    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward

    AwardAmount

    MWBEAmount

    SubContractor

    Sub AwardAmount

    Sub MWBEAmount

    Projected BptWorkers %

    Projected

    MinorityWorkers %

    COB1309A -Wentfield ParkProject

    IWAConstruction(WBE) 01/15/09 $99,000.00 $99,000.00

    EngineersWelding (AAMBE) $14,800.00 $14,800.00 100.00%

    NationwideElectric (AA MBE) $9,160.00 $9,160.00 33.00% 100.00%

    Jack Goncalves $16,000.00 100.00% 0.00%D & DConstruction (AAMBE) $18,000.00 $18,000.00

    CDB2329B -New SidewalksPhase 4

    DiCoccoConstruction(WBE) 03/24/09 $61,634.00 $61,634.00

    D & DConstruction (AAMBE) $4,000.00 $4,000.00 100.00% 100.00%

    Aquaculture

    School

    Addition 1.01

    Site & Piles

    PJ'sConstruction(MBE) 04/22/09 $3,613,300.00 $3,613,300.00 25.00% 37.50%

    Elm CityRenovations (AAMBE) $63,532.00 $63,532.00 0.00% 50.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    2/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward

    AwardAmount

    MWBEAmount

    SubContractor

    Sub AwardAmount

    Sub MWBEAmount

    Projected BptWorkers %

    Projected

    MinorityWorkers %

    New EnglandFoundation(WBE) $475,000.00 $475,000.00 0.00% 10.00%

    Pro-Teck Unit Prices 0.00% 0.00%

    EngineersWelding (AAMBE) $159,803.00 $159,803.00 50.00% 100.00%

    COB13492 -

    Aquaculture

    School

    Addition - 1.02

    Concrete

    WaterburyMasonry &Foundation

    (WBE) - MBV 04/24/09 $1,109,000.00 $1,109,000.00 tbd tbd

    Capital Masonry(AA MBE) $77,420.00 $77,420.00 0.00% 0.00%

    Modern Concrete $18,000.00 0.00% 100.00%CDB23593 -

    Scattered Site

    Rehab 39-41

    McKinley Ave.

    IWAConstruction(WBE) 05/12/09 $132,500.00 $132,500.00 44.00% 11.00%

    Jesco Builders(AA MBE) $18,500.00 $18,500.00 100.00% 100.00%

    NationwideElectric (AA MBE) $13,500.00 $13,500.00 100.00% 100.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    3/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward

    AwardAmount

    MWBEAmount

    SubContractor

    Sub AwardAmount

    Sub MWBEAmount

    Projected BptWorkers %

    Projected

    MinorityWorkers %

    COB13492 -

    Aquaculture

    School

    Addition - 1.12

    Plumbing James T. Kay 05/13/09 $1,019,000.00 tbd tbd

    Shetucket Supply(WBE) $100,000.00 $100,000.00 n/a n/a

    PCC Tech (AAMBE) $153,000.00 $153,000.00 n/a n/a

    Grove Systems(WBE) $50,000.00 $50,000.00 n/a n/a

    Langan Insulation $178,000.00 33.00% 33.00%COB13492 -

    Aquaculture

    SchoolAddition - 1.13

    Mechanical James T. Kay 05/13/09 $2,423,900.00 tbd tbd

    Grove Systems(WBE) $130,000.00 $130,000.00 n/a n/a

    Grove Systems(WBE) $244,000.00 $244,000.00 tbd 50.00%

    Shetucket Supply

    (WBE) $50,000.00 $50,000.00 n/a n/a

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    4/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward

    AwardAmount

    MWBEAmount

    SubContractor

    Sub AwardAmount

    Sub MWBEAmount

    Projected BptWorkers %

    Projected

    MinorityWorkers %

    PCC Tech (AAMBE) $302,800.00 $302,800.00 n/a n/a

    Air Tech $490,000.00 tbd tbd

    CDB2339C -

    Asbestos

    Removal &

    Demo - 37 &

    45 Revere &

    309 Carroll

    IndustrialWrecking 05/22/09 $61,250.00 66.00% 33.00%

    RedTechnologies(WBE) $9,200.00 $9,200.00 0.00% 0.00%

    EES (AA MBE) $9,200.00 $9,200.00 33.00% 33.00%COB13592 -

    East End

    School

    CreativeRecreation -

    MBV 05/21/09 $113,141.00 14.28% 28.57%CapitalRestoration (AAMBE) $13,000.00 $13,000.00 0.00% 66.00%

    Site Specifics(WBE) $57,432.00 $57,432.00 0.00% 0.00%

    COB13694 -

    Repair &

    Replacement -

    Columbus

    School Holzner Electric 05/29/09 $437,000.00 66.00% 66.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    5/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward

    AwardAmount

    MWBEAmount

    SubContractor

    Sub AwardAmount

    Sub MWBEAmount

    Projected BptWorkers %

    Projected

    MinorityWorkers %

    HE Palmer $6,950.00

    Vaz QualityWorks (MBE) $234,000.00 $234,000.00 100.00% 60.00%PremierConstruction (AAMBE) $28,500.00 $28,500.00 66.00% 33.00%

    Total Fence(WBE) $17,900.00 $17,900.00 0.00% 33.00%

    Pro Iron (WBE) $36,500.00 $36,500.00

    Fairfield ElectricSupply (WBE) $25,000.00 $25,000.00 n/a n/a

    COB13492 -

    Aquacultue

    SchoolAddition - 1.05

    General

    Trades

    GennariniConstruction(WBE) 06/11/09 $2,526,400.00 $2,526,400.00 60.00% 40.00%

    PremierConstruction (AAMBE) $48,066.00 $48,066.00 100.00% 100.00%

    MCM Acoustics(AA MBE) $104,000.00 $104,000.00 33.00% 66.00%

    Unity Prevention(AA MBE) $65,000.00 $65,000.00 100.00% 100.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    6/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward

    AwardAmount

    MWBEAmount

    SubContractor

    Sub AwardAmount

    Sub MWBEAmount

    Projected BptWorkers %

    Projected

    MinorityWorkers %

    AdvancedCleaning (AAMBE) $11,800.00 $11,800.00 50.00% 50.00%

    Tyssen KruppElevator $58,500.00 0.00% 0.00%

    J & G Glass $137,000.00 100.00% 50.00%

    Clonial WoodProducts $54,490.00 0.00% 0.00%

    CGM Acoustics $600,000.00 50.00% 50.00%

    Ford & Ulrich $29,284.00 n/a n/a

    InnovativeInstallation

    $5,100.000.00% 0.00%

    Colony Builders $1,900.00 0.00% 0.00%

    R & R Locker $4,865.00 0.00% 0.00%

    CRF Inc. $13,283.00 0.00% 0.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    7/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    CDB2339C -

    Asbestos

    Removal &

    Demo - 983

    Kossuth St. AMEC 06/09/09 $27,425.00 38.00% 84.00%CPMEnvironmental(AA MBE) $6,500.00 $6,500.00 6.00% 100.00%

    CDB23593 -

    Rehab 51-55Evers Court -

    Phase II C C & L (MBE) 06/11/09 $115,000.00 $115,000.00 50.00% 75.00%

    IWA Construction(WBE) $61,182.00 $61,182.00 80.00% 40.00%

    NationwideElectric (AA MBE) $11,000.00 $11,000.00 14.00% 50.00%

    COB13492 -

    Aquaculture

    SchoolAddition - 1.04

    Steel United Steel 06/17/09 $977,740.00 n/a n/a

    Action Steel(WBE) $328,000.00 $328,000.00 13.00% 33.00%EngineersWelding (AAMBE) $147,000.00 $147,000.00 n/a n/a

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    8/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    COB13492 -

    Aquaculture

    School

    Addition - 1.06

    Roofing &

    Sheetmetal

    The ImperialCompany 06/19/09 $932,917.00 10.00% 20.00%

    The HartfordLumber Company

    (WBE) $140,000.00 $140,000.00 n/a n/a

    Jordan Electric(AA MBE) $140,000.00 $140,000.00 n/a n/a

    COB13492 -

    Aquaculture

    School

    Addition - 1.14

    Electrical ACME Electric 06/25/09 $1,176,273.00 25.00% 25.00%AMCEnvironmental

    (AA MBE) $86,000.00 $86,000.00 0.00% 66.00%AndersonElectrical (AAMBE) $87,400.00 $87,400.00 n/a n/a

    KND Electric(WBE) $20,000.00 $20,000.00 n/a n/a

    Net Services(WBE) $160,000.00 $160,000.00 n/a n/a

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    9/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    CDB2339C -

    Asbestos

    Removal &

    Demo - 480

    Clinton Ave.

    AMEC (thelowest bidderwasdisqualified fornon-compliance) 06/25/09 $19,500.00

    F & GConstruction

    (WBE) $3,000.00 $3,000.000.00% 100.00%

    CPMEnvironmental(AA MBE) $1,170.00 $1,170.00 50.00% 100.00%D & DConstruction (AAMBE) $1,755.00 $1,755.00 100.00% 100.00%

    COB13492 -

    Aquaculture

    School - 1.11

    Fire Protection

    ProfessionalMechanical 07/09/09 $141,000.00 0.00% 0.00%

    R & F Piping (AAMBE) $21,150.00 $21,150.00 n/a n/a

    Shetucket Supply(WBE) $21,150.00 $21,150.00 n/a n/a

    COB13492 -

    Aquaculture

    School - 1.07

    Flooring

    UrbanContractors ofCt. LLC (AAMBE) 07/22/09 $255,770.00 $255,770.00 0.00% 50.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    10/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    COB13492 -

    Aquaculture

    School

    Addition - 1.03

    Masonry

    ConnecticutMasonContractors

    (WBE) - MBV 08/04/09 $830,000.00 $830,000.00 20.00% 40.00%

    PremierConstruction (AAMBE) $124,500.00 $124,500.00 100.00% 100.00%

    CDB23593 -

    Rehab 59-61

    Evers Court -

    Phase IIC F & V Design 08/05/09 $119,500.00 20.00% 20.00%

    PremierConstruction (AAMBE) $15,000.00 $15,000.00

    SouthportContracting(WBE) $19,750.00 $19,750.00

    BFK Plumbing $33,000.00 0.00% 0.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    11/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    Walter's Electric $11,000.00 0.00% 0.00%

    COB13492 -

    Aquaculture

    School

    Addition

    MacKenziePainting (WBE) 08/14/09 $98,500.00 $98,500.00 75.00% 75.00%

    CunninghamPainting (AAMBE) $14,775.00 $14,775.00

    CDB23086 -

    HVAC Work -

    BAYM

    Celco Corp.(Failed toComply withthe MBEOrdinance)

    NotAwarded

    Project on

    2/4/09 Re-bid $23,033.00

    CDB23086R -

    HVAC - BAYM

    Celco Heating& AirConditioning****** Granted15% WBE waiver

    only based on

    Good Faith Efforts 10/06/09 $23,624.00 25.00% 25.00%

    Jordan Electric(AA MBE) $3,543.00 $3,543.00 100.00% 100.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    12/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    MNB106107S -

    Wheeler

    Fountain

    Repair

    MerrittContractors****** Granted15% WBE Waiver

    based on

    Bridgeport

    Resident

    Exemption 10/14/09 $199,000.00 33.00% 66.00%

    EngineersWelding (AAMBE) $13,300.00 $13,300.00 100.00% 100.00%SerranoConstruction(MBE) $23,400.00 $23,400.00

    MNB110109 -

    Eisenhower

    Pool DrainRepair Holzner Electric 10/23/09 $12,985.00

    Fathom Solutions(MBE) $2,600.00 $2,600.00 0.00% 0.00%

    Premier

    Construction (AAMBE) $1,200.00 $1,200.00 100.00% 100.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    13/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    Discovery

    Magnet School

    - 1.02 Site

    Work

    K & WConstruction(WBE) 11/05/09 $2,833,198.00 $2,833,198.00 22.00% 22.00%

    Onsite Services(WBE) $26,680.00 $26,680.00 28.00% 0.00%Glen TerraceLandscaping

    (WBE) $140,650.00 $140,650.00 0.00% 10.00%A & JConstruction(MBE) $189,317.00 $189,317.00 0.00% 100.00%

    Massey Trucking(AA MBE) $110,000.00 $110,000.00 0.00% 100.00%

    J.A.Q. Concrete(AA MBE) $300,000.00 $300,000.00 0.00% 100.00%

    MD Drilling $163,000.00 0.00% 25.00%

    Total Fence(WBE) $95,319.00 $95,319.00 0.00% 50.00%

    Tremson Corp. $9,800.00 0.00% 50.00%Discovery

    Magnet School

    - 1.03

    Concrete

    McDowellBuilding &Foundation

    (WBE) 11/24/09 $1,463,000.00 $1,463,000.00 11.00% 22.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    14/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    JFC Construction(AA MBE) $219,500.00 $219,500.00 25.00% 50.00%

    Columbus

    School

    Renovation

    1.16 Electrical Wiremen, Inc. 12/08/09 $280,400.00 0.00% 0.00%

    Kerr Electric (AA

    MBE) $42,500.00 $42,500.00 n/a n/a

    Beacon Electric(WBE) $42,500.00 $42,500.00 n/a n/a

    Columbus

    School 1.02

    Demo &

    Abatement

    Cherry HillConstruction 12/11/09 $429,190.00 0.00% 50.00%

    AMCEnvironmental(AA MBE) $40,000.00 $40,000.00 0.00% 66.00%

    Victory Industries(AA MBE) $25,200.00 $25,200.00 0.00% 80.00%

    JD Environmental(WBE) $65,000.00 $65,000.00 0.00% 0.00%

    Discovery

    Magnet 1.05

    Steel

    SteeltechBuildingProducts 12/11/09 $1,318,000.00 n/a n/a

    First ClassConstruction (AA

    MBE) $85,000.00 0.00% 0.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    15/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    Bear SteelErectors (WBE) $488,000.00 23.00% 34.00%

    COB13910A -

    Columbus

    School

    Renovation

    1.06 General

    Trades

    DiRienzoMechanicalContractors

    (WBE) - MBV 12/14/09 $429,166.00 $429,166.00 0.00% 12.50%

    JennetteConstruction (AAMBE) $29,900.00 $29,900.00 0.00% 100.00%

    Shetucket Supply(WBE) $86,000.00 $86,000.00 n/a n/aKricketMechanical(WBE) $50,000.00 $50,000.00 n/a n/a

    Columbus

    School 15AFire Protection

    HHSMechanical 12/14/09 $266,000.00 0.00% 0.00%

    Enterprise FireProtection (AAMBE) $39,900.00 $39,900.00 n/a n/aKricketMechanical(WBE) $39,900.00 $39,900.00 n/a n/a

    Columbus

    School

    Renovation

    1.06 GeneralTrades G. Donovan 12/15/09 $1,555,600.00

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    16/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    Major Theater $4,925.00 0.00% 50.00%

    Total Fence $3,945.00 50.00%

    Division 3 $7,100.00 0.00% 100.00%

    Accessory Doors& Hardware $45,870.00 0.00% 0.00%

    SchindlerElevator $69,400.00 0.00% 0.00%

    GC Signs $13,800.00 0.00% 0.00%New EnglanInteriorSpecialties $3,600.00 0.00% 0.00%AdvancedCleaning (AAMBE) $20,350.00 $20,350.00 100.00% 100.00%

    Executive Suites(AA MBE) $12,740.00 $12,740.00 25.00% 100.00%

    Logan & Logan(AA MBE) $168,000.00 $168,000.00 n/a n/a

    Davis Disposal

    (AA MBE) $31,000.00 $31,000.00 100.00% 100.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    17/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    YSR (AA MBE) $2,230.00 $2,230.00 n/a n/a

    Gold SealRoofing (WBE) $42,500.00 $42,500.00 0.00% 62.00%

    Clay Furniture(WBE) $42,350.00 $42,350.00 0.00% 33.00%

    Accurate Door &Windows (WBE) $138,000.00 $138,000.00 0.00% 20.00%

    Pro-Tect Inc.(WBE) $20,500.00 $20,500.00 50.00% 50.00%

    Discovery

    Magnet - 1.06

    General

    Trades

    LeoConstruction(AA MBE) 12/21/09 $1,075,000.00 $1,075,000.00 50.00% 50.00%

    UnitedBlackboard $47,000.00 0.00% 0.00%

    Thyssen KruppElevator $52,700.00 0.00% 0.00%

    CRF $95,000.00 0.00% 0.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    18/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    C & A Distributers $38,630.00 n/a n/a

    AmericanOverhead Door $15,850.00 0.00% 0.00%

    Tull Brothers $196,000.00 n/a n/a

    Sign Lite $16,806.00 0.00% 0.00%

    WalkerSpecialties $8,500.00 0.00% 100.00%

    R & R Locker $9,400.00 n/a n/a

    Draperies Inc. $23,386.00 0.00% 100.00%

    Stan-Mar

    Cleaning $10,000.00 100.00% 100.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    19/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    AdvancedCleaning (AAMBE) $12,000.00 $12,000.00 50.00% 100.00%

    Stuart White $1,702.00 n/a n/aDiscovery

    Magnet - 1.09Drywall CGM 12/29/09 $1,100,000.00 55.00% 44.00%

    New EnglandConstruction (AAMBE) $172,000.00 $172,000.00 14.00% 28.00%

    Green Depot(WBE) $155,000.00 $155,000.00 n/a n/a

    StoningtonServices (WBE) $13,500.00 $13,500.00

    Discovery

    Magnet - 1.07

    Roofing

    GreenwoodIndustries 12/29/09 $1,577,000.00 52.00% 40.00%

    Leo Construction(AA MBE) $292,150.00 $292,150.00 25.00% 50.00%

    Hartford Lumber(WBE) $236,550.00 $236,550.00 n/a n/a

    Discovery

    Magnet - 1.16

    Electrical Rizzo Electric 12/30/09 $2,076,503.00 13.00% 13.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    20/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    Kerr Electric (AAMBE) $315,000.00 $315,000.00 0.00% 0.00%

    NY-Conn (WBE) $315,000.00 $315,000.00 n/a n/a

    Award

    Total $30,951,449.00 Sub Contractor Total $10,594,510.00

    Prime MWBE

    Award Totals $14,641,468.00 Sub MWBE Totals $7,527,724.00

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    21/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Dateof

    Award

    Award

    Amount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected Bpt

    Workers %

    Proje

    Mino

    Worker

    Calculated on

    9/07/11 Prime MWBE % 47.31%

    Sub MWBE % of

    the Total Sub

    Contracts 71.05%

    (# 10) WBE Amount $9,582,398.00

    Sub MWBE % of

    the Total Prime

    Awards 24.33%

    (# 4) MBE Amount $5,059,070.00

    Sub WBE Total

    Amounts $3,945,563.00

    (2) AA MBE Amount $1,330,770.00

    Sub WBE % of the

    Total Sub

    Contracts 37.25%

    Sub WBE % of the

    Total Prime

    Awards 12.75%

    Sub MBE Totals

    Amounts $4,155,161.00

    Sub MBE % of the

    Total Sub

    Contracts 39.22%

    Sub MBE % of the

    Total Prime

    Awards 13.42%

    Sub AA MBE Total

    Amounts $3,403,954.00

    Sub AA MBE % of

    the Total Sub

    Contracts 32.13%

    Sub AA MBE % of

    the Total PrimeAwards 11.00%

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    22/44

    Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)

    Project Contractor

    Date

    of

    Award

    Award

    Amount

    MWBE

    Amount

    Sub

    Contractor

    Sub Award

    Amount

    Sub MWBE

    AmountProjected BptWorkers %

    Projected

    MinorityWorkers %

    keys:

    Not awarded to low

    bidder, because they

    failed to comply with

    the City's MBE

    Ordinance

    *****Grantedwaiver throughGood FaithEfforts

    WBE = CertifiedWoman OwnedBusiness

    MBE = CertifiedMinority OwnedBusiness

    AA MBE =

    Certified AfricanAmericanOwned Business

    MBV = MinorityBusinessViolation

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    23/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    24/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    25/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    26/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    27/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    28/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    29/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    30/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    31/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    32/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    33/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    34/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    35/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    36/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    37/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    38/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    39/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    40/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    41/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    42/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    43/44

  • 8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009

    44/44