45
Business Area Mines Capital Markets Day 6 September 2011 Jan Moström President BA Mines

Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Business Area MinesCapital Markets Day 6 September 2011

Jan MoströmPresident BA Mines

Page 2: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Strategic direction

Operational excellence

Organic growth

Acquired growth

Operationell excellence

Organicgrowth

Acquiredgrowth

2011-09-062Boliden Group-CMD 2011

Page 3: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

R&D Program

Exploration‒ Geometallurgy

‒ Improving geological and drill core data for production design (rock mechanics, comminution and processing, optimization of production plans)

Mining‒ Mine automation

‒ Communication systems, remote control, autonomous units

Processing‒ Flotation design

‒ Circuit design for higher recoveries‒ Treatment of penalty elements

‒ Reduce penalty costs, better marketability, new resources‒ Process control

‒ Improving recoveries/quality by real time adjustments according to ore properties

Environmental‒ Water treatment

‒ Control of emissions and minimized operating costs (metals, nitrogen, thiosulfates)

2011-09-063Boliden Group-CMD 2011

Page 4: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

New Boliden Way Roll out

4

Boliden Area OperationsProject

Boliden AreaAnalysis

KristinebergPilot Assumptions:

Analysis: 6 weeksProjects: 12-15 months

2010 2011 20132012

Aitik Project

Aitik 1Analysis

TaraAnalysis

TaraProject

GarpenbergAnalysis

Aitik 2Analysis

2011-09-06Boliden Group-CMD 2011

Page 5: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Operational excellence, Cash Cost C1, BA Mines

2011-09-065Boliden Group-CMD 2011

0

50

100

150

200

250

300

350

400

450

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

c/lb C1 Aitik50th percLME price

Source: Brook Hunt - A WoodMcKenzie company, Reuters

Page 6: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Growth, Mineral Resources and Ore Reserves 2006-2010

2011-09-066Boliden Group-CMD 2011

Page 7: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Aitik

2011-09-067Boliden Group-CMD 2011

Page 8: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Aitik Expansion - update

Ramp-up period‒ 32 mtonnes annualized ore production

in Q2‒ Peak capacity convincing‒ 36 mtonnes 2014

Actions implemented‒ Truck engine exchange program‒ Crusher 165 (old) connected‒ New crushers not satisfactory‒ More robust ore supply

Capacity Reliability

Mine and logistics √ √

Crushers √Conveyors √ √Mills √ √Flotation √ √

2011-09-068Boliden Group-CMD 2011

Page 9: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

The Aitik Expansion

Double ore production‒ High productivity‒ Profitable mining of lower grades‒ Average reserve grade 0,25%‒ Cu annual production approx +50%‒ Life of mine - 2030

Lower grades‒ Current production plan has lower than

average grades 2011-17 Capex

‒ 6,1 bSEK Time

‒ In production 1 July 2010‒ Full production – 36 Mtonnes ore -

2014

9Boliden Group-CMD 2011 2011-09-06

Page 10: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Production areas with Hauling Cycles

2011-09-0610Boliden Group-CMD 2011

S1

S2

Salmijärvi

5

6

7

Crusher -285Crusher -165

Crusher +20

New Concentrator

Page 11: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Production Aitik, Total milled vs new millHalf year 2011

2011-09-0611Boliden Group-CMD 2011

0

500

1 000

1 500

2 000

2 500

3 000

3 500

maj-10 aug-10 nov-10 feb-11 maj-11

Tonn

es

Total milled New mill

Page 12: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Boliden Area

2011-09-0612Boliden Group-CMD 2011

Page 13: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

2011-09-0613Boliden Group-CMD 2011

Page 14: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Inauguration of Maurliden Östra

2011-09-0614Boliden Group-CMD 2011

Page 15: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

2011-09-0615Boliden Group-CMD 2011

Page 16: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Kankberg Expansion

2011-09-0616Boliden Group-CMD 2011

Page 17: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Progress report – Kankberg Mine

Ventilation shaft – raise boring 30 m (401)

Drifting – On schedule

Core drilling on plan, two units in operation

Basic and detail engineering – shaft levels, mine water pumping, chrushers etc

Procurement of mobile equipment

2011-09-0617Boliden Group-CMD 2011

Page 18: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Project report – Concentrator, leaching plant

Detail engineering of process and plant upgrade

Basic engineering mechanical and piping

Procurement of process equipment

2011-09-0618Boliden Group-CMD 2011

Page 19: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Ore and waste dumps

2011-09-0619Boliden Group-CMD 2011

Page 20: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Ventilation shaft

2011-09-0620Boliden Group-CMD 2011

Page 21: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Ventilation shaft

2011-09-0621Boliden Group-CMD 2011

Page 22: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Summary Kankberg project

TIME SCHEDULE On track

CAPEX No deviations

FUNCTION No deviations

2011-09-0622Boliden Group-CMD 2011

Page 23: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

New Ore handling system at Boliden

2011-09-0623Boliden Group-CMD 2011

Page 24: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

New Ore handling system at Boliden

24 2011-09-06Boliden Group-CMD 2011

Page 25: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

2.0

1.5

1.5

1.0

2.0

2.0

2.0

3.0

3.0

3.0

3.02.5

3.0

3.0

4.0

4.0

4.0

4.0

3.0

4.0

4.0

0.0

1.0

2.0

3.0

4.0

5.01. Leadership

4. Performance Management

6. Problem Solving

9. Standards for Work

12. 5S

14. Maintenance

22. Visual control

Boliden

Starting/Present Short term Long term

Spider web Boliden Area

2011-09-0625Boliden Group-CMD 2011

Page 26: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Garpenberg

2011-09-0626Boliden Group-CMD 2011

Page 27: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

2011-09-0627Boliden Group-CMD 2011

Page 28: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Garpenberg Expansion

2011-09-0628Boliden Group-CMD 2011

Page 29: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Progress report – General

Project team in place

Permission granted for shaft and underground activities

Application for a new environmental permit for new industrial site submitted, negotiations late fall. According to time schedule

Application for building permit submitted

2011-09-0629Boliden Group-CMD 2011

Page 30: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Progress report - Mine

Production shaft – raise boring section 1 (60 %)

Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced

Drifting – several levels in the mine

Ventilation canals – rock work ongoing

Ventilations shafts – 2 section ongoing

Crushers – 2 used ones to be refurbished

Basic and detail engineering – shaft levels, mine water pumping, chrushersetc

Procurement of process equipment

2011-09-0630Boliden Group-CMD 2011

Page 31: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Project report - Concentrator

Detail engineering of paste plant upgrade

Basic engineering mechanical and piping

Procurement of process equipment

2011-09-0631Boliden Group-CMD 2011

Page 32: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Break through section 1 personnel shaft

2011-09-0632Boliden Group-CMD 2011

Page 33: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Raise boringpersonnel shaft

2011-09-0633Boliden Group-CMD 2011

Page 34: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Raise boring reamer personnel shaft 4.5 m

2011-09-0634Boliden Group-CMD 2011

Page 35: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Break through at surface for personnel shaft

2011-09-0635Boliden Group-CMD 2011

Page 36: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

New 558 meter level (rope change level)

2011-09-0636Boliden Group-CMD 2011

Page 37: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Rope change level production shaft (15*26*7,5 m)

2011-09-0637Boliden Group-CMD 2011

Page 38: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Electrical substation 700 meter level

2011-09-0638Boliden Group-CMD 2011

Page 39: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

On going rock work for ventilation canals

2011-09-0639Boliden Group-CMD 2011

Page 40: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Diamond drilling for cement stabilisation of ventilation shaft

2011-09-0640Boliden Group-CMD 2011

Page 41: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Summary Garpenberg expansion

TIME SCHEDULE On track

CAPEX No deviations

FUNCTION No deviations

2011-09-0641Boliden Group-CMD 2011

Page 42: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

Tara

2011-09-0642Boliden Group-CMD 2011

Page 43: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

AG grinding mill Tara

2011-09-0643Boliden Group-CMD 2011

Page 44: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work

1.5

2

22

1.5

2

3

2.53

2

3

3.5

34

3

0

1

2

3

4

51. Leadership

4. Performance Management

6. Problem Solving

7. Learning & Competence Dev

14. Maintenance

Tara

Starting/Present Short term Long term

Spider web Tara

2011-09-0644Boliden Group-CMD 2011

Page 45: Business Area Mines - Boliden...Personnel shaft– section 1 raised (300 m), raise boring section 2 commenced Drifting – several levels in the mine Ventilation canals – rock work