Before After Presentation Baywood#3 Apartment Turnover

Embed Size (px)

DESCRIPTION

As the project manager for this job, I developed the scope of work, designed the kitchen, and dispatched the proper tradesmen.

Citation preview

Page 1: Before After Presentation   Baywood#3 Apartment Turnover
Page 2: Before After Presentation   Baywood#3 Apartment Turnover

New Laminate Floor in Kitchen• Hauled Garbage• Installed 5/8” OSB Board• Installed Pergo Flooring• Custom Cuts Multiple Doorways• Installed New Quarter Round Molding

Page 3: Before After Presentation   Baywood#3 Apartment Turnover

New Laminate Floor in Kitchen• Hauled Garbage• Installed 5/8” OSB Board• Installed Pergo Flooring• Custom Cuts Doors, Baseboard Heaters• Installed New Quarter Round Molding

Page 4: Before After Presentation   Baywood#3 Apartment Turnover

New Kitchen• Extensive shimming because of sloping

floor• Custom sink because of vent pipe• Cut counter around exposed vent pipe

Page 5: Before After Presentation   Baywood#3 Apartment Turnover

Kitchen (continued): New Wiring for Dishwasher• Installed new sub-panel• Ran wiring for Stove• Ran wiring for Dishwasher• Installed new GFCI outlet

New Electric Subpanel

New Dishwasher Wiring (before dishwasher delivery )

Page 6: Before After Presentation   Baywood#3 Apartment Turnover

New Carpeting in Stairway and Bedroom

Also: Ceiling Repair & New

Ceiling Fan

Page 7: Before After Presentation   Baywood#3 Apartment Turnover

Bathtub• New Silicone Caulking• Patched hole in tub finish• Thoroughly Cleaned

Page 8: Before After Presentation   Baywood#3 Apartment Turnover

Bathroom: Cleaned Ceramic Floor

Page 9: Before After Presentation   Baywood#3 Apartment Turnover

Stairway Wall Patching &

Painting