9
Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m @ Q0=1.1E10 May 19,2011 defect on cell #1 was known after bulk EP, gradient was limited by this defect. local grind will be applied before 2nd test. MHI-017: 1st VT 38.4MV/m @ Q0=6.1E09 June 02,2011 no defect was observed after bulk EP, ILC specification clear performance, so it will go module installation. Next vertical test is scheduled on 16 June (MHI-014, 3rd VT, field emission turned on by #8-#9iris scratch, local grind will be applied).

Cavity status; recent KEK activities · Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Cavity status; recent KEK activities · Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m

Cavity status; recent KEK activities2011.06.07: Hayano

(1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m @ Q0=1.1E10 May 19,2011

defect on cell #1 was known after bulk EP,gradient was limited by this defect.local grind will be applied before 2nd test.

MHI-017: 1st VT 38.4MV/m @ Q0=6.1E09 June 02,2011no defect was observed after bulk EP,ILC specification clear performance,so it will go module installation.

Next vertical test is scheduled on 16 June(MHI-014, 3rd VT, field emission turned on by #8-#9iris scratch,

local grind will be applied).

Page 2: Cavity status; recent KEK activities · Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m

Result of MHI-016 1st VT

Page 3: Cavity status; recent KEK activities · Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m

Q0-Eacc Curve for MHI #16 @1.8K & 4.2K

3STF Cavity Group Meeting (2011/5/23)

8.4MV/m

power limit

Qt = 2.68 x 1011 → 2.65 x 1011

21.3MV/m

Cell #1 heating

20.8MV/m

Cell #1 heating

Yasuchika Yamamoto

Page 4: Cavity status; recent KEK activities · Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m

4STF Cavity Group Meeting (2011/5/23)

Radiation Level in π mode measurement @2K

Yasuchika Yamamoto

Page 5: Cavity status; recent KEK activities · Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m

STF Cavity Group Meeting (2011/5/23)

21MV/m

Comparison between T-mapping and X-ray mapping @2nd π

55

T-mapping X-ray-mapping

97°

Yasuchika Yamamoto

Page 6: Cavity status; recent KEK activities · Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m

Result of MHI-017 1st VT

Page 7: Cavity status; recent KEK activities · Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m

Toshio Shishido

Page 8: Cavity status; recent KEK activities · Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m

8STF Cavity Group Meeting (2011/6/6)

Radiation Level in π mode measurement @2K

Yasuchika Yamamoto

Page 9: Cavity status; recent KEK activities · Cavity status; recent KEK activities 2011.06.07: Hayano (1) MHI-016, MHI-017 ; 9 cell cavities field measurements MHI-016: 1st VT 21.0MV/m

STF Cavity Group Meeting

(2011/6/6) 9

38MV/m

Comparison between T-mapping and X-ray mapping @3rd π

9

X-ray-mappingとの相関は見られない。

T-mapping X-ray-mapping

Yasuchika Yamamoto