43
C11 - 1 Learning Objectives Power Notes 1. Just-in-Time Principles 2. Applying a Just-in-Time Approach 3. Accounting for Just-in-Time Operations 4. Accounting for the Costs of Quality Chapter M11 C11 Cost Management for Just-in-Time Manufacturers Cost Management for Just-in-Time Manufacturers

C11 - 1 Learning Objectives Power Notes 1.Just-in-Time Principles 2.Applying a Just-in-Time Approach 3.Accounting for Just-in-Time Operations 4.Accounting

Embed Size (px)

Citation preview

C11 - 1

Learning Objectives

Power Notes

1. Just-in-Time Principles

2. Applying a Just-in-Time Approach

3. Accounting for Just-in-Time Operations

4. Accounting for the Costs of Quality

Chapter M11

C11

Cost Management for Just-in-Time Manufacturers Cost Management for Just-in-Time Manufacturers

C11 - 2

Chapter M11

Just-in-Time Processing

Traditional Operations

Just-in-Time Operations

Accounting for the Costs of Quality

Slide # Power Note Topics

Note: To select a topic, type the slide # and press Enter.

Power Notes

3

11

18

26

Cost Management for Just-in-Time Manufacturers Cost Management for Just-in-Time Manufacturers

C11 - 3

Just-in-Time Processing (JIT)Just-in-Time Processing (JIT)

JIT is a business philosophy that focuses on reducing time and cost and eliminating poor quality.

JIT organizes work cells that perform several manufacturing steps.

Workers are cross-trained to perform more than one task. This provides flexibility and worker pride and involvement in the final product.

Because products have limited movement between departments, the nonvalue-added cost of transporting products and parts is reduced.

C11 - 4

Reduces inventory

Reduces lead time

Reduces setup time

Emphasizes product-oriented layout

Just-in-Time ManufacturingJust-in-Time ManufacturingTraditional Manufacturing Traditional Manufacturing

Increases inventory to protect against process problems

Increases lead time to protect against uncertainty

Disregards setup timeas an improvement priority

Emphasizes process-oriented layout

Just-in-Time PrinciplesJust-in-Time Principles

C11 - 5

Emphasizes team-oriented employee involvement

Emphasizes pull manufacturing

Emphasizes zero defects

Emphasizes supplier partnering

Just-in-Time ManufacturingJust-in-Time ManufacturingTraditional Manufacturing Traditional Manufacturing

Emphasizes work of individuals, following manager instructions

Emphasizes push manufacturing

Tolerates defects

Treats suppliers as “arms-length,” independent entities

C11 - 6

Reducing Lead (Throughput) TimesReducing Lead (Throughput) Times

Conversion TimeConversion Time

Value-added

Start of productionfor a single item

C11 - 7

Nonvalue-added

Reducing Lead (Throughput) TimesReducing Lead (Throughput) Times

Conversion TimeConversion Time Wait TimeWait Time

Value-added

Start of productionfor a single item

C11 - 8

Nonvalue-added

Reducing Lead (Throughput) TimesReducing Lead (Throughput) Times

Conversion TimeConversion Time Wait TimeWait Time Move TimeMove Time

Value-added

Start of productionfor a single item

C11 - 9

Nonvalue-added

Reducing Lead (Throughput) TimesReducing Lead (Throughput) Times

Conversion TimeConversion Time Wait TimeWait Time Move TimeMove Time Down TimeDown Time

Value-added

Start of productionfor a single item

C11 - 10

Nonvalue-added

Reducing Lead (Throughput) TimesReducing Lead (Throughput) Times

Conversion TimeConversion Time Wait TimeWait Time Move TimeMove Time Down TimeDown Time

Value-added

Total Lead Time

Start of productionfor a single item

End of productionfor a single item

C11 - 11

Traditional OperationsTraditional Operations

Administrative Offices:Accounting

SalesCustomer Service

Maintenance and Tooling

Technical Offices:Design

SchedulingManufacturing

C11 - 12

Traditional OperationsTraditional Operations

Administrative Offices:Accounting

SalesCustomer Service

Maintenance and Tooling

Technical Offices:Design

SchedulingManufacturing

Receiving and Raw Materials

Inventory

C11 - 13

Stamping

Traditional OperationsTraditional Operations

Administrative Offices:Accounting

SalesCustomer Service

Maintenance and Tooling

Technical Offices:Design

SchedulingManufacturing

Receiving and Raw Materials

Inventory

Work in Process AreasWork in Process Areas

WIPWIP

C11 - 14

Stamping

Traditional OperationsTraditional Operations

Administrative Offices:Accounting

SalesCustomer Service

Maintenance and Tooling

Technical Offices:Design

SchedulingManufacturing

Receiving and Raw Materials

Inventory

Punching

Work in Process AreasWork in Process Areas

WIPWIP

WIPWIP

C11 - 15

Stamping

Traditional OperationsTraditional Operations

Administrative Offices:Accounting

SalesCustomer Service

Maintenance and Tooling

Technical Offices:Design

SchedulingManufacturing

Receiving and Raw Materials

Inventory

Forming Punching

Work in Process AreasWork in Process Areas

WIPWIP

WIPWIP WIPWIP

C11 - 16

Stamping

Traditional OperationsTraditional Operations

Administrative Offices:Accounting

SalesCustomer Service

Maintenance and Tooling

Technical Offices:Design

SchedulingManufacturing

Receiving and Raw Materials

Inventory

FinishedGoods

Inventory

Forming Punching

Work in Process AreasWork in Process Areas

WIPWIP

WIPWIP WIPWIP

C11 - 17

Stamping

Traditional OperationsTraditional Operations

Administrative Offices:Accounting

SalesCustomer Service

Maintenance and Tooling

Technical Offices:Design

SchedulingManufacturing

Receiving and Raw Materials

Inventory

ShippingDepartment

FinishedGoods

Inventory

Forming Punching

Work in Process AreasWork in Process Areas

WIPWIP

WIPWIP WIPWIP

C11 - 18

Just-in-Time OperationsJust-in-Time Operations

Administrative Offices:Accounting

SalesCustomer Service

Technical Offices:Design

SchedulingManufacturing

C11 - 19

Just-in-Time OperationsJust-in-Time Operations

Administrative Offices:Accounting

SalesCustomer Service

Technical Offices:Design

SchedulingManufacturing

Re

ceiv

ing

C11 - 20

Just-in-Time OperationsJust-in-Time Operations

Administrative Offices:Accounting

SalesCustomer Service

Technical Offices:Design

SchedulingManufacturing

Maintenance and ToolingSmall covers

Maintenance and ToolingMedium covers

Maintenance and ToolingLarge covers

Re

ceiv

ing

Sh

ipp

ing

Stamping

Stamping

Stamping

C11 - 21

Just-in-Time OperationsJust-in-Time Operations

Administrative Offices:Accounting

SalesCustomer Service

Technical Offices:Design

SchedulingManufacturing

Maintenance and ToolingSmall covers

Maintenance and ToolingMedium covers

Maintenance and ToolingLarge covers

Re

ceiv

ing

Sh

ipp

ing

Stamping Punching

Stamping Punching

Stamping Punching

C11 - 22

Just-in-Time OperationsJust-in-Time Operations

Administrative Offices:Accounting

SalesCustomer Service

Technical Offices:Design

SchedulingManufacturing

Maintenance and ToolingSmall covers

Maintenance and ToolingMedium covers

Maintenance and ToolingLarge covers

Re

ceiv

ing

Sh

ipp

ing

Stamping Punching Forming

Stamping Punching Forming

Stamping Punching Forming

C11 - 23

Just-in-Time OperationsJust-in-Time Operations

Administrative Offices:Accounting

SalesCustomer Service

Technical Offices:Design

SchedulingManufacturing

Maintenance and ToolingSmall covers

Maintenance and ToolingMedium covers

Maintenance and ToolingLarge covers

Re

ceiv

ing

Sh

ipp

ing

Stamping Punching Forming

Stamping Punching Forming

Stamping Punching Forming

C11 - 24

Accounting for Just-in-Time OperatonsAccounting for Just-in-Time Operatons

Fewer Transactions. The accounting system is simpler because there are fewer transactions to record.

Combined Accounts. All in-process work is combined with raw materials to form a new account, Raw and In Process (RIP) Inventory.

Nonfinancial Performance Measures. There is a greater emphasis on nonfinancial measures.

Direct Tracing of Overhead. Indirect labor is directly assigned to product production cells.

In a just-in-time operating environment, the accounting system will have the following characteristics:

C11 - 25

Nonfinancial Performance MeasurementNonfinancial Performance Measurement

1. Measures of product quality

2. Customer complaints and warranty experience

3. Customer satisfaction and retention rates

4. Product availability and on-time performance

5. New product time to market and market share

Nonfinancial performance measures combined with conventional financial measures provide a balanced performance perspective.

C11 - 26

Prevention costs are the costs of activities that prevent defects from occurring during the design and delivery of products or services.

Appraisal costs are the costs of activities that detect, measure, evaluate, and audit products and processes to ensure that they conform to customer requirements and performance standards.

Costs of Controlling QualityCosts of Controlling Quality

C11 - 27

Internal failure costs are the costs associated with defects discovered by a business before the product or service is delivered to the consumer.

External failure costs are the costs incurred after defective units or services have been delivered to consumers. Although difficult to measure, it may be the largest cost in the quality equation.

Costs of Failing to Control QualityCosts of Failing to Control Quality

C11 - 28

Rework $ 380,000 Internal failureWarranty work 225,000 External failureDisposing of scrap 195,000 Internal failureDisposal of rejected materials 160,000 Internal failureProcessing returned materials 150,000 External failureFinished goods inspection 140,000 AppraisalPreventive maintenance 80,000 PreventionMaterials inspection 70,000 AppraisalDesign engineering 55,000 PreventionAssessing vendor quality 45,000 Prevention

Total activity cost $1,500,000

Quality Control Activity AnalysisQuality Control Activity Analysis

Quality Control Activities Activity Cost Classification

Internal failureExternal failureInternal failureInternal failureExternal failureAppraisalPreventionAppraisalPreventionPrevention

C11 - 29

Value-Added / Nonvalue-Added Activity AnalysisValue-Added / Nonvalue-Added Activity Analysis

Quality Control Activities Activity Cost

Rework $ 380,000 Warranty work 225,000 Disposing of scrap 195,000 Disposal of rejected materials 160,000 Processing returned materials 150,000 Finished goods inspection 140,000 Preventive maintenance 80,000 Materials inspection 70,000 Design engineering 55,000 Assessing vendor quality 45,000

Total activity cost $1,500,000

Which activities are value-added and which are nonvalue- added?

Which activities are value-added and which are nonvalue- added?

C11 - 30

Value-Added / Nonvalue-Added Activity AnalysisValue-Added / Nonvalue-Added Activity Analysis

Quality Control Activities Activity Cost

Nonvalue-added$1,110,000

74%

Rework $ 380,000 Warranty work 225,000 Disposing of scrap 195,000 Disposal of rejected materials 160,000 Processing returned materials 150,000 Finished goods inspection 140,000 Preventive maintenance 80,000 Materials inspection 70,000 Design engineering 55,000 Assessing vendor quality 45,000

Total activity cost $1,500,000

C11 - 31

Value-Added / Nonvalue-Added Activity AnalysisValue-Added / Nonvalue-Added Activity Analysis

Quality Control Activities Activity Cost

Nonvalue-added$1,110,000

74%

Rework $ 380,000 Warranty work 225,000 Disposing of scrap 195,000 Disposal of rejected materials 160,000 Processing returned materials 150,000 Finished goods inspection 140,000 Preventive maintenance 80,000 Materials inspection 70,000 Design engineering 55,000 Assessing vendor quality 45,000

Total activity cost $1,500,000

Value-added$390,000

26%

C11 - 32

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0

Rework

Warranty work

Disposing of scrap

Disposal of rejected materials

Processing returned materials

Finished goods inspection

Preventive maintenance

Materials inspection

Design engineering

Assessing vendor quality

Quality Control Activities

Activity Categories

Costs

C11 - 33

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0Activity Categories

Costs

Rework

C11 - 34

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0Activity Categories

Costs

Warranty work

C11 - 35

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0Activity Categories

Costs

Disposing of scrap

C11 - 36

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0Activity Categories

Costs

Disposal of rejected materials

C11 - 37

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0Activity Categories

Costs

Processing returned materials

C11 - 38

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0Activity Categories

Costs

Finished goods inspection

C11 - 39

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0Activity Categories

Costs

Preventive maintenance

C11 - 40

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0Activity Categories

Costs

Materials inspection

C11 - 41

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0Activity Categories

Costs

Design engineering

C11 - 42

Pareto Chart of Quality CostsPareto Chart of Quality Costs

$400,000

350,000

300,000

250,000

200,000

150,000

100,000

50,000

0Activity Categories

Costs

Assessing vendor quality

C11 - 43

Note: To see the first slide, type 1 and press Enter.

This is the last slide in Chapter 24.This is the last slide in Chapter 24.

Power NotesChapter 24

Cost Management for Just-in-Time Manufacturers Cost Management for Just-in-Time Manufacturers