Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
1
BLUEPRINT FOR SUCCESSDesigning for Kids of Tomorrow
Downers Grove School District 58Board of Education Update - May 13, 2019
Tonight Objectives✓ Briefly Review Process to Date✓ Evaluation of Priorities
▪ Guiding Principles✓ Master Facility Plan Development
▪ Plan Drivers▪ Concept Plans
Steps 7 & 8 | Finalize
Facility Plan
Community EndorsementBOE Adoption
Step 2 |What do
we Have?
DemographicsPhysical Condition
Educational AlignmentCapacity|Utilization
Timeline
Steps 3 & 4 |
What do we Want?
Gap AnalysisPrioritiesStaff & Community Engagement|Evaluation
Step 1 |
Establish the Why?
Facility Planning Council Visioning Meetings
Step 5 | Facility
Master Planning
Alternatives|OptionsCost EstimatesCommunity EducationFeedback
2019
Step 6 | Facility
Master Plan
Recommend to BOEEvaluate FinancesImplementation Strategies
Initiate
Implementation
Plan
2020
2018 S O N D J F M A M J J A S O N D J
Prior Steps
Facility Assessments Building Maintenance,
Repairs and Operations Capital Planning
Strategic Planning
Timeline – Today and Immediate Future
Steps 3 & 4 |
What do we Want?
Gap AnalysisPrioritiesStaff & Community Engagement|Evaluation
Step 5 | Facility
Master Planning
Alternatives|OptionsCost EstimatesCommunity EducationFeedback
2019
2018 S O N D J A M J J A S O N D J
2020
F M
What Do We Want ✓ Evaluation of Priorities
▪ Guiding Principles
21st Century
Learning
Use of Color, Light & Material
Aesthetics in the Learning
Environment to
ENLIVEN SPACES
Bringing DAYLIGHT into
Learning Environments
Provide Agile and Adaptable
Classrooms through the uses of
FLEXIBLE FURNITURE
Support Creative Thinking,
COLLABORATION, and Small
Group Activity
Connectedness
Enhance access to STUDENT
SUPPORT resources
Enhance EMOTIONAL
SUPPORT & SOCIAL
WELLBEING
Safe & Healthy
Environments
Creating a safe and secure
atmosphere – SAFE PLACE VIBE
Enhance student HEALTH & WELLNESS
Adapt spaces for Student &
Staff COMFORT
Improve INDOOR AIR QUALITY
Guiding Principles for Facility Planning
Master Facility Plan Development✓ Plan Drivers✓ Concept Plans
1. Create safe and secure atmospheres 2. Improve indoor air quality3. Spaces for 21st century learning & doing4. All buildings have maintenance and capital improvement needs
Key Drivers of the Plan
5. Explore grade reconfiguration - freeing up space in elementary schools and exploring feasibility of 6-8 middle schools
6. Evaluate District facility use (Longfellow and ASC)
THE 4 INGREDIENTS OF YOUR FACILITY MASTER PLAN
MAINTENANCE 21ST CENTURY LEARNINGSAFE & HEALTHY ENVIRONMENTS
COMPREHENSIVE IMPROVEMENTS
Capital Improvements
Mech / Elect / Plumb
Interior Repairs
Health Life Safety
Site
Maker/STEM/STEAM
Collaboration/Break-Out
Flexible Furniture
Secure Entrances
Indoor Air Quality
Air Conditioning
Herrick Middle School
O’Neill Middle School
N
Herrick
QUICK FACTSOriginal Year Built: 1953Additions: 1963, 1968, 1993, 2005Site Area: 11.3 AcresCurrent Building Square footage: 92,196Current Enrollment: 655 studentsCurrent Grade Levels: 7-8
MAIN
ENTRY
CAFETERIA
ORCH
STAGE
MUSIC/
CHOIR
GIRLS
LOCKER
RM
KIT
CH
EN
STAFF
LOUNGE
ELA/
SS
SS
MATHMATH MATH
ART
LIBRARY
READING
SS/
FRENCH
SS
FACSELA
SS
MATH
ELASPAN
MATH
T
MAIN
OFFICE
CONF
T
T
T
EXISTING FIRST FLOOR PLAN
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
N
Herrick
QUICK FACTSOriginal Year Built: 1953Additions: 1963, 1968, 1993, 2005Site Area: 11.3 AcresProposed Building Square footage: 162,000Proposed Enrollment: 985 studentsProposed Grade Levels: 6-8
COMPREHENSIVE IMPROVEMENTS• secure entrances
• air conditioning
• indoor air quality
• breakout spaces
• collaborate learning
• flexible furniture
• partial addition&
renovation
• student support
services
MAINTENANCE• mech/elect/plumb
• health life safety
• roof replacement
• interior repairs
• site improvements
MAIN
ENTRY
KITCHEN
CONCEPT 1 - FIRST FLOOR PLAN
ADMIN & SUPPORT SERVICES,
LIBRARY, CLASSROOMS, and
EXPANDED CAFETERIA ADDITION
2-STORY
CLASSROOM
ADDITION
EXPANDED
AUX GYM
N
Herrick
QUICK FACTSOriginal Year Built: 1953Additions: 1963, 1968, 1993, 2005Site Area: 11.3 AcresProposed Building Square footage: 138,000Proposed Enrollment: 985 studentsProposed Grade Levels: 6-8
COMPREHENSIVE IMPROVEMENTS• secure entrances
• air conditioning
• indoor air quality
• breakout spaces
• collaborate learning
• flexible furniture
• partial addition&
renovation
• student support
services
MAINTENANCE• mech/elect/plumb
• health life safety
• roof replacement
• interior repairs
• site improvements
CONCEPT 2 - FIRST FLOOR PLAN
MAIN
ENTRY
KITCHENADMIN
ADDITION
2-STORY
CLASSROOM
ADDITION AUX GYM
ADDITION
N
O’Neill
QUICK FACTSOriginal Year Built: 1957Additions: 1963, 1967, 1971, 1990, 1993Site Area: 9.5 AcresCurrent Building Square footage: 99,047 SFCurrent Enrollment: 439 studentsCurrent Grade Levels: 7-8
MAIN
ENTRY
MAIN GYM
CAFETERIA
SMALL GYM
ORCH FITNESS
BANDSTAGE
CHOIR
GIRLS
LOCKER
RM
BOYS LOCKER RM KITCHEN
BOILER
STAFF
LOUNGE
SCIENCE SCIENCE
MATH
MATH
MATHHEALTH
LIBRARY
HEALTHSSSS
FACS
DLP
EXPLOREMEDIA/
CONFSS BEST BEST
BESTMATHCONF
MAIN
OFFICE
OFFIC
ES
TT
TT
EXISTING FIRST FLOOR PLAN
*School hosts specialized programs with unique enrollment classifications
N
O’Neill
QUICK FACTSOriginal Year Built: 1957Additions: 1963, 1967, 1971, 1990, 1993Site Area: 9.5 AcresProposed Building Square footage: 118,000Proposed Enrollment: 739 studentsProposed Grade Levels: 6-8
COMPREHENSIVE IMPROVEMENTS• secure entrances
• air conditioning
• indoor air quality
• breakout spaces
• collaborate learning
• flexible furniture
• partial addition&
renovation
• student support
services
MAINTENANCE• mech/elect/plumb
• health life safety
• roof replacement
• interior repairs
• site improvements
MAIN
ENTRY
CONCEPT - FIRST FLOOR PLAN
EXPANDED CAFETERIA
& KITCHEN ADDITION
ADMIN&
LIBRARY
ADDITIONCLASSROOM
ADDITION
CLASSROOM
ADDITION
Elementary Schools
Belle Aire
El Sierra
Fairmount
Henry Puffer
Highland
Hillcrest
Indian Trail
Kingsley
Lester
Pierce DownerWhittier
21ST CENTURY LEARNING• freeing up 2 classroom/ building
• breakout spaces for additional 21st
century learning opportunities
• collaborative learning space
• additional classroom spaces
SAFE & HEALTHY ENVIRONMENTS• secure vestibules
• indoor air quality
• air conditioning
MAINTENANCE• mech/elect/plumb
• health life safety
• roof replacement
• interior repairs
• site improvements
NEXT STEPSMany more conversations to come and lots more planning to do…
May 21 & 22 Community Engagement
June-July Evaluate Configuration Master Plan | Develop Budgets
August Present Long-Range Plan