Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (1): SH 1 of 28
Qty Unit Rate Amount
1.0
SERVICES AND FACILITIES
PROVIDED BY CONTRACTOR
Storage of Material
A Material Store House Sum 10,000.00
Temporary Works
B Hoarding of site Sum 19,000.00
Services
C Supply of electricity Item
D Supply of water Item
CLEAR AWAY AND CLEAN DOWN
EClear away all plant and temporary works unless otherwise Item
describe or directed to make good. Clear away all existing
rubbish, debris surplus materials as they accumulate and at
completion. Clean floors, paving, glass and both sides and all
external surfaces and leave the works clean and perfect at
completion.
Protection
F. Insurance of the works & Plant Materials Item
G. Third Party Insurance Item
H. Insurance of Equipment Item
I Performance Security Item
To Collection $
PRELIMINARIES Project:Construction of Tomato Café and
Deli
Item
No.Description
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (1): SH 2 of 28
Qty Unit Rate Amount
PRELIMINARIES Project:Construction of Tomato Café and
Deli
Item
No.Description
COLLECTION
SHEET NO.1
To Summary $
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (2): SH 1 of 28
Qty Unit Rate Amount
2.0 EXTERNAL WORKS
2.2 STORMWATER DRAINAGE
New R.C box drain connected to existing rc box drain
D20 EXCAVATING AND FILLING
Excavating
Pits; 42" maximum depth
A Trenches exceeding 12" wide 7.4 CY
Disposal
B Excavated material; Off site 5 CY
E05 INSITU CONCRETE CONSTRUCTION GENERALLY
REINFORCED 20psi @28 days;
C To sides and base of box drain 4 CY
E20 FORMWORK FOR IN SITU CONCRETE
Rough Finish
D Edges; not exceeding 10" high 150 LY
E30 REINFORCEMENT FOR IN SITU CONCRETE
E Fabric; A142 BRC Mesh 56 SY
To Collection $ 0.00
CIVIL WORKS Project:Construction of Tomato Café and
Deli
Item
No.Description
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (2): SH 2 of 28
Qty Unit Rate Amount
CIVIL WORKS Project:Construction of Tomato Café and
Deli
Item
No.Description
COLLECTION
SHEET NO.1 $0.00
To Summary $ 0.00
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (3): SH 1 of 28
Qty Unit Rate Amount
3.0 GENERAL
3.1 EXCAVATION
D20 EXCAVATING AND FILLING
EXCAVATING
Site Clearance item
A To reduce levels 182 CY
Pits
B 42" maximum depth 67 CY
Trenches exceeding 12" wide
C 42" maximum depth 175 CY
DISPOSAL
Excavated material
D off site 310 CY
SELECTED EXCAVATED MATERIAL
Filling to excavations
E arising from the excavations 254 CY
HARDCORE
Filling to make up levels
F not exceeding 8" average thick 200 CY
SAND
Filling to make up levels
G not exceeding 10" average thick 15 CY
TERMITE TREATMENT
Applying to surfaces
H generally 760 SY
SURFACE TREATMENTS
Compacting bottoms of excavations
blinding 2" thick 660 SY
To Collection $
Refer to the drawings 14012001/DWG # S1 -S6 for details of the
works under this section, on the exterior of the building envelope.
BUILDING WORKS (STRUCTURES) Project:Construction of Tomato Café and
Deli
Item
No.Description
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (3): SH 2 of 28
Qty Unit Rate Amount
BUILDING WORKS (STRUCTURES) Project:Construction of Tomato Café and
Deli
Item
No.Description
3.2 SUBSTRUCTURE
E05 INSITU CONCRETE CONSTRUCTION GENERALLY
REINFORCED 30psi @28 days; 20mm aggregate; (1:2:4) mix
Column Bases
A 3'-0" x 3'-0" 10 CY
Strip Footing
B 2'-0" wide 34 CY
Capping beams
C 12" x 8" 11 CY
PLAIN 10psi @28 days; 20mm aggregate; (1:3:6) mix
Foundation blinding
D blinding 2" thick 18 CY
Filling hollow walls
E 8" thick 19 CY
E20 FORMWORK FOR IN SITU CONCRETE
Rough Finish
Column Bases
F Edges; not exceeding 10" high 4 LY
Strip Footing
G Edges; not exceeding 10" high 146 LY
Capping Beam
H Edges; not exceeding 10" high 146 LY
To Collection $
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (3): SH 3 of 28
Qty Unit Rate Amount
BUILDING WORKS (STRUCTURES) Project:Construction of Tomato Café and
Deli
Item
No.Description
3.2 SUBSTRUCTURE
Cont'd
E30 REINFORCEMENT FOR IN SITU CONCRETE
High yield deformed steel bars; straight and bent bars
Column Bases
I 1/2" 900 LBS
Strip Footing
J 1/2" 1786 LBS
K 3/8" 371 LBS
Foundation Walls
L 1/2" 610 LBS
Capping Beams
M 5/8" 1141 LBS
N 5/16" 371 LBS
F10 BRICK/BLOCK WALLING
Concrete Masonry Blocks
O 8" thick 181 SY
Steel fabric reinforcement; brickforce or similar
Foundation Walls
P 8" wide 363 LY
Polythene sheeting; 500 gauge laid horizontally
Ground floor
Q Slab on grade 660 SY
To Collection $
F30 ACCESSORIES AND SUNDRY ITEMS FOR BRICK,
BLOCK AND STONE WALLING
J40 FLEXIBLE SHEET TANKING/DAMP PROOF
MEMBRANES
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (3): SH 4 of 28
Qty Unit Rate Amount
BUILDING WORKS (STRUCTURES) Project:Construction of Tomato Café and
Deli
Item
No.Description
3.3 SUPERSTRUCTURE: GROUND FLOOR
E05 INSITU CONCRETE CONSTRUCTION GENERALLY
REINFORCED 30psi @28 days; 20mm aggregate; (1:2:4) mix
Columns
A 8"x 8" 4.25 CY
B 12" dia 1 CY
Porch Column Bases
C 18" x 18" 2 CY
Porch Column Bases
D 18" x 3'-2" 1 CY
Ground floor slab
E 6" thick 110 CY
PLAIN 10psi @28 days; 20mm aggregate; (1:3:6) mix
Filling hollow walls
F 8" thick 31 CY
G 6" thick 10 CY
E20 FORMWORK FOR IN SITU CONCRETE
Rough finish
Columns
H 8"x 8" 150 LY
E30 REINFORCEMENT FOR IN SITU CONCRETE
High yield deformed steel bars; straight and bent bars
Columns
I 3/4" 300 LBS
J 5/8" 876 LBS
K 3/8" 391 LBS
Walls
L 1/2" 1472 LBS
Fabric; A142 BRC Mesh
M Ground Floor slab 660 SY
To Collection $
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (3): SH 5 of 28
Qty Unit Rate Amount
BUILDING WORKS (STRUCTURES) Project:Construction of Tomato Café and
Deli
Item
No.Description
3.3 SUPERSTRUCTURE: GROUND FLOOR
Cont'd
F10 BRICK/BLOCK WALLING
Concrete Masonry Blocks
Ground Floor to Roof
N 8" thick Load-bearing 288 SY
O 6" thick Load-bearing 155 SY
P 4" thick Load-bearing 96 SY
Steel fabric reinforcement; brickforce or similar
Ground Floor to First Floor
Q 6" wide 193 LY
R 8" wide 444 LY
G20 CARPENTRY/TIMBER FRAMING AND FIRST FIXING
Treated sawn soft wood; timber stud partitions comprising 1 layer
1/2" water resistant dry wall fixed to both sides of partition on 2"
x 4" studs.
S 4" Wall Frame 56 LY
K11: RIGID SHEET
FLOORING/SHEATHING/LININGS/CASINGS
gypsum board
T 1/2" drywall; over 12" wide 36 SY
Refer to the drawings 14012001/DWG # S1 for detail;
Hard wood post;attached to reinforced concrete pedestal with 8" x
16" stainless steel "U" bracket
U Timber columns 6" x 6" x 6' hard wood timber post 14 LY
V Stainless steel "U" Bracket 7 nr
W 1/2" dia x 8" galvanized bolt 21 nr
To Collection $
F30 ACCESSORIES AND SUNDRY ITEMS FOR BRICK,
BLOCK AND STONE WALLING
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (3): SH 6 of 28
Qty Unit Rate Amount
BUILDING WORKS (STRUCTURES) Project:Construction of Tomato Café and
Deli
Item
No.Description
3.4 SUPERSTRUCTURE: MEZANINE FLOOR
E05 INSITU CONCRETE CONSTRUCTION GENERALLY
REINFORCED 30psi @28 days; 20mm aggregate; (1:2:4) mix
Columns
A 8"x 8" 2.3 CY
First floor slab
B 6" thick 25 CY
First floor beams
C 16" x 8" 10 CY
PLAIN 10psi @28 days; 20mm aggregate; (1:3:6) mix
Filling hollow walls
D 8" thick 23 CY
E 6" thick 13 CY
E20 FORMWORK FOR IN SITU CONCRETE
Rough finish
Columns
F 8"x 8";square; attached to walls 97 LY
G 8" x 8" Irrigular shaped;Quoins 23 SY
First floor beams & Slab
H Edge of 10" deep beams 197 LY
form work; Fair Finish
I Soffit of slab 129 SY
E30 REINFORCEMENT FOR IN SITU CONCRETE
High yield deformed steel bars; straight and bent bars
Columns
J 3/4" 120 LBS
K 5/8" 500 LBS
L 3/8" 211 LBS
To Collection $
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (3): SH 7 of 28
Qty Unit Rate Amount
BUILDING WORKS (STRUCTURES) Project:Construction of Tomato Café and
Deli
Item
No.Description
3.4 SUPERSTRUCTURE: MEZANINE FLOOR
Cont'd
E30 REINFORCEMENT FOR IN SITU CONCRETE
High yield deformed steel bars; straight and bent bars
Beams
M 3/4" 3236 LBS
N 5/8" 969 LBS
O 1/2" 654 LBS
P 3/8" 472 LBS
Q 1/4" 797 LBS
Walls
R 1/2" 491 LBS
Slab
S 3/8" 2250 LBS
F10 BRICK/BLOCK WALLING
Concrete Masonry Blocks
First Floor to Roof
T 8" thick Load-bearing 47 SY
U 6" thick Load-bearing 121 SY
Steel fabric reinforcement; brickforce or similar
First Floor to Roof
V 6" wide 150 LY
W 8" wide 60 LY
To Collection $
F30 ACCESSORIES AND SUNDRY ITEMS FOR BRICK,
BLOCK AND STONE WALLING
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (3): SH 8 of 28
Qty Unit Rate Amount
BUILDING WORKS (STRUCTURES) Project:Construction of Tomato Café and
Deli
Item
No.Description
3.5 SUPERSTRUCTURE: ROOF
G20 CARPENTRY/TIMBER FRAMING AND FIRST FIXING
SAWN HARDWOOD
Pitched roof members
A 3" x 10" Ridge 35 LY
B 3" x 10" Hip Rafters 27 LY
C 3" x 8" Rafters 944 LY
D 2" x 6" Colar Tie 210 LY
E 4" x 8" Bearer Plate 46 LY
TREATED SAWN SOFTWOOD
F Pitched roof members
G 2" x 6" monopitch rafters 186 LY
H 2" x 8" Hip rafters 6.6 LY
I 2" x 3" purlins 1187 LY
J 1 1/4" x 12" wrough softwood in facias/barge 143 LY
STEEL
K 1/2" diameter bolt;4" long at rafter lap joint 1032 nr
L 1/2" diameter "J" bolt; 12" long bedded in concrete 76 nr
M galvanized hurricane straps 82 nr
N steel brackets; with 4 1/2" bolt through rafter 100 nr
K11: SHEATHING, LININGS AND CASINGS
moisture resistant tongue and grooved hardwood boarding:
O 1" x 4"; over 12" wide 960 SY
To Collection $
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (3): SH 9 of 28
Qty Unit Rate Amount
BUILDING WORKS (STRUCTURES) Project:Construction of Tomato Café and
Deli
Item
No.Description
3.5 SUPERSTRUCTURE: ROOF
Cont'd
H74 ZINC SHEET COVERINGS/FLASHINGS
Roof coverings
P sloping; over 10 n.e 50 degrees 960 SY
Flashings
Q 7"A Style Aluminum Box Gutter 31 LY
Metal roof Capping
R 24" wide 70 LY
Eave Trim
S not exceeding 6" wide 32 LY
T Roof accessories item
J40 FLEXIBLE SHEET TANKING/DAMP PROOF
MEMBRANES
Bituminous Roof Felt
Tanking and damp proofing
U sloping; over 10 n.e 50 degrees 960 SY
PROVISIONAL SUMS
Allow the following sum for work or cost which cannot be
entirely measured, defined or detailed
VSupply and installation of roof insulation material in accordance
with drawings and specification. Sum60,000.00
To Collection $
Galvanized roofing; Fluted profile metal RoofPanels; Cutting and
fixing to timber purlins
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (3): SH 10 of 28
Qty Unit Rate Amount
BUILDING WORKS (STRUCTURES) Project:Construction of Tomato Café and
Deli
Item
No.Description
COLLECTION
SHEET NO. 1
SHEET NO. 2
SHEET NO. 3
SHEET NO. 4
SHEET NO. 5
SHEET NO. 6
SHEET NO. 7
SHEET NO. 8
SHEET NO. 9
To Summary $
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (4): SH 1 of 28
Qty Unit Rate Amount
4.0 GENERAL
4.1 PLUMBING
N13 SANITARY APPLIANCES/FITTINGS
LAVATORY BASINS
A 22" x 24" 4 nr
WATER CLOSETS
B W C suite; P-trap 4 nr
KITCHEN SINK
kitchen sink; stainless steel; combined bowl; chain stay and plug;
complete with pillar taps; with and including all necessary fittings
and accessories
C double bowl 1 nr
D Single bowl; Bar sink 2 nr
URINAL
Partition Urinal; low level vitreous china pan; low pressure ball
valve and plastic flush pipe plugged and screwed; mastic joint to
drain; with and including all necessary fittings and accessories.
EScreened 1 nr
Shower fittings; riser pipe with valve and shower head and angled
shower arm; fixing to wall outlet
F 1/2" dia. Riser pipe 1 nr
To Collection $
Water closet suite; low level vitreous china pan
plastic seat; 9 liter vitreous china cistern and bracket
low pressure ball valve and plastic flush pipe plugged
and screwed; mastic joint to drain; with and including
Refer to the drawings 14012001/DWG # EP1 for details of the
works under this section, on the exterior of the building envelope.
lavatory basin; vitreous china; 1 1/2" dia. waste stay and plug;
easy cleaned pillar taps; fixed on cantilever brackets; with and
including all necessary fittings and accessories
BUILDING WORKS (SERVICES) Project:Construction of Tomato Café and
Deli
Item
No.Description
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (4): SH 2 of 28
Qty Unit Rate Amount
BUILDING WORKS (SERVICES) Project:Construction of Tomato Café and
Deli
Item
No.Description
4.1 PLUMBING
Cont'd
S10 PLUMBING INSTALLATION
PROVISIONAL SUMS
PIPED SUPPLY AND DISPOSAL SYSTEMS
G
Allow for supply and installation of all pipe sand pipe fittings or
cold water supply lines, waste and soil lines to septic tank
sum
20,000.00
H Allow for soak away and septic tank systemsSum 5,500.00
To Collection $ 25,500.00
Allow the following sum for work or cost which cannot be
entirely measured, defined or detailed
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (4): SH 3 of 28
Qty Unit Rate Amount
BUILDING WORKS (SERVICES) Project:Construction of Tomato Café and
Deli
Item
No.Description
4.2 ELECTRICAL
V10 GENERAL LIGHTING AND LOW VOULTAGE
POWERLighting points; wired in PVC insulated and PVC sheathed cable;
insulated in cavities; protected where buried by medium gauged
PVC Conduit
A Lighting point 64 No.
Power points; wired in PVC insulated and PVC sheathed cable;
insulated in cavities; protected where buried by medium gauged
PVC Conduit
B 13 amp switched socket outlet power points 41 No.
Consumer control Units; mounted insulated control units; fitted
with miniature circuit breakers including conduit with runs ready
for finial connections by power supply authority
C consumer main switch panel 1 No.
ELECTRICAL FITTINGS/FIXTURES AND ACCESSORIES
Plate switches
C single pole 36 No.
D three way 5 No.
13 amp switched socket outlets
E duplex 44 No.
single 4 No.
telephone socket outlets
F single socket outlets 6 No.
To Collection $
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (4): SH 4 of 28
Qty Unit Rate Amount
BUILDING WORKS (SERVICES) Project:Construction of Tomato Café and
Deli
Item
No.Description
4.2 ELECTRICAL
Cont'd
television socket outlets
G single socket outlets 9 No.
data socket outlets
H single socket outlets 6 No.
Placement of Electrical fittings and fixtures; complete with
and including all necessary accessories
Lamps and holders
I ceiling fan 7 No.
J 4'-0" long; fluorescent lamps 27 No.
K Interior wall scones 14 No.
L exterior wall scones 7 No.
M ceiling light fixture 14 No.
N cable lighting run 3 No.
PROVISIONAL SUMS
Allow the following sum for work or cost which cannot be
entirely measured, defined or detailed
O Rain water disposal Sum 15,000.00
P Provision of signage Sum 5,000.00
To Collection $
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (4): SH 5 of 28
Qty Unit Rate Amount
BUILDING WORKS (SERVICES) Project:Construction of Tomato Café and
Deli
Item
No.Description
COLLECTION
SHEET NO. 1
SHEET NO. 2 $25,500.00
SHEET NO. 3
SHEET NO. 4
To Summary $
Project No.13012002 Millenia L.D.C Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (5): Sheet (1) of 28
DescriptionQty Unit Rate Amount
5.0 GENERAL
Refer to the drawings A-1 to S-6 for details of the works under this
section, on the exterior of the building envelope.
GROUND FLOOR
5.1 WALL FINISHES
M20: PLASTERED, RENDERED & ROUGHCAST
COATINGS
Rendering; cement and sand (1:3) steel toweled; 1/2" thick; work to
walls
To walls, general surfaces
A external 246 SY
B internal 769 SY
Rendering; cement and sand (1:3) steel toweled; 2" thick; work to
exterior walls below perimeter cill; stainless steel rendering
reinforcement mesh.
C external surface 16 SY
wall sweep perimeter cill formed and casted with reinforced concrete
D 3 inch x 12 inch concrete perimeter cill 72 LY
one coat primer on walls; one base coat; one top coat
TROWELTEX ; to all surfaces; Harris or similar approved
E external walls: on 2" plaster; over 300 mm wide 16 SY
Concrete base and concrete column 29 SY
To Collection $
BUILDING WORKS (FITTING OUT & FINISHES) Project:Construction of , Tomato Café and
Deli
Item
No.
Project No.13012002Millenia L.D.C
Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (5): Sheet (2) of 28
DescriptionQty Unit Rate Amount
BUILDING WORKS (FITTING OUT & FINISHES) Project:Construction of , Tomato Café and
Deli
Item
No.
P20: UNFRAMED ISOLATED TRIMS, SKIRTING AND
SUNDRY ITEMS
F
4' height interior wall panel ; 3/8" bead ply; BS 1455;INT bonded;
cutting and fixing to timber framing members; on concrete block
wall.
G 3/8" thick; over 300 mm wide (building Interior) 80 SY
H 3/4" x 3" Treated pitch pine; joist framing 80 SY
wrought softwood; molded strip; top of wall paneling .
I moldings; 1 1/4" x 3/4" 30 LY
moldings; 71/2" x 1 1/2" molded to both edges 14 LY
M60: PAINTING AND CLEAR FINISHING
Emulsion paint
One coat primer; three top coats acrylic semi-gloss latex enamel
paint; to rendered surfaces; LANCO or similar approved
J exterior rendered walls 262 SY
interior rendered walls 769 SY
dry wall surface 13 SY
K 3 inch x 12 inch concrete perimeter cill 72 LY
L Quoins sum 1,000.00
To Collection $
Project No.13012002Millenia L.D.C
Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (5): Sheet (3) of 28
DescriptionQty Unit Rate Amount
BUILDING WORKS (FITTING OUT & FINISHES) Project:Construction of , Tomato Café and
Deli
Item
No.
GROUND FLOOR
WALL FINISHES cont'd
M60: PAINTING AND CLEAR FINISHING
Prepare, knot, prime and stop, apply two undercoats and one top coat
gloss paint; general surfaces.
M 3/8" thick; over 300 mm wide (building Interior) 80 SY
N moldings; 1 1/4" x 3/4" 30 LY
moldings; 71/2" x 1 1/2" molded to both edges 14 LY
Door frames; including door architraves and stops 76 LY
O over 300 mm girth; Interior door & exterior door 66.6 SY
Linseed oil
Timber post; 6" x 6" 14 LY
M40: STONE, CONCRE, QUARRY & CERAMIC TILING &
MOASIC
Glazed ceramic tiling; BS6431; fixing with tile adhesive, grouting
with neat white cement; to floated backings
P kitchen counter backsplash 6 SY
5.2 FLOOR FINISHES
E41: WORKED FINISHES TO IN SITU CONCRETE
polished concrete; one coat sealer: two coats hardener
A polished to smooth surface 805 SY
To Collection $
Project No.13012002Millenia L.D.C
Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (5): Sheet (4) of 28
DescriptionQty Unit Rate Amount
BUILDING WORKS (FITTING OUT & FINISHES) Project:Construction of , Tomato Café and
Deli
Item
No.
5.3 CEILINGS
M60: PAINTING AND CLEAR FINISHING
Emulsion paint
One coat primer; one base coat; three coats odorless acrylic semi-
gloss latex enamel paint; to rendered surfaces; LANCO or similar
approved
A To lining; width exceeding 300 mm 166 SY
MEZANINE FLOOR
5.4 WALL FINISHES
M20: PLASTERED, RENDERED & ROUGHCAST
COATINGS
Rendering; cement and sand (1:3) steel toweled; 12.5 mm thick;
work to walls
To walls, general surfaces
A external 58 SY
B internal 272 SY
M60: PAINTING AND CLEAR FINISHING
Emulsion paint
One coat primer; one base coat; three coats odorless acrylic semi-
gloss latex enamel paint; to rendered surfaces; LANCO or similar
approved
C interior walls; exceeding 300 mm wide 272 SY
D exterior walls; exceeding 300 mm wide 58 SY
Prepare, knot, prime and stop, apply two undercoats and one top coat
GLOSS PAINT; general surfaces:
E Door frames; including door architraves and stops 11 LY
F over 300 mm girth; Interior door & exterior door 7.5 SY
To Collection $
Project No.13012002Millenia L.D.C
Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (5): Sheet (5) of 28
DescriptionQty Unit Rate Amount
BUILDING WORKS (FITTING OUT & FINISHES) Project:Construction of , Tomato Café and
Deli
Item
No.
MEZANINE FLOOR
M40: STONE, CONCRE, QUARRY & CERAMIC TILING &
MOASIC
Glazed ceramic tiling; BS6431; fixing with tile adhesive, grouting
with neat white cement; to floated backings
G Full wall height (bathroom) 46 SY
5.5 FLOOR FINISHES
E41: WORKED FINISHES TO IN SITU CONCRETE
polished concrete; one coat sealer: two coats hardener
A polished to smooth surface 145.28 SY
MEZANINE FLOOR
5.6 CEILING
M60: PAINTING AND CLEAR FINISHING
Linseed oil
sanding and oiling
Linings to roof soffit:
A 1" x 4" matchboard; over 12" wide 873 SY
3" x 10" Ridge 35 LY
3" x 10" Hip Rafters 27 LY
3" x 8" Rafters 944 LY
2" x 6" Collar Tie 210 LY
Prepare, knot, prime and stop, apply two undercoats and one top coat
gloss paint; general surfaces:
fascia
B Fascia; n.e. 12" wide 143 LY
To Collection $
Project No.13012002Millenia L.D.C
Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (5): Sheet (6) of 28
DescriptionQty Unit Rate Amount
BUILDING WORKS (FITTING OUT & FINISHES) Project:Construction of , Tomato Café and
Deli
Item
No.
5.7 WINDOWS AND EXTERNAL DOORS
GENERALLY
L10:WINDOWS
Marvin or equal windows; casement; fitted with standard sill;
complete with ironmongery;
size approx: Secured by Design
A 36" wide x 24" high 1 No.
B 36" wide x 36" 7 No.
C 24" wide x 24" 5 No.
Timber windows; fixed louvered;
D 36" wide x 24" high; automotive paint finish 23 No.
L20: DOORS
hanging and ironmongery fitting
E36" X 80" semi solid core plywood flush door including framing &
ironmongery9 No.
F30" X 80" semi solid core plywood flush door including framing &
ironmongery2 No.
G34" X 80" semi solid core plywood flush door including framing &
ironmongery1 No.
H40" X 86" block frame; single swing door including framing &
ironmongery1 No.
I60" X 86" block frame; double door including framing &
ironmongery1 No.
J72" X 86" Traffic swing; double door; laminated timber & glazed
door; including framing & ironmongery1 No.
Sawn Softwood; treated door frames;
Jambs and heads
K 2" x 6" internal door frames 87 LY
Door stops
L 1/2" x 2" 87 LY
To Collection $
Project No.13012002Millenia L.D.C
Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (5): Sheet (7) of 28
DescriptionQty Unit Rate Amount
BUILDING WORKS (FITTING OUT & FINISHES) Project:Construction of , Tomato Café and
Deli
Item
No.
5.8 TIMBER STAIRS
L30; STAIRS, WALKWAYS AND BALUSTRADES
GENERALLY
staircase as drawing D-2; 3'-3" between stringers; balustrades to one
side; 13 risers 1" thick risers; 12 (hard wood) treads1 1/2" thick;
one 3'-3" x 3'- 3" landing; 1 1/2" Stringer (10'-0" total rise)
A Timber stair case item
Balustrades and hand rail
Wrought hard wood 1 1/2" x 3" mounted handrail; 1 1/2" x1 1/2"
hard wood balustrades at 6" centers; overall height 3'-0"; rails to
opening above stair case; post 3 1/2" x 3 1/2" post
B Balustrade and hand rail item
PROVISIONAL SUMS
Allow the following sum for work or cost which cannot be entirely
measured, defined or detailed
Metal Hand rail system;
C exterior deck sum 12,000.00
To Collection $
Project No.13012002Millenia L.D.C
Date:4/27/2012
Employer: Tomato Cafe and Deli
Consultant: Sorell Consulting
Contractor:
Construction Cost Estimate Bill No. (5): Sheet (8) of 28
DescriptionQty Unit Rate Amount
BUILDING WORKS (FITTING OUT & FINISHES) Project:Construction of , Tomato Café and
Deli
Item
No.
COLLECTION
SHEET NO. 1
SHEET NO. 2
SHEET NO. 2
SHEET NO. 3
SHEET NO. 4
SHEET NO. 5
SHEET NO. 6
To Summary $
Project No.13012002Millenia L.D.C
Date:4/27/2012
Amount
1 Preliminaries
2 External Works
3 Structures
4 Services
5 Finishes
6
GRAND SUMMARY $
Add 10 % contingencies
Subtotal
SUMMARY Project:Construction of Tomato Café
and Deli
BILL
No.Description