Transcript
Page 1: before every use. • Spray back of formwork with water ... · to GSV guidelines (German Formwork Association). 81 kN/m2 uniform area load, DIN 18202, Table 3, Line 6. 67.5 kN/m2

TRM 72

TRM 72

270x240

270x240

05

1015202530354045505560657075

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75

120°

33 30

30 30

ø 24

TRM

72

60

TRM

72

60

TGE

TGE

72

60

TE

60

60

TE

TE

TRM

72

TRM

72

90

TE

TE

TRM

72

TRM

72

TRM

72

TRM

72

30 30TA

R 8

5

TAR

85

270x

240

270x

240

TRS 90

TRS 90TRS

90

TRS

90

240 TE

120

120

240

240

240

60

TRM

72

TAR 85

TAR

85

TAR 8560

TE

TAR 85

60

75°

270

x 24

0

270

x 24

0

TRM 72

60

TGE

TGE

60

TAR 85

TRM 72

TAR 85

TAR 85TRM 72 TGE

30 TGE

TRM

72

TAR

85

TRM 72

60

TAR 85

TAR 85

TRM 72

TGE

TAR 85TRM 72

60

TAR 85TRM 72

TAR 85TRM 72

60 TGE

TGE

TAR 85TRM

72

60

TAR

85

TRM

72

TE

60

72

TE

TETE

6060

TAR 85

TE

60

72

30

30

9.

4.

2.

3.

5.

7.

6.

72

60

TE

60

72

TE

7272

90

TE

TE

90

TE

TE

90

TE

TE

90

TE

TE

90

TE

TE

120

TE

TE

TRM

72

TRM

72

Betriebsanleitung

TRIO Versetzhaken 1,5tArt.-Nr. 023690

TRIO Kombigehänge-2Art.-Nr. 044760

Betriebsanleitung

Paletten undStapelrungen

Betriebsanleitung

GSVPERI TRIORahmenschalung

Prüfbericht Ausgabe 10/95

GSVgeprüft

durch neutrales Prüfinstitut

GüteschutzverbandBetonschalungen

Push-Pull Props and Kicker Braces

The panel formwork with the BFD coupler system

*If necessary, the distance from top of formwork must beadapted to the system.

A maximum force of 11.3 kN is to be led into the building atthe foot of the push-pull-prop for the given width of influence.

Wind loads: h < 8 m = 0.5 kN/m2

8 m < h < 20 m = 0.8 kN/m2

Formwork height h [m]Fig. 2Fig. 1

Table for PERI Push-Pull Props and Kicker Braces

Edition 02/2008

Since production began, TRIO has always fulfilled thehighest requirements regarding the formwork evenness.

2.70 m steel elements have been certified accordingto GSV guidelines (German Formwork Association).

81 kN/m2 uniform area load, DIN 18202, Table 3, Line 6.67.5 kN/m2 triangular load, DIN 18202, Table 3, Line 7.

Permissible fresh concrete pressure for aluminium elements60 kN/m2 uniform area load, DIN 18202, Table 3, Line 7.60 kN/m2 h = 2.70 m, DIN 18202, Table 3, Line 6.

For standard element joints On external corners For timber extensionsWith filler timber up to 100 mm

7. Bulkhead FormworkUsing the TRIO MT/MTF stopend panel with continuousreinforcement, with or without water bars.

MT centre part,without water bar

MT centre part,with water bar

2. Length AdjustmentSimple and fast solution.With timber, or timber and formlining,and BFD alignment coupler up to 100 mm.

4. Oblique AnglesTRIO articulated corner TGE – for internaland external corners alike.

5. Wall OffsetsUp to max. 200 mm

Stopend tie

max

.

86 c

m

min

.

20 c

m

Timber

Hook tieDW 15/400

Additional BFD for120 mm offsets upwards

Lower TAR 85 to befixed from below

Filler timber

max

.

200

3. CornersBasic rules for cornersWall thicknesses 180 – 400 mm

Adaptation to wall thickness usingwall thickness compensation WDA 5,WDA 6 or timber infills

Internal formwork:With TRIO Corner TE

Connection:2 BFD alignment couplers for h = 2.70 m

6. T-junctionsBasic rules for T-JunctionsWall thicknesses 180 – 400 mm and 600 mm

External formwork: with panel TR 90Internal formwork: with TRIO Corner TE

Adapting to wall thicknesses using wall thicknesscompensation WDA 5, WDA 6 or timber infills.

Up to max. 860 mm

Working Platforms

Planking and GuardrailsWorking platforms are to be assembledaccording to current valid guidelines.Maximum spacing of the scaffoldbrackets = 1.35 m with a permissibleload of 150 kg/m2.

Scaffold BracketTRG 80 Item no. 023670TRG 120 Item no. 023680

9. Shafts

The TRIO TSE shaft element allowscomplete shaft formwork units to bemoved as one unit.

Shaft Panel TSE 270,Item no. 105523

TRIO shaft panel TSE in a raisedposition.

When striking, lever crowbarupwards.

For rectangular shafts, shortenthe chains on the longitudinalsides – this ensures that all shaftelements are evenly loaded.

Concreting Platform 120 x 270Item no. 022950

A single platform unit is only 320 mmhigh when folded. Each additional unitadds only 170 mm in height. 13 concretingplatforms (35 m) stacked on top of eachother is equal to the loading height of atruck.

1466

320

170

Transport and StorageLifting Gear Combi-2 TRIOPerm. load 2.9 t with 45° angle of spread of the lifting gear.The pins are used to move stacks of panels located on the ground.TRIO lifting hooks or TRIO stacking devices are attached to the loadhook.

Follow instructions for Use!

Stacking Device TRIO, galv.Perm. load 500 kg/piece.For safe stacking of 5 TRIO panelsof any size.

Follow instructions for Use!

ExtensionsAlignment couplers and all-round strutsensure that extensions with TRIO aresimple and easy.

Extensions up to max. 8.10 m high(3 panels at 2.70 m) can be assembledas one unit.

Four BFD couplers are requiredfor 2.40 m or 2.70 m wide panelsfor extensions up to 5.40 m.

Two TAR 85 compensation walers andtwo BFD alignment couplers are requiredfor extensions up to 8.10 m.

Compensation Waler TAR 85Item no. 023550

Extension Units (Steel)Formwork should be assembledto its full height on the ground!

TRIO Panels

Lifting Hook TRIOMaximum load capacity of 1.5 t,max. lifting gear angle of 30°.Always use in pairs!

Follow instructions for Use!

Instructions for UseLifting Gear Combi-2 TRIO

Push-pull props and kickers to bracethe formwork and bearing the windloadare to be arranged as shown on theadjacent diagram and table.The first panel must always be braced with2 push-pull props and subsequent panels

Stacking Device TRIOItem no. 023390

Lifting Gear Combi-2 TRIOItem no. 044760

Lifting Hook TRIOItem no. 023690

8. Wall Connections

2. With WDA or timber

3. With TRM 72

3. With TR 301. With 270x240 2. With TRM 72

Handrail Post Holder TRIOItem no. 101592

> 3

.00

m

2 WDA 5 (6)

Timber supplied bycontractors for specialwall thicknesses

x

WDA 5 (6)

max. 3606 – 300max. 100

TAR

85

TAR 85

TAR

85

Variable filler timber

200

(180

)

250

(240

)

300

350

(360

)

400

WDA 5 (6)

1. Standard Panel Connections

2.70

m

2 BFD alignment couplerItem no. 023500for 2.70 m panel heights.

60

Filler timber

Filler timber

Filler timber

Filler timber

Corner construction:600 mm wall thicknessPerm. fresh concrete pressure 60 kN/m2.

Corner construction:80 cm wall thicknessPerm. fresh concrete pressure 60 kN/m2.

LL

L

L

Important:Along the length L of 2.25 m, 3BFD alignment couplers arerequired per element joint.

240

240

TE

90

90TR

M 7

224

0

240

60

800

600

600

800

1.93

9.49.5

2.6

4.32.61.54.5

1.67

11.38.5

2.3

4.72.61.85.5

1.49

11.39.3

2.1

5.32.81.86.2

1.35

11.310.1

1.9

5.93.01.86.9

3.53

9.7

2.1

1.2

1.0

2.73

9.7

2.3

1.6

1.2

2.19

9.8

2.2

2.0

1.5

1.82

9.8

2.2

2.4

1.8

1.58

9.8

2.3

2.9

2.0

1.42

9.6

2.6

3.5

2.0

4.0 5.0 7.0 8.06.0 9.0 10.0 11.0 12.03.0

FRS1

FRS2

x1

x2

y1

y2

165°

150°

135°

75°

Heig

ht

Wid

th

270 240 120 90 72 60 30 TE TGE TGE TE

240 /

270

Internal Internal External External

30

0330

or T

RIO

330

360

390

450

480

540

Height

Width

m2

Item no.Weight

m2

Item no.Weight

m2

Item no.Weight

m2

Item no.Weight

m2

Item no.Weight

6.48022570329.00 kg

3.24022510162.00 kg

1.4402260076.30 kg

1.0802390033.30 kg

2.43022520115.00 kg

1.0802261058.20 kg

0.5402279034.70 kg

2.4302385070.60 kg

1.6202255087.70 kg

0.7202264043.40

0.3602281025.90 kg

1.6202387049.60 kg

0.5402395018.00 kg

0.8102256060.60 kg

0.3602265028.40 kg

0.1802282015.70 kg

0.8102388031.70 kg

0.2702396010.80 kg

1.9402253097.60 kg

0.8602262048.60 kg

0.4302280029.10 kg

1.6202258069.80 kg

0.7202266033.20 kg

0.3602284018.00 kg

1.6202389142.10 kg

0.5402397115.20 kg

TAE TAM 72

1.94022540103.00 kg

0.8602263056.20 kg

1.9402386060.90 kg

0.6502398023.70 kg

Multi-purposepanel withcontinuoustie hole strip

Hinged cornerfrom 75°-285°for inner andouter corners

1.6202320094.80 kg

0.7203230043.60 kg

Inner cornerwith 30 cmleg length

0.7202264043.40 kg

according to the table. They areconnected to the panel with the TRIOBrace Connctor and to the slab with theappropriate base plate and the PERIanchor bolt MMS 20x130 .

Shaft Panel TSE 120,Item no. 105524

The concrete cover c is25 mm or 50 mm.

Instructions for UseLifting Hook TRIO

FoundationsIndividual foundations withTRIO foundation strapItem no. 023800

Strip foundations withFoundation Tie Clamp Item no. 023010Perforated Foundation Tie Item no. 023020Top Tie Bracket-2 AH Item no. 023630

Stopend tie

Scaffold Bracket TRG 100/112Item no. 023590

600

Important:Along the length L of 3.00 m,3 BFD alignment couplers arerequired per element joint.

Universal Waler 245Item no. 023920

Waler StopItem no. 023930

Tie RodCylinder YokeItem no. 022030

Compensation WalerTAR 85Item no. 023550

Tie hole positionsUnused tie holesCompensation waler TAR 85BFD alignment coupler

For assembly ofbase plates.

PERI anchor boltMMS 20x130Item no. 103606

TRIO ColumnWith elements for walls and columns

Can be used as column panels for cross-sections of up to 750 x 750 mm.Used in the wall as “standard” 900 mmformwork panel.

Permissible fresh concrete pressure100 kN/m2.

External formwork:with multi-panel TRM 72 and articulatedcorners

External element connection:2 compensation walers TAR 85, 6 BFDcouplers

Internal formwork:with TR 60 or TR 30 panels and articulatedcorners

Internal element connection:4 BFD couplers

Tie details

ArticulatedCorner TGE 270Item no. 023200

Articulated CornerTGE 120Item no. 023300

Cost-effective solution.With filler plates from 60 – 360 mm.LA 270, Item no. 023170LA 120, Item no. 023270

Optimal visible surface solution.With formlining and filler support.TPP, Alu 270, Item no. 101813TPP, Alu 120, Item no. 101823

max. 2.10 m or

width of influence 1.3

5 m

Test report availableon request.

External formwork:With TR 72 panels or TRM 72 and TR 60

Connection:5 BFD alignment couplers for h = 2.70 m

4. With WDA or timber infills

WDA 5/6

1. With 270x240

Filler timber

Filler timber

Filler timber

BFD alignmentcoupler

Filler plate LA Filler support TPPFormlining

Only one component is required for all connectionsThe TRIO BFD alignment coupler ensuresthat all panel joints are: flush

alignedtightin only one step!

Foundation strap

Top tie bracket-2 AH

Foundationtie clamp

Perforatedfoundation tie

HandrailPost HSGPItem no. 034580

Accessories:Handrail PostHSGPItem no. 034580

TGE

TGE

TGE

60

30

max.750x750

Ready-to-use 5.40 m high TRIO columnformwork with concreting platform,access ladder and push-pull props.

For square or rectangular columnsup to 750 x 750 mm.

h

y y

x

x

60°

FR

S 1

FR

S 2

FAV

0,5

kN/m

2

0,5

kN/m

20,

8 kN

/m2

60°60°

Fig. 1

Fig. 2

h

h

y

x

FAV

FRS

60°

0,5

kN/m

2

Stop rail

Without exception, current safety regulations must be observedin those countries where our products are used.

Tips for trouble-free progress

• Spray formwork on all sides with PERI BIO Cleanbefore every use.

• Spray back of formwork with water immediatelyafter concreting to reduce the cleaning work.

• Always start at a corner or difficult area.Pay attention to the wall thickness. See corners.

• Only use the required number of ties. Unused tie holesmust be sealed with plugs ø 20/24, item no 030300.

• More information can be found in the TRIO AssemblyInstructions.

Actual kicker load FAV [kN]at maximum spacing

Allowable prop spacing [m](max. width of influence)

Actual prop load FRS [kN]at maximum spacing

*Top connection point [m]from top of formworky =

Distance of base plate [m]from rear face of formworkx =

240 120 90 60 30 TE72 TRM 72 TGE

2.88022514163.00 kg

TR

27

0T

R 1

20

TR

60

TR

A 2

70

TR

A 9

0

300200

(180)

250

(240)

350

(360)

400

WD

A 1

0

Instructions for UsePallets and Stacking Devices

WDA 5/6

WDA 5 (6)WDA 5 (6)

WDA 5

AT MT AT AT MTF ATc cc c

h

y

x

FAV

FRS

TAR 85TAR 85

WDA 5 (6) 2 WDA 5

1.00

1.00

TRIOgeprüft

durch neutrales Prüfinstitut

GüteschutzverbandBetonschalungen

Page 2: before every use. • Spray back of formwork with water ... · to GSV guidelines (German Formwork Association). 81 kN/m2 uniform area load, DIN 18202, Table 3, Line 6. 67.5 kN/m2

D e

02/

2008

10m

a A

rt. N

r.: 7

9090

9 ©

Cop

yrig

ht b

y P

ER

I Gm

bH

TRIOPanel Formwork

Poster

Edition 02/2008

Wall FormworkPanel FormworkGirder FormworkCircular FormworkFacade FormworkBrace Frame

Column FormworkSquareRectangularCircular

Slab FormworkPanel FormworkBeam Grid FormworkGirder FormworkSlab TableBeam Formwork

Shoring SystemsSteel Slab PropsAluminium Slab PropsTower SystemsHeavy-Duty Props

Climbing SystemsClimbing ScaffoldSelf-Climbing SystemClimbing Protection PanelPlatform Systems

Scaffold, Stairways, Working PlatformsFacade ScaffoldWorking PlatformWeather Protection RoofStairway Access

Bridge and Tunnel FormworkCantilevered Parapet CarriageCantilevered Parapet PlatformEngineer´s Construction Kit

ServicesFormwork AssemblyCleaning / RepairsFormwork PlanningSoftwareStaticsSpecial Constructions

Additional SystemsPlywoodFormwork GirdersStopend SystemsPalletsTransportation Containers

PERI GmbHFormwork Scaffolding EngineeringP.O. Box 126489259 WeissenhornGermanyTel +49 (0)73 09.9 50- 0Fax +49 (0)73 09.9 51- [email protected]

PERI Product Range

Page 3: before every use. • Spray back of formwork with water ... · to GSV guidelines (German Formwork Association). 81 kN/m2 uniform area load, DIN 18202, Table 3, Line 6. 67.5 kN/m2

D e

02/

2008

10m

a A

rt. N

r.: 7

9090

9 ©

Cop

yrig

ht b

y P

ER

I Gm

bH

TRIOPanel Formwork

Poster

Edition 02/2008

Wall FormworkPanel FormworkGirder FormworkCircular FormworkFacade FormworkBrace Frame

Column FormworkSquareRectangularCircular

Slab FormworkPanel FormworkBeam Grid FormworkGirder FormworkSlab TableBeam Formwork

Shoring SystemsSteel Slab PropsAluminium Slab PropsTower SystemsHeavy-Duty Props

Climbing SystemsClimbing ScaffoldSelf-Climbing SystemClimbing Protection PanelPlatform Systems

Scaffold, Stairways, Working PlatformsFacade ScaffoldWorking PlatformWeather Protection RoofStairway Access

Bridge and Tunnel FormworkCantilevered Parapet CarriageCantilevered Parapet PlatformEngineer´s Construction Kit

ServicesFormwork AssemblyCleaning / RepairsFormwork PlanningSoftwareStaticsSpecial Constructions

Additional SystemsPlywoodFormwork GirdersStopend SystemsPalletsTransportation Containers

PERI GmbHFormwork Scaffolding EngineeringP.O. Box 126489259 WeissenhornGermanyTel +49 (0)73 09.9 50- 0Fax +49 (0)73 09.9 51- [email protected]

PERI Product Range


Recommended