Upload
jrvinod
View
219
Download
0
Embed Size (px)
Citation preview
8/13/2019 Before Junior Engineer
1/3
CURRICULAM VITAENAME
S/o-ABC
At/Po-XXXXVia-ABC,Dist-ABC,
Pin-700001(State)Phone: 999999999
E-Mail:[email protected]
CAREER OBJECTIVES
Want to involve myself in a challenging environment offering scope for Growth
& Development and an opportunity to apply my learning to effectively contribute towards the
achievement of the organizational objective.
EDUCATIONAL BACKGROUND Degree : B.Tech (AE&I).
Institute : ABC Institute Of Engineering & Technology (ABC).University : ABCUNIVERSITY AND TECHNOLOGY (ABC).
C.G.P.A : 7.31(73%).
Degree : 12
th
.Institute : ABC college in March 2005
University : CHSE.
Marks : 57.33%.
Degree : 10th.Institute : ABChigh school
University : ABC.
Marks : 76.80%.
[
SOFTWARE SKILL
Operating System : MS-DOS, WINDOWS7/xp /vista,
Language : C, C++
Database : RDBMS
8/13/2019 Before Junior Engineer
2/3
WORK EXPERIENCE
Job post : Graduate Engineering Trainee in Power Plant Instrumentation Deptt.
Company Name : ABC and Power Limited, State.
Company Details : Power Plant with 2 AFBC (1!54 TPH and 1!51 TPH) Boilers, 3
WHRB (3!10.2 TPH) Boilers and 2 TGs (1!32 MW and 1!15 MW).
Responsibilities : Calibration of Transmitters using HART COMMUNICATOR,Calibration of pressure gauge & pressure switch using dead weightcalibrator & pressure precision calibrator, Calibration i/pconverter and
e/p converter using MILLIAMP SOURCE and MULTIMETER
,Calibration of control valves using Milliamps source, Maintenances
and operation of Control valves (Air to open & Air to close), totalizedflow meter, ON-OFF Power cylinder, Regulated Power Cylinder, Autodrain valves, Solenoid valve, Operations of Elgi types compressor,
Detail knowledge on Temperature gauge, Thermocouple, RTD, I/Pconverter, Positioner, Position Transmitter, Pressure switch, Level
switch.
Job period : 02ndFebruary, 2010 to 15th January, 2011.
Job post : ASST. ENGGin Power Plant Instrumentation Deptt.
Company Name : ABC and Power Limited, Jamuria, State.
Company Details : Power Plant Projectwith 1 AFBC (54 TPH) and 1 CFBC (135 TPH)
Boilers , 6 WHRB (4 !10.2 TPH and 2!38 TPH) Boilers, 2 TGs (1!18MW and 1!43 MW).
Responsibilities : Sizing and Selection of Control Valve ,Indenting works for Power Plant
Project (Instrument Department),Knowledge of DCS & PLC,preparation of IO list, Instrument list logic diagrams etc.Knowledge of Instrument Specifications. Knowledge of variousInstrumentation International Standards .Operation andmaintenance of PLCs, Maintenance and calibration of fieldinstruments used in SID and Ash Handling System. Erection of DCS
panels,HMI and field instruments.
Job period : 15thJanuary, 2011 to till date.
[
SALARY DETAILS:
RECENT SALARY: 2.94 lakhs per anum
EXPECTED SALARY: 3.60 lakhs per anum
ACADEMIC TRAINING
8/13/2019 Before Junior Engineer
3/3
Title : Programmable Logic Control (PLC)"
Duration : From 10th June 2008 to 09th July 2008
Client : Central Tool Room & Training Centre
ACADEMIC PROJECT
Title : Cooling Tower Optimisation
Client : GIET, Gunupur.
Title : !" $ %&% '()*+ ,-+.)/0,(1 )*2.0,/3 )3)/*4
Client : !"#$%&' $)"*#*#+ "#, -)./01$ 10#$)0, Bhubaneswar
ACADEMIC SEMINAR
Title : cellonics, code division duplexing.
Client : ABC Institute of Engineering and Technology (GIET)
PERSONAL PROFILEFathers Name : XXXXX
Date of Birth : XXXXXX
Branch : Applied Electronics & Instrumentation.
Marital Status : Single
Gender : Male
Nationality : Indian
Religion : Hindu
Language Known : English, Hindi, Odia, Bengali
Area of Interest : Internet surfing, searching for new ideas Thoughts
Things, Playing Cricket, Pc Games.
!$)0#+$%' : Dedicated towards my job, Confidence, Cool and Calm
Thinking, Strong Determination, Highly Ambitious,Tackle any type of situation
DECLARATIONI hereby declare that all the informations given above are true to the best of my knowledge.
DATE: 03.07.2012 ABC
PLACE: ABC (Signature)