P.O. Box 5097, Vacaville, CA. 95696 Phone: (707) 447-8420 Email: [email protected] Website: www.RNVWD.com
1
Directors Staff Chris Calvert, President Gordon Stankowski, General Manager Robert Whitehouse, Vice President Brenda Kane, Billing Manager Michael Bianco, Secretary Rick Trites, Meter Reading/Backflow Elizabeth Miles, Director Nancy Veerkamp, Clerk/Admin Joe Gates, Director Solano Irrigation District, Operation &
Maintenance
BOARD OF DIRECTORS REGULAR
MEETING MINUTES January 9, 2018 at 7:00 pm Vacaville Fire Protection District, Fire Station
#67 4135 Cantelow Road, Vacaville CA 95688
I. Call to order/ Roll Call/ Approval of the Agenda
Chris Calvert called to order the Regular Meeting of the Rural North Vacaville Water District at 7:00 pm on January 9, 2018 at Vacaville Fire Protection District, Fire Station #67, 4135 Cantelow Road, Vacaville, CA 95688.
The following board members were present: Chris Calvert, President; Robert "Bob"
Whitehouse, Vice President; Mike Bianco, Secretary; Elizabeth Miles, Director; Joseph Gates, Director; Others present Gordon Stankowski, General Manager; Nancy Veerkamp, Clerk/Administrator, Jim Miles public comment.
Chris called for a motion to approve the Agenda. Bob made a motion to approve the
Agenda, Mike seconded the motion. Motion carried with the following votes: Chris – Aye, Bob – Aye, Mike – Aye, Elizabeth – Aye, and Joe – Aye.
II. Public Comment - None
Ill. Consent Items
a) Approval of the Board Regular Meeting Minutes for December 12, 2017 b) Approval of the Financial Reports for November 2017 and Adjustments for
December 2017.
Mike made a motion to approve all consent items. Joe seconded the motion.
Motion carried with the following votes: Chris – Aye, Bob – Aye, Mike – Aye,
Elizabeth – Aye, and Joe – Aye
P.O. Box 5097, Vacaville, CA. 95696 Phone: (707) 447-8420 Email: [email protected] Website: www.RNVWD.com
2
IV. General Manager Report a) Draft Policy for Agenda, Meeting Minutes, Teleconferencing and Website
posting – No comments were received from board members since the last board meeting. California Special Districts Association (CSDA) has released a new Sample Policy Manual which was received today in the mail. Gordon will compare this to the current draft policies and resubmit at the next Board Meeting. A copy of the Sample Policy manual index was passed out and a copy of all the policies will be sent via e mail to the board members for their use.
b) Board member short form of resume for website. Two board members have submitted their paragraph. Mike indicated that he would not provide a resume.
c) Board Member Orientation Checklist Update – No change from last meeting. General Manager to meet with Elizabeth per new board member orientation guideline recommendations. Joe to complete Ethics and Sexual Harassment Training.
d) CSDA Board of Directors Annual Leadership Training in Napa – Gordon passed out the registration form to Board Members. The training is in July and the District will pay for members who want to attend.
e) Special District Board Member/Trustee Handbook 2015/16– CSDA’s latest version passed out.
f) Non-revenue water – 30% of last month’s water loss was due to the 6” water line break. FY16/17 ended with 13% non-revenue water, currently for FY17/18 we are at 10% year to date.
V. Continuing Business
a) Well #2 Arsenic removal facility planning – Review of Proposals (RFP) – a report summary by LSCE was received by the General Manager late today. There is a meeting on January 16th to go over all proposals with Solano Irrigation District (SID) and Luhdorff & Scalamini (LSCE) and score the different proposals. A recommendation on how to proceed with the proposals and vendor selection will be presented to the board at the February regular board meeting regarding.
b) Well #2 low performance efficiency – retesting by SID determined that the pump was at 25% efficiency. It was decided to pull the pump to see what is wrong. It could be that the column pipe is leaking or pump damage to one of the stages. Gordon to schedule the work and get pricing on replacement of the column pipe and evaluate other repair costs once an inspection can be made. Also the well will be video inspected once the pump is removed.
VI. New Business
a) Election of President- Bob nominated Chris Calvert for the position of President. Motion carried with the following votes: Chris – Abstained, Bob – Aye, Mike – Aye, and Joe – Aye. Elizabeth – No.
P.O. Box 5097, Vacaville, CA. 95696 Phone: (707) 447-8420 Email: [email protected] Website: www.RNVWD.com
3
b) Election of Vice President – Mike nominated Bob for the position of Vice President. Bob nominated Mike who declined. Motion for Bob as the VP carried with the following votes: Chris – Aye, Bob – Abstained, Mike – Aye, and Joe – Aye. Elizabeth – No.
c) Election of Secretary – Chris Calvert nominated Elizabeth Miles for the position of Secretary. Motion carried with the following votes: Chris – Aye, Bob – Aye, Mike – Aye, Elizabeth – Abstained, and Joe – Aye.
VII. Public Comments –
a) Jim Miles –In the past public comments were short on agenda items and he wished that Chris would improve upon that. Transparency is important to encourage meeting attendance and public participation. He would also like to see more information on District happenings in the monthly bills to customers.
VIII. Board Member Comments a) Bob Whitehouse – thank you for your confidence b) Elizabeth – thank you for the nomination for Secretary. She would like to know
if members were reviewing meeting minutes as she has not seen comments from them in the past. Bob says he phones in his comments to Gordon. She also wanted to know if there was training or hand off of information of duties from prior Secretary Mike. The board discussed the Secretary position and indicated that the majority of work duties are done by staff and presented for board approval. Gordon passed out copies of the District By-Laws Article IV which describe District Officers duties including the Secretary position. The discussion concluded that there will not be a transition meeting between the outgoing and incoming Secretary.
c) Chris – would like public comment lines added to the Agenda as a reminder. Mrs. Miles agreed with Mr. Calvert as this would provide the President a reminder to request public comment before each agenda item. He also asked Nancy to review the SID Agenda.
XI. Adjourn – Joe made a motion to adjourn the meeting, Mike seconded the motion. All approved 7:45pm
The next regular meeting is scheduled for February 13, 2018 @ 7:00 pm. Minutes submitted by Nancy Veerkamp, Clerk of the Board Minutes approved by: Chris Calvert, President
Signed
Date
500 First Street I Woodland, CA 95695-4026 I 530.661.0109 I Fax 530.661.6806
GROUNDWATER RESOURCES HYDROLOGY · DEVELOPMENT · MANAGEMENT
LUHDORFF & SCALMANINI C O N S U L T I N G E N G I N E E R S
Technical Memorandum DATE: February 9, 2018 PROJECT: 17-5-094 TO: Gordon Stankowski, General Manager, Rural North Vacaville Water District CC: Justin Hopkins, PE, Senior Civil Engineer, Solano Irrigation District Matthew Medill, PE, Superintendent of Water & Power, Solano Irrigation District Sue Murphy, Water Quality Specialist, Solano Irrigation District FROM: Justin Shobe, PE, Senior Engineer, LSCE Aaron King, Project Engineer, LSCE SUBJECT: Board Summary: Vendor Proposals for Well 2 Arsenic Treatment
INTRODUCTION This memo provides a summary of the evaluation from the review of vendor proposals for the Well 2 arsenic treatment system. A Request for Proposals (RFP) was issued to arsenic vendors on November 2, 2017. Eight different treatment systems were proposed by vendors in response to the RFP. A meeting was held on January 16, 2018 among the recipients of this memo to review the proposals. At the meeting we narrowed the systems to two top-ranked vendors that LSCE then contacted for further information. A follow up meeting was to discuss the two top-ranked proposals. The purpose of this memo is to summarize the conclusions from the evaluation and the recommendations moving forward for vendor selection and system design.
VENDOR SELECTION In total eight arsenic treatment systems were proposed from six different vendors; four were adsorption systems and four were coagulation/filtration (C/F) systems. The proposed base system costs are shown below.
Table 1: Vendor System Costs Adsorption vs. C/F Systems Adsorption systems have significantly lower labor costs and operational complexity, while producing less waste requiring disposal, as compared with coagulation/filtration systems. Those positive characteristics are somewhat offset by the high cost of the adsorption media and its requirement for replacement every 1 to 3 years. The lowest capital-cost adsorption proposal (* on table at left), from AdEdge, was selected for implementation, although this was not the primary concern in the selection process.
Technology Base Cost Adsorption Vendor A $669,625 Adsorption Vendor B $180,000 Adsorption Vendor C $185,000 Adsorption Vendor D * $178,500 C/F Vendor A $929,000 C/F Vendor B $267,338 C/F Vendor C $220,000 C/F Vendor D $245,280
BOARD SUMMARY: ARSENIC VENDOR PROPOSALS FEBRUARY 9, 2018
LUHDORFF & SCALMANINI CONSULTING ENGINEERS 2
Proposals were evaluated based on the following criteria with input from RNVWD and SID.
1. Proposal Responsiveness to RFP and Overall Quality
2. Design Quality
3. Complexity and Ancillary Equipment
4. O&M Cost and Complexity
5. Performance Guarantee
6. Purchase Cost
Adsorption was chosen over coagulation/filtration due to the level of operational complexity associated with coagulation/filtration in terms of maintenance tasks (daily backwash cycles, backwash waste water storage, and sludge drying beds, and hazardous waste disposal). Coagulation/filtration also has a higher capital cost.
Among the 4 adsorption proposals, AdEdge (adsorption Vendor D in Table 1) was chosen for the following major reasons.
1. Local service personnel (locations in Sacramento and San Francisco),
2. Demonstrated a strong understanding of the specific water chemistry issues on Well #2 (high silicate), and provided realistic and conservative estimates of expected performance
3. AdEdge is the manufacturer of the adsorption media they use, unlike some of the other vendors that purchase the media from others. This translates to better understating of the media performance given the high silicate issues with Well #2.
4. Design and engineering quality, i.e. fully assembled, skid-mounted treatment vessels and valving, complete drawings and specs.
5. Competitive capital pricing and O/M costs.
NEXT STEPS Bench-scale standardized (Rapid Small-Scale Column Test) testing of the adsorption media with a representative sample of Well #2 water under normal operating conditions will be conducted to verify the estimate of media life (frequency of media exchanges). This will allow for more certainty in the ongoing costs of the system, which are driven primarily by the cost to replace the media. The cost of the test ($14,000) is a small fraction of the life-time cost of the system and would likely result in an improved performance guarantee in favor of RNVWD.
Preliminary designs will be developed with input from SID, RNVWD, and AdEdge, as well as the California State Water Resources Control Board Division of Drinking Water (DDW).
Permits and documentation of all certifications will be obtained and filed when DDW is satisfied that the designs meet all requirements.
Bid solicitation will commence when designs are finalized, and contractor(s) are selected to install the system.
February 8, 2018
Operations & Maintenance Plan PUBLIC WATER SYSTEM NUMBER: CA4810013
Gordon Stankowski, General Manager (707) 447-8420 P.O. Box 5097, Vacaville, CA 95696
Table of Contents
Section 1: System Overview 1
Section 2: Routine Operational Practices 5
Section 3: Monitoring and Reporting 10
Section 4: Response to Violations 11
Section 5: Consumer Complaint Response Procedures 12
Section 6: Emergency Operational Practices 13
Attachment A: RNVWD #CA4810013 Bacteriological Sample Siting Plan 2017
Attachment B: RNVWD Emergency Notification Plan
Attachment C: RNVWD Emergency Response Plan
- 1 -
Section 1: System Overview As detailed in this plan, the Rural North Vacaville Water District (RNVWD) and its staff will strive to provide a safe and reliable water supply for its customers. In the interests of public health and optimized domestic water system operation, RNVWD will adhere to the performance standards and operational goals as detailed in the California Safe Drinking Water Act and the California Water Works Standards, Title 22, California Code of Regulations, designed to maintain the operations and protect the quality of the water delivered to its users. RNVWD is a community water system serving an unincorporated area of rural Solano County, north of Vacaville, CA. The surrounding land is mixed agricultural and rural-residential comprised of the 22 square mile service area enveloping Cantelow Road, English Hills, Gibson Canyon, and Steiger Hill. The system is designed to provide drinking water for 533 metered service connections or approximately 1,508 people, by way of LAFCO’s Municipal Services Review Report 2.83 multiplier of people per households. The sources of supply are two (2) groundwater wells, Well 01, Primary Station (PS) Code 4810013-001 and Well 02, PS Code 4810013-002. RNVWD wells are located approximately 1000 feet apart, drilled to a depth of 1,400 feet (ft.), and producing as much as 350 gallons per minute (gpm). Well 02 continues to serve as an emergency standby source due to a history of arsenic contamination greater than 10 parts per billions (ppb), the maximum contaminant level. The wells are located in the Solano sub-basin of the Sacramento County Valley groundwater basin, DWR basin number 5-21.66. RNVWD chlorinates its water supply on a continuous basis. A supervisory control and data acquisition (SCADA) system monitors chlorine residual levels. The feed rate is controlled manually to provide delivered chlorine residual levels ranging between 0.5 and 0.8 mg/L. Using a double-walled containment for chemical storage, RNVWD stores 12.5% sodium hypochlorite with no dilution upwards of six (6) months before refill. The treatment facility is stored in a secure shed adjacent to Well 01. Each well is supplied chlorine by the centralized chlorine injection system supplied from a centralized treatment storage shed adjacent to Well 01. As a safety precaution, an eye wash station is located at each well site. The disinfection and oxidation chemical stored on site is 1087 Sodium Hypochlorite 9. The product is NSF/ANSI 60 certified per title 22 CCR §64590. The Prominent Control chlorine analyzer and chemical metering pumps inject chlorine through polyethylene black tubing downstream of Well 01’s check valve. The target residual fed to the well head is 1.5 mg/L free chlorine. RNVWD has two (2) storage tanks, one (1) surge tank, and one (1) hydropnuematic pressure tank. They are as follows:
- 2 -
Storage Facilities The RNVWD distribution system currently consists of 398 service connections across five (5) pressure zones. Water is delivered through approximately 40.3 miles of water mains ranging in size from four (4) inches to 12 inches in diameter, consisting of mostly Class 150 and 200 PVC piping. Security for the distribution system is adequate, as it includes chain linked fences, locked pump sheds, and storage tanks with locked ladders reducing risk of unauthorized entry, theft, or vandalism.
Table 1. RNVWD Storage Facilities
Name Location Storage Capacity Description Surge Tank Well 01 5,500 gallons Pressure Tank
Tank 01 Station Site 3 300,000 gallons Coated Steel
Tank 02 Station Site 4 300,000 gallons Coated Steel
Pressure Tank Station Site 4 5,500 gallons Hydropnuematic Pressure Tank
The well pumps are operated by the tank level controllers and operate in series to supply the distribution system. Throughout the distribution system the pressure range varies between 60 and 130 psi due to terrain. The elevation in the system varies from 170 feet to 980 feet above sea level. Finished Water Pump Facilities Finished water pumping stations in the distribution system are adequate, with each facility having two (2) pumps. The pumps alternate, but can be activated to pump simultaneously to meet peak demands.
Table 2. RNVWD Pumps Facilities
RNVWD utilizes a SCADA system to continuously monitor and remotely operate the system as needed. This feature allows the system to set pressure parameters throughout the distribution system to alarm in case of malfunction requiring further investigation.
Name Supply Number of Pumps Capacity (gpm)
Well Sources Zone 1 2 – 75 HP (each) 350 (each)
Station Site 3 Zone 3 2 – 30 HP (each) 250 (each)
Station Site 4 Zone 4 2 – 20 HP (each) 250 (each)
Station Site 5 Zone 5 2 – 5 HP (each) 65 (each)
- 3 -
Pressure Zones The distribution system pressure zones, because of the steep elevation changes in the service area terrain, are supplied by pumped and gravity fed supply lines from Station Sites 3 and 4.
Table 3. RNVWD Pressure Zones
Name Begin End Description
Zone 1 Well Sources Station Site 3 100-120 psi
Zone 2 Station Site 3 Service Area Gravity Feed to Distribution
Zone 3 Station Site 3 Station Site 4 Lifted by Booster Station 3
Zone 4 Station Site 4 Station Site 5 Lifted by Booster Station 4
Zone 5 Station Site 5 Service Area Lifted by Booster Station 5
Pressure regulating valves are installed and maintained at each residential service connection to ensure an adequate delivery pressure range. Additionally, RNVWD contains four (4) pressure reducing valves located in Zone 2 supplying the greatest number of service connections along the English Hills service area. Cross Connection Control RNVWD is required by Title 17, Section 7584 of the California Code of Regulations (17 CCR §7584) to implement a cross-connection control program. RNVWD’s cross-connection control program includes: backflow protection devices at each service connection, personnel training, annual backflow prevention device testing, and records maintenance. RNVWD contracts with Trites Backflow Services to perform annual testing and cross connection surveys. The most recent cross connection survey was completed on August 1, 2016. Certified Operators In accordance with Title 22, Section 64413.3 of the California Code of Regulations (22 CCR §64413.3), RNVWD is classified as a D1 level distribution system. RNVWD meets the distribution system staff certification requirements of 22 CCR §64413.7 by contracting at least one (1) D1 designated chief operator, and at least one (1) D1 designated distribution operator whom are available to be contacted within one (1) hour.
- 4 -
Table 4. RNVWD Certified Operators
Name Agency Title/ Certification Grade Expiration Date/ Number
Joshua Hendrickson SID Contract Chief Operator / D4 4/01/2019 / 38478
Brian Hoffman SID Lead Dist. Operator / D5 5/01/2020 / 30368
Jeff Wright SID Distribution Operator / D3 3/01/2020 / 29462 Adam Burbey SID Distribution Operator / D3 9/01/2019 / 37228
- 5 -
Section 2: Routine Operational Practices
On a regular basis the RNVWD operations staff perform such duties listed below throughout the distribution system: Daily Operational Procedures
1. Monitor and record tank levels, well production, pumping plant flow rates, chlorine residuals and operating pressures.
2. Visually inspect for leaks, openings into the water system through spill pipes and air vents not being properly screened, lubricants, electrical hazards, chemical leaks, safety hazards and proper operation of pumps, wells and monitoring equipment.
3. Visually inspect tanks for leaks, corrosion, and deteriorated piping.
4. Visually inspect facilities for proper lighting and security throughout the perimeter of the facilities.
5. Visually inspect chlorine pumps, disinfectant reservoirs, disinfectant residual in all pressure zones of the distribution system, and disinfectant concentrations by using free chlorine test kits.
6. Inspect all gauges and meters for proper operation, leaks, and corrosion. Repair or replace apparatus as needed and keep records of the dates in which the corrections were made.
The RNVWD pressure is maintained by the existing water storage tanks and the booster stations. The operation of the well pumps and booster station 3 is controlled by a start and stop water level inside the water storage tanks. Booster stations 4 and 5 are controlled by specific pressure set points. If the distribution system pressure begins to drop below the specified set point, the booster stations are turned on in sequence to provide the required water delivery and maintain the pressure in the distribution system. In the event the system continues to lose pressure, an automated alarm system notifies operations staff of the problem. Staff will then respond to the alarming facility to verify the problem and take corrective action to maintain the pressure. The corrective action shall include appropriate flushing and disinfection with sampling to verify bacteriological quality and chlorine residual.
Reservoir Inspections and Cleaning In addition to RNVWD’s daily operational practices, biannual exterior reservoir inspections are conducted to determine the condition of:
Protective coatings and paint
- 6 -
Vents, overflows, drain pipe covers, and screening
Facility security, condition of access ladders, and tank entries
Condition of staff gauges
Floating surface water material
Interior inspections are conducted in accordance with AWWA Standard M42-2013 at least every five (5) years to determine the condition of:
Protective coatings and paint
Interior ladder
Overflows
Cathodic Protection
Support Columns
Floor to wall seems
And overall condition of the storage facility
Tank Disinfection Procedures Dry Entry: The disinfection and bacteriological testing of the tank prior to entering into service shall adhere to AWWA Standard C652-11. Water and chlorine are added to the storage facility in amounts such that the solution will initially contain 50mg/l available chlorine and will fill approximately five percent (5%) of the tank volume. The solution shall be held in the tank for a period of not less than six (6) hours. The tank will then be filled to the overflow level by flowing potable water into the tank. Once full, the solution shall be held for a period not less than 24 hours. When the tank level of chlorine residual has returned to 2 parts per million (ppm) the first bacteriological sample can be taken. After two (2) tests for coliform taken 24 hours apart are negative, the storage facility may be placed in service. If the test shows the presence of coliform bacteria, then repeat samples shall be taken until two (2) consecutive samples are negative or the facility must repeat the disinfection procedure. Diver Entry: Tanks that are cleaned by divers must first establish the chlorine residual and turbidity before entering the tank. Prior to entering the tank, all personnel and equipment are disinfected in accordance with AWWA Standard C652-11. After all personnel and equipment are removed from the tank, the chlorine residual in the tank should be re-tested. If the chlorine residual in the tank
- 7 -
did not drop during the inspection the facility can be returned to service as soon as a bacteriological sample is taken. If it was necessary to rebuild the chlorine residual the tank should not be returned to service until after completion of bacteriological analysis. Water Main Disinfection Procedures New Water Main Procedures: New water mains that are installed, whether expanding a distribution system or replacing a line, must be physically separated from the existing system until satisfactory flushing, pressure testing, disinfection, and bacteriological sampling has been completed. The new water main must be considered contaminated and the chlorine concentration used for disinfection makes the water non-potable. After satisfactory bacteriological sample results are obtained from the new water main, a section of connecting pipe must be installed between the new section and the existing system. Before installation, the interiors of all pipes and fittings used to make the connection must be swabbed or sprayed with an l% hypochlorite solution. Flushing and pressure testing the new water main must be completed and approved before beginning disinfection procedures. Upon completion and approval of the pressure test by the RNVWD project manager the M&I Operations Department will be notified. The disinfection and bacteriological testing of the new main shall adhere to AWWA Standards (AWWA C65l-14). The number of water samples taken will depend upon the length (one (1) sample for every 1,000 feet), and number of branches off the new main but a minimum of two (2) samples must be taken. These samples shall be taken from each end of the new water main. Two (2) consecutive samples at least 15 minutes apart must be reported and return negative bacteriological results. Results from bacteriological testing will be available the day after the sample is taken. Repairing existing mains: Leaks and breaks that are repaired while the mains remain full of pressurized water may present little danger of contamination and therefore do not require disinfection. When existing mains are wholly or partially dewatered, after the following procedures the existing main may be returned to service prior to the completion of bacteriological testing in order to minimize the time customers are without water. Slug chlorination is performed in the isolated section by applying chlorine continuously and for a sufficient period of time to develop a solid column, or slug, of chlorinated water that will, as it moves through the main, expose all interior surfaces to a concentration of approximately 100 mg/L for a least three (3) hours. If at any time the chlorine residual drops below 50 mg/L, the flow shall be stopped; chlorination equipment shall be relocated at the head of the slug and, as flow resumes, chlorine shall be applied to restore the free chlorine in the slug to not less than 100 mg/L. After the retention time, heavily chlorinated water should not remain in prolonged contact with the pipe. In disposing of heavily chlorinated water, a neutralizing chemical shall be applied to thoroughly neutralize the residual chlorine.
- 8 -
Distribution System Flushing/Dead-End Main Flushing RNVWD maintenance staff conduct routine systematic flushing of the RNVWD distribution system for the purpose of sediment removal and biofilm control. The frequency is typically biennial but may be modified based on water quality complaints, degradation, or drought. Flushing of dead-end mains is conducted annually but may be modified based on observed water quality. Records are maintained to document the date and location of all pressure and water quality complaints to help determine flushing locations and frequencies. The following procedures are followed during flushing activities:
Start at or near the water source working outward to not disturb sediments in portions of the system that have not yet been flushed
A minimum flushing velocity of 2.5 feet per second will be achieved
Distribution system pressure will not be allowed to drop below 20 psi during flushing activities
Flushing water energy will be diffused to prevent property damage and erosion
All water flushed will have its chlorine concentrations neutralized by dissolving sodium bisulfate tablets with in the diffuser
Flushing records will be maintained documenting the date, flow, flushing duration, discharge water quality and hydrant condition for a minimum of five (5) years
Inspecting and Exercising Water Main Valves To ensure that distribution system valves are accessible and operable at all times, the following water main valve exercising and inspection procedures take place biannually:
All valves are cycled from fully open to fully closed and then back to open. Caution is used when large valves in critical single-source transmission mains are cycled. Demand should be minimal and all valves should be cycled slowly to prevent potential water hammer impacts.
Inspection includes the examination of the condition of the valve box or vault and removal of any debris, if needed.
Records of all operation and maintenance are retained for a minimum of three (3) years.
- 9 -
Maintenance and Testing of Backflow Prevention Devices RNVWD staff are responsible for the protection of the water distribution system from contamination or pollution due to the backflow of contaminants or pollutants through water service connections. A State approved backflow assembly at each customer’s water service connection is required by RNVWD. The following procedures will take place:
All backflow assembly installations shall be approved by the RNVWD Cross-Connection Control Specialist
The type of backflow assembly required shall be a reduced pressure principle backflow preventer
All testing of system backflow assemblies shall be performed by an AWWA certified tester or Cross-Connection Control Specialist
All system backflow assemblies shall be tested annually
All system backflow assemblies shall be tested immediately after they are installed, relocated or repaired and placed into service
All testing records shall be retained for a minimum of 10 years
- 10 -
Section 3: Monitoring and Reporting Bacteriological Monitoring Bacteriological monitoring shall be in accordance with the RNVWD #CA4810013 Bacteriological Sample Siting Plan 2017 attached as Attachment A.
- 11 -
Section 4: Response to Violations In response to a violation requiring public notification, the following steps will be taken:
Notification shall be given as directed by the Department of Water Resources, Division of Drinking Water The RNVWD will prepare a summary of the issue and corrective measures taken to mitigate the issue
A copy of the summary will be provided to the Department of Water Resources, Division of Drinking Water
- 12 -
Section 5: Consumer Complaint Response Procedures In an effort to maintain a high standard of customer service, the RNVWD has established guidelines for the handling of customer complaints. Customer complaints and feedback are valuable sources of information that the RNVWD may use to improve the operation and maintenance of the system or to help identify a system issue. The following steps will be taken when a customer complaint is received.
Record in complaint log (name, address and nature of the problem) Investigate the complaint
Verify or dismiss the complaint
Record the steps taken to address or correct the problem
Notify complainant of action taken
Keep complaint records with corrective action for five years. Report complaints to DDW annually
- 13 -
Section 6: Emergency Operational Practices Emergency notification practices shall be in accordance with the RNVWD Emergency Notification Plan attached as Attachment B. Emergency operational practices shall be in accordance with the RNVWD Emergency Response Plan attached as Attachment C.
Attachment A
Attachment B
Attachment C
RNVWD - Operating FundBalance Sheet
As of December 31, 2017
Dec 31,17
ASSETSCurrent Assets
Checking/Savings160.020 • Cash WFB Checking #3799 56,638160.015 -Cash WFB - Op Fund #6169 270,148160.021 • Cash WFB-Cap Maint Fund #4202 540,883160.025 • Cash PayPal Account 927
Total Checking/Savings 868,597
Other Current Assets160.110 • Accounts Receivable 55,729160.130 • Accounts Receivable - Other 2,995160.119 • Due from Other Fund 16,312
Total Other Current Assets 75,036
Total Current Assets 943,633
Fixed Assets160.315 • Infrastructure 12,826,854160.340 • Equipment 42,816160.370 • Allowance For Depreciation (6,237,356)
Total Fixed Assets 6,632,315
TOTAL ASSETS 7,575,947
LIABILITIES & EQUITYLiabilities
Current LiabilitiesCredit Cards
160.600 • Wells Fargo Visa Card 687
Total Credit Cards 687
Other Current Liabilities160.510 • Accounts Payable 29,717160.550 • Deposits Payable 11,500
Total Other Current Liabilities 41,217
Total Current Liabilities 41,903
Total Liabilities 41,903
Equity160.740 • Fund Balance Available 653,441160.770 • Investment in Fixed Assets 6,632,31532000 • Retained Earnings 213,786Net Income 34,502
Page 1
RNVWD - Operating FundBalance Sheet
As of December 31,2017
Dec 31, 17
Total Equity 7,534,044
TOTAL LIABILITIES & EQUITY 7,575,947
Page 2
RNVWD - Operating FundProfit & Loss Budget Performance
December 2017
Dec 17 Budget $ Over Budget Jul-Dec17 YTD Budget $ Over Budget Annual Bud...
Ordinary Income/ExpenseIncome
60.9000 • Revenues60.9005 • Base Fee60.9010 • Supplemental Fees60.9015 • Tierl60.9020 • Tier 260.9025 • Tier 360.9027 • Capital Recovery Charge60.9030 • Hydrant Water Usage60.9035 • Backflow Testing60.9060 • New Connection Fees60.9075 • Admin Fees, Late Fees & Int.
Total 60.9000 • Revenues
Total Income
Expense60.2000 • Operating Expenses
60.2005 • General Manager60.2010 • Administration & Board Clerk60.2015 • Billing Manager60.2020 • Meter Reading60.2025 • Backflow Testing60.2028 • Plant & Facilities Operations60.2033 • Weed Abatement60.2035 • Legal60.2040 • Engineering60.2045 • Audit60.2050 • Accountant CPA60.2065 • USA Marking60.2070 • Webmaster60.2075 • Office Supplies60.2080 • Records Storage & Office Space60.2090 • Postage & PO Box Rental60.2105 • Ins. Gen. Liab., Prop., & Bond60.2115- Electricity, PGE60.2125 • Office Equipment60.2130 • Bank & Bankcard Fees60.2145 • Phone Service60.2150 • Tank Access Rd. Maint. & Gate60.2160 • CORE SW Lie., Data Stg, Trng.60.2175 • Publications & Legal Notices60.2185 • Trade Memberships & Training60.2190 • Licenses, Permits & Fees60.2200 • ITRON Moble Reader SW & Warr.60.2205 • New Connections
27,8601,6664,720644576
5,970000
359
41,795
41,795
27,7201,7176,0001,5841,0845,9402500
416359
45,070
45,070
140(51)
(1,280)(940)(508)30
(250)0
(416)0
(3,275)
(3,275)
166,53010,20043,93216,47613,29235,685
51014,920
990960
303,495
303,495
166,32010,30236,0009,5006,50035,6401,500
15,1602,5002,158
285,580
285,580
210(102)7,9326,9766,792
45(990)(240)
(1,510)(1,198)
17,915
17,915
332,64020,60472,00019,00013,00071,2803,00015,1605,0004,316
556,000
556,000
5,000600
3,1001,100
08,878
00
7539,2091,0005112357863001910
2,3560
4380000
1,71200
1,283
4,938541
3,0901,100
07,500205375375666709625416166300291334
2,1876233434
1,000634154117594416
62591000
1,378(205)(375)378
8,543291
(114)(181)6200
(101)(334)169(62)104(34)
(1,000)(63)(41)
1,171(175)(94)867
29,6003,26518,3006,60014,80054,422
0950
5,2199,2094,4472,7201,6401,425600
1,7133,01427,473
01,948
0486750174
5,9090
2,3994,390
29,6253,25018,5406,60015,16045,0001,2252,2502,2504,0004,2503,7502,5001,0001,8001,7502,00028,282
3752,000200
6,000376250
3,2501,050560
2,500
(25)15
(240)0
(360)9,422
(1,225)(1,300)2,9695,209197
(1,030)(860)425
(1,200)(37)
1,014(809)(375)(52)(200)
(5,514)374(76)
2,659(1,050)1,8391,890
59,2506,50037,08013,20015,16090,0002,4504,5004,5008,0008,5007,5005,0002,0003,6003,5004,00045,000
7504,000400
12,000750500
6,5002,1001,1205,000
Page 1
RNVWD - Operating FundProfit & Loss Budget Performance
December 2017
60.2208 • Underground Leak Repairs60.2210 • Routine Maintenance & Minor Rep60.2235 • Contingency60.2246 • Arsenic Study, Valve Ex., Hydrn60.2250 • Depreciation Expense60.2300 • Capital Improvements, CRC Resv.
Total 60.2000 • Operating Expenses
Total Expense
Net Ordinary Income
Net Income
Dec 17
6,0096,750
02,386
00
52,597
52,597
(10,801)
(10,801)
Budget $ Over Budget Jul-Dec17 YTD Budget $ Over Budget Annual Bud..
4,1661,750
4295,834
04,750
43,507
43,507
1,563
1,563
1,8435,000(429)
(3,448)0
(4,750)
9,090
9,090
(12,364)
(12,364)
36,40015,502
015,638
(0)0
268,993
268,993
34,502
34,502
25,00010,5002,570
35,0000
28,500
291,363
291,363
(5,783)
(5,783)
11,4005,002
(2,570)(19,362)
(0)(28,500)
(22,370)
(22,370)
40,285
40,285
50,00021,000
5,14070,000
057,000
556,000
556,000
Page 2
Rural N. Vacaville Water Dist.-DSFBalance Sheet
As of December 31, 2017
ASSETSCurrent Assets
Checking/Savings164.010 • Cash in Treasury
Total Checking/Savings
Accounts Receivable164.100 • Accounts Receivable
Total Accounts Receivable
Total Current Assets
Other Assets164.230 • Long-Term Receivables164.250 • Future Loan Redempt Req
Total Other Assets
TOTAL ASSETS
LIABILITIES & EQUITYLiabilities
Current LiabilitiesOther Current Liabilities
164.520 • Due to Other Fund164.550 • Deferred Revenue164.605 • Current Portion of LT Debt
Total Other Current Liabilities
Total Current Liabilities
Long Term Liabilities164.610 • Bond & Other LT Debt
Total Long Term Liabilities
Total Liabilities
Equity164.700 • Reserve for LT Assets164.730 • Reserve-Other164.740 • Fund Balance164.790 • Fund Balance - Designated32000 • Retained EarningsNet Income
Total Equity
TOTAL LIABILITIES & EQUITY
Dec 31, 17
1,634,641
1,634,641
741
741
1,635,382
51,0843,938,571
3,989,655
5,625,037
16,31239,407
791,299
847,017
847,017
3,147,272
3,147,272
3,994,289
14,485645,216(9,025)908,90379,020(7,853)
1,630,747
5,625,037
Page 1
Rural N. Vacaville Water Dist.-DSFProfit & Loss Budget Performance
December 2017
Budget $ Over Budget YTD Budget $ Over Budget Annual Budget
Ordinary Income/ExpenseIncome
64.9014 • Taxes - Special Assessments64.9100 • From Pre Payment Assmt Res Acct64.9401 • Interest Income
Total Income
Expense64.2005 • General Manager64.2008 • Administration64.2009 • Legal64.2010 • NBS Administration Fee64.2012 • NBS Delinq, Tx Rolls and Late64.2045 • Auditor64.2050 • Accountant Services64.2075 • NBS Adminstrative Expenses64.2190 • County Collection Fees64.3200 • Debt Service Expenditures
64.3230 • Long-Term Loan Redemption64.3244 • Interest on LT Debt
Total 64.3200 • Debt Service Expenditures
Total Expense
Net Ordinary Income
Net Income
456,97500
456,975
4593800
1,6000
5,00060553376
252,49037,410
289,900
298,372
158,603
158,603
463,325692666
464,683
520166415304141629131800
252,49037,410
289,900
292.736
171,947
171,947
(6,350)(692)(666)
(7,708)
(61)214(41)
1,070(41)
4,58431422
(424)
(0)(0)
(0)
5,636
(13.344)
(13,344)
456,9750
5,198
462,173
2,8361,156246
3,200500
5,0002,170
91376
393,82360,629
454,452
470,026
(7,853)
(7,853)
463,3254,1574,000
471,482
3,125997250
3,175250
2,5001,750184
4,800
393,82360,629
454,452
471,483
(1)
(1)
(6,350)(4,157)1,198
(9,309)
(289)159(4)25250
2,500420(93)
(4,424)
0(0)
(0)
(1,457)
(7.852)
(7,852)
926,6498,3148,000
942,963
6,2501,993500
6,350500
5,0003,500367
9,600
793,273115,630
908,903
942,963
0
0
Pagel
I
Adjustments Detail Report '
From: 1/1/2018
ments Have Been Posted to the Customer's Balance:
These Adjustments Haven 't Been Billed.
Implement Account AccountDate Number Status Revenue
1/5/2018
1/7/2018
1/7/2018
1/7/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
21302
15801
19901
38002
7101
18602
18501
18202
17201
15201
10401
8701
8401
19401
7302
20301
6602
5401
5001
4101
3801
34002
30001
8201
38301
3101
2701
1401
44101
42201
40901
19201
38601
35901
34402
31701
26401
25501
22701
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
BA
CFEE
CFEE
BA
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
CFEE
CFEE
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
I_C1
LC1
LC1
LC1
LC1
LC1
To: 1/31/2018
Amount User Comment
($200.00)
$5.00
$5.00
$95.00
$7.13
$9.30
$10.60
$15.47
$11.50
$4.66
$31.21
$12.25
$12.80
$14.36
$34.00
$9.30
$10.23
$26.80
$20.65
$21.52
$14.48
$5.00
$5.00
$43.98
$12.30
$10.40
$10.50
$6.65
$8.90
$10.90
$10.62
$16.88
$24.41
$15.56
$8.64
$13.89
$5.38
$5.04
$18.94
ADMI Adjustment for water leak. Approved
ADMI
ADMI
ADMI Client account closed. Son assuming
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI
Thursday, February 1, 2018 Page 1 of 2
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/12/2018
1/24/2018
1/27/2018
1/30/2018
22601
22402
21402
20801
40301
38002
26101
15801
Total Number of Adjustments
Total Number of Adjustments
Total Number of Adjustments for Group: 1
Total Number of Adjustments for Area: 1
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
47
47
= 47
= 47
LC1
LC1
LC1
LC1
LC1
ADMIN
CFEE
CFEE
Total =
Total =
Total =
Total =
$11.07
$13.59
$22.20
$10.70
$9.70
($17.00)
$5.00
$5.00
$464.51
$464.51
$464.51
$464.51
ADMI
ADMI
ADMI
ADMI
ADMI
ADMI no longer ach payer but amount take
ADMI
ADMI
These Adjustments Have Been Posted to the Customer's Balance:
These Adjustments Haven't Been Billed.
Implement AccountDate Number
1/22/2018 32601
Total Number of Adjustments =
AccountStatus
ACTIVE
1
Revenue Amount User Comment
ADMIN ($200.00) ADMI Refund of backflow testing 5 years
Total = , ($200.00)
Total Number of Adjustments = Total = ($200.00)
Total Number of Adjustments for Group: 1 1 Total = ($200.00)
Total Number of Adjustments for Area: 2 = Total = ($200.00)
Total Number of Adjustments for All Areas: = 48 Total = $264.51
Thursday, February 1, 2018 Page 2 of 2