3
TRM 72 TRM 72 270x240 270x240 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 120° 33 30 30 30 ø 24 TRM 72 60 TRM 72 60 TGE TGE 72 60 TE 60 60 TE TE TRM 72 TRM 72 90 TE TE TRM 72 TRM 72 TRM 72 TRM 72 30 30 TAR 85 TAR 85 270x240 270x240 TRS 90 TRS 90 TRS 90 TRS 90 240 TE 120 120 240 240 240 60 TRM 72 TAR 85 TAR 85 TAR 85 60 TE TAR 85 60 75° 270 x 240 270 x 240 TRM 72 60 TGE TGE 60 TAR 85 TRM 72 TAR 85 TAR 85 TRM 72 TGE 30 TGE TRM 72 TAR 85 TRM 72 60 TAR 85 TAR 85 TRM 72 TGE TAR 85 TRM 72 60 TAR 85 TRM 72 TAR 85 TRM 72 60 TGE TGE TAR 85 TRM 72 60 TAR 85 TRM 72 TE 60 72 TE TE TE 60 60 TAR 85 TE 60 72 30 30 9. 4. 2. 3. 5. 7. 6. 72 60 TE 60 72 TE 72 72 90 TE TE 90 TE TE 90 TE TE 90 TE TE 90 TE TE 120 TE TE TRM 72 TRM 72 Betriebsanleitung TRIO Versetzhaken 1,5t Art.-Nr. 023690 TRIO Kombigehänge-2 Art.-Nr. 044760 Betriebsanleitung Paletten und Stapelrungen Betriebsanleitung G S V PERI TRIO Rahmenschalung Prüfbericht Ausgabe 10/95 G S V geprüft durch neutrales Prüfinstitut Güteschutzverband Betonschalungen Push-Pull Props and Kicker Braces The panel formwork with the BFD coupler system *If necessary, the distance from top of formwork must be adapted to the system. A maximum force of 11.3 kN is to be led into the building at the foot of the push-pull-prop for the given width of influence. Wind loads: h < 8 m = 0.5 kN/m 2 8 m < h < 20 m = 0.8 kN/m 2 Formwork height h [m] Fig. 2 Fig. 1 Table for PERI Push-Pull Props and Kicker Braces Edition 02/2008 Since production began, TRIO has always fulfilled the highest requirements regarding the formwork evenness. 2.70 m steel elements have been certified according to GSV guidelines (German Formwork Association). 81 kN/m 2 uniform area load, DIN 18202, Table 3, Line 6. 67.5 kN/m 2 triangular load, DIN 18202, Table 3, Line 7. Permissible fresh concrete pressure for aluminium elements 60 kN/m 2 uniform area load, DIN 18202, Table 3, Line 7. 60 kN/m 2 h = 2.70 m, DIN 18202, Table 3, Line 6. For standard element joints On external corners For timber extensions With filler timber up to 100 mm 7. Bulkhead Formwork Using the TRIO MT/MTF stopend panel with continuous reinforcement, with or without water bars. MT centre part, without water bar MT centre part, with water bar 2. Length Adjustment Simple and fast solution. With timber, or timber and formlining, and BFD alignment coupler up to 100 mm. 4. Oblique Angles TRIO articulated corner TGE – for internal and external corners alike. 5. Wall Offsets Up to max. 200 mm Stopend tie max. 86 cm min. 20 cm Timber Hook tie DW 15/400 Additional BFD for 120 mm offsets upwards Lower TAR 85 to be fixed from below Filler timber max. 200 3. Corners Basic rules for corners Wall thicknesses 180 – 400 mm Adaptation to wall thickness using wall thickness compensation WDA 5, WDA 6 or timber infills Internal formwork: With TRIO Corner TE Connection: 2 BFD alignment couplers for h = 2.70 m 6. T-junctions Basic rules for T-Junctions Wall thicknesses 180 – 400 mm and 600 mm External formwork: with panel TR 90 Internal formwork: with TRIO Corner TE Adapting to wall thicknesses using wall thickness compensation WDA 5, WDA 6 or timber infills. Up to max. 860 mm Working Platforms Planking and Guardrails Working platforms are to be assembled according to current valid guidelines. Maximum spacing of the scaffold brackets = 1.35 m with a permissible load of 150 kg/m 2 . Scaffold Bracket TRG 80 Item no. 023670 TRG 120 Item no. 023680 9. Shafts The TRIO TSE shaft element allows complete shaft formwork units to be moved as one unit. Shaft Panel TSE 270, Item no. 105523 TRIO shaft panel TSE in a raised position. When striking, lever crowbar upwards. For rectangular shafts, shorten the chains on the longitudinal sides – this ensures that all shaft elements are evenly loaded. Concreting Platform 120 x 270 Item no. 022950 A single platform unit is only 320 mm high when folded. Each additional unit adds only 170 mm in height. 13 concreting platforms (35 m) stacked on top of each other is equal to the loading height of a truck. 1466 320 170 Transport and Storage Lifting Gear Combi-2 TRIO Perm. load 2.9 t with 45° angle of spread of the lifting gear. The pins are used to move stacks of panels located on the ground. TRIO lifting hooks or TRIO stacking devices are attached to the load hook. Follow instructions for Use! Stacking Device TRIO, galv. Perm. load 500 kg/piece. For safe stacking of 5 TRIO panels of any size. Follow instructions for Use! Extensions Alignment couplers and all-round struts ensure that extensions with TRIO are simple and easy. Extensions up to max. 8.10 m high (3 panels at 2.70 m) can be assembled as one unit. Four BFD couplers are required for 2.40 m or 2.70 m wide panels for extensions up to 5.40 m. Two TAR 85 compensation walers and two BFD alignment couplers are required for extensions up to 8.10 m. Compensation Waler TAR 85 Item no. 023550 Extension Units (Steel) Formwork should be assembled to its full height on the ground! TRIO Panels Lifting Hook TRIO Maximum load capacity of 1.5 t, max. lifting gear angle of 30°. Always use in pairs! Follow instructions for Use! Instructions for Use Lifting Gear Combi-2 TRIO Push-pull props and kickers to brace the formwork and bearing the windload are to be arranged as shown on the adjacent diagram and table. The first panel must always be braced with 2 push-pull props and subsequent panels Stacking Device TRIO Item no. 023390 Lifting Gear Combi-2 TRIO Item no. 044760 Lifting Hook TRIO Item no. 023690 8. Wall Connections 2. With WDA or timber 3. With TRM 72 3. With TR 30 1. With 270x240 2. With TRM 72 Handrail Post Holder TRIO Item no. 101592 > 3.00 m 2 WDA 5 (6) Timber supplied by contractors for special wall thicknesses x WDA 5 (6) max. 360 6 – 300 max. 100 TAR 85 TAR 85 TAR 85 Variable filler timber 200 (180) 250 (240) 300 350 (360) 400 WDA 5 (6) 1. Standard Panel Connections 2.70 m 2 BFD alignment coupler Item no. 023500 for 2.70 m panel heights. 60 Filler timber Filler timber Filler timber Filler timber Corner construction: 600 mm wall thickness Perm. fresh concrete pressure 60 kN/m 2 . Corner construction: 80 cm wall thickness Perm. fresh concrete pressure 60 kN/m 2 . L L L L Important: Along the length L of 2.25 m, 3 BFD alignment couplers are required per element joint. 240 240 TE 90 90 TRM 72 240 240 60 800 600 600 800 1.93 9.4 9.5 2.6 4.3 2.6 1.5 4.5 1.67 11.3 8.5 2.3 4.7 2.6 1.8 5.5 1.49 11.3 9.3 2.1 5.3 2.8 1.8 6.2 1.35 11.3 10.1 1.9 5.9 3.0 1.8 6.9 3.53 9.7 2.1 1.2 1.0 2.73 9.7 2.3 1.6 1.2 2.19 9.8 2.2 2.0 1.5 1.82 9.8 2.2 2.4 1.8 1.58 9.8 2.3 2.9 2.0 1.42 9.6 2.6 3.5 2.0 4.0 5.0 7.0 8.0 6.0 9.0 10.0 11.0 12.0 3.0 F RS1 F RS2 x 1 x 2 y 1 y 2 165° 150° 135° 75° Height Width 270 240 120 90 72 60 30 TE TGE TGE TE 240 / 270 Internal Internal External External 300 330 or TRIO 330 360 390 450 480 540 Height Width m 2 Item no. Weight m 2 Item no. Weight m 2 Item no. Weight m 2 Item no. Weight m 2 Item no. Weight 6.48 022570 329.00 kg 3.24 022510 162.00 kg 1.44 022600 76.30 kg 1.08 023900 33.30 kg 2.43 022520 115.00 kg 1.08 022610 58.20 kg 0.54 022790 34.70 kg 2.43 023850 70.60 kg 1.62 022550 87.70 kg 0.72 022640 43.40 0.36 022810 25.90 kg 1.62 023870 49.60 kg 0.54 023950 18.00 kg 0.81 022560 60.60 kg 0.36 022650 28.40 kg 0.18 022820 15.70 kg 0.81 023880 31.70 kg 0.27 023960 10.80 kg 1.94 022530 97.60 kg 0.86 022620 48.60 kg 0.43 022800 29.10 kg 1.62 022580 69.80 kg 0.72 022660 33.20 kg 0.36 022840 18.00 kg 1.62 023891 42.10 kg 0.54 023971 15.20 kg TAE TAM 72 1.94 022540 103.00 kg 0.86 022630 56.20 kg 1.94 023860 60.90 kg 0.65 023980 23.70 kg Multi-purpose panel with continuous tie hole strip Hinged corner from 75°-285° for inner and outer corners 1.62 023200 94.80 kg 0.72 032300 43.60 kg Inner corner with 30 cm leg length 0.72 022640 43.40 kg according to the table. They are connected to the panel with the TRIO Brace Connctor and to the slab with the appropriate base plate and the PERI anchor bolt MMS 20x130 . Shaft Panel TSE 120, Item no. 105524 The concrete cover c is 25 mm or 50 mm. Instructions for Use Lifting Hook TRIO Foundations Individual foundations with TRIO foundation strap Item no. 023800 Strip foundations with Foundation Tie Clamp Item no. 023010 Perforated Foundation Tie Item no. 023020 Top Tie Bracket-2 AH Item no. 023630 Stopend tie Scaffold Bracket TRG 100/112 Item no. 023590 600 Important: Along the length L of 3.00 m, 3 BFD alignment couplers are required per element joint. Universal Waler 245 Item no. 023920 Waler Stop Item no. 023930 Tie Rod Cylinder Yoke Item no. 022030 Compensation Waler TAR 85 Item no. 023550 Tie hole positions Unused tie holes Compensation waler TAR 85 BFD alignment coupler For assembly of base plates. PERI anchor bolt MMS 20x130 Item no. 103606 TRIO Column With elements for walls and columns Can be used as column panels for cross- sections of up to 750 x 750 mm. Used in the wall as “standard” 900 mm formwork panel. Permissible fresh concrete pressure 100 kN/m 2 . External formwork: with multi-panel TRM 72 and articulated corners External element connection: 2 compensation walers TAR 85, 6 BFD couplers Internal formwork: with TR 60 or TR 30 panels and articulated corners Internal element connection: 4 BFD couplers Tie details Articulated Corner TGE 270 Item no. 023200 Articulated Corner TGE 120 Item no. 023300 Cost-effective solution. With filler plates from 60 – 360 mm. LA 270, Item no. 023170 LA 120, Item no. 023270 Optimal visible surface solution. With formlining and filler support. TPP, Alu 270, Item no. 101813 TPP, Alu 120, Item no. 101823 max. 2.10 m or width of influence 1.35 m Test report available on request. External formwork: With TR 72 panels or TRM 72 and TR 60 Connection: 5 BFD alignment couplers for h = 2.70 m 4. With WDA or timber infills WDA 5/6 1. With 270x240 Filler timber Filler timber Filler timber BFD alignment coupler Filler plate LA Filler support TPP Formlining Only one component is required for all connections The TRIO BFD alignment coupler ensures that all panel joints are: flush aligned tight in only one step! Foundation strap Top tie bracket-2 AH Foundation tie clamp Perforated foundation tie Handrail Post HSGP Item no. 034580 Accessories: Handrail Post HSGP Item no. 034580 TGE TGE TGE 60 30 max. 750x750 Ready-to-use 5.40 m high TRIO column formwork with concreting platform, access ladder and push-pull props. For square or rectangular columns up to 750 x 750 mm. h y y x x 60° F RS 1 F RS 2 F AV 0,5 kN/m 2 0,5 kN/m 2 0,8 kN/m 2 60° 60° Fig. 1 Fig. 2 h h y x F AV F RS 60° 0,5 kN/m 2 Stop rail Without exception, current safety regulations must be observed in those countries where our products are used. Tips for trouble-free progress Spray formwork on all sides with PERI BIO Clean before every use. Spray back of formwork with water immediately after concreting to reduce the cleaning work. Always start at a corner or difficult area. Pay attention to the wall thickness. See corners. Only use the required number of ties. Unused tie holes must be sealed with plugs ø 20/24, item no 030300. More information can be found in the TRIO Assembly Instructions. Actual kicker load F AV [kN] at maximum spacing Allowable prop spacing [m] (max. width of influence) Actual prop load F RS [kN] at maximum spacing *Top connection point [m] from top of formwork y = Distance of base plate [m] from rear face of formwork x = 240 120 90 60 30 TE 72 TRM 72 TGE 2.88 022514 163.00 kg TR 270 TR 120 TR 60 TRA 270 TRA 90 300 200 (180) 250 (240) 350 (360) 400 WDA 10 Instructions for Use Pallets and Stacking Devices WDA 5/6 WDA 5 (6) WDA 5 (6) WDA 5 AT MT AT AT MTF AT c c c c h y x F AV F RS TAR 85 TAR 85 WDA 5 (6) 2 WDA 5 1.00 1 .00 TRIO geprüft durch neutrales Prüfinstitut Güteschutzverband Betonschalungen

before every use. • Spray back of formwork with water ... · to GSV guidelines (German Formwork Association). 81 kN/m2 uniform area load, DIN 18202, Table 3, Line 6. 67.5 kN/m2

  • Upload
    vudien

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: before every use. • Spray back of formwork with water ... · to GSV guidelines (German Formwork Association). 81 kN/m2 uniform area load, DIN 18202, Table 3, Line 6. 67.5 kN/m2

TRM 72

TRM 72

270x240

270x240

05

1015202530354045505560657075

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75

120°

33 30

30 30

ø 24

TRM

72

60

TRM

72

60

TGE

TGE

72

60

TE

60

60

TE

TE

TRM

72

TRM

72

90

TE

TE

TRM

72

TRM

72

TRM

72

TRM

72

30 30TA

R 8

5

TAR

85

270x

240

270x

240

TRS 90

TRS 90TRS

90

TRS

90

240 TE

120

120

240

240

240

60

TRM

72

TAR 85

TAR

85

TAR 8560

TE

TAR 85

60

75°

270

x 24

0

270

x 24

0

TRM 72

60

TGE

TGE

60

TAR 85

TRM 72

TAR 85

TAR 85TRM 72 TGE

30 TGE

TRM

72

TAR

85

TRM 72

60

TAR 85

TAR 85

TRM 72

TGE

TAR 85TRM 72

60

TAR 85TRM 72

TAR 85TRM 72

60 TGE

TGE

TAR 85TRM

72

60

TAR

85

TRM

72

TE

60

72

TE

TETE

6060

TAR 85

TE

60

72

30

30

9.

4.

2.

3.

5.

7.

6.

72

60

TE

60

72

TE

7272

90

TE

TE

90

TE

TE

90

TE

TE

90

TE

TE

90

TE

TE

120

TE

TE

TRM

72

TRM

72

Betriebsanleitung

TRIO Versetzhaken 1,5tArt.-Nr. 023690

TRIO Kombigehänge-2Art.-Nr. 044760

Betriebsanleitung

Paletten undStapelrungen

Betriebsanleitung

GSVPERI TRIORahmenschalung

Prüfbericht Ausgabe 10/95

GSVgeprüft

durch neutrales Prüfinstitut

GüteschutzverbandBetonschalungen

Push-Pull Props and Kicker Braces

The panel formwork with the BFD coupler system

*If necessary, the distance from top of formwork must beadapted to the system.

A maximum force of 11.3 kN is to be led into the building atthe foot of the push-pull-prop for the given width of influence.

Wind loads: h < 8 m = 0.5 kN/m2

8 m < h < 20 m = 0.8 kN/m2

Formwork height h [m]Fig. 2Fig. 1

Table for PERI Push-Pull Props and Kicker Braces

Edition 02/2008

Since production began, TRIO has always fulfilled thehighest requirements regarding the formwork evenness.

2.70 m steel elements have been certified accordingto GSV guidelines (German Formwork Association).

81 kN/m2 uniform area load, DIN 18202, Table 3, Line 6.67.5 kN/m2 triangular load, DIN 18202, Table 3, Line 7.

Permissible fresh concrete pressure for aluminium elements60 kN/m2 uniform area load, DIN 18202, Table 3, Line 7.60 kN/m2 h = 2.70 m, DIN 18202, Table 3, Line 6.

For standard element joints On external corners For timber extensionsWith filler timber up to 100 mm

7. Bulkhead FormworkUsing the TRIO MT/MTF stopend panel with continuousreinforcement, with or without water bars.

MT centre part,without water bar

MT centre part,with water bar

2. Length AdjustmentSimple and fast solution.With timber, or timber and formlining,and BFD alignment coupler up to 100 mm.

4. Oblique AnglesTRIO articulated corner TGE – for internaland external corners alike.

5. Wall OffsetsUp to max. 200 mm

Stopend tie

max

.

86 c

m

min

.

20 c

m

Timber

Hook tieDW 15/400

Additional BFD for120 mm offsets upwards

Lower TAR 85 to befixed from below

Filler timber

max

.

200

3. CornersBasic rules for cornersWall thicknesses 180 – 400 mm

Adaptation to wall thickness usingwall thickness compensation WDA 5,WDA 6 or timber infills

Internal formwork:With TRIO Corner TE

Connection:2 BFD alignment couplers for h = 2.70 m

6. T-junctionsBasic rules for T-JunctionsWall thicknesses 180 – 400 mm and 600 mm

External formwork: with panel TR 90Internal formwork: with TRIO Corner TE

Adapting to wall thicknesses using wall thicknesscompensation WDA 5, WDA 6 or timber infills.

Up to max. 860 mm

Working Platforms

Planking and GuardrailsWorking platforms are to be assembledaccording to current valid guidelines.Maximum spacing of the scaffoldbrackets = 1.35 m with a permissibleload of 150 kg/m2.

Scaffold BracketTRG 80 Item no. 023670TRG 120 Item no. 023680

9. Shafts

The TRIO TSE shaft element allowscomplete shaft formwork units to bemoved as one unit.

Shaft Panel TSE 270,Item no. 105523

TRIO shaft panel TSE in a raisedposition.

When striking, lever crowbarupwards.

For rectangular shafts, shortenthe chains on the longitudinalsides – this ensures that all shaftelements are evenly loaded.

Concreting Platform 120 x 270Item no. 022950

A single platform unit is only 320 mmhigh when folded. Each additional unitadds only 170 mm in height. 13 concretingplatforms (35 m) stacked on top of eachother is equal to the loading height of atruck.

1466

320

170

Transport and StorageLifting Gear Combi-2 TRIOPerm. load 2.9 t with 45° angle of spread of the lifting gear.The pins are used to move stacks of panels located on the ground.TRIO lifting hooks or TRIO stacking devices are attached to the loadhook.

Follow instructions for Use!

Stacking Device TRIO, galv.Perm. load 500 kg/piece.For safe stacking of 5 TRIO panelsof any size.

Follow instructions for Use!

ExtensionsAlignment couplers and all-round strutsensure that extensions with TRIO aresimple and easy.

Extensions up to max. 8.10 m high(3 panels at 2.70 m) can be assembledas one unit.

Four BFD couplers are requiredfor 2.40 m or 2.70 m wide panelsfor extensions up to 5.40 m.

Two TAR 85 compensation walers andtwo BFD alignment couplers are requiredfor extensions up to 8.10 m.

Compensation Waler TAR 85Item no. 023550

Extension Units (Steel)Formwork should be assembledto its full height on the ground!

TRIO Panels

Lifting Hook TRIOMaximum load capacity of 1.5 t,max. lifting gear angle of 30°.Always use in pairs!

Follow instructions for Use!

Instructions for UseLifting Gear Combi-2 TRIO

Push-pull props and kickers to bracethe formwork and bearing the windloadare to be arranged as shown on theadjacent diagram and table.The first panel must always be braced with2 push-pull props and subsequent panels

Stacking Device TRIOItem no. 023390

Lifting Gear Combi-2 TRIOItem no. 044760

Lifting Hook TRIOItem no. 023690

8. Wall Connections

2. With WDA or timber

3. With TRM 72

3. With TR 301. With 270x240 2. With TRM 72

Handrail Post Holder TRIOItem no. 101592

> 3

.00

m

2 WDA 5 (6)

Timber supplied bycontractors for specialwall thicknesses

x

WDA 5 (6)

max. 3606 – 300max. 100

TAR

85

TAR 85

TAR

85

Variable filler timber

200

(180

)

250

(240

)

300

350

(360

)

400

WDA 5 (6)

1. Standard Panel Connections

2.70

m

2 BFD alignment couplerItem no. 023500for 2.70 m panel heights.

60

Filler timber

Filler timber

Filler timber

Filler timber

Corner construction:600 mm wall thicknessPerm. fresh concrete pressure 60 kN/m2.

Corner construction:80 cm wall thicknessPerm. fresh concrete pressure 60 kN/m2.

LL

L

L

Important:Along the length L of 2.25 m, 3BFD alignment couplers arerequired per element joint.

240

240

TE

90

90TR

M 7

224

0

240

60

800

600

600

800

1.93

9.49.5

2.6

4.32.61.54.5

1.67

11.38.5

2.3

4.72.61.85.5

1.49

11.39.3

2.1

5.32.81.86.2

1.35

11.310.1

1.9

5.93.01.86.9

3.53

9.7

2.1

1.2

1.0

2.73

9.7

2.3

1.6

1.2

2.19

9.8

2.2

2.0

1.5

1.82

9.8

2.2

2.4

1.8

1.58

9.8

2.3

2.9

2.0

1.42

9.6

2.6

3.5

2.0

4.0 5.0 7.0 8.06.0 9.0 10.0 11.0 12.03.0

FRS1

FRS2

x1

x2

y1

y2

165°

150°

135°

75°

Heig

ht

Wid

th

270 240 120 90 72 60 30 TE TGE TGE TE

240 /

270

Internal Internal External External

30

0330

or T

RIO

330

360

390

450

480

540

Height

Width

m2

Item no.Weight

m2

Item no.Weight

m2

Item no.Weight

m2

Item no.Weight

m2

Item no.Weight

6.48022570329.00 kg

3.24022510162.00 kg

1.4402260076.30 kg

1.0802390033.30 kg

2.43022520115.00 kg

1.0802261058.20 kg

0.5402279034.70 kg

2.4302385070.60 kg

1.6202255087.70 kg

0.7202264043.40

0.3602281025.90 kg

1.6202387049.60 kg

0.5402395018.00 kg

0.8102256060.60 kg

0.3602265028.40 kg

0.1802282015.70 kg

0.8102388031.70 kg

0.2702396010.80 kg

1.9402253097.60 kg

0.8602262048.60 kg

0.4302280029.10 kg

1.6202258069.80 kg

0.7202266033.20 kg

0.3602284018.00 kg

1.6202389142.10 kg

0.5402397115.20 kg

TAE TAM 72

1.94022540103.00 kg

0.8602263056.20 kg

1.9402386060.90 kg

0.6502398023.70 kg

Multi-purposepanel withcontinuoustie hole strip

Hinged cornerfrom 75°-285°for inner andouter corners

1.6202320094.80 kg

0.7203230043.60 kg

Inner cornerwith 30 cmleg length

0.7202264043.40 kg

according to the table. They areconnected to the panel with the TRIOBrace Connctor and to the slab with theappropriate base plate and the PERIanchor bolt MMS 20x130 .

Shaft Panel TSE 120,Item no. 105524

The concrete cover c is25 mm or 50 mm.

Instructions for UseLifting Hook TRIO

FoundationsIndividual foundations withTRIO foundation strapItem no. 023800

Strip foundations withFoundation Tie Clamp Item no. 023010Perforated Foundation Tie Item no. 023020Top Tie Bracket-2 AH Item no. 023630

Stopend tie

Scaffold Bracket TRG 100/112Item no. 023590

600

Important:Along the length L of 3.00 m,3 BFD alignment couplers arerequired per element joint.

Universal Waler 245Item no. 023920

Waler StopItem no. 023930

Tie RodCylinder YokeItem no. 022030

Compensation WalerTAR 85Item no. 023550

Tie hole positionsUnused tie holesCompensation waler TAR 85BFD alignment coupler

For assembly ofbase plates.

PERI anchor boltMMS 20x130Item no. 103606

TRIO ColumnWith elements for walls and columns

Can be used as column panels for cross-sections of up to 750 x 750 mm.Used in the wall as “standard” 900 mmformwork panel.

Permissible fresh concrete pressure100 kN/m2.

External formwork:with multi-panel TRM 72 and articulatedcorners

External element connection:2 compensation walers TAR 85, 6 BFDcouplers

Internal formwork:with TR 60 or TR 30 panels and articulatedcorners

Internal element connection:4 BFD couplers

Tie details

ArticulatedCorner TGE 270Item no. 023200

Articulated CornerTGE 120Item no. 023300

Cost-effective solution.With filler plates from 60 – 360 mm.LA 270, Item no. 023170LA 120, Item no. 023270

Optimal visible surface solution.With formlining and filler support.TPP, Alu 270, Item no. 101813TPP, Alu 120, Item no. 101823

max. 2.10 m or

width of influence 1.3

5 m

Test report availableon request.

External formwork:With TR 72 panels or TRM 72 and TR 60

Connection:5 BFD alignment couplers for h = 2.70 m

4. With WDA or timber infills

WDA 5/6

1. With 270x240

Filler timber

Filler timber

Filler timber

BFD alignmentcoupler

Filler plate LA Filler support TPPFormlining

Only one component is required for all connectionsThe TRIO BFD alignment coupler ensuresthat all panel joints are: flush

alignedtightin only one step!

Foundation strap

Top tie bracket-2 AH

Foundationtie clamp

Perforatedfoundation tie

HandrailPost HSGPItem no. 034580

Accessories:Handrail PostHSGPItem no. 034580

TGE

TGE

TGE

60

30

max.750x750

Ready-to-use 5.40 m high TRIO columnformwork with concreting platform,access ladder and push-pull props.

For square or rectangular columnsup to 750 x 750 mm.

h

y y

x

x

60°

FR

S 1

FR

S 2

FAV

0,5

kN/m

2

0,5

kN/m

20,

8 kN

/m2

60°60°

Fig. 1

Fig. 2

h

h

y

x

FAV

FRS

60°

0,5

kN/m

2

Stop rail

Without exception, current safety regulations must be observedin those countries where our products are used.

Tips for trouble-free progress

• Spray formwork on all sides with PERI BIO Cleanbefore every use.

• Spray back of formwork with water immediatelyafter concreting to reduce the cleaning work.

• Always start at a corner or difficult area.Pay attention to the wall thickness. See corners.

• Only use the required number of ties. Unused tie holesmust be sealed with plugs ø 20/24, item no 030300.

• More information can be found in the TRIO AssemblyInstructions.

Actual kicker load FAV [kN]at maximum spacing

Allowable prop spacing [m](max. width of influence)

Actual prop load FRS [kN]at maximum spacing

*Top connection point [m]from top of formworky =

Distance of base plate [m]from rear face of formworkx =

240 120 90 60 30 TE72 TRM 72 TGE

2.88022514163.00 kg

TR

27

0T

R 1

20

TR

60

TR

A 2

70

TR

A 9

0

300200

(180)

250

(240)

350

(360)

400

WD

A 1

0

Instructions for UsePallets and Stacking Devices

WDA 5/6

WDA 5 (6)WDA 5 (6)

WDA 5

AT MT AT AT MTF ATc cc c

h

y

x

FAV

FRS

TAR 85TAR 85

WDA 5 (6) 2 WDA 5

1.00

1.00

TRIOgeprüft

durch neutrales Prüfinstitut

GüteschutzverbandBetonschalungen

Page 2: before every use. • Spray back of formwork with water ... · to GSV guidelines (German Formwork Association). 81 kN/m2 uniform area load, DIN 18202, Table 3, Line 6. 67.5 kN/m2

D e

02/

2008

10m

a A

rt. N

r.: 7

9090

9 ©

Cop

yrig

ht b

y P

ER

I Gm

bH

TRIOPanel Formwork

Poster

Edition 02/2008

Wall FormworkPanel FormworkGirder FormworkCircular FormworkFacade FormworkBrace Frame

Column FormworkSquareRectangularCircular

Slab FormworkPanel FormworkBeam Grid FormworkGirder FormworkSlab TableBeam Formwork

Shoring SystemsSteel Slab PropsAluminium Slab PropsTower SystemsHeavy-Duty Props

Climbing SystemsClimbing ScaffoldSelf-Climbing SystemClimbing Protection PanelPlatform Systems

Scaffold, Stairways, Working PlatformsFacade ScaffoldWorking PlatformWeather Protection RoofStairway Access

Bridge and Tunnel FormworkCantilevered Parapet CarriageCantilevered Parapet PlatformEngineer´s Construction Kit

ServicesFormwork AssemblyCleaning / RepairsFormwork PlanningSoftwareStaticsSpecial Constructions

Additional SystemsPlywoodFormwork GirdersStopend SystemsPalletsTransportation Containers

PERI GmbHFormwork Scaffolding EngineeringP.O. Box 126489259 WeissenhornGermanyTel +49 (0)73 09.9 50- 0Fax +49 (0)73 09.9 51- [email protected]

PERI Product Range

Page 3: before every use. • Spray back of formwork with water ... · to GSV guidelines (German Formwork Association). 81 kN/m2 uniform area load, DIN 18202, Table 3, Line 6. 67.5 kN/m2

D e

02/

2008

10m

a A

rt. N

r.: 7

9090

9 ©

Cop

yrig

ht b

y P

ER

I Gm

bH

TRIOPanel Formwork

Poster

Edition 02/2008

Wall FormworkPanel FormworkGirder FormworkCircular FormworkFacade FormworkBrace Frame

Column FormworkSquareRectangularCircular

Slab FormworkPanel FormworkBeam Grid FormworkGirder FormworkSlab TableBeam Formwork

Shoring SystemsSteel Slab PropsAluminium Slab PropsTower SystemsHeavy-Duty Props

Climbing SystemsClimbing ScaffoldSelf-Climbing SystemClimbing Protection PanelPlatform Systems

Scaffold, Stairways, Working PlatformsFacade ScaffoldWorking PlatformWeather Protection RoofStairway Access

Bridge and Tunnel FormworkCantilevered Parapet CarriageCantilevered Parapet PlatformEngineer´s Construction Kit

ServicesFormwork AssemblyCleaning / RepairsFormwork PlanningSoftwareStaticsSpecial Constructions

Additional SystemsPlywoodFormwork GirdersStopend SystemsPalletsTransportation Containers

PERI GmbHFormwork Scaffolding EngineeringP.O. Box 126489259 WeissenhornGermanyTel +49 (0)73 09.9 50- 0Fax +49 (0)73 09.9 51- [email protected]

PERI Product Range