Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

Embed Size (px)

Citation preview

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    1/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    ONR FencingQuality FencingPeekskill, NY 01/03/11 $13,510.00

    Engineers

    Welding (AA

    MBE)

    Bridgeport, Ct. $4,500.00 $4,500.00 100.00% 100.00%

    Columbus

    School HVAC

    Phase II

    DiRienzoMechanical(WBE) NewHaven, Ct. 01/20/11 $397,440.00 $397,440.00 0.00% 20.00%

    A.B. Electric (AAMBE) Windsor,Ct. $24,000.00 $24,000.00 0.00% 100.00%

    MNB14611C -

    Boiler

    Replacement

    at Producto

    Southport

    Contracting

    (WBE)

    Bridgeport, Ct. 01/25/11 $149,900.00 $149,900.00 33.00% 33.00%

    CPMEnvironmental(AA MBE)

    Seymour, Ct. $23,900.00 $23,900.00 50.00% 50.00%

    A & R Electric

    (Hispanic MBE)

    Bridgeport, Ct. $4,200.00 $4,200.00 0.00% 0.00%

    Edgerton Inc.Monroe, Ct. $7,200.00 0.00% 0.00%Davis & Davis

    Const.

    Bridgeport, Ct. $5,000.00 100.00% 100.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    2/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    COB168111 -Pleasure

    Beach Water

    Taxi

    BTT MarineEast Boston,Mass. 03/02/11 $518,000.00 0.00% 0.00%

    Resource

    Services (AA

    MBE) $63,516.00 $63,516.00 100.00% 100.00%

    KTM Electrical(WBE) Orange,Ct. $53,950.00 $53,950.00 0.00% 33.00%

    COB169111 -

    New Vaults

    City Hall Annex

    Merritt

    Contractors

    Bridgeport, Ct. 03/23/11 $523,000.00 33.00% 33.00%

    Engineers

    Welding (AA

    MBE)

    Bridgeport, Ct $85,700.00 $85,700.00 75.00% 100.00%

    DeRienzoMechanical

    (WBE) NewHaven, Ct. $43,140.00 $43,140.00 33.00% 33.00%

    MacKenziePainting (WBE)Stratford, Ct. $27,400.00 $27,400.00 tba tba

    East CoastMasonrySeymour, Ct $59,800.00 0.00% 0.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    3/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    County Electric

    Bridgeport, Ct. $18,600.00 0.00% 0.00%

    RJB ContractingTorrington, Ct. $67,970.00 0.00% 20.00%

    COB170113 -

    Columbus

    School Phase3 Abatement

    Oscar'sAbatement

    (Hispanic MBE)Hartford, Ct. 03/24/11 $1,117,496.00 $1,117,496.00 50.00% 100.00%

    DedicatedIndustries (AAMBE)New Haven, Ct. $95,000.00 $95,000.00 0.00% 80.00%

    MNB149112 -

    Exhaust Fan

    Police

    Headquarters

    Carl TechMilford, Ct. 04/07/11 $8,600.00 50.00% 0.00%

    Jordan Electric(AA MBE)

    Bridgeport, Ct $1,290.00 $1,290.00 n/a n/a

    COB170113 -

    Columbus

    School Phase

    3 - General

    Trades

    Merritt

    Contractors

    Bridgeport, Ct. 04/19/11 $687,000.00 33.00% 33.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    4/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    Engineers

    Welding (AA

    MBE)

    Bridgeport, Ct. $21,200.00 $21,200.00 100.00% 100.00%

    Jordan Electric

    (AA MBE)

    Bridgeport, Ct $20,500.00 $20,500.00 100.00% 100.00%

    ADE Const. (AA

    MBE)Bridgeport, Ct. $25,500.00 $25,500.00 0.00% 50.00%

    Unity Prevention

    (AA MBE)

    Bridgeport, Ct. $29,205.00 $29,205.00 0.00% 100.00%

    Phoenix Builders(WBE) Oxford,Ct. $110,500.00 $110,500.00 n/a n/a

    COB170113 -Columbus

    School Phase

    3 Painting

    C & G PaintingNew York, NewYork 04/20/11 $224,922.00 n/a n/a

    JHP IndustrialSupply (AA MBE)Syracuse, NY $24,760.00 $24,760.00 n/a n/a

    AbracadabraPainting (WBE)

    Mamaroneck, NY $97,736.00 $97,736.00 0.00% 100.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    5/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    COB143101 -

    Citywide

    Streetscape -

    Madison Ave.

    (North to

    Harral)

    G. Pic

    Bridgeport, Ct 05/16/11 $447,366.00 75.00% 30.00%

    ADE Ladscaping

    & Construction

    (AA MBE)

    Bridgeport, Ct $142,050.00 $142,050.00 33.00% 66.00%

    COB16611C -Roof

    Replacement -

    Engine 12

    AlliedRestoration EastHartford, Ct. 05/23/11 $94,460.00 30.00% 67.00%

    Jordan Electric

    (AA MBE)

    Bridgeport, Ct. $16,000.00 $16,000.00 n/a n/a

    ASAEnvironmentalProducts (WBE)

    Stonington, Ct. $18,000.00 $18,000.00 n/a n/aCOB172115 -

    Burroughs

    Library Boiler &

    Chiller

    Southport

    Contracting

    (WBE) Bpt., Ct. 05/11/11 $469,900.00 $469,900.00 33.00% 33.00%

    EES (AA MBE)Trumbull, Ct. $28,194.00 $28,194.00 0.00% 100.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    6/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    MNB14211CR -

    Siding &

    Gutters -

    Fairchild

    Wheeler

    Ground's

    Keeper's

    House

    Leake BuildersOxford, Ct 06/03/11 $16,510.00 0.00% 0.00%

    YumblaConstruction(MBE)Wallingford, Ct $2,500.00 $2,500.00 0.00% 100.00%

    Hartford LumberCompany (WBE)Hartford, Ct. $5,302.00 $5,302.00 n/a n/a

    111 -

    Cardinal

    Sheehan

    Center -

    Overhead

    Door

    Willco SalesFairfield, Ct. 06/07/11 $6,500.00

    Wallco Sales(WBE)Fairfield, Ct. $2,800.00 $2,800.00 0.00% 0.00%

    CDB250114 -

    Cardinal

    Sheehan

    Center

    Joe R. Masonry(Hispanic MBE)Monroe, Ct. 06/14/11 $11,320.00 $11,320.00 60.00% 60.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    7/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    Advanced

    CleaningConcepts (AA

    MBE)

    Bridgeport, Ct. $680.00 $680.00 75.00% 100.00%

    CDB256114 -

    Cardinal

    Sheehan

    Center -

    Shower Heads

    Joe R. Masonry(Hispanic MBE)Monroe, Ct. 06/14/11 $8,700.00 $8,700.00 50.00% 100.00%

    Advanced

    CleaningConcepts (AA

    MBE)

    Bridgeport, Ct. $525.00 $525.00 75.00% 100.00%

    COB175115 -

    Wilbur

    CrossPkg. 02 -

    Abatement &

    Demo

    Enviroguard,LLCSeymour, Ct. 06/30/11 $650,000.00 15.00% 50.00%

    CPMEnvironmental(AA MBE)Trumbull, Ct. $97,500.00 $97,500.00 50.00% 60.00%

    R.E.D.Technologies(WBE)Bloomfield, Ct. $30,000.00 $30,000.00 n/a n/a

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    8/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    Supreme Safety,Inc. (WBE)Warminster, PA $70,000.00 $70,000.00 n/a n/a

    COB143101 -

    Unit Prices -

    Sidewalks in

    Front of

    Volleyball

    Court in

    Seaside park

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 07/01/11 $73,620.00 $73,620.00 80.00% 50.00%

    NyborConstruction

    (AA MBE)

    Bridgeport, Ct. $4,425.00 $4,425.00 n/a n/a

    COB143101 -

    Unit Prices -

    Corner of

    Coleman &

    Pequonnock

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 07/01/11 $27,660.00 $27,660.00 80.00% 50.00%

    Nybor

    Construction

    (AA MBE)Bridgeport, Ct. $1,700.00 $1,700.00 n/a n/a

    COB143101 -

    Unit Prices -

    ADA Ramps

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 07/01/11 $218,855.00 $218,855.00 80.00% 50.00%

    Nybor

    Construction

    (AA MBE)

    Bridgeport, Ct. $13,115.00 $13,115.00 n/a n/a

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    9/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    COB143101 -Unit Prices -

    Park Ave.

    Sidewalks

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 07/01/11 $463,824.00 $463,824.00 80.00% 50.00%

    Nybor

    Construction

    (AA MBE)

    Bridgeport, Ct. $27,850.00 $27,850.00 n/a n/a

    CDB249113 -

    Demolitions -

    291 HarriettSt., 131

    Caroline St. &

    578

    Beechwood

    Ocean TraceWatertown, ct 07/06/11 $134,579.00 25.00% 25.00%

    CPMEnvironmental(AA MBE)Seymour, Ct. $28,066.00 $28,066.00 15.00% 80.00%

    Balestrieri & Sons(WBE) Trumbull,Ct. $27,000.00 $27,000.00 0.00% 0.00%

    COB175115 -

    Wilbur Cross

    ADA Pkg.

    16Electrical

    Conn. ElectricalNew Haven, Ct. 07/18/11 $775,624.00 40.00% 60.00%

    TF Electric (AAMBE) New

    Haven, Ct. $199,500.00 $199,500.00 0.00% 100.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    10/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    Leo

    Construction

    (AA MBE)

    Bridgeport, Ct. $33,210.00 $33,210.00 n/a n/a

    COB174115

    Discovery

    Magnet

    Playscape

    Pat CorsettiContractingMamoroneck,NY 07/19/11 $133,000.00 0.00% 75.00%

    Peggy Payne &Assos. (WBE)Hawthorne, NY $31,837.00 $31,837.00 0.00% 0.00%

    COB143101 -

    Citywide

    Streetscape

    Unit Prices-

    Esplanades on

    Commerce Dr.

    G.Pic & Sons

    (WBE)

    Bridgeport, Ct. 07/21/11 $86,018.00 $86,018.00 80.00% 50.00%

    Nybor

    Construction

    (AA MBE)Bridgeport, Ct. $5,650.00 $5,650.00 n/a n/a

    CDB249113 -

    Demo 45

    Revere,1563

    East Main,

    Deforest Ave.

    Cherry Hill NorthBranford, Ct. 07/22/11 $91,700.00 0.00% 33.00%

    TLC Services (AAMBE) Monroe, Ct. $29,300.00 $29,300.00 0.00% 80.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    11/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    CDB 253114 -

    Toilet

    Renovation -

    392 Prospect

    St.

    SouthportContracting

    (WBE)

    Bridgeport, Ct. 07/27/11 $19,160.00 $19,160.00 0.00% 0.00%

    Davis & Davis

    Construction

    (AA MBE)

    Bridgeport, Ct. $1,900.00 $1,900.00 100.00% 100.00%

    CDB252114 -

    Hall

    NeighborhoodRoof

    DME

    ConstructionOldfield, NY 08/01/11 $7,910.00 0.00% 100.00%

    Logan & Logan(AA MBE)Ansonia, Ct. $1,200.00 $1,200.00 n/a n/a

    Hartford LumberCompany (WBE)Hartford, Ct. $1,100.00 $1,100.00 n/a n/a

    COB143101 -Citywide

    Streetscapes -

    Unit Prices -

    South Main St.

    & Whiting

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 08/01/11 $93,556.00 $93,556.00 80.00% 50.00%

    Nybor

    Construction

    (AA MBE)

    Bridgeport, Ct. $6,110.00 $6,110.00 n/a n/a

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    12/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    COB143101 -Citywide

    Streetscape -

    Unit Prices -

    Gilman St.

    Sidewalks

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 08/01/11 $99,013.00 $99,013.00 80.00% 50.00%

    Nybor

    Construction

    (AA MBE)

    Bridgeport, Ct. $6,000.00 $6,000.00 n/a n/a

    COB175115 -

    Cross School

    ADA Alteration -

    Sitework Pkg.

    DallingConstructionStratford, Ct. 08/02/11 $563,323.00 30.00% 30.00%

    A & JConstruction(Hispanic MBE)Brookfield, Ct. $54,089.00 $54,089.00 0.00% 85.00%

    Resource

    Services (AAMBE)

    Bridgeport, Ct. $4,625.00 $4,625.00 100.00% 100.00%

    Engineers

    Welding (AA

    MBE)

    Bridgeport, Ct. $21,867.00 $21,867.00 100.00% 100.00%

    Logan & Logan(AA MBE)Ansonia, Ct. $8,241.00 $8,241.00 n/a n/a

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    13/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    COB175115 -Wilbur Cross -

    Painting Pkg.

    ProfessionalPainting (WBE)New Haven, Ct 08/04/11 $61,700.00 $61,700.00 0.00% 50.00%

    Valentine Repairs(AA MBE) NewHaven, Ct $9,500.00 $9,500.00 n/a n/a

    COB175115 -

    Wilbur Cross -

    Fire Protection

    Davis-UlmerEastLongmeadow,Mass 08/10/11 $259,000.00 tbd tbd

    JHP Supply (AAMBE) Syracuse,NY $38,850.00 $38,850.00 n/a n/a

    JC Smith (WBE)Syracuse, NY $38,850.00 $38,850.00 n/a n/a

    CDB249113 -

    Additional

    Demos

    PrimroseConstruction

    (Hispanic MBE)

    Bridgeport, Ct. 08/17/11 $91,825.00 $91,825.00 0.00% 50.00%

    EES (AA MBE)Trumbull, Ct. $32,300.00 $32,300.00 100.00% 100.00%

    CDB255114R -

    Hall

    NeighborhoodHouse - HVAC

    Jordan Electric

    (AA MBE)Bridgeport, Ct. 08/18/11 $26,050.00 $26,050.00 50.00% 50.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    14/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    Celco Inc.

    Bridgeport, Ct $18,675.00 0.00% 25.00%

    COB180127 -

    Knowlton Park

    Phase One

    Anthony Julain

    R.R.

    Bridgeport, Ct. 08/18/11 $1,089,110.00 25.00% 25.00%

    ADE

    Landscaping

    (AA MBE)Bridgeport, Ct. $170,000.00 $170,000.00 50.00% 75.00%

    T. Arduini (WBE)

    Bridgeport, Ct. $251,000.00 $251,000.00 75.00% 50.00%

    COB175115 -

    Wilbur Cross -

    Drywall Pkg.

    Epifano BuldersMilford, Ct. 08/30/11 $430,000.00 0.00% 0.00%

    Aries

    Contracting (AA

    MBE)

    Bridgeport, Ct $70,000.00 $70,000.00 25.00% 25.00%

    MCM Acoustics(AA MBE)Hartford, Ct. $152,000.00 $152,000.00 0.00% 0.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    15/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    COB143101 -Citywide

    Streetscape

    Unit Prices -

    Central Ave.

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 08/31/11 $16,105.00 $16,108.00 80.00% 50.00%

    Nybor

    Construction

    (AA MBE)

    Bridgeport, Ct. $1,100.00 $1,100.00 n/a n/a

    COB143101 -

    CitywideStreetscape

    Unit Prices -

    Alanson St.

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 08/31/11 $93,558.50 $93,558.50 80.00% 50.00%

    Nybor

    Construction

    (AA MBE)

    Bridgeport, Ct. $6,250.00 $6,250.00 n/a n/a

    COB143101 -

    Citywide

    Streetscape

    Unit Prices -

    333 State St.

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 08/31/11 $72,297.50 $72,297.50 80.00% 50.00%

    Nybor

    Construction

    (AA MBE)

    Bridgeport, Ct. $4,750.00 $4,750.00 n/a n/a

    CDB249113 -

    Additional

    Demos

    Ct. Dismantling

    Bridgeport, Ct. 08/31/11 $52,466.00

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    16/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    EES, Inc. (AAMBE)Trumbull, Ct. $15,000.00 $15,000.00 75.00% 75.00%

    COB143101 -

    Citywide

    Streetscape

    Unit Prices -

    Remington &

    Dover

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 08/31/11 $389,555.50 $389,555.50 80.00% 50.00%

    NyborConstruction

    (AA MBE)

    Bridgeport, Ct. $24,780.00 $24,780.00 n/a n/a

    COB143101 -

    Citywide

    Streetscape

    Unit Prices -

    Fishing Pier

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 09/02/11 $90,430.00 $90,430.00 80.00% 50.00%

    Nybor

    Construction(AA MBE)

    Bridgeport, Ct. $5,925.00 $5,925.00 n/a n/a

    COB143101 -

    Citywide

    Streetscape

    Unit Prices -

    Carroll &

    Ordinance

    G. Pic & Sons

    (WBE)

    Bridgeport, Ct. 09/02/11 $59,930.00 $59,930.00 80.00% 50.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    17/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    Nybor

    Construction

    (AA MBE)

    Bridgeport, Ct. $3,920.00 $3,920.00 n/a n/a

    COB179116 -

    Longfellow

    Asbestos

    Abatement &

    Demo

    AAIS, Inc. WestHaven, Ct 09/07/11 $418,425.00 25.00% 50.00%

    Premier

    Construction

    (AA MBE)

    Bridgeport, Ct. $63,800.00 $63,800.00 80.00% 80.00%

    Premier

    Enterprises (AA

    WBE)

    Bridgeport, Ct. $64,000.00 $64,000.00 100.00% 100.00%

    CDB249113 -

    Demo -

    Additional

    Quotes

    ******(partial waive)

    StamfordWrecking

    Trumbull, Ct 09/07/11 $30,400.00 50.00% 50.00%

    Midway Trucking(WBE) NorthBranford, Ct $7,900.00 $7,900.00 0.00% 0.00%

    Total Fence(WBE) NewHaven, Ct. $1,925.00 $1,925.00 0.00% 0.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    18/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    COB075115 -Wilbur Cross

    School -

    Plumbing &

    HVAC

    SuperiorMechanicalWallingford, Ct 09/15/11 $910,000.00 25.00% 25.00%

    R.K. Insulation(AA MBE)Hartford, Ct $136,500.00 $136,500.00 0.00% 50.00%

    Superior ServiceGroup (WBE)Cheshire, Ct $140,000.00 $140,000.00 n/a n/a

    COB175115 -

    Wilbur Cross

    School -

    Windows

    Massey Plate &GlassBranford, Ct 09/16/11 $528,000.00 0.00% 10.00%

    Nybor

    Constructio (AA

    MBE)

    Bridgeport, Ct $79,200.00 $79,200.00 n/a n/a

    MasseyArchitecturalSystems (WBE)Branford, Ct $135,404.00 $135,404.00

    COB175115 -

    Wilbur Cross

    School -

    Flooring

    Spectrum FloorsCheshire, Ct 09/25/11 $223,865.00 20.00% 20.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    19/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    Nybor

    Construction

    (AA MBE)

    Bridgeport, Ct. $33,000.00 $33,000.00 n/a n/a

    Garsan Corp(WBE)Watertown, Ct $25,000.00 $25,000.00 n/a n/a

    JJ Curran & Sons(WBE) Albany,NY $7,894.00 $7,894.00 0.00% 0.00%

    COB201128 -

    Washington

    Park Splash

    Pad

    ConcreteCreations newHaven, Ct 10/05/11 $118,000.00

    Nybor

    Construction

    (AA MBE)

    Bridgeport, Ct $19,470.00 $19,470.00 n/a n/a

    M.E. O'Brien(WBE)Medfield, Mass $28,355.00 $28,355.00 n/a n/a

    COB16611C -

    Engine 7/11

    Roof

    Replacement

    AlliedRestoration EastHartford, Ct. 10/19/11 $134,400.00 20.00% 65.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    20/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    Jordan Electric

    (AA MBE)

    Bridgeport, Ct $20,160.00 $20,160.00 100.00% 100.00%

    ASAEnvironmentalProducts(Hispanic WBE)Stonington, Ct. $20,160.00 $20,160.00 n/a n/a

    CDB249113 -

    Demos -Additional

    Quotes

    Ocean TraceDemolitionWatertown, Ct. 10/31/11 $54,422.00 0.00% 33.00%

    CPMEnvironmental(AA MBE)Seymour, Ct $8,162.00 $8,162.00 100.00% 100.00%

    Balestrieri & Sons(WBE) Trumbull,Ct $8,004.00 $8,004.00 33.00% 66.00%

    COB20912A -

    Washington

    Park

    Improvements

    ConcreteCreations NewHaven, Ct. 11/08/11 $182,900.00 0.00% 0.00%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    21/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    NyborConstruction

    (AA MBE)

    Bridgeport, Ct $40,178.00 $40,178.00 n/a n/a

    M.E. O'Brien(WBE)Medfield, Mass $15,000.00 $15,000.00 n/a n/a

    COB178116R -

    BurroughLibrary Roof

    Replacement -

    Rebid

    GreenwoodIndustries, Inc.Worcester,Mass. 11/22/11 $1,013,000.00

    Costar Metal &Iron Services (AAMBE) Bethel,Ct. $75,500.00 $75,500.00 0.00% 0.00%

    Imperial RubbishRemoval (AA

    MBE)Yalesville, Ct. $105,642.00 $105,642.00 0.00% 100.00%

    Ace Mechanical(AA MBE)Waterbury, Ct. $27,645.00 $27,645.00 0.00% 100.00%

    PremierEnterprises KM,LLC (AA WBE)Bridgeport, Ct. $46,320.00 $46,320.00

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    22/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    NyborConstruction (AAWBE) Bridgeport,Ct. $89,430.00 $89,430.00 n/a n/a

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    23/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    Award

    Total $14,477,905.50 Sub Contractor Total $3,876,452.00Prime MWBE

    Award Totals $4,137,916.50 Sub MWBE Totals $3,699,207.00

    Calculated on

    11/22/11 Prime MWBE % 28.58%

    Sub MWBE % of

    the Total Sub

    Contracts 95.43%

    (15) WBE Amount $2,882,552.00

    Sub MWBE % of

    the Total Prime

    Awards 25.55%

    (5) MBE Amount $1,255,391.00

    Sub WBE Total

    Amounts $1,262,257.00

    (1) AA MBE Amount $26,050.00

    Sub WBE % of the

    Total Sub

    Contracts 32.56%

    Sub WBE % of the

    Total Prime

    Awards 8.72%

    Sub MBE Totals

    Amounts $2,500,950.00

    Sub MBE % of the

    Total Sub

    Contracts 64.52%

    Sub MBE % of the

    Total Prime

    Awards 17.28%

    Sub AA MBE Total

    Amounts $2,440,161.00

    Sub AA MBE % of

    the Total Sub

    Contracts 62.95%

    Sub AA MBE % of

    the Total Prime

    Awards 16.86%

  • 8/3/2019 Awarded Physical Development Projects for 2011 Only - Prime Sub Rev 11-22-11 (2)

    24/24

    Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)

    Project Contractor

    Date

    of

    Award

    AwardAmount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Projected

    Minority

    Workers %

    keys:

    Not awarded to low

    bidder, because they

    failed to comply with

    the City's MBE

    Ordinance

    *****Grantedwaiver throughGood FaithEfforts

    WBE = CertifiedWoman OwnedBusiness

    MBE = CertifiedMinority OwnedBusiness

    AA MBE =Certified AfricanAmericanOwned Business

    MBV = MinorityBusinessViolation

    DBV = DavisBacon Violation

    Bold Type=Bpt

    Based

    Businesses