITH AISC SPECIFICATION (9th EDITION) IN SO FAR AS THEY DO NOT CONFLICT

    CONSTRUCTION AND ASTM TO AMERICAN SOCIETY FOR TESTING MATERIALS.

    HOPPERS TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT

    LING OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, BUCKETS OR

    4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS

    3. CONCTRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION. RE-HAND

    WHERE VIBRATIONS ARE EXTREMELY DIFFICULT TO ACCOMPLISH.UNLESS AUTHORIZED IN WRITING BY THE DESIGNERS AND ONLY FOR UNUSUAL CONDITIONS

    WHEELBARROWS, NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM

    EXCEED SIX (6) METERS IN AGGREGATE LENGTH.

    2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS.

    5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED &

    EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL,8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS,

    WHERE CONCRETE IS DEPOSITED

    BEAM STIRRUPS AND COLUMN TIES WHERE CONCRETE IS EXPOSED TOEARTH BUT POURED AGAINST FORMS

    ELECTRICAL, AND MECHANICAL DRAWINGS.

    SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.

    SLAB ON GRADE SUSPENDED SLABS

    DIRECTLY AGAINST EARTH

    WALLS ABOVE GRADE

    EIGHT (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS FOLLOWS.1. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY

    SLAB ON FILL

    ALL OTHERS, INCLUDINGSUSPENDED SLABS,

    BEAMS, SLABS

    COLUMNS

    LOCATIONAGGREGATE

    --------------------------------------

    MAX. SIZE OF

    20mm

    20mm

    20mm

    20mm

    ----------------------------------------

    -------------------------------------

    ---------------------------

    ----------------------------

    ----------------------------------

    28 DAYS STRENGTH

    4000 PSI (27.6 MPa)

    4000 PSI (27.6 MPa)

    4000 PSI (27.6 MPa)

    4000 PSI (27.6 MPa)

    75mm

    50mm

    MAX. SLUMP

    100mm

    100mm

    100mm

    100mm

    40mm

    40mm25mm

    20mm

    IN FLOOR SLABS, OPENINGS IN THE WALLS AND SLABS, INTERIOR PARTIONS, LOCATION2. IN REFERENCE TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS

    1. IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN ANDDISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES.

    SCHEDULE OF MINIMUM SLAB REINFORCEMENT

    10 mm Ø @ 225mm EACH WAY

    10 mm Ø @ 140mm EACH WAY

    10 mm Ø @ 150mm EACH WAY

    10 mm Ø @ 185mm EACH WAY

    10 mm Ø @ 250mm EACH WAY

    125 mm

    200 mm

    175 mm

    150 mm

    100 mm

    THICKNESS MINIMUM TEMPERATURE BARS

    fy = 227.5 MPa ( 33,000 psi )---------

    CONF

    . REI

    NF.

    SHALL NOT BE LESS THAN 100mm)(SPACING OF TIES ALONG THIS REGION

    TYPICAL COLUMN ELEV. SHOWINGDOWELS AND TIES SPACING

    DEEPEST BEAM THAT FRAME INTO FOUR

    CONDITIONS USE HOOPS @ "Sh" CENTERS.SIDES OF THE COLUMN. ALL OTHER

    FOR COL. BAR SPLICES SEE TABLEOF MIN. LAP SPLICE LENGTH OFCOLUMN REINFORCEMENT

    EDITION OF ACI DETAILING MANUAL DONE IN ACCORDANCE WITH THE LATEST

    ALL CONCRETE REINF. DETAIL SHOULD BE

    CONF

    . REI

    NF.

    CONF

    . REI

    NF.

    Sh

    NOTE:

    CONF

    . REI

    NF.

    Sh

    PE

    R S

    CH

    ED

    ULE

    ARE BEAMS HAVING WIDTH OF AT LEAST ONE-HALF THE COLUMN WIDTH & DEPTHS

    JOINT HOOP SPACE @ "2Sh" WHEN THERE

    NOT LESS THAN THREE QUARTERS OF THE

    H

    10d min.

    CROSS-TIE

    350m

    m. M

    AX

    .

    H

    fy = 275 MPa ( 40,000 psi )

    fy = 275 MPa ( 40,000 psi )

    fy = 275 MPa ( 40,000 psi )-------------------

    --------------

    ------

    b

    20 mm CLEAR FOR JOIST

    FIG. B-2

    40 mm CLEAR FOR BEAMSAND GIRDERS

    NOTE 1

    SEE NOTE

    SEE NOTE

    t

    WEB BARS

    0.025M Ø

    SEE NOTE

    SEPARATOR

    t

    D

    FIG. B-3

    MAIN REINFORCEMENT

    EACH SIDE OF SLEEVESPROVIDE 3-Ø10 EXTRA STIRR.

    TYP. DET. FOR SLEEVESTHRU CONCRETE BEAM

    t OR

    1/4

    D

    PIPES MAX. 1/5 DSLEEVES FOR UTILITY

    fc'= 27.6MPa(4000psi)fc'= 20.7MPa(3000psi)fc'= 27.6MPa(4000psi)fc'= 20.7MPa(3000psi) BAR SIZE

    12mm Ø

    16mm Ø

    20mm Ø

    25mm Ø

    28mm Ø

    32mm Ø

    10mm Ø

    FOR COLUMNS.VALUES GIVEN ABOVE CAN ALSO BE USED

    NOTE : TOP PLAIN BARS , MULTIPLY VALUE BY 2

    (DEFORMED)EMBEDMENT

    650

    550

    350

    300

    300

    850

    300

    EMBEDMENT LAPPED

    750

    600

    400

    300

    300

    950

    300

    400

    550

    800

    1000

    300

    1300

    300

    LAPPED

    1100

    400

    850

    500

    750

    300

    300

    EMBEDMENT

    325

    475

    550

    625

    250

    700

    200

    EMBEDMENT LAPPED

    350

    450

    700

    625

    550

    275

    225

    400

    500

    625

    675

    300

    775

    300

    LAPPED

    775

    675

    625

    500

    400

    300

    300

    EMBEDMENT LENGTHS ANDTENSION BARSTABLE 'A'

    LAPPED SPLICED IN MILLIMETERSEMBEDMENT LENGTHS AND

    COMPRESSION BARSTABLE 'B'

    D

    (SEE SCHEDULE BELOW)

    A

    1-Ø12EA.TOP&BOT.

    1-Ø12EA.TOP&BOT.

    L1/3

    L1/6

    L2/3TOP BAR

    BOTTOM BAR

    L1/3

    L1/5 L2/5

    L1

    BOTTOM BAR

    TOP BAR

    L2

    D

    L1

    2D

    L3/5L2/5L2/5

    2-Ø12mm SIDE BARS

    L2/3

    LAP SPLICES ARE ALLOWEDONLY IN THIS PORTION

    L2/32D

    L2

    2D 2DL3/3

    L3

    L3/6

    L3/32D

    BOTTOM BARS WEB BARS

    TOP BARS

    SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    OIC, DISTRICT ENGINEER

    DATE:

    ENGINEER II

    7

    11

    3

    S 4

    GENERAL CONSTRUCTION NOTES

    MARK LESTER S. CASTRO

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACAN

    ROJEANE ANN R. DE LEON

    ENGINEER I

    PAUL JAYSON F. DUYA

    DATE: 01/19/2021

    DATE: 01/19/2021

    AutoCAD SHX TextNOTES ON BEAMS AND GIRDERS

    AutoCAD SHX TextNOTES ON FOOTINGS

    AutoCAD SHX TextSECTION "A"

    AutoCAD SHX TextNOTES ON REINFORCEMENT

    AutoCAD SHX TextNOTES ON CONCRETE SLABS

    AutoCAD SHX TextTYPICAL BAR BENDING AND CUTTING DETAILS FOR SLABS

    AutoCAD SHX TextNOTES ON CONCRETE MIXES & PLACING

    AutoCAD SHX TextGENERAL NOTES

    AutoCAD SHX TextJOINT REINF.

    AutoCAD SHX TextD

    AutoCAD SHX TextJOINT REINF.

    AutoCAD SHX TextD

    AutoCAD SHX TextD

    AutoCAD SHX TextCOLUMN TIES AS

    AutoCAD SHX TextD

    AutoCAD SHX TextNOTES ON COLUMNS

    AutoCAD SHX TextFIG. B-1

    AutoCAD SHX Text1. PROVIDE EXTRA SETS OF TIES AT 100mm O.C. FOR TIED COLUMN REINFORCEMENT PROVIDE EXTRA SETS OF TIES AT 100mm O.C. FOR TIED COLUMN REINFORCEMENT ABOVE AND BELOW BEAM-COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF CONNECTION EQUAL TO THE GREATER OF THE OVERALL THICKNESS OF COLUMN, 1/6 THE CLEAR HEIGHT OF COLUMN OR 450mm. 2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST MONOLITHICALLY WITH THE CORE WITH THE MINIMUM THICKNESS OF 40mm AND NOT LESS THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS. 3. WHERE COLUMNS CHANGE IN SIZE, VERTICAL REINFORCEMENTS SHALL SHALL BE WHERE COLUMNS CHANGE IN SIZE, VERTICAL REINFORCEMENTS SHALL SHALL BE OFFSET AT A SLOPE OF NOT MORE THAN 1 IN 6 AND EXTRA 10mm TIES AT 100mm SHALL BE PROVIDED THRU OUT THE OFFSET REGION. 4. UNLESS OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR VERTICAL COLUMN UNLESS OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR VERTICAL COLUMN REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND THE SPLICE LENGTH SHALL NOT BE LESS THAN 40 BAR DIAMETERS. WELDING OR APPROVED MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES BETWEEN THESE WELDS OR SPLICES OF ADJACENT BARS IS NOT LESS THAN 600mm.

  • 3. TIES & CLOSE STIRRUPS MUST BE BENT AT 135°.

    DOOROPENING

    28mm Ø

    25mm Ø

    20mm Ø

    16mm Ø

    12mm Ø

    32mm Ø

    BAR SIZE(DEFORMED)

    10mm Ø

    STRUCTURAL ENGINEER.

    1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS OTHERWISE PERMITTED BY THE

    2. REINFORCEMENT PARCIALLY EMBEDED IN CONCRETE SHALL NOT BE FILLED BENT, EXCEPT

    AS SHOWN IN THE DESIGN DRAWINGS OR PERMITTED BY THE STRUCTURAL ENGINEER.

    1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE SHALL BE

    CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED. SHEAR KEY SHALL BE

    D/3

    D/3

    TYP. DET. OF LINTEL BEAM AT CHB WALL OPENING

    TYPICAL CONNECTION DETAIL OF MASONRY WALL

    200

    (DO

    WE

    L)

    400

    400

    (DO

    WE

    L)

    SECTION

    INTERSECTING R.C. COL. OR WALL

    (DOWEL)

    (DO

    WE

    L)

    FIN. FLR. LVL.

    BARS TYPICAL1-Ø16 VERT.

    ELEVATION

    OPENING

    200

    INTERSECTION WALL

    Ø10 STIRRUPS@ 150 O.C.

    CHB WALL

    (MIN) 200 (MIN)

    400

    2-Ø12 TOP BARS

    2-Ø12 BOTT. BARS

    FOR SIZE AND SPACINGOF HOR. & VERT. BARSSEE CONSTRUCTION NOTES

    DOWEL BARS TO MATCHCHB VERT. BARS

    Ø10mm @ 200mmØ10mm @ 200mmØ10mm @ 200mm

    OPENING OR END WALL

    400

    FOR SIZE AND SPACING

    12 THK. EXPANSION JOINT

    SEE CONSTRUCTION NOTES.

    SEE CONSTRUCTION NOTES.OF HOR. & VERT. BARS

    CORNER WALL

    CHB WALL

    WITH MASTIC FILLER

    1-Ø16 VERT. BARS

    12 THK. EXPANSION JOINT

    OF HOR. & VERT. BARSFOR SIZE AND SPACING

    3.40M3.70M4.00

    3.003.303.60

    20.0

    CHB WALL

    WITH MASTIC FILLER

    1-Ø16 VERT. BARS

    1-Ø161-Ø161-Ø20

    300300300

    1-Ø121-Ø121-Ø12

    12 THK. EXPANSION JOINT

    CHB HOR. BARSDOWEL BARS TO MATCH

    R.C. COLUMN OR WALL

    WITH MASTIC FILLER

    SEE CONSTRUCTION NOTES.

    CHB WALL

    OF HOR. & VERT. BARSFOR SIZE AND SPACING

    1-Ø16 VERT. BARS

    2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS OTHERWISE

    SHOWN OR DETAILED IN THE DRAWINGS.

    1. USE E70xx ELECTRODES FOR ALL MEMBERS WELDED.

    TYPICAL CHB FOOTING DETAILS

    Ø10 BOTT. BARS @ 300 O.C.3-Ø10 BARS (AS SHOWN)

    t=F

    OR

    SLA

    B

    TYPICAL DETAIL FOR BEAMOR SLAB CHANGE SOFFIT

    (min.)

    2t=FOR SLAB

    ( WHERE APPLICABLE )

    (min.) (min.)

    Ø10 BOTT. BARS @ 300 O.C.3-Ø10 BARS (AS SHOWN)

    DOWEL TO MATCHCHB VERT. BARS

    WHERE DEPRESSEDSLAB OCCURS

    DOWEL TO MATCHCHB VERT. BARS

    FIN. FLR. LVL.

    db

    550

    OF R.C. WALL AT CORNERSTYPICAL CONNECTION DETAIL

    550

    dbD

    TYP. SECTION OF MASONRYPARTITION REINFORCEMENTS

    FLR. SLAB OR BEAM

    SHALL BE REINFORCED AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW BLOCKS AND CERAMIC

    1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCKS

    2. PROVIDE 150mm x 300mm STIFFENER COLUMN REINFORCED WITH 4-12mm WITH 6mmØ TIES AT

    BLOCK REINFORCEMENT.

    12mmØ @ 600mm O.C.

    10mmØ @ 600mm O.C.

    10mmØ @ 600mm O.C.

    10mmØ @ 600mm O.C.

    OF CONCRETE HOLLOW BLOCK WALLS UNLESS NOTED IN STRUCTURAL PLANS.150mm ON CENTER WHERE CONCRETE HOLLOW BLOCK TERMINATES AND AT EVERY 3.0M LENGTH

    SCHEDULE OF CONCRETE HOLLOW BLOCK AND CERAMIC BLOCK REINFORCEMENT

    HORIZONTAL

    125 mm

    200 mm

    150 mm

    75 mm

    BLOCKTHICKNESS

    B. PROVIdE RIGHT ANGLED REINFORCEMENT

    Ø6mm @ 200mmØ6mm @ 200mm

    Ø6mm @ 200mmØ6mm @ 200mm

    R E I N F O R C E M E N T

    Ø6mm @ 200mm

    REINFORCEMENTS SHALL BE PROVIDED

    C. WHERE CHB OR CER. BLK. WALL DOWELSJOIN COL. R.C. BEAMS AND WALL DOWELS

    WITH THE SAME SIZE AS VERT. OR HOR.

    AT CORNERS 0.92M LONG

    A. MINIMUM LAPS AT SPLICE = 0.25M

    Ø10mm @ 200mm

    HEIGHT OF

    (MM)LINTEL

    1.60M

    (L+0.40M)

    TOTALLENGTH

    2.20M1.90M

    2.90M2.50M

    1.80M150M

    2.10M2.40M

    1.20M

    ("L")

    SPANCLEAR

    14.0

    17.0

    (MPa)

    MIN.fc'

    3.10M2.70M

    1-Ø121-Ø10

    200200

    1-Ø121-Ø12250

    250

    1-Ø101-Ø10

    1-Ø101-Ø10

    1-Ø10

    BOTTOM

    200

    TOP

    1-Ø10

    1-Ø16250 1-Ø12

    10mmØ @ 600mm O.C.

    10mmØ @ 600mm O.C.

    12mmØ @ 600mm O.C.

    10mmØ @ 600mm O.C.

    REINFORCEMENT

    VERTICAL

    STIRRUPS

    NOTES

    REINFORCEMENT UNLESS OTHERWISE INDICATED IN THE PLANS.1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL

    STAGGERED AT LEAST 1.50M.O.C.

    REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL EXCEPTFOR WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL BE PROVIDED, AND FOR EXPOSED FACES OF FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm CLEAR.

    NECESSARY STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL ENDS VERTICAL

    BE REINFORCED AROUND WITH 2-20mmØ BARS FOR 225mm, 200mm, 175mm, 150mm, USE2-16mmØ. FOR 125mm AND 100mm WALLS, USE 2-12mmØ BARS. ALL WALLS SPANNINGSHALL HAVE VERTICAL REINFORCEMENT BENT TO A U-FORM LIKE STIRRUPS AND SPACED

    2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES WHEN

    AND HORIZONTAL BARS SHALL BE SPLICED BY LAPPING A DISTANCE EQUAL TO 30 DIAMETERSAND WIRED SECURELY WITH 16 G.I. WIRE PROVIDED THAT SPLICES IN ADJACENT BARS ARE

    3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER SHALL

    ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED (SEE FIG.1)

    Ø10mm @ 250mm O.C.

    Ø10mm @ 200mm O.C.

    Ø12mm @ 250mm O.C.

    HORIZONTAL

    1-Ø16 CONT. HOR. BARS

    2. FOR REINFORCEMENTS SEE

    FOR MASONRY WALL REIN-SEE CONSTRUCTION NOTES

    FIN. FLR. LVL.

    NAT. GRD. LVL.

    FORCEMENTS (TYPICAL)

    CHB VERTICAL BARS

    Ø10 BOTT. BARS

    DOWEL BARS TO MATCH

    @ 300 O.C.

    3-Ø10 BOTT. BARS

    400

    (DO

    WE

    L)

    FOR FLOOR SLAB ONLY

    WITH CONCRETE GROUT.

    CONSTRUCTION NOTES.

    BARS SHALL BE FILLED

    4-Ø16 VERT. BARS

    550

    150mm

    125mm

    100mm

    CONTAINING REINFORCING 1. ALL JOINTS AND CELLS

    400

    (DO

    WE

    L)

    DOWEL BARS TOMATCH VERT. BARS

    WALLTHICKNESS

    4-Ø16 VERT. BARS

    550

    Ø10mm @ 300mm O.C.

    Ø10mm @ 250mm O.C.

    Ø12mm @ 300mm O.C. BARS STAGGERED OUT

    AT CENTERS VERTICAL

    HORIZONTAL BARS

    BARS

    VERT.BARS

    HORIZ.

    VERTICAL REMARKS

    VERTICAL SECTION

    PROVIDE THESE ADDITIONAL BARS FOR

    BAR SIZE

    10mm Ø

    (DEFORMED)

    12mm Ø

    16mm Ø

    20mm Ø

    25mm Ø

    (ALL GRADES)

    180° HOOK

    350

    230

    200

    450

    D+2db

    240

    150

    115

    95

    75

    300

    60

    125

    150

    200

    300

    100

    335

    75

    DIAMETER(mm)

    L

    175

    150

    125

    600

    250

    550

    300

    450

    200

    150

    90° HOOK

    L

    MAIN BAR END HOOKS

    D

    12db L

    (ALL GRADES)

    180° HOOKDIAMETER

    125

    165

    200

    250

    365

    40

    50

    65

    115

    150

    D+2db(mm)

    90° HOOK

    85

    115

    140

    165

    230

    L

    100

    115

    150

    300

    405

    L

    STIRRUP AND TIE HOOKS

    L

    D6db

    L1

    EQUAL TO THE NUMBER OF TERMINATED

    PLANS FOR SLAB OPENING LOCATION.

    SHOWN) PARALLEL TO SIDE OF OPENING

    SEE ARCHITECTURAL & MECHANICAL

    TYP. EXTERIOR WINDOW & DOOR OPENING

    4db or 65mm

    L

    D+

    2db

    ALL OPENINGS PLUS BARS (NOT

    BARS AT OPENING

    db

    L

    OPENINGWINDOWCLEAR

    38mm

    CONSTRUCTION JOINT DET.TYPICAL SLAB & BEAM

    NOTE:

    BEAM

    WITH ENGINEERS APPROVALSTRESS, PROVIDE SHEAR RODSWHERE JOINTS IS AT POINT OF

    (MIN.)(MIN.)

    30 BAR DIA.50

    D/3

    30 BAR DIA.

    D

    t/3

    t/3

    t/3

    MAIN REINFORCEMENTSTO BE CONTINUOUS

    Ø10x1000 LONG

    SLAB

    @ 300 O.C.

    40

    t

    CONTINUOUS (TOP & BOTT. BARS)MAIN REINFORCEMENTS TO BE

    WRITING BY THE STRUCTURAL ENGINEER.

    B. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY.

    A. ALL EMBEDED PIPES FOR UTILITIES, ETC. THAT PASS THRU BEAMS SHALL NOT EXCEED 100mm

    1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS STRUCTURE SHALLCOMPLY WITH ALL THE PERTINENT PROVISION OF AISC SPECIFICATION FOR THE DESIGN,

    FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDING LATEST EDITION.

    3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE MEMBERS CONNECTED.

    OTHERWISE INDICATED.2. ALL STRUCTURAL STEEL SHAPES SHALL CONFORM TO ASTM A36 STRUCTURAL STEEL UNLESS

    4. UNLESS OTHERWISE SPECIFIED ALL WELDING RODS SHALL CONFORM AWS E60 ELECTRODES.

    IN DIAMETER OR 1/3 BEAM DEPTH WHCHEVER IS LESS, UNLESS OTHERWISE APPROVED IN

    C. NO PIPES SHALL BE EMBEDED IN COLUMNS.

    PROVIDED AT THE JOINT.

    5. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS.

    SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    OIC, DISTRICT ENGINEER

    DATE:

    PAUL JAYSON F. DUYA

    ENGINEER II

    8

    11

    4

    S 4

    GENERAL CONSTRUCTION NOTES

    MARK LESTER S. CASTRO

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACAN

    ROJEANE ANN R. DE LEON

    ENGINEER I

    DATE: 01/19/2021

    DATE: 01/19/2021

    AutoCAD SHX TextNOTES OF STIRRUPS

    AutoCAD SHX TextNOTES ON CONSTRUCTION JOINTS IN CONCRETE

    AutoCAD SHX TextD=FOR BEAM

    AutoCAD SHX TextNOTES ON WELDS

    AutoCAD SHX Text250

    AutoCAD SHX TextVERIFY DEPRESSION

    AutoCAD SHX TextD=FOR BEAM

    AutoCAD SHX Text30 BAR DIA.

    AutoCAD SHX Text30 BAR DIA.

    AutoCAD SHX Text400

    AutoCAD SHX Text30 BAR DIA.

    AutoCAD SHX Text400

    AutoCAD SHX Text300

    AutoCAD SHX Text(TYP.)

    AutoCAD SHX Text400

    AutoCAD SHX TextDOWEL

    AutoCAD SHX Text400

    AutoCAD SHX Text300

    AutoCAD SHX Text(TYP.)

    AutoCAD SHX Text400

    AutoCAD SHX TextDOWEL

    AutoCAD SHX Text250

    AutoCAD SHX TextVERIFY ARCHITECTURAL

    AutoCAD SHX TextVARIES

    AutoCAD SHX Text600 (MIN.)

    AutoCAD SHX TextNOTES ON CONCRETE HOLLOW BLOCK WALLS

    AutoCAD SHX TextREINFORCING CONCRETE LINTEL BEAM IN

    AutoCAD SHX TextLINTELS IN BLOCK WALLS

    AutoCAD SHX TextCONCRETE BLOCK WALLS

    AutoCAD SHX TextNOTES ON CONCRETE WALLS

    AutoCAD SHX Text250

    AutoCAD SHX TextREINFORCEMENT

    AutoCAD SHX Text180%%D END HOOKS

    AutoCAD SHX Text90%%D END HOOKS

    AutoCAD SHX Text90%%D HOOKS

    AutoCAD SHX Text135%%D HOOKS

    AutoCAD SHX TextNOTES ON STRUCTURAL STEEL

    AutoCAD SHX TextNOTES ON EMBEDED PIPES

  • 1LPP

    Sa

    Sa

    Sa

    Sa

    Sa

    52

    00

    A

    1

    B

    2

    3

    3400

    20

    00

    2LPP

    3LPP

    52

    00

    A

    1

    B

    2

    3

    3400

    20

    00

    SCHEDULE OF LOADS

    PANEL NAME : LPP

    CKT. NO. LOAD DESCRIPTION

    NO. OF

    OUTLETS

    VOLTS

    LOAD (VA)

    AMPERE

    CIRCUIT

    BREAKER

    FEEDER SIZE CONDUIT SIZE AND TYPE

    1 LIGHTING OUTLET 5 230 500 1.74 15 2- 3.5mm

    2

    THHN + 2 3.5mm

    2

    TW 20 mm Ø PVC PIPE

    2 6 230 2160 9.39 20 2- 3.5mm

    2

    THHN + 2 3.5mm

    2

    TW 20 mm Ø PVC PIPE

    31.0HP ROOM ACU, 230V, 8A

    1 230 1840 8 30 2- 3.5mm

    2

    THHN + 2 3.5mm

    2

    TW 20 mm Ø PVC PIPE

    CONNECTED LOAD (VA) = 4,500

    VA

    I

    T

    = 4,500 +25% (8)

    ( 230 V)

    = 19.57A + 2A

    = 21.57 AMPERES

    Idf @ 80% df = 17.26 AMPERES

    FEEDER SIZE

    USE: 2 - 8.0mm

    2

    THHN STRANDED COPPER WIRE

    1 - 5.5mm

    2

    TW(G) STRANDED COPPER WIRE

    IN 25mm Ø RSC PIPE

    1 - 40AT CIRCUIT BREAKER

    CONVENIENCE OUTLET

    ELECTRICAL LEGEND

    SYMBOL DESCRIPTION QTY.

    PANEL BOARD (LPP)

    1

    SERVICE METER 1

    1 x 40 WATTS FLUORESCENT LAMP 1

    LIGHTING RECEPTACLE w/ 23W, 230V,

    CFL

    4

    DUPLEX CONVENIENCE OUTLET 6

    ACU OUTLET 1

    ONE GANG SWITCH 5

    SERVICE ENTRANCE 1

    CIRCUIT HOMERUN 3

    CIRCUIT BREAKER, RATING AS

    INDICATED

    4

    SWITCH LOCATION 4

    RACEWAY CONDUIT, CONCEALED IN

    CEILING / UNDER FLOOR

    RACEWAY CONDUIT CONCEALED IN

    WALL

    M

    Sa

    #LPP

    SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    GROUND FLOOR LIGHTING LAYOUT

    GROUND FLOOR POWER LAYOUT

    GENERAL NOTES

    SCHEDULE OF LOADS

    ELEC'L LEGEND

    PANEL BOARD DIAGRAM

    CIRCUIT BREAKER DIAGRAM

    PELAGIO D. DELA CRUZ

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    OIC, DISTRICT ENGINEER

    DATE:

    PAUL JAYSON F. DUYA

    ENGINEER II

    GENERAL NOTES:

    1. ALL ELECTRICAL WORKS SHALL COMPLY WITH

    THESE PLANS AND SPECIFICATION. THE

    APPLICABLE PROVISIONS OF THE LATEST EDITION

    OF THE PHILIPPINE ELECTRICAL CODE (PEC). THE

    RULES AND REGULATIONS OF THE LOCAL

    ENFORCING AUTHORITY AND THE REQUIREMENTS

    OF THE LOCAL POWER COMPANY.

    2. THE ELECTRICAL SERVICE POWER SHALL BE

    1-PHASE, 2WIRE, 230 VOLTS AC,60 Hz.

    3. WIRING METHOD SHALL BE AS FOLLOWS:

    RIGID STEEL CONDUIT OR POLYVINYL CHLORIDE

    CONDUIT SCHEDULE 40 SHALL BE USED AS

    SPECIFIED IN THE PLAN.

    4. ALL WIRES SHALL BE COPPER AND

    THERMOPLASTIC INSULATED TYPE "THHN" UNLESS

    OTHERWISE INDICATED IN THE PLAN,THE MINIMUM

    SIZE WIRE FOR POWER AND LIGHTING CIRCUIT

    HOMERUNS SHALL BE 3.5mm² AND INSULATED FOR

    600VOLTS. LIKEWISE, ALL CONDUCTORS SHALL BE

    COLOR-CODED. SMALLEST RACEWAY SHALL BE

    15mm Ø (NOMINAL).

    5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE

    NO. 16 DEEP TYPE

    6. ALL MATERIALS TO BE USED SHALL BE BRAND

    NEW AND APPROVED FOR THE PARTICULAR

    LOCATION AND USAG

    7. EQUIPMENT GROUNDING SYSTEM SHALL BE

    APPROVED TO THE ELECTRICAL SYSTEM AS PER

    PHILIPPINE ELECTRICAL SYSTEM AS PER

    PHILIPPINE ELECTRICAL CODE REQUIREMENT.

    8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE

    AS FOLLOWS:

    a. LIGHT SWITCH......................1.20m ABOVE FINISH FLOOR

    b. CONVENIENCE OUTLET.......0.30m ABOVE FINISH FLOOR

    c. PANEL BOARD.......................1.50m ABOVE FINISH FLOOR

    9. ALL ELECTRICAL WORKS SHALL BE DONE UNDER

    THE DIRECT AND IMMEDIATE SUPERVISION OF A

    DULY REGISTERED ELECTRICAL ENGINEER

    FLOOR PLAN

    SCALE: 1:100mts.

    23

    E-2

    POWER LAYOUT

    9

    11

    1

    E 1

    FLOOR PLAN

    SCALE: 1:100mts.

    22

    E-1

    LIGHTING LAYOUT

    SCHEDULE OF LOADS

    40 AT

    M

    2 - 8.0mm2 THHN COPPERWIRE1 - 5.5mm2 TW (G) in25mm Ø PVC PIPE

    GROUND TERMINAL BLOCK

    16mm Ø x 2.40m COPPER WELD GROUNDROD WITH HEAVY DUTY CLAMP

    LPP

    2 - 8.0mm2 THHN COPPER WIRE1 - 5.5mm2 TW (G) in

    25mm Ø RSC PIPE

    LIGHTING OUTLET 1ACU 3

    2 CONVENIENCEOUTLET

    15 AT 20 AT

    30 AT

    FINISHED GRADE LEVEL

    GROUND FLOOR LEVEL

    "LPP"

    SINGLE ENTRANCE:Single Phase, 2 wire,230 volts, 60 hz.

    16mm Ø x 2.40m COPPER GROUND RODW/ HEAVY DUTY CLAMP

    BUILD

    ING

    LINE

    1 - 8.0mm2 TW wire in 25 mm Ø PVC PIPE

    2 - 8.0mm2THHNin 1 - 5.5mm2 TW (G)in 25mm Ø PVC PIPE

    2 - 8.0mm2THHNin 1 - 5.5mm2 TW (G)

    in 25mm Ø PVC PIPE

    ELEC'L RISER DIAGRAM

    PANEL BOARD DIAGRAM

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACAN

    ROJEANE ANN R. DE LEON

    ENGINEER I

    DATE: 01/19/2021

    DATE: 01/19/2021

    AutoCAD SHX Text5.00

    AutoCAD SHX Text1728.00

  • 5200

    3400

    TAP

    TO E

    XIST

    ING

    WAT

    ER LI

    NE

    WC

    LAV

    A B

    1

    2

    3

    5200

    3400

    CONN

    ECT

    TO E

    XIST

    ING

    SEPT

    IC T

    ANK

    WC

    FD

    LAV

    A B

    1

    2

    3

    2000

    2000

    PLUMBING LEGEND:

    WATER METER

    WATER CLOSETWC=

    M=

    FAUSETFAU=

    CLEAN OUTCO=

    GATE VALVEGV=

    =

    POLYVINYL CHLORIDE VENT PIPE50mm Ø PVC VP=

    POLYVINYL CHLORIDE VENT PIPE75mm Ø PVC VP=

    =

    DOWNSPOUT=

    CATCH BASINCB=

    18mm Ø PVC CWL

    12mm Ø PVC CWL

    POLYVINYL CHLORIDE COLD WATER LINE

    POLYVINYL CHLORIDE COLD WATER LINE

    CHECK VALVECV=

    FLOOR DRAINFD=

    LAVATORYLAV=

    DS

    POLYVINYL CHLORIDE SOIL PIPE100mm Ø PVC VS=

    PROVISIONS OF THE PHILIPPINE PLUMBING CODE,

    COORDINATE THE DRAWINGS WITH OTHER RELATED

    ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF

    ALL PLUMBING WORKS INCLUDED HEREIN

    RULES AND REGULATIONS OF THE LOCALITY.

    GENERAL PLUMBING NOTES :

    MANUFACTURER'S RECOMMENDATIONS.

    CONTACT WITH THE SOIL SHALL BE PROVIDED

    WRAPPED WITH JUTE CLOTH AND SOAKED

    WORK WITH THE SEWER AND STORM DRAINAGE

    THE CONTRACTOR SHALL VERIFY ALL EXISTING

    WATER LINE SERVICE/CONNECTING POINT.

    CHAMBER MADE OF CAPPED VERTICAL

    SIZED IN ACCORDANCE WITH THE

    EXECUTION OF PLUMBING WORKS SHALL BE

    ANY RELOCATION REQUIRED FOR PROPER

    ELEVATION OF ALL EXISTING PIPES AND

    PROPOSED SANITARY UTILITIES SHALL CONFORM

    ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL

    ALL BRANCHES OF FIXTURE OR GROUP OF

    24 HOURS BEFORE BURIED OR COVERED.

    ALL WATER LINES SHALL BE HYDROSTATICALLY

    MINIMUM UNLESS OTHERWISE SPECIFIED.

    MILLIMETERS (mm) UNLESS OTHERWISE SPECIFIED.

    09.

    08.

    AND/OR THE ARCHITECT.

    07.

    05.

    03.

    04.

    02.

    01.

    SHALL BE EXECUTED IN ACCORDANCE WITH THE

    THE NATIONAL BUILDING CODE AND THE

    DRAWING SPECIFICATIONS. THE ENGINEER AND/OR

    ANY OTHER DISCREPANCIES FOUND

    ALL PIPES SHALL BE INSTALLED AS INDICATED.

    WITH PROPER APPROVAL FROM THE ENGINEER

    STRUCTURES AS VERIFIED BY THE CONTRACTOR.

    TO THE ACTUAL LOCATION, DEPTH AND

    MAINTAIN A ONE-PERCENT (1%) SLOPE

    WATER SUPPLY PIPES TO FIXTURES SHALL BE 06.

    EXTENSION PIPE NIPPLE.

    FIXTURES SHALL BE PROVIDED WITH AIR

    WITH TWO (2) COATS OF ASPHALT AND

    IN MELTED ASPHALT.

    ALL GALVANIZED IRON PIPES DIRECTLY IN

    TESTED AT 120 P.S.I. FOR A PERIOD OF

    LINE, EFFLUENT DISPOSAL POINT AND THE

    UTILITIES AT THE SITE AND COORDINATE THE

    ALL PIPES AND OTHER DIMENSIONS ARE IN 10.

    SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    OIC, DISTRICT ENGINEER

    DATE:

    PAUL JAYSON F. DUYA

    ENGINEER II

    10

    11

    1

    P 1

    FLOOR WATER LAYOUT

    FLOOR PLUMBING LAYOUT

    LEGEND

    GENERAL PLUMBING NOTES

    FLOOR WATER LAYOUT

    SCALE: 1:80mts.

    24

    E-1

    FLOOR PLUMBING LAYOUT

    SCALE: 1:80mts.

    25

    E-2

    MARK LESTER S. CASTRO

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACAN

    ROJEANE ANN R. DE LEON

    ENGINEER I

    DATE: 01/19/2021

    DATE: 01/19/2021

  • CONSTRUCTION OF (Name of Project and Location)

    CONTRACTOR :

    DATE STARTED :

    CONTRACT COMPLETION DATE :

    CONTRACT COST :

    CONSTRUCTION CONSULTANT :

    IMPLEMENTING OFFICE :

    SOURCE OF FUND :

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    Text 2920 or call (02) 165-02 for any concern on this project

    www.dpwh.gov.ph

    1200

    50 X 50 WOODEN STAKE

    1000

    500

    1000

    DISPLAY AREA

    50 x 50 HORIZONTAL

    COCO LUMBER

    GROUND

    LEVEL

    50 x 75 VERTICAL

    COCO LUMBER

    GROUND

    LEVEL

    DISPLAY AREA

    (1200 X 2400 X 12

    MARINE PLYWOOD)

    1200

    1000

    500

    GROUND

    LEVEL

    DISPLAY AREA

    (TARPAULIN ON 1200 X 2400 X 5

    MARINE PLYWOOD

    1200

    1000

    500

    50 x 50

    HORIZONTAL

    COCO LUMBER

    50 x 75 VERTICAL

    COCO LUMBER

    50 x 50 WOODEN

    STAKE

    24002400

    TYPICAL FRAME

    ELEVATION

    FRONT ELEVATION

    (OPTION 1)

    FRONT ELEVATION

    (OPTION 2)

    4

    5

    °

    BILLBOARD

    EDGE OF ROAD

    TRAFFIC DIRECTION

    ROAD

    ORIENTATION

    BILLBOARD FRAME

    (NOT TO SCALE, ALL DIMENSIONS ARE

    IN MILLIMETERS)

    DPWH Project

    Billboard

    2" X 2" X 8' COCO LUMBER SPACE @ 0.60m

    G.I. CORRUGATED SHEET

    1

    4

    THK ORDINARY PLYWOOD

    FLOOR PLAN FRONT ELEVATION

    DETAILED PLAN LEFT SIDE ELEVATION

    1

    4

    THK ORDINARY PLYWOOD

    G.I. CORRUGATED SHEET

    BUNKHOUSE PLAN

    SCALE: NTS

    SCALE: NTSSCALE: NTS

    SCALE: NTS SCALE: NTS

    Department of Public Works and Highways

    Bulacan First Distric Engineering Office

    Tikay City of Malolos, Bulacan

    Project:

    Location:

    Implementing Agency/ies:

    Development Partner/s:

    Contractor/Supplier:

    Brief Description of Project:

    Project Details:

    Cost:

    Fund Source/s:

    For particular or complaints about this project, please contact

    the Regional Office or Cluster which has audit jurisdiction on

    this Project:

    COA Regional Office No./Cluster:

    Address:

    Contact No.:

    Project Date Project Date

    Remarks

    Duration Started

    Target

    Date of

    Completion

    Percentage

    of

    Completion

    As of

    (Date)

    Cost

    Incurred

    to Date

    Date

    Completed

    COA Project

    Billboard

    SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

    DATE:

    REVIEWED:DRAFTED:

    PREPARED:

    SHEET CONTENTS:PROJECT NAME AND LOCATION:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    REGIONAL OFFICE NO. 3

    BULACAN 1ST DISTRICT ENGINEERING OFFICE

    Tikay, City of Malolos, Bulacan

    DPWH PROJECT BILLBOARD

    COA PROJECT BILLBOARD

    BUNKHOUSE DETAIL

    11

    ENGINEER II, PLANNING AND DESIGN

    ARISTOTLE B. RAMOS

    ASSISTANT DISTRICT ENGINEER

    DATE:

    NORBERTO L. SANTOS

    CHIEF, PLANNING AND DESIGN

    DATE:

    HENRY C. ALCANTARA

    OIC, DISTRICT ENGINEER

    DATE:

    PAUL JAYSON F. DUYA

    ENGINEER II

    11

    1

    M 1

    2.40

    6.00

    2.00

    6.00

    6.00

    2.40

    6.00

    MARK LESTER S. CASTRO

    CONSTRUCTION OF MULTI - PURPOSE BUILDING

    (SENIOR CITIZEN BUILDING) AT

    BARANGAY BABATNIN, MALOLOS, BULACAN

    ROJEANE ANN R. DE LEON

    ENGINEER I

    DATE: 01/19/2021

    DATE: 01/19/2021