BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Create Breakdown Maintenance Order:
Objective: Use this process to create a maintenance order, while attending a maintenance work of the breakdown occured in the system.
Transaction code: IW31 : It is a code for creation of order directly.
Process: The maintenance order can be created in two ways-
1. It can be created directly by Transaction Code i.e. IW31 or follow the menu path on the Easy Access Screen.
2. And it can be created with reference to notification also. Creation of the notification can be seen from respective user manual.
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 1 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Process 1.
Direct creation of the order
PROCEDURE: Step 1 : Start the transaction using the menu path or transaction code.
2.
Click SAP menu tree item
.
3. Click Logistics tree item .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 2 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
4.
5.
Click Plant Maintenance tree item .
Click Maintenance Processing tree item
6. Click Order tree item
7. Click create general tree item
Create Breakdown Order: Initial Screen
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 3 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 4 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
8. AS required complete/ review the following fields:
Field Name Description R/O/C User Action and Values Comments
Order type Order type is selected from the list shown in the system. As DM02 is selected in case of breakdown maintenance order.
R Enter Order type is selected from the list shown in the system, As DM02 is selected in case of breakdown maintenance order.
Functional Location #
Enter the Functional Location from the list.
O Choose from the list of the functional locations from the required plant area.
Equipment # Enter the affected equipment from the list.
O Choose from the list of the required functional location.
Planning Plant
Enter the Planning Plant, which is 1232 as a Naraina S/stn
R
# Remark : As Functional Location and Equipment are the optional fields here, it is not mandatory field. But if you have filled these fields here , there is no need fill these details next screens. And also you can select anyone of the field out of these two. So Breakdown Order can be created on either functional location or equipments individually.
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 5 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
9. Click button .
Create breakdown Order: Central Header
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 6 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 7 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
10. AS required complete/ review the following fields:
Field Name Description R/O/C User Action and Values Comments
Order Description
Order Description is the details of the breakdown happened in the system.
R Enter Order Description is the details of the breakdown happened in the system.
11. Click Operations tab control . On the screen shown above.
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 8 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
12. As required, complete/review the following fields:
Fields R/O/C Description
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 9 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Operation short text Required It is the description of the individual operations to be executed at site
Work Required
Example: 120 MIN
Number Required Example: 2
Control key Required Example: PM01 or PM03
13.
In case of control key ‘PM03’ is selected in one of the line operation in the operation Tab, then you have to select the ‘external’ button , as shown below, for filling the external service details for the particular operation, for which external service is required.
14. After selecting the ‘External Tab’ , following screen appear on the system, And fields are filled as :
Fields R/O/C Description
Material Group Required It is the material group, categorizes the various materials or services existing in the system.
Purchasing group Required Purchasing Group is also selected from the list
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 10 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
16. Click button .
17. Create Breakdown order : External Processing Operation
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 11 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
18. As required, complete/review the following fields:
Fields R/O/C Description
Service Number RequiredService no can be selected from the list, according to the
Purchasing group Required Purchasing Group is also selected from the list existing in the system
(Note: On above table, in column “R/O/C”: “R” = Required, “O” = Optional, “C” = Conditional)
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 12 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
19. Click button .
20. Create Breakdown Order: Operation Overview
21. Click Components tab control .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 13 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
22. Create Breakdown Order : Component Overview
23. Click button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 14 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
24. Material Number
25.As required, complete/review the following fields :
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 15 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Field R/O/C Description
Plant Required
Example:1221
26. Click button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 16 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
27. Material Number (1) 33 Entries found
28. Double Click label
Create Breakdown Order : Component Overview
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 17 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
29. As required, complete/review the following fields:
Field R/O/C Description
Reqmt Qty Required
Example: 1
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 18 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Field R/O/C Description
IC Required
Example: L ( Stock Item ) N ( Non-stock Item )
SLoc Required
Example:
30. Click button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 19 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Component 110905001: Plants/Storage Locs (1) 2 Entries found
31. Double Click label
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 20 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Create Breakdown Order : Component Overview
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 21 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Allocation Operation
32. As required, complete/review the following fields:
Field R/O/C Description
Operation Required
Example:0020
33. Click button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 22 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Change Breakdown Order 20000257: Component Overview
34. Click button . For releasing the order
35. Click Button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 23 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Change Status
36. Click button .[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 24 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Change Breakdown Order 20000257: Component Overview
37. Click button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 25 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Maintain Settlement Rule : Overview
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 26 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
38. As required, complete/review the following fields:
Field R/O/C Description
Settlement Receiver Required
Example:12310000
Settlement Receiver Required
Example:12310000
39. Click button
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 27 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Change Breakdown Order 20000257 : Component Overview
40. Click Gen. Data button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 28 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Create Breakdown Maintenance order : Component Detail General Data
41. button .[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 29 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Change Breakdown Order 20000257 : Component Overview
42. Click Costs tab control .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 30 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Create Breakdown Maintenance order : Cost Overview
43. Click Button
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 31 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
44. Click Rep. Plan/Act. button .
Plan/Actual Comparison
45. Click button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 32 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Create Breakdown Maintenance order : Cost Overview
46. Click Button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 33 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Result:
You have created Maintenance Order Successfully. Your order will be saved with no given as under, and it is a unique no generated by the system.
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 34 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Process 2.
Creation of the order with the notification
Step 1: Follow the steps mentioned in the ‘creation of notification user manual’ and open the notification in changed mode by transaction code ( T-Code: iw22 ) or follow the menu path as
under:
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 35 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Step 2. Double Click to open the notification in the changed mode for creation of order. It will open the screen given as under-
Step 3. For selection of the desired notification from the list, click button to see the list as under-
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 36 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Display Notifications : Selection of Notifications
Now, it can be seen from the above screen , a notification can be selected by above selection criteria as-
Notification Status Notification Number Notification type wise Functional location wise Equipment wise
Fill any of the field above and select the notification as under-
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 37 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Display Notification : List of Notification
Step 4elect the particular notification from the list and click button to open the notification.
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 38 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Change PM Notification: Initial Screen
Step 4. Click button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 39 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Change PM Notification: Breakdown Notificat
Step 5. As it can be seen from the notification itself, the functional location details i.e. it automatically taking the information of the location , where the problem has been occurred. And after opening the notification in the changed mode, order can be created directly by
clicking the button .
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 40 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Create Order
Step 6. Click button
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 41 of 42
BUSINESS PROCESS PROCEDURE
Title: Creation of Breakdown Maintenance Order
Organization/Area: Plant Maintenance
File Name : PM_01 Release: ECC 6.0Responsibility: Status:
Create Breakdown Order: Central Header
Step 7. In this screen , it can be seen as most of the information of the notification captured from the notification itself. And HeaderData is filled by system itself, but it can be edited as per requirement.
Step 8. After it all the fields and screen are same and same steps are followed as in the above case ( From page no 7 to 31 ).
[Type text]Last changed on: Last changed by: Version: 1.0 Page:22.09.2010 PM Core Team 42 of 42