Upload
cesar-arguelles
View
3
Download
2
Embed Size (px)
Citation preview
Building a Smarter Planet
IBM Software Group | Tivoli SoftwareIBM Software Group | Tivoli Software
© 2009 IBM Corporation
IBM Maximo Enterprise Asset Management
Gestión Eficiente de Activos Enfoque y Soluciones de Valor
Daniel Wierna
IBM Global Business Services
Building a Smarter Planet
AGENDA
Gestión de Activos
Visión y Experiencia de IBM
Ciclo de Vida de los Activos:
Soluciones de Valor.
Sistemas de Gestión de Mantenimiento
(CMMS)
Building a Smarter Planet
IBM Global Business Services – Gestión de Activos
Europe70 EAM Staff
Americas40 EAM Staff
East Asia 10 EAM Staff
Australia, NZ15 EAM Staff
+25 años de experiencia en consultoría de gestión de activos físicos
+700 Consultores calificados en todo el mundo
Centros de Excelencia en Canada, UK y Australia
Alianzas Estratégicas: University of Toronto, Canada
Soluciones de Optimización Aladon UK - RCMII
+ 500 proyectos a nivel mundial Reciente adquisición de MRO Máximo
Bases de Conocimiento y Publicaciones: Uptime, Maintenance Excellence, MRO Handbook, Maintenance, Replacement and Reliability
Building a Smarter Planet
IBM Global Business Services – Gestión de Activos
Nuestra Misión “Ayudar a nuestros clientes a mejorar de manera significativa la performance de sus activos, incluyendo la reducción de los costos de mantenimiento y a incrementar la utilización de planta y flota, a la vez que se ve incrementada la generación de ingresos del negocio”
Railways, Electric / Gas Distribution, Highways, Telecom, Water, Wastewater
Planta y Producción
Real Estate y Facilities
Flota y Transporte
Infraestructura
Land, Offices Warehouses, Retail Space, Schools, Housing, Hospitals
Mining, Semi-Conductor, Textile, Chemical, Petroleum, Electronics, Food
Military, Airlines, Trucking, Shipping, Railroad, Public
Redes y Equipos de TI Computers, Routers, Networks, Software, AutoDiscovery, Service Desk
Building a Smarter Planet
Tendencias y Desafíos en la Gestión de Activos
Automatización
Control por PCs
Roles Planta / IT
Mas programas predictivos
Complejidad
Diversidad de Activos y Regímenes de
Mantenimiento
Procesos end to end / Plataforma única
(Simplicidad)
Fuerza laboral experimentada
Transferencia y registro de conocimiento
Fuente: Business Impact of Asset Management, IBM Copyright 2008
Building a Smarter Planet
Costos Fijos - Capital Intensivo
Venta
s
Costos Variables
0 10 20 30 40 50 60 70 80 90Volumen %
$ (C
osto
s y
Ven
tas)
0
10
20
30
40
50
60
70
80
90
10
0
El incremento de Volumen genera un margen mayor.
7 %
MayorMargen
5 %
Puntode Equilibrio
El Volumen se incrementa debido al aumento de la Disponibilidad.
Mantenimiento es un costo significativo(10-45%).Gran oportunidad
¿Por qué dar foco a la Gestión de Mantenimiento de Activos?
Building a Smarter Planet
Qué preguntas se hacen nuestros clientes?
Cómo reducir nuestros costos operacionales?
Ej: Confiabilidad / TPM
Como debería gestionar partes y
materiales? Ej: Matriz Estratégica /
Soluciones Optimización
Qué tipo de organización y procesos debería tener para gestionar mis activos? Qué
funciones debería tercerizar?Ej: Estrategia / Organización
Qué información debería generar, y
cómo?Ej: Sistemas de Mantenimiento
(mejoras y upgrades)
Cómo debería operar/mantener los activos para optimizar calidad,
disponibilidad y costo?Ej: Optimización ciclo de vida de
activos
Gestión Eficiente de Activos
Building a Smarter Planet
8
Abordamos el Modelo de Gestión de Mantenimiento, enfocando en 10 dimensiones
amcoe Asset Management Center of Excellence
CATEGORIAS
1. Estrategia
2. Organización
3. Información
4. Gestión de Materiales y Repuestos
5. Planificación & Programación
6. Táctivas
7. Indicadores
8. Mantenimiento Autónomo
9. Confiabilidad
10. Rediseño de Procesos
IBM Industrial Products – Metals & Mining 8
Building a Smarter Planet
Camino a la Madurez
InocenciaInocencia ConcienciaConciencia EntendimientoEntendimiento CompetenciaCompetencia ExcelenciaExcelencia
Madurez en la Gestión de ActivosMadurez en la Gestión de Activos
Mantenimiento es un Gasto
Mantenimiento es un Gasto
Linea de TiempoLinea de Tiempo Mantenimiento es una Inversión
Mantenimiento es una Inversión
Ma
nte
nim
ien
to y
ga
sto
en
re
pu
es
tos
($
)M
an
ten
imie
nto
y g
as
to e
n r
ep
ue
sto
s
($)
Co
nfi
ab
ilid
ad
y D
es
em
pe
ño
Co
nfi
ab
ilid
ad
y D
es
em
pe
ño
Reparaciones tan bien como antes
Reparaciones tan bien como antes
Reactivo – repararlo cuando falla
Reactivo – repararlo cuando falla
Luchando con los sistemas de gestión Luchando con los
sistemas de gestión
Mantenimiento preventivo, proactivo
Mantenimiento preventivo, proactivo
Los Sistemas son herramientas valoradas – Información como un
activo
Los Sistemas son herramientas valoradas – Información como un
activo
Reparaciones como nuevo
Reparaciones como nuevo
Mantenimiento preventivo, proactivo
Mantenimiento preventivo, proactivo
Mantenimiento es parte de la cadena de suministro
Mantenimiento es parte de la cadena de suministro
Toma de Deciciones optimizada
Toma de Deciciones optimizada
Foco en ciclo de vida y confiabilidad
Foco en ciclo de vida y confiabilidad
Cambio de Actitud
desde el enfoque en costos
a un enfoque de valor
Cambio de Actitud
desde el enfoque en costos
a un enfoque de valor
Building a Smarter Planet
ProcessProcessReRe--DesignDesign
ReliabilityReliability
TacticsTactics MeasuresMeasures
DataDataManagementManagement
Planning &Planning &SchedulingScheduling
MaterialsMaterialsManagementManagement
StrategyStrategy ManagementManagement
AutonomousAutonomousMaintenanceMaintenance
Quantum LeapsQuantum Leaps
LeadershipLeadership
ContinuousContinuousImprovementsImprovements
ControlControl
1. Strategy
2. Organization/Management
3. Data Management
4. Maintenance Tactics
5. Materials Management
6. Planning and Scheduling
7. Key Performance Indicators
8. Reliability Center Maintenance
9. Autonomous Maintenance
10. Process Re-design
Real Estate and Facilities
Plant and Production
Mobile Assets
Infrastructure
Information TechnologyProcesses documented and coordinated with support areas (Inv. / Purc )Evidence of regular review cyc
Processes documented Evidence of periodic review. Procedures well documented and organized
Processes Documented Planning and Scheduling disciplines are prevalentMedium amount of Reactive and PM Workload
Some processes documents. Moderate amount of procedures availableHigh PM Workload
Processes not documented. Some procedures availableHigh Reactive Work Percentat
10.Process Redesign
Decentralized teams
Business based decisions
Excellent cooperation with Maint . / Production
Teamwork a hallmark of entire organization
Self Directed teamsMaint . / Production cooperation at all levels. Team work at organization levels
Directed WorkforceSome TeamworkMaint ./ Production cooperation at working level
Directed WorkforceLittle Teamwork
Good cooperation of Maint . And Production
Directed WorkforceNo TeamworkMaint & Production relationship strained
9. Autonomous Maintenance
All Tactics Based on Analysis
Some CBMSome Prev . Maint . Few Surprises
Time and Use Based InspectionsSome - NDT
Time Based InspectionsAnnual S/D Inspections Only
4. Maintenance Tactics
Fully Integrated to common databasesData Standards in Place
Fully Functional Asset Mgmnt System liked to Financials and/or Inventory Systems
Fully Functional Asset Mgmnt . Stand Alone System
A “System ” that Allows for Some Scheduling and Parts Tracking
Manual or Ad -hoc specialty Systems
3. Data Mgmnt/ IT
Multi -Skilled Independent Trades
Some Level of Multi -Skilled Staff
Decentralized Mixed Trade Teams
Partly Centralized for Some Trades
Highly Centralized2. Organization / Management
*Service levels 95%+*On line material requisitioning *Turns exceed 1.5
*Alliances developed *(Free Issues )*Streamlined processes*Material Delivery Process Established *Automatic Matching of Invoices *Computerized inventory control system
System computerizedStock levels set – no Maint . Input.Lead time and Safety Stock Levels set – Rare;
*Some storeroom controls*Lack of performance measurements *Turns less than 1.0
*Absence of storeroom management practices
5. Materials Management
Some FMECA used
Mean Time to Failure / Repair Records AvailableSeparate Maintenance Costs
Solid General Planning and Scheduling Job Planning with Engineering Support
Long Term Improvement Plan
II Competence
RCM Program in PlaceRisk and Root Cause Analysis Program
Failure DB Established. Used for Analysis
Collect s Failure Data but make little use of it
No Failure Records8. Reliability Centered Maintenance
OEM BenchmarkingFull Cost Database
Downtime by CauseMaintenance Costs Available
Some Downtime / Reliability RecordsMaint . Costs Not Segregated
No Systematic Approach. Maint . Cost Not Available
7. Performance Measures
Long Term Major Project Planning for both Maintenance and Engineering
Maintenance Planning Group EstablishedAd -hoc Engineering
Some Troubling Shooting SupportInspection Scheduling
Little or No Formal Planning, Scheduling, or Engineering Support
6. Planning and Scheduling
Established and Communicated Maintenance and Asset Strategy
Annual Improvement PlanPrevent Maintenance Improvement Program
Mostly Reactive Breakdown Maintenance
1.Strategy
ExcellenceIII
UnderstandingIV
AwarenessVI
InnocenceRatingLevels
Processes documented and coordinated with support areas (Inv. / Purc )Evidence of regular review cycle
Processes documented Evidence of periodic review. Procedures well documented and organized
Processes Documented Planning and Scheduling disciplines are prevalentMedium amount of Reactive and PM Workload
Some processes documents. Moderate amount of procedures availableHigh PM Workload
Processes not documented. Some procedures availableHigh Reactive Work Percentage
10.Process Redesign
Decentralized teams
Business based decisions
Excellent cooperation with Maint . / Production
Teamwork a hallmark of entire organization
Self Directed teamsMaint . / Production cooperation at all levels. Team work at organization levels
Directed WorkforceSome TeamworkMaint ./ Production cooperation at working levelMaint
Directed WorkforceNo TeamworkMaint & Production relationship strained
9. Autonomous Maintenance
All Tactics Based on Analysis
Some CBMSome Prev . Maint . Few Surprises
Time and Use Based InspectionsSome - NDT
Time Based InspectionsAnnual S/D Inspections Only
4. Maintenance Tactics
Fully Integrated to common databasesData Standards in Place
Fully Functional Asset Mgmnt System liked to Financials and/or Inventory Systems
Fully Functional Asset Mgmnt . Stand Alone System
A “System ” that Allows for Some Scheduling and Parts Tracking
Manual or Ad -hoc specialty Systems
3. Data Mgmnt/ IT
Multi -Skilled Independent Trades
Some Level of Multi -Skilled Staff
Decentralized Mixed Trade Teams
Partly Centralized for Some Trades
Highly Centralized2. Organization / Management
*Service levels 95%+*On line material requisitioning *Turns exceed 1.5
*Alliances developed *(Free Issues )*Streamlined processes*Material Delivery Process Established *Automatic Matching of Invoices *Compurtized inventory control system
System computerizedStock levels set – no Maint . Input.Lead time and Safety Stock Levels set – Rare;
*Some storeroom controls*Lack of performance measurements *Turns less than 1.0
*Absence of storeroom management practices
5. Materials Management
Some FMECA used
Mean Time to Failure / Repair Records AvailableSeparate Maintenance Costs
Solid General Planning and Scheduling Job Planning with Engineering Support
Long Term Improvement Plan
II Competence
RCM Program in PlaceRisk and Root Cause Analysis Program
Failure DB Established. Used for Analysis
Collect s Failure Data but make little use of it
No Failure Records8. Reliability Centered Maintenance
OEM BenchmarkingFull Cost Database
Downtime by CauseMaintenance Costs Available
Some Downtime / Reliability RecordsMaint . Costs Not Segregated
No Systematic Approach. Maint . Cost Not Available
7. Performance Measures
Long Term Major Project Planning for both Maintenance and Engineering
Maintenance Planning Group EstablishedAd -hoc Engineering
Some Troubling Shooting SupportInspection Scheduling
Little or No Formal Planning, Scheduling, or Engineering Support
6. Planning and Scheduling
Established and Communicated Maintenance and Asset Strategy
Annual Improvement PlanPrevent Maintenance Improvement Program
Mostly Reactive Breakdown Maintenance
1.Strategy
ExcellenceIII
UnderstandingIV
AwarenessVI
InnocenceRatingLevels
See 6. NOTE
El Modelo de Madurez permite identificar las áreas de oportunidad
Slide: 10
Building a Smarter Planet
Diagnóstico basado en Benchmarks
CategoryMax.
IBM DB Top 1/ 4
IBM DB Average
Highest (Best)
1. Maintenance Strategy 100% 81% 62% 94%2. Organization / Human Resources 100% 71% 59% 95%3. Employee Empowerment 100% 75% 63% 93%4. Maintenance Tactics 100% 81% 62% 92%5. Reliability Analysis 100% 75% 59% 90%6. Performance Measures / Benchmarking 100% 68% 49% 90%7. Information Technology 100% 73% 52% 88%8. Planning and Scheduling 100% 80% 61% 87%9. Materials Management 100% 75% 63% 82%10. Maintenance Process Reengineering 100% 72% 49% 90%
Source Organization Maintenance Strategy
Organization Human
Resources
Employee Empowerm
ent
Maintenance Tactics
Reliability Analysis
Performance Measures
Uptime Canada 96 Campbell's, Keough 94.00 94.55 93.00 92.00 90.00 90.00 NAISA Plant 48 100.00 65.00 80.00 100.00 100.00 80.00 WCMS - Dubai ADCO, Abbas 93.00 85.45 81.11 90.00 79.00 87.00 NAISA Plant 45 100.00 70.00 90.00 100.00 80.00 55.00 WCMS - Jeddah Saudi-Oger, Fawzi 73.00 64.44 100.00 94.44 83.33 87.50 Uptime Canada 96 Suncor, FtMcM 82.00 81.82 61.11 87.00 86.00 90.00 NAISA Plant 17 100.00 80.00 100.00 65.00 70.00 70.00 WCMS - Dubai Gasco, Saeed 95.00 82.73 71.25 96.00 82.00 64.00 WCMS - Dubai Garmco, Adel 75.00 84.55 78.33 54.00 93.75 80.00 NAISA Plant 32 100.00 65.00 65.00 85.00 80.00 65.00 WCMS - Jeddah BNOC, Khalifa 80.00 84.00 50.00 93.75 93.75 70.00 Uptime Canada 96 Shell, VanTol 60.00 78.75 65.00 79.00 75.00 75.00 WCMS - Dubai ?, Oman 100.00 69.00 63.33 70.00 63.00 65.00 NAISA Plant 29 80.00 75.00 80.00 100.00 100.00 20.00 Uptime Canada 96 EBEddy, NairnCtr 75.00 70.91 66.00 74.00 85.00 70.00 NAISA Plant 56 90.00 50.00 90.00 70.00 70.00 80.00 WCMS - Dubai Adma-Opco, Ali 80.00 76.36 61.11 85.00 90.00 87.50
Building a Smarter Planet
Proceso deIdentificaciónde Trabajo
Proceso dePlanificación
Proceso deProgramación
Proceso deEjecución
Proceso deAsignaciónde Trabajo
Trabajorequerid
o
Detalles deejecución
Tareas Adicionales
y mejoras deplanificación
Programas yasignacione
s
Ciclo de Gestión:asegurar que hacemos
las tareas correctamente
Trab. Emergencia
PlanesDe Mtto.
Planificación y Programación: Ciclo de vida de las órdenes de Trabajo
Proceso de
Análisis
Proceso de
Análisis
Ciclo de mejoramiento continuo:
asegurar que hacemos las tareas correctas
Mediciónde Desempeño, Análisis
de Confiabilidad
Datoshistórico
s
Building a Smarter Planet
Indice
Gestión de Activos en IBM: Nuestro
Enfoque
Ciclo de Vida de los Activos:
Soluciones de Valor.
Sistema de Gestión de Mantenimiento
(CMMS)
Building a Smarter Planet
Plan Evaluate and Design
Create / Procure
Operate Maintain Modify DisposeAssetStrategy
El Ciclo de Vida de los Activos
Nuestra visión en IBM es lograr una plataforma
colaborativa para gestionar los proyectos
de ciclo de vida de activos
70% de los costos se consumen en el Comisionamiento
Building a Smarter Planet
Modelo de Efectividad de Equipos
Interrupciones planeadas
Interrupciones planeadas
Pérd p/ fallasPérd p/ fallas
Pérdidasoperacionales
Pérdidasoperacionales
Pérdidaspor velocidad
Pérdidaspor velocidad
Pérd p/ calidadPérd p/ calidad
Efectividad de los equipos
Efectividad de los equipos
TiempoTotal
TiempoDisponib
TiempoEfectivoOEE (Efectividad Global de los Activos):
¿Qué tanto lo puede operar? ¿Cuán rápido lo puede operar?
¿Cuánto de lo producido está dentro de especificación?
Al trabajar sobre las fallas y pérdidas más significativas, Ud. estará haciendo el uso más efectivo de los activos
Building a Smarter Planet
Factor generación de valor
Factor generación de valor
CalidadCalidad
EfectividadEfectividad
Costos OperaciónCostos Operación
Costos mantenimientoCostos mantenimiento
Tamaño de equiposTamaño de equipos
InventariosInventarios
AccidentesAccidentes
Medio AmbienteMedio Ambiente
Total [US$]Total [US$]
Brecha oportunidad(2002-2004)
Brecha oportunidad(2002-2004)
u$s 7,1milloresu$s 7,1millores
u$s 34,2 millonesu$s 34,2 millones
u$s 10,2 millonesu$s 10,2 millones
u$s 2,2 millonesu$s 2,2 millones
------
No cuantificadaNo cuantificada
u$s 0,7millonesu$s 0,7millones
No cuantificadaNo cuantificada
u$s 55,3 mill.u$s 55,3 mill.
Mejora Confiabilidad Equipo
Mejora Confiabilidad Equipo
u$s 3,13 mill. (u$s 0,27 mill. Año 1)
u$s 3,13 mill. (u$s 0,27 mill. Año 1)
TotalTotal
------
u$s 2,30 mill.u$s 2,30 mill.
u$s 0,38 mill.u$s 0,38 mill.
u$s 0,20 mill.u$s 0,20 mill.
------
------
u$s 0,25 mill.u$s 0,25 mill.
------
Casos de Éxito: Yacimiento de Cobre, Chile
Análisis de fallas en la estación 13 de las MDC 1 y 2
Building a Smarter Planet
Indice
Gestión de Activos en IBM: Nuestro
Enfoque
Ciclo de Vida de los Activos: Soluciones
de Valor.
Sistema de Gestión de Mantenimiento
(CMMS)
Building a Smarter Planet
Sistemas de Gestión de Mantenimiento
Gestionar Activos o Gestionar OTs? Mejora en la utilización: costos, tipos
de fallas, mediciones, rutas, planes de seguridad
Facilidad de uso/nivel de esfuerzo de implementación. Impacto y esfuerzo del cambio: personas y procesos
Comprensión del valor de la información: 70% del tiempo de los analistas se utiliza para procesar datos y generar reportes
OPORTUNIDADES DE MEJORA USUALMENTE DETECTADASOPORTUNIDADES DE MEJORA USUALMENTE DETECTADAS
Building a Smarter Planet
Sistemas de Gestión de Mantenimiento
Tiempo en el mercado / ciclo de actualizaciones Grupos de usuarios Roadmap de evolución y mejora
Mejores prácticas (soluciones de industria) Estándares de equipos / fallas Adherencia a PAS 55 Workflow de procesos integrado Segmentación dinámica de activos (lineales)
Gestionar Costos. Devengado (no percibido) Tablero de indicadores (KPIs en línea) Representación gráfica / geoespacial Reporteador Integrado Análisis de Confiabilidad
Tipificación de fallas y modos Calidad de los registros
Facilidad de uso e Integración Mantenibilidad Arquitectura WEB – SOA
QUE OBSERVAR AL EVALUAR UN CMMS?QUE OBSERVAR AL EVALUAR UN CMMS?
Building a Smarter Planet
IBM Global Services Maximo Enterprise Asset Management
MUCHAS GRACIAS
Daniel [email protected]
+54 11 5070-1707