    Installation of DDTMA for A9100 BTS

    File Reference Edition Status Date PageAlcatel M435323A6.doc V45 3DF 00435 0032 RJAGA 06 Released 04/09/15 1/3All rights reserved. P assing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

    Appendix A: CCL, Completion Check List of installation

    Appendix A. CCL, Completion Check List of

    installation

    1. IDENTIFICATION

    Customer VIP mobile d.o.oname : Serbia

    Customerapplication :

    Sitename :

    Siteaddress:

    2. USED DOCUMENTS

    Document Ed Date Document Ed Date

    3. FAULT REPORTS

    Date Subject123

    4. SIGNATURE AND COMMENTS OF CONCERNED PEOPLE

    Name Signature Name Signature

    Name Signature Name Signature

    Start date End date Time spent on site

    COMMENTS

  • 7/31/2019 CCL TMA

    2/3

    Installation of DDTMA for A9100 BTS

    File Reference Edition Status Date PageAlcatel M435323A6.doc V45 3DF 00435 0032 RJAGA 06 Released 04/09/15 2 /3All rights reserved. P assing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

    Appendix A: CCL, Completion Check List of installation

    5. EQUIPMENTS FOR THE TEST

    01 Type- Serial number- Validity date

    02 Type- Serial number- Validity date

    03 Type- Serial number- Validity date

    6. REPORT

    Record the results as the work proceeds: Put a cross in the Yes | No | NA (Not Applicable) box. Enter the information or measurements in the boxes provided. Enter the comments referred to on page 1.

    7. RESULTS

    Steps Title Yes No NA

    1 Prerequisite task to starting work on site01 Access to the site

    02 Availability and contents of documentation

    03 Availability of tools

    04 Availability of supplies

    2 Safety rules and precautions01 General safety

    02 On site

    03 Of people

    04 Of equipment

    3 Installation01 DDTMA: attachment

    02 DDTMA: jumper connections

    03 DDTMA: grounding

    04 Bias T: connections to feeder

    05 Bias T: connection to DC injector cable

  • 7/31/2019 CCL TMA

    3/3

    Installation of DDTMA for A9100 BTS

    File Reference Edition Status Date PageAlcatel M435323A6.doc V45 3DF 00435 0032 RJAGA 06 Released 04/09/15 3 /3All rights reserved. P assing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

    Appendix A: CCL, Completion Check List of installation

    Steps Title Yes No NA

    06 PDU: attachment

    07 PDU: connection to power supply

    08 PDU: connection to Bias T power cables

    09 PDU: connection of alarms cable

    10 PDU: grounding

    11 Switching on

    12 Alarms

    4 END OF TEST01 Site clean and services finished

    8. FAULTS

    # Proc. N Title

    1

    action:

    Solved on:by:

    2

    action:

    Solved on:by:

    3

    action:

    Solved on:by:

    4

    action:

    Solved on:by:

    5

    action:

    Solved on:by:

    Any fault encountered in the course of a procedure must be entered as it arises in the above form ( even if thefault is not covered by a FR, AF or ALCATEL 3000) .

    Indicate:- in column 2 the number of the procedure in which the fault occurred,- in column 3 a description of the fault, and action taken if appropriate (FR, AF or ALCATEL 3000),- in the last column : the date and name of the person correcting the fault.