Installation of DDTMA for A9100 BTS
File Reference Edition Status Date PageAlcatel M435323A6.doc V45 3DF 00435 0032 RJAGA 06 Released 04/09/15 1/3All rights reserved. P assing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel
Appendix A: CCL, Completion Check List of installation
Appendix A. CCL, Completion Check List of
installation
1. IDENTIFICATION
Customer VIP mobile d.o.oname : Serbia
Customerapplication :
Sitename :
Siteaddress:
2. USED DOCUMENTS
Document Ed Date Document Ed Date
3. FAULT REPORTS
Date Subject123
4. SIGNATURE AND COMMENTS OF CONCERNED PEOPLE
Name Signature Name Signature
Name Signature Name Signature
Start date End date Time spent on site
COMMENTS
7/31/2019 CCL TMA
2/3
Installation of DDTMA for A9100 BTS
File Reference Edition Status Date PageAlcatel M435323A6.doc V45 3DF 00435 0032 RJAGA 06 Released 04/09/15 2 /3All rights reserved. P assing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel
Appendix A: CCL, Completion Check List of installation
5. EQUIPMENTS FOR THE TEST
01 Type- Serial number- Validity date
02 Type- Serial number- Validity date
03 Type- Serial number- Validity date
6. REPORT
Record the results as the work proceeds: Put a cross in the Yes | No | NA (Not Applicable) box. Enter the information or measurements in the boxes provided. Enter the comments referred to on page 1.
7. RESULTS
Steps Title Yes No NA
1 Prerequisite task to starting work on site01 Access to the site
02 Availability and contents of documentation
03 Availability of tools
04 Availability of supplies
2 Safety rules and precautions01 General safety
02 On site
03 Of people
04 Of equipment
3 Installation01 DDTMA: attachment
02 DDTMA: jumper connections
03 DDTMA: grounding
04 Bias T: connections to feeder
05 Bias T: connection to DC injector cable
7/31/2019 CCL TMA
3/3
Installation of DDTMA for A9100 BTS
File Reference Edition Status Date PageAlcatel M435323A6.doc V45 3DF 00435 0032 RJAGA 06 Released 04/09/15 3 /3All rights reserved. P assing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel
Appendix A: CCL, Completion Check List of installation
Steps Title Yes No NA
06 PDU: attachment
07 PDU: connection to power supply
08 PDU: connection to Bias T power cables
09 PDU: connection of alarms cable
10 PDU: grounding
11 Switching on
12 Alarms
4 END OF TEST01 Site clean and services finished
8. FAULTS
# Proc. N Title
1
action:
Solved on:by:
2
action:
Solved on:by:
3
action:
Solved on:by:
4
action:
Solved on:by:
5
action:
Solved on:by:
Any fault encountered in the course of a procedure must be entered as it arises in the above form ( even if thefault is not covered by a FR, AF or ALCATEL 3000) .
Indicate:- in column 2 the number of the procedure in which the fault occurred,- in column 3 a description of the fault, and action taken if appropriate (FR, AF or ALCATEL 3000),- in the last column : the date and name of the person correcting the fault.