Country Club Creek TrailPreliminary Engineering Report
Public Outreach
Jessica V. SalinasCOA Project Manager
December 9, 2014
Country Club Creek Trail Agenda
Introduction of Project Team Overall Program Goals for Urban Trails Country Club Creek Trail Summary Preliminary Engineering Report Overview
– Outline of PER– Evaluation Criteria– Recommended Route
Next Steps Questions
12/9/14 jvsalinas2
Project Team
City Project Sponsor – Nadia Barrera, PWD City Project Manager – Jessica Salinas, PWD Project Consultant & Subconsultants:
– Civil Engineering Consultants – Gary Martin & Ken Thomas– CAS Consulting, Inc. – Cost Estimating and Utility Coordination– Harutunian Engineering, Inc. – Lighting Options– Hicks & Company – Environmental Investigation– HVJ – Geotechnical Investigation– Jaster Quintanilla San Antonio, LLP – Preliminary Structural Design– Macias & Associates, L.P. – Surveying and Parcel Information
12/9/14 jvsalinas3
12/9/14 nbarrera4
Program Goals for Urban Trails
Easy access for transportation & recreation users. Link to bicycle & sidewalk network. Adequate size to accommodate recreation & transportation
uses. Incorporate amenities & features that transform them into
unique greenways that reflect the City around them. Provide adequate resources to maintain & operate. Ensure context-sensitivity & environmentally sustainability as
well as preservation and improvement upon wildlife habitat.
12/9/14 jvsalinas5
Country Club Creek Trail Project Summary
Project Funded by 2010 Prop 1 & 2012 Prop 12 Preliminary Engineering Report: April 2014 – February 2015 Design Phase: Spring 2015 – Spring 2016
– Construction Estimate (w/20% Contingency) - $4,519,892 Construction – Pending Project Funding
– Anticipated start Fall 2016 Project website: http://www.austintexas.gov/urbantrails
Trail Vicinity Map
12/9/2014 jvsalinas6
Country Club Creek Trail
12/9/14 jvsalinas7
• Approximately 3-mile multi-use path generally running along Country Club Creek connecting Lady Bird Lake to Mabel Davis Park in southeast Austin.
• Two segments of the trail that need to be constructed
• 0.5 mile trail section - from Ventura Drive to Burleson Road through an existing City of Austin electric easement.
• Note: Existing segment along Pleasant Valley from Burleson Road to East Oltorf.
• 1 mile section - from East Oltorf to the existing gravel trail just north of Elmont Drive.
Preliminary Engineering Report
The Preliminary Engineering Report consists of the following sections:Executive Summary Environmental IssuesIntroduction Utilities ImpactPreliminary Trail Routes Structural Preliminary DesignEvaluation Criteria Lighting OptionsCritical Water Quality Zone Opinion Of Probable CostErosion Hazard Zone Route EvaluationDrainage and Floodplain Recommended OptionRight-of-Way Summary & Next StepsTrees
12/9/14 cec8
Evaluation Factors
The following factors were used to evaluate the different trail segments:Accessibility Right-of-WayConnectivity ObstructionsCritical Water Quality Zone Tree ImpactsErosion Hazard Zone EnvironmentalFloodplain/Drainage Impacts Cost
12/9/14 cec9
TRAIL ROUTE
12/8/14 cec10
12/9/14 jvsalinas11
Existing Austin Energy Easement
SEGMENT 1 Austin Energy right-of-way (ROW) from Ventura Drive to Burleson Rd
12/9/14 jvsalinas12
Electric power ROW looking north from Ventura.
SEGMENT 1 Austin Energy right-of-way (ROW) from Ventura Drive to Burleson Rd
Segment 2 – Existing Route along S. Pleasant Valley from Burleson to Oltorf
12/9/14 jvsalinas13
SEGMENT 3 starting at S. Pleasant Valley Rd & E. Oltorf to Riverside Dr.
12/9/14 jvsalinas14
SEGMENT 3 starting at S. Pleasant Valley Rd & E. Oltorf to Riverside Dr.
12/9/14 jvsalinas15
Oltorf facing west towards Pleasant Valley Looking south towards Riverside Dr.
SEGMENT 3B Segment near Sheringham Dr
12/9/14 jvsalinas16
SEGMENT 4 Riverside Dr. & Wickersham Intersection
12/9/14 jvsalinas17
SEGMENT 4 starting at Riverside Dr. to Elmont Dr.
12/9/14 jvsalinas18
Wickersham Dr lookingnorth from E. Riverside Dr.
Northern Bridge of E. Riverside Dr from Wickersham Lane.
SEGMENT 4 Riverside Dr. to Elmont Dr.
12/9/14 jvsalinas19
SEGMENT 4 Riverside Dr. to Elmont Dr.
12/9/14 jvsalinas20
SEGMENT 4 Wickersham Pavement Markings (West Side)
12/9/14 jvsalinas21
SEGMENT 4 Wickersham Pavement Markings (West Side)
12/9/14 jvsalinas22
SEGMENT 4 Wickersham Pavement Markings (East Side)
12/9/14 jvsalinas23
12/9/14 jvsalinas24
Construction Estimate Section 1 & 2
Section Base Estimate 20% Contingency w/Lighting1 $371,575 $445,890 $692,6442 $35,362 $42,435 $352,345
12/9/14 jvsalinas25
Construction Estimate Section 3 & 4
Section Base Estimate 20% Contingency w/Lighting3B1 $1,166,366 $1,399,640 $1,840,3363C $1,406,156 $1,687,387 $1,834,2864B1 $787,116 $944,539 $1,549,733
TOTAL $3,766,575 $4,519,891 $6,269,344
Next Steps
Dec 2014: Collect Public Input to PER– Open House– City Website
Jan 2015: Project Team to incorporate Feedback and update PER Jan 2015: City Stakeholder Final Review of PER Feb 2015: Follow-up Open House to present Final PER Spring 2015: Design Phase
12/9/14 jvsalinas26
12/9/14 jvsalinas27
QUESTIONS
TRAIL ROUTE
12/8/14 cec28
12/9/14 jvsalinas29
BACK-UP
Evaluation Factors (continued)
Accessibility – Primarily deciding how easy it is to comply with ADA requirements in a segment.
Connectivity – The ease of reaching destinations from the proposed trail. Critical Water Zone (CWQZ) – Indicates whether or not the trail segment is located in this
zone. Erosion Hazard Zone (EHZ) – Indicates whether the trail segment is in the EHZ or not. Floodplain/Drainage Impacts – Indicates whether or not the trail segment is located in the
floodplain and if there are any negative impacts to drainage. Right-of-Way – Indicates if a new easement is required in a trail segment. Obstructions – Indicates if there are features that would impact the location of the trail. Tree Impact – Indicates the impact to trees in a trail segment. Environmental – Indicates the whether or not environmental permits would be required. Cost – Indicates the relative cost in relation to the other options.
12/9/14 cec30