41
B B K K Z Z Constructions Pvt. Ltd. BKZ Construction Pvt. Ltd. Professional Builders Office Number 16, Ground Floor, Ahmed Centre, I-8 Markaz, Islamabad. Ph: 051-4864508, Fax: 051-4101739, Cell: 0345-5004101 Email: [email protected], Web: www.bkzconst.com BKZ Profile BKZ Profile

BKZ Contracting Company Profile

Embed Size (px)

DESCRIPTION

BKZ Constriction Company is working in Azad Jammu & Kashmir.BKZ Const. is Government Contractor.

Citation preview

Page 1: BKZ Contracting Company Profile

BB KK ZZConstructions Pvt. Ltd.

B K Z Construction Pvt. Ltd.

Professional Builders

Office Number 16, Ground Floor, Ahmed Centre, I-8 Markaz, Islamabad.Ph: 051-4864508, Fax: 051-4101739, Cell: 0345-5004101Email: [email protected], Web: www.bkzconst.com

BKZ Pro f i l eBKZ Pro f i l e

Page 2: BKZ Contracting Company Profile
Page 3: BKZ Contracting Company Profile

INTRODUCTION

BB KK ZZConstruction Pvt. Ltd.

Page 4: BKZ Contracting Company Profile

BKZ Construction (Pvt.) Ltd. stands for Bashir Khurshid and Zaman.

BKZ Construction Pvt. Ltd. is a successful, privately owned construction company established in 2008. It is involved in multi-disciplined building and civil engineering projects. The Company has a wide and varied client base from blue chip private sector clients to central government agencies and local authorities.

We have extensive experience across a variety of projects including commercial, industrial, distribution, leisure, retail, education, residential, prison and armed forces.

BKZ Construction Pvt. Ltd. has a history of commitment, co-operation and non adversarial contracting. By working together and maintaining client relationships we have developed a reputation for delivering successful projects, which has generated a large amount of repeat business.

BKZ Construction Pvt. Ltd. recognizes all forms of procurement, traditional tender, partnering, design and build. These have and will all contribute to the service that BKZ Construction Pvt. Ltd. offers their clients.

Our aim is to continue to provide an outstanding level of customer service. To measure the success of a project and to gauge our performance we operate an ongoing client satisfaction program. The data collected from this enables us to strive for continuous improvement. The objective is to build on the Company's strengths and the development of areas of expertise to the benefit of clients, employees and all associated with BKZ Construction Pvt. Ltd.

Safety, Health and Environment are incorporated into all the Company's activities. All employees take an active role and are totally committed to SHE.

INTRODUCTIONINTRODUCTION

Page 5: BKZ Contracting Company Profile

Our mission is to perform for our customers the highest level of quality construction services at fair and market competitive prices. To ensure the longevity of our company, through repeat and referral business achieved by customer satisfaction in all areas; including timeliness, attention to detail and service-minded attitudes. Our mission is to maintain the highest levels of professionalism, integrity, honesty and fairness in our relationships with our suppliers, subcontractors, professional associates and customers.

To deliver high-quality, cost-effective projects on schedule by employing and supporting motivated, flexible, and focused teams. We value the importance of our relationships and will continue to remain fair and true in our dealings with all employees, clients, vendors, and partners. Our clients count on our dependability, our drive, and our integrity. We take great pride in our accomplishments and build on them every day.

We offer consistent, reliable and timely service in a proactive manner. We also provide our customers with the industries highest standards of proactive management and quality of workmanship. We earn the trust of our customers by treating them as we treat ourselves, with respect, honesty and fairness.

Our personnel are the foundation of our success. We all share a cohesive vision as well as the core philosophy of BKZ Construction Pvt. Ltd. and execute both with purpose and pride. We trust and support each other. We value creativity, productivity and loyalty. The value we appreciate in each other reflects in the quality of work we produce together.

We strive to live balanced lives in work, family and play. By exercising our ethics and value's on each and every project, we cultivate the future of the company. We are as confident of our future as we are of yours. We care about our clients, their families and their future because we care about our own families, communities and future.

MISSION AND VISIONMISSION AND VISION

MISSION:

VISION:

To further strengthen and expand our new establish position and continue being the first choice for clients.

Page 6: BKZ Contracting Company Profile

ORGANIZATION CHARTORGANIZATION CHART

B K Z Construction Pvt. Ltd.

Professional Builders

Page 7: BKZ Contracting Company Profile

HR

Assis

tan

t

Dire

cto

r

Acc

ou

nta

nt

Ch

ief

Ex

ec

uti

ve

Dire

cto

r

Str

uct

ure

En

gin

ee

rM

ech

an

ica

lE

ng

ine

er

Su

b E

ng

ine

er

Sto

re K

ee

pe

r

Pla

nt / M

ach

ine

ryO

pe

rato

r

Su

rve

yor

Su

b E

ng

ine

er

Sto

re K

ee

pe

r

Fo

rem

an

Me

cha

nic

s

Sto

re K

ee

pe

r

La

bo

ur

Pla

nt / M

ach

ine

ryO

pe

rato

r

HR

Offic

eA

ssis

tan

t

Acc

ou

nts

Co

mp

ute

rO

pe

rato

r

Hig

hw

ay

En

gin

ee

r

Su

rve

yor

Fo

rem

an

La

bo

ur

Page 8: BKZ Contracting Company Profile

Nearly 6.5 million people work at approximately 252,000 construction sites across the nation on any given day. The fatal injury rate for the construction industry is higher than the national average in this category for all industries.

Potential hazards for workers in construction include:

· Falls (from heights);

· Trench collapse;

· Scaffold collapse;

· Electric shock and arc flash/arc blast;

· Failure to use proper personal protective equipment; and

· Repetitive motion injuries.

For construction, the 10 OSHA standards most frequently included in the agency's citations in FY 2004 were:

1. Scaffolding

2. Fall protection (scope, application, definitions)

3. Excavations (general requirements)

4. Ladders

5. Head protection

6. Excavations (requirements for protective systems)

7. Hazard communication

8. Fall protection (training requirements)

9. Construction (general safety and health provisions)

10.Electrical (wiring methods, design and protection)

Hazard: When scaffolds are not erected or used properly, fall hazards can occur. About 2.3 million construction workers frequently work on scaffolds. Protecting these workers from scaffold-related accidents would prevent an estimated 4,500 injuries and 50 fatalities each year.

!Scaffold must be sound, rigid and sufficient to carry its own weight plus four times the

maximum intended load without settling or displacement. It must be erected on solid footing.

EMPHASIS OF WORKER SAFETYEMPHASIS OF WORKER SAFETY

Hazards & Solutions

Solutions:

Page 9: BKZ Contracting Company Profile

Hazard: Each year, falls consistently account for the greatest number of fatalities in the construction industry. A number of factors are often involved in falls, including unstable working surfaces, misuse or failure to use fall protection equipment and human error. Studies have shown that using guardrails, fall arrest systems, safety nets, covers and restraint systems can prevent many deaths and injuries from falls.

!Consider using aerial lifts or elevated platforms to provide safer elevated working surfaces;

!Erect guardrail systems with toe-boards and warning lines or install control line systems to

protect workers near the edges of floors and roofs;

Solutions:

Fall Protection

Hazard: Ladders and stairways are another source of injuries and fatalities among construction workers. OSHA estimates that there are 24,882 injuries and as many as 36 fatalities per year due to falls on stairways and ladders used in construction. Nearly half of these injuries were serious enough to require time off the job.

!Use the correct ladder for the task.

!Have a competent person visually inspect a ladder before use for any defects such as:

! Structural damage, split/bent side rails, broken or missing rungs/steps/cleats and

missing or damaged safety devices;

! Grease, dirt or other contaminants that could cause slips or falls;

! Paint or stickers (except warning labels) that could hide possible defects.

! Make sure that ladders are long enough to safely reach the work area.

!Mark or tag ("Do Not Use") damaged or defective ladders for repair or replacement, or

destroy them immediately.

!Never load ladders beyond the maximum intended load or beyond the manufacturer's rated

Solutions:

Ladders

Page 10: BKZ Contracting Company Profile

B K Z Construction Pvt. Ltd.

Professional Builders

DIRECTORSDIRECTORS

Page 11: BKZ Contracting Company Profile

Muhammad Zaman

Muhammad Khurshid

Muhammad Bashir

Qualification:Experience:

Matric25 years construction experience.

Qualification:Professional Qualification:Experience:

Graduation (Economics)3 years diploma in Construction5 years experience in Construction

Qualification:Experience:

Matric10 years construction experience.

Page 12: BKZ Contracting Company Profile

PROJECTS OF B K Z PROJECTS OF B K Z

B K Z Construction Pvt. Ltd.

Professional Builders

Page 13: BKZ Contracting Company Profile

Contract Identification ClientStartingMonthly /Year

CompletionMonth /Year

TotalContractAmount (Rs.Million)

PWD Project serraDRU Package SidpurMuzaffarabad, AJK

PWD Project DRUPackage TehsilAthmukam, DistrictMuzaffarabad, AJK

Private ProjectAl-Haram CityRawalpindi

PWD

PWD

Private

March 2009

July 2009

January 2010

March 2010

March 2010

January 2011

48.153million

30 million

100 million

PROJECTSPROJECTS

PWD Project serraDRU Package TalgranGHS Rajpaian,Muzaffarabad, AJK

PWD In Process 26.2million

PWD Project serraDRU Package GundigranDIU, Muzaffarabad, AJK

PWD In Process 35million

Page 14: BKZ Contracting Company Profile

TECHNICAL

&

NON-TECHNICAL

STAFF

TECHNICAL

&

NON-TECHNICAL

STAFF

Page 15: BKZ Contracting Company Profile

NamePresentPosition

QualificationTotal

ExperienceYears with

Firm

Muhammad ZamanSheikh

Chief Executive Matric 22 years 2 years

Muhammad Khurshid DirectorB.A

3 years Diplomain Construction

05 years 2 years

Muhammad HassanAccountant / HR Advisor

MS.cManagement

(HRM) UKMBA (Finance) PK

20 years 2 years

Aamer Mubarak Civil Engineer F.Sc. 01 year 01 year

Rana Abdul Hameed Civil Engineer F.Sc. 05 year 01 year

Irshad Gul

Muhammad Bashir

Abdul Qadeer

Rana Mohsin

Ch. Muhammad Usman

Raja Muhammad Bilal

Muhammad Naseer

Raja Muhammad Ashaq

Abdul Qadeer Khan

Muhammad Fareed

Rana Muhammad Bashir

Site Engineer Civil Engineering 01 year 6 months

Site Supervisor Matric 10 years 02 years

Supervisor B.A 01 year 01 year

Engineer DAE 01 year 01 year

Surveyor Diploma inSurveyor

03 years 08 months

Surveyor 05 years 01 year

Surveyor 03 years 02 years

Surveyor 05 years 03 months

Accountant B.Com 03 years 01 year

ComputerOperator I.Com 01 year 06 months

Accountant B.A 01 year 05 months

Diploma inSurveyor

Diploma inSurveyor

Diploma inSurveyor

LIST OF STAFFLIST OF STAFF

Page 16: BKZ Contracting Company Profile

MACHINERY

&

EQUIPMENTS

MACHINERY

&

EQUIPMENTS

Page 17: BKZ Contracting Company Profile

LIST OF MACHINERYLIST OF MACHINERY

S.NO NAME OF MACHINERY QTY.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

Dozer CAT D-9H

Excavator Wheel Type Back - Hoe Hydraulic Caterpillar

Excavator Track Chain Type Back Hoe Hydraulic CAT 225

Loader CAT950-B

Loader CAT 950-E

Loader CAT950-A

Tractor Hydraulic

Water Bozer

Dump Truck Rear Hydraulic

Dump Truck Bottom Hydraulic

Concrete Mixer Machine

Diesel Generator

Level Machine of Different Brand

Guarder Shuttering 30m Length 2100mm Height

Gauder Shuttering 25m Length & 1700mm Height

Concrete Vibrators of Different Types and Different Brands

Generator of Capacity 5 to 15 KVA

Generator of Capacity of 500 KVA

Generator of Capacity of 100 KVA

03

04

02

05

02

02

02

05

07

01

15

05

05

01

01

10

05

03

04

Rented

Rented

Page 18: BKZ Contracting Company Profile

CLIENTAGE LISTCLIENTAGE LIST

Gwadar Development Authority, Govt. Of Balochistan.

Building and Road Department, Govt. Of Balochistan.

Education Department, Govt. Of Pakistan.

World Bank

Coast Guard, Govt. Of Pakistan

ERA, Govt. Of Pakistan.

SERA (State Earthquake Rehabilitation Authority), Govt. Of AJ&K

NESPAK, Pakistan

DRU Muzaffarabad, Govt. AJ&K

Public World Department, Govt. Of AJ&K

Education Department. Govt. Of AJ&K

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

Page 19: BKZ Contracting Company Profile

REGISTRATION

&

AFFILIATION

REGISTRATION

&

AFFILIATION

FBRPAKISTAN

Page 20: BKZ Contracting Company Profile
Page 21: BKZ Contracting Company Profile
Page 22: BKZ Contracting Company Profile

FBRPAKISTAN

Page 23: BKZ Contracting Company Profile
Page 24: BKZ Contracting Company Profile
Page 25: BKZ Contracting Company Profile
Page 26: BKZ Contracting Company Profile

BANK SBANK S

B K Z Construction Pvt. Ltd.

Professional Builders

Page 27: BKZ Contracting Company Profile
Page 28: BKZ Contracting Company Profile

3 0 , 6 5 0 0 0 . 0 0***********

( u h t L o n n )R p e e s T i r y a c s S i x t y F i v e T h u s a d s o l y

Page 29: BKZ Contracting Company Profile

FINANCIAL STATEMENTFINANCIAL STATEMENT

B K Z Construction Pvt. Ltd.

Professional Builders

Page 30: BKZ Contracting Company Profile
Page 31: BKZ Contracting Company Profile
Page 32: BKZ Contracting Company Profile
Page 33: BKZ Contracting Company Profile
Page 34: BKZ Contracting Company Profile
Page 35: BKZ Contracting Company Profile
Page 36: BKZ Contracting Company Profile
Page 37: BKZ Contracting Company Profile
Page 38: BKZ Contracting Company Profile

AUDITOR’S REPORTAUDITOR’S REPORT

B K Z Construction Pvt. Ltd.

Professional Builders

Page 39: BKZ Contracting Company Profile
Page 40: BKZ Contracting Company Profile
Page 41: BKZ Contracting Company Profile