    PICCARDY PLACE DEVELOPMENT

    Hotel and Retail Stores Development

    Eftychia Parisi

    Group 5

    Reg. Number : 085077999

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    2/13

    Introduction

    Edinburgh City Council in a trial to change citys aspect, is trying to redevelop the traffic dominated area of Picardy Place, the St

    James Centre, New St Andrews House, the King James Thistle Hotel, into one of Edinburghs most important gateways to

    positive urban use and broaden the city limits. This project is consisted of a group of students coming together to collaborate and

    design a suitable structure and functionality for a hotel to be located in one of the busiest spots of the city.

    The requirements of this project are:

    Recreate the principal street edge to the north of the site

    Provide a high quality public open space

    Signal an important gateway to the city centre

    Define the Leith Street / Leith Walk urban corridor

    Maximise pedestrian movement and use

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    3/13

    The Idea

    Our proposal ,for the development of a hotel of 132 rooms in total, conference centre of 1500msq and retail stores of 4800 msq

    would contribute in meeting the relevant aspirations on the ECLP by introducing a high quality development that would through

    design and location , complete the retail loop between Multrees walk , St Andrew square , George Street and the East End of

    Princess Street. In order to preserve the areas character we had to avoid skyline erosion by increasing building heights. By

    incorporating a cascading element in building heights, our proposal responds to the scale of the surrounding buildings, in respect

    to the area and to the rest of the properties.

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    4/13

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    5/13

    The Area

    As Civil/ Structural engineers we were asked to make a proposal for the development of the area in collaboration with a team of

    experts ( Architects, Construction Managers, Real Estate Managers etc). The role of a Civil Engineer is essential for the design

    process of the building and the traffic of the area but also for the definition of the costs and the whole construction. The idea of

    the reinvention of the place was enforced by the creation of the tram that makes the triangle of Picardy Place a major transport

    interchange. Our role is to investigate the traffic volumes through the site at the moment and also for the future volumes in order

    to assess our road layout proposals.

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    6/13

    The Traffic

    What we decided to do , in order to have the minimal impact to the traffic flow is to change the roundabout into junction with

    traffic lights. Our decision was based on statistics, that prove that traffic flow is increasing from year to year and on the fact that

    junctions with traffic lights can assess larger traffic volumes than roundabouts. Furthermore we created an underpass for

    pedestrians, at Leith street, which leads the pedestrians from the hotel to the Omni centre.

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    7/13

    The structure

    In terms of the design, in collaboration with the architects we had to design the frame of the building and try to maximise the

    spacing in order to maximise the flexibility of the uses of the building in the future.

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    8/13

    Steel I-Posts

    Pre- tensioned Prefabricated Concrete Slabs

    Reinforced Concrete Cores

    1. Auger cast piles will be used as this eliminates noise which is created by driven piles.

    2. Steel was chosen for speed of construction on site.

    3. The steel frame will be delivered to the site out of rush hour times as to reduce disruption to traffic flow.

    4. The internal fit out can begin on the lower floors before the upper floors are fully weather proof. This will also help with reducing the time of the

    construction.

    The Sustainability

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    9/13

    Sustainability and Building Services : PV Cells

    Ventilation

    GSHP

    Renewable energy provision : 20% of sites energy

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    10/13

    The Timeline

    The duration of the project is estimated to be five years. From October of 2009 until November of 2014.

    Approvals : 12 months

    Design / Procedure : 30 months

    Mobilisation / Ground Works : 15 months

    Structures : 21 months

    Fit Out / Commission : 7 months

    Handover : 15 months

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    11/13

    The Cost

    The Total Cost of the Development Is estimated to be : 22,111,670

  • 8/7/2019 COLLABORATIVE DESIGN OVERVIEW_PICCARDY PLACE

    12/13

    The Team

    Architects : Craig Thomson, Lucie Vejmelkova

    Civil and Structural Enginners : gareth McShea, Michael Percival, Euan Rennie

    Planner : Stuart McInytre

    Real Estate Manager : Michael Henretty

    Quantity Surveyors : Alastair Brodie, Chixun Liu

    Building Surveyors : George Fyrd

    Construction Project Manager : Rowan Frost

    Architecture Design : Mark Norden