Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
COLE SWEATTVice PresidentTel: (916) [email protected] Lic. #01220240
BRIAN PAVEY, CCIMSenior Investment ConsultantTel: (916) [email protected] Lic. #01447547
TRI Commercial | 532 Gibson Drive, Suite 200 | Roseville, CA | BRE # 00532032
Exclusively Listed By:
AVAILABLE FOR LEASE4 7 1 7 G O L D E N F O OT H I L L P K W Y
E l Do rado H i l l s , CA 95762
NEW RATE!$0.90/SF
FULL SERVICE
LINCOLN GATEWAY100-170 GATEWAY DRIVE | LINCOLN, CA 95648
AVAILABLE FOR LEASE4717 GOLDEN FOOTHILLS PKWY | EL DORADO HILLS, CA
• Office/Flex building in the heart of the El Dorado Hills submarket
• ± 3,358 SF first floor office and ± 1,294 SF second floor office
• Can be combined ± 4,652 SF, two-story office suite
• Fully improved with multiple private offices, conference room, reception area, two break rooms, rest rooms, and lab space
• The property features clean window lines and ample parking
• Close proximity to various retail and restaurant amenities
• Zoned: M1 per Sacramento County
• JUST REDUCED LEASE RATE: $0.90/SF FULL SERVICE
PROPERTY HIGHLIGHTS:
FIRST FLOOR
UP
UP
UP
UP
UP
Test Room1
Storage2
Janitor3
Breakroom4
Office5
Office6
Office7
Women9
Office10
Hall11
Office12
Office13
Office14
Office15
Hallway16
Conference17
Marketing18
113 SF
Server19
Lobby20
Office21
Office22
Office23
Office24
Office25
Office26
Office27
Office28
Office29
Office30
Office31
Office32
Office33
Supplies34
Clo.35
Clo.36
386 SF
Breakroom37
R/R38
311 SF
Lab39
424 SF
Lab40
142 SF
Office42
95 SF
Office43
79 SF
Women44
79 SF
Men45
145 SF
Breakroom46
104 SF
Office47
103 SF
Office48
308 SF
Conference49
56 SF
Supplies50
67 SF
Stairs51
Stair52
Clo53
270 SF
Lobby54
582 SF
Hall55
Electrical56
Utility57
Office58 Men
8
REC
EPTI
ON
DES
K
1
TACTILEEXIT SIGN
TOTAL AREA: 3,358
DBA
R
Scale
Project Number
Date
Drawn by
Checked by
REVISIONS
SHEET TITLE:
PROJECT ADDRESS:
PROJECT NAME:
1751 Cebrian StreetWest Sacramento, CA 95691
P - 916.375-0773www.SacDesign.Systems
Professional Member of the A.I.B.D.American Institue of Building Designers
1/8" = 1'-0"
2/13
/201
7 1:
03:0
8 PM
AA-1
Area Analysis Plan
11-026
ESI CorporateOffices
02-13-2017MKEGMKEG
4717 Golden FoothillsPkwyEl Dorado Hills, CA
1/8" = 1'-0"1 First Floor Plan - SF Analysis
Area Schedule - First Floor
Number Name Area Floor Finish Base Finish Wall Finish Ceiling Finish Comments
4 Breakroom 135 SF (N) Porcelain Tile (N) Rubber Base (E) Textured Gyp Bd (E) T-Bar Grid and Panels5 Office 76 SF (E) Carpet (E) Wood Base (N) & (E) Textured Gyp Bd (N) Painted Gyp Bd6 Office 170 SF (E) Carpet (E) Wood Base (N) & (E) Textured Gyp Bd (E) Painted Gyp Bd11 Hall 98 SF (N) Porcelain Tile (N) Wood Base (N) & (E) Textured Gyp Bd (N) Painted Gyp Bd16 Hallway 848 SF (E) Porcelain Tile (E) Wood Base (N) & (E) Textured Gyp Bd (E) Painted Gyp Bd18 Marketing 1002 SF (E) Stained Concrete (N) Wood Base (E) Textured Gyp Bd (N) Insulation Paper - Painted19 Server 113 SF (N) VCT 12" (N) Rubber Base (E) Textured Gyp Bd (E) Painted Gyp Bd20 Lobby 654 SF (E) Stained Concrete (N) Wood Base (N) Textured Gyp Bd (N) Insulation Paper - Painted21 Office 99 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint22 Office 102 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint23 Office 102 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint24 Office 96 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint25 Office 113 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint26 Office 94 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint27 Office 86 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint28 Office 84 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint29 Office 88 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint30 Office 88 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint31 Office 82 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint32 Office 81 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint33 Office 76 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) Painted Gyp Bd All New Finishes - Match Textures and Paint34 Supplies 36 SF (N) Carpet (N) Rubber Base (N) & (E) Textured Gyp Bd (E) Painted Gyp Bd Match Textures and Paint at New Finishes35 Clo. 18 SF (N) Carpet (N) Rubber Base (N) & (E) Textured Gyp Bd (E) Painted Gyp Bd Match Textures and Paint at New Finishes36 Clo. 21 SF (N) Carpet (N) Rubber Base (E) Textured Gyp Bd (E) T-Bar Grid and Panels Match Finishes at Carpet37 Breakroom 386 SF (E) Stained Concrete (N) Rubber Base (N) FRP and Trim (E) T-Bar Grid and Panels Match Finishes at New Areas39 Lab 311 SF (E) Stained Concrete (N) Rubber Base (N) & (E) Textured Gyp Bd (E) T-Bar Grid and Panels Match Finishes at New Areas40 Lab 424 SF (E) Exposed Concrete (N) Rubber Base (N) Textured Gyp Bd (E) T-Bar Grid and Panels Match Finishes at New Areas42 Office 142 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) T-Bar Grid and Panels All New Finishes - Match Textures and Paint43 Office 95 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd (N) T-Bar Grid and Panels All New Finishes - Match Textures and Paint44 Women 79 SF (N) Porcelain Tile (N) Tile Base (N) FRP and Trim (N) Painted Gyp Bd All New Finishes - Match Textures and Paint45 Men 79 SF (N) Porcelain Tile (N) Tile Base (N) FRP and Trim (N) Painted Gyp Bd All New Finishes - Match Textures and Paint46 Breakroom 145 SF (N) Porcelain Tile (N) Rubber Base (N) FRP and Trim (N) T-Bar Grid and Panels All New Finishes - Match Textures and Paint47 Office 104 SF (N) Carpet (N) Rubber Base (N) Textured Gyp Bd (N) T-Bar Grid and Panels All New Finishes - Match Textures and Paint48 Office 103 SF (N) Carpet (N) Rubber Base (N) Textured Gyp Bd (N) T-Bar Grid and Panels All New Finishes - Match Textures and Paint49 Conference 308 SF (E) Stained Concrete (N) Wood Base (N) Textured Gyp Bd (N) T-Bar Grid and Panels Match Finishes at New Areas50 Supplies 56 SF (E) Stained Concrete (N) Rubber Base (N) & (E) Textured Gyp Bd (N) T-Bar Grid and Panels Match Finishes at New Areas51 Stairs 67 SF (E) Stained Concrete (E) Rubber Base (E) Textured Gyp Bd (N) T-Bar Grid and Panels Match Finishes at New Areas52 Stair 72 SF (N) Rubber Stair Tread & Risers (N) Rubber Base (N) Textured Gyp Bd (N) Insulation Paper - Painted All New Finishes - Match Textures and Paint53 Clo 31 SF (E) Stained Concrete (N) Rubber Base (N) Textured Gyp Bd (N) Painted Gyp Bd Match Finishes at New Areas54 Lobby 270 SF (E) Stained Concrete (N) Wood Base (N) Textured Gyp Bd (N) Insulation Paper - Painted All New Finishes - Match Textures and Paint55 Hall 582 SF (E) Exposed Concrete (N) Wood Base (N) Textured Gyp Bd (N) T-Bar Grid and Panels All New Finishes - Match Textures and Paint56 Electrical 67 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work (E) First Floor Room to Remain57 Utility 52 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work (E) First Floor Room to Remain58 Office 103 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work (E) First Floor Room to Remain
No. Description Date
SECOND FLOOR
DN
DN
DN
DN
250 SF
Conference59
773 SF
Office61
360 SF
Office62
97 SF
Men63
46 SF
Women64
268 SF
Office65
963 SF
Storage66
378 SF
Hallway67
62 SF
Tech68
20 SF
Closet70
6 SF
Closet71
1004 SF
Storage72
1313 SF
Mezzanine73
TOTAL AREA: 1,294 S.F.
DBA
R
Scale
Project Number
Date
Drawn by
Checked by
REVISIONS
SHEET TITLE:
PROJECT ADDRESS:
PROJECT NAME:
1751 Cebrian StreetWest Sacramento, CA 95691
P - 916.375-0773www.SacDesign.Systems
Professional Member of the A.I.B.D.American Institue of Building Designers
1/8" = 1'-0"
2/13
/201
7 1:
03:0
8 PM
AA-2
Area Analysis -Second Level
11-026
ESI CorporateOffices
02-13-2017MKEGMKEG
4717 Golden FoothillsPkwyEl Dorado Hills, CA
1/8" = 1'-0"1 Second Floor Plan - SF Analysis
Area Schedule - Second Floor
Number Name Area Floor Finish Base Finish Wall Finish Ceiling Finish Comments
59 Conference 250 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required61 Office 773 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required62 Office 360 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required63 Men 97 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required64 Women 46 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required65 Office 268 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required66 Storage 963 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required67 Hallway 378 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required68 Tech 62 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required70 Closet 20 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required71 Closet 6 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required72 Storage 1004 SF Existing - No Work Existing - No Work Existing - No Work Existing - No Work Second Floor Room - No Work Required73 Mezzanine 1313 SF (N) Carpet (N) Wood Base (N) Textured Gyp Bd Existing - No Work Second Floor Room - No Work Required
No. Description Date
* Floor plans not to scale.Available: ± 3,358 SF
Available: ± 1,294 SF
LINCOLN GATEWAY100-170 GATEWAY DRIVE | LINCOLN, CA 95648
AVAILABLE FOR LEASE4717 GOLDEN FOOTHILLS PKWY | EL DORADO HILLS, CA
MATURE LANDSCAPING THROUGHOUT
INTERIOR IMAGES
SPACIOUS ROOMS OPEN FLOOR PLANS LAB SPACE
HARDWOOD FLOORS NATURAL LIGHT BREAK ROOM
LINCOLN GATEWAY100-170 GATEWAY DRIVE | LINCOLN, CA 95648
AVAILABLE FOR LEASE4717 GOLDEN FOOTHILLS PKWY | EL DORADO HILLS, CA
The informat ion in th is document was obta ined f rom sources we deem rel iable; however, no warranty or representa t ion, expressed or impl ied, is made to the accuracy of the informat ion conta ined herein.
4717 GOLDEN FOOTHILL PKWY
LATRO
BE R
D
Cole SweattVice PresidentTel: (916) [email protected] Lic. #01220240
Brian Pavey, CCIMSenior Investment ConsultantTel: (916) [email protected] Lic. #01447547
GOLDEN FOOTHILL PKWY
FOUR SEASONS AT EL DORADO HILLS
Exclusively Listed By:
LINCOLN GATEWAY100-170 GATEWAY DRIVE | LINCOLN, CA 95648
AVAILABLE FOR LEASE4717 GOLDEN FOOTHILLS PKWY | EL DORADO HILLS, CA