10/16/2017
CIL / S106
Financial Viability and Funding Hertfordshire Workshop
Chris Marsh FRICS MRTPI DipTP DipCP
Christopher Marsh and Co.Ltd
Daniel Kaye BSc(Hons) MRICS FRSA
Dip.Int.Man
Sheridan Development Management Ltd
1
Questions / Issues
Why are developer contributions towards
new infrastructure often disappointing?
How do we get a better understanding of
financial appraisal modelling?
How can LPAs get better outcomes via
CIL/S106 or by alternative mechanisms?
10/16/2017 2
10/16/2017
Part 1 Content
Principles of Viability Models
Key financial variables
Financial Testing and Development
Viability
The role of CIL/S106 and affordable
housing.
3
10/16/2017
The Importance of
Development Appraisals
Policy Context
– Increasingly critical to test Policies in terms of Financial Viability BEFORE adoption
» PPS3 Para. 29 re Changing Affordable Housing Thresholds
» NPPF and PPG – ‘ developments are deliverable’
» Whole Plan Viability
» CIL testing and more generally, post Circular 05/05 SPDs, such as…………..
4
The London Plan
Policy 3.12: Applicants ‘prove’ max
AH with working viability model
(interrogated?) and full evidence.
10/16/2017 5
10/16/2017
An understanding of the Basics of
Residual Valuations – Quick Summary
Simple method for appraising development
viability
Initial ‘Filtering’ of projects before DCF
To determine maximum value of a
Development Site – the ‘Bid’ value.
To calculate expected Profit and cost ceiling
10/16/2017
The Basics
Simple method for appraising development viability
Completed Value of the Development
-
Construction Costs
-
Developers Profit
=
Residual Land Value
10/16/2017
Purposes
To determine maximum value of a
Development Site – the ‘Bid’ value.
To calculate expected Profit
To calculate a cost ceiling
10/16/2017
COMPLETED DEVELOPMENT VALUE
-
CONSTRUCTION COSTS, FEES ETC.
-
DEVELOPER’S PROFIT
=
RESIDUAL LAND VALUE
(Must exceed Existing Use Value)
10/16/2017
COMPLETED DEVELOPMENT VALUE
-
CONSTRUCTION COSTS, FEES ETC.
PLANNING OBLIGATIONS
-
DEVELOPER’S PROFIT
=
RESIDUAL LAND VALUE
(Must exceed Existing Use Value)
REDUCTION
10/16/2017
COMPLETED DEVELOPMENT VALUE
-
CONSTRUCTION COSTS, FEES ETC.
PLANNING OBLIGATIONS
AFFORDABLE HOUSING
-
DEVELOPER’S PROFIT
=
RESIDUAL LAND VALUE
(Must exceed Existing Use Value)
REDUCTION
10/16/2017
COMPLETED DEVELOPMENT VALUE
-
CONSTRUCTION COSTS, FEES ETC.
PLANNING OBLIGATIONS
AFFORDABLE HOUSING
-
DEVELOPER’S PROFIT
=
RESIDUAL LAND VALUE
(Must exceed Existing Use Value)
REDUCTION
Percentage/ Tenure
10/16/2017
COMPLETED DEVELOPMENT VALUE
-
CONSTRUCTION COSTS, FEES ETC.
PLANNING OBLIGATIONS
AFFORDABLE HOUSING
-
DEVELOPER’S PROFIT
=
RESIDUAL LAND VALUE
(Must exceed Existing Use Value)
REDUCTION
Percentage/ Tenure
and new initiatives ?
10/16/2017
COMPLETED DEVELOPMENT VALUE
-
CONSTRUCTION COSTS, FEES ETC.
PLANNING OBLIGATIONS
AFFORDABLE HOUSING
CIL
-
DEVELOPER’S PROFIT
=
RESIDUAL LAND VALUE
(Must exceed Existing Use Value)
LA Starting Point 1
Policy Compliant scheme
Transparent ‘open book’ appraisals
wherever possible – FoI challenges
Directly comparable or adjusted evidence
Early discussions and RP offers
10/16/2017 15
LA Starting Point 2
Costs detailed and benchmarked, current
not projected (unless long term phased
schemes)
Abnormal costs disaggregated, justified and
reflected in land value
S106/CIL costs agreed early and inputted
10/16/2017 16
LA Starting Point 3
Profit – LB Viability Group now suggesting
15-20% on cost – Controversial ?
10/16/2017 17
LA Starting Point 4
Land value
RV v Benchmark LV (reflecting policies)
EUV + Premium
cf – Acquisition cost / AUV
– Planning policies are ‘squeezed’ ??
10/16/2017 18
Review Mechanisms
Changing financial variables during build
May be sought up to policy compliance on
phased and non phased schemes (see GLA
Housing SPG)
Review timings ?
10/16/2017 19
Complications
CIL Review status
Starter homes – planning bases ?
Changing market conditions and build cost
inflation
New affordable housing initiatives
What time is it ???
10/16/2017 20
10/16/2017
The Peak of the Market
Recession – little or no
development activity
Demand falls – Rental
Growth slows
Capital Values fall
Developments Unviable
Banks stop lending
Bankruptcies Increased Demand as
Recovery begins
Reduction in
Over-supply
Rents Rising
Development Activity
Capital Values Rising
WHAT TIME IS IT ?
Herts CIL or s106 Examples - 1
10/16/2017 22
NoLocal
authoritySite Scheme
Developer and
applicant
Date of
application
Date of
resolution to
grant
Type and
existing useSite size Total units Private
Affordable
rent
Intermediate or
shared
ownership
S106 costs CIL costsS106 or CIL
per unit
Comments or
other info
1 Broxbourne
Land To The West Of
Hoddesdon And East Of
The A10 Incorporating
Land To The North And
South Of The Dinant Link
Road Between Hertford
Road And Lord Street And
Land To The South Of Lord
Street Hertfords
AN OUTLINE PLANNING APPLICATION FOR A
RESIDENTIAL/MIXED USE DEVELOPMENT INCORPORATING
HOUSING UP TO 523 UNITS (WITH DELIVERY OF A 1FE
PRIMARY SCHOOL) OR UP TO 485 UNITS (WITH DELIVERY
OF A 2FE PRIMARY SCHOOL), A SHOP, A HOTEL (WITH
ANCILLARY GYM/RESTAURANT), COMMERCIAL FLOOR
SPACE, PUBLIC OPEN SPACE AND ALLOTMENTS, WITH ALL
MATTERS RESERVED EXCEPT FOR MEANS OF ACCESS
FROM THE DINANT LINK ROAD AND LORD STREET AND A
SUSTAINABLE URBAN DRAINAGE SYSTEMS WITH
ASSOCIATED EARTH WORKS TO ENABLE DELIVERY OF
PHASE 1
Land
Improvement
Holdings and
Savills
14/10/2013 02/04/2015 Green belt land 39.42 ha 523 418 84 21 £ 13,446,586 £ - £ 25,710 20% affordable
2 Broxbourne
Former St Marys High
School Site Churchgate
Cheshunt Hertfordshire
DEMOLITION OF ALL EXISTING BUILDINGS AND
REPLACEMENT WITH THE ERECTION OF 79 RESIDENTIAL
DWELLINGS COMPRISING 12 APARTMENTS AND 67
HOUSES, PROVISION OF OPEN SPACES AND
LANDSCAPING, PROVISION OF AN INTERNAL VEHICULAR
NETWORK AND ASSOCIATED HIGHWAY WORKS AND CAR
PARKING, AND CREATION OF AN ATTENUATION POND
Cheshunt
Properties Ltd
and CBRE
24/01/2014 16/01/2015Green belt school
redevelopment2.9 ha 79 55 24 0 £ 1,435,000 £ - £ 18,165 30% affordable
3 Dacorum
LIDL - LAND FORMERLY
ROY CHAPMAN LTD AND
DAVIS AND SAMSON,
GOSSOMS END,
BERKHAMSTED, HP4 3LP
(CONSTRUCTION OF A FOODSTORE (CLASS A1) WITH
RESIDENTIAL DEVELOPMENT (30 UNITS) ABOVE
TOGETHER WITH CAR-PARKING, LANDSCAPING, ACCESS,
LANDSCAPING AND ASSOCIATED ENGINEERING WORKS
ON LAND AT GOSSOMS END / BILLET LANE,
BERKHAMSTED)
Lidl Uk and
GVA16/06/2014 28/102014
Redevelopment of
commercial and
light industrial use
0.6 ha 30 20 8 2 £ 134,555 £ - £ 4,485 33% affordable
4 Dacorum
FORMER MARTINDALE
JMI SCHOOL, BOXTED
ROAD, HEMEL
HEMPSTEAD, HP1 2QS
RESIDENTIAL DEVELOPMENT (UP TO 43 DWELLINGS),
DEMOLITION OF EXISTING BUILDINGS AND STRUCTURES,
ACCESS AND PARKING, ALTERATIONS TO LEVELS,
LANDSCAPING AND RELATED WORKS (OUTLINE
APPLICATION - ALL MATTERS RESERVED EXCEPT
ACCESS)
Herts CC and
Vincent &
Gorbing
06/05/2014 27/02/2015
Redevelopment of
school and playing
fields
1.4 ha 43 28 11 4 £ 66,703 £ - £ 1,551
35% affordable and
on site play facilities
and health care
Herts CIL or s106 Examples - 2
10/16/2017 23
12 Hertsmere
Hertswood School Thrift
Farm Lane Borehamwood
Hertfordshire WD6 1TS
Demolition of existing school buildings (Use Class D1), Ark Theatre
(Use Class Sui Generis) and 2 residential dwellings (Use Class
C3) and erection of 301 residential units comprising 68 x 3 bed
houses, 81 x 4 bed houses, 39 x 1 bed flats and 113 x 2 bed flats
with new vehicular access, open space, parking and landscaping.
(Amended Plans received 15/07/2015 and 16/07/2015)
Bellway Homes 06/11/2014 08/10/2015Redevelopment of
school2.65 ha 301 194 80 27 £ - £ 1,190,455 £ 3,955 35% AH
13 Hertsmere
Tridac Dental Equipment
Ltd, Elton House Bushey
Hall Road Bushey WD23
2HJ
Demolition of existing building and erection of two new buildings to
provide 22 No: residential units (6 x 1 bed flat and 16 x 2 bed flat),
and communal amenity area, basement parking, cycle parking and
refuse / recycling stores (Amended plans received 21/01/15)
Heronslea 28/10/2014 27/11/2015Demolition of
offices0.2 ha 22 19 0 3 £ 385,000 £ - £ 17,500 13.6% AH
14 Hertsmere
Land South Of Elstree And
Borehamwood Station And
Adjacent To Coleridge Way
And Byron Avenue
Borehamwood
Hertfordshire
Development for 43 residential units (Class C3) with associated
access, parking, amenity space and landscaping.
Taylor Wimpey
North Thames18/06/2014 28/11/2014
Town centre infill
development1.3 ha 43 28 11 4 £ 316,831 £ - £ 7,368 35% AH
15 Hertsmere
Land At Studio Way
Borehamwood
Hertfordshire WD6 5NN
Demolition of Avenir House and the construction of 49no.
residential apartment units, together with vehicular access, parking,
amenity open space and landscaping. (Amended & Additional
Plans received 28/04/15 , 03/07/15 & 11/12/15) Affordable Rent
Units:
2 (two) x 2 (two) bed,; 2 (two) x 1 (one) bed; 2(two) x 3 (three)
bed. Shared Ownership Unit: 4 (four) x 1 (one) bed (a total of 10
Affordable Units).
Private
individual12/06/2014 09/05/2016
Town centre office
and warehouse0.47 ha 49 39 10 0 £ 1,048,911 £ - £ 21,406 20% AH
16 Hertsmere
Land At Rossway Industrial
Estate Rossway Drive
Bushey Hertfordshire
Change of use from car breakers yard (sui generis) to residential
development (C3) comprising: demolition of existing 5300m² GIA
industrial buildings and erection of 82 residential dwellings, parking,
open space and underground infrastructure. Private Dwellings: 33
x 3 bedroom houses; 24 x 4 bedroom houses; 9 x 5 bedroom
houses. Affordable Dwellings: 7 x 2 bedrooms (flats); 7 x 3
bedrooms; 2 x 4 bedrooms.
Private
individual13/05/2014 28/11/2014
Suburban car
breakers yard3.8 ha 82 66 12 4 £ 1,004,519 £ - £ 12,250 19.5% AH
Land – Price, Value, Cost or
Worth
Existing use value
Existing use value plus 20% (release
premium)
Alternative use value
Market value
Benchmark value
Residual value
Acquisition price
10/16/2017 29
Ideas and Options 1
Implement ‘Herts Viability Protocol’ adopting EUV (plus)
as a baseline for benchmark land value in viability
assessments
Adopt open book and transparency protocol
Universal CIL adoption across Herts with banding
Increase CIL in certain locations to reflect brownfield,
greenfield and market differences across Herts
Adopt twin track of fixed 35% AH and ‘roof tariff’ per
unit
Optimise consistency and sharing between the authorities
10/16/2017 30
Ideas and Options 2
Establish pan-Herts Infrastructure Development
Corporation, in partnership with LEP, HCA, NHS etc… to
acquire land (CPO) and build infrastructure
Encourage new entrants to the market place – SMEs
builders
Undertake comprehensive ‘top to bottom’ housing and
employment land capacity study to identify all potential
sites from 10 homes to 5,000 homes plus comprehensive
site allocations regime
Bid for Central Government new funding initiatives
Identify alternative models – eg TIF
10/16/2017 31
10/16/2017
Contacts / Queries
Chris Marsh – Christopher Marsh & Co Ltd.
Tel/Mob : 01233 612575 / 07940063781
Email : [email protected]
www.suspc.co.uk for more information
Danny Kaye – Sheridan Development Management Ltd
Tel/Mob – 020 7018 1821/ 07508 124 142
Email: [email protected]
32