BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

Embed Size (px)

Citation preview

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    1/37

    Technical Site Survey Report - Existing Site

    Site Name: Site ID:

    Site Address:

    Latitude: Longitude:

    Altitude: 28 m Site Owner:

    Landlord / Building Management Contact:

    Access Hour: 24 hours Limited, from ___ - ___

    DIGI

    N/AN/A

    Penang

    5.30044 100.26097

    KOMPLEKS TABUNG HAJI 4063AU

    RENTOKIL, No.23-D, Lebuh Maccallum,

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    2/37

    Site Information

    Site Type: RT GF IBC RT & IBC Site Category: DiGi SBC ES Other Operator Share

    Building Category: Residential Industrial Commercial Other : TM Exchange

    Structure Type:

    Structure Height: 6m

    3G BTS Equipment:

    Transmission Information

    Rectifier

    Existing Information

    Current Vendor

    Equipment Model

    Description Condition

    GOOD

    Indoor Outdoor

    GOOD

    Number of Rectifier Modules 6

    Brand & Model

    Existing Total DC Loading

    EMERSON

    73A

    System Configuration

    HUAWEI

    BBU3900

    S3 + 3 + 3

    Equipment Model PASOLINK

    System Configuration NA

    Current Vendor NEC

    Leasing E1

    BNC

    E1 Routing

    E1 Cable Length

    TM Celcom Maxis Other:_DIGI_____________

    DiGi DDF Supplier DDF DiGi DDF to Supplier DDF

    10m

    Concrete Pole RT Pole

    3L T 4L T MP MP3 LP BB MiniMast Mini Monopole Unipole

    Supplier

    DDF Connector

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    3/37

    DCPDB (if available)

    Battery

    ACPDB

    Model NA NAVentilation Fan

    NA

    GOODAvailable Not Available

    N/A N/A

    Description Condition

    GOOD

    Description

    Down Conductor

    Air-condi tioner System

    Grounding Cable

    Earthing Reading

    GOOD

    GOODInternal Ground Bar

    Description Condition

    DCPDB total load (sys A & B)

    Available Not Available

    Available Not Available

    Grounding System

    N/A

    N/A N/A

    Main incoming breaker per feed

    (Amp)

    NA N/A

    Spare Breaker (Amp) N/A

    N/A

    Total capacity (number of bank x

    Ah)

    48 x 200 AH Good

    Battery installed since (year) NA -

    N/A

    N/A

    N/A

    Available Not Available

    NA

    Condition

    External Ground Bar

    Space for additional Breaker

    Description Condition

    Capacity and Quantity

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    4/37

    RF Antenna Information: (3G)

    RF Antenna Pole / Boom Information:

    Cable Ladder Information

    Sector 1 Sector 2 Sector 3

    Condition

    Source TNB Tapping Good

    AC Pow er Supply

    Description

    RCU RCU RCU

    0

    Brand & Model KATHREIN 742236 KATHREIN 742236 KATHREIN 742236

    Type of Antenna 1800/2100 DB 1800/2100 DB 1800/2100 DB

    150 290

    Antenna Height (AGL) 25.0M 25.0M 25.0M

    Antenna Azimuth 30

    N/A N/A

    Sector 1

    Jumper Length (m) 6m X 2 LENGTH 6m X 2 LENGTH 6m X 2 LENGTH

    Mechanical Tilt

    Electrical Tilt

    Type of Jumper 1/2" 1/2"

    Connector Type 7/16" 7/16" 7/16"

    CPRIType of Feeder CPRI CPRI

    1/2"

    0 0

    NA NA NA

    76 76

    Angle Between Supports (angle

    between 2 supports at pole

    70M X 1 LENGTH

    Sector 3

    Support Length (m) 5m 5m

    2.0 2.0

    NA

    Size

    Floor Mount300x300mm

    Wall Mount / Floor MountFooting Type & Size

    Floor Mount

    if tapping, indicate from where

    Feeder Length (m)

    300x300mmFloor Mount

    76

    300x300mm

    5m

    NA

    Space Availabilit y

    NA

    Pole Diameter (mm)

    2.0

    Sector 2

    Pole Height (m)

    N/A

    Support Height (m)

    Model of TMA N/A N/A N/A

    Model of RET K 86010025 K 86010025 K 86010025

    Duplexer / Triplexer

    Pole Type (Boom / Bipod / Tripod) BOOM BOOM BOOM

    70M X 1 LENGHT 70M X 1 LENGTH

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    5/37

    Microwave Pole / Boom Information

    Cabin / Equipment Room Information

    Others Information:

    N/A

    Pole Height (m) 3.0 N/A N/A

    70 N/A N/A

    N/A

    N/A N/A N/A

    Support Length (m) N/A N/A N/A

    Space Available (indicate in

    drawing with dimension) YES

    CABIN 6300X2100X3000

    Floor / Site Cleanliness (photo) YES

    Cabin / Room Size (H x L x W)

    N/AFooting Type & Size NA N/A

    Wall Mount / Floor Mount NA N/A N/A

    Support Height (m)

    Pole Diameter (mm) 91 N/A

    MW 1 MW 2 MW 3

    N/A

    Antenna Azimuth

    Angle Between Support (angle

    between 2 supports at pole N/A

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    6/37

    Equipment Information

    BBU 3900

    BBU Power Supply

    APM 19" Open Rack Existing 19" Rack HUAWEI TMC CABINET

    S2/2/2 S1/1/1/1 Others______________

    Grounding Cable For 19" rack to

    IGBNA

    APM SPB DDF Panel DCDU Eltek TRM

    System Configuration

    Proposed Equipments (3G)

    DC Power Cable Length (from

    rectifier to DCDU + BBU) 2m 5m 10m Other: 20m

    Installation Type

    Quantity of BBU

    Type of Auxiliary Products

    1 no. / nos.

    BBU Dry Contact Alarm CableLength

    Quantity

    N/A

    N/A

    Additonal Information PROPOSED NEW DCDU-B FOR BISECTOR RRU

    BBU - Transmission Information

    BBU Trunk Cable (E1

    between BBU and

    DDF)Trunk Cable (E1

    between DiGi DDF

    and other operator

    DDF, if required)

    75E1

    BNC

    Grounding Cable For APM

    N/A

    10M

    Grounding Cable For DCDU

    Type of Trunk

    Type of Connector

    (from BBU to DDF)

    lub Trunk Cable

    1 m

    NA

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    7/37

    Proposed RRU location:

    Bottom of tower with 1.5m @76mm pole Tower platform Antenna Pole

    Bottom of tower leg Cabin wall BTS 3900 in Cabin

    Tower leg near Antenna Building Wall Plinth Wall

    No. of RRU: 3 required.

    Other: (specify): PROPOSED BISECTOR RRU MOUNT ON RRU POLE, SHARE WITH EXISTING 3G R

    RRU Power Supp ly & CPRI Interface

    Additonal Information PROPOSED BISECTOR RRU MOUNT ON RRU POLE, SHARE WITH EXISTING 3G R

    NN/A

    N/A N

    N/A NCPRI Cable BBU - RRU

    Sector 1

    60m X 1 length

    25mm X 6.0m

    Sector 2 Sector 3

    Grounding Cable RRU - busbar

    Power Cable DCDU- RRU

    70m X 1 length

    Antenna & Feeder Information

    Antenna height (AGL/m)

    Antenna Azimuth

    Antenna Mechanical Tilting

    Antenna Electrical Tilting

    No. of antennas (no)

    Type of antennas

    Antenna gain

    Feeder Size

    Feeder Quantity

    Connector (Type and Qty)Type of jumpers

    Jumper Quantity

    Connector (Type and Qty)

    STMA N/A

    RCU

    N/A

    N/A

    N/A

    TenXc Wideband

    Sector 1 Sector 2

    N/A

    N/A 1/2"N/A

    N/A

    N/A

    N/A

    N/A

    NA

    N/A

    7/16" Male X 4

    N/A

    N/A

    N/AN/A

    N/A

    N/A

    N/A

    N/A

    N/A

    N/A

    N/AN/A

    0

    NA

    N/A 6.0m X 2 length

    N/A 25m

    N/A 0

    N/A

    NA

    1

    18 dBi

    150

    Sector 3

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    8/37

    Attach w ith ACAD drawings.

    Proposed Pole For 3G Antenna

    New Pole (Tower, MP, MT Site)

    Pole Bracket

    Add in New Tripod (Rooftop Site)

    Add " Triangle" Bracket

    Add "Ring" Bracket

    Add in New Mini Monopole (Rooftop Site)

    New Pole Height (m)

    New Pole Diameter (mm)

    NA

    NA

    Swapping Existing 76mm Pole

    Add in New Bipod (Rooftop Site)

    Add in New Wall Mounted (Rooftop Site)

    N/A

    NA

    Sector 1

    2m

    N/A

    NA

    Sector 2

    0.5m

    NA

    Proposed CME Works

    N/A

    NA

    Sector 3

    Yes No

    Yes No

    N/A

    N/A

    N/A

    N/AN/A

    NA

    NA

    2

    78

    N/A

    N/A

    N/AN/A

    Add Support

    Others Information:

    Cable Ladder

    Other Information:

    Add "H" Bracket

    Add "Y" Bracket (for MP & Tower site)

    Yes No

    Yes No Yes No

    300mm

    600mm

    Inside Cabin (200mm)

    At Tower / MP / MP3 / BB (300mm)

    Yes No

    Yes No

    Yes No

    Yes No

    450mm N/A

    N/A

    Sector 1 Sector 2

    N/A

    N/A

    Yes No

    N/A N/A

    NA

    N/A

    Yes No

    200mm

    Sector 3

    N/A

    N/A

    N/A

    N/A

    N/A

    N/A

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    9/37

    Power Supply Unit (Rectifier)

    Brand Model Capacity Qty

    N/A N/A N/A N/AN/A N/A N/A N/A

    N/A N/A N/A N/A

    N/A N/A N/A N/A

    N/A N/A N/A N/A

    Feeder Inlet: Existing space available

    Propose New Roxtec,

    Specify size and location

    Upgrade Breaker

    New Eltek TRM (outdoor site)

    Replace Obsolete Rectifier with

    Eltek

    Upgrade Module

    Upgrade Battery

    DDF Panel: Existing, attach photo

    New, Specify size and location

    Equipments Footing:

    Concrete Plinth I-beam C-Channel

    Others:

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    10/37

    Site Photos

    Front View 2G Sector 1_____

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    11/37

    3G Sector 1 : 30

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    12/37

    3G Sector 3 : 290

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    13/37

    Existing Equipments 1

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    14/37

    Existing Cable Routing 1 Existing Cable routing 2

    N/A

    Existing Cable Routing 3 Existing Cable routing 4

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    15/37

    Panoramic View 0

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    16/37

    Panoramic View 60

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    17/37

    Panoramic View 120

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    18/37

    Panoramic View 180

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    19/37

    Panoramic View 240

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    20/37

    Panoramic View 300

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    21/37

    Proposed 3G Sector 1 View : 30

    Proposed remain existing 3G DualBand

    Anttena for Sector 1 on existing 2m

    Antenna Sub PoleHeight : 25.0m AGL

    Direction : 30

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    22/37

    Proposed 3G Sector 2 View : 150

    Proposed new 3G TenXc wideband Bisector

    Ant for Sector 2 on new 2m Antenna Pole

    and bracketHeight : 25.0m AGL

    Direction : 150

    Proposed remain existing 3G DualBand

    Anttena and 3G jumper to new connect to

    new TenXc wideband Bisector Ant for Sector 2Height : 25.0m AGL

    Direction : 150

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    23/37

    Proposed 3G Sector 3 View : 290

    Proposed to remain existing 3G DualBand

    Anttena for Sector 3 on existing 2m

    Antenna PoleHeight : 25.0m AGL

    Direction : 290

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    24/37

    Proposed Equipment Location

    Proposed add DCDU-B for Bisector RRU on

    existing 19'' Rack

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    25/37

    Photomontage for RRU sec-1 Photomontage for RRU sec-2

    Proposed remain sec-1 RRUProposed new Bisector

    sec-2 RRU

    Photomontage for RRU sec-3 Photomontage for Cable Routing

    Proposed remain sec-3 RRU

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    26/37

    Existing ACPDB View

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    27/37

    Proposed DCDU-B 50A DC Breaker

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    28/37

    Site Access Site Access

    Site Access Site Access

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    29/37

    Evidence : Batteries Rack Full View

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    30/37

    Evidence : MGB External, Inlet MGB Evidence : MGB External, near Antenna

    Evidence : MGB , room Inlet Evidence : Ground cable chamber

    E i ti 3G C dit i (S t 1)

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    31/37

    Existing 3G Condit ion (Sector 1)

    3G Sector 1: Antenna Condition

    3G Sector 1: Sector View

    Existing 3G Conditi on (Sector 2)

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    32/37

    Existing 3G Conditi on (Sector 2)

    3G Sector 2: Antenna Condition

    3G Sector 2: Sector View

    Existing 3G Conditi on (Sector 3)

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    33/37

    Existing 3G Conditi on (Sector 3)

    3G Sector 3: Sector View

    3G Sector 3: Antenna Condition

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    34/37

    Huawei Technologies (M) Sdn. Bhd.

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    35/37

    ROOF PLAN (NEW)

    Huawei Technologies (M) Sdn. Bhd.

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    36/37

    VIEW 'A' (NEW)

    Huawei Technologies (M) Sdn. Bhd.

  • 8/9/2019 BiSectorTSSR_4063A KOMPLEKS TABUNG HAJI REV A.pdf

    37/37

    Huawei Technologies (M) Sdn. Bhd.