Prepared by:Eng. Abdul Rasool H. Nouri General Manager
Plant on Jebal Ali Free Zone South on Plot # 20909
Tel : 00971 4 8865551Dir : 00971 4 8865553Fax: 00971 4 8865552E-mail: [email protected]
Introduction to Gulf Petro GasEntry/ Exit Procedures at GPG Plant
•Communicate your arrival time to concerned GPG staff prior arrival.
•Ring bell & identify yourself upon request.
•Automatic door lock shall be opened from switch at office.
•Register details in Visitor log Book at reception upon entry/exit.
•Site Induction Training shall be given recorded & registered.
Operation GPG plant – Organization ChartOperation GPG plant – Organization Chart
GM Eng. Abdul Rasool Nouri
Plant Ops Manager Ahmed Abood
Plant administrator Jackuilin
Plant Supervisor NoorNabi
OperatorHarun
OperatorMohd
OperatorFabi
OperatorKumar
OperatorSasi
OperatorSaleem
QC/lab in chargeJenivas
AccountantFaris
CoordinatorEmran
GPG Plant - Facility Details & Volumes Cap.GPG Plant - Facility Details & Volumes Cap.
*Area *Area 8200 sq. mtrs8200 sq. mtrs
*Facilities*Facilities Bitumen Storage Bitumen Storage –– 3.5 KT 3.5 KT Truck Loading Gantry Truck Loading Gantry ––3 Nos3 Nos Output points- 5 NosOutput points- 5 Nos LaboratoryLaboratory Maintenance BlockMaintenance Block Road Bitumen Tanker -25NosRoad Bitumen Tanker -25Nos Weighbridge – 100 TonesWeighbridge – 100 Tones Heating system Heating system
*Volumes Planned for YR.2009*Volumes Planned for YR.2009 Bitumen 60 KtBitumen 60 Kt
MAINT. BLOCK ROAD TANKERS
HEATING SYSTEM Truck Loading Gantry
Weighbridge
General Overview – Plant Facilities
•Office Block:•toilet•emergency exits
•Canteen Block•Guardhouse:
•security checks•entry passes
•Loading Gantry:•Bitumen
•Tank Farms:•Bitumen
Office BlockTank Farms
Bitumen Road Tankers Laboratory and canteen
Bitumen Cargo ( by vessel ) having
quality certificate from origin
Drown random samples for quality reconfirmation
by third party
Meets spec YesVessel Discharge
Via Loading gantry
Into road tankers
No
Rejected
GM
(recovery Plan)
Trucks receipt at
GPG plant
Bitumen trucks discharged
into GPG’s storages
GPG’s quality reconfirmation
Sales throughputs measured by GPG’s weighbridge
GPG’s Operation DiagramGPG’s Operation Diagram
General Overview – Plant Facilities
Laboratory and canteen
Gpg Office block
Heating sys. And pump station
45 T road tankers