計算機を使った 干渉計“デジタル”リアルタイム制御 2012127東大宇宙線研共同利用発表会 宮川 (代理:三代木伸二) 2012/12/7 東大宇宙線研共同利用研究発表会

CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

計算機を使った 干渉計“デジタル”リアルタイム制御

2012年12月7日 東大宇宙線研共同利用発表会

宮川 治

(代理:三代木伸二)

2012/12/7 東大宇宙線研共同利用研究発表会

Page 2: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

Control of 2nd Generation Laser Interferometer such as KAGRA and LIGO VIRGO

2012/12/7 東大宇宙線研共同利用研究発表会 2

ETMy

ETMx

ITMy

ITMx BS EOM IFI

DARM

REF

PRM

POX

ω1 ω2

200W Laser

OMC

SRM

ω3

Pre-MC

MC

PR2

PR3

SR3

SR2

+l−l −L

+L

RFPMI With Resonant Sideband Extraction with two Mode Cleaners

lsDDM

OMC REF

Page 3: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

Control of 2nd Generation Laser Interferometer such as KAGRA and LIGO VIRGO

2012/12/7 東大宇宙線研共同利用研究発表会 3

FP Cavity Length Control : (L+, L-, l+, l-, ls) (Lx, Ly, lx, ly, lsx, lsy) Five degrees of freedom.

PD

Ly

Lx Laser

ly

lx lsx lsy

2

,2

,2

,2

,2

lsylsxls

lylxl

lylxl

LyLxL

LyLxL

+=

−=−

+=+

−=−

+=+ FP cavity common motion

( Use as F-stabilization reference)

FP cavity differential motion (GW signals are included in)

PRC length motion (Michelson Part Common)

Michelson Part Differential motion

SRC length motion Michelson Part

Common : Same motion from BS Differential : Opposite motion from BS

ETMy

ETMx

ITMy

ITMx BS

SRM

PRM

Page 4: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

Control of 2nd Generation Laser Interferometer such as KAGRA and LIGO VIRGO

2012/12/7 東大宇宙線研共同利用研究発表会 4

D : Differential

C : Common

Mirror Alignment Control (Pitch and Yaw motion) for all mirrors are required, otherwise, higher TEM modes are induced and it deteriorate GWD sensitivity.

TEM00

TEM10

TEM01

Page 5: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

Seismic Noise Isolation using Multi-Pendulum

2012/12/7 東大宇宙線研共同利用研究発表会 5

Pre Isolator

GAS1

GAS2

GAS3

GAS4

Cryo-payload

Sapphire mirror

2nd floor

1st floor

Cryostat

Room-temp. Vacuum tank

Vacuum Tube

Heig

ht 1

3m

Pre Isolator prototype at Lucca(Pisa)

GAS filter prototype

Payload prototype for room-temp. optics

・多段振り子の共振による大きな揺れを

制御しつつ、鏡の位置を制御する必要

がある。 鏡駆動系の電気雑音が、感度を犯さな

いように、階層的な駆動が必要。

Page 6: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

Analog System Digital System

2012/12/7 東大宇宙線研共同利用研究発表会 6

アナログ制御からデジタル制御への転換が必須 (但し、制御のUGF < 1kHz程度までだが、KAGRAの制御のほとんどが含まれる)

LIGOとMOUを結んで、デジタルシステム開発中

重力波データ・環境データ取得系との親和性確保

Page 7: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

Schedule

A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance

B. 2011~ standalone system for subsystem (system: done, 2/5 delivered) – Data analysis, VIS, (IOO, CRY…)

C. 2011 Small network test with 1 master and 2 RT PCs (done) – GE RFM, Dolphin RFM, DAQ, timing network

D. 2012-2013 Full test@ Kamioka new building – Constructing many RT rack modules

2012/12/7 東大宇宙線研共同利用研究発表会

Installation into KAGRA mine

7

Page 8: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

Delivering standalone digital system to VIS group at ICRR, Kashiwa

Client WS

• Simple standalone system (RT PC + ADC/DAC, AA/AI, Client WS, router) has been delivered to VIS group at Kashiwa on 1/30/2012.

• 3days work for installation, lecture, training and measurement/control

Diagnosis on Mac through wireless LAN

DTT (FFT)

Dataviewer (oscilloscope)

MEDM

Real Time PC

ADC/DAC

Anti Alias Anti Image

Pre-Isolator

8 2012/12/7 東大宇宙線研共同利用研究発表会

Page 9: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

Real time model for Pre-Isolator

2012/12/7 東大宇宙線研共同利用研究発表会

Sensor Feedback

filter

Global control

Input Matrix

Output Matrix

Actuator

Whitening/dewhitening Switch

6DOF input signal

9

6DOF output signal

Page 10: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

MEMD screen -- GUI for EPICS --

2012/12/7 東大宇宙線研共同利用研究発表会

Sensor Feedback

filter Global control

Input Matrix Output

Matrix

Actuator

Offset control

10

Page 11: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

MEMD screen -- GUI for EPICS --

2012/12/7 東大宇宙線研共同利用研究発表会

Sensor Feedback

filter Global control

Input Matrix Output

Matrix

Actuator

Offset control

11

Page 12: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

Detector Characterizationシステムの開発・試運転

内山、田中、端山、宮川、三代木、山本、譲原の6人で入坑 2012年10月15日~19日の5日間(前半3日で準備、3日目途中から実際のデータ取得)

1. KAGRAで使用するリアルタイム制御用DAQシステムから生成されるフレームデータの検証

2. 観測からサイエンスを引き出すため、リアルタイムに観測データの質や状態を把握するシステムの開発

CLIOの各装置モニター、周辺環境モニターを設置し、多面的にCLIOの観測状態の把握 雑音解析の結果をリアルタイムに表示 観測から期待できるサイエンスのモニター

3. キャリブレーションによって干渉計の位相の変化を時空の歪みに変換

CLIO試験観測運転

2012/12/7 東大宇宙線研共同利用研究発表会 16

Page 13: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

2012/12/7 東大宇宙線研共同利用研究発表会

Client system

DTT (FFT) Dataviewer(オシロ)

MEDM (マニュアル制御)

オートロックスクリプト コントローラ(自動制御)

DTTメニュー

MEDMメニュー DTT (Swept sine)

17

Page 14: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

2012/12/7 東大宇宙線研共同利用研究発表会

photo detector

加速度計

CLIO

100file毎

16秒毎

16秒毎

RT計算機

16秒毎に リアルタイム で更新

辺環境モニター

各装置モニター

感度モニター

Detector Characterizationシステム

18

Page 15: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

Network design

GPS antenna

Mozumi Entrance

New Atotsu Entrance Remote

control

Timing: Synchronization for all RT PC and ADC/DAC

GW New building (Hokubu-Kaikan)

Data Storage iKAGRA: 500TB bKAGRA: 1PB/year

RFM RT control signal: very low latency DAQ GW data: huge amount, low latency

TCP/IP: EPICS, NFS, network boot

2012/12/7 東大宇宙線研共同利用研究発表会 23

Page 16: CLIO task 分担(素案)...A. 2009-2010 prototype test @ CLIO (done) – Basic IFO operation and noise performance B. 2011~ standalone system for subsystem (system: done, 2/5 delivered)

おまけ:KAGRAトンネル現場見学会

2012/12/7 東大宇宙線研共同利用研究発表会 28

写真提供:鹿島建設