AB-149 Flue Fire Burners John Stanley Supplementary Firing Eclipse Product: Submitted by: Application: Site Location: Burner installed in duct Yeosu, South Korea The burner supplied on this application raises the temperature of the exhaust gas coming from the turbine to the required temperature entering the HRSG. The burner consists of 10 independent rows with 24 heads per row. The total burner capacity is 230.0 MMBtu/hr. maximum with a low fire capacity of 23.0 MMBtu/hr. CFD analysis was used to design the inlet air distribution plates to provide more uniform air into the burner. As a result of the CFD analysis, the burners were angled to provide the best heat distribution entering the HRSG. See page 2 for before and after images. System Description: Turbine Make GE Type 6581B Turbine Exhaust Gas Mass Flow 529,000kg/h Oxygen level 13.63% Temperature in 546º C Temperature out 898º C Burner Duty 230.0 MMBtu/hr. (max.), 23.0 MMBtu/hr. (min.) Fuel Propane and LPG Technical Data: Overall view of Cogeneration Plant

Burner installed in duct - Docuthek

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Burner installed in duct - Docuthek

AB-149

Flue Fire Burners

John Stanley

Supplementary Firing

Eclipse Product:

Submitted by:

Application:

Site Location:

Burner installed in duct

Yeosu, South Korea

The burner supplied on this application raises the temperature of theexhaust gas coming from the turbine to the required temperature enteringthe HRSG. The burner consists of 10 independent rows with 24 headsper row. The total burner capacity is 230.0 MMBtu/hr. maximum with alow fire capacity of 23.0 MMBtu/hr. CFD analysis was used to design theinlet air distribution plates to provide more uniform air into the burner. Asa result of the CFD analysis, the burners were angled to provide the bestheat distribution entering the HRSG. See page 2 for before and afterimages.

System Description:

Turbine Make GE Type 6581BTurbine Exhaust Gas Mass Flow 529,000kg/h Oxygen level 13.63% Temperature in 546º C Temperature out 898º CBurner Duty 230.0 MMBtu/hr. (max.), 23.0 MMBtu/hr. (min.) Fuel Propane and LPG

Technical Data:

Overall view of Cogeneration Plant

Page 2: Burner installed in duct - Docuthek

Litho in U.S.A.AB-149

CFD generated velocity contours before and after the addition ofdistribution plates illustrating improved flow distribution into the HRSG.