Agenda
Big Picture
Civil WorksMilitaryIIS
SWD Missions
The Path Ahead
BUILDING STRONGSM
Southwestern Division
USACE Civil Works Programs Missions
BUILDING STRONGSM
Southwestern Division
Worldwide organizationWorldwide organization
233 years of service233 years of service
Relevant,Relevant,
Ready,Ready,
Responsive,Responsive,
Reliable, &Reliable, &
RespectedRespected
BUILDING STRONGSM
Southwestern Division
Recreation areas 376 M Visitors/yrGenerate $15 B in economic activity,
500,000 jobs11,000 miles of
Commercial Inland Waterways:
½ the cost of rail1/10 the cost of
trucks 400 miles of
Shore protectionDestination for
75% of U.S.Vacations
8,500 Miles of Levees
363 Deep Draft Harbors
12 EmergencyResponses
Stewardship of11.7 Million Acres
Public Lands EnvironmentalRestoration
733 Shallow Draft Harbors
100,000 permitsMost in 14 days
3% of Nation’s Electricity: $500 M + in power sales
Civil Works Value to the Nation
• US Ports & Waterways convey > 2B Tons Commerce • Foreign Trade alone creates > $160 B Tax Revenues
BUILDING STRONGSM
Southwestern Division
Budgets & Appropriations
FY06 FY07 FY08 FY09 $ Millions
Investigations 95 94 90 91Operation & Maintenance 1,979 2,258 2,471 2,475Construction 1,637 1,555 1,523 1,402Mississippi River & Tribs. 270 278 260 240Regulatory Program 160 173 180 183 Flood & Coastal Emergencies 70 81 40 40F.U.S.R.A.P. 140 130 130 130Expenses 162 164 177 177ASA(CW) 0 0 0 6Total Budget Request 4,513 4,733 4,871 4,741Appropriation 5,329 5,340 5,592 5401Approp.>Budget +816 +607 +721 +660Supplementals 6,585 1,609 3,383 5,761Stimulus 4,600Approp. + Supplementals 11,914 6,949 8,975 15,762
BUILDING STRONGSM
Southwestern Division
Figures from FY09 Budget + Supplemental. Total = $9.475 M (includes $183 M Management & Oversight not listed in pictures)
Navigation
$1,892 M
** Estimated reimbursement from supported agencies, not in budget
Flood & CoastalStorm Damage
Reduction
$7,083 M
Environmental Protection& Restoration
$511 MHydropower
$319 M
EmergencyManagement
$58 MSupport for Others
$2,400 M**
Water Supply
$6 M
Regulatory
$180 M
Recreation
$270 M
Recreation
$270 M
BUILDING STRONGSM
Southwestern Division
USACE Military Program Missions
BUILDING STRONGSM
Southwestern Division
• Military Construction • Overseas Contingency
Operations (OCO)• Real Estate• Formerly Used Defense Sites
(FUDS)• Base Realignment and Closure
(BRAC)• Interagency and International
Services• Installation Support
Military Program Missions
BUILDING STRONGSM
Southwestern Division
'00 '01 '02 '03 '04 '05 '06 '07 '08 '09 10 11 12 13
0
5,000
10,000
15,000
20,000
25,000
30,000
Military Functions Program TrendsFY00-13
Fiscal Year
Program ($Millions)
RE
DOD
Air ForceConstruction
Army Construction
Engineering & Design
RDT&E
Other (ED&M, OMA)
Host Nation/FMS
Environmental
Overseas ContingencyOperations (OCO)
BUILDING STRONGSM
Southwestern Division
0
2
4
6
8
10
12
14
16
FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13
DOD BRAC
DOD MILCON
AF BRAC
AF MILCON
Army Res BRAC
Army Res MILCON
Army BRAC
Army MILCON(MCA & AFH)
Execute $67.5B MILCON/BRAC Requirements (FY06-13)
Projected Army FY06-13 = $46.2B
$ B
illi
on
s
Host Nation Support (FY06-13): *Japan-$8.2B *Korea-$6.7B
BUILDING STRONGSM
Southwestern Division
FY08 SRM ReimbursableTotal $2.7B ( FY08 ) vs $2.2B ( FY07)
BUILDING STRONGSM
Southwestern Division
MILCON Process Reinvention is…
• Greater emphasis on facility planning• Customer dictates facility requirements and standards• Standardization of facilities and processes• The Corps changes the way it executes MILCON and BCA
– Army, DLA, and Medical Programs will be most affected• Execution of Army MILCON as a continuous building program• Expanded use of manufactured building solutions• Greater emphasis on partnering with all USACE customers and with
industry
“Quality facilities delivered in less time at lower cost”
BUILDING STRONGSM
Southwestern Division
Success Is…
• 15% cost savings and 30% time savings• Facilities with a 50 year life cycle• Lower unit costs for primary facilities provides a greater ability to
absorb market vagaries• Providing a Complete BCT in 15-24 months• Providing a Quality BCT within the 1391 Program Amounts
– While lowering unit costs – Having ability to absorb detrimental market conditions
• Achieving Army ssustainability standards• Continuing to meet Army/DoD Small Business requirements
Quality facilities for our Soldiers, Civilians, and Families
BUILDING STRONGSM
Southwestern Division
Private Sector Partnerships
Construction Contractors: ~300,000 employees
Unlimited Capability
Perform 100% of Civil Works & Military Construction
Architect-Engineer Firms
~5,000 employees perform over 65%
of Planning & Design
~32,000Corps
Employees
Sponsors, Agencies, Associations
ONE TEAM!ONE TEAM!
BUILDING STRONGSM
Southwestern Division
The Southwestern Division
BUILDING STRONGSM
Southwestern Division
Southwestern Division Total ProgramSouthwestern Division Total Program
FY09 Dollars by ProgramTotal Dollars: $5.9 B
Military $3.6B
Civil Works $1.5B
IIS $502M
Environmental $229M
VA $49M
BUILDING STRONGSM
Southwestern Division
Current & Projected Total WorkloadCurrent & Projected Total Workload
(Mill
ions
)
$0
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
FY08 FY09 FY10 FY11 FY12
REIMB
DOD BRAC
AF BRAC
AR BRAC
DOD MILCON
AF MILCON
AR MILCON
DOD WFO wo ENV
DOD WFO ENV
COS
ECSO
IIS (non ECSO)
CW FC&CE
CW SUPP O&M
CW O&M
CW CG
CW GI
BUILDING STRONGSM
Southwestern Division
Civil Works
&
Military Programs
BUILDING STRONGSM
Southwestern Division
Flood Damage Reduction 90 Lakes More than 33M acre-feet of flood storage 760 miles of Local Flood Protection Projects $53.8B cumulative damages prevented
Navigation 2 major waterways 4 of the Nation’s top 10 ports 12 deep-water and 22 shallow-draft ports 1,458 miles of channels More than one-half billion tons of commerce shipped annually
Hydroelectric Power 18 power plants 8 non-Federal power plants at Corps dams 87% of hydropower capacity in region
Water Supply 7.7M acre-feet of storage for municipal, industrial and agricultural use
Recreation 11,400 miles of lake shoreline 1,172 recreation sites; 28,112 campsites 83.6M visits annually
Regulatory 4,870 jurisdictional determinations 3,569 activities authorized under general permits; 326 individual permits
Civil Works Boundary
BUILDING STRONGSM
Southwestern Division
Civil Works Workload
(Mill
ions
)
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
FY08 FY09 FY10 FY11 FY12
CW FC&CE
CW O&M SUPP
CW O&M
CW CG
CW GI
BUILDING STRONGSM
Southwestern Division
Appropriations Calendar
• 1 Oct 08- 11Mar 09–FY09 Continuing Resolution Act (CRA)• 17 Feb 09 – ‘American Recovery and Reinvestment Act’
-- PL 111-5 (ARRA) – The “Stimulus” Bill• 24 Feb 09 – FY09 Omnibus Appropriations Conference Rpt Filed• 26 Feb 09 – President presents FY10 Budget Overview• 11 Mar 09 – FY09 Omnibus Appropriations Act• 11 Mar 09 – FY11 Budget Guidance to field offices• 24 Apr 09 – FY09 Omnibus Appropriations Act funds issued to field offices• ~1 May 09 – FY10 Budget Passback• ~4 May 09 – ARRA funds issued to field offices• ~6 May 09 – FY10 Budget details released to public• 12 May/20 May – House/Senate FY10 Budget Hearings• ~ Jun 09 – Defense Supplemental• ~ Sep 09 – FY10 Appropriations?• 03 Feb 10 – FY 11 Budget Released• ~ Sep 09 – Feb 10 Another Stimulus Bill?
BUILDING STRONGSM
Southwestern Division
ARRA Appropriations
Appropriations by Account
($Billions)• Investigations $0.025
Construction $2.000• O&M $2.075• MR&T $0.375• Regulatory $0.025• FUSRAP $0.100• TOTAL $4.600
BUILDING STRONGSM
Southwestern Division
Other Criteria Under Consideration (PRE-DEClSIONAL)
• Execution of higher value projects• Economic efficiency• High risk/safety/life• High value environmental projects• Projects in high unemployment areas• Elimination of unsupportable projects• Labor Intensity• Others?
BUILDING STRONGSM
Southwestern Division
FY2009 Potential CW O&MConstruction Contracts
• Bull Shoals, AR – Spillway Bridge Repair $5M - $10M
• Granger Lake, TX – Embankment Repair $5M - $10M
• Marion Lake, KS – Park Modernization $5M - $10M
• Mouth of Colorado River, TX-Construct New Jetty $20M - $30M
• Somerville Lake, TX – Park Modernization $5M - $10M
• Table Rock Lake, MO - Rehab Dewey Short Visitor Center $5M - $10M
BUILDING STRONGSM
Southwestern Division
FY2009 Potential CWConstruction Contracts
• San Antonio Channel Improvement Project, TXMission Reach PH 2a $20M - $30M
• Sims Bayou, Houston, TX – MLK Plug Removal $5M - $10M
• Central City, Ft. Worth, TX – Samuel Avenue Detention Area $2M - $5M
• Dallas Floodway Extension, TX –Upper Chain of Wetlands $10M -
$15M
• Joe Creek Habitat Restoration, Tulsa, OK $5M - $10M
BUILDING STRONGSM
Southwestern Division
FY2010 Potential CWConstruction Contracts
• San Antonio Channel Improvement Project, TXMission Reach PH 3 $20M - $30M
• Central City, Ft. Worth, TX – Bypass Channel, PH I $10M - $20M
• Sims Bayou, Houston, TX – Reach 8b $15M - $20M• OC Fisher Dam – Embankment Repair $2M - $5M• Sam Rayburn Lake – Twin Dikes Park Rehab $2M - $5M• Buffalo Bayou, Houston, TX – Clodine Ditch PH II $5M - $10M• Tenkiller Lake, OK – Repair Spillway Bridge $5M - $10M• Lake Texoma, TX – Modernize Rec Facilities $5M - $10M
BUILDING STRONGSM
Southwestern Division
McClellan-Kerr Arkansas River Navigation System
Beaver Dam & Powerhouse
Dallas Floodway Extension
Houston-Galveston Ship Channels
Lake Texoma
BUILDING STRONGSM
Southwestern Division
MilitaryPrograms Boundary
10 Army Posts
11 Air Force Bases
Army Transformation
- Increasing active duty forces by 30%; overall pool of forces by 60%
- 142,000 people restationing
Military ConstructionTransformation
Faster, Better, Cheaper, Greener
- From prescriptive requirements to
performance-based criteria
- Centers of Standardization (CoS)
- Adaptable, reusable and reconfigurable
BUILDING STRONGSM
Southwestern Division
(Mil
lio
ns)
Military Programs Workload
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
FY08 FY09 FY10 FY11 FY12
DOD BRAC
AF BRAC
AR BRAC
DOD MILCON
AF MILCON
AR MILCON
$3,500
$3,000
$2,500
$2,000
$1,500
$1,000
$500
BUILDING STRONGSM
Southwestern Division
•Huntsville Center•Physical Fitness Facility•Outdoor Sports Facility•Child Development Center (2) •Youth Activity Center•Consolidated Fire, Safety & Security Facility•Fire Station•Army Community Service Center•Bowling Center•Hazardous Material Storage Facility•Close Combat Tactical Trainer•Military Operations Urban Terrain Facility•Training Ranges•Battle Command Training Center•Training Support Center•Medical Facilities
Centers of Standardization•Louisville District
•Army Reserve Center•Operational Readiness Training Complex
•Norfolk District•General Instruction Building•Classroom 21•Dining Facility•Military Entrance Processing Station•Family Housing•Information Systems Facility•Troop Issue Subsistence Activity Center•Criminal Investigation Command Facility
BUILDING STRONGSM
Southwestern Division
•Mobile District•Aviation -Vertical Construction•4-Star HQ Facility•National Guard Armory•Ready Building•Simulations Center•Weather Observation Station
•Savannah District•Company Operations Facility•Tactical Equipment Maintenance Facility•Brigade Operations Complex•Brigade/Battalion HQ: Admin•Command and Control Army (UEy) & Corps (UEx) HQ: Admin/Opns
Centers of Standardization•Ft Worth District
•Unaccompanied Enlisted Personnel Housing (Barracks)•Basic Combat Training Complex (BCT)
/One Station Unit Trainee (OSUT)•Advanced Individual Training Complex(AIT)•General Purpose Warehouse•Central Issue Warehouse
•Honolulu District•Unaccompanied Officers Quarters•Transient Officers Quarters
•Omaha District•Religious Facility•Cantonment Area Roads Paved•Entrance Gates•Access Control Building
BUILDING STRONGSM
Southwestern Division
Fort Sam Houston
Battlefield Health and Trauma Research
BUILDING STRONGSM
Southwestern Division
Fort Sill
Barracks Complex
Air Defense Artillery School Dining Facility
BUILDING STRONGSM
Southwestern Division
International & Interagency Services
and
Disaster Response & Recovery
BUILDING STRONGSM
Southwestern Division
International & Interagency Services
“This stretch of the borderline is directly south of where Border Patrol Agent Luis Aguilar was murdered by drug traffickers in January 2008. He was killed by the driver of a vehicle that drove, unhindered into the USA across the sand dunes. As you can see … it will never be the same … it is a beautiful sight … I see victory.”
-Ron Colburn, Deputy Chief, HQ CBP
BUILDING STRONGSM
Southwestern Division
Disaster response & recovery
BUILDING STRONGSM
Southwestern Division
Regional Contracting
BUILDING STRONGSM
Southwestern Division
Regional Contracting
Contract
Type UR SB 8(a) HZ SDV
D-B, D-B-B Contract $445,821,680.00 SWD Available Now MATOC X 3,000.00$ $ 33,000,000.00
D-B, D-B-B Contract $180,000,000.00 SWD Available Now MATOC X 3,000.00$ $ 10,000,000.00
D-B, D-B-B Contract $73,000,000.00 SWD Available Now MATOC X $ 3,000.00 $ 5,000,000.00
Socioeconmic Group MinimumTask Order
MaximumTask Order
Currrent SWD
MATOCs
Remaining Capacity
Currrent SWD MATOCs Availability Date
All contracts have been awarded with the exception to the HUBZone set-aside. This procurement is forthcoming.
BUILDING STRONGSM
Southwestern Division
Regional ContractingSDVOSB Firms
W9126G-09D-0014Blackhawk Ventures, LLC423 W CevallosSan Antonio, Tx 78204
W9126G09-D-0015AMX VSS, L.L.C.2351 W Northwest HwySte 2118Dallas, Tx 75220
W9126G09-D-0016LEC Construction Mgmt17440 Dallas PkwyDallas, Tx 75287
BUILDING STRONGSM
Southwestern Division
Regional ContractingUnrestricted
Firms
W9126G08-D-0073Overland Corp. 7 Miles South ArdmoreOn Hwy 77Ardmore, Ok, 73401
W9126G08-D-0085 Innovative Technical Solutions, Inc.2730 Shadelands Dr #100Walnut Creek, Ca, 94598
W9126G08-D-0084RKJ Construction Inc.604 W Avenue CLampasas, Tx, 76550
W9126G08-D-0087MCC/Catamount, LLC5990 GreenwoodPlaza Blvd Ste 205Greenwood Village, Co, 80111
BUILDING STRONGSM
Southwestern Division
Regional Contracting
Solicitation issued for “Unrestricted” on Apr 3.
Type UR SB 8(a) HZ SDV
D-B, D-B-B Contract $370,000,000.00 SWD Minimum 15-Jul-09 MATOC X 100,000.00$ $ 50,000,000.00
D-B, D-B-B Contract $400,000,000.00 SWD Minimum 15-Jul-09 MATOC X 2,000.00$ $ 20,000,000.00
D-B, D-B-B Contract $140,000,000.00 SWD Minimum 15-Jul-09 MATOC X 2,000.00$ $ 15,000,000.00
D-B, D-B-B Contract $50,000,000.00 SWD Minimum 15-Jul-09 MATOC X 2,000.00$ $ 10,000,000.00
D-B, D-B-B Contract $30,000,000.00 SWD Minimum 15-Jul-09 MATOC X 2,000.00$ $ 5,000,000.00
MaximumTask Order
Availability Date
New SWD MATOCs(Primarily Vertical)
Provided Capacity
Geographical Area of Coverage MinimumTask Order
Solicitation issued for all set-asides on Apr 6.
BUILDING STRONGSM
Southwestern Division
Regional ContractingContract
Type UR SB 8(a) HZ SDV
D-B, D-B-B Contract $400,000,000.00 SWD Minimum Late 4th QTR/Early 1st QTR MATOC X 100,000.00$ $ 50,000,000.00
D-B, D-B-B Contract $75,000,000.00 SWD Minimum Late 4th QTR/Early 1st QTR MATOC X 2,000.00$ $ 15,000,000.00
D-B, D-B-B Contract $50,000,000.00 SWD Minimum Late 4th QTR/Early 1st QTR MATOC X 2,000.00$ $ 10,000,000.00
D-B, D-B-B Contract $25,000,000.00 SWD Minimum Late 4th QTR/Early 1st QTR MATOC X 2,000.00$ $ 5,000,000.00
Socioeconmic Group
MinimumTask Order
MaximumTask Order
New SWD MATOCs(Primarily Horizontal)
Provided Capacity
Geographical Area of Coverage Availability Date
Currently, in the Acquisition Planning/Strategy Process
Contract
Type UR SB 8(a) HZ SDV
$99,800,000.00Envr. Services Primarily SWD FY 09 IDIQ XEnvr. Services Primarily SWD FY 09 IDIQ XEnvr. Services Primarily SWD FY 09 IDIQ XEnvr. Services Primarily SWD FY 09 IDIQ X
Studies & Removals related to HTRW/Envr Engr/Sanitary
Engr/Removals/MMRP
Socioeconmic Group
New SWD Environmental
Provided Capacity
Geographical Area of Coverage Availability Date Scope
BUILDING STRONGSM
Southwestern Division
Regional Contracting
Currently, in the Acquisition Planning/Strategy Process
Contract
Type UR SB 8(a) HZ SDV
Environmental $29,900,000.00 Primarily SWD FY 09 IDIQ Environmental Services
Socioeconmic Group
New SWD Environmental
Provided Capacity
Geographical Area of Coverage Availability Date Scope
TBD
Type UR SB 8(a) HZ SDV
$72,000,000.00A/E - HTRW Primarily SWD FY 09 IDIQ XA/E - HTRW Primarily SWD FY 09 IDIQ XA/E - HTRW Primarily SWD FY 09 IDIQ
A/E Primarily SWD FY 09 IDIQ X X
Studies & Designs related to HTRW/Envr Engr/Sanitary Engr/Removals/MMRP and
Planning Support
New SWD Environmental
Provided Capacity
Geographical Area of Coverage Availability Date Scope
BUILDING STRONGSM
Southwestern Division
Small Business
BUILDING STRONGSM
Southwestern Division
Small Business Mission Statement
The Southwestern Division provides counsel and assistance to small businesses to maximize
their opportunities for procurements within SWD’s area of responsibility on a continual
basis to ensure a broad base of capable small business firms to support our mission and
strengthen our Nation’s economic development.
BUILDING STRONGSM
Southwestern Division
Architect-engineer services Environmental planning & restoration Construction (prime & subcontractors) Materials (concrete, steel, etc.) Equipment (e.g. Power generation) Recreation services (600,000 jobs) Contingency contracting for emergencies &
National Defense work Infrastructure security & force protection
Small Business Opportunities(Not an All-Inclusive List)
BUILDING STRONGSM
Southwestern Division
FY 09 Opportunities
Civil Works • Studies• Construction• A/E Services• Dredging• Facility Support Services
International/Interagency Support
• Repair/Alteration• Environmental• PM Services• Equipment Rental
Military Programs Construction
• Ft. Sam Houston• Centers of Standardization• JOC @ ANGB• Ft. Sill• Tinker AFB
Operations and Maintenance (O&M)
• Ft. Polk• Ft. Hood• Ft. Sill
BUILDING STRONGSM
Southwestern Division
Category Prime Contract Goal Subcontract Goal
Small Business 32% 70%
Small Disadvantaged Business
18% 6.2%
HUBZone 10% 9.8%
Women-Owned Small Business
5.8% 7.0%
Service-Disabled Veteran-Owned
3% .9%
Veteran-Owned Small Business
0% 3%
Historically Black Colleges & Universities/Minority Institutions
13%of contract $ to academic
institutions
USACE FY09 Small Business Program Goals
BUILDING STRONGSM
Southwestern Division
National to Regional Trends Small Business Dollars/Percentages
Obligated $
USACE
SB $
USACE
USACE
Goal
Obligated $
SWD
SB $
SWDAchieved
%
2005 $11,199M $5,195M 41.3% $1,241M $436M 35.20%
2006 $15,157M $5,690M 43% $1,662M $684M 41.14%
2007 $15,396M $6,105M 44.8% $2,002M $789M 39.41%
2008 $21,764M $6,887M 40% $2,952B $932M 31.51%
2009* $7,752M $2,154M 32% $1,608M $319M 19.81%
*as of 27 APR 2009
BUILDING STRONGSM
Southwestern Division
The Path Ahead
- Informed and integrated discussion and decision making on program funding
- Pursue collaborative watershed integration management
- Become the employer, investment, teammate and provider of choice
BUILDING STRONGSM
Southwestern Division
ESSAYONS!
WE ARE THE PACESETTERS!
Melea CrouseAssistant Associate Director, SPD/SWD