Volkswagen Suppliers in Kaluga – Contribution to Regional Development VI Kaluga Invest-Forum May 14 th 2009. OOO Volkswagen Group Rus Kaluga. Capacity ca. 150.000 Fahrzeuge/a (cars/year) ca. 3.000 Mitarbeiter (employees) Investment > 500 Mio Euro plus - PowerPoint PPT Presentation
Citation preview
Volkswagen Group Rus - TechnoparkStand: May 2009
Volkswagen Suppliers in Kaluga –
Contribution to Regional Development
VI Kaluga Invest-Forum
May 14th 2009
2Volkswagen Group Rus - TechnoparkStand: May 2009
Capacity ca. 150.000 Fahrzeuge/a (cars/year)
ca. 3.000 Mitarbeiter (employees)
Investment
> 500 Mio Euro
plus
> 95 Mio Euro outsourced press shop
4
1 2
5
3
1 Fahrzeugwerk / car plant
2 Importeurslager / import storage
3 Ersatzteillager / spare part storage
4 Industriepark / Technopark
5 Option
OOO Volkswagen Group Rus Kaluga
3Volkswagen Group Rus - TechnoparkStand: May 2009
Investment agreement with «Volkswagen AG» signed: 29. May 2006
Laying the foundation stone: 28. October 2006
First assembly: 28.November 2007
Car assemblies in 2008: > 60 000 cars
Car models to be manufactured in Kaluga:
- Skoda Oktavia - VW Tiguan - Skoda Fabia - VW Polo - VW Passat -
Current stage of realization: construction of production workshop in progress
SOP full-fledged production: September 2010
Data
4Volkswagen Group Rus - TechnoparkStand: May 2009
Su
pp
lier
Are
aT
ech
no
par
k
Vo
lksw
agen
Gro
up
Ru
s
to Moscow
to Kaluga/Tula
5Volkswagen Group Rus - TechnoparkStand: May 2009
Technopark - Supplier Area “4”
Total area: ca. 110 ha net
6Volkswagen Group Rus - TechnoparkStand: May 2009
Land plot supplier area “4”:
Location: Technopark «Grabtsevo»
Total area: 110 ha
1-st stage of development: 40 ha
Category of land: industrial land
Owner, sales & development: OJSC «Kaluga Region Development Corporation» (KRDC)
Minimal lot size: 2 ha
Media: electricity*, gas, water, telecommunication, sewage water, rain water are included in the sales price
* Electricity 0.5 megawatt per hectare included in sales price
7Volkswagen Group Rus - TechnoparkStand: May 2009
Seat framesKaluga
ExhaustKaluga
WheelsKaluga
Car glassKaluga
Fuel tankKaluga
Interior trimKaluga
Acoustic trimKaluga
SeatingKaluga
CeilingSt. Petersburg
AxlesKaluga
Front endKaluga Body parts
Kaluga
LightingRyazan
Washer tankKinel
InstrumentsChistopol
Horn---
AbsorbersSt. Petersburg
PedalsRyazan
TiresJaroslavl
SealingTutaev
Seat foamsMoscow
Headlining---
Cable CoverTogliatti
CockpitTula
TiresNizhnekamsk
FilterSt. Petersburg
OOO Volkswagen Group Rus – Component Localization Russia
8Volkswagen Group Rus - TechnoparkStand: May 2009
Seat framesKaluga
ExhaustKaluga
WheelsKaluga
Car glassKaluga
Fuel tankKaluga
Interior trimKaluga
Acoustic trimKaluga
SeatsKaluga
AxlesKaluga
Front endKaluga
Body partsKaluga
OOO Volkswagen Group Rus – Component Localization Kaluga
9Volkswagen Group Rus - TechnoparkStand: May 2009
Development Supplier Requirements for Construction Area
0
10
20
30
40
50
60
70
hectare
1 2 3
Comparison Status 09-08 against 05-09
Required Land Size
09-2008
05-2009
Committment Option Summary
10Volkswagen Group Rus - TechnoparkStand: May 2009
Magna7 ha
MediaCenter
offen
A+Park 20 ha
11Volkswagen Group Rus - TechnoparkStand: May 2009
General procedure for investors in Technopark «Grabtsevo»:
• Submission of «Production Placement Application» (download from www.invest.kaluga.ru) to Kaluga Region Development Corporation KRDC
• Project approval by Volkswagen Group Rus (required!)
• Investment agreement with Kaluga Region Government and KRDC
• Preliminary agreement with KRDC e.g. for land survey (optional!)
• Land purchase contract with KRDC
• Construction
12Volkswagen Group Rus - TechnoparkStand: May 2009
• We expect from our JIT, key & volume suppliers to settle next door
benefits e.g.: transport, reaction times, direct communication, chance of simplified logistics etc.
• Neighborhood creates synergies (Volkswagen & Supplier and Supplier & Supplier):
e.g. construction (speed through use of existing men & material), security, general services, transport etc.
• Strong commitment from Kaluga towards Technopark Grabtsevo
• Dense tier 1 supplier community attracts tier 2 & 3 suppliers
• Strengthened position discussing general infrastructure etc.
Technopark Grabtsevo - Benefits
13Volkswagen Group Rus - TechnoparkStand: May 2009
Our Message
If our suppliers decide for a green field solution within Kaluga Oblast Technopark Grabtsevo must be first choice
Volkswagen Group Rus as well as Kaluga Government and Administration are actively supporting this policy
14Volkswagen Group Rus - TechnoparkStand: May 2009
KRDC «Kaluga Region Development Corporation»
Mr. Dmitriy Abramov
Head of Investment Programs Department
Tel/Fax: +7 4842 79 04 10
E-mail: [email protected]
Mr. Igor Egerev
Head of Project Management Department
Tel/Fax: +7 4842 79 04 10
E-mail: [email protected]
OOO «Volkswagen Group Rus»
Dr. Harald Manzenrieder
Supplier Placement Techno park
Tel: +7 4842 718 086
Fax: +7 4842 718 085
E-mail: [email protected]
Miroslav Vlasak
Purchasing Director
Tel: +7 4842 718 074
Fax: +7 4842 718 060
E-mail: [email protected]
15Volkswagen Group Rus - TechnoparkStand: May 2009
Thank you for your attention