Upload
charity-nelson
View
217
Download
0
Tags:
Embed Size (px)
Citation preview
Central Sterile Processing
Team Members:Charles Ristau (CPRE) Team Leader
Theron Worthington (CPRE) Communication Liaison
Yik Sen Tan (EE) Webmaster
Mohd Tariq Azmy (EE) Document Manager
Advisor:Dr. Daji Qiao
Client:Iowa Health Des Moines
User Friendly Requesting System
At the hospital, Central Sterile Processing prepares instruments for the operating rooms to be used throughout the day.
Sometimes, additional or different instruments are needed, requiring nurses to call CSP, sometimes so much that the phone lines are completely tied up.
Need a better form of communicating and logging requests.
Project Goal / Problem Statement
The Sterilization Process
Conceptual Diagram
Coordinator processes requests
Nurses’ Requests sent to coordinator via new visual communication system, possibly touch screen enabled
Central Sterile Processing receives requests, prepares equipment
Nurses receive specified surgical equipment from CSP, update the needed tools list
Surgeon requires specific surgical equipment,
Nurse receives these requests from the surgeon verbally or written.
Nurse enters the needed equipment via a workstation.
CSP staff receives request from the nurse CSP delivers equipment to the OR
Use Case Scenario
System Block Diagram
Interface Input request with the database Event Entry and Update Set different levels of request
Functional Requirements
Easy to use Organize requests accordingly (priority) Reliability (CSP respond) Maintainability
Non-functional Requirements
Project Initilization
Problem Definition
Proposed Solution
Project Plan
Requirements
Design
Design Document
Weekly Report
Website
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Weeks
Tasks
Task Breakdown / Schedule
Less than $5,000 (grant) Available Total 2 Monitors(< $1200) Labor $3,000 (300 hours @ $10/hour) Workstation computers available Total: < $4,500
Cost Estimate
Change of Project Requirements Change of Management Reaching Project Checkpoint in Timely
Manner Overbudget
Potential Risks & Mitigations
Questions?