1. Open the 344 pegas folder on the desktop by double clicking.

Page 3: Basic Turret Press Set Up Training

2. Select the part type (double click). Example: housing; rail; end cap.

3. Select Part Number (Double click)

Page 4: Basic Turret Press Set Up Training

4. Select “.STP” file

5. Click file

Page 5: Basic Turret Press Set Up Training

6. Click print

7. Click print on pop up box

Page 6: Basic Turret Press Set Up Training

Printing a Blue Print

Page 7: Basic Turret Press Set Up Training
Page 8: Basic Turret Press Set Up Training
Page 9: Basic Turret Press Set Up Training
Page 10: Basic Turret Press Set Up Training
Page 11: Basic Turret Press Set Up Training
Page 12: Basic Turret Press Set Up Training
Page 13: Basic Turret Press Set Up Training
Page 14: Basic Turret Press Set Up Training
Page 15: Basic Turret Press Set Up Training
Page 16: Basic Turret Press Set Up Training
Page 17: Basic Turret Press Set Up Training

Print should now be printing on “big” printer.

Page 18: Basic Turret Press Set Up Training
Page 19: Basic Turret Press Set Up Training

1. Verify part Number and Work Order quantity per Work Order.

a. Make sure you have a set up sheet and Blue print.

2. Locate tooling per set up sheet

a. Check both tooling boards

b. Check the Tooling cabinet

c. Borrow additional tooling from the Turrets in the fab department

3. Verify tool Angles and location to set up sheet

a. Mark any tools in a different set up sheet to edit to

4. Put turret in “Manual Mode” (turn Mode Select all the way right then 1 click to left).

Page 20: Basic Turret Press Set Up Training

5. Turn tool change switch to “ON”

6. Flip Index pin switch to “OUT”

Page 21: Basic Turret Press Set Up Training

7. Open upper “Tool Change Door”

8. Press the Pin Switch in.

9. Use the “Turret On” buttons to spin the turret left or right to the desired station.

a. Station numbers stamped on top of turret.

Page 22: Basic Turret Press Set Up Training

10. Remove un-needed tool (if applicable); and install proper tool

a. Be wary of tool angle; and remember that 0 for a standard punch and 0 for a special tool are 90 opposed to each other.

Page 23: Basic Turret Press Set Up Training

11. Repeat as needed to set all tools in turret double-checking that none of your tools are crossed.

Loading a program into

the 344 Pega Q

Page 24: Basic Turret Press Set Up Training

1. Start the Machine talk Program.a. The Ms talk program on the desktop

Page 25: Basic Turret Press Set Up Training

Double click the “Machine Talk” icon.

This is the main machine talk screen

2. Select the send NC file button off of the main screen.

Page 26: Basic Turret Press Set Up Training

3. On the next screen select either Pega 1 or Pega 2

4. Once one of the machines is selected the “Add File” button will become active. Click the control to use it.

5. When the “Add File” Button is clicked it will open a file open box. Click the “Browse” button.

6. Press the down arrow in the browse box

Page 27: Basic Turret Press Set Up Training

7. Select “344 programs” folder

Page 28: Basic Turret Press Set Up Training

8. Select correct Pega (1 or 2)

9. Select part Number

10. Select “.GCD” file (Double click)

Page 29: Basic Turret Press Set Up Training

11. Press “READ” button on turret

12. Click “SEND FILE”