33
A1 COURTESY © GOOGLE MAPS LOCALITY PLAN NTS PHONE: (02) 9680 1123, MOBILE: 0408 218 575 CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS MALCOLM SMITH PTY. LIMITED EMAIL: [email protected] PO BOX 6189 NORWEST NSW 2153 (ACN 063558449) ISSUE B DATE ISSUE REVISION BY 06/04/2020 B AMENDED PLANS IN ACCORDANCE WITH STATEMENT OF FACTS AND CONTENTIONS FILED BY BCC. BNS DECEMBER, 2019 A INITIAL ISSUE FOR DA BNS PLAN SCHEDULE SHEET No. DESCRIPTION 1 CONCEPTUAL ENGINEERING PLAN 2 GENERAL ARRANGEMENT PLAN 3 BULK EARTHWORKS PLAN 4 BULK EARTHWORKS - SECTION A-A 5 BULK EARTHWORKS - SECTION B-B 6 BULK EARTHWORKS - SECTIONS C-C AND D-D 7 LONGITUDINAL SECTION - TALLAWONG ROAD AND TYPICAL CROSS SECTION (PARTIAL WIDTH ROAD RECONSTRUCTION) 8 CROSS SECTIONS - TALLAWONG ROAD (PARTIAL WIDTH ROAD RECONSTRUCTION) 9 LONGITUDINAL SECTION - PROPOSED ROAD 1 AND TYPICAL CROSS SECTION 10 CROSS SECTIONS - PROPOSED ROAD 1 11 LONGITUDINAL SECTION - PROPOSED ROAD 2 AND TYPICAL CROSS SECTION 12 CROSS SECTIONS - PROPOSED ROAD 2 13 LONGITUDINAL SECTION - PROPOSED ROAD 3 AND TYPICAL CROSS SECTION 14 CROSS SECTIONS - PROPOSED ROAD 3 15 LONGITUDINAL SECTION - PROPOSED ROAD 4 AND TYPICAL CROSS SECTION 16 CROSS SECTIONS - PROPOSED ROAD 4 17 LONGITUDINAL SECTION - PROPOSED TEMPORARY PUBLIC ROAD, TYPICAL CROSS SECTION AND CROSS SECTIONS 18 STORMWATER DRAINAGE CATCHMENT PLAN 19 PLAN - TEMPORARY OSD/WATER QUALITY SYSTEM, ABOVE GROUND OSD SUMMARY SHEET AND SECTIONS A-A & B-B 20 CONCEPTUAL ENGINEERING PLAN - PROPOSED LOT PADS AND RETAINING WALLS 21 CONCEPTUAL ENGINEERING PLAN - PROPOSED LOT PADS AND RETAINING WALLS 22 WASTE COLLECTION VEHICLE SWEPT PATHS 23 DRAINAGE CALCULATIONS - HYDROLOGICAL RESULTS (5yr AND 20yr ARI DESIGN STORM EVENT) 24 DRAINAGE CALCULATIONS - HYDRAULIC RESULTS (5yr AND 20yr ARI DESIGN STORM EVENT) 25 DRAINAGE LONGITUDINAL SECTIONS - LINES 2 & 3 (5yr) 26 DRAINAGE LONGITUDINAL SECTIONS - LINES 4 & 5 (5yr) 27 DRAINAGE LONGITUDINAL SECTIONS - LINES 7 & 9 (20yr) 28 DRAINAGE CALCULATIONS - HYDROLOGICAL RESULTS (100yr ARI DESIGN STORM EVENT) 29 DRAINAGE CALCULATIONS - HYDRAULIC RESULTS (100yr ARI DESIGN STORM EVENT) 30 DRAINAGE LONGITUDINAL SECTIONS - LINES 2 & 3 (100yr) 31 DRAINAGE LONGITUDINAL SECTION - LINE 4 (100yr) 32 DRAINAGE LONGITUDINAL SECTIONS - LINES 7 & 9 (100yr) SITE 15. MINIMUM 150mm THICK TOPSOIL SHALL BE SPREAD ON ALL FOOTPATHS, BERMS, BATTERS AND SITE REGRADING AREAS. EXCESS TOPSOIL SHALL BE DISPOSED OF AS DIRECTED BY THE ENGINEER. 16. ALL LAND DISTURBED BY EARTHWORKS SHALL BE SPRAY-GRASSED, OR SIMILARLY TREATED TO ESTABLISH GRASS COVER WITHIN 14 DAYS. SEED MIXTURES ARE TO BE APPROVED BY COUNCIL PRIOR TO APPLICATION. ALL GRASSED AREAS SHALL BE REGULARLY WATERED AND MAINTAINED UNTIL EXPIRATION OF THE MAINTENANCE PERIOD. 17. THE CONTRACTOR SHALL CONTROL DUST THROUGHOUT THE DURATION OF THE PROJECT. 18. ALL PITS DEEPER THAN 1.2m SHALL HAVE STEP IRONS PROVIDED IN ACCORDANCE WITH COUNCIL'S STANDARDS. 19. ALL DRAINAGE LINES THROUGH LOTS SHALL BE CONTAINED WITHIN EASEMENTS AND CONFORM WITH COUNCIL'S STANDARDS. 20. ALL DRAINAGE LINES UNDER ROADS SHALL BE BACKFILLED WITH SHARP SAND TO SUBGRADE LEVEL AND HAVE A 3.0m LENGTH OF AGRICULTURAL LINE, WRAPPED IN AN APPROVED FILTER FABRIC, AT INVERT LEVEL DISCHARGING INTO THE DOWNSTREAM PIT. 21. SUBSOIL DRAINS SHALL BE CONSTRUCTED TO THE SATISFACTION OF THE ENGINEER. 22. PRECAST KERB INLET LINTELS SHALL BE USED ON GULLY PITS. GRATES SHALL BE 'WELDLOK' TYPE GG 78-51 OR EQUIVALENT. 23. KERB ADAPTORS FOR CONNECTION OF ROOF DRAINS SHALL BE PROVIDED TO ALL LOTS DRAINING TO THE KERB AT THE DOWNSTREAM BOUNDARY. 24. PROVIDE VEHICULAR ENTRIES IN KERB AND GUTTER WHERE SHOWN "VC" OR WHERE DIRECTED BY THE ENGINEER. 25. ERECT STREET NAME SIGNS, CONDUIT WARNING SIGNS AND NO THROUGH ROAD SIGNS WHERE SHOWN ON THE PLAN OR OTHERWISE AS DIRECTED BY THE ENGINEER. GALVANISED STEEL POSTS TO BE USED 26. CONDUITS SHALL BE LAID AFTER POSITIONS HAVE BEEN DETERMINED BY THE RELEVANT AUTHORITIES. 27. POSITION OF ALL CONDUITS SHALL BE MARKED ON THE KERB. 28. FELLED TREES SHALL BE SALVAGED FOR REUSE AS WOODCHIP OR MULCH FOR SITE REHABILITATION. ANY NON-SALVAGEABLE MATERIAL SHALL BE DISPOSED OF OFF-SITE. 29. THE CONTRACTOR SHALL PROVIDE MINIMUM 24 HOURS NOTICE TO THE COUNCIL FOR ALL INSPECTIONS. 30. THE CONTRACTOR SHALL MAINTAIN SERVICES AND ALL WEATHER ACCESS AT ALL TIMES TO THE ADJOINING PROPERTIES. 31. THE CONTRACTOR SHALL UNDERTAKE TRAFFIC CONTROL MEASURES TO ENGINEERS SATISFACTION AND SHALL DISPLAY ALL APPROPRIATE WARNING SIGNS THROUGHOUT THE DURATION OF CONSTRUCTION. TRAFFIC CONTROLS TO BE IN ACCORDANCE WITH AS 1742.3 32. ALL CONSTRUCTION SITE WORKS MUST BE CARRIED OUT USING THE BENCH MARKS SHOWN ON THESE DRAWINGS. GENERAL NOTES: 1. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH COUNCIL'S STANDARDS AND SPECIFICATIONS AND/OR AS DIRECTED BY COUNCIL'S ENGINEER. 2. THE CONTRACTOR SHALL LOCATE AND LEVEL ALL EXISTING SERVICES PRIOR TO COMMENCING CONSTRUCTION AND SHALL MAKE ALL NECESSARY ARRANGEMENTS WITH THE RELEVANT AUTHORITY TO RELOCATE OR ADJUST AS FOUND NECESSARY AT NO COST TO COUNCIL. 3. WORKING HOURS SHALL BE FROM IN DAYLIGHT HOURS BETWEEN 7am AND 5pm MONDAY TO FRIDAY AND BETWEEN 8am AND 1pm ON SATURDAY. NO WORK SHALL BE CARRIED OUT ON A SUNDAY OR PUBLIC HOLIDAY. 4. THE CONTRACTOR SHALL NOT ENTER UPON OR DO ANY WORK WITHIN ADJACENT LANDS WITHOUT PRIOR WRITTEN PERMISSION OF THE LAND OWNER. 5. SURVEY MARKS SHALL BE MAINTAINED AT ALL TIMES. WHERE RETENTION IS NOT POSSIBLE, THE ENGINEER SHALL BE NOTIFIED AND CONSENT RECEIVED PRIOR TO THEIR REMOVAL. 6. ALL NEW WORKS SHALL MAKE SMOOTH JUNCTION WITH EXISTING CONDITIONS. 7. SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED PRIOR TO SOIL DISTURBANCE IN KEEPING WITH THE "MANAGING URBAN STORMWATER SOILS AND CONSTRUCTION, 3rd EDITION, AUGUST 1998 MANUAL" PRODUCED BY THE NSW DEPARTMENT OF HOUSING AND TO THE SATISFACTION OF THE ENGINEER AND AS SHOWN IN THESE DRAWINGS. 8. COUNCIL'S TREE PRESERVATION ORDER SHALL BE OBSERVED AND NO TREE SHALL BE FELLED, LOPPED OR REMOVED WITHOUT PRIOR APPROVAL. APART FROM DESIGNATED STOCKPILE SITES, ALL OTHER AREAS TO BE CORDONED OFF AND REMAIN UNDISTURBED. 9. THE CONTRACTOR SHALL CLEAR THE SITE BY REMOVING ALL RUBBISH, FENCES, OUT HOUSES, CAR BODIES, DEBRIS ETC. THE CONTRACTOR SHALL NOT DISPOSE OF ANY DEBRIS BY BURNING OFF IN AN OPEN FIRE. 10. UNSOUND MATERIALS AS DETERMINED BY THE ENGINEER SHALL BE REMOVED PRIOR TO ANY FILLING. 11. ALL SITE REGRADING AREAS SHALL BE GRADED TO THE DESIGN LEVELS AND SATISFACTION OF THE ENGINEER. THE CONTRACTOR SHALL TAKE LEVELS ON THE EXISTING SURFACE AFTER STRIPPING TOPSOIL AND PRIOR TO COMMENCING ANY FILL OPERATIONS. 12. SPECIAL ATTENTION IS DRAWN TO THE FOLLOWING REQUIREMENTS FOR SUBMISSION OF: i) COMPACTION CERTIFICATES FOR SUBGRADE & LOT FILLING; ii) COMPACTION CERTIFICATES FOR PAVEMENT MATERIALS. iii) COMPLIANCE CERTIFICATES FROM ROAD MATERIAL SUPPLIERS. 13. SURPLUS EXCAVATED MATERIAL SHALL BE PLACED WHERE DIRECTED BY THE ENGINEER. THICK AND COMPACTED TO 95% STANDARD COMPACTION IN ACCORDANCE WITH PERFORMED BY N.A.T.A. REGISTERED LABORATORY AND THE RESULTS 14. ALL SITE FILLING SHALL BE PLACED IN LAYERS NOT EXCEEDING 250mm BCC WORKS SPECIFICATION - 2005. COMPACTION TESTING OF SITE FILL TO FORWARDED TO THE CONTRACTOR AND PROJECT ENGINEER. WITH BLACK POWDER COAT FINISH IN ACCORDANCE WITH THE ADOPTED POLICY OF BLACKTOWN CITY COUNCIL.

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

A1

COURTESY © GOOGLE MAPS

LOCALITY PLANNTS

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

ISSUE B

DATE ISSUE REVISION BY

06/04/2020 B AMENDED PLANS IN ACCORDANCE WITH STATEMENT OF FACTS AND CONTENTIONSFILED BY BCC. BNS

DECEMBER, 2019 A INITIAL ISSUE FOR DA BNS

PLAN SCHEDULESHEET No. DESCRIPTION

1 CONCEPTUAL ENGINEERING PLAN

2 GENERAL ARRANGEMENT PLAN

3 BULK EARTHWORKS PLAN

4 BULK EARTHWORKS - SECTION A-A

5 BULK EARTHWORKS - SECTION B-B

6 BULK EARTHWORKS - SECTIONS C-C AND D-D

7LONGITUDINAL SECTION - TALLAWONG ROAD AND TYPICAL CROSS SECTION (PARTIAL WIDTHROAD RECONSTRUCTION)

8 CROSS SECTIONS - TALLAWONG ROAD (PARTIAL WIDTH ROAD RECONSTRUCTION)

9 LONGITUDINAL SECTION - PROPOSED ROAD 1 AND TYPICAL CROSS SECTION

10 CROSS SECTIONS - PROPOSED ROAD 1

11 LONGITUDINAL SECTION - PROPOSED ROAD 2 AND TYPICAL CROSS SECTION

12 CROSS SECTIONS - PROPOSED ROAD 2

13 LONGITUDINAL SECTION - PROPOSED ROAD 3 AND TYPICAL CROSS SECTION

14 CROSS SECTIONS - PROPOSED ROAD 3

15 LONGITUDINAL SECTION - PROPOSED ROAD 4 AND TYPICAL CROSS SECTION

16 CROSS SECTIONS - PROPOSED ROAD 4

17 LONGITUDINAL SECTION - PROPOSED TEMPORARY PUBLIC ROAD, TYPICAL CROSS SECTIONAND CROSS SECTIONS

18 STORMWATER DRAINAGE CATCHMENT PLAN

19 PLAN - TEMPORARY OSD/WATER QUALITY SYSTEM, ABOVE GROUND OSD SUMMARY SHEETAND SECTIONS A-A & B-B

20 CONCEPTUAL ENGINEERING PLAN - PROPOSED LOT PADS AND RETAINING WALLS

21 CONCEPTUAL ENGINEERING PLAN - PROPOSED LOT PADS AND RETAINING WALLS

22 WASTE COLLECTION VEHICLE SWEPT PATHS

23DRAINAGE CALCULATIONS - HYDROLOGICAL RESULTS (5yr AND 20yr ARI DESIGN STORMEVENT)

24 DRAINAGE CALCULATIONS - HYDRAULIC RESULTS (5yr AND 20yr ARI DESIGN STORM EVENT)

25 DRAINAGE LONGITUDINAL SECTIONS - LINES 2 & 3 (5yr)

26 DRAINAGE LONGITUDINAL SECTIONS - LINES 4 & 5 (5yr)

27 DRAINAGE LONGITUDINAL SECTIONS - LINES 7 & 9 (20yr)

28 DRAINAGE CALCULATIONS - HYDROLOGICAL RESULTS (100yr ARI DESIGN STORM EVENT)

29 DRAINAGE CALCULATIONS - HYDRAULIC RESULTS (100yr ARI DESIGN STORM EVENT)

30 DRAINAGE LONGITUDINAL SECTIONS - LINES 2 & 3 (100yr)

31 DRAINAGE LONGITUDINAL SECTION - LINE 4 (100yr)

32 DRAINAGE LONGITUDINAL SECTIONS - LINES 7 & 9 (100yr)

SITE

15. MINIMUM 150mm THICK TOPSOIL SHALL BE SPREAD ON ALLFOOTPATHS, BERMS, BATTERS AND SITE REGRADING AREAS. EXCESSTOPSOIL SHALL BE DISPOSED OF AS DIRECTED BY THE ENGINEER.

16. ALL LAND DISTURBED BY EARTHWORKS SHALL BE SPRAY-GRASSED,OR SIMILARLY TREATED TO ESTABLISH GRASS COVER WITHIN 14 DAYS.SEED MIXTURES ARE TO BE APPROVED BY COUNCIL PRIOR TO APPLICATION. ALL GRASSED AREAS SHALL BE REGULARLY WATERED ANDMAINTAINED UNTIL EXPIRATION OF THE MAINTENANCE PERIOD.

17. THE CONTRACTOR SHALL CONTROL DUST THROUGHOUT THEDURATION OF THE PROJECT.

18. ALL PITS DEEPER THAN 1.2m SHALL HAVE STEP IRONS PROVIDED INACCORDANCE WITH COUNCIL'S STANDARDS.

19. ALL DRAINAGE LINES THROUGH LOTS SHALL BE CONTAINED WITHINEASEMENTS AND CONFORM WITH COUNCIL'S STANDARDS.

20. ALL DRAINAGE LINES UNDER ROADS SHALL BE BACKFILLED WITHSHARP SAND TO SUBGRADE LEVEL AND HAVE A 3.0m LENGTH OFAGRICULTURAL LINE, WRAPPED IN AN APPROVED FILTER FABRIC, ATINVERT LEVEL DISCHARGING INTO THE DOWNSTREAM PIT.

21. SUBSOIL DRAINS SHALL BE CONSTRUCTED TO THE SATISFACTION OFTHE ENGINEER.

22. PRECAST KERB INLET LINTELS SHALL BE USED ON GULLY PITS. GRATES SHALL BE 'WELDLOK' TYPE GG 78-51 OR EQUIVALENT.

23. KERB ADAPTORS FOR CONNECTION OF ROOF DRAINS SHALL BEPROVIDED TO ALL LOTS DRAINING TO THE KERB AT THE DOWNSTREAMBOUNDARY.

24. PROVIDE VEHICULAR ENTRIES IN KERB AND GUTTER WHERE SHOWN"VC" OR WHERE DIRECTED BY THE ENGINEER.

25. ERECT STREET NAME SIGNS, CONDUIT WARNING SIGNS AND NOTHROUGH ROAD SIGNS WHERE SHOWN ON THE PLAN OR OTHERWISEAS DIRECTED BY THE ENGINEER. GALVANISED STEEL POSTS TO BE USED

26. CONDUITS SHALL BE LAID AFTER POSITIONS HAVE BEEN DETERMINEDBY THE RELEVANT AUTHORITIES.

27. POSITION OF ALL CONDUITS SHALL BE MARKED ON THE KERB.

28. FELLED TREES SHALL BE SALVAGED FOR REUSE AS WOODCHIP ORMULCH FOR SITE REHABILITATION. ANY NON-SALVAGEABLE MATERIALSHALL BE DISPOSED OF OFF-SITE.

29. THE CONTRACTOR SHALL PROVIDE MINIMUM 24 HOURS NOTICE TO THECOUNCIL FOR ALL INSPECTIONS.

30. THE CONTRACTOR SHALL MAINTAIN SERVICES AND ALL WEATHERACCESS AT ALL TIMES TO THE ADJOINING PROPERTIES.

31. THE CONTRACTOR SHALL UNDERTAKE TRAFFIC CONTROL MEASURESTO ENGINEERS SATISFACTION AND SHALL DISPLAY ALL APPROPRIATEWARNING SIGNS THROUGHOUT THE DURATION OF CONSTRUCTION. TRAFFIC CONTROLS TO BE IN ACCORDANCE WITH AS 1742.3

32. ALL CONSTRUCTION SITE WORKS MUST BE CARRIED OUT USING THE BENCH MARKS SHOWN ON THESE DRAWINGS.

GENERAL NOTES:

1. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH COUNCIL'SSTANDARDS AND SPECIFICATIONS AND/OR AS DIRECTED BY COUNCIL'SENGINEER.

2. THE CONTRACTOR SHALL LOCATE AND LEVEL ALL EXISTING SERVICESPRIOR TO COMMENCING CONSTRUCTION AND SHALL MAKE ALLNECESSARY ARRANGEMENTS WITH THE RELEVANT AUTHORITY TORELOCATE OR ADJUST AS FOUND NECESSARY AT NO COST TO COUNCIL.

3. WORKING HOURS SHALL BE FROM IN DAYLIGHT HOURS BETWEEN 7amAND 5pm MONDAY TO FRIDAY AND BETWEEN 8am AND 1pm ON SATURDAY.NO WORK SHALL BE CARRIED OUT ON A SUNDAY OR PUBLIC HOLIDAY.

4. THE CONTRACTOR SHALL NOT ENTER UPON OR DO ANY WORK WITHINADJACENT LANDS WITHOUT PRIOR WRITTEN PERMISSION OF THELAND OWNER.

5. SURVEY MARKS SHALL BE MAINTAINED AT ALL TIMES. WHERERETENTION IS NOT POSSIBLE, THE ENGINEER SHALL BE NOTIFIED ANDCONSENT RECEIVED PRIOR TO THEIR REMOVAL.

6. ALL NEW WORKS SHALL MAKE SMOOTH JUNCTION WITH EXISTINGCONDITIONS.

7. SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED PRIOR TOSOIL DISTURBANCE IN KEEPING WITH THE "MANAGING URBANSTORMWATER SOILS AND CONSTRUCTION, 3rd EDITION, AUGUST 1998MANUAL" PRODUCED BY THE NSW DEPARTMENT OF HOUSING AND TOTHE SATISFACTION OF THE ENGINEER AND AS SHOWN IN THESEDRAWINGS.

8. COUNCIL'S TREE PRESERVATION ORDER SHALL BE OBSERVED AND NOTREE SHALL BE FELLED, LOPPED OR REMOVED WITHOUT PRIORAPPROVAL. APART FROM DESIGNATED STOCKPILE SITES, ALL OTHERAREAS TO BE CORDONED OFF AND REMAIN UNDISTURBED.

9. THE CONTRACTOR SHALL CLEAR THE SITE BY REMOVING ALL RUBBISH,FENCES, OUT HOUSES, CAR BODIES, DEBRIS ETC. THE CONTRACTORSHALL NOT DISPOSE OF ANY DEBRIS BY BURNING OFF IN AN OPENFIRE.

10. UNSOUND MATERIALS AS DETERMINED BY THE ENGINEER SHALL BEREMOVED PRIOR TO ANY FILLING.

11. ALL SITE REGRADING AREAS SHALL BE GRADED TO THE DESIGNLEVELS AND SATISFACTION OF THE ENGINEER. THE CONTRACTORSHALL TAKE LEVELS ON THE EXISTING SURFACE AFTER STRIPPINGTOPSOIL AND PRIOR TO COMMENCING ANY FILL OPERATIONS.

12. SPECIAL ATTENTION IS DRAWN TO THE FOLLOWING REQUIREMENTSFOR SUBMISSION OF:

i) COMPACTION CERTIFICATES FOR SUBGRADE & LOT FILLING; ii) COMPACTION CERTIFICATES FOR PAVEMENT MATERIALS. iii) COMPLIANCE CERTIFICATES FROM ROAD MATERIAL SUPPLIERS.

13. SURPLUS EXCAVATED MATERIAL SHALL BE PLACED WHERE DIRECTEDBY THE ENGINEER.

THICK AND COMPACTED TO 95% STANDARD COMPACTION IN ACCORDANCE WITH

PERFORMED BY N.A.T.A. REGISTERED LABORATORY AND THE RESULTS

14. ALL SITE FILLING SHALL BE PLACED IN LAYERS NOT EXCEEDING 250mm

BCC WORKS SPECIFICATION - 2005. COMPACTION TESTING OF SITE FILL TO

FORWARDED TO THE CONTRACTOR AND PROJECT ENGINEER.

WITH BLACK POWDER COAT FINISH IN ACCORDANCE WITH THE ADOPTEDPOLICY OF BLACKTOWN CITY COUNCIL.

AutoCAD SHX Text
CLIENT: G & S SPITERI
AutoCAD SHX Text
BLACKTOWN CITY COUNCIL REF: DA-19-01887
AutoCAD SHX Text
PROPOSED SUBDIVISION OF LOT 45 IN DP30186 (No. 175) TALLAWONG ROAD, ROUSE HILL
AutoCAD SHX Text
CONCEPTUAL ENGINEERING PLANS FOR THE CONSTRUCTION OF PAVEMENT WIDENING IN TALLAWONG ROAD, NEW ROADS AND ASSOCIATED STORMWATER DRAINAGE.

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:500

A.H.D.

32

DECEMBER, 2019

1

GJA

BNS

2624DA1-1

MS2624CONCEPTUAL ENGINEERING PLAN

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

1:500 10 0 10 20

485

451452453454455456457458459460461462463464465466467

484483482481480479478477476475

474

473472471470469468

450

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

DRAIN, DESILT AND BACKFILL EXISTINGDAM ON SITE. FINAL DETAILS TO BESHOWN ON ECC PLANS.

ROAD DRAINAGE TO BYPASS OSDSYSTEM AND BE DIRECTED TOSTORMWATER DRAINAGE LINEWITHIN No. 163 TALLAWONG ROAD- REFER DA 18-01492.

EROSION & SEDIMENTATION CONTROLSNTS

LEGENDEXISTING CONTOUR & LEVEL

PROPOSED GULLY PIT AND PIT NUMBER

PROPOSED JUNCTION PIT

OVERHEAD ELECTRICAL WIRES (EXISTING)

SEDIMENT FENCE

STRAW BALE SEDIMENT FILTER

NOTES:1. ROADS AND STORMWATER DRAINAGE SUBJECT TO DESIGN

REQUIREMENTS OF BLACKTOWN CITY COUNCIL.CONSTRUCTION DETAILS TO BE SUBMITTED WITH THECONSTRUCTION CERTIFICATE APPLICATION.

2. FINAL DESIGNS MAY VARY FROM CONCEPT LAYOUT TO SUITSITE CONDITIONS AND REQUIREMENTS OF DEVELOPMENTAPPROVAL.

3. FINAL SOIL AND WATER MANAGEMENT DETAILS ARE TO BESUBMITTED WITH THE CONSTRUCTION CERTIFICATEAPPLICATION BASED ON PUBLICATION "MANAGING URBANSTORMWATER" PREPARED BY LANDCOM.

4. EXISTING BUILDINGS, OUTBUILDINGS AND TREES ARE TO BEDEMOLISHED AS PART OF THIS DEVELOPMENT APPLICATION.

PROPOSED STORMWATER DRAINAGE LINE

EXISTING TREE, NUMBER AND HEIGHT

RATIO: 1:500CONCEPTUAL ENGINEERING PLAN

FUTURE GULLY PIT (BY OTHERS)

CONSTRUCT TEMPORARY OSD AND BIO-RETENTIONSYSTEM GENERALLY IN ACCORDANCE WITH DETAILS ONSHEET 19. FINAL DETAILS TO BE SUBMITTED WITHCONSTRUCTION CERTIFICATE DRAWINGS.

DESIGN EXTENT OF BATTERS

DOWNSTREAM PIPE TO BE CAPPED AT PIT TODIRECT STORMWATER FLOWS THROUGH LOT468 TO TEMPORARY OSD BASIN.

IAD LINE THROUGH LOT 468 TO BE CAPPED AFTERREMOVAL OF TEMPORARY BASIN. CONNECT IADLINE TO STREET DRAINAGE UNDER SEPARATECONSTRUCTION CERTIFICATE APPLICATION.

PROPOSED ROAD 4 (8.5 WIDE)

PROPOSED ROAD 2 (8 WIDE)

PROP

OSED

ROA

D 3

(8.5

WID

E)

PROP

OSED

ROA

D 1

(18 W

IDE)

TEMP PUBLIC ROAD (11 WIDE)

(RESIDUE)

OVERHEAD TELECOMMUNICATION WIRES (EXISTING)

INDICATIVE DRIVEWAY LOCATION

DRAIN, DESILT AND BACKFILL EXISTINGDAM ON SITE. FINAL DETAILS TO BESHOWN ON ECC PLANS.

DRAIN, DESILT AND BACKFILL EXISTINGDAM ON SITE. FINAL DETAILS TO BESHOWN ON ECC PLANS.

REFER TO APPROVED CONCEPTUAL ENGINEERINGPLANS PREPARED BY WOOD & GRIEVE ENGINEERSFOR ROAD AND STORMWATER DRAINAGE LINEDETAILS ON LOT 1 DP1244483 (DA-18-01492).

REMOVE EXISTING HEADWALL AND CONSTRUCTNEW GULLY PIT OVER EXISTING DRAINAGE LINETO REDIRECT STORMWATER FLOWS ALONGTALLAWONG ROAD.

TEMPORARY PUBLIC ROAD 11m WIDE TO PROVIDEALTERNATIVE ACCESS TO DEVELOPMENT SITE, IFREQUIRED. ACCESS TO SITE TO BE VIA APPROVEDSUBDIVISION TO THE SOUTH UNDER DA-18-01492.

EASEMENT FOR DRAINAGE 1.83 WIDE (D.P.30186) - (H500894)PROPOSED EASEMENT TO DRAIN WATER 1.0 WIDE

EASEMENTS

NEW FLEXIBLE PAVEMENT

TRANSITION WORKS

B06/04/2020 - AMENDED PLANS IN ACCORDANCE WITH STATEMENT OF FACTSAND CONTENTIONS FILED BY BCC.

450Ø

1-1

1-2

375Ø

375Ø

375Ø

375Ø

450Ø450Ø450Ø450Ø450Ø450Ø450Ø450Ø450Ø450Ø450Ø450Ø

525Ø

2-1

2-2

2-3

2-4

2-52-62-72-82-92-102-112-122-132-142-152-162-17

2-18

375Ø

450Ø3-1

3-2

375Ø375Ø375Ø375Ø

375Ø375Ø

4-14-24-34-44-5

4-6

4-7

4-8

675Ø

675Ø

675Ø675Ø

675Ø

750Ø

5-1

5-2

5-3

5-4

5-5

5-6

5-7

525Ø

6-16-2

6-3

225Ø225Ø225Ø300Ø300Ø300Ø300Ø300Ø375Ø375Ø375Ø375Ø375Ø375Ø375Ø450Ø450Ø 7-17-27-37-47-57-67-77-87-97-107-117-127-137-147-157-167-17

450Ø8-1

150Ø

375Ø

9-19-2

150Ø225Ø

225Ø225Ø

225Ø225Ø

225Ø300Ø

300Ø

10F-1

10F-2

10F-3

10F-4

10F-5

10F-6

10F-7

10F-8

10F-9

150Ø225Ø

225Ø225Ø

225Ø300Ø

375Ø11F-1

11F-2

11F-3

11F-4

11F-5

11F-6

11F-7

FUTURE SUBDIVISION LAYOUT OF LOT 450AND STORMWATER DRAINAGE LINES 10F& 11F ARE BASED ON PLANS TABLED ATPAM MEETING REF: C19/48789; DATED:17/10/2019 AND IS SUBJECT TO ASEPARATE DEVELOPMENT APPLICATION.

REFER TO SHEETS 25-27 & 30-32FOR PIPE SIZES AND GRADES.

6.1 PIT NUMBERS BY WOOD & GRIEVEENGINEERS FOR 163 TALLAWONG ROAD

6.3

6.2

7.1

6.1

2-1

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
MGA (SCIMS)
AutoCAD SHX Text
SEDIMENT FENCE
AutoCAD SHX Text
DRAINAGE AREA 0.6ha MAX. SLOPE GRADIENT 1:2 MAX.
AutoCAD SHX Text
DIRECTION OF
AutoCAD SHX Text
0.2m
AutoCAD SHX Text
MAX.
AutoCAD SHX Text
0.6m
AutoCAD SHX Text
FLOW.
AutoCAD SHX Text
SLOPE LENGTH 60m MAX.
AutoCAD SHX Text
WIRE OR STEEL MESH
AutoCAD SHX Text
DISTURBED AREA.
AutoCAD SHX Text
0.6m INTO
AutoCAD SHX Text
GROUND.
AutoCAD SHX Text
POSTS DRIVEN
AutoCAD SHX Text
GEOTEXTILE FILTER
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
DETAIL OF OVERLAP.
AutoCAD SHX Text
3m MAX.
AutoCAD SHX Text
FABRIC
AutoCAD SHX Text
0.1m DEEP
AutoCAD SHX Text
DIRECTION OF
AutoCAD SHX Text
FLOW.
AutoCAD SHX Text
STRAW BALE SEDIMENT FILTER
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
ANGLE FIRST STAKE TOWARDS
AutoCAD SHX Text
PREVIOUSLY LAID STRAW BALE.
AutoCAD SHX Text
DRAINAGE AREA 0.4ha MAX. SLOPE GRADIENT 1:2 MAX.
AutoCAD SHX Text
STAKES DRIVEN 0.6m
AutoCAD SHX Text
DISTURBED AREA
AutoCAD SHX Text
SLOPE LENGTH 40m MAX.
AutoCAD SHX Text
INTO GROUND.
AutoCAD SHX Text
1
AutoCAD SHX Text
45
AutoCAD SHX Text
2.023 ha
AutoCAD SHX Text
285.91
AutoCAD SHX Text
70.715
AutoCAD SHX Text
286.445
AutoCAD SHX Text
70.715
AutoCAD SHX Text
BENCH MARK CUT IN CONCRETE R.L. 53.45 A.H.D.
AutoCAD SHX Text
46
AutoCAD SHX Text
TALLAWONG ROAD
AutoCAD SHX Text
(46.0)
AutoCAD SHX Text
(46.0)
AutoCAD SHX Text
(47.0)
AutoCAD SHX Text
(47.0)
AutoCAD SHX Text
(48.0)
AutoCAD SHX Text
(48.0)
AutoCAD SHX Text
(49.0)
AutoCAD SHX Text
(49.0)
AutoCAD SHX Text
(50.0)
AutoCAD SHX Text
(50.0)
AutoCAD SHX Text
(51.0)
AutoCAD SHX Text
(51.0)
AutoCAD SHX Text
(52.0)
AutoCAD SHX Text
(52.0)
AutoCAD SHX Text
(53.0)
AutoCAD SHX Text
(53.0)
AutoCAD SHX Text
(54.0)
AutoCAD SHX Text
(54.0)
AutoCAD SHX Text
(55.0)
AutoCAD SHX Text
(55.0)
AutoCAD SHX Text
(56.0)
AutoCAD SHX Text
(56.0)
AutoCAD SHX Text
(56.0)
AutoCAD SHX Text
(57.0)
AutoCAD SHX Text
(57.0)
AutoCAD SHX Text
(58.0)
AutoCAD SHX Text
(58.0)
AutoCAD SHX Text
(59.0)
AutoCAD SHX Text
(60.0)
AutoCAD SHX Text
(60.0)
AutoCAD SHX Text
(61.0)
AutoCAD SHX Text
(61.0)
AutoCAD SHX Text
(62.0)
AutoCAD SHX Text
(62.0)
AutoCAD SHX Text
(64.0)
AutoCAD SHX Text
(65.0)
AutoCAD SHX Text
(45.5)
AutoCAD SHX Text
(45.5)
AutoCAD SHX Text
(46.5)
AutoCAD SHX Text
(46.5)
AutoCAD SHX Text
(47.5)
AutoCAD SHX Text
(47.5)
AutoCAD SHX Text
(48.5)
AutoCAD SHX Text
(48.5)
AutoCAD SHX Text
(49.5)
AutoCAD SHX Text
(49.5)
AutoCAD SHX Text
(50.5)
AutoCAD SHX Text
(50.5)
AutoCAD SHX Text
(51.5)
AutoCAD SHX Text
(51.5)
AutoCAD SHX Text
(52.5)
AutoCAD SHX Text
(52.5)
AutoCAD SHX Text
(53.5)
AutoCAD SHX Text
(53.5)
AutoCAD SHX Text
(54.5)
AutoCAD SHX Text
(54.5)
AutoCAD SHX Text
(55.5)
AutoCAD SHX Text
(55.5)
AutoCAD SHX Text
(56.5)
AutoCAD SHX Text
(56.5)
AutoCAD SHX Text
(56.5)
AutoCAD SHX Text
(57.5)
AutoCAD SHX Text
(57.5)
AutoCAD SHX Text
(58.5)
AutoCAD SHX Text
(58.5)
AutoCAD SHX Text
(59.5)
AutoCAD SHX Text
(60.5)
AutoCAD SHX Text
(60.5)
AutoCAD SHX Text
(61.5)
AutoCAD SHX Text
(61.5)
AutoCAD SHX Text
(62.5)
AutoCAD SHX Text
(62.5)
AutoCAD SHX Text
(63.5)
AutoCAD SHX Text
METAL SHED
AutoCAD SHX Text
SINGLE STORY BRICK RESIDENCE TILE ROOF
AutoCAD SHX Text
DAM
AutoCAD SHX Text
DAM
AutoCAD SHX Text
DAM
AutoCAD SHX Text
DAM
AutoCAD SHX Text
DAM
AutoCAD SHX Text
F
AutoCAD SHX Text
D
AutoCAD SHX Text
GRAVEL DRIVEWAY
AutoCAD SHX Text
#1
AutoCAD SHX Text
#2
AutoCAD SHX Text
#3
AutoCAD SHX Text
#4
AutoCAD SHX Text
#5
AutoCAD SHX Text
#6
AutoCAD SHX Text
#7
AutoCAD SHX Text
#8
AutoCAD SHX Text
#9
AutoCAD SHX Text
#10
AutoCAD SHX Text
#11
AutoCAD SHX Text
#12
AutoCAD SHX Text
#13
AutoCAD SHX Text
#14
AutoCAD SHX Text
#15
AutoCAD SHX Text
#16
AutoCAD SHX Text
#17
AutoCAD SHX Text
D.P. 1244483
AutoCAD SHX Text
D.P. 407863
AutoCAD SHX Text
D.P. 407863
AutoCAD SHX Text
(A)
AutoCAD SHX Text
#18
AutoCAD SHX Text
#19
AutoCAD SHX Text
#20
AutoCAD SHX Text
#21
AutoCAD SHX Text
#22
AutoCAD SHX Text
#23
AutoCAD SHX Text
#24
AutoCAD SHX Text
#25
AutoCAD SHX Text
#26
AutoCAD SHX Text
#27
AutoCAD SHX Text
#28
AutoCAD SHX Text
#29
AutoCAD SHX Text
#30
AutoCAD SHX Text
#31
AutoCAD SHX Text
#32
AutoCAD SHX Text
#33
AutoCAD SHX Text
#34
AutoCAD SHX Text
#35
AutoCAD SHX Text
#36
AutoCAD SHX Text
#37
AutoCAD SHX Text
#38
AutoCAD SHX Text
#39
AutoCAD SHX Text
#40
AutoCAD SHX Text
#41
AutoCAD SHX Text
#42
AutoCAD SHX Text
#43
AutoCAD SHX Text
#44
AutoCAD SHX Text
#45
AutoCAD SHX Text
#46
AutoCAD SHX Text
450
AutoCAD SHX Text
IO
AutoCAD SHX Text
150
AutoCAD SHX Text
100
AutoCAD SHX Text
10m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
8m
AutoCAD SHX Text
15m
AutoCAD SHX Text
10m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
10m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
25m
AutoCAD SHX Text
8m
AutoCAD SHX Text
25m
AutoCAD SHX Text
25m
AutoCAD SHX Text
20m
AutoCAD SHX Text
25m
AutoCAD SHX Text
8m
AutoCAD SHX Text
20m
AutoCAD SHX Text
20m
AutoCAD SHX Text
20m
AutoCAD SHX Text
25m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
20m
AutoCAD SHX Text
15m
AutoCAD SHX Text
10m
AutoCAD SHX Text
15m
AutoCAD SHX Text
10m
AutoCAD SHX Text
20m
AutoCAD SHX Text
20m
AutoCAD SHX Text
20m
AutoCAD SHX Text
20m
AutoCAD SHX Text
20m
AutoCAD SHX Text
15m
AutoCAD SHX Text
30m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
20m
AutoCAD SHX Text
20m
AutoCAD SHX Text
20m
AutoCAD SHX Text
30m
AutoCAD SHX Text
15m
AutoCAD SHX Text
20m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
20m
AutoCAD SHX Text
25m
AutoCAD SHX Text
20m
AutoCAD SHX Text
25m
AutoCAD SHX Text
30m
AutoCAD SHX Text
25m
AutoCAD SHX Text
6m
AutoCAD SHX Text
10m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
10m
AutoCAD SHX Text
20m
AutoCAD SHX Text
8m
AutoCAD SHX Text
10m LINE OF TREES
AutoCAD SHX Text
6m
AutoCAD SHX Text
8m
AutoCAD SHX Text
15m
AutoCAD SHX Text
15m
AutoCAD SHX Text
20m
AutoCAD SHX Text
20m
AutoCAD SHX Text
20m
AutoCAD SHX Text
6m
AutoCAD SHX Text
6m
AutoCAD SHX Text
8m
AutoCAD SHX Text
10m
AutoCAD SHX Text
8m
AutoCAD SHX Text
8m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
10m
AutoCAD SHX Text
8-10m TREES
AutoCAD SHX Text
10m
AutoCAD SHX Text
15m
AutoCAD SHX Text
BLOCK & METAL SHED
AutoCAD SHX Text
SINGLE STORY FIBRO RESIDENCE TILE ROOF
AutoCAD SHX Text
CARPORT
AutoCAD SHX Text
METAL GARDEN SHEDS
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
METAL WIRE FENCE
AutoCAD SHX Text
GRAVEL DRIVEWAY
AutoCAD SHX Text
(63.0)
AutoCAD SHX Text
(64.5)
AutoCAD SHX Text
(65.5)
AutoCAD SHX Text
(66.0)
AutoCAD SHX Text
(59.5)
AutoCAD SHX Text
(59.0)
AutoCAD SHX Text
(45.0)
AutoCAD SHX Text
(45.0)
AutoCAD SHX Text
(65.0)
AutoCAD SHX Text
(66.0)
AutoCAD SHX Text
(65.5)
AutoCAD SHX Text
(65.0)
AutoCAD SHX Text
(64.5)
AutoCAD SHX Text
(64.0)
AutoCAD SHX Text
(63.5)
AutoCAD SHX Text
(63.0)
AutoCAD SHX Text
(57.0)
AutoCAD SHX Text
(56.5)
AutoCAD SHX Text
(56.0)
AutoCAD SHX Text
(A)
AutoCAD SHX Text
(A)
AutoCAD SHX Text
#33
AutoCAD SHX Text
20m
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(A)
AutoCAD SHX Text
(B)

CH 105.00

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:500

A.H.D.

32

DECEMBER, 2019

2

GJA

BNS

2624DA1-2

MS2624GENERAL ARRANGEMENT PLAN

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B1:500 10 0 10 20

485

451452453454455456457458459460461462463464465466467

484483482481480479478477476475473472471470469468

CH -30.00

CH -15.00

CH 0.00

CH 15.00

CH 30.00

CH 45.00

CH 60.00

CH 75.00

CH 90.00

CH 105.00

CH 70.71

CH 0

.00

CH 1

5.00

CH 3

0.00

CH 4

5.00

CH 6

0.00

CH 7

5.00

CH 9

0.00

CH 1

05.0

0

CH 1

20.0

0

CH 1

35.0

0

CH 1

50.0

0

CH 1

65.0

0

CH 1

80.0

0

CH 1

95.0

0

CH 2

10.0

0

CH 2

25.0

0

CH 2

40.0

0

CH 2

19.9

1

CH -30.00

CH -15.00

CH 0.00 BDY

CH 15.00

CH 30.00

CH 45.00

CH 60.00

CH 75.00

CH 90.00

CH 70.71 CH 0

.00

CH 1

5.00

CH 3

0.00

CH 4

5.00

CH 6

0.00

CH 7

5.00

CH 9

0.00

CH 1

05.0

0

CH 1

20.0

0

CH 1

35.0

0

CH 1

50.0

0

CH 1

65.0

0

CH 1

80.0

0

CH 1

95.0

0

CH 2

10.0

0

CH 2

20.4

4

CH 1665.00

CH 1680.00

CH 1695.00

CH 1710.00

CH 1725.00

CH 1740.00

CH 1755.00

CH 1770.00

CH 1785.00

CH 1800.00

CH 1695.43 BDY

CH 1766.14

CH 1746.00

450

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

LEGEND NOTES:1. ROADS AND STORMWATER DRAINAGE SUBJECT TO DESIGN

REQUIREMENTS OF BLACKTOWN CITY COUNCIL.CONSTRUCTION DETAILS TO BE SUBMITTED WITH THECONSTRUCTION CERTIFICATE APPLICATION.

2. NORTH-SOUTH ROADS TO BE DESIGNED WITH TRAFFIC FLOWPRIORITY AT INTERSECTIONS WITH EAST-WEST ROADS.GIVE-WAY SIGNS AND LINE MARKING AT CROSS ROADINTERSECTIONS TO BE INSTALLED. CONSTRUCTIONCERTIFICATE DETAILS OF SIGNAGE AND LINEMARKING REQUIREAPPROVAL BY THE LOCAL TRAFFIC COMMITTEE PRIOR TOCONSTRUCTION.

3. FINAL DESIGNS MAY VARY FROM CONCEPT LAYOUT TO SUITSITE CONDITIONS AND REQUIREMENTS OF DEVELOPMENTAPPROVAL.

4. DRIVEWAY LOCATION SHOWN ON THIS PLAN ARE INDICATIVEONLY.

DESIGN EXTENT OF BATTERS

PROPOSED ROAD 4 (8.5 WIDE)

PROPOSED ROAD 2 (8 WIDE)

PROP

OSED

ROA

D 3

(8.5

WIDE

)

PROP

OSED

ROA

D 1

(18 W

IDE)

TEMP PUBLIC ROAD (11 WIDE)

(RESIDUE)

474

8.0

4.5PROPOSED RK

BOUNDARY

PATH PAVING

BOUNDARY

PROPOSED RK

BOUNDARYPATH PAVING

BOUNDARY

5.0

8.5

11.018.0

5.08.5

PROP

OSED

RK

BOUN

DARY

PATH

PAVIN

G

BOUN

DARY

PROP

OSED

RK

PATH

PAVIN

G

BOUN

DARY

PATH

PAVIN

G

BOUN

DARY

PROP

OSED

K&G

BOUN

DARY

5.54.5610.06

PROPOSED GULLY PIT

PROPOSED JUNCTION PIT

PROPOSED STORMWATER DRAINAGE LINE

FUTURE GULLY PIT (BY OTHERS)

7.0

1.0

3.0

PROPOSED RK

BOUNDARY

BOUNDARYEDGE OF PAVEMENT

EXTENT OF BATTER

EXTENT OF BATTER

TALL

AWON

G

ROAD

ROAD DRAINAGE TO BYPASS OSDSYSTEM AND BE DIRECTED TOSTORMWATER DRAINAGE LINEWITHIN No. 163 TALLAWONG ROAD- REFER DA 18-01492.

CONSTRUCT TEMPORARY OSD AND BIO-RETENTIONSYSTEM GENERALLY IN ACCORDANCE WITH DETAILS ONSHEET 19. FINAL DETAILS TO BE SUBMITTED WITHCONSTRUCTION CERTIFICATE DRAWINGS.

DOWNSTREAM PIPE TO BE CAPPED AT PIT TODIRECT STORMWATER FLOWS THROUGH LOT468 TO TEMPORARY OSD BASIN.

IAD LINE THROUGH LOT 468 TO BE CAPPED AFTERREMOVAL OF TEMPORARY BASIN. CONNECT IADLINE TO STREET DRAINAGE UNDER SEPARATECONSTRUCTION CERTIFICATE APPLICATION.

REFER TO APPROVED CONCEPTUAL ENGINEERINGPLANS PREPARED BY WOOD & GRIEVE ENGINEERSFOR ROAD AND STORMWATER DRAINAGE LINEDETAILS ON LOT 1 DP1244483 (DA-18-01492).

REMOVE EXISTING HEADWALL AND CONSTRUCTNEW GRATED PIT OVER EXISTING DRAINAGELINE TO REDIRECT STORMWATER FLOWSALONG TALLAWONG ROAD.

TEMPORARY PUBLIC ROAD 11m WIDE TO PROVIDEALTERNATIVE ACCESS TO DEVELOPMENT SITE, IFREQUIRED. ACCESS TO SITE TO BE VIA APPROVEDSUBDIVISION TO THE SOUTH UNDER DA-18-01492.

FORM BUILDING PADS ON PROPOSED LOTS WITHBULK EARTHWORKS. INSTALL RETAINING WALLS TOPROVIDE SUPPORT. REFER TO DETAILS ON SHEETS20 AND 21.

PROPOSED RETAINING WALL

INDICATIVE DRIVEWAY LOCATION

NEW FLEXIBLE PAVEMENT

EASEMENT FOR DRAINAGE 1.83 WIDE (D.P.30186) - (H500894)PROPOSED EASEMENT TO DRAIN WATER 1.0 WIDE

EASEMENTS

TRANSITION WORKS

06/04/2020 - AMENDED PLANS IN ACCORDANCE WITH STATEMENT OF FACTSAND CONTENTIONS FILED BY BCC.

450Ø

1-1

1-2

375Ø

375Ø

375Ø

375Ø

450Ø450Ø450Ø450Ø450Ø450Ø450Ø450Ø450Ø450Ø450Ø

525Ø

2-1

2-2

2-3

2-4

2-52-62-72-82-92-102-112-122-132-142-152-162-17

2-18

375Ø

450Ø

3-1

3-2

375Ø375Ø375Ø375Ø

375Ø375Ø

4-14-24-34-44-5

4-6

4-7

4-8

675Ø

675Ø

675Ø675Ø

675Ø

750Ø

5-1

5-2

5-3

5-4

5-5

5-6

5-7

525Ø

6-16-2

6-3

225Ø225Ø225Ø300Ø300Ø300Ø300Ø300Ø375Ø375Ø375Ø375Ø375Ø375Ø375Ø450Ø450Ø 7-17-27-37-47-57-67-77-87-97-107-117-127-137-147-157-167-17

450Ø8-1

150Ø

375Ø

9-19-2

150Ø225Ø

225Ø225Ø

225Ø225Ø

225Ø300Ø

300Ø

10F-1

10F-2

10F-3

10F-4

10F-5

10F-6

10F-7

10F-8

10F-9

150Ø225Ø

225Ø225Ø

225Ø300Ø

375Ø

11F-1

11F-2

11F-3

11F-4

11F-5

11F-6

11F-7

6.1 PIT NUMBERS BY WOOD & GRIEVEENGINEERS FOR 163 TALLAWONG ROAD

6.3

6.2

7.1

6.1

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
MGA (SCIMS)
AutoCAD SHX Text
1
AutoCAD SHX Text
45
AutoCAD SHX Text
2.023 ha
AutoCAD SHX Text
285.91
AutoCAD SHX Text
70.715
AutoCAD SHX Text
286.445
AutoCAD SHX Text
70.715
AutoCAD SHX Text
46
AutoCAD SHX Text
F
AutoCAD SHX Text
D
AutoCAD SHX Text
D.P. 1244483
AutoCAD SHX Text
D.P. 407863
AutoCAD SHX Text
D.P. 407863
AutoCAD SHX Text
(A)
AutoCAD SHX Text
450
AutoCAD SHX Text
SINGLE STORY FIBRO RESIDENCE TILE ROOF
AutoCAD SHX Text
(A)
AutoCAD SHX Text
(A)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(A)
AutoCAD SHX Text
(B)

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:500

A.H.D.

32

DECEMBER, 2019

3

GJA

BNS

2624DA1-3

MS2624BULK EARTHWORKS PLAN

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B1:500 10 0 10 20

485

451452453454455456457458459460461462463464465466467

484483482481480479478477476475473472471470469468

450

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

PROPOSED ROAD 4 (8.5 WIDE)

PROPOSED ROAD 2 (8 WIDE)

PROP

OSED

ROA

D 3

(

8.5 W

IDE)

PROP

OSED

ROA

D 1

(18 W

IDE)

TEMP PUBLIC ROAD (11 WIDE)

(RESIDUE)

474

RATIO: 1:20

TYPICAL SECTION - PAD FORMATION ATPROPOSED LOT BOUNDARIES

0.40

1% FALL

1:2 BATTER

BOUN

DARY

PROP

OSED

LOT

1% FALL

natural surface

EXCAVATE 400mm BEHIND LINE OF EXTERNALBOUNDARY TO ALLOW FOR RETAINING WALLCONSTRUCTION TO UPPER PAD.

BB

AA

CC

DD

DEPTH RANGE TABLE

-3.0 to -2.5 CUT

-2.5 to -2.0 CUT

-2.0 to -1.5 CUT

-1.5 to -1.0 CUT

-1.0 to -0.5 CUT

-0.5 to 0 CUT

0 to 0.5 FILL

0.5 to 1.0 FILL

1.0 to 1.5 FILL

1.5 to 2.0 FILL

2.0 to 2.5 FILL

Lower Upper CUT/FILL Colour

2.5 to 3.0

3.0 to 3.5

3.5 to 4.0

FILL

FILL

FILL

-3.5 to -3.0 CUT

-4.0 to -3.5 CUT

06/04/2020 - AMENDED PLANS IN ACCORDANCE WITH STATEMENT OF FACTSAND CONTENTIONS FILED BY BCC.

TRANSITION WORKS ONLY REQUIRED IFDEVELOPMENT OF 163 TALLAWONG ROAD(DA-18-01492) HAS NOT YET COMMENCED.

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
MGA (SCIMS)
AutoCAD SHX Text
1
AutoCAD SHX Text
285.91
AutoCAD SHX Text
70.715
AutoCAD SHX Text
286.445
AutoCAD SHX Text
70.715
AutoCAD SHX Text
46
AutoCAD SHX Text
F
AutoCAD SHX Text
D
AutoCAD SHX Text
D.P. 1244483
AutoCAD SHX Text
D.P. 407863
AutoCAD SHX Text
D.P. 407863
AutoCAD SHX Text
(A)
AutoCAD SHX Text
SINGLE STORY FIBRO RESIDENCE TILE ROOF
AutoCAD SHX Text
(A)
AutoCAD SHX Text
(A)
AutoCAD SHX Text
TALLAWONG ROAD
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)
AutoCAD SHX Text
(B)

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE

A.H.D.

32

DECEMBER, 2019

4

GJA

BNS

2624DA1-4

MS2624BULK EARTHWORKS - SECTION A-A

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

1:500(HS); 1:100(VS)

0.00

045

.011

45.9

17

3.35

045

.288

45.7

823.

500

45.3

0045

.782

3.65

045

.313

45.6

333.

950

45.3

3845

.672

9.00

245

.807

45.8

23

14.0

5046

.284

45.6

71

14.3

3946

.312

45.6

32

14.4

9546

.322

45.7

75

14.6

4546

.330

45.7

81

15.0

0046

.349

45.7

95

18.4

6746

.683

45.9

33

20.1

5146

.554

46.0

61

30.0

0046

.961

44.8

00

42.8

3147

.803

44.8

00

42.8

3247

.803

46.0

80

44.4

3247

.916

46.0

80

44.5

3247

.923

47.2

80

45.0

0047

.956

47.2

80

56.9

4148

.786

47.2

80

57.0

4148

.792

48.4

80

60.0

0048

.987

48.4

80

69.4

5149

.584

48.4

80

69.5

5249

.590

49.5

30

75.0

0049

.936

49.5

30

81.9

6250

.400

49.5

30

82.0

6150

.406

50.1

80

90.0

0050

.883

50.1

80

94.4

7251

.169

50.1

80

94.5

7251

.175

50.8

30

104.

612

51.7

7450

.830

104.

712

51.7

8051

.136

105.

000

51.7

9751

.136

114.

751

52.7

7351

.136

114.

852

52.8

0151

.613

120.

000

53.4

8951

.612

124.

891

52.6

6351

.612

124.

992

52.6

6552

.193

135.

000

52.9

0452

.193

135.

031

52.9

0552

.193

135.

131

52.9

0852

.717

145.

172

53.3

1652

.717

145.

272

53.3

2153

.217

150.

000

53.5

3353

.217

155.

312

53.8

6553

.217

155.

411

53.8

7153

.600

165.

000

54.3

7853

.600

165.

452

54.3

8453

.600

165.

552

54.3

8653

.858

175.

592

54.5

8653

.858

175.

655

54.5

8953

.954

180.

000

54.6

9153

.954

185.

732

54.6

8353

.954

185.

795

54.6

8354

.018

195.

000

54.6

8954

.018

195.

872

54.7

0554

.018

195.

935

54.7

0654

.082

206.

012

54.7

5254

.082

206.

075

54.7

5154

.210

210.

000

54.9

6854

.210

216.

562

55.1

1754

.210

220.

062

54.7

7654

.794

223.

911

54.7

7954

.639

224.

062

54.7

7954

.639

224.

212

54.7

7954

.489

224.

512

54.7

7954

.529

225.

000

54.7

7954

.544

229.

564

54.7

8354

.681

234.

612

54.7

8554

.529

234.

911

54.7

8554

.490

235.

062

54.7

8554

.639

235.

212

54.7

8554

.639

239.

102

54.7

8654

.786

255.

000

56.1

98

270.

000

57.7

79

285.

000

59.3

14

291.

298

59.9

2659

.926

295.

086

60.2

9160

.683

299.

954

60.5

8960

.488

300.

000

60.5

9060

.488

300.

104

60.5

9460

.488

300.

144

60.5

9660

.338

300.

594

60.6

1160

.378

305.

644

60.8

0360

.530

CHAINAGE

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 40.000

LONGITUDINAL SECTION - SECTION A-ARATIO: 1:500 (H); 1:100 (V)

C/L -

TAL

LAW

ONG

ROAD

C/L -

ROA

D 3

C/L -

ROA

D 1

TEMPORARY BASIN

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:500(HS); 1:100(VS)

A.H.D.

32

DECEMBER, 2019

5

GJA

BNS

2624DA1-5

MS2624BULK EARTHWORKS - SECTION B-B

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

C/L -

TAL

LAW

ONG

ROAD

C/L -

ROA

D 3

C/L -

ROA

D 1

0.00

045

.363

46.3

84

3.35

045

.676

46.2

493.

500

45.6

9046

.249

3.65

045

.704

46.0

993.

950

45.7

3246

.139

9.00

346

.209

46.2

90

14.0

5046

.539

46.1

39

14.3

5046

.560

46.0

99

14.5

0046

.570

46.2

49

14.6

5046

.581

46.2

49

15.0

0046

.605

46.2

63

18.5

1246

.853

46.4

05

21.0

0147

.026

46.9

18

30.0

0047

.581

46.9

18

32.1

4847

.699

46.9

18

32.2

4847

.704

47.6

18

44.6

5848

.569

47.6

18

44.7

5848

.576

48.1

17

45.0

0048

.593

48.1

17

57.1

6849

.535

48.1

17

57.2

6849

.543

49.3

18

60.0

0049

.761

49.3

18

69.6

7850

.468

49.3

18

69.7

7850

.474

50.5

14

75.0

0050

.826

50.5

14

82.1

8851

.335

50.5

14

82.2

8851

.342

51.5

14

90.0

0051

.968

51.5

14

94.6

9852

.387

51.5

14

94.7

9852

.396

52.3

08

104.

838

53.3

7552

.308

104.

938

53.3

7653

.170

105.

000

53.3

7753

.170

114.

978

53.4

7853

.170

115.

078

53.4

7853

.832

120.

000

53.5

0853

.832

125.

118

53.5

1253

.832

125.

218

53.5

1254

.734

135.

000

55.1

9654

.734

135.

258

55.2

1554

.734

135.

358

55.2

2255

.565

145.

398

55.6

9955

.565

145.

498

55.7

0356

.245

150.

000

55.9

0056

.245

155.

538

56.2

1256

.245

155.

638

56.2

1756

.769

165.

000

56.6

4656

.769

165.

678

56.6

8256

.769

165.

778

56.6

8757

.290

175.

854

57.0

4657

.290

175.

918

57.0

4757

.515

180.

000

57.0

7957

.515

185.

994

57.1

9257

.515

186.

058

57.1

9657

.708

195.

000

57.4

8357

.708

196.

134

57.4

7857

.708

196.

198

57.4

7857

.966

206.

274

57.4

8157

.966

206.

338

57.4

8158

.037

210.

000

57.5

2358

.037

216.

788

57.5

3258

.037

220.

288

57.5

6057

.964

224.

138

57.6

0357

.810

224.

288

57.6

0657

.810

224.

438

57.6

1057

.661

224.

741

57.6

1657

.701

225.

000

57.6

2557

.708

229.

791

57.6

8957

.852

234.

838

57.7

6857

.700

235.

138

57.7

7257

.660

235.

288

57.7

7357

.810

235.

438

57.7

7557

.810

239.

288

57.7

7457

.964

240.

000

57.8

1057

.822

240.

047

57.8

1357

.813

255.

000

58.6

42

270.

000

59.6

28

285.

000

60.6

53

286.

109

60.7

2860

.730

295.

314

61.6

4062

.571

300.

000

62.2

5262

.384

300.

182

62.2

7062

.376

300.

332

62.2

7362

.376

300.

372

62.2

7262

.226

300.

822

62.2

6862

.266

305.

872

62.5

6762

.418

CHAINAGE

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 40.000

LONGITUDINAL SECTION - SECTION B-BRATIO: 1:500 (H); 1:100 (V)

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:200(HS); 1:100(VS)

A.H.D.

32

DECEMBER, 2019

6

GJA

BNS

2624DA1-6

MS2624BULK EARTHWORKS - SECTIONS C-C AND D-D

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

4 2 0 2 4 81:200

2 1 0 1 2 3 41:100

0.00

051

.384

51.6

71

3.35

051

.393

51.5

373.

500

51.3

9451

.537

3.65

051

.394

51.3

873.

950

51.3

9551

.427

9.00

051

.487

51.5

78

14.0

5051

.476

51.4

27

14.3

5051

.473

51.3

87

14.5

0051

.472

51.5

37

14.6

5051

.471

51.5

37

15.0

0051

.468

51.5

51

18.5

0051

.393

51.6

91

22.0

0051

.305

50.5

96

30.0

0051

.151

50.5

16

45.0

0050

.826

50.3

66

45.0

5650

.825

50.3

65

45.1

5650

.823

49.6

81

60.0

0050

.248

49.5

32

68.2

1249

.924

49.4

50

71.7

1649

.782

49.3

70

75.0

0049

.627

49.2

39

75.5

6649

.600

49.2

16

75.7

1649

.593

49.2

16

75.8

6649

.586

49.0

66

76.1

6649

.572

49.1

06

80.2

1649

.380

49.2

27

84.2

6649

.133

49.1

0684

.566

49.1

1049

.066

84.7

1649

.098

49.2

1684

.866

49.0

8649

.216

88.2

1649

.350

CHAINAGE

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 42.000

LONGITUDINAL SECTION - SECTION C-CRATIO: 1:200 (H); 1:100 (V)

0.00

058

.204

3.34

958

.843

58.0

703.

499

58.8

3258

.070

3.64

958

.821

57.9

203.

949

58.7

9757

.960

8.99

958

.401

58.1

11

14.0

4957

.952

57.9

60

14.3

4957

.934

57.9

20

14.4

9957

.925

58.0

70

14.6

4957

.916

58.0

70

15.0

0057

.895

58.0

84

18.4

9957

.645

58.2

24

21.9

9957

.429

57.4

50

30.0

0056

.919

57.2

94

45.0

0055

.695

57.0

01

45.0

5655

.690

57.0

00

45.1

5655

.682

56.1

00

46.0

1255

.611

56.1

00

46.0

5655

.607

55.2

00

60.0

0054

.460

53.8

78

68.2

1253

.702

53.1

00

71.7

1453

.398

52.5

40

75.0

0053

.135

52.4

08

75.5

6453

.090

52.3

86

75.7

1453

.078

52.3

86

75.8

6453

.066

52.2

36

76.1

6453

.042

52.2

76

80.2

5952

.711

52.3

96

84.2

6452

.406

52.2

7684

.564

52.3

8352

.236

84.7

1452

.372

52.3

8684

.864

52.3

6052

.386

88.2

1652

.105

52.5

20

CHAINAGE

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 46.000

LONGITUDINAL SECTION - SECTION D-DRATIO: 1:200 (H); 1:100 (V)

C/L -

ROA

D 4

C/L -

ROA

D 2

C/L -

ROA

D 4

C/L -

ROA

D 2

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE AS SHOWN

A.H.D.

32

DECEMBER, 2019

7

GJA

BNS

2624DA1-7

MS2624

LONGITUDINAL SECTION - TALLAWONG ROAD ANDTYPICAL CROSS SECTION (PARTIAL WIDTH ROADRECONSTRUCTION)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

I.P.

58.5

22

I.P.

58.7

80

I.P.

61.8

67

I.P.

62.7

02

I.P.

63.5

53

10.000 VC 10.000 VC 22.944 VC 10.071 VC 10.071 VC

7.446% 2.578% 7.000% 5.056% 8.449% 6.504%

1650

.000

56.2

98

1665

.000

57.4

00

1675

.428

58.1

5058

.150

1680

.000

58.4

9058

.439

1680

.428

58.5

2258

.461

1685

.428

58.8

8758

.651

1690

.428

59.2

2558

.835

1695

.000

59.5

3359

.100

1695

.428

59.5

6259

.130

1710

.000

60.4

7760

.150

1723

.056

61.2

6261

.064

1725

.000

61.3

7861

.198

1734

.528

61.9

3161

.811

1740

.000

62.2

3662

.128

1746

.000

62.6

0362

.447

1751

.036

62.9

1662

.744

1755

.000

63.1

6263

.038

1756

.071

63.2

2863

.127

1761

.107

63.5

5263

.528

1766

.142

63.8

8063

.880

1770

.000

64.1

30

1785

.000

65.0

31

1800

.000

65.8

43

CHAINAGE

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 50.000

LONGITUDINAL SECTION - TALLAWONG ROAD (PARTIAL WIDTH ROAD RECONSTRUCTION)RATIO: 1:500 (H); 1:100 (V)

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

TYPICAL SECTION - TALLAWONG ROAD (PARTIAL WIDTH ROAD RECONSTRUCTION)RATIO 1:50

STD K&G

Natural Surface

SAWCUT EXISTINGPAVEMENT

DESI

GN C

/L

BERM5.54.560.5

FACE

OF

KERB

BOUN

DARY

10.06

TRANSITION NEW PAVEMENT TO EXISTINGUSING AC10 TO MAKE SMOOTH JUNCTION.

0.9

4.0% 3.0%

Design Surface

Natural Surface

SITE

BOU

NDAR

Y

SITE

BOU

NDAR

Y

TRANSITION NEW PAVEMENT TO EXISTINGUSING AC10 OVER 20m. MAKE SMOOTHJUNCTION WITH EXISTING.

TRANSITION NEW PAVEMENT TO EXISTINGUSING AC10 OVER 20m. MAKE SMOOTHJUNCTION WITH EXISTING.

SHARED PATH2.5 1.16

1:502100.51

PROPOSED TALLAWONG ROAD CONSTRUCTION WORKS(AS PER DESIGN BY BCC; RECEIVED 27/09/2019)

SECTION 94 CONTRIBUTION PLAN No.22W (SITE No. R5.2)

TALLAWONG ROAD DESIGN BYBLACKTOWN CITY COUNCIL;RECEIVED 27/09/2019.

1:5 BATTER

TRANSITION WORKS

TRANSITION WORKS

# TRANSITION WORKS ONLY REQUIRED IFDEVELOPMENT OF 163 TALLAWONG ROAD(DA-18-01492) HAS NOT YET COMMENCED.

#

CH 1

746.

00

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
FUTURE KERB
AutoCAD SHX Text
BERM
AutoCAD SHX Text
BOUNDARY
AutoCAD SHX Text
4.56
AutoCAD SHX Text
5.5
AutoCAD SHX Text
0.5
AutoCAD SHX Text
FACE OF KERB
AutoCAD SHX Text
10.06
AutoCAD SHX Text
FUTURE ROAD CONSTRUCTION WORKS (BY OTHERS)

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:200

A.H.D.

32

DECEMBER, 2019

8

GJA

BNS

2624DA1-8

MS2624CROSS SECTIONS - TALLAWONG ROAD (PARTIALWIDTH ROAD RECONSTRUCTION)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

CH 1695.428

4.0% -3.0%

-10.

558

59.3

8759

.283

-10.

058

59.4

3859

.263

-5.6

9059

.419

59.0

88

-5.5

4059

.425

59.0

88

-5.5

0059

.426

58.9

38

-5.0

5059

.440

58.9

78

0.00

059

.562

59.1

30

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 54.000

CH 1766.142

-20.0%4.0% -3.0%

-19.

232

62.2

9862

.298

-10.

558

63.0

8464

.033

-10.

058

63.1

3064

.013

-5.6

9063

.502

63.8

39

-5.5

4063

.549

63.8

39

-5.5

0063

.553

63.6

89

-5.0

5063

.597

63.7

29

0.00

063

.880

63.8

80

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 58.000

CH 1710

-20.0% 4.0% -3.0% 5.0%

-12.

716

59.8

7259

.872

-10.

558

60.0

4260

.303

-10.

058

60.0

8160

.283

-5.6

9060

.292

60.1

08

-5.5

4060

.297

60.1

08

-5.5

0060

.298

59.9

58

-5.0

5060

.313

59.9

98

0.00

060

.477

60.1

50

4.08

760

.354

60.3

54

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 55.000

CH 1725

-20.0%4.0% -3.0% 5.0%

-17.

921

59.8

7959

.879

-10.

558

60.5

3961

.352

-10.

058

60.5

8561

.332

-5.6

9061

.091

61.1

57

-5.5

4061

.098

61.1

57

-5.5

0061

.100

61.0

07

-5.0

5061

.121

61.0

47

0.00

061

.378

61.1

98

2.22

061

.309

61.3

09

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 55.000

CH 1740

-20.0%4.0% -3.0%

-20.

154

60.3

6260

.362

-10.

558

61.2

3562

.282

-10.

058

61.2

8462

.262

-5.6

9061

.871

62.0

87

-5.5

4061

.879

62.0

87

-5.5

0061

.881

61.9

37

-5.0

5061

.913

61.9

77

0.00

062

.236

62.1

28

1.56

962

.207

62.2

07

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 56.000

CH 1746

-20.0%4.0% -3.0% 5.0%

-19.

696

60.7

7360

.773

-10.

558

61.6

9862

.600

-10.

058

61.7

5162

.580

-5.6

9062

.292

62.4

05

-5.5

4062

.291

62.4

05

-5.5

0062

.290

62.2

55

-5.0

5062

.299

62.2

95

0.00

062

.603

62.4

47

2.45

362

.570

62.5

70

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 56.000

CH 1755

-20.0%4.0% -3.0% 5.0%

-18.

888

61.5

2661

.526

-10.

558

62.3

7163

.192

-10.

058

62.4

2363

.172

-5.6

9062

.876

62.9

97

-5.5

4062

.882

62.9

97

-5.5

0062

.883

62.8

47

-5.0

5062

.902

62.8

87

0.00

063

.162

63.0

38

2.20

163

.149

63.1

49

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 57.000

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

1:2004 02 4 8

TRANSITION NEW PAVEMENT TO EXISTINGUSING AC10 TO MAKE SMOOTH JUNCTION.

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE AS SHOWN

A.H.D.

32

DECEMBER, 2019

9

GJA

BNS

2624DA1-9

MS2624LONGITUDINAL SECTION - PROPOSED ROAD 1 ANDTYPICAL CROSS SECTION

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

1:502100.51

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

TYPICAL SECTION - PROPOSED ROAD 1RATIO 1:50

DESI

GN C

/L

BERM5.53.50.5

FACE

OF

KERB

BOUN

DARY

9.0

5.5 3.5

FACE

OF

KERB

BOUN

DARY

9.0

0.9PATH PAVING

1.5BERM

0.5

4.0%

ROLL KERB

Natural Surface3.0%

PROPOSED ROAD CONSTRUCTION WORKSSUBDIVISION OF 163 TALLAWONG ROAD(REFER TO CONCEPTUAL ENGINEERING PLANS PREPARED

BY WOOD GRIEVE ENGINEERS UNDER DA 18-01492)

FUTURE SUBDIVISION OF 165 GUNTAWONG ROAD

1:5 BATTER

I.P.

50.2

91

I.P.

52.3

61

I.P.

54.4

10

I.P.

63.0

76

I.P.

62.1

26

CR

EST

SAG

SAG

7.500 VC 30.000 VC 30.000 VC 70.000 VC 10.000 VC

-3.019% 5.399% 5.825% 11.166% -2.318% 3.004%

-70.

870

50.7

90

-60.

000

50.4

62

-58.

089

50.4

04

-55.

400

50.3

64

-54.

339

50.3

70

-50.

589

50.4

93

-45.

000

50.7

95

-31.

000

51.5

51

-30.

000

51.6

05

-16.

000

52.3

77

-15.

000

52.4

33

-1.0

0053

.430

53.2

35

0.00

053

.534

53.2

93

4.17

454

.870

53.5

36

15.0

0054

.783

54.2

71

19.1

7454

.783

54.6

10

30.0

0055

.834

55.6

34

34.1

7457

.223

56.0

85

45.0

0057

.476

57.2

94

60.0

0058

.588

58.9

69

61.7

8258

.804

59.1

68

70.7

1459

.878

60.0

88

75.0

0060

.359

60.4

75

90.0

0061

.552

96.7

8261

.896

105.

000

62.1

94

119.

749

62.4

04

120.

000

62.4

04

131.

782

62.2

64

132.

755

62.2

42

135.

000

62.2

03

137.

111

62.1

91

137.

755

62.1

93

142.

755

62.2

76

150.

000

62.4

94

151.

805

62.5

48

CHAINAGE

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 42.000

LONGITUDINAL SECTION - PROPOSED ROAD 1RATIO: 1:500 (H); 1:100 (V)

Natural Surface

Design Surface

0.9PATH PAVING

1.5

ROLL KERB

3.0%4.0%

SITE REGRADE

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE

CH 15

4.0% -3.0% -3.0% 4.0% 20.0%

-9.5

0054

.777

54.3

84

-9.0

0054

.778

54.3

64

-5.6

5054

.779

54.2

30

-5.5

0054

.779

54.2

30

-5.3

5054

.779

54.0

80

-5.0

5054

.779

54.1

20

0.00

054

.783

54.2

71

5.05

054

.783

54.1

20

5.35

054

.783

54.0

80

5.50

054

.783

54.2

30

5.65

054

.783

54.2

30

9.00

054

.783

54.3

64

9.50

054

.783

54.3

84

11.5

0054

.784

54.7

84

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 51.000

CH 30

4.0% -3.0% -3.0% 4.0%

-9.5

0056

.338

55.7

47

-9.0

0056

.287

55.7

27

-5.6

5055

.949

55.5

93

-5.5

0055

.934

55.5

93

-5.3

5055

.918

55.4

43

-5.0

5055

.886

55.4

83

0.00

055

.834

55.6

34

5.05

055

.638

55.4

83

5.35

055

.617

55.4

43

5.50

055

.606

55.5

93

5.65

055

.595

55.5

93

9.00

055

.698

55.7

27

9.50

055

.731

55.7

47

9.56

055

.735

55.7

35

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 52.000

CH 45

4.0% -3.0% -3.0% 4.0%

-9.5

0057

.555

57.4

06

-9.0

0057

.540

57.3

86

-5.6

5057

.449

57.2

52

-5.5

0057

.450

57.2

52

-5.3

5057

.450

57.1

02

-5.0

5057

.452

57.1

42

0.00

057

.476

57.2

94

5.05

057

.190

57.1

42

5.35

057

.190

57.1

02

5.50

057

.189

57.2

52

5.65

057

.189

57.2

52

9.00

057

.188

57.3

86

9.50

057

.187

57.4

06

10.4

0057

.226

57.2

26

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 55.000

CH 60

-3.0% -3.0% 4.0%

-5.0

5058

.064

58.8

17

0.00

058

.588

58.9

69

5.05

058

.829

58.8

17

5.35

058

.842

58.7

77

5.50

058

.848

58.9

27

5.65

058

.854

58.9

27

9.00

058

.972

59.0

61

9.50

058

.979

59.0

81

9.97

658

.986

58.9

86

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 55.000

1:100 (NAT.)

A.H.D.

10

GJA

BNS

2624DA1-10

MS2624CROSS SECTIONS - PROPOSED ROAD 1

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

0 2 42 11:100

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

32

DECEMBER, 2019

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE AS SHOWN

A.H.D.

11

GJA

BNS

2624DA1-11

MS2624LONGITUDINAL SECTION - PROPOSED ROAD 2 ANDTYPICAL CROSS SECTION

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

1:502100.51

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

TYPICAL SECTION - PROPOSED ROAD 2RATIO 1:50

Natural Surface

DESI

GN C

/L &

BDY

4.5 3.5

FACE

OF

KERB

BOUN

DARY

8.0

0.9PATH PAVING

1.5BERM

0.5

4.0%

ROLL KERB

3.0%

Design Surface

Natural Surface

C/L

- R

OAD

3

C/L

- ROA

D 1

PROPOSED ROAD CONSTRUCTION WORKS FUTURE EXTENSION(BY OTHERS)

SITE REGRADE

I.P.

52.8

61

I.P.

52.2

97

I.P.

49.8

99

I.P.

47.6

60

I.P.

44.8

77

I.P.

45.1

50

I.P.

45.2

87

I.P.

45.1

52

I.P.

45.0

02

SAG

12.000 VC 30.000 VC 30.000 VC 35.000 VC 8.000 VC 10.000 VC

-2.999% -1.000% -3.559% -5.650% -11.500% 2.000% 3.026%-2.977%-3.000% -5.650%

0.00

053

.534

53.2

93

8.40

753

.013

53.0

41

14.4

0752

.892

52.8

91

15.0

0052

.880

52.8

79

20.4

0752

.739

52.8

01

30.0

0052

.855

52.7

05

45.0

0052

.981

52.5

55

55.7

9352

.850

52.4

47

60.0

0052

.714

52.3

97

70.7

9352

.453

52.2

01

75.0

0052

.295

52.0

98

85.7

9351

.784

51.7

63

90.0

0051

.582

51.6

13

105.

000

51.1

8651

.080

120.

000

50.6

0250

.546

123.

177

50.5

1250

.433

135.

000

50.1

7949

.963

138.

177

50.1

1349

.821

150.

000

49.3

8049

.227

153.

177

49.1

9649

.051

160.

302

48.7

9948

.649

165.

000

48.5

5448

.365

177.

802

47.8

6147

.404

180.

000

47.7

2447

.212

195.

000

46.8

1345

.682

195.

302

46.7

9445

.648

198.

000

46.6

1745

.337

202.

000

46.3

5545

.012

204.

815

46.1

7344

.946

206.

000

46.1

1344

.957

210.

000

45.9

1145

.037

215.

608

45.6

2445

.150

219.

910

45.3

9845

.280

220.

149

45.3

8245

.287

224.

680

45.0

7345

.152

225.

000

45.0

5145

.142

229.

680

44.7

2744

.969

234.

680

44.7

20

240.

000

44.4

19

CHAINAGE

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 36.000

LONGITUDINAL SECTION - PROPOSED ROAD 2RATIO: 1:500 (H); 1:100 (V)

32

DECEMBER, 2019

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
BERM
AutoCAD SHX Text
4.5
AutoCAD SHX Text
3.5
AutoCAD SHX Text
0.5
AutoCAD SHX Text
FACE OF KERB
AutoCAD SHX Text
BOUNDARY
AutoCAD SHX Text
8.0
AutoCAD SHX Text
ROAD CONSTRUCTION WORKS (DA-18-01492)

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:200

A.H.D.

12

GJA

BNS

2624DA1-12

MS2624CROSS SECTIONS - PROPOSED ROAD 2

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

CH 15

-3.0% 4.0%

-8.5

0052

.044

53.0

22-8

.000

52.0

9353

.002

-4.6

5052

.422

52.8

68-4

.500

52.4

3752

.868

-4.3

5052

.452

52.7

18-4

.050

52.4

8152

.758

0.00

052

.880

52.8

79

4.05

053

.297

52.7

58

4.35

053

.374

52.7

18

4.50

053

.412

52.8

68

4.65

053

.451

52.8

68

8.00

054

.344

53.0

02

8.50

054

.486

53.0

22

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 48.000

CH 30

-3.0% 4.0%

-8.5

0052

.043

52.8

48-8

.000

52.0

9352

.828

-4.6

5052

.421

52.6

94-4

.500

52.4

3552

.694

-4.3

5052

.449

52.5

44-4

.050

52.4

7752

.584

0.00

052

.855

52.7

05

4.05

053

.255

52.5

84

4.35

053

.280

52.5

44

4.50

053

.293

52.6

94

4.65

053

.305

52.6

94

8.00

053

.587

52.8

28

8.50

053

.629

52.8

48

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 48.000

CH 45

-3.0% 4.0%

-8.5

0052

.170

52.6

97-8

.000

52.2

2052

.677

-4.6

5052

.552

52.5

43-4

.500

52.5

6752

.543

-4.3

5052

.580

52.3

93-4

.050

52.6

0852

.433

0.00

052

.981

52.5

55

4.05

053

.305

52.4

33

4.35

053

.329

52.3

93

4.50

053

.341

52.5

43

4.65

053

.353

52.5

43

8.00

053

.599

52.6

77

8.50

053

.634

52.6

97

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 48.000

CH 60

-3.0% 4.0%

-8.5

0052

.067

52.5

40-8

.000

52.1

0552

.520

-4.6

5052

.360

52.3

86-4

.500

52.3

7252

.386

-4.3

5052

.383

52.2

36-4

.050

52.4

0652

.276

0.00

052

.714

52.3

97

4.05

053

.042

52.2

76

4.35

053

.066

52.2

36

4.50

053

.078

52.3

86

4.65

053

.090

52.3

86

8.00

053

.358

52.5

20

8.50

053

.398

52.5

40

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 48.000

CH 75

-3.0% 4.0%-8

.500

51.6

7352

.240

-8.0

0051

.708

52.2

20

-4.6

5051

.946

52.0

86-4

.500

51.9

5752

.086

-4.3

5051

.968

51.9

36-4

.050

51.9

8951

.976

0.00

052

.295

52.0

98

4.05

052

.558

51.9

76

4.35

052

.577

51.9

36

4.50

052

.587

52.0

86

4.65

052

.597

52.0

86

8.00

052

.812

52.2

20

8.50

052

.845

52.2

40

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 47.000

CH 90

-3.0% 4.0%

-8.5

0051

.029

51.7

56-8

.000

51.0

6351

.736

-4.6

5051

.287

51.6

02-4

.500

51.2

9751

.602

-4.3

5051

.306

51.4

52-4

.050

51.3

2551

.492

0.00

051

.582

51.6

13

4.05

051

.903

51.4

92

4.35

051

.927

51.4

52

4.50

051

.939

51.6

02

4.65

051

.951

51.6

02

8.00

052

.222

51.7

36

8.50

052

.264

51.7

56

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 47.000

CH 105

-3.0% 4.0%

-8.5

0050

.398

51.2

22-8

.000

50.4

3451

.202

-4.6

5050

.684

51.0

68-4

.500

50.6

9551

.068

-4.3

5050

.709

50.9

18-4

.050

50.7

4150

.958

0.00

051

.186

51.0

80

4.05

051

.230

50.9

58

4.35

051

.149

50.9

18

4.50

051

.108

51.0

68

4.65

051

.068

51.0

68

8.00

050

.830

51.2

02

8.50

050

.833

51.2

22

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 46.000

CH 120

-3.0% 4.0%

-8.5

0049

.881

50.6

88-8

.000

49.9

2450

.668

-4.6

5050

.209

50.5

34-4

.500

50.2

2250

.534

-4.3

5050

.235

50.3

84-4

.050

50.2

6050

.424

0.00

050

.602

50.5

46

4.05

050

.911

50.4

24

4.35

050

.936

50.3

84

4.50

050

.948

50.5

34

4.65

050

.961

50.5

34

8.00

051

.568

50.6

68

8.50

051

.747

50.6

88

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 45.000

CH 135

-3.0% 4.0%

-8.5

0049

.443

50.1

06-8

.000

49.4

8250

.086

-4.6

5049

.857

49.9

52-4

.500

49.8

7149

.952

-4.3

5049

.885

49.8

02-4

.050

49.9

1249

.842

0.00

050

.179

49.9

63

4.05

050

.409

49.8

42

4.35

050

.426

49.8

02

4.50

050

.435

49.9

52

4.65

050

.443

49.9

52

8.00

050

.633

50.0

86

8.50

050

.667

50.1

06

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 45.000

CH 150

-3.0% 4.0%

-8.5

0049

.370

-8.0

0049

.350

-4.6

5049

.087

49.2

16-4

.500

49.0

9849

.216

-4.3

5049

.110

49.0

66-4

.050

49.1

3349

.106

0.00

049

.380

49.2

27

4.05

049

.572

49.1

06

4.35

049

.586

49.0

66

4.50

049

.593

49.2

16

4.65

049

.600

49.2

16

8.00

049

.759

49.3

50

8.50

049

.782

49.3

70

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 44.000

CH 165

-3.0% 4.0%

-8.5

0048

.508

-8.0

0048

.488

-4.6

5048

.317

48.3

54-4

.500

48.3

2548

.354

-4.3

5048

.333

48.2

04-4

.050

48.3

4948

.244

0.00

048

.554

48.3

65

4.05

048

.714

48.2

44

4.35

048

.726

48.2

04

4.50

048

.732

48.3

54

4.65

048

.738

48.3

54

8.00

048

.862

48.4

88

8.50

048

.880

48.5

08

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 44.000

CH 180

-3.0% 4.0%

-8.5

0047

.292

47.3

54-8

.000

47.3

1847

.334

-4.6

5047

.488

47.2

00-4

.500

47.4

9547

.200

-4.3

5047

.503

47.0

50-4

.050

47.5

1847

.090

0.00

047

.724

47.2

12

4.05

047

.845

47.0

90

4.35

047

.852

47.0

50

4.50

047

.856

47.2

00

4.65

047

.859

47.2

00

8.00

047

.940

47.3

34

8.50

047

.952

47.3

54

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 43.000

1:2004 02 4 8 32

DECEMBER, 2019

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE AS SHOWN

A.H.D.

13

GJA

BNS

2624DA1-13

MS2624LONGITUDINAL SECTION - PROPOSED ROAD 3 ANDTYPICAL CROSS SECTION

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

1:502100.51

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

I.P.

43.0

69

I.P.

45.0

77

I.P.

46.0

51 I.P.

47.1

72

30.000 VC 30.000 VC 40.817 VC 10.000 VC

0.995% 4.365% 2.750% 1.000% 2.960%

-70.

872

42.9

00

-68.

881

42.9

20

-60.

000

43.0

52

-53.

881

43.1

95

-45.

000

43.4

78

-38.

881

43.7

24

-30.

000

44.1

11

-22.

875

44.4

22

-15.

000

44.7

49

-7.8

7545

.016

0.00

045

.398

45.2

80

7.12

545

.562

45.4

89

15.0

0045

.775

45.6

93

27.5

3445

.971

45.9

61

30.0

0046

.007

46.0

06

45.0

0046

.165

46.2

24

47.9

4246

.218

46.2

55

60.0

0046

.435

46.3

75

70.7

1446

.429

46.4

83

75.0

0046

.815

46.5

25

90.0

0046

.675

105.

000

46.8

25

120.

000

46.9

75

134.

690

47.1

22

135.

000

47.1

25

139.

690

47.1

97

144.

690

47.3

20

150.

000

47.4

77

151.

740

47.5

29

CHAINAGE

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 35.000

LONGITUDINAL SECTION - PROPOSED ROAD 3RATIO: 1:500 (H); 1:100 (V)

PROPOSED ROAD CONSTRUCTION WORKSSUBDIVISION OF 163 TALLAWONG ROAD(REFER TO CONCEPTUAL ENGINEERING PLANS PREPARED

BY WOOD GRIEVE ENGINEERS UNDER DA 18-01492)

FUTURE SUBDIVISION OF 165 GUNTAWONG ROAD

TYPICAL SECTION - PROPOSED ROAD 3RATIO 1:50

DESI

GN C

/L &

BDY

5.0 3.5

FACE

OF

KERB

BOUN

DARY

9.0

0.9PATH PAVING

1.5BERM

0.5

4.0%ROLL KERB

3.0%

Natural Surface

NOTE:FINAL DETAILS OF TEMPORARY MASONRY WALL AT COMMONSITE BOUNDARY TO BE SUBMITTED AT CONSTRUCTIONCERTIFICATE STAGE.

SITE REGRADETEMPORARY MASONRY WALL ANDFENCE ALONG BOUNDARY

0.5

Natural Surface Design Surface

32

DECEMBER, 2019

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
BERM
AutoCAD SHX Text
5.5
AutoCAD SHX Text
3.5
AutoCAD SHX Text
0.5
AutoCAD SHX Text
FACE OF KERB
AutoCAD SHX Text
BOUNDARY
AutoCAD SHX Text
9.0
AutoCAD SHX Text
FUTURE KERB
AutoCAD SHX Text
CROWN

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:100 (NAT.)

A.H.D.

14

GJA

BNS

2624DA1-14

MS2624CROSS SECTIONS - PROPOSED ROAD 3

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

CH 15

-3.0% 4.0%

-10.

000

44.9

4245

.820

-9.5

0044

.983

45.8

00

-6.1

5045

.261

45.6

66-6

.000

45.2

7345

.666

-5.8

5045

.286

45.5

16-5

.550

45.3

1045

.556

-0.5

0045

.729

45.7

080.

000

45.7

7545

.693

4.55

046

.039

45.5

56

4.85

046

.054

45.5

16

5.00

046

.062

45.6

66

5.15

046

.070

45.6

66

8.50

046

.328

45.8

00

9.00

046

.641

45.8

20

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 42.000

CH 30

-3.0% 4.0%

-10.

000

45.0

0346

.134

-9.5

0045

.053

46.1

14

-6.1

5045

.389

45.9

80-6

.000

45.4

0445

.980

-5.8

5045

.419

45.8

30-5

.550

45.4

4945

.870

-0.5

0045

.954

46.0

210.

000

46.0

0746

.006

4.55

046

.499

45.8

70

4.85

046

.532

45.8

30

5.00

046

.549

45.9

80

5.15

046

.565

45.9

80

8.50

046

.935

46.1

14

9.00

046

.991

46.1

34

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 42.000

CH 45

-3.0% 4.0%

-10.

000

45.2

1046

.351

-9.5

0045

.262

46.3

31

-6.1

5045

.584

46.1

97-6

.000

45.5

9846

.197

-5.8

5045

.612

46.0

47-5

.550

45.6

4146

.087

-0.5

0046

.118

46.2

390.

000

46.1

6546

.224

4.55

046

.443

46.0

87

4.85

046

.461

46.0

47

5.00

046

.470

46.1

97

5.15

046

.480

46.1

97

8.50

046

.689

46.3

31

9.00

046

.725

46.3

51

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 43.000

CH 60

-3.0%

-10.

000

45.5

4146

.503

-9.5

0045

.585

46.4

83

-6.1

5045

.880

46.3

49-6

.000

45.8

9346

.349

-5.8

5045

.906

46.1

99-5

.550

45.9

3246

.239

-0.5

0046

.395

46.3

900.

000

46.4

3546

.375

4.55

046

.734

46.2

39

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 43.000

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

0 2 42 11:100 32

DECEMBER, 2019

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE AS SHOWN

A.H.D.

15

GJA

BNS

2624DA1-15

MS2624LONGITUDINAL SECTION - PROPOSED ROAD 4 ANDTYPICAL CROSS SECTION

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

1:502100.51

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

TYPICAL SECTION - PROPOSED ROAD 4RATIO 1:50

DESI

GN C

/L &

BDY

5.03.5

FACE

OF

KERB

BOUN

DARY

9.0

0.9PATH PAVING

1.5BERM

0.5

4.0%ROLL KERB

3.0%

Natural Surface

NOTE:FINAL DETAILS OF TEMPORARY MASONRY WALL AT COMMONSITE BOUNDARY TO BE SUBMITTED AT CONSTRUCTIONCERTIFICATE STAGE.

SITE REGRADETEMPORARY MASONRY WALL ANDFENCE ALONG BOUNDARY

Design Surface

Natural Surface

C/L

- R

OAD

3

C/L

- ROA

D 1

PROPOSED ROAD CONSTRUCTION WORKS

I.P.

59.7

12

I.P.

57.2

45

I.P.

50.8

39

I.P.

45.9

48

SAG

15.000VC 35.000VC 35.000VC 10.000VC

-3.000% -3.404% -8.700% -11.111% 3.000% 3.009%

0.00

059

.878

60.0

88

5.05

060

.090

59.9

37

12.5

5060

.010

59.7

04

15.0

0059

.947

59.6

25

20.0

5059

.813

59.4

56

30.0

0059

.481

59.1

18

45.0

0058

.858

58.6

07

60.0

0058

.361

58.0

96

67.5

0057

.998

57.8

41

75.0

0057

.562

57.5

43

85.0

0056

.955

57.0

14

90.0

0056

.636

56.6

92

102.

500

55.7

5855

.723

105.

000

55.5

7455

.505

120.

000

54.2

6654

.200

135.

000

52.8

7152

.895

141.

135

52.3

0552

.362

150.

000

51.5

0651

.563

158.

635

50.7

8050

.734

165.

000

50.3

0150

.089

176.

135

49.4

5248

.895

180.

000

49.1

3848

.465

195.

000

48.0

5746

.798

197.

650

47.8

8046

.504

202.

650

47.5

5446

.125

205.

524

47.3

6746

.067

207.

650

47.2

2846

.098

210.

000

47.0

8146

.169

215.

895

46.7

0446

.346

220.

445

46.4

2946

.483

CHAINAGE

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 40.000

LONGITUDINAL SECTION - PROPOSED ROAD 4RATIO: 1:500 (H); 1:100 (V)

32

DECEMBER, 2019

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
BERM
AutoCAD SHX Text
5.5
AutoCAD SHX Text
3.5
AutoCAD SHX Text
0.5
AutoCAD SHX Text
FACE OF KERB
AutoCAD SHX Text
BOUNDARY
AutoCAD SHX Text
9.0
AutoCAD SHX Text
FUTURE KERB
AutoCAD SHX Text
0.5
AutoCAD SHX Text
CROWN

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:200

A.H.D.

16

GJA

BNS

2624DA1-16

MS2624CROSS SECTIONS - PROPOSED ROAD 4

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

1:2004 02 4 8

CH 15

4.0% -3.0%

-9.0

0057

.563

59.7

52

-8.5

0057

.565

59.7

32

-5.1

5059

.675

59.5

98

-5.0

0059

.682

59.5

98

-4.8

5059

.690

59.4

48

-4.5

5059

.706

59.4

88

0.00

059

.947

59.6

25

0.50

059

.983

59.6

40

5.55

060

.337

59.4

885.

850

60.3

5659

.448

6.00

060

.366

59.5

986.

150

60.3

7559

.598

9.50

059

.732

10.0

0059

.752

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 53.000

CH 30

4.0% -3.0%

-9.0

0057

.552

59.2

45

-8.5

0057

.559

59.2

25

-5.1

5059

.141

59.0

91

-5.0

0059

.162

59.0

91

-4.8

5059

.183

58.9

41

-4.5

5059

.217

58.9

81

0.00

059

.481

59.1

18

0.50

059

.511

59.1

33

5.55

059

.809

58.9

815.

850

59.8

2658

.941

6.00

059

.834

59.0

916.

150

59.8

4359

.091

9.50

059

.225

10.0

0059

.245

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 53.000

CH 45

4.0% -3.0%

-9.0

0058

.252

58.7

34

-8.5

0058

.300

58.7

14

-5.1

5058

.572

58.5

80

-5.0

0058

.581

58.5

80

-4.8

5058

.590

58.4

30

-4.5

5058

.604

58.4

70

0.00

058

.858

58.6

07

0.50

058

.883

58.6

22

5.55

059

.181

58.4

705.

850

59.2

0158

.430

6.00

059

.211

58.5

806.

150

59.2

2158

.580

9.50

058

.714

10.0

0058

.734

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 54.000

CH 60

4.0% -3.0%

-9.0

0057

.645

58.2

24

-8.5

0057

.688

58.2

04

-5.1

5057

.916

58.0

70

-5.0

0057

.925

58.0

70

-4.8

5057

.934

57.9

20

-4.5

5057

.952

57.9

60

0.00

058

.361

58.0

96

0.50

058

.401

58.1

11

5.55

058

.797

57.9

605.

850

58.8

2157

.920

6.00

058

.832

58.0

706.

150

58.8

4358

.070

9.50

058

.204

10.0

0058

.224

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 53.000

CH 75

4.0% -3.0%-9

.000

57.0

0857

.671

-8.5

0057

.040

57.6

51

-5.1

5057

.252

57.5

17

-5.0

0057

.262

57.5

17

-4.8

5057

.271

57.3

67

-4.5

5057

.290

57.4

07

0.00

057

.562

57.5

43

0.50

057

.604

57.5

58

5.55

058

.046

57.4

075.

850

58.0

7257

.367

6.00

058

.085

57.5

176.

150

58.0

9857

.517

9.50

057

.651

10.0

0057

.671

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 52.000

CH 90

4.0% -3.0%

-9.0

0056

.322

56.8

20

-8.5

0056

.346

56.8

00

-5.1

5056

.441

56.6

66

-5.0

0056

.447

56.6

66

-4.8

5056

.452

56.5

16

-4.5

5056

.464

56.5

56

0.00

056

.636

56.6

92

0.50

056

.667

56.7

07

5.55

057

.000

56.5

565.

850

57.0

1956

.516

6.00

057

.029

56.6

666.

150

57.0

3956

.666

9.50

057

.153

56.8

0010

.000

57.1

4556

.820

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 52.000

CH 105

4.0% -3.0%

-9.0

0055

.104

55.6

33

-8.5

0055

.129

55.6

13

-5.1

5055

.298

55.4

79

-5.0

0055

.306

55.4

79

-4.8

5055

.313

55.3

29

-4.5

5055

.328

55.3

69

0.00

055

.574

55.5

05

0.50

055

.601

55.5

20

5.55

055

.839

55.3

695.

850

55.8

5155

.329

6.00

055

.856

55.4

796.

150

55.8

6255

.479

9.50

055

.988

55.6

1310

.000

55.9

7355

.633

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 50.000

CH 120

4.0% -3.0%

-9.0

0053

.939

54.3

28

-8.5

0053

.954

54.3

08

-5.1

5054

.060

54.1

74

-5.0

0054

.066

54.1

74

-4.8

5054

.072

54.0

24

-4.5

5054

.084

54.0

64

0.00

054

.266

54.2

00

0.50

054

.282

54.2

15

5.55

054

.445

54.0

645.

850

54.4

5554

.024

6.00

054

.460

54.1

746.

150

54.4

6554

.174

9.50

054

.576

54.3

0810

.000

54.5

9354

.328

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 49.000

CH 135

4.0% -3.0%

-9.0

0052

.705

53.0

23

-8.5

0052

.727

53.0

03

-5.1

5052

.871

52.8

69

-5.0

0052

.878

52.8

69

-4.8

5052

.884

52.7

19

-4.5

5052

.887

52.7

59

0.00

052

.871

52.8

95

0.50

052

.884

52.9

10

5.55

053

.127

52.7

595.

850

53.1

4252

.719

6.00

053

.149

52.8

696.

150

53.1

5752

.869

9.50

053

.218

53.0

0310

.000

53.0

4553

.023

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 48.000

CH 150

4.0% -3.0%

-9.0

0051

.393

51.6

91

-8.5

0051

.405

51.6

71

-5.1

5051

.471

51.5

37

-5.0

0051

.472

51.5

37

-4.8

5051

.473

51.3

87

-4.5

5051

.476

51.4

27

0.00

051

.506

51.5

63

0.50

051

.487

51.5

78

5.55

051

.395

51.4

275.

850

51.3

9451

.387

6.00

051

.394

51.5

376.

150

51.3

9351

.537

9.50

051

.384

51.6

7110

.000

51.3

8351

.691

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 46.000

CH 165

4.0% -3.0%

-9.0

0050

.200

50.2

17

-8.5

0050

.204

50.1

97

-5.1

5050

.229

50.0

63

-5.0

0050

.230

50.0

63

-4.8

5050

.231

49.9

13

-4.5

5050

.234

49.9

53

0.00

050

.301

50.0

89

0.50

050

.279

50.1

04

5.55

050

.903

49.9

535.

850

50.9

8649

.913

6.00

050

.988

50.0

636.

150

50.9

9050

.063

9.50

051

.035

50.1

9710

.000

51.0

3650

.217

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 45.000

CH 180

4.0% -3.0%

-9.0

0049

.066

48.5

93

-8.5

0049

.070

48.5

73

-5.1

5049

.096

48.4

39

-5.0

0049

.098

48.4

39

-4.8

5049

.099

48.2

89

-4.5

5049

.101

48.3

29

0.00

049

.138

48.4

65

0.50

049

.127

48.4

80

5.55

050

.230

48.3

295.

850

50.4

0248

.289

6.00

050

.489

48.4

396.

150

50.5

7548

.439

9.50

048

.573

10.0

0048

.593

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 44.000

32

DECEMBER, 2019

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE AS SHOWN

A.H.D.

17

GJA

BNS

2624DA1-17

MS2624

LONGITUDINAL SECTION - PROPOSED TEMPORARYPUBLIC ROAD, TYPICAL CROSS SECTION AND CROSSSECTIONS

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

A

2 1 0 1 2 3 41:100

1:502100.51 32

DECEMBER, 2019

I.P.

59.4

75

I.P.

54.0

24

8.000 VC 8.000 VC

-3.0% 7.238% -5.0% -11.598% -5.0% -4.0% 3.0%

0.00

059

.991

59.5

85

5.05

059

.873

59.4

34

5.50

059

.859

59.3

94

10.0

8059

.682

59.7

25

11.0

8059

.603

59.6

75

15.0

0059

.306

59.4

16

15.0

8059

.300

59.4

09

19.0

8058

.980

59.0

11

30.0

0057

.902

57.7

45

45.0

0056

.251

56.0

05

58.0

8055

.311

54.4

88

60.0

0055

.356

54.2

80

62.0

8055

.372

54.0

90

66.0

8055

.414

53.8

24

67.0

8055

.426

53.7

74

70.4

3155

.441

53.6

40

70.5

8155

.440

53.6

40

70.7

3155

.438

53.4

90

71.0

3155

.435

53.5

30

75.0

0055

.359

53.6

49

76.0

8155

.338

53.6

81

CHAINAGE

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 45.000

LONGITUDINAL SECTION - TEMPORARY PUBLIC ROADRATIO: 1:200 (H); 1:100 (V)

Design Surface

Natural Surface

C/L

- ROA

D 1

C/L

- TAL

LAW

ONG

ROAD

BOUN

DARY

BOUN

DARY

FACE

OF

KERB

FACE

OF

KERB

CH 10.08

-7.0% -7.0% 7.0%

-6.5

0059

.439

59.4

23

-3.6

5059

.519

59.6

22

-3.5

0059

.525

59.6

22

-3.3

5059

.532

59.4

72

-3.0

5059

.545

59.5

12

0.00

059

.682

59.7

25

3.50

059

.854

59.9

70

4.50

059

.904

60.0

40

5.00

059

.928

60.0

75

5.58

959

.957

59.9

57

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 54.000

CH 20

4.0% -3.0% 3.0%

-6.5

0058

.600

59.0

37

-3.6

5058

.734

58.9

23

-3.5

0058

.741

58.9

23

-3.3

5058

.748

58.7

73

-3.0

5058

.762

58.8

13

0.00

058

.905

58.9

04

3.50

059

.046

59.0

09

4.50

059

.083

59.0

49

5.00

059

.101

59.0

69

5.19

759

.109

59.1

09

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 54.000

CH 30

4.0% -3.0% 3.0%

-6.5

0057

.690

57.8

77

-3.6

5057

.783

57.7

63

-3.5

0057

.788

57.7

63

-3.3

5057

.793

57.6

13

-3.0

5057

.802

57.6

53

0.00

057

.902

57.7

45

3.50

058

.023

57.8

50

4.50

058

.060

57.8

90

5.00

058

.078

57.9

10

6.03

958

.117

58.1

17

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 53.000

CH 40

4.0% -3.0% 3.0%

-6.5

0056

.569

56.7

17

-3.6

5056

.624

56.6

03

-3.5

0056

.628

56.6

03

-3.3

5056

.633

56.4

53

-3.0

5056

.645

56.4

93

0.00

056

.757

56.5

85

3.50

056

.887

56.6

90

4.50

056

.923

56.7

30

5.00

056

.942

56.7

50

6.19

356

.988

56.9

88

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 52.000

CH 50

4.0% -3.0% 3.0%

-6.5

0055

.503

55.5

58

-3.6

5055

.611

55.4

44

-3.5

0055

.617

55.4

44

-3.3

5055

.623

55.2

94

-3.0

5055

.635

55.3

34

0.00

055

.756

55.4

25

3.50

055

.895

55.5

30

4.50

055

.913

55.5

70

5.00

055

.920

55.5

90

6.99

755

.989

55.9

89

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 51.000

CH 60

-0.2% -4.3% 4.5%

-6.5

0054

.492

54.2

54

-3.6

5054

.700

54.2

59

-3.5

0054

.711

54.2

59

-3.3

5054

.722

54.1

09

-3.0

5054

.744

54.1

49

0.00

055

.356

54.2

80

3.50

055

.369

54.4

38

4.50

055

.023

54.4

89

5.00

054

.778

54.5

14

6.32

554

.779

54.7

79

OFFSET

NAT. SURFACE (RL)

DESIGN SURFACE (RL)

DATUM RL = 50.000

4.0%

3.5 3.5 1.0 0.53.0BERM

BOUN

DARY

FACE

OF

KERB

DESI

GN C

/L

EDGE

OF

PAVE

MEN

T

BOUN

DARY

3%ROLL KERB

NOTE:FINAL DETAILS OF TEMPORARY MASONRY WALL AT COMMONSITE BOUNDARY TO BE SUBMITTED AT CONSTRUCTIONCERTIFICATE STAGE.

TEMPORARY MASONRY WALL ANDFENCE ALONG BOUNDARY

TYPICAL SECTION - TEMPORARY PUBLIC ROADRATIO 1:50

1:5 BATTER

Natural Surface

Natural Surface

(RATIO 1:200)

(RATIO 1:200)

(RATIO 1:200)

(RATIO 1:200)(RATIO 1:200)

(RATIO 1:200)

4 2 0 2 4 81:200

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

TEMPORARY PUBLIC ROAD 11m WIDE TO PROVIDEALTERNATIVE ACCESS TO DEVELOPMENT SITE, IFREQUIRED. ACCESS TO SITE TO BE VIA APPROVEDSUBDIVISION TO THE SOUTH UNDER DA-18-01492.

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:1000

A.H.D.

18

GJA

BNS

2624DA1-18

MS2624STORMWATER DRAINAGE CATCHMENT PLAN

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B1:1000 20 0 20 40

165 GUNTAWONG RD

163 TALLAWONG RD2.04ha - EXTERNAL CATCHMENT165 GUNTAWONG RDENTERS SITE VIA ROAD 4 AND BY-PASSES TEMPORARY BASIN SITE

0.112ha - INTERNAL CATCHMENTBYPASS TEMPORARY BASIN SITE

1.912ha - INTERNAL CATCHMENTDRAINS TO TEMPORARY BASIN SITE

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

32

DECEMBER, 2019

175 TALLAWONG RD

06/04/2020 - AMENDED PLANS IN ACCORDANCE WITH STATEMENT OF FACTSAND CONTENTIONS FILED BY BCC.

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE AS SHOWN

A.H.D.

32

DECEMBER, 2019

19

GJA

BNS

2624DA1-19

MS2624

PLAN - TEMPORARY OSD/WATER QUALITY SYSTEM,ABOVE GROUND OSD SUMMARY SHEET AND SECTIONSA-A & B-B

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

FACE

OF

KERB

BOUN

DARY

LOT

BOUN

DARY

TWL 46.54

SAFE

TY F

ENCE

PROPOSED BASIN WALL AND FOOTINGSSUBJECT TO STRUCTURAL ENGINEER'S DESIGN.DETAILS TO BE SUBMITTED WITHCONSTRUCTION CERTIFICATE APPLICATION.

FINISHED SURFACE

FSL 44.6

RATIO: 1:50SECTION A-A

SAFE

TY F

ENCE

INSTALL SAFETY FENCE 1.8m HIGH TO PERIMETEROF TEMPORARY OSD SYSTEM. PROVIDE LOCKABLEGATE TO OSD SYSTEM FOR MAINTENANCE ACCESS.

RATIO: 1:200PLAN - TEMPORARY OSD/WATER QUALITY SYSTEM

ACCE

SS R

AMP

3m W

IDE

@ M

AX 1

:6 G

RADE

Natural Surface

RATIO: 1:50SECTION B-B

END OF PIPE TO BE PLUGGED TODIRECT WATER TO TEMPORARYBASIN SITE.

CONSTRUCT TEMPORARY BIO-RETENTION SYSTEMGENERALLY IN ACCORDANCE WITH COUNCIL'SSTANDARDS. FINAL DETAILS TO BE SUBMITTEDWITH CONSTRUCTION CERTIFICATE DRAWINGS.

SUPPLY AND INSTALL 150Ø uPVC COLLECTORPIPE WITH RISER AND LID TO ALLOW FLUSHING.CONNECT TO SEALED JUNCTION PIT DOWN-STREAM OF DCP

SUPPLY AND INSTALL 100Ø SLOTTED PIPESWITH FLUSHING POINTS AT SURFACE. CONNECTTO 150Ø PIPE WITH SLOPE JUNCTIONS.

BIO-RETENTION SYSTEM AS PER COUNCIL'S STANDARDS

TRANSITION LAYER - 100mm

0.65

HDPE LINER150Ø uPVC PIPE @ 0.5% MIN GRADE

CONSTRUCT TEMPORARY ON-SITE DETENTIONSYSTEM (OSD) ON RESIDUE LOT 467. DESIGNSTORAGE VOLUME = 936m³ (MIN). CAPACITYPROVIDED = 939m³ ABOVE EDD LINE

466

467

CH 1

80.0

0

CH 1

95.0

0

CH 2

10.0

0

CH 2

25.0

0

CH 2

19.9

1

CH -15.00

CH 0.00 BDY

CH 15.00

CH 30.00

PROPOSED ROAD 2 (8 WIDE)

PROP

OSED

ROA

D 3 (

8.5 W

IDE)

BB

AA

DISCHARGECONTROLPITS (DCP)

23.4m (internal)

24.6

m (i

nter

nal)

16.5m (internal)

468 469 470

PROPOSED BASIN WALL AND FOOTINGSSUBJECT TO STRUCTURAL ENGINEER'S DESIGN.DETAILS TO BE SUBMITTED WITHCONSTRUCTION CERTIFICATE APPLICATION.

FINISHED SURFACE

ROAD 3

DRAINAGE LAYER - 250mm min

FILTER MEDIA LAYER - 400mm

46.70 TOW 47.40 TOW

47.20

TOW

46.70 TOW

46.70

TOW

46.54 WEIR - 8m long

47.40

TOW

46.70/47.40 TOW

1:502100.51

1:200 4 0 4 8

WSUD - 44.50

NOTES:

1. TEMPORARY OSD AND BIO-RETENTION BASIN, RETAINING WALLS ANDASSOCIATED PIPE WORKS TO BE REMOVED WHEN BASIN IS NOLONGER REQUIRED. FILL BASIN TO FINISHED LEVELS AND REINSTATEROAD DRAINAGE SYSTEM IN ROAD 2. DETAILS UNDER SEPARATECONSTRUCTION CERTIFICATE APPLICATION.

2. AFTER BASIN IS REMOVED, TEMPORARY DRAINAGE LINES/PITS TO BEDECOMMISSIONED AND PERMANENT LINES ACTIVATED.

3. TRASH SCREENS TO BE OF WELDLOK F40/203 MATERIAL FORORIFICES OF 150Ø AND GREATER WITH A MINIMUM SCREEN AREA OF20 TIMES THE ORIFICE AREA.

(RESIDUE)

OUTLET PIPE TO CONNECT TO PIPEDDRAINAGE SYSTEM INSTALLED UNDERDA-18-01492. - REFER PLANS BY WOOD &GRIEVES ENGINEERS REF: Project No 38154.

CH 1

89.7

3

+ 46.7

46.70

TOW

EDD = 44.80

FSL 44.60 ++ FSL 44.60

RATIO: 1:50SECTION B-B

BASIN FLOOR = 44.50

JUNCTION PIT WITH WATERSEALED SOLID COVER

TWL 45.945 (1.5yr ARI OVERFLOW WEIR)

ORIFICE 158ØCL 43.975 (APPROX.)

ORIFICE 305ØCL 43.885 (APPROX.)

OUTLET PIPE - 525Ø RCP @ 3%

EDD = 44.80

TOW = 46.70

BOUN

DARY

SUBSOIL INLET

FINISHED SURFACE

Natural Surface

PROPOSED BASIN WALL AND FOOTINGSSUBJECT TO STRUCTURAL ENGINEER'S DESIGN.DETAILS TO BE SUBMITTED WITHCONSTRUCTION CERTIFICATE APPLICATION.

TWL 46.54 (BASIN OVERFLOW WEIR - 1:100yr ARI)

DISCHARGE CONTROL PIT WITHSURCHARGE TYPE GRATED COVERHINGED TO FRAME.

FSL 44.6

0.3

+ FSL 4

4.60

FSL 44.60 +

FSL 44.60 +

+ FSL 44.50 FSL 44.5

0 +

FSL 44.50 +

+ FSL 44.50

TRASH SCREEN(SEE NOTE 3)TRASH SCREEN

(SEE NOTE 3)

06/04/2020 - AMENDED PLANS IN ACCORDANCE WITH STATEMENT OF FACTSAND CONTENTIONS FILED BY BCC.

IL 43.46

46.70

TOW

45.10

TOW

STAGING OF BIORETENTION CONSTRUCTION WORKS:DESIGN NOTES:1. WHERE THE UPSTREAM CATCHMENT HAS NOT ACHIEVED 90% OF FINAL CONSTRUCTION, INCLUDING LANDSCAPING, THE BIORETENTION SYSTEM IS TO BE

CONSTRUCTED WITH A SACRIFICIAL LAYER.2. ONCE THE 90% TARGET HAS BEEN ACHIEVED, THE BIORETENTION SYSTEM IS TO BE CONSTRUCTED WITHIN 6 MONTHS. CAPTURED SEDIMENT AND SATURATED

SOIL IS TO BE REMOVED AND THE BIORETENTION SYSTEM CONSTRUCTED AS PER THE DESIGN.3. BIORETENTION SYSTEMS SHALL ACHIEVE A MINIMUM DENSITY OF 8 PLANTS PER m2.

CONSTRUCTION ACTIVITIES CAN GENERATE LARGE SEDIMENT LOADS IN RUNOFF WHICH CAN SMOTHER VEGETATION AND CLOG BIORETENTION FILTER MEDIA.BIORETENTION BASINS ARE BEST CONSTRUCTED IN STAGES, IN CONJUNCTION WITH OTHER DEVELOPMENT ACTIVITIES:

STAGE 1:TEMPORARY SEDIMENT BASIN - EXCAVATE BULK EARTHWORKS, RETAINING WALL CONSTRUCTION, INSTALLATION OF OUTLET TO MEET REQUIREMENTS OF BLUEBOOK, INSTALLATION OF SYSTEM INLET PITS, SURROUNDED EACH SIDE BY TEMPORARY ROCK DISSIPATOR. DISSIPATOR SHALL EXTEND A MINIMUM OF 2m AROUNDTHE INLET PIT AND HAVE A D50 = 300mm.

STAGE 2:FUNCTIONAL INSTALLATION OF SACRIFICIAL BIORETENTION - ONCE UPSTREAM CATCHMENT BULK EARTHWORKS ARE COMPLETE AND HAVE EFFECTIVELY BEENSEALED A SACRIFICIAL FILTER SYSTEM SHALL BE CONSTRUCTED. THIS INCLUDES:

· REMOVAL OF TEMPORARY ROCK DISSIPATOR AT SYSTEM INLET PITS.· REMOVAL OF ALL SEDIMENT AND CLEAN OUT PITS.· INSTALLATION OF GEOTEXTILE AND LINERS UNDER.· INSTALLATION OF SUBSOIL DRAINS AND DRAINAGE LAYERS. TEMPORARY SUPPORT FLUSHING POINTS.· INSTALLATION OF 250mm OF TRANSITION LAYERS.· INSTALLATION OF TEMPORARY GEOTEXTILE AND 150mm MEDIA OR COARSE SAND LAYERS.· INSTALLATION OF WASHED TURF OVER THE SACRIFICIAL MEDIA LAYER.

STAGE 3:OPERATIONAL ESTABLISHMENT ONCE 90% DEVELOPMENT HAS OCCURRED - REMOVAL OF TURF, SACRIFICIAL MEDIA LAYER AND TEMPORARY GEOTEXTILEINSTALLATION OF:

· UPPER 200mm OF TRANSITION LAYER.· FILTER MEDIA LAYER.· PLANTING, WATERING AND MAINTENANCE.· REMOVAL OF ALL SEDIMENT FROM PIPES, INLETS AND OUTLETS.· FINAL COMMISSIONING.

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
MGA (SCIMS)
AutoCAD SHX Text
FUTURE BDY
AutoCAD SHX Text
FUTURE KERB (BY OTHERS)

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:200

A.H.D.

32

DECEMBER, 2019

20

GJA

BNS

2624DA1-20

MS2624CONCEPTUAL ENGINEERING PLAN - PROPOSED LOTPADS AND RETAINING WALLS

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

485

451452453454455456

484483482481480

450

CONT

INUE

D ON

SHE

ET 2

1

RATIO: NTSTYPICAL SECTION - TIERED RETAINING WALL

WALLS AND FOUNDATIONSSUBJECT TO ENGINEER'SDESIGN

finished surfaceHEIG

HT V

ARIE

S

finished surface

LOT

BOUN

DARY

GAL STEEL SECTION

PRECAST CONCRETEPLANK SECTION

(MAX

. 1.0

m)

finished surface

HEIG

HT V

ARIE

S(M

AX. 1

.0m

)

RATIO: NTSTYPICAL SECTION - RETAINING WALL

LEGEND:

PROPOSED RETAINING WALL

RL TOP & BOTTOM OF WALL

PROPOSED ROAD 2

PROPOSED ROAD 4

PROP

OSED

ROA

D 1

58.6158.61

PROPOSED TEMPORARY PUBLIC ROAD

[60.0]

[59.0]

[61.0]

[62.0]

[63.0]

[58.0]

[57.0]

[56.0]

[55.0]

[54.0]

[54.0]

[55.0]

[56.0]

[57.0]

[58.0]

[59.0]

[60.0]

[59.0]

[58.0]

[58.0]

[53.0]

[55.0]

[54.0]

[53.0]

1:200 4 0 4 8

58.5058.5058.1058.1057.8057.8057.4557.4556.85

57.0057.0057.0057.0057.0057.0057.0057.0057.0057.0056.62

53.6553.6553.4553.4553.3553.3553.2553.2553.1053.1052.90

55.2055.2055.2055.2055.2055.2055.2055.2055.2055.2054.84

TW 57.00/BW 56.10 TW 57.00/BW 56.10 TW 57.00/BW 56.10 TW 57.00/BW 56.10 TW 57.00/BW 56.10

TW 56.10/BW 55.20

TW 57.20/BW 56.30

FINISHED PAD LEVEL57.00

TW 56.10/BW 55.20 TW 56.10/BW 55.20 TW 56.10/BW 55.20TW 56.10/BW 55.20

TW 56.65/BW 55.75

TW 55.75/BW 54.85

TW 60.10/BW 59.80TW 58.40/BW 58.00

TEMPORARY MASONRY WALL

TW 54.50/BW 54.20 TW 58.55/BW 59.05TW 56.75/BW 56.50

SUBSOILDRAINAGE

SUBSOILDRAINAGE

WALLS AND FOUNDATIONSSUBJECT TO ENGINEER'SDESIGN

finished surfaceHEIG

HT V

ARIE

S

finished surface

LOT

BOUN

DARY

GAL STEEL SECTION

PRECAST CONCRETEPLANK SECTION

(MAX

. 1.2

m)

SUBSOILDRAINAGE

06/04/2020 - AMENDED PLANS IN ACCORDANCE WITH STATEMENT OF FACTSAND CONTENTIONS FILED BY BCC.

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
MGA (SCIMS)
AutoCAD SHX Text
TALLAWONG ROAD

456457458459460461462463464465466

467

480479478477476475474473472471470469468

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:200

A.H.D.

32

DECEMBER, 2019

21

GJA

BNS

2624DA1-21

MS2624CONCEPTUAL ENGINEERING PLAN - PROPOSED LOTPADS AND RETAINING WALLS

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

THIS IS A CONCEPT PLAN ONLY- NOT FOR CONSTRUCTION -

LEGEND:

PROPOSED RETAINING WALL

RL TOP & BOTTOM OF WALL

1:200 4 0 4 8

56.62

54.84

TW 56.65/BW 55.75

TW 57.20/BW 56.30

FINISHED PAD LEVEL57.00

TW 55.75/BW 54.85

PROPOSED ROAD 2

PROPOSED ROAD 4

PROP

OSED

ROA

D 3

56.10

54.31

56.10

54.31

55.42

53.63

55.42

53.63

54.59

52.80

54.59

52.80

53.68

51.90

53.68

51.90

53.02

51.20

53.02

51.20

52.16

50.98

52.16

50.98

51.37

50.33

51.37

50.33

50.37

49.68

50.37

49.68

49.17

48.63

49.17

48.63

47.97

47.43

47.97

47.43

47.4747.4746.7746.77

46.23 (FUTURE PAD)

TW 56.10/BW 55.20

TW 55.20/BW 54.30

TW 55.45/BW 54.55

TW 54.55/BW 53.65

TW 54.60/BW 53.70

TW 53.70/BW 52.80

TW 53.70/BW 52.80

TW 52.80/BW 51.90

TW 53.05/BW 52.15

TW 52.15/BW 51.25

TW 52.15/BW 50.95TW 51.40/BW 50.30TW 50.40/BW 49.65TW 49.20/BW 48.60TW 48.00/BW 47.40TW 47.40/BW 44.60TW 47.40/BW 44.60TW 46.70/BW 44.60 TW 46.70/BW 44.60

TW 47.20/BW 44.60TW 46.70/BW 44.60

TW 46.70/BW 44.60

TW 47.40/BW 44.60

56.85

52.90

56.33

52.60

56.33

52.60

55.65

52.20

55.65

52.20

54.82

51.85

54.82

51.85

53.91

51.45

53.91

51.45

53.25

51.10

53.25

51.10

52.39

50.75

52.39

50.75

51.60

50.10

51.60

50.10

50.60

49.45

50.60

49.45

49.40

48.40

49.40

48.40

48.20

47.20

48.20

47.20

47.7047.7047.00

46.00 (FUTURE PAD)

47.00

[52.0]

[51.0]

[50.0]

[49.0]

[48.0]

[47.0]

[46.

0]

[45.0]

[45.0]

[46.0]

[52.0]

[53.0]

[54.0]

[46.0]

[47.0]

[48.0]

[49.0]

[50.0]

[51.0]

[52.0]

[53.0]

[54.0]

[55.0]

[56.0]

[57.0]

TW 46.50/BW 46.40 TW 47.40/BW 46.00 TW 49.15/BW 48.40 TW 54.30/BW 54.10

TW 45.40/BW 45.20

TEMPORARY MASONRY WALL

CONT

INUE

D FR

OM S

HEET

20

(RESIDUE)

06/04/2020 - AMENDED PLANS IN ACCORDANCE WITH STATEMENT OF FACTSAND CONTENTIONS FILED BY BCC.

TW 45.10/BW 44.45

46.23 (FUTURE PAD)

46.00 (FUTURE PAD)

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
MGA (SCIMS)

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE -

A.H.D.

32

06/04/2020

23

GJA

BNS

2624DA1-23

MS2624DRAINAGE CALCULATIONS - HYDROLOGICAL RESULTS(5yr AND 20yr ARI DESIGN STORM EVENT)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

DESIGN STORM 1:20yr ARI HYDROLOGIC RESULTS (INTERALLOTMENT DRAINAGE LINES ONLY)PIT

NAMEPIT TYPE CATCHMENT

AREAIMPERVIOUSPERCENTAGE

RUNOFF C

IMPERVIOUSTIME Tc

IMPERVIOUSINTENSITY I

PERVIOUSTIME Tc

PERVIOUSINTENSITY I

FULL AREATIME Tc

FULL AREAINTENSITY I

FULL AREACAT. FLOW Qc

PARTIAL AREATIME Tc

PARTIAL AREAINTENSITY I

PARTIAL AREACAT. FLOW Qc

TOTAL CAT.FLOW Qc

DIRECTFLOW Qd

APPROACHFLOW Qa

FLOODEDDEPTH d

FLOODEDWIDTH w

FLOODED(vxd)

ROADGRADE

ROADXFALL

CHOKEFACTOR

INLETFLOW Qg

BYPASSFLOW Qb

BYPASSPIT

COMMENTS

(-) (-) (ha) (%) (-) (min) (mm/hr) (min) (mm/hr) (min) (mm/hr) (L/s) (min) (mm/hr) (L/s) (L/s) (L/s) (L/s) (m) (m) (sq.m/s) (%) (%) (-) (L/s) (L/s) (-)

7-1 GSIP 600x900 0.038 80 0.854 5 168 5 168 5 168 15 5 168 15 15 0 15 15 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-2 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-3 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-4 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-5 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-6 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-7 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-8 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-9 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-10 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-11 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-12 GSIP 600x900 0.027 80 0.854 5 168 5 168 5 168 11 5 168 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-13 GSIP 600x900 0.034 80 0.854 5 168 5 168 5 168 14 5 168 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-14 GSIP 600x900 0.034 80 0.854 5 168 5 168 5 168 14 5 168 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-15 GSIP 600x900 0.034 80 0.854 5 168 5 168 5 168 14 5 168 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-16 GSIP 600x900 0.034 80 0.854 5 168 5 168 5 168 14 5 168 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-17 GSIP 600x900 0.034 80 0.854 5 168 5 168 5 168 14 5 168 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

4-7 GSIP 900x900 8-1 J.PIT 900x900 SOLID COVER 0 FUTURE GRATED COVER 5-4 GGP 1.2m KI (SAG)

9-1 GSIP 600x900 0.034 80 0.854 5 168 5 168 5 168 14 5 168 14 14 0 14 6.4 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

9-2 GSIP 600x900 0.034 80 0.854 5 168 5 168 5 168 14 5 168 14 14 0 14 8.5 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

2-16 GGP 2.4m EKI 10F-1 GSIP 600x900 0.022 85 0.86 5 168 5 168 5 168 9 5 168 9 9 0 9 9 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-2 GSIP 600x900 0.022 85 0.86 5 168 5 168 5 168 9 5 168 9 9 0 9 9 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-3 GSIP 600x900 0.022 85 0.86 5 168 5 168 5 168 9 5 168 9 9 0 9 9 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-4 GSIP 600x900 0.022 85 0.86 5 168 5 168 5 168 9 5 168 9 9 0 9 9 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-5 GSIP 600x900 0.022 85 0.86 5 168 5 168 5 168 9 5 168 9 9 0 9 9 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-6 GSIP 600x900 0.022 85 0.86 5 168 5 168 5 168 9 5 168 9 9 0 9 9 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-7 GSIP 600x900 0.022 85 0.86 5 168 5 168 5 168 9 5 168 9 9 0 9 9 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-8 GSIP 600x900 0.022 85 0.86 5 168 5 168 5 168 9 5 168 9 9 0 9 9 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-9 GSIP 600x900 0.025 85 0.86 5 168 5 168 5 168 10 5 168 10 10 0 10 10 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

3-1 GSIP 600x900 11F-1 GSIP 600x900 0.024 85 0.86 5 168 5 168 5 168 10 5 168 10 10 0 10 10.1 10 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-2 GSIP 600x900 0.024 85 0.86 5 168 5 168 5 168 10 5 168 10 10 0 10 11.2 10 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-3 GSIP 600x900 0.024 85 0.86 5 168 5 168 5 168 10 5 168 10 10 0 10 11.2 10 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-4 GSIP 600x900 0.024 85 0.86 5 168 5 168 5 168 10 5 168 10 10 0 10 11.2 10 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-5 GSIP 600x900 0.024 85 0.86 5 168 5 168 5 168 10 5 168 10 10 0 10 10.9 10 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-6 GSIP 600x900 0.024 85 0.86 5 168 5 168 5 168 10 5 168 10 10 0 10 9.3 10 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-7 GSIP 600x900 0.024 85 0.86 5 168 5 168 5 168 10 5 168 10 10 0 10 7.8 10 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

DESIGN STORM 1:5yr ARI HYDROLOGIC RESULTSPIT

NAMEPIT TYPE CATCHMENT

AREAIMPERVIOUSPERCENTAGE

RUNOFF C

IMPERVIOUSTIME Tc

IMPERVIOUSINTENSITY I

PERVIOUSTIME Tc

PERVIOUSINTENSITY I

FULL AREATIME Tc

FULL AREAINTENSITY I

FULL AREACAT. FLOW Qc

PARTIAL AREATIME Tc

PARTIAL AREAINTENSITY I

PARTIAL AREACAT. FLOW Qc

TOTAL CAT.FLOW Qc

DIRECTFLOW Qd

APPROACHFLOW Qa

FLOODEDDEPTH d

FLOODEDWIDTH w

FLOODED(vxd)

ROADGRADE

ROADXFALL

CHOKEFACTOR

INLETFLOW Qg

BYPASSFLOW Qb

BYPASSPIT

COMMENTS

(-) (-) (ha) (%) (-) (min) (mm/hr) (min) (mm/hr) (min) (mm/hr) (L/s) (min) (mm/hr) (L/s) (L/s) (L/s) (L/s) (m) (m) (sq.m/s) (%) (%) (-) (L/s) (L/s) (-)

1-1 GSIP 600x900 0.118 95 0.858 5 129 5 129 5 129 36 5 129 36 36 0 36 5.9 3 1 34 2 1-2 1-2 GGP 1.8m EKI 0.057 95 0.859 5 129 5 129 5 129 18 5 129 18 18 0 20 6.1 20 0 1-3 CONN 2-1 GGP 2.4m EKI 0.028 95 0.858 5 129 5 129 5 129 9 5 129 9 9 0 9 11.2 3 1 9 0 2-4 2-2 GGP 2.4m EKI 0.027 95 0.859 5 129 5 129 5 129 8 5 129 8 8 0 8 11.2 3 1 8 0 2-3 2-3 GGP 2.4m EKI 0.016 95 0.858 5 129 5 129 5 129 5 5 129 5 5 0 5 9.3 3 1 5 0 3-2 2-4 GGP 2.4m EKI 0.028 95 0.858 5 129 5 129 5 129 9 5 129 9 9 0 9 7.7 3 1 9 0 2-5 2-5 GGP 2.4m EKI 0.019 95 0.858 5 129 5 129 5 129 6 5 129 6 6 0 6 1.8 3 1 6 0 2-6 2-6 GGP 2.4m EKI 0.046 85 0.848 5.117763 127.8 5 129 5.117763 127.8 14 5 129 14 14 0 14 1 3 1 14 0 2-7 2-7 GGP 2.4m EKI 0.071 85 0.848 5.117763 127.8 5 129 5.117763 127.8 21 5 129 21 21 0 21 1 3 1 21 0 2-8 2-8 GGP 2.4m EKI 0.035 85 0.848 5.117763 127.8 5 129 5.117763 127.8 11 5 129 11 11 0 11 1 3 1 11 0 2-9 2-9 GGP 2.4m EKI 0.072 85 0.848 5.117763 127.8 5 129 5.117763 127.8 22 5 129 21 22 0 22 2.7 3 1 21 0 2-10

2-10 GGP 2.4m EKI 0.035 85 0.848 5.117763 127.8 5 129 5.117763 127.8 11 5 129 10 11 0 11 3.5 3 1 11 0 2-11 2-11 GGP 2.4m EKI 0.072 85 0.848 5.117763 127.8 5 129 5.117763 127.8 22 5 129 21 22 0 22 3.6 3 1 21 0 2-12 2-12 GGP 2.4m EKI 0.036 85 0.848 5.117763 127.8 5 129 5.117763 127.8 11 5 129 11 11 0 11 3.6 3 1 11 0 2-13 2-13 GGP 2.4m EKI 0.07 85 0.848 5.117763 127.8 5 129 5.117763 127.8 21 5 129 21 21 0 21 4.5 3 1 21 0 2-14 2-14 GGP 2.4m EKI 0.044 85 0.848 5.117763 127.8 5 129 5.117763 127.8 13 5 129 13 13 0 13 5.4 3 1 13 0 2-15 2-15 GGP 2.4m EKI 0.044 85 0.848 5.117763 127.8 5 129 5.117763 127.8 13 5 129 13 13 0 13 5.9 3 1 13 0 2-16 2-16 GGP 2.4m EKI 0.013 95 0.858 5 129 5 129 5 129 4 5 129 4 4 0 4 8.5 3 1 4 0 5-6 2-17 J.PIT 900x900 SOLID COVER 0 EXTENDED CHAMBER PIT (SPECIAL)

2-18 HW OUT 3-1 GSIP 600x900 0.027 85 0.86 5 129 5 129 5 129 8 5 129 8 8 0 8 5.8 8 0 3-2 GGP 1.8m EKI 0.021 95 0.859 5 129 5 129 5 129 6 5 129 6 6 0 6 5.8 6 0 2-5 GGP 2.4m EKI 4-1 GGP 1.8m EKI 0.045 95 0.859 5 129 5 129 5 129 14 5 129 14 14 0 14 3.4 3 1 14 0 4-2 4-2 GGP 1.8m EKI 0.043 95 0.858 5 129 5 129 5 129 13 5 129 13 13 0 13 8.7 3 1 13 0 4-3 4-3 GGP 1.8m EKI 0.039 95 0.858 5 129 5 129 5 129 12 5 129 12 12 0 12 10.1 3 1 12 0 4-4 4-4 GGP 1.8m EKI 0.021 95 0.859 5 129 5 129 5 129 6 5 129 6 6 0 6 11.1 3 1 6 0 4-5 4-5 GGP 1.2m KI (SAG) 0.01 95 0.859 5 129 5 129 5 129 3 5 129 3 3 0 3 11.1 3 1 3 0 5-2 4-6 J.PIT 600x900 SOLID COVER 0 4-7 GSIP 900x900 0.037 80 0.854 5 129 5 129 5 129 11 5 129 11 11 0 11 11 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

4-8 HW OUT 5-1 GGP 2.4m KI (SAG) 2.04 85 0.848 5 129 7.5 111 7.5 111 533 5 129 591 591 0 591 1.4 591 0 5-2 GGP 2.4m KI (SAG) 0.026 95 0.859 5 129 5 129 5 129 8 5 129 8 8 0 8 1.4 8 0 5-3 GGP 1.8m EKI 0 5-4 GGP 1.2m KI (SAG) 0.017 95 0.859 5 129 5 129 5 129 5 5 129 5 5 0 5 1.5 3 1 5 0 5-5 5-5 GGP 1.8m EKI 0.019 95 0.859 5 129 5 129 5 129 6 5 129 6 6 0 6 2.4 3 1 6 0 5-6 5-6 GGP 2.4m KI (SAG) 0.11 85 0.848 5.117763 127.8 5 129 5.117763 127.8 33 5 129 33 33 0 33 2.2 33 0 5-7 GGP 2.4m KI (SAG)

6-1 GSIP 1200x1200 0 0 5 0 0 5 0 0 0 74 74 2.2 74 0 6-2 GSIP 1200x1200 0 0 0 0 0 0 0 0 0 0 0 2.2 0 0 6-3 J.PIT 900x900 SOLID COVER 0

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE -

A.H.D.

32

06/04/2020

24

GJA

BNS

2624DA1-24

MS2624DRAINAGE CALCULATIONS - HYDRAULIC RESULTS(5yr AND 20yr ARI DESIGN STORM EVENT)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

DESIGN STORM 1:5yr ARI HYDRAULIC RESULTSPIPE NAME PIPE TYPE PIPE

DIAMETERPIPE

LENGTHPIPE

SLOPEPIPE

AREA AfFULL AREA

TIME TcFULL AREAINTENSITY I

FULL AREASUM CA

FULL AREAFLOW Qc

PART-AREATIME Tc

PART-AREAINTENSITY I

PART-AREASUM CA

PART-AREAFLOW Qc

DIRECT PIPEFLOW Qp

PEAK FLOWQrat

NET BYPASSFLOW Qb

PIPEFLOW Q

FLOW CAP.Qcap

Q/QcapRATIO

FULL PIPEVELOCITY

NORM. DEPTHVELOCITY

CRIT. DEPTHVELOCITY

U/S PITGRATE RL

PIPEU/S IL

PIPED/S IL

PIPE D/SDROP

U/S PITKu

U/S PITKw

PIPEV'HEAD

PIT LOSS(Ku.V'head)

WSE LOSS(Kw.V'head)

TOTALPIPE LOSS

U/S PITHGL

U/S PIPEHGL

D/S PIPEHGL

HGLGRADE

MIN.COVER

U/SFREEBOARD

COMMENTS

(-) (-) (mm) (m) (%) (sq.m) (min) (mm/hr) (ha) (L/s) (min) (mm/hr) (ha) (L/s) (L/s) (L/s) (L/s) (L/s) (L/s) (-) (m/s) (m/s) (m/s) (m) (m) (m) (m) (-) (-) (m) (m) (m) (m) (m) (m) (m) (%) (m) (m)

1-1 to 1-2 RCP/RRJ/CL2 450 54.85 6.56 0.16 5 129 0.101 36.2 5 129 0.1 36.2 0 36.2 -2.2 34 901.8 0.04 0.21 2.8 0.94 62.496 60.9 57.3 0 4 0 0.01 0.01 3.58 61.035 61.025 57.465 6.49 1.08 1.46 1-2 to 1-3 RCP/RRJ/CL2 450 5 6.08 0.16 5.46 124.4 0.15 52 5 129 0.14 50.6 0 52 0 52 867.8 0.06 0.33 3.08 1.06 58.922 57.3 56.996 1.68 0.01 0.01 0.01 0 57.465 57.456 57.069 7.74 1.1 1.46

58.685 57.069 2-1 to 2-2 RCP/RRJ/CL2 375 12.15 4.11 0.11 5 129 0.024 8.7 5 129 0.02 8.7 0 8.7 0 8.7 442.1 0.02 0.08 1.63 0.67 57.297 55.7 55.2 0 4 0 0 0 0.49 55.767 55.766 55.296 3.87 0.99 1.53 2-2 to 2-3 RCP/RRJ/CL2 375 17.43 10.9 0.11 5.1 128 0.048 17 5 129 0.05 17 0 17 0 17 721.7 0.02 0.15 2.8 0.8 56.719 55.2 53.3 0 2.56 2.78 0 0 0 1.9 55.296 55.293 53.409 10.81 1.05 1.42 2-3 to 2-4 RCP/RRJ/CL2 375 14.21 4.92 0.11 5.25 126.5 0.061 21.5 5.15 127.5 0.06 21.5 0 21.5 0 21.5 484 0.04 0.19 2.26 0.86 54.889 53.3 52.6 0 2.11 2.54 0 0 0 0.69 53.409 53.405 52.729 4.75 1.01 1.48 2-4 to 2-5 RCP/RRJ/CL2 375 14.22 9.85 0.11 5.36 125.4 0.086 29.8 5.26 126.4 0.09 29.9 0 29.9 0 29.9 685.8 0.04 0.27 3.19 0.94 54.138 52.6 51.2 0 1.42 0 0.01 0.01 1.26 52.729 52.724 51.5 8.61 1.01 1.41 2-5 to 2-6 RCP/RRJ/CL2 450 9.12 2.19 0.16 5.98 120.2 0.467 155.8 5.66 122.7 0.46 157.6 0 157.6 0 157.6 519.4 0.3 0.99 2.88 1.52 52.846 51.2 51 0 0.43 0.05 0.02 0.02 0.19 51.5 51.479 51.324 1.7 1.15 1.35 2-6 to 2-7 RCP/RRJ/CL2 450 21.2 1.42 0.16 6.05 119.7 0.506 168.1 5.7 122.4 0.5 170.1 0 170.1 0 170.1 416.3 0.41 1.07 2.49 1.57 52.74 51 50.7 0 0.58 0.06 0.03 0.03 0.28 51.324 51.29 51.057 1.1 1.24 1.42 2-7 to 2-8 RCP/RRJ/CL2 450 9.74 1.54 0.16 6.23 118.6 0.566 186.5 5.84 121.2 0.56 188.4 0 188.4 -0.1 188.3 434.5 0.43 1.18 2.64 1.64 52.528 50.7 50.55 0 0.72 0.07 0.05 0.05 0.14 51.057 51.006 50.899 1.09 1.33 1.47 2-8 to 2-9 RCP/RRJ/CL2 450 20.7 1.69 0.16 6.31 118.1 0.596 195.6 5.93 120.6 0.59 197.5 0 197.5 0 197.5 455.5 0.43 1.24 2.77 1.67 52.43 50.55 50.2 0 0.46 0.08 0.04 0.04 0.32 50.899 50.863 50.589 1.33 1.35 1.53

2-9 to 2-10 RCP/RRJ/CL2 450 9.85 2.03 0.16 6.49 117.1 0.657 213.6 6.13 119.2 0.65 215.7 0 215.7 -0.2 215.6 499.4 0.43 1.36 3.03 1.74 52.032 50.2 50 0 0.66 0.09 0.06 0.06 0.19 50.589 50.527 50.377 1.52 1.24 1.44 2-10 to 2-11 RCP/RRJ/CL2 450 20.35 2.95 0.16 6.57 116.6 0.687 222.4 6.21 118.7 0.68 224.7 0 224.7 0 224.7 602.9 0.37 1.41 3.53 1.77 51.714 50 49.4 0 0.43 0.1 0.04 0.04 0.57 50.377 50.334 49.819 2.53 1.12 1.34 2-11 to 2-12 RCP/RRJ/CL2 450 10.8 3.7 0.16 6.74 115.6 0.747 239.9 6.35 117.9 0.74 242.6 0 242.6 -0.2 242.4 676.2 0.36 1.52 3.92 1.84 50.99 49.4 49 0 0.61 0.12 0.07 0.07 0.38 49.819 49.747 49.405 3.16 1.08 1.17 2-12 to 2-13 RCP/RRJ/CL2 450 19.32 4.14 0.16 6.83 115 0.778 248.6 6.44 117.4 0.77 251.5 0 251.5 0 251.5 715.3 0.35 1.58 4.12 1.88 50.606 49 48.2 0 0.41 0.13 0.05 0.05 0.76 49.405 49.353 48.646 3.66 1.1 1.2 2-13 to 2-14 RCP/RRJ/CL2 450 12.84 4.67 0.16 6.99 114.1 0.838 265.4 6.56 116.6 0.83 268.7 0 268.7 -0.1 268.6 760 0.35 1.69 4.39 1.95 49.848 48.2 47.6 0 0.56 0.15 0.08 0.08 0.57 48.646 48.564 48.037 4.1 1.13 1.2 2-14 to 2-15 RCP/RRJ/CL2 450 12.15 5.76 0.16 7.09 113.4 0.875 275.7 6.64 116.1 0.87 279.3 0 279.3 0 279.3 844.7 0.33 1.76 4.79 2 49.207 47.6 46.9 0 0.43 0.16 0.07 0.07 0.67 48.037 47.97 47.346 5.14 1.09 1.17 2-15 to 2-16 RCP/RRJ/CL2 450 16.18 7.11 0.16 7.2 112.8 0.912 285.8 6.74 115.5 0.9 289.8 0 289.8 0 289.8 938.5 0.31 1.82 5.23 2.04 48.521 46.9 45.75 0 0.42 0.17 0.07 0.07 1.06 47.346 47.276 46.264 6.26 1.1 1.17 2-16 to 2-17 RCP/RRJ/CL2 450 12.09 7.03 0.16 7.33 112 0.981 305.3 6.84 115 0.97 309.8 0 309.8 0 309.8 933.5 0.33 1.95 5.3 2.13 47.333 45.75 44.9 0 0.66 0.76 0.19 0.13 0.15 0.67 46.283 46.136 45.501 5.26 0.82 1.05 2-17 to 2-18 RCP/RRJ/CL2 525 5.68 1.76 0.22 7.43 111.4 0.981 303.6 6.94 114.4 0.97 308.1 0 308.1 0 308.1 698.9 0.44 1.42 3.12 1.86 46.16 44.9 44.8 0.13 2.17 2.71 0.1 0.22 0.28 0 45.557 45.276 45.044 4.09 0.15 0.6

45.325 45.044 3-1 to 3-2 RCP/RRJ/CL2 375 4.53 4.42 0.11 5.76 121.9 0.347 117.4 5.48 124.2 0.34 118.5 0 118.5 0 118.5 458.2 0.26 1.07 3.51 1.49 53.63 51.85 51.65 0 4 0.06 0.23 0.23 0.2 52.339 52.104 51.896 4.58 1.2 1.29 3-2 to 2-5 RCP/RRJ/CL2 450 22.03 2.04 0.16 5.8 121.6 0.364 123.1 5.54 123.7 0.36 124.3 0 124.3 0 124.3 501 0.25 0.78 2.64 1.4 53.31 51.65 51.2 0 0 0.03 0 0 0.43 51.896 51.896 51.5 1.8 1.01 1.41

51.5 4-1 to 4-2 RCP/RRJ/CL2 375 50.7 6.71 0.11 5 129 0.038 13.8 5 129 0.04 13.8 0 13.8 0 13.8 565.3 0.02 0.12 2.22 0.76 57.843 56.3 52.9 0 4 0 0 0 3.38 56.386 56.383 53.021 6.63 1.12 1.46 4-2 to 4-3 RCP/RRJ/CL2 375 45.3 9.82 0.11 5.42 124.8 0.075 26.1 5 129 0.07 25.9 0 26.1 0 26.1 684.9 0.04 0.24 3.06 0.9 54.403 52.9 48.45 0 2 0 0.01 0.01 4.44 53.021 53.016 48.596 9.76 1.05 1.38 4-3 to 4-4 RCP/RRJ/CL2 375 24.19 9.09 0.11 5.8 121.6 0.108 36.6 5.38 125.2 0.11 36.6 0 36.6 0 36.6 658.8 0.06 0.33 3.29 1 50.303 48.45 46.25 0 1.49 0.01 0.01 0.01 2.2 48.596 48.588 46.404 9.02 1.07 1.71 4-4 to 4-5 RCP/RRJ/CL2 375 11.49 9.84 0.11 6 120 0.126 42 5.58 123.4 0.12 42.1 0 42.1 0 42.1 685.4 0.06 0.38 3.52 1.04 47.677 46.25 45.12 0 0.87 0.01 0.01 0.01 1.1 46.404 46.398 45.331 9.29 0.93 1.27 4-5 to 4-6 RCP/RRJ/CL2 375 6 1 0.11 6.1 119.4 0.135 44.6 5.67 122.6 0.13 44.7 0 44.7 0 44.7 216.4 0.21 0.4 1.56 1.06 46.406 45.12 45.06 0 2.12 2.66 0.01 0.02 0.02 0.01 45.336 45.313 45.323 -0.17 0.88 1.07 4-6 to 4-7 uPVC 375 24.11 1.04 0.11 6.15 119.1 0.135 44.5 5.72 122.2 0.13 44.6 0 44.6 0 44.6 262.8 0.17 0.4 1.79 1.06 46.773 45.06 44.81 0 0.2 0.01 0 0 0.01 45.323 45.322 45.319 0.01 1.39 1.45 4-7 to 4-8 uPVC 450 0.9 1.11 0.16 6.47 117.2 0.602 195.9 6.13 119.2 0.6 197.2 0 197.2 0 197.2 441.5 0.45 1.24 2.69 1.67 46.774 44.81 44.8 2.5 2.78 0.08 0.2 0.22 0 45.341 45.123 45.011 12.43 1.86 1.43

45.25 45.011 5-1 to 5-2 RCP/RRJ/CL2 675 11 1.09 0.36 7.5 111 1.73 533.3 5 129 1.65 591.3 0 591.3 0 591.3 1055.8 0.56 1.65 3.03 2.13 46.04 43.93 43.81 0 2 0.14 0.28 0.28 0.04 45.344 45.065 45.027 0.35 1.25 0.7 5-2 to 5-3 RCP/RRJ/CL2 675 14.27 1.05 0.36 7.59 110.4 1.752 537.4 5.09 128.1 1.67 594.9 0 594.9 0 594.9 1036.3 0.57 1.66 2.99 2.13 46.041 43.81 43.66 0 2.29 2.62 0.14 0.32 0.37 0.05 45.074 44.704 44.654 0.35 1.51 0.97 5-3 to 5-4 RCP/RRJ/CL2 675 19.94 1 0.36 7.71 109.7 1.752 533.9 5.21 126.9 1.67 589.4 0 589.4 0 589.4 1012.1 0.58 1.65 2.93 2.12 46.304 43.66 43.46 0 0.5 0.14 0.07 0.07 0.07 44.654 44.585 44.516 0.34 1.9 1.65 5-4 to 5-5 RCP/RRJ/CL2 675 21.88 1.01 0.36 7.88 108.7 1.766 533.5 5.38 125.2 1.69 586.7 0 586.7 0 586.7 1013.3 0.58 1.64 2.93 2.12 46.072 43.46 43.24 0 1.1 0.14 0.15 0.15 0.07 44.516 44.365 44.291 0.34 1.68 1.56 5-5 to 5-6 RCP/RRJ/CL2 675 13.62 1.03 0.36 8.06 107.6 1.782 532.9 5.56 123.5 1.7 584.2 0 584.2 0 584.2 1024.6 0.57 1.63 2.95 2.11 45.634 43.24 43.1 0.05 0.5 0.14 0.07 0.07 0.05 44.291 44.223 44.176 0.34 1.12 1.34 5-6 to 5-7 RCP/RRJ/CL2 750 9.01 1 0.44 8.17 107 1.875 557.2 5.67 122.6 1.8 611.7 0 685.7 0 685.7 1330.8 0.52 1.55 3.03 2.13 44.934 43.05 42.96 1.4 0.12 0.17 0.17 0.02 44.176 44.004 43.98 0.27 0.95 0.76

44.938 43.98 6-1 to 6-2 RCP/RRJ/CL2 375 1.2 13.75 0.11 5 129 0 0 5 129 0 0 0 74 0 74 810.9 0.09 0.67 4.66 1.25 44.8 43.785 43.62 0 4 0.02 0.09 0.09 0 44.263 44.172 44.17 0.12 0.54 6-2 to 6-3 RCP/RRJ/CL2 525 1.05 15.24 0.22 5.01 128.9 0 0 5.01 128.9 0 0 0 74 0 74 2060.5 0.04 0.34 4.65 1.13 45.945 43.62 43.46 0 -1.75 0.01 -0.01 -0.01 0 44.17 44.181 44.18 0.02 1.77 6-3 to 5-6 RCP/RRJ/CL2 525 6.37 2.91 0.22 5.02 128.8 0 0 5.02 128.8 0 0 0 74 0 74 896.2 0.08 0.34 2.56 1.13 44.8 43.46 43.275 0.225 0.43 0.49 0.01 0 0 0 44.181 44.178 44.176 0.02 0.77 0.62

44.934 44.176

DESIGN STORM 1:20yr ARI HYDRAULIC RESULTS (INTERALLOTMENT DRAINAGE LINES ONLY)PIPE NAME PIPE TYPE PIPE

DIAMETERPIPE

LENGTHPIPE

SLOPEPIPE

AREA AfFULL AREA

TIME TcFULL AREAINTENSITY I

FULL AREASUM CA

FULL AREAFLOW Qc

PART-AREATIME Tc

PART-AREAINTENSITY I

PART-AREASUM CA

PART-AREAFLOW Qc

DIRECT PIPEFLOW Qp

PEAK FLOWQrat

NET BYPASSFLOW Qb

PIPEFLOW Q

FLOW CAP.Qcap

Q/QcapRATIO

FULL PIPEVELOCITY

NORM. DEPTHVELOCITY

CRIT. DEPTHVELOCITY

U/S PITGRATE RL

PIPEU/S IL

PIPED/S IL

PIPE D/SDROP

U/S PITKu

U/S PITKw

PIPEV'HEAD

PIT LOSS(Ku.V'head)

WSE LOSS(Kw.V'head)

TOTALPIPE LOSS

U/S PITHGL

U/S PIPEHGL

D/S PIPEHGL

HGLGRADE

MIN.COVER

U/SFREEBOARD

COMMENTS

(-) (-) (mm) (m) (%) (sq.m) (min) (mm/hr) (ha) (L/s) (min) (mm/hr) (ha) (L/s) (L/s) (L/s) (L/s) (L/s) (L/s) (-) (m/s) (m/s) (m/s) (m) (m) (m) (m) (-) (-) (m) (m) (m) (m) (m) (m) (m) (%) (m) (m)

7-1 to 7-2 uPVC 225 10.14 1.08 0.04 5 168 0.032 15.2 5 168 0.03 15.2 0 15.2 0 15.2 70.1 0.22 0.38 1.41 0.87 57 56.3 56.19 0 4 0.01 0.03 0.03 0.07 56.431 56.401 56.364 0.37 0.5 0.57 7-2 to 7-3 uPVC 225 10.14 1.08 0.04 5.08 167 0.056 26 5 168 0.06 25.9 0 26 0 26 70.1 0.37 0.65 1.63 1.05 57 56.19 56.08 0 1.83 0.02 0.04 0.04 0.06 56.364 56.324 56.303 0.21 0.61 0.64 7-3 to 7-4 uPVC 225 10.14 1.08 0.04 5.17 166 0.079 36.6 5.08 167 0.08 36.6 0 36.6 0 36.6 70.1 0.52 0.92 1.78 1.21 57 56.08 55.97 0 1.44 0.04 0.06 0.06 0.11 56.303 56.24 56.144 0.95 0.71 0.7 7-4 to 7-5 uPVC 300 10.14 1.08 0.07 5.25 165 0.103 47.2 5.17 166 0.1 47.2 0 47.2 0 47.2 149.6 0.32 0.67 1.88 1.16 57 55.97 55.86 0 0.27 0.02 0.01 0.01 0.09 56.144 56.138 56.082 0.55 0.74 0.86 7-5 to 7-6 uPVC 300 10.14 1.08 0.07 5.34 163.9 0.126 57.6 5.25 165 0.13 57.7 0 57.7 0 57.7 149.6 0.39 0.82 1.98 1.25 57 55.86 55.75 0.4 1.04 0.03 0.04 0.04 0.05 56.082 56.047 55.879 1.65 0.47 0.92 7-6 to 7-7 uPVC 300 10.14 1.08 0.07 5.42 162.9 0.15 67.8 5.34 163.9 0.15 68 0 68 0 68 149.6 0.45 0.96 2.07 1.33 56.62 55.35 55.24 0.59 2.17 2.66 0.05 0.1 0.13 0.04 55.679 55.553 55.382 1.69 0.46 0.94 7-7 to 7-8 uPVC 300 10.14 1.08 0.07 5.51 161.9 0.173 78 5.34 163.9 0.17 78.3 0 78.3 0 78.3 149.6 0.52 1.11 2.14 1.42 56.1 54.65 54.54 0.74 2.14 2.64 0.06 0.13 0.17 0.04 55.033 54.868 54.694 1.72 0.48 1.07 7-8 to 7-9 uPVC 300 10.14 1.08 0.07 5.59 161.1 0.197 88.1 5.42 162.9 0.2 88.4 0 88.4 0 88.4 149.6 0.59 1.25 2.2 1.51 55.42 53.8 53.69 0.79 2.1 2.58 0.08 0.17 0.21 0.04 54.238 54.032 53.856 1.73 0.5 1.18

7-9 to 7-10 uPVC 375 10.14 1.08 0.11 5.68 160.2 0.22 98.1 5.42 162.9 0.22 98.4 0 98.4 0 98.4 269.1 0.37 0.89 2.25 1.38 54.59 52.9 52.79 0.59 2.15 2.71 0.04 0.09 0.11 0.02 53.24 53.13 52.947 1.81 0.42 1.35 7-10 to 7-11 uPVC 375 10.14 1.08 0.11 5.76 159.4 0.244 107.9 5.59 161.1 0.24 108.4 0 108.4 0 108.4 269.1 0.4 0.98 2.31 1.44 53.68 52.2 52.09 0.74 2.14 2.66 0.05 0.11 0.13 0.02 52.573 52.442 52.255 1.84 0.46 1.11 7-11 to 7-12 uPVC 375 10.14 1.08 0.11 5.85 158.5 0.267 117.7 5.59 161.1 0.26 118.3 0 118.3 0 118.3 269.1 0.44 1.07 2.36 1.49 53.02 51.35 51.24 0.74 2.14 2.66 0.06 0.13 0.16 0.02 51.759 51.603 51.414 1.87 0.44 1.26 7-12 to 7-13 uPVC 375 12.51 1.04 0.11 5.93 157.7 0.291 127.3 5.68 160.2 0.29 128.1 0 128.1 0 128.1 263.1 0.49 1.16 2.37 1.54 52.16 50.5 50.37 0.87 2.13 2.66 0.07 0.15 0.18 0.05 50.947 50.764 50.555 1.67 0.5 1.21 7-13 to 7-14 uPVC 375 12.51 1.04 0.11 6.03 156.7 0.32 139.1 5.78 159.2 0.32 140.1 0 140.1 0 140.1 263.1 0.53 1.27 2.42 1.61 51.37 49.5 49.37 1.07 2.12 2.63 0.08 0.17 0.22 0.05 49.992 49.776 49.565 1.69 0.5 1.38 7-14 to 7-15 uPVC 375 12.51 1.04 0.11 6.14 155.6 0.349 150.7 5.8 159 0.34 152 0 152 0 152 263.1 0.58 1.38 2.46 1.67 50.37 48.3 48.17 1.07 2.1 2.59 0.1 0.2 0.25 0.05 48.838 48.587 48.375 1.7 0.5 1.53 7-15 to 7-16 uPVC 375 12.51 1.04 0.11 6.24 154.6 0.378 162.1 5.9 158 0.37 163.7 0 163.7 0 163.7 263.1 0.62 1.48 2.5 1.74 49.17 47.1 46.97 1.07 2.07 2.55 0.11 0.23 0.29 0.05 47.684 47.398 47.185 1.7 0.5 1.49 7-16 to 7-17 uPVC 450 12.51 1.04 0.16 6.35 153.5 0.407 173.4 5.92 157.8 0.4 175.2 0 175.2 0 175.2 424.7 0.41 1.1 2.55 1.59 47.97 45.9 45.77 0 2.13 2.7 0.06 0.13 0.17 0.12 46.361 46.194 46.112 0.66 1.13 1.61 7-17 to 4-7 uPVC 450 1.75 1.14 0.16 6.45 152.5 0.435 184.5 6.03 156.7 0.43 186.7 0 186.7 0 186.7 446.5 0.42 1.17 2.69 1.63 46.77 45.77 45.75 0.94 0.54 0.07 0.04 0.04 0 46.112 46.074 45.953 6.95 0.56 0.66

45.518 8-1 to 5-4 RCP/RRJ/CL2 450 6.5 1.54 0.16 5 168 0 0 5 168 0 0 0 0 0 0 434.2 0 0 0 0 46.774 44.6 44.5 1.04 0.5 0 0 0 0 44.876 44.876 44.876 0 1.08 1.9

44.876 9-1 to 9-2 uPVC 150 13 8.46 0.02 5 168 0.029 13.5 5 168 0.03 13.5 0 13.5 0 13.5 57.1 0.24 0.76 2.66 0.99 48.424 47.5 46.4 0.3 4 0.03 0.12 0.12 0.85 47.727 47.608 46.449 8.91 0.6 0.7

9-2 to 2-16 RCP/RRJ/CL2 375 5.5 1.82 0.11 5.11 166.7 0.058 26.8 5 168 0.06 26.7 0 26.8 0 26.8 292.8 0.09 0.24 1.68 0.91 47.339 46.1 46 0.25 2.29 2.99 0 0.01 0.01 0 46.392 46.383 46.384 -0.02 0.85 0.9546.415

10F-1 to 10F-2 uPVC 150 7.75 9.68 0.02 5 168 0.019 9 5 168 0.02 9 0 9 0 9 61.1 0.15 0.51 2.5 0.84 60.859 59.9 59.15 0 4 0.01 0.05 0.05 0.73 60.041 59.988 59.276 9.19 0.76 0.82 10F-2 to 10F-3 uPVC 225 7.74 9.68 0.04 5.06 167.2 0.039 18 5 168 0.04 17.9 0 18 0 18 177.8 0.1 0.45 2.91 0.92 60.052 59.15 58.4 0 1.41 0.01 0.01 0.01 0.72 59.276 59.261 58.573 8.88 0.63 0.78 10F-3 to 10F-4 uPVC 225 7.75 7.75 0.04 5.13 166.5 0.058 26.8 5.06 167.2 0.06 26.8 0 26.8 0 26.8 158.9 0.17 0.68 3 1.06 59.276 58.4 57.8 0 1.57 0.02 0.04 0.04 0.56 58.573 58.537 58.011 6.79 0.61 0.7 10F-4 to 10F-5 uPVC 225 7.75 7.75 0.04 5.19 165.7 0.077 35.6 5.13 166.5 0.08 35.7 0 35.7 0 35.7 158.9 0.22 0.9 3.25 1.19 58.672 57.8 57.2 0 1.28 0.04 0.05 0.05 0.54 58.011 57.958 57.446 6.62 0.61 0.66 10F-5 to 10F-6 uPVC 225 7.75 5.16 0.04 5.26 164.9 0.097 44.3 5.19 165.7 0.1 44.4 0 44.4 0 44.4 129.6 0.34 1.12 2.96 1.33 58.056 57.2 56.8 0 1.09 0.06 0.07 0.07 0.32 57.446 57.376 57.078 3.85 0.61 0.61 10F-6 to 10F-7 uPVC 225 7.74 4.52 0.04 5.32 164.1 0.116 52.9 5.19 165.7 0.12 53.1 0 53.1 0 53.1 121.1 0.44 1.34 2.95 1.48 57.657 56.8 56.45 0.3 0.96 0.09 0.09 0.09 0.29 57.078 56.991 56.585 5.24 0.61 0.58 10F-7 to 10F-8 uPVC 225 7.75 3.87 0.04 5.39 163.4 0.135 61.5 5.26 164.9 0.13 61.7 0 61.7 0 61.7 112 0.55 1.55 2.88 1.64 57.334 56.15 55.85 0 1.9 2.24 0.12 0.23 0.28 0.3 56.627 56.352 56.057 3.81 0.78 0.71 10F-8 to 10F-9 uPVC 300 9.25 3.24 0.07 5.45 162.6 0.155 69.9 5.32 164.1 0.15 70.2 0 70.2 0 70.2 218.2 0.32 0.99 2.76 1.35 56.841 55.85 55.55 0.3 0 0.05 0 0 0.09 56.057 56.057 55.667 4.21 0.68 0.78

10F-9 to 3-1 uPVC 300 27.45 10.38 0.07 5.53 161.7 0.177 79.4 5.34 164 0.18 79.8 0 79.8 0 79.8 392.2 0.2 1.13 4.4 1.43 56.856 55.25 52.4 0.55 2.13 2.63 0.07 0.14 0.17 2.73 55.641 55.47 52.541 10.67 0.91 1.2152.541

11F-1 to 11F-2 uPVC 150 8.71 10.33 0.02 5 168 0.021 9.8 5 168 0.02 9.8 0 9.8 0 9.8 63.1 0.15 0.55 2.61 0.87 59.671 58.8 57.9 0 4 0.02 0.06 0.06 0.88 58.954 58.891 58.033 9.86 0.67 0.72 11F-2 to 11F-3 uPVC 225 8.71 11.48 0.04 5.07 167.1 0.042 19.4 5 168 0.04 19.4 0 19.4 0 19.4 193.7 0.1 0.49 3.16 0.95 58.719 57.9 56.9 0 1.41 0.01 0.02 0.02 0.96 58.033 58.015 57.085 10.68 0.54 0.69 11F-3 to 11F-4 uPVC 225 8.71 11.48 0.04 5.15 166.3 0.063 29 5.07 167.1 0.06 29 0 29 0 29 193.7 0.15 0.73 3.54 1.09 57.746 56.9 55.9 0 1.57 0.03 0.04 0.04 0.95 57.085 57.042 56.126 10.52 0.57 0.66 11F-4 to 11F-5 uPVC 225 8.71 9.18 0.04 5.22 165.4 0.084 38.5 5.15 166.3 0.08 38.5 0 38.5 0 38.5 173.1 0.22 0.97 3.53 1.24 56.773 55.9 55.1 0 1.28 0.05 0.06 0.06 0.73 56.126 56.065 55.364 8.05 0.55 0.65 11F-5 to 11F-6 uPVC 225 8.71 11.48 0.04 5.29 164.5 0.105 47.8 5.22 165.4 0.1 48 0 48 0 48 193.7 0.25 1.21 4.07 1.39 55.893 55.1 54.1 0 1.09 0.07 0.08 0.08 1 55.364 55.283 54.286 11.44 0.53 0.53 11F-6 to 11F-7 uPVC 300 8.71 8.04 0.07 5.36 163.6 0.126 57.1 5.22 165.4 0.12 57.3 0 57.3 0 57.3 344.8 0.17 0.81 3.66 1.24 54.943 54.1 53.4 0 0 0.03 0 0 0.7 54.286 54.286 53.589 8 0.5 0.66

11F-7 to 3-1 uPVC 375 13.6 7.35 0.11 5.44 162.8 0.147 66.3 5.29 164.5 0.15 66.6 0 66.6 0 66.6 592.1 0.11 0.6 3.61 1.2 54.661 53.4 52.4 0.55 0.09 0.02 0 0 0.96 53.589 53.588 52.541 7.7 0.53 1.0752.541

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:500(HS); 1:100(VS)

A.H.D.

32

06/04/2020

25

GJA

BNS

2624DA1-25

MS2624DRAINAGE LONGITUDINAL SECTIONS - LINES 2 & 3 (5yr)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

42.00

375

4.11

0.08

9

442

RCP/RRJ/CL2

0.99

3.87

12.15

45.4

57.4

4957

.297

055

.71.

6055

.766

2-1

GG

P 2.

4m E

KI

375

10.90

0.15

17

722

RCP/RRJ/CL2

1.05

10.81

17.43

40.2

2956

.718

56.7

1912

.155

55.2

55.2

1.52

1.52

55.2

9355

.296

2-2

GG

P 2.

4m E

KI

375

4.92

0.19

22

484

RCP/RRJ/CL2

1.01

4.75

14.21

22.8

54.7

8654

.889

29.5

8453

.353

.31.

591.

5953

.405

53.4

09

2-3

GG

P 2.

4m E

KI

375

9.85

0.27

30

686

RCP/RRJ/CL2

1.01

8.61

14.22

13.7

9954

.779

54.1

3843

.797

52.6

52.6

1.54

1.54

52.7

2452

.729

2-4

GG

P 2.

4m E

KI

450

2.19

0.99

158

519

RCP/RRJ/CL2

1.15

1.7

9.12

16.2

5253

.354

52.8

4658

.013

51.2

51.2

1.65

1.65

51.4

7951

.5

2-5

LIN

E 3

GG

P 2.

4m E

KI

450

1.42

1.07

170

416

RCP/RRJ/CL2

1.24

1.1

21.2

25.3

6953

.258

52.7

467

.129

51511.

741.

7451

.29

51.3

24

2-6

GG

P 2.

4m E

KI

450

1.54

1.18

188

434

RCP/RRJ/CL2

1.33

1.09

9.74

46.5

6553

.337

52.5

2888

.326

50.7

50.7

1.83

1.83

51.0

0651

.057

2-7

GG

P 2.

4m E

KI

450

1.69

1.24

197

455

RCP/RRJ/CL2

1.35

1.33

20.7

56.3

0453

.203

52.4

398

.065

50.5

550

.55

1.88

1.88

50.8

6350

.899

2-8

GG

P 2.

4m E

KI

450

2.03

1.36

216

499

RCP/RRJ/CL2

1.24

1.52

9.85

7752

.51

52.0

3211

8.76

150

.250

.21.

831.

8350

.527

50.5

89

2-9

GG

P 2.

4m E

KI

450

2.95

1.41

225

603

RCP/RRJ/CL2

1.12

2.53

20.3586

.853

52.0

951

.714

128.

614

50501.

711.

7150

.334

50.3

77

2-10

GG

P 2.

4m E

KI

450

3.70

1.52

242

676

RCP/RRJ/CL2

1.08

3.16

10.8

107.

199

51.5

0550

.99

148.

9649

.449

.41.

591.

5949

.747

49.8

19

2-11

GG

P 2.

4m E

KI

450

4.14

1.58

251

715

RCP/RRJ/CL2

1.1

3.66

19.32

118

51.0

2950

.606

159.

761

49491.

611.

6149

.353

49.4

05

2-12

GG

P 2.

4m E

KI

450

4.67

1.69

269

760

RCP/RRJ/CL2

1.13

4.1

12.84

137.

319

50.3

5549

.848

179.

079

48.2

48.2

1.65

1.65

48.5

6448

.646

2-13

GG

P 2.

4m E

KI

450

5.76

1.76

279

845

RCP/RRJ/CL2

1.09

5.14

12.15

150.

163

49.5

8349

.207

191.

924

47.6

47.6

1.61

1.61

47.9

748

.037

2-14

GG

P 2.

4m E

KI

450

7.11

1.82

290

938

RCP/RRJ/CL2

1.1

6.26

16.18

162.

309

48.8

7348

.521

204.

069

46.9

46.9

1.62

1.62

47.2

7647

.346

2-15

GG

P 2.

4m E

KI

450

7.03

1.95

310

933

RCP/RRJ/CL2

0.82

5.26

12.09

178.

492

47.9

4447

.333

220.

253

45.7

545

.75

1.58

1.58

46.1

3646

.264

2-16

LIN

E 9

GG

P 2.

4m E

KI

525

1.76

1.42

308

699

RCP/RRJ/CL2

0.15

4.09

5.68

190.

582

47.2

0346

.16

232.

343

44.9

44.9

1.26

1.26

45.2

7645

.501

2-17

J.PI

T 90

0x90

0 SO

LID

CO

VER

EXTE

ND

ED C

HAM

BER

PIT

(SPE

CIA

L)

191.

0847

.667

45.3

2523

8.01

944

.844

.80.

520.

5245

.044

2-18

HW

OU

T

PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 2

46.00

375

4.42

1.07

119

458

RCP/RRJ/CL2

1.2

4.58

4.53

0.5

54.2

2453

.63

051

.85

1.78

52.1

04

3-1

LIN

E 10

F

LIN

E 11

F

GSI

P 60

0x90

0

450

2.04

0.78

124

501

RCP/RRJ/CL2

1.01

1.8

22.03

154

.027

53.3

14.

528

51.6

551

.65

1.66

1.66

51.8

96

3-2

GG

P 1.

8m E

KI

16.2

5253

.354

52.8

4626

.559

51.2

51.2

1.65

1.65

51.4

7951

.5

2-5

LIN

E 2

GG

P 2.

4m E

KI

PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 3

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:500(HS); 1:100(VS)

A.H.D.

32

06/04/2020

26

GJA

BNS

2624DA1-26

MS2624DRAINAGE LONGITUDINAL SECTIONS - LINES 4 & 5 (5yr)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

42.00

375

6.71

0.12

14

565

RCP/RRJ/CL2

1.12

6.63

50.7

66.6

6257

.724

57.8

430

56.3

1.54

56.3

83

4-1

GG

P 1.

8m E

KI

375

9.82

0.24

26

685

RCP/RRJ/CL2

1.05

9.76

45.3

117.

361

54.3

0254

.403

50.6

9852

.952

.91.

501.

5053

.016

53.0

21

4-2

GG

P 1.

8m E

KI

375

9.09

0.33

37

659

RCP/RRJ/CL2

1.07

9.02

24.19

162.

661

50.3

9150

.303

95.9

9848

.45

48.4

51.

851.

8548

.588

48.5

96

4-3

GG

P 1.

8m E

KI

375

9.84

0.38

42

685

RCP/RRJ/CL2

0.93

9.29

11.49

186.

853

48.5

8847

.677

120.

191

46.2

546

.25

1.43

1.43

46.3

9846

.404

4-4

GG

P 1.

8m E

KI

375

1.00

0.40

45

216

RCP/RRJ/CL2

0.88

-0.17

619

8.34

47.7

8446

.406

131.

678

45.1

245

.12

1.29

1.29

45.3

1345

.331

4-5

GG

P 1.

2m K

I (SA

G)

375

1.04

0.40

45

263

uPVC

1.39

0.01

24.11

47.7

646

.773

137.

678

45.0

645

.06

1.71

1.71

45.3

2245

.323

4-6

J.PI

T 60

0x90

0 SO

LID

CO

VER

450

1.11

1.24

197

442

uPVC

1.86

12.43

0.9

47.3

8146

.774

161.

783

44.8

144

.81

1.96

1.96

45.1

2345

.319

4-7

LIN

E 7

GSI

P 90

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

47.3

5145

.25

162.

683

44.8

44.8

0.45

0.45

45.0

11

4-8

HW

OU

T

PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 4

39.00

675

1.09

1.65

591

1056

RCP/RRJ/CL2

1.25

0.35

11

205.

524

48.8

4646

.04

043

.93

2.11

45.0

65

5-1

GG

P 2.

4m K

I (SA

G)

675

1.05

1.66

595

1036

RCP/RRJ/CL2

1.51

0.35

14.27

205.

3247

.398

46.0

4111

.002

43.8

143

.81

2.23

2.23

44.7

0445

.027

5-2

GG

P 2.

4m K

I (SA

G)

675

1.00

1.65

589

1012

RCP/RRJ/CL2

1.9

0.34

19.94

55.5

0946

.71

46.3

0425

.27

43.6

643

.66

2.64

2.64

44.5

8544

.654

5-3

GG

P 1.

8m E

KI

675

1.01

1.64

587

1013

RCP/RRJ/CL2

1.68

0.34

21.88

35.5

7146

.369

46.0

7245

.207

43.4

643

.46

2.61

2.61

44.3

6544

.516

5-4

LIN

E 8

GG

P 1.

2m K

I (SA

G)

675

1.03

1.63

584

1025

RCP/RRJ/CL2

1.12

0.34

13.62

13.6

9245

.994

45.6

3467

.086

43.2

443

.24

2.39

2.39

44.2

2344

.291

5-5

GG

P 1.

8m E

KI

750

1.00

1.55

686

1331

RCP/RRJ/CL2

0.95

0.27

9.01

205

46.3

4344

.934

80.7

0843

.05

43.1

1.88

1.83

44.0

0444

.176

5-6

LIN

E 6

GG

P 2.

4m K

I (SA

G)

205.

312

46.0

0444

.938

89.7

1342

.96

42.9

61.

981.

9843

.98

5-7

GG

P 2.

4m K

I (SA

G)

PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 5

(FU

TUR

E PI

T BY

OTH

ERS)

LIM

IT O

F C

ON

STR

UC

TIO

N

LIM

IT O

F C

ON

STR

UC

TIO

N

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:500(HS); 1:100(VS)

A.H.D.

32

06/04/2020

27

GJA

BNS

2624DA1-27

MS2624DRAINAGE LONGITUDINAL SECTIONS - LINES 7 & 9 (20yr)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

41.00

225

1.08

0.38

15

70

uPVC

0.5

0.37

10.14

57.2

5457

056

.30.

7056

.401

7-1

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

225

1.08

0.65

26

70

uPVC

0.61

0.21

10.14

57.1

4157

10.1

456

.19

56.1

90.

810.

8156

.324

56.3

64

7-2

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

225

1.08

0.92

37

70

uPVC

0.71

0.95

10.14

56.1

1957

20.2

856

.08

56.0

80.

920.

9256

.24

56.3

03

7-3

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

300

1.08

0.67

47

150

uPVC

0.74

0.55

10.14

55.6

7857

30.4

255

.97

55.9

71.

031.

0356

.138

56.1

44

7-4

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

300

1.08

0.82

58

150

uPVC

0.47

1.65

10.14

55.5

7557

40.5

655

.86

55.8

61.

141.

1456

.047

56.0

82

7-5

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

300

1.08

0.96

68

150

uPVC

0.46

1.69

10.14

55.0

4656

.62

50.7

55.3

555

.75

1.27

0.87

55.5

5355

.879

7-6

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

300

1.08

1.11

78

150

uPVC

0.48

1.72

10.14

54.5

8156

.160

.84

54.6

555

.24

1.45

0.86

54.8

6855

.382

7-7

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

300

1.08

1.25

88

150

uPVC

0.5

1.73

10.14

54.1

1955

.42

70.9

853

.854

.54

1.62

0.88

54.0

3254

.694

7-8

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.08

0.89

98

269

uPVC

0.42

1.81

10.14

53.5

3354

.59

81.1

252

.953

.69

1.69

0.90

53.1

353

.856

7-9

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.08

0.98

108

269

uPVC

0.46

1.84

10.14

53.4

9353

.68

91.2

652

.252

.79

1.48

0.89

52.4

4252

.947

7-10

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.08

1.07

118

269

uPVC

0.44

1.87

10.14

53.3

553

.02

101.

451

.35

52.0

91.

670.

9351

.603

52.2

55

7-11

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.04

1.16

128

263

uPVC

0.5

1.67

12.51

52.3

0952

.16

111.

5450

.551

.24

1.66

0.92

50.7

6451

.414

7-12

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)375

1.04

1.27

140

263

uPVC

0.5

1.69

12.51

51.0

951

.37

124.

0549

.550

.37

1.87

1.00

49.7

7650

.555

7-13

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.04

1.38

152

263

uPVC

0.5

1.7

12.51

50.1

7450

.37

136.

5648

.349

.37

2.07

1.00

48.5

8749

.565

7-14

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.04

1.48

164

263

uPVC

0.5

1.7

12.51

49.2

6249

.17

149.

0747

.148

.17

2.07

1.00

47.3

9848

.375

7-15

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

450

1.04

1.10

175

425

uPVC

1.13

0.66

12.51

48.4

2647

.97

161.

5845

.946

.97

2.07

1.00

46.1

9447

.185

7-16

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

450

1.14

1.17

187

447

uPVC

0.56

6.95

1.75

47.4

7646

.77

174.

0945

.77

45.7

71.

001.

0046

.074

46.1

12

7-17

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

47.3

8146

.774

175.

8444

.81

45.7

51.

961.

0245

.167

45.9

53

4-7

LIN

E 4

GSI

P 90

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 7

38.00

150

8.46

0.76

14

57

uPVC

0.6

8.91

13

165.

548

.907

48.4

240

47.5

0.92

47.6

08

9-1

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.82

0.24

27

293

RCP/RRJ/CL2

0.85

-0.02

5.5

178.

548

.095

47.3

3913

46.1

46.4

1.24

0.94

46.3

8346

.449

9-2

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

178.

492

47.9

4447

.333

18.5

45.7

546

1.58

1.33

46.1

746

.384

2-16

LIN

E 2

GG

P 2.

4m E

KI

PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 9

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE -

A.H.D.

32

06/04/2020

28

GJA

BNS

2624DA1-28

MS2624DRAINAGE CALCULATIONS - HYDROLOGICAL RESULTS(100yr ARI DESIGN STORM EVENT)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

DESIGN STORM 1:100yr ARI HYDROLOGIC RESULTSPIT

NAMEPIT TYPE CATCHMENT

AREAIMPERVIOUSPERCENTAGE

RUNOFF C

IMPERVIOUSTIME Tc

IMPERVIOUSINTENSITY I

PERVIOUSTIME Tc

PERVIOUSINTENSITY I

FULL AREATIME Tc

FULL AREAINTENSITY I

FULL AREACAT. FLOW Qc

PARTIAL AREATIME Tc

PARTIAL AREAINTENSITY I

PARTIAL AREACAT. FLOW Qc

TOTAL CAT.FLOW Qc

DIRECTFLOW Qd

APPROACHFLOW Qa

FLOODEDDEPTH d

FLOODEDWIDTH w

FLOODED(vxd)

ROADGRADE

ROADXFALL

CHOKEFACTOR

INLETFLOW Qg

BYPASSFLOW Qb

BYPASSPIT

COMMENTS

(-) (-) (ha) (%) (-) (min) (mm/hr) (min) (mm/hr) (min) (mm/hr) (L/s) (min) (mm/hr) (L/s) (L/s) (L/s) (L/s) (m) (m) (sq.m/s) (%) (%) (-) (L/s) (L/s) (-)

1-1 GSIP 600x900 0.118 95 1 5 219 5 219 5 219 72 5 219 72 72 0 72 5.9 3 0.8 49 23 1-2 1-2 GGP 1.8m EKI 0.057 95 1 5 219 5 219 5 219 35 5 219 35 35 0 58 6.1 58 0 1-3 CONN 2-1 GGP 2.4m EKI 0.028 95 1 5 219 5 219 5 219 17 5 219 17 17 0 17 11.2 3 0.8 14 3 2-4 2-2 GGP 2.4m EKI 0.027 95 1 5 219 5 219 5 219 17 5 219 17 17 0 17 11.2 3 0.8 13 3 2-3 2-3 GGP 2.4m EKI 0.016 95 1 5 219 5 219 5 219 9 5 219 9 9 0 13 9.3 3 0.8 10 3 3-2 2-4 GGP 2.4m EKI 0.028 95 1 5 219 5 219 5 219 17 5 219 17 17 0 21 7.7 3 0.8 17 4 2-5 2-5 GGP 2.4m EKI 0.019 95 1 5 219 5 219 5 219 12 5 219 12 12 0 16 1.8 3 0.8 13 3 2-6 2-6 GGP 2.4m EKI 0.046 85 0.997 5 219 5 219 5 219 28 5 219 28 28 0 31 1 3 0.8 24 7 2-7 2-7 GGP 2.4m EKI 0.071 85 0.997 5 219 5 219 5 219 43 5 219 43 43 0 50 1 3 0.8 35 15 2-8 2-8 GGP 2.4m EKI 0.035 85 0.997 5 219 5 219 5 219 22 5 219 22 22 0 36 1 3 0.8 27 9 2-9 2-9 GGP 2.4m EKI 0.072 85 0.997 5 219 5 219 5 219 43 5 219 43 43 0 53 2.7 3 0.8 37 16 2-10

2-10 GGP 2.4m EKI 0.035 85 0.997 5 219 5 219 5 219 21 5 219 21 21 0 37 3.5 3 0.8 28 9 2-11 2-11 GGP 2.4m EKI 0.072 85 0.997 5 219 5 219 5 219 43 5 219 43 43 0 53 3.6 3 0.8 37 16 2-12 2-12 GGP 2.4m EKI 0.036 85 0.997 5 219 5 219 5 219 22 5 219 22 22 0 38 3.6 3 0.8 28 10 2-13 2-13 GGP 2.4m EKI 0.07 85 0.997 5 219 5 219 5 219 43 5 219 43 43 0 52 4.5 3 0.8 37 16 2-14 2-14 GGP 2.4m EKI 0.044 85 0.997 5 219 5 219 5 219 27 5 219 27 27 0 42 5.4 3 0.8 31 11 2-15 2-15 GGP 2.4m EKI 0.044 85 0.997 5 219 5 219 5 219 26 5 219 26 26 0 38 5.9 3 0.8 28 10 2-16 2-16 GGP 2.4m EKI 0.013 95 1 5 219 5 219 5 219 8 5 219 8 8 0 18 8.5 3 0.8 14 4 5-6 2-17 J.PIT 900x900 SOLID COVER 0 EXTENDED CHAMBER PIT (SPECIAL)

2-18 HW OUT 3-1 GSIP 600x900 0.027 85 0.995 5 219 5 219 5 219 16 5 219 16 16 0 16 5.8 16 0 3-2 GGP 1.8m EKI 0.021 95 1 5 219 5 219 5 219 13 5 219 13 13 0 15 5.8 15 0 2-5 GGP 2.4m EKI 4-1 GGP 1.8m EKI 0.045 95 1 5 219 5 219 5 219 27 5 219 27 27 0 27 3.4 3 0.8 21 7 4-2 4-2 GGP 1.8m EKI 0.043 95 1 5 219 5 219 5 219 26 5 219 26 26 0 33 8.7 3 0.8 24 9 4-3 4-3 GGP 1.8m EKI 0.039 95 1 5 219 5 219 5 219 23 5 219 23 23 0 32 10.1 3 0.8 24 9 4-4 4-4 GGP 1.8m EKI 0.021 95 1 5 219 5 219 5 219 13 5 219 13 13 0 21 11.1 3 0.8 17 4 4-5 4-5 GGP 1.2m KI (SAG) 0.01 95 1 5 219 5 219 5 219 6 5 219 6 6 0 10 11.1 3 0.8 8 2 5-2 4-6 J.PIT 600x900 SOLID COVER 0 4-7 GSIP 900x900 0.037 80 0.99 5 219 5 219 5 219 22 5 219 22 22 0 22 22 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

4-8 HW OUT 5-1 GGP 2.4m KI (SAG) 2.04 85 0.996 5 219 7.5 188 7.5 188 1060 5 219 1175 1175 0 1175 1.4 1175 0 5-2 GGP 2.4m KI (SAG) 0.026 95 1 5 219 5 219 5 219 16 5 219 16 16 0 18 1.4 18 0 5-3 GGP 1.8m EKI 0 5-4 GGP 1.2m KI (SAG) 0.017 95 1 5 219 5 219 5 219 10 5 219 10 10 0 10 1.5 3 0.8 8 2 5-5 5-5 GGP 1.8m EKI 0.019 95 1 5 219 5 219 5 219 11 5 219 11 11 0 13 2.4 3 0.8 11 3 5-6 5-6 GGP 2.4m KI (SAG) 0.11 85 0.997 5 219 5 219 5 219 67 5 219 67 67 0 73 2.2 73 0 5-7 GGP 2.4m KI (SAG)

6-1 GSIP 1200x1200 0 0 0 0 0 0 0 0 0 0 0 2.2 0 0 6-2 GSIP 1200x1200 0 0 5 0 0 5 0 0 0 322 322 2.2 322 0 6-3 J.PIT 900x900 SOLID COVER 0 5-6 GGP 2.4m KI (SAG)

7-1 GSIP 600x900 0.038 80 0.99 5 219 5 219 5 219 23 5 219 23 23 0 23 23 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-2 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-3 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-4 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-5 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-6 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-7 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-8 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-9 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-10 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-11 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-12 GSIP 600x900 0.027 80 0.99 5 219 5 219 5 219 17 5 219 17 17 0 17 17 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-13 GSIP 600x900 0.034 80 0.99 5 219 5 219 5 219 20 5 219 20 20 0 20 20 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-14 GSIP 600x900 0.034 80 0.99 5 219 5 219 5 219 20 5 219 20 20 0 20 20 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-15 GSIP 600x900 0.034 80 0.99 5 219 5 219 5 219 20 5 219 20 20 0 20 20 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-16 GSIP 600x900 0.034 80 0.99 5 219 5 219 5 219 20 5 219 20 20 0 20 20 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

7-17 GSIP 600x900 0.034 80 0.99 5 219 5 219 5 219 20 5 219 20 20 0 20 20 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

4-7 GSIP 900x900 8-1 J.PIT 900x900 SOLID COVER 0 FUTURE GRATED COVER 5-4 GGP 1.2m KI (SAG)

9-1 GSIP 600x900 0.034 80 0.99 5 219 5 219 5 219 20 5 219 20 20 0 20 6.4 20 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

9-2 GSIP 600x900 0.034 80 0.99 5 219 5 219 5 219 20 5 219 20 20 0 20 8.5 20 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

2-16 GGP 2.4m EKI 10F-1 GSIP 600x900 0.022 85 0.995 5 219 5 219 5 219 14 5 219 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-2 GSIP 600x900 0.022 85 0.995 5 219 5 219 5 219 14 5 219 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-3 GSIP 600x900 0.022 85 0.996 5 219 5 219 5 219 14 5 219 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-4 GSIP 600x900 0.022 85 0.996 5 219 5 219 5 219 14 5 219 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-5 GSIP 600x900 0.022 85 0.996 5 219 5 219 5 219 14 5 219 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-6 GSIP 600x900 0.022 85 0.996 5 219 5 219 5 219 14 5 219 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-7 GSIP 600x900 0.022 85 0.996 5 219 5 219 5 219 14 5 219 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-8 GSIP 600x900 0.022 85 0.995 5 219 5 219 5 219 14 5 219 14 14 0 14 14 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

10F-9 GSIP 600x900 0.025 85 0.996 5 219 5 219 5 219 15 5 219 15 15 0 15 15 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

3-1 GSIP 600x900 11F-1 GSIP 600x900 0.024 85 0.995 5 219 5 219 5 219 15 5 219 15 15 0 15 10.1 15 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-2 GSIP 600x900 0.024 85 0.995 5 219 5 219 5 219 15 5 219 15 15 0 15 11.2 15 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-3 GSIP 600x900 0.024 85 0.995 5 219 5 219 5 219 15 5 219 15 15 0 15 11.2 15 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-4 GSIP 600x900 0.024 85 0.995 5 219 5 219 5 219 15 5 219 15 15 0 15 11.2 15 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-5 GSIP 600x900 0.024 85 0.995 5 219 5 219 5 219 15 5 219 15 15 0 15 10.9 15 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-6 GSIP 600x900 0.024 85 0.995 5 219 5 219 5 219 15 5 219 15 15 0 15 9.3 15 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

11F-7 GSIP 600x900 0.024 85 0.995 5 219 5 219 5 219 15 5 219 15 15 0 15 7.8 15 0 + 150Ø STUB (REDUCED AT 600 x 600 AT SURFACE)

3-1 GSIP 600x900

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE -

A.H.D.

32

06/04/2020

29

GJA

BNS

2624DA1-29

MS2624DRAINAGE CALCULATIONS - HYDRAULIC RESULTS(100yr ARI DESIGN STORM EVENT)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

DESIGN STORM 1:100yr ARI HYDRAULIC RESULTSPIPE NAME PIPE TYPE PIPE

DIAMETERPIPE

LENGTHPIPE

SLOPEPIPE

AREA AfFULL AREA

TIME TcFULL AREAINTENSITY I

FULL AREASUM CA

FULL AREAFLOW Qc

PART-AREATIME Tc

PART-AREAINTENSITY I

PART-AREASUM CA

PART-AREAFLOW Qc

DIRECT PIPEFLOW Qp

PEAK FLOWQrat

NET BYPASSFLOW Qb

PIPEFLOW Q

FLOW CAP.Qcap

Q/QcapRATIO

FULL PIPEVELOCITY

NORM. DEPTHVELOCITY

CRIT. DEPTHVELOCITY

U/S PITGRATE RL

PIPEU/S IL

PIPED/S IL

PIPE D/SDROP

U/S PITKu

U/S PITKw

PIPEV'HEAD

PIT LOSS(Ku.V'head)

WSE LOSS(Kw.V'head)

TOTALPIPE LOSS

U/S PITHGL

U/S PIPEHGL

D/S PIPEHGL

HGLGRADE

MIN.COVER

U/SFREEBOARD

COMMENTS

(-) (-) (mm) (m) (%) (sq.m) (min) (mm/hr) (ha) (L/s) (min) (mm/hr) (ha) (L/s) (L/s) (L/s) (L/s) (L/s) (L/s) (-) (m/s) (m/s) (m/s) (m) (m) (m) (m) (-) (-) (m) (m) (m) (m) (m) (m) (m) (%) (m) (m)

1-1 to 1-2 RCP/RRJ/CL2 450 54.85 6.56 0.16 5 219 0.118 71.7 5 219 0.12 71.7 0 71.7 -22.7 48.9 901.8 0.05 0.31 3.11 1.04 62.496 60.9 57.3 0 4 0 0.02 0.02 3.52 61.071 61.051 57.576 6.34 1.08 1.42 1-2 to 1-3 RCP/RRJ/CL2 450 5 6.08 0.16 5.46 212.6 0.175 103.5 5 219 0.16 100 0 103.5 0 103.5 867.8 0.12 0.65 3.74 1.31 58.922 57.3 56.996 2.45 0.02 0.05 0.05 0 57.576 57.524 57.1 8.48 1.1 1.35

58.685 57.1 2-1 to 2-2 RCP/RRJ/CL2 375 12.15 4.11 0.11 5 219 0.028 17.2 5 219 0.03 17.2 0 17.2 -3.4 13.8 442.1 0.03 0.12 1.86 0.76 57.297 55.7 55.2 0 4 0 0 0 0.48 55.786 55.783 55.325 3.77 0.99 1.51 2-2 to 2-3 RCP/RRJ/CL2 375 17.43 10.9 0.11 5.1 217.6 0.056 33.7 5 219 0.06 33.6 0 33.7 -6.8 26.9 721.7 0.04 0.24 3.21 0.91 56.719 55.2 53.3 0 2.56 2.78 0 0.01 0.01 1.89 55.326 55.317 53.45 10.72 1.05 1.39 2-3 to 2-4 RCP/RRJ/CL2 375 14.21 4.92 0.11 5.25 215.5 0.071 42.7 5.15 217 0.07 42.7 0 42.7 -6 36.7 484 0.08 0.33 2.64 1 54.889 53.3 52.6 0 2.1 2.55 0.01 0.01 0.01 0.68 53.452 53.438 52.783 4.6 1.01 1.44 2-4 to 2-5 RCP/RRJ/CL2 375 14.22 9.85 0.11 5.36 213.9 0.1 59.3 5.26 215.3 0.1 59.3 0 59.3 -6.8 52.5 685.8 0.08 0.48 3.75 1.11 54.138 52.6 51.2 0 1.5 0.01 0.02 0.02 0.77 52.783 52.766 52.051 5.03 1.01 1.35 2-5 to 2-6 RCP/RRJ/CL2 450 9.12 2.19 0.16 5.98 205.3 0.541 308.6 5.66 209.8 0.54 312.4 0 312.4 -3.2 309.2 519.4 0.6 1.94 3.4 2.13 52.846 51.2 51 0 0.42 0.19 0.08 0.08 0.07 52.051 51.97 51.898 0.79 1.15 0.79 2-6 to 2-7 RCP/RRJ/CL2 450 21.2 1.42 0.16 6.05 204.3 0.587 333.1 5.7 209.2 0.58 337.4 0 337.4 -7.2 330.2 416.3 0.79 2.08 2.89 2.23 52.74 51 50.7 0 0.47 0.22 0.1 0.1 0.19 51.898 51.794 51.604 0.9 1.24 0.84 2-7 to 2-8 RCP/RRJ/CL2 450 9.74 1.54 0.16 6.23 202.2 0.658 369.6 5.84 207.2 0.65 374.3 0 374.3 -15 359.3 434.5 0.83 2.26 3.03 2.37 52.528 50.7 50.55 0 0.57 0.26 0.15 0.15 0.1 51.604 51.457 51.354 1.06 1.33 0.92 2-8 to 2-9 RCP/RRJ/CL2 450 20.7 1.69 0.16 6.31 201.2 0.693 387.6 5.89 206.6 0.68 392.4 0 392.4 -9.1 383.3 455.5 0.84 2.41 3.19 2.5 52.43 50.55 50.2 0 0.5 0.3 0.15 0.15 0.25 51.354 51.206 50.957 1.2 1.35 1.08

2-9 to 2-10 RCP/RRJ/CL2 450 9.85 2.03 0.16 6.49 199.2 0.765 423 6.1 203.8 0.76 428.6 0 428.6 -15.7 412.9 499.4 0.83 2.6 3.49 2.66 52.032 50.2 50 0 0.58 0.34 0.2 0.2 0.14 50.957 50.757 50.62 1.39 1.24 1.07 2-10 to 2-11 RCP/RRJ/CL2 450 20.35 2.95 0.16 6.57 198.3 0.8 440.5 6.14 203.3 0.79 446.3 0 446.3 -9.3 437 602.9 0.72 2.75 4.11 2.8 51.714 50 49.4 0 0.5 0.39 0.19 0.19 0.34 50.62 50.428 50.099 1.61 1.12 1.09 2-11 to 2-12 RCP/RRJ/CL2 450 10.8 3.7 0.16 6.74 196.6 0.871 475.7 6.29 201.6 0.86 481.7 0 481.7 -15.8 465.9 676.2 0.69 2.93 4.56 2.97 50.99 49.4 49 0 0.56 0.44 0.25 0.25 0.19 50.099 49.854 49.663 1.77 1.08 0.89 2-12 to 2-13 RCP/RRJ/CL2 450 19.32 4.14 0.16 6.83 195.7 0.907 493.1 6.38 200.5 0.9 499.2 0 499.2 -9.6 489.6 715.3 0.68 3.08 4.82 3.11 50.606 49 48.2 0 0.47 0.48 0.23 0.23 0.53 49.663 49.435 48.917 2.69 1.1 0.94 2-13 to 2-14 RCP/RRJ/CL2 450 12.84 4.67 0.16 6.99 194.1 0.977 526.9 6.56 198.4 0.97 533.3 0 533.3 -15.6 517.7 760 0.68 3.26 5.12 3.28 49.848 48.2 47.6 0 0.51 0.54 0.28 0.28 0.33 48.917 48.638 48.313 2.53 1.13 0.93 2-14 to 2-15 RCP/RRJ/CL2 450 12.15 5.76 0.16 7.09 192.9 1.021 547.1 6.64 197.6 1.01 554.6 0 554.6 -11.5 543.1 844.7 0.64 3.41 5.62 3.43 49.207 47.6 46.9 0 0.46 0.59 0.27 0.27 0.43 48.313 48.04 47.617 3.48 1.09 0.89 2-15 to 2-16 RCP/RRJ/CL2 450 16.18 7.11 0.16 7.2 191.6 1.065 566.8 6.74 196.6 1.05 575.5 0 575.5 -9.7 565.8 938.5 0.6 3.56 6.16 3.57 48.521 46.9 45.75 0 0.43 0.65 0.28 0.28 0.52 47.617 47.342 46.827 3.18 1.1 0.9 2-16 to 2-17 RCP/RRJ/CL2 450 12.09 7.03 0.16 7.33 190 1.145 604.3 6.84 195.6 1.13 615.1 0 615.1 -3.5 611.6 933.5 0.66 3.85 6.23 3.86 47.333 45.75 44.9 0 0.56 0.62 0.75 0.43 0.46 0.37 46.866 46.401 46.035 3.03 0.82 0.47 2-17 to 2-18 RCP/RRJ/CL2 525 5.68 1.76 0.22 7.43 188.8 1.145 600.5 6.94 194.6 1.13 611.9 0 611.9 -3.5 608.4 698.9 0.87 2.81 3.6 2.88 46.16 44.9 44.8 0.13 1.77 2.11 0.37 0.65 0.77 0 46.16 45.388 45.183 3.61 0.15 0

45.325 45.183 3-1 to 3-2 RCP/RRJ/CL2 375 4.53 4.42 0.11 5.76 208.4 0.401 232.3 5.5 212 0.4 234.5 0 234.5 0 234.5 458.2 0.51 2.12 4.17 2.22 53.63 51.85 51.65 0 4 0.23 0.92 0.92 0.05 53.12 52.2 52.161 0.86 1.2 0.51 3-2 to 2-5 RCP/RRJ/CL2 450 22.03 2.04 0.16 5.8 207.9 0.422 243.6 5.51 211.8 0.42 246 0 246 2.6 248.6 501 0.5 1.56 3.14 1.87 53.31 51.65 51.2 0 -0.02 0.02 0.12 0 0 0.11 52.166 52.163 52.051 0.51 1.01 1.14

52.051 4-1 to 4-2 RCP/RRJ/CL2 375 50.7 6.71 0.11 5 219 0.045 27.2 5 219 0.04 27.2 0 27.2 -6.6 20.6 565.3 0.04 0.19 2.49 0.85 57.843 56.3 52.9 0 4 0 0.01 0.01 3.36 56.409 56.402 53.065 6.58 1.12 1.43 4-2 to 4-3 RCP/RRJ/CL2 375 45.3 9.82 0.11 5.42 213.1 0.088 52 5 219 0.08 51.1 0 52 -8.8 43.2 684.9 0.06 0.39 3.54 1.05 54.403 52.9 48.45 0 2 0.01 0.02 0.02 4.42 53.065 53.05 48.663 9.68 1.05 1.34 4-3 to 4-4 RCP/RRJ/CL2 375 24.19 9.09 0.11 5.8 207.8 0.126 72.9 5.38 213.7 0.12 72.8 0 72.9 -8.6 64.3 658.8 0.1 0.58 3.86 1.19 50.303 48.45 46.25 0 1.63 0.02 0.03 0.03 2.18 48.663 48.635 46.485 8.88 1.07 1.64 4-4 to 4-5 RCP/RRJ/CL2 375 11.49 9.84 0.11 6 205 0.147 83.7 5.58 210.9 0.14 83.9 0 83.9 -4.4 79.5 685.4 0.12 0.72 4.21 1.28 47.677 46.25 45.12 0 1.11 0.03 0.03 0.03 0.58 46.485 46.456 45.929 4.59 0.93 1.19 4-5 to 4-6 RCP/RRJ/CL2 375 6 1 0.11 6.1 203.8 0.157 88.7 5.67 209.6 0.15 89 0 89 -2.1 86.9 216.4 0.4 0.79 1.86 1.32 46.406 45.12 45.06 0 1.93 2.27 0.03 0.06 0.07 0.01 45.939 45.868 45.857 0.17 0.88 0.47 4-6 to 4-7 uPVC 375 24.11 1.04 0.11 6.15 203.2 0.157 88.5 5.72 208.9 0.15 88.7 0 88.7 -2.1 86.6 262.8 0.33 0.78 2.14 1.32 46.773 45.06 44.81 0 0.2 0.03 0.01 0.01 0.03 45.857 45.851 45.82 0.13 1.39 0.92 4-7 to 4-8 uPVC 450 0.9 1.11 0.16 6.47 199.4 0.698 386.8 6.04 204.5 0.69 390.7 0 390.7 -2.1 388.6 441.5 0.88 2.44 3.1 2.53 46.774 44.81 44.8 1.95 2.14 0.3 0.59 0.65 0 45.879 45.227 45.131 10.64 1.86 0.9

45.25 45.131 5-1 to 5-2 RCP/RRJ/CL2 675 11 1.09 0.36 7.5 188 2.03 1060.3 5 219 1.93 1175 0 1175 0 1175 1055.8 1.11 3.28 3.28 3.35 46.04 43.93 43.81 0 2 0 0 0 0 46.04 46.04 46.04 0 1.25 0 5-2 to 5-3 RCP/RRJ/CL2 675 14.27 1.05 0.36 7.59 187.3 2.056 1069.5 5.09 217.7 1.96 1183.6 0 1183.6 2.1 1185.7 1036.3 1.14 3.31 3.31 3.38 46.041 43.81 43.66 0 2.04 2.26 0 0 0 0 46.04 46.04 46.04 0 1.51 0 5-3 to 5-4 RCP/RRJ/CL2 675 19.94 1 0.36 7.71 186.3 2.056 1064.1 5.21 216.1 1.96 1174.6 0 1174.6 2.1 1176.7 1012.1 1.16 3.29 3.29 3.36 46.304 43.66 43.46 0 0.5 0 0 0 0 46.04 46.04 46.04 0 1.9 0.26 5-4 to 5-5 RCP/RRJ/CL2 675 21.88 1.01 0.36 7.88 185 2.073 1065.2 5.38 213.7 1.97 1172 0 1172 0 1172 1013.3 1.16 3.28 3.28 3.35 46.072 43.46 43.24 0 1.1 0.53 0.59 0.59 0.29 46.04 45.453 45.167 1.31 1.68 0.03 5-5 to 5-6 RCP/RRJ/CL2 675 13.62 1.03 0.36 8.06 183.4 2.092 1065.6 5.56 211.2 1.99 1168.9 0 1168.9 -0.6 1168.3 1024.6 1.14 3.26 3.26 3.34 45.634 43.24 43.1 0.05 0.5 0.54 0.27 0.27 0.18 45.167 44.895 44.713 1.33 1.12 0.47 5-6 to 5-7 RCP/RRJ/CL2 750 9.01 1 0.44 8.17 182.3 2.201 1114.5 5.67 209.6 2.1 1223.9 0 1545.9 5.6 1551.5 1330.8 1.17 3.51 3.51 3.58 44.934 43.05 42.96 1.4 0.63 0.88 0.88 0.12 44.713 43.832 43.71 1.35 0.95 0.22

44.938 43.71 6-1 to 6-2 RCP/RRJ/CL2 375 1.2 13.75 0.11 5 219 0 0 5 219 0 0 0 0 0 0 810.9 0 0 0 0 44.8 43.785 43.62 0 4 0 0 0 0 44.8 44.8 44.8 0 0 6-2 to 6-3 RCP/RRJ/CL2 525 1.05 15.24 0.22 5.01 218.9 0 0 5.01 218.9 0 0 0 322 0 322 2060.5 0.16 1.49 7.04 1.89 45.945 43.62 43.46 0 5.96 0 0.02 0.02 0 44.8 44.779 44.779 0.01 1.15 6-3 to 5-6 RCP/RRJ/CL2 525 6.37 2.91 0.22 5.02 218.7 0 0 5.02 218.7 0 0 0 322 0 322 896.2 0.36 1.49 3.82 1.89 44.8 43.46 43.275 0.225 0.37 0.4 0.11 0.04 0.04 0.02 44.782 44.737 44.713 0.38 0.77 0.02

44.934 44.713 7-1 to 7-2 uPVC 225 10.14 1.08 0.04 5 219 0.038 22.9 5 219 0.04 22.9 0 22.9 0 22.9 70.1 0.33 0.58 1.58 1 57 56.3 56.19 0 4 0.02 0.07 0.07 0.01 56.62 56.552 56.538 0.14 0.5 0.38 7-2 to 7-3 uPVC 225 10.14 1.08 0.04 5.08 217.8 0.065 39.3 5 219 0.06 39.1 0 39.3 0 39.3 70.1 0.56 0.99 1.81 1.25 57 56.19 56.08 0 1.8 0.05 0.09 0.09 0.04 56.538 56.449 56.412 0.37 0.61 0.46 7-3 to 7-4 uPVC 225 10.14 1.08 0.04 5.17 216.6 0.092 55.4 5.08 217.8 0.09 55.3 0 55.4 0 55.4 70.1 0.79 1.39 1.95 1.52 57 56.08 55.97 0 1.39 0.1 0.14 0.14 0.1 56.412 56.274 56.192 0.81 0.71 0.59 7-4 to 7-5 uPVC 300 10.14 1.08 0.07 5.25 215.5 0.119 71.4 5.17 216.6 0.12 71.4 0 71.4 0 71.4 149.6 0.48 1.01 2.09 1.36 57 55.97 55.86 0 0.27 0.05 0.01 0.01 0.05 56.192 56.178 56.171 0.07 0.74 0.81 7-5 to 7-6 uPVC 300 10.14 1.08 0.07 5.34 214.3 0.147 87.2 5.25 215.5 0.15 87.3 0 87.3 0 87.3 149.6 0.58 1.24 2.19 1.5 57 55.86 55.75 0.4 1.04 0.08 0.08 0.08 0.04 56.171 56.09 55.915 1.73 0.47 0.83 7-6 to 7-7 uPVC 300 10.14 1.08 0.07 5.42 213.1 0.174 102.8 5.34 214.3 0.17 103 0 103 0 103 149.6 0.69 1.46 2.27 1.65 56.62 55.35 55.24 0.59 2.04 2.49 0.11 0.22 0.27 0.05 55.868 55.598 55.423 1.73 0.46 0.75 7-7 to 7-8 uPVC 300 10.14 1.08 0.07 5.51 211.9 0.201 118.3 5.34 214.3 0.2 118.6 0 118.6 0 118.6 149.6 0.79 1.68 2.34 1.81 56.1 54.65 54.54 0.74 1.95 2.34 0.14 0.28 0.34 0.06 55.249 54.913 54.742 1.68 0.48 0.85 7-8 to 7-9 uPVC 300 10.14 1.08 0.07 5.59 210.7 0.228 133.5 5.42 213.1 0.23 134 0 134 0 134 149.6 0.9 1.9 2.38 1.98 55.42 53.8 53.69 0.79 1.86 2.15 0.18 0.34 0.39 0.07 54.469 54.074 53.913 1.59 0.5 0.95

7-9 to 7-10 uPVC 375 10.14 1.08 0.11 5.68 209.5 0.255 148.6 5.51 211.9 0.25 149.3 0 149.3 0 149.3 269.1 0.55 1.35 2.5 1.66 54.59 52.9 52.79 0.59 2.09 2.64 0.09 0.2 0.25 0.02 53.431 53.185 52.99 1.92 0.42 1.16 7-10 to 7-11 uPVC 375 10.14 1.08 0.11 5.76 208.4 0.283 163.5 5.51 211.9 0.28 164.4 0 164.4 0 164.4 269.1 0.61 1.49 2.55 1.75 53.68 52.2 52.09 0.74 2.07 2.55 0.11 0.23 0.29 0.02 52.786 52.498 52.302 1.93 0.46 0.89 7-11 to 7-12 uPVC 375 10.14 1.08 0.11 5.85 207.2 0.31 178.3 5.59 210.7 0.31 179.4 0 179.4 0 179.4 269.1 0.67 1.62 2.6 1.84 53.02 51.35 51.24 0.74 2.04 2.5 0.13 0.28 0.34 0.02 51.996 51.66 51.465 1.93 0.44 1.02 7-12 to 7-13 uPVC 375 12.51 1.04 0.11 5.93 206 0.337 192.8 5.68 209.5 0.33 194.2 0 194.2 0 194.2 263.1 0.74 1.76 2.59 1.93 52.16 50.5 50.37 0.87 2.01 2.43 0.16 0.32 0.38 0.06 51.205 50.821 50.611 1.68 0.5 0.96 7-13 to 7-14 uPVC 375 12.51 1.04 0.11 6.03 204.6 0.371 210.6 5.7 209.3 0.37 212.3 0 212.3 0 212.3 263.1 0.81 1.92 2.64 2.05 51.37 49.5 49.37 1.07 1.94 2.3 0.19 0.37 0.43 0.07 50.266 49.832 49.627 1.64 0.5 1.1 7-14 to 7-15 uPVC 375 12.51 1.04 0.11 6.14 203.3 0.404 228.3 5.8 207.8 0.4 230.2 0 230.2 0 230.2 263.1 0.88 2.08 2.67 2.18 50.37 48.3 48.17 1.07 1.88 2.17 0.22 0.42 0.48 0.08 49.123 48.641 48.443 1.58 0.5 1.25 7-15 to 7-16 uPVC 375 12.51 1.04 0.11 6.24 202.1 0.438 245.7 5.9 206.3 0.43 247.8 0 247.8 0 247.8 263.1 0.94 2.24 2.69 2.32 49.17 47.1 46.97 1.07 1.83 2.05 0.26 0.47 0.53 0.09 47.975 47.448 47.262 1.49 0.5 1.19 7-16 to 7-17 uPVC 450 12.51 1.04 0.16 6.35 200.8 0.471 262.9 5.92 206.1 0.46 265.3 0 265.3 0 265.3 424.7 0.62 1.67 2.81 1.94 47.97 45.9 45.77 0 2.04 2.56 0.14 0.29 0.36 0.08 46.625 46.262 46.229 0.26 1.13 1.34 7-17 to 4-7 uPVC 450 1.75 1.14 0.16 6.45 199.6 0.505 279.9 6.11 203.6 0.5 282.6 0 282.6 0 282.6 446.5 0.63 1.78 2.96 2.01 46.77 45.77 45.75 0.94 0.54 0.16 0.09 0.09 0 46.229 46.142 46.01 7.51 0.56 0.54

45.879 8-1 to 5-4 RCP/RRJ/CL2 450 6.5 1.54 0.16 5 219 0 0 5 219 0 0 0 0 0 0 434.2 0 0 0 0 46.774 44.6 44.5 1.04 0.5 0 0 0 0 46.04 46.04 46.04 0 1.08 0.73

46.04 9-1 to 9-2 uPVC 150 13 8.46 0.02 5 219 0.034 20.4 5 219 0.03 20.4 0 20.4 0 20.4 57.1 0.36 1.16 2.97 1.25 48.424 47.5 46.4 0.3 4 0.07 0.27 0.27 0.8 47.903 47.63 46.843 6.05 0.6 0.52

9-2 to 2-16 RCP/RRJ/CL2 375 5.5 1.82 0.11 5.11 217.5 0.067 40.6 5 219 0.07 40.4 0 40.6 0 40.6 292.8 0.14 0.37 1.89 1.03 47.339 46.1 46 0.25 1.99 2.58 0.01 0.01 0.02 0 46.847 46.829 46.827 0.04 0.85 0.4946.866

10F-1 to 10F-2 uPVC 150 7.75 9.68 0.02 5 219 0.022 13.6 5 219 0.02 13.6 0 13.6 0 13.6 61.1 0.22 0.77 2.8 1 60.859 59.9 59.15 0 4 0.03 0.12 0.12 0.71 60.13 60.008 59.321 8.87 0.76 0.73 10F-2 to 10F-3 uPVC 225 7.74 9.68 0.04 5.06 218.1 0.045 27.1 5 219 0.04 27.1 0 27.1 0 27.1 177.8 0.15 0.68 3.27 1.07 60.052 59.15 58.4 0 1.41 0.02 0.03 0.03 0.67 59.321 59.287 58.652 8.21 0.63 0.73 10F-3 to 10F-4 uPVC 225 7.75 7.75 0.04 5.13 217.2 0.067 40.5 5.06 218.1 0.07 40.5 0 40.5 0 40.5 158.9 0.26 1.02 3.36 1.27 59.276 58.4 57.8 0 1.57 0.05 0.08 0.08 0.49 58.652 58.569 58.111 5.91 0.61 0.62 10F-4 to 10F-5 uPVC 225 7.75 7.75 0.04 5.19 216.3 0.09 53.8 5.13 217.2 0.09 53.9 0 53.9 0 53.9 158.9 0.34 1.36 3.62 1.49 58.672 57.8 57.2 0 1.27 0.09 0.12 0.12 0.45 58.111 57.992 57.557 5.61 0.61 0.56 10F-5 to 10F-6 uPVC 225 7.75 5.16 0.04 5.26 215.4 0.112 67 5.19 216.3 0.11 67.1 0 67.1 0 67.1 129.6 0.52 1.69 3.28 1.75 58.056 57.2 56.8 0 1.03 0.15 0.15 0.15 0.22 57.557 57.407 57.196 2.72 0.61 0.5 10F-6 to 10F-7 uPVC 225 7.74 4.52 0.04 5.32 214.5 0.134 80.1 5.26 215.4 0.13 80.2 0 80.2 0 80.2 121.1 0.66 2.02 3.25 2.05 57.657 56.8 56.45 0.3 0.87 0.21 0.18 0.18 0.21 57.196 57.015 56.814 2.6 0.61 0.46 10F-7 to 10F-8 uPVC 225 7.75 3.87 0.04 5.39 213.6 0.157 93 5.26 215.4 0.16 93.3 0 93.3 0 93.3 112 0.83 2.35 3.14 2.36 57.334 56.15 55.85 0 1.58 1.92 0.28 0.44 0.54 0.27 56.909 56.37 56.102 3.46 0.78 0.43 10F-8 to 10F-9 uPVC 300 9.25 3.24 0.07 5.45 212.7 0.179 105.9 5.32 214.5 0.18 106.2 0 106.2 0 106.2 218.2 0.49 1.5 3.07 1.68 56.841 55.85 55.55 0.3 0 0.12 0 0 0.3 56.102 56.102 55.803 3.22 0.68 0.74

10F-9 to 3-1 uPVC 300 27.45 10.38 0.07 5.53 211.6 0.205 120.2 5.4 213.4 0.2 120.7 0 120.7 0 120.7 392.2 0.31 1.71 4.91 1.83 56.856 55.25 52.4 0.55 1.94 2.31 0.15 0.29 0.34 2.42 55.859 55.515 53.12 8.72 0.91 153.12

11F-1 to 11F-2 uPVC 150 8.71 10.33 0.02 5 219 0.024 14.7 5 219 0.02 14.7 0 14.7 0 14.7 63.1 0.23 0.83 2.93 1.04 59.671 58.8 57.9 0 4 0.04 0.14 0.14 0.85 59.055 58.913 58.082 9.53 0.67 0.62 11F-2 to 11F-3 uPVC 225 8.71 11.48 0.04 5.07 218 0.048 29.4 5 219 0.05 29.3 0 29.4 0 29.4 193.7 0.15 0.74 3.55 1.1 58.719 57.9 56.9 0 1.41 0.03 0.04 0.04 0.9 58.082 58.043 57.172 10 0.54 0.64 11F-3 to 11F-4 uPVC 225 8.71 11.48 0.04 5.15 217 0.073 43.8 5.07 218 0.07 43.8 0 43.8 0 43.8 193.7 0.23 1.1 3.97 1.32 57.746 56.9 55.9 0 1.57 0.06 0.1 0.1 0.87 57.172 57.075 56.233 9.67 0.57 0.57 11F-4 to 11F-5 uPVC 225 8.71 9.18 0.04 5.22 216 0.097 58.2 5.15 217 0.1 58.2 0 58.2 0 58.2 173.1 0.34 1.46 3.94 1.57 56.773 55.9 55.1 0 1.24 0.11 0.14 0.14 0.63 56.233 56.098 55.481 7.08 0.55 0.54 11F-5 to 11F-6 uPVC 225 8.71 11.48 0.04 5.29 214.9 0.121 72.3 5.22 216 0.12 72.5 0 72.5 0 72.5 193.7 0.37 1.82 4.53 1.87 55.893 55.1 54.1 0 1 0.17 0.17 0.17 0.99 55.481 55.311 54.329 11.27 0.53 0.41 11F-6 to 11F-7 uPVC 300 8.71 8.04 0.07 5.36 213.9 0.145 86.4 5.29 214.9 0.15 86.6 0 86.6 0 86.6 344.8 0.25 1.23 4.09 1.49 54.943 54.1 53.4 0 0 0.08 0 0 0.7 54.329 54.329 53.637 7.95 0.5 0.61

11F-7 to 3-1 uPVC 375 13.6 7.35 0.11 5.44 212.9 0.17 100.3 5.29 214.9 0.17 100.7 0 100.7 0 100.7 592.1 0.17 0.91 4.05 1.39 54.661 53.4 52.4 0.55 0.08 0.04 0 0 0.57 53.637 53.633 53.12 3.78 0.53 1.0253.12

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:500(HS); 1:100(VS)

A.H.D.

32

06/04/2020

30

GJA

BNS

2624DA1-30

MS2624DRAINAGE LONGITUDINAL SECTIONS - LINES 2 & 3 (100yr)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

42.00

375

4.11

0.12

14

442

RCP/RRJ/CL2

0.99

3.77

12.15

45.4

57.4

4957

.297

055

.71.

6055

.783

2-1

GG

P 2.

4m E

KI

375

10.90

0.24

27

722

RCP/RRJ/CL2

1.05

10.72

17.43

40.2

2956

.718

56.7

1912

.155

55.2

55.2

1.52

1.52

55.3

1755

.325

2-2

GG

P 2.

4m E

KI

375

4.92

0.33

37

484

RCP/RRJ/CL2

1.01

4.6

14.21

22.8

54.7

8654

.889

29.5

8453

.353

.31.

591.

5953

.438

53.4

5

2-3

GG

P 2.

4m E

KI

375

9.85

0.48

53

686

RCP/RRJ/CL2

1.01

5.03

14.22

13.7

9954

.779

54.1

3843

.797

52.6

52.6

1.54

1.54

52.7

6652

.783

2-4

GG

P 2.

4m E

KI

450

2.19

1.94

309

519

RCP/RRJ/CL2

1.15

0.79

9.12

16.2

5253

.354

52.8

4658

.013

51.2

51.2

1.65

1.65

51.9

752

.051

2-5

LIN

E 3

GG

P 2.

4m E

KI

450

1.42

2.08

330

416

RCP/RRJ/CL2

1.24

0.9

21.2

25.3

6953

.258

52.7

467

.129

51511.

741.

7451

.794

51.8

98

2-6

GG

P 2.

4m E

KI

450

1.54

2.26

359

434

RCP/RRJ/CL2

1.33

1.06

9.74

46.5

6553

.337

52.5

2888

.326

50.7

50.7

1.83

1.83

51.4

5751

.604

2-7

GG

P 2.

4m E

KI

450

1.69

2.41

383

455

RCP/RRJ/CL2

1.35

1.2

20.7

56.3

0453

.203

52.4

398

.065

50.5

550

.55

1.88

1.88

51.2

0651

.354

2-8

GG

P 2.

4m E

KI

450

2.03

2.60

413

499

RCP/RRJ/CL2

1.24

1.39

9.85

7752

.51

52.0

3211

8.76

150

.250

.21.

831.

8350

.757

50.9

57

2-9

GG

P 2.

4m E

KI

450

2.95

2.75

437

603

RCP/RRJ/CL2

1.12

1.61

20.3586

.853

52.0

951

.714

128.

614

50501.

711.

7150

.428

50.6

2

2-10

GG

P 2.

4m E

KI

450

3.70

2.93

466

676

RCP/RRJ/CL2

1.08

1.77

10.8

107.

199

51.5

0550

.99

148.

9649

.449

.41.

591.

5949

.854

50.0

99

2-11

GG

P 2.

4m E

KI

450

4.14

3.08

490

715

RCP/RRJ/CL2

1.1

2.69

19.32

118

51.0

2950

.606

159.

761

49491.

611.

6149

.435

49.6

63

2-12

GG

P 2.

4m E

KI

450

4.67

3.26

518

760

RCP/RRJ/CL2

1.13

2.53

12.84

137.

319

50.3

5549

.848

179.

079

48.2

48.2

1.65

1.65

48.6

3848

.917

2-13

GG

P 2.

4m E

KI

450

5.76

3.41

543

845

RCP/RRJ/CL2

1.09

3.48

12.15

150.

163

49.5

8349

.207

191.

924

47.6

47.6

1.61

1.61

48.0

448

.313

2-14

GG

P 2.

4m E

KI

450

7.11

3.56

566

938

RCP/RRJ/CL2

1.1

3.18

16.18

162.

309

48.8

7348

.521

204.

069

46.9

46.9

1.62

1.62

47.3

4247

.617

2-15

GG

P 2.

4m E

KI

450

7.03

3.85

612

933

RCP/RRJ/CL2

0.82

3.03

12.09

178.

492

47.9

4447

.333

220.

253

45.7

545

.75

1.58

1.58

46.4

0146

.827

2-16

LIN

E 9

GG

P 2.

4m E

KI

525

1.76

2.81

608

699

RCP/RRJ/CL2

0.15

3.61

5.68

190.

582

47.2

0346

.16

232.

343

44.9

44.9

1.26

1.26

45.3

8846

.035

2-17

J.PI

T 90

0x90

0 SO

LID

CO

VER

EXTE

ND

ED C

HAM

BER

PIT

(SPE

CIA

L)

191.

0847

.667

45.3

2523

8.01

944

.844

.80.

520.

5245

.183

2-18

HW

OU

T

PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 2

46.00

375

4.42

2.12

234

458

RCP/RRJ/CL2

1.2

0.86

4.53

0.5

54.2

2453

.63

051

.85

1.78

52.2

3-1

LIN

E 10

F

LIN

E 11

F

GSI

P 60

0x90

0

450

2.04

1.56

249

501

RCP/RRJ/CL2

1.01

0.51

22.03

154

.027

53.3

14.

528

51.6

551

.65

1.66

1.66

52.1

6352

.161

3-2

GG

P 1.

8m E

KI

16.2

5253

.354

52.8

4626

.559

51.2

51.2

1.65

1.65

51.9

752

.051

2-5

LIN

E 2

GG

P 2.

4m E

KI

PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 3

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:500(HS); 1:100(VS)

A.H.D.

32

06/04/2020

31

GJA

BNS

2624DA1-31

MS2624DRAINAGE LONGITUDINAL SECTION - LINE 4 (100yr)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

42.00

375

6.71

0.19

21

565

RCP/RRJ/CL2

1.12

6.58

50.7

66.6

6257

.724

57.8

430

56.3

1.54

56.4

02

4-1

GG

P 1.

8m E

KI

375

9.82

0.39

43

685

RCP/RRJ/CL2

1.05

9.68

45.3

117.

361

54.3

0254

.403

50.6

9852

.952

.91.

501.

5053

.05

53.0

65

4-2

GG

P 1.

8m E

KI

375

9.09

0.58

64

659

RCP/RRJ/CL2

1.07

8.88

24.19

162.

661

50.3

9150

.303

95.9

9848

.45

48.4

51.

851.

8548

.635

48.6

63

4-3

GG

P 1.

8m E

KI

375

9.84

0.72

79

685

RCP/RRJ/CL2

0.93

4.59

11.49

186.

853

48.5

8847

.677

120.

191

46.2

546

.25

1.43

1.43

46.4

5646

.485

4-4

GG

P 1.

8m E

KI

375

1.00

0.79

87

216

RCP/RRJ/CL2

0.88

0.17

619

8.34

47.7

8446

.406

131.

678

45.1

245

.12

1.29

1.29

45.8

6845

.929

4-5

GG

P 1.

2m K

I (SA

G)

375

1.04

0.78

87

263

uPVC

1.39

0.13

24.11

47.7

646

.773

137.

678

45.0

645

.06

1.71

1.71

45.8

5145

.857

4-6

J.PI

T 60

0x90

0 SO

LID

CO

VER

450

1.11

2.44

389

442

uPVC

1.86

10.64

0.9

47.3

8146

.774

161.

783

44.8

144

.81

1.96

1.96

45.2

2745

.82

4-7

LIN

E 7

GSI

P 90

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

47.3

5145

.25

162.

683

44.8

44.8

0.45

0.45

45.1

31

4-8

HW

OU

T

PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 4

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E

PHONE: (02) 9680 1123, MOBILE: 0408 218 575

CIVIL ENGINEERS AND DEVELOPMENT CONSULTANTS

MALCOLM SMITH PTY. LIMITED

EMAIL: [email protected]

PO BOX 6189 NORWEST NSW 2153(ACN 063558449)

POWER LIGHT POLE

ELECTRICITY PILLAR

PUBLIC UTILITIES LEGEND

WATER METER

STOP VALVE

SEWER A/CHAMBER

TAP

SEWER

WATER

HYDRANT

LIGHT POLE

LAMPHOLE

STAY POLE

POWER POLE

ELECTRICITY

CROSS SECTIONS

TELSTRA POLE

TELSTRA PILLAR

TELSTRA PIT

TELSTRA

GAS METER

GAS VALVE

GAS LONG SECTION

PLAN

AMENDMENTS

A1

(V)

(H)

SHEET

DATE

DATUM

RATIO SURVEY

DESIGN

CAD FILE

OF REF:

ISSUE 1:500(HS); 1:100(VS)

A.H.D.

32

06/04/2020

32

GJA

BNS

2624DA1-32

MS2624DRAINAGE LONGITUDINAL SECTIONS - LINES 7 & 9 (100yr)

PROPOSED SUBDIVISION OF LOT 45 INDP30186 (No. 175) TALLAWONG ROAD,ROUSE HILL

B

10 5 0 5 10 20

2 1 0 1 2 3 4

1:500

1:100

41.00

225

1.08

0.58

23

70

uPVC

0.5

0.14

10.14

57.2

5457

056

.30.

7056

.552

7-1

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

225

1.08

0.99

39

70

uPVC

0.61

0.37

10.14

57.1

4157

10.1

456

.19

56.1

90.

810.

8156

.449

56.5

38

7-2

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

225

1.08

1.39

55

70

uPVC

0.71

0.81

10.14

56.1

1957

20.2

856

.08

56.0

80.

920.

9256

.274

56.4

12

7-3

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

300

1.08

1.01

71

150

uPVC

0.74

0.07

10.14

55.6

7857

30.4

255

.97

55.9

71.

031.

0356

.178

56.1

92

7-4

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

300

1.08

1.24

87

150

uPVC

0.47

1.73

10.14

55.5

7557

40.5

655

.86

55.8

61.

141.

1456

.09

56.1

71

7-5

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

300

1.08

1.46

103

150

uPVC

0.46

1.73

10.14

55.0

4656

.62

50.7

55.3

555

.75

1.27

0.87

55.5

9855

.915

7-6

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

300

1.08

1.68

119

150

uPVC

0.48

1.68

10.14

54.5

8156

.160

.84

54.6

555

.24

1.45

0.86

54.9

1355

.423

7-7

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

300

1.08

1.90

134

150

uPVC

0.5

1.59

10.14

54.1

1955

.42

70.9

853

.854

.54

1.62

0.88

54.0

7454

.742

7-8

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.08

1.35

149

269

uPVC

0.42

1.92

10.14

53.5

3354

.59

81.1

252

.953

.69

1.69

0.90

53.1

8553

.913

7-9

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.08

1.49

164

269

uPVC

0.46

1.93

10.14

53.4

9353

.68

91.2

652

.252

.79

1.48

0.89

52.4

9852

.99

7-10

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.08

1.62

179

269

uPVC

0.44

1.93

10.14

53.3

553

.02

101.

451

.35

52.0

91.

670.

9351

.66

52.3

02

7-11

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.04

1.76

194

263

uPVC

0.5

1.68

12.51

52.3

0952

.16

111.

5450

.551

.24

1.66

0.92

50.8

2151

.465

7-12

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)375

1.04

1.92

212

263

uPVC

0.5

1.64

12.51

51.0

951

.37

124.

0549

.550

.37

1.87

1.00

49.8

3250

.611

7-13

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.04

2.08

230

263

uPVC

0.5

1.58

12.51

50.1

7450

.37

136.

5648

.349

.37

2.07

1.00

48.6

4149

.627

7-14

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.04

2.24

248

263

uPVC

0.5

1.49

12.51

49.2

6249

.17

149.

0747

.148

.17

2.07

1.00

47.4

4848

.443

7-15

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

450

1.04

1.67

265

425

uPVC

1.13

0.26

12.51

48.4

2647

.97

161.

5845

.946

.97

2.07

1.00

46.2

6247

.262

7-16

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

450

1.14

1.78

283

447

uPVC

0.56

7.51

1.75

47.4

7646

.77

174.

0945

.77

45.7

71.

001.

0046

.142

46.2

29

7-17

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

47.3

8146

.774

175.

8444

.81

45.7

51.

961.

0245

.227

46.0

1

4-7

LIN

E 4

GSI

P 90

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 7

38.00

150

8.46

1.16

20

57

uPVC

0.6

6.05

13

165.

548

.907

48.4

240

47.5

0.92

47.6

3

9-1

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

375

1.82

0.37

41

293

RCP/RRJ/CL2

0.85

0.04

5.5

178.

548

.095

47.3

3913

46.1

46.4

1.24

0.94

46.8

2946

.843

9-2

GSI

P 60

0x90

0 +

150

Ø S

TUB

(RED

UC

ED A

T 60

0 x

600

AT S

UR

FAC

E)

178.

492

47.9

4447

.333

18.5

45.7

546

1.58

1.33

46.4

0146

.827

2-16

LIN

E 2

GG

P 2.

4m E

KI

PIPE CHAINAGE

ROAD CHAINAGE

NATURAL SURFACE LEVEL

DESIGN SURFACE LEVEL

INVERT LEVEL

HYDRAULIC GRADE LINE

DEPTH TO INVERT

PIPE GRADE (%)

PIPE SIZE (mm)

FULL PIPE VELOCITY (m/s)

PEAK FLOW (L/s)CAPACITY FLOW (L/s)

PIPE CLASS

PIPE COVER MINIMUM

HGL GRADE (%)PIPE LENGTH (m)

DATUM (m)

DRAINAGE LINE 9

AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
E