    Packer test data

  • 0

    0.2

    0.4

    0.6

    0.8

    1.0

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.0

    0.0

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 27.0 mbgl

    Bottom of test section : 30.0 mbgl

    Centre of test section : 28.5 mbgl

    Length of test section : 3.0 m

    Pressure gauge height : 0.8 m

    Initial depth of GW : 3.7 mbgl

    Correction to gauge pressure : 43.9 kPa

    0.0

    0.0

    0.0

    0.0

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    293.9

    423.9

    543.9

    423.9

    293.9

    0.0

    0.0

    0.0

    0.0

    0.0

    250

    380

    500

    380

    250

    0.0

    0.0

    0.0

    0.0

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.0

    0.0

    0.0

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 27.00 - 30.00 m

    Test No.: 3

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Comacchio Geo 305

    Driller: Terratest Pty Ltd.

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5818541.538 m

    Reduced Level: 17.072 m AHDLocation:

    Easting: 331036.574 m

    Greenaway Street outside former BulleenDrive-In, Bulleen

    File: 31350061101 NEL-BH005 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 2/06/2017

    Borehole Logged By: MLM/JR

    Drilling Start Date: 26/05/2017

    NEL-BH005 (REV 0)

    250

    380

    500

    380

    250

    PressureStage(kPa) 1 minStart

    587

    587

    587

    587

    587

    587

    587

    587

    587

    587

    3 min 4 min

    587

    587

    587

    587

    587

    5 min

    587

    587

    587

    587

    587

    587

    587

    587

    587

    587

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    587

    587

    587

    587

    587

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

  • 0

    0.2

    0.4

    0.6

    0.8

    1.0

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.0

    0.0

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 30.0 mbgl

    Bottom of test section : 33.0 mbgl

    Centre of test section : 31.5 mbgl

    Length of test section : 3.0 m

    Pressure gauge height : 0.8 m

    Initial depth of GW : 3.7 mbgl

    Correction to gauge pressure : 43.9 kPa

    0.0

    0.0

    0.0

    0.0

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    293.9

    423.9

    543.9

    423.9

    293.9

    0.0

    0.0

    0.0

    0.0

    0.0

    250

    380

    500

    380

    250

    0.0

    0.0

    0.0

    0.0

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.0

    0.0

    0.0

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 30.00 - 33.00 m

    Test No.: 2

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Comacchio Geo 305

    Driller: Terratest Pty Ltd.

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5818541.538 m

    Reduced Level: 17.072 m AHDLocation:

    Easting: 331036.574 m

    Greenaway Street outside former BulleenDrive-In, Bulleen

    File: 31350061101 NEL-BH005 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 2/06/2017

    Borehole Logged By: MLM/JR

    Drilling Start Date: 26/05/2017

    NEL-BH005 (REV 0)

    250

    380

    500

    380

    250

    PressureStage(kPa) 1 minStart

    572

    572

    572

    572

    572

    572

    572

    572

    572

    572

    3 min 4 min

    572

    572

    572

    572

    572

    5 min

    572

    572

    572

    572

    572

    572

    572

    572

    572

    572

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    572

    572

    572

    572

    572

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

  • 0

    0.2

    0.4

    0.6

    0.8

    1.0

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.0

    0.0

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 38.0 mbgl

    Bottom of test section : 41.0 mbgl

    Centre of test section : 39.5 mbgl

    Length of test section : 3.0 m

    Pressure gauge height : 0.8 m

    Initial depth of GW : 3.7 mbgl

    Correction to gauge pressure : 43.9 kPa

    0.0

    0.0

    0.0

    0.0

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    293.9

    423.9

    543.9

    423.9

    293.9

    0.0

    0.0

    0.0

    0.0

    0.0

    250

    380

    500

    380

    250

    0.0

    0.0

    0.0

    0.0

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.0

    0.0

    0.0

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 38.00 - 41.00 m

    Test No.: 1

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Comacchio Geo 305

    Driller: Terratest Pty Ltd.

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5818541.538 m

    Reduced Level: 17.072 m AHDLocation:

    Easting: 331036.574 m

    Greenaway Street outside former BulleenDrive-In, Bulleen

    File: 31350061101 NEL-BH005 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 2/06/2017

    Borehole Logged By: MLM/JR

    Drilling Start Date: 26/05/2017

    NEL-BH005 (REV 0)

    250

    380

    500

    380

    250

    PressureStage(kPa) 1 minStart

    569

    569

    569

    569

    569

    569

    569

    569

    569

    569

    3 min 4 min

    569

    569

    569

    569

    569

    5 min

    569

    569

    569

    569

    569

    569

    569

    569

    569

    569

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    569

    569

    569

    569

    569

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

  • 0

    0.04

    0.08

    0.12

    0.16

    0.20

    0.24

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -70°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.1

    0.2

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 12.7 mbgl

    Bottom of test section : 16.4 mbgl

    Centre of test section : 14.6 mbgl

    Length of test section : 4.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 8.1 mbgl

    Correction to gauge pressure : 89.3 kPa

    0.0

    0.0

    0.1

    0.0

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    329.3

    449.3

    589.3

    449.3

    329.3

    0.0

    0.0

    0.1

    0.0

    0.0

    240

    360

    500

    360

    240

    0.0

    0.1

    0.2

    0.0

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.1

    0.0

    0.0

    0.2

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 13.50 - 17.50 m

    Test No.: 8

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: 305°Inclination: -70°

    Client/Project: North East Link Project

    Drill Rig: Drill Techniques D710

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5824448.530 m

    Reduced Level: 88.350 m AHDLocation:

    Easting: 331202.740 m

    Transmission line easement to the east ofGreensborough Road, Watsonia

    File: 31350061101 NEL-BH007 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 24/05/2017

    Borehole Logged By: SR

    Drilling Start Date: 16/05/2017

    NEL-BH007 (REV 0)

    240

    360

    500

    360

    240

    PressureStage(kPa) 1 minStart

    649

    650

    651

    652

    652

    649

    650

    651

    652

    652

    3 min 4 min

    649

    650

    651

    652

    652

    5 min

    650

    652

    652

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    649

    650

    651

    652

    652

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    0

    0

    0

  • 0

    0.4

    0.8

    1.2

    1.6

    0 100 200 300 400

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -70°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.9

    1.3

    0.6

    0.3

    0.1

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 16.0 mbgl

    Bottom of test section : 19.7 mbgl

    Centre of test section : 17.9 mbgl

    Length of test section : 4.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 8.1 mbgl

    Correction to gauge pressure : 89.3 kPa

    0.8

    0.8

    0.3

    0.2

    0.1

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    299.3

    399.3

    499.3

    399.3

    299.3

    0.2

    0.3

    0.2

    0.1

    0.0

    210

    310

    410

    310

    210

    0.9

    1.3

    0.6

    0.3

    0.1

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    1.3

    0.1

    0.3

    0.6

    0.9

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 17.00 - 21.00 m

    Test No.: 7

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: 305°Inclination: -70°

    Client/Project: North East Link Project

    Drill Rig: Drill Techniques D710

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5824448.530 m

    Reduced Level: 88.350 m AHDLocation:

    Easting: 331202.740 m

    Transmission line easement to the east ofGreensborough Road, Watsonia

    File: 31350061101 NEL-BH007 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 24/05/2017

    Borehole Logged By: SR

    Drilling Start Date: 16/05/2017

    NEL-BH007 (REV 0)

    210

    310

    410

    310

    210

    PressureStage(kPa) 1 minStart

    697

    704

    711

    714

    716

    698

    705

    711

    715

    716

    3 min 4 min

    700

    708

    712

    715

    716

    5 min

    701

    709

    713

    716

    716

    702

    714

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    699

    706

    712

    715

    716

    714

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    1

    1

    1

    0

    0

    1

    1

    1

    0

    0

    1

    1

    1

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    1

    1

    1

    0

    0

    1

    1 1

  • 0

    0.04

    0.08

    0.12

    0.16

    0.20

    0.24

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -70°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.1

    0.2

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 19.3 mbgl

    Bottom of test section : 23.0 mbgl

    Centre of test section : 21.1 mbgl

    Length of test section : 4.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 8.1 mbgl

    Correction to gauge pressure : 89.3 kPa

    0.0

    0.0

    0.1

    0.0

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    329.3

    449.3

    569.3

    449.3

    329.3

    0.0

    0.0

    0.1

    0.0

    0.0

    240

    360

    480

    360

    240

    0.0

    0.1

    0.2

    0.0

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.1

    0.0

    0.0

    0.2

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 20.50 - 24.50 m

    Test No.: 6

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: 305°Inclination: -70°

    Client/Project: North East Link Project

    Drill Rig: Drill Techniques D710

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5824448.530 m

    Reduced Level: 88.350 m AHDLocation:

    Easting: 331202.740 m

    Transmission line easement to the east ofGreensborough Road, Watsonia

    File: 31350061101 NEL-BH007 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 24/05/2017

    Borehole Logged By: SR

    Drilling Start Date: 16/05/2017

    NEL-BH007 (REV 0)

    240

    360

    480

    360

    240

    PressureStage(kPa) 1 minStart

    649

    650

    651

    652

    652

    649

    650

    651

    652

    652

    3 min 4 min

    649

    650

    651

    652

    652

    5 min

    650

    652

    652

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    649

    650

    651

    652

    652

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    0

    0

    0

  • 0

    0.2

    0.4

    0.6

    0.8

    1.0

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -70°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.0

    0.8

    0.5

    0.3

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 22.6 mbgl

    Bottom of test section : 26.3 mbgl

    Centre of test section : 24.4 mbgl

    Length of test section : 4.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 8.1 mbgl

    Correction to gauge pressure : 89.3 kPa

    0.0

    0.0

    0.4

    0.3

    0.4

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    239.3

    459.3

    589.3

    459.3

    239.3

    0.0

    0.0

    0.2

    0.1

    0.1

    150

    370

    500

    370

    150

    0.0

    0.0

    0.8

    0.5

    0.3

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.0

    0.3

    0.5

    0.8

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 24.00 - 28.00 m

    Test No.: 5

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: 305°Inclination: -70°

    Client/Project: North East Link Project

    Drill Rig: Drill Techniques D710

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5824448.530 m

    Reduced Level: 88.350 m AHDLocation:

    Easting: 331202.740 m

    Transmission line easement to the east ofGreensborough Road, Watsonia

    File: 31350061101 NEL-BH007 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 24/05/2017

    Borehole Logged By: SR

    Drilling Start Date: 16/05/2017

    NEL-BH007 (REV 0)

    150

    370

    500

    370

    150

    PressureStage(kPa) 1 minStart

    608

    608

    608

    613

    616

    608

    608

    609

    614

    616

    3 min 4 min

    608

    608

    611

    615

    617

    5 min

    608

    608

    611

    615

    617

    608

    608

    612

    616

    618

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    608

    608

    610

    614

    617

    613

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    0

    1

    1

    0

    0

    0

    1

    1

    0

    0

    0

    1

    1

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    1

    1

    0

    0

    0

    1

    1

    0

    1

  • 0

    0.2

    0.4

    0.6

    0.8

    1.0

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -70°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.9

    0.7

    0.8

    0.2

    0.1

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 26.8 mbgl

    Bottom of test section : 30.5 mbgl

    Centre of test section : 28.7 mbgl

    Length of test section : 4.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 8.1 mbgl

    Correction to gauge pressure : 89.3 kPa

    0.6

    0.4

    0.4

    0.1

    0.1

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    339.3

    459.3

    589.3

    459.3

    339.3

    0.2

    0.2

    0.2

    0.0

    0.0

    250

    370

    500

    370

    250

    0.9

    0.7

    0.8

    0.2

    0.1

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.7

    0.1

    0.2

    0.8

    0.9

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 28.50 - 32.50 m

    Test No.: 4

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: 305°Inclination: -70°

    Client/Project: North East Link Project

    Drill Rig: Drill Techniques D710

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5824448.530 m

    Reduced Level: 88.350 m AHDLocation:

    Easting: 331202.740 m

    Transmission line easement to the east ofGreensborough Road, Watsonia

    File: 31350061101 NEL-BH007 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 24/05/2017

    Borehole Logged By: SR

    Drilling Start Date: 16/05/2017

    NEL-BH007 (REV 0)

    250

    370

    500

    370

    250

    PressureStage(kPa) 1 minStart

    375

    380

    385

    389

    390

    376

    382

    385

    389

    390

    3 min 4 min

    377

    383

    387

    389

    390

    5 min

    378

    384

    388

    390

    390

    379

    384

    389

    390

    391

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    376

    383

    386

    389

    390 391

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    1

    1

    1

    0

    0

    1

    1

    1

    0

    0

    1

    0

    1

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    1

    1

    1

    0

    0

    1

    0

    1

    0

    0 0

  • 0

    0.2

    0.4

    0.6

    0.8

    1.0

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -70°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.6

    0.8

    0.8

    0.5

    0.2

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 31.0 mbgl

    Bottom of test section : 34.8 mbgl

    Centre of test section : 32.9 mbgl

    Length of test section : 4.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 8.1 mbgl

    Correction to gauge pressure : 89.3 kPa

    0.5

    0.4

    0.4

    0.3

    0.2

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    339.3

    459.3

    589.3

    459.3

    339.3

    0.2

    0.2

    0.2

    0.1

    0.1

    250

    370

    500

    370

    250

    0.6

    0.8

    0.8

    0.5

    0.2

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.8

    0.2

    0.5

    0.8

    0.6

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 33.00 - 37.00 m

    Test No.: 3

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: 305°Inclination: -70°

    Client/Project: North East Link Project

    Drill Rig: Drill Techniques D710

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5824448.530 m

    Reduced Level: 88.350 m AHDLocation:

    Easting: 331202.740 m

    Transmission line easement to the east ofGreensborough Road, Watsonia

    File: 31350061101 NEL-BH007 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 24/05/2017

    Borehole Logged By: SR

    Drilling Start Date: 16/05/2017

    NEL-BH007 (REV 0)

    250

    370

    500

    370

    250

    PressureStage(kPa) 1 minStart

    339

    347

    354

    359

    361

    339

    348

    355

    359

    361

    3 min 4 min

    341

    350

    357

    360

    362

    5 min

    341

    351

    357

    361

    362

    342

    351

    358

    361

    362

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    340

    349

    356

    360

    361

    343

    352

    359

    362

    344

    352

    362

    344

    353

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    1

    1

    1

    0

    1

    1

    1

    1

    1

    1

    0

    1

    1

    1

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    1

    1

    1

    0

    1

    1

    1

    0

    0

    1

    1

    1

    0

    1

    1

    0

    0

    1

  • 0

    0.4

    0.8

    1.2

    1.6

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -70°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.8

    1.2

    1.4

    0.9

    0.5

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 35.7 mbgl

    Bottom of test section : 39.5 mbgl

    Centre of test section : 37.6 mbgl

    Length of test section : 4.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 8.1 mbgl

    Correction to gauge pressure : 89.3 kPa

    0.6

    0.6

    0.6

    0.5

    0.4

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    339.3

    469.3

    589.3

    469.3

    339.3

    0.2

    0.3

    0.3

    0.2

    0.1

    250

    380

    500

    380

    250

    0.8

    1.2

    1.4

    0.9

    0.5

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    1.2

    0.5

    0.9

    1.4

    0.8

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 38.00 - 42.00 m

    Test No.: 2

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: 305°Inclination: -70°

    Client/Project: North East Link Project

    Drill Rig: Drill Techniques D710

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5824448.530 m

    Reduced Level: 88.350 m AHDLocation:

    Easting: 331202.740 m

    Transmission line easement to the east ofGreensborough Road, Watsonia

    File: 31350061101 NEL-BH007 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 24/05/2017

    Borehole Logged By: SR

    Drilling Start Date: 16/05/2017

    NEL-BH007 (REV 0)

    250

    380

    500

    380

    250

    PressureStage(kPa) 1 minStart

    297

    303

    310

    318

    322

    298

    304

    311

    319

    323

    3 min 4 min

    300

    307

    314

    321

    324

    5 min

    301

    308

    316

    322

    325

    302

    309

    317

    322

    325

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    299

    306

    313

    320

    324

    302

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    1

    1

    1

    1

    1

    1

    1

    1

    0

    0

    1

  • 0

    0.2

    0.4

    0.6

    0.8

    1.0

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -70°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.2

    0.5

    0.8

    0.5

    0.3

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 40.4 mbgl

    Bottom of test section : 46.0 mbgl

    Centre of test section : 43.2 mbgl

    Length of test section : 6.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 8.1 mbgl

    Correction to gauge pressure : 89.3 kPa

    0.1

    0.2

    0.2

    0.2

    0.1

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    339.3

    459.3

    589.3

    459.3

    339.3

    0.0

    0.1

    0.1

    0.1

    0.0

    250

    370

    500

    370

    250

    0.2

    0.5

    0.8

    0.5

    0.3

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.5

    0.3

    0.5

    0.8

    0.2

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 43.00 - 49.00 m

    Test No.: 1

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: 305°Inclination: -70°

    Client/Project: North East Link Project

    Drill Rig: Drill Techniques D710

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5824448.530 m

    Reduced Level: 88.350 m AHDLocation:

    Easting: 331202.740 m

    Transmission line easement to the east ofGreensborough Road, Watsonia

    File: 31350061101 NEL-BH007 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 24/05/2017

    Borehole Logged By: SR

    Drilling Start Date: 16/05/2017

    NEL-BH007 (REV 0)

    250

    370

    500

    370

    250

    PressureStage(kPa) 1 minStart

    207

    210

    213

    217

    220

    207

    210

    214

    218

    220

    3 min 4 min

    208

    211

    215

    219

    221

    5 min

    208

    212

    216

    220

    221

    208

    212

    217

    220

    221

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    207

    211

    215

    218

    221

    208

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    1

    1

    1

    0

    1

    1

    1

    1

    0

    0

    1

    1

    1

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    1

    1

    0

    0

    1

    1

    1

    0

    0

  • 0

    1.0

    2.0

    0 100 200

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.6

    0.2

    2.3

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 27.7 mbgl

    Bottom of test section : 33.7 mbgl

    Centre of test section : 30.7 mbgl

    Length of test section : 6.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 7.0 mbgl

    Correction to gauge pressure : 78.0 kPa

    0.0

    0.3

    0.1

    1.4

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    203.0

    268.0

    328.0

    268.0

    203.0

    0.0

    0.1

    0.0

    0.4

    0.0

    125

    190

    250

    190

    125

    0.0

    0.6

    0.2

    2.3

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.6

    0.0

    2.3

    0.2

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 27.70 - 33.70 m

    Test No.: 2

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Drill Techniques D710

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5818808.111 m

    Reduced Level: 14.286 m AHDLocation:

    Easting: 330551.874 m

    Eastern end of entry road within Yarra FlatsPark, Ivanhoe East

    File: 31350061101 NEL-BH026 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 25/07/2017

    Borehole Logged By: AS

    Drilling Start Date: 18/07/2017

    NEL-BH026 (REV 0)

    125

    190

    250

    190

    125

    PressureStage(kPa) 1 minStart

    6150

    6153

    6161

    6162

    6186

    6150

    6154

    6161

    6164

    6186

    3 min 4 min

    6150

    6155

    6162

    6169

    6186

    5 min

    6150

    6156

    6162

    6171

    6186

    6150

    6156

    6162

    6173

    6186

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    6150

    6154

    6161

    6167

    6186

    6176 6178 6180 6182 6185

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    1

    0

    2

    0

    0

    1

    0

    2

    0

    0

    1

    0

    2

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    1

    0

    2

    0

    0

    1

    0

    2

    0

    2 2 2 2 2

  • 0

    0.4

    0.8

    1.2

    1.6

    2.0

    0 100 200

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    1.6

    1.0

    0.7

    0.7

    0.2

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 34.7 mbgl

    Bottom of test section : 40.2 mbgl

    Centre of test section : 37.5 mbgl

    Length of test section : 5.5 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 7.0 mbgl

    Correction to gauge pressure : 78.0 kPa

    1.5

    0.7

    0.4

    0.5

    0.2

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    203.0

    268.0

    328.0

    268.0

    203.0

    0.3

    0.2

    0.1

    0.1

    0.0

    125

    190

    250

    190

    125

    1.6

    1.0

    0.7

    0.7

    0.2

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    1.0

    0.2

    0.7

    0.7

    1.6

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 34.70 - 40.20 m

    Test No.: 1

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Drill Techniques D710

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5818808.111 m

    Reduced Level: 14.286 m AHDLocation:

    Easting: 330551.874 m

    Eastern end of entry road within Yarra FlatsPark, Ivanhoe East

    File: 31350061101 NEL-BH026 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 25/07/2017

    Borehole Logged By: AS

    Drilling Start Date: 18/07/2017

    NEL-BH026 (REV 0)

    125

    190

    250

    190

    125

    PressureStage(kPa) 1 minStart

    6193

    6204

    6211

    6215

    6219

    6194

    6206

    6212

    6216

    6219

    3 min 4 min

    6198

    6208

    6213

    6217

    6219

    5 min

    6198

    6208

    6214

    6218

    6220

    6201

    6209

    6215

    6219

    6220

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    6195

    6207

    6213

    6216

    6219

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    2

    1

    1

    1

    0

    3

    1

    1

    1

    0

    1

    1

    1

    1

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    1

    2

    1

    1

    0

    3

    1

    1

    1

    0

  • 0

    20

    40

    60

    80

    100

    120

    0 40 80 120 160 200

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    64.3

    83.0

    95.5

    84.3

    83.7

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Pressure Stage, P1: Out of waterPressure Stage, P2: Out of waterPressure Stage, P3: Out of waterPressure Stage, P4: Out of waterPressure Stage, P5: Out of water

    Top of test section : 20.0 mbgl

    Bottom of test section : 26.0 mbgl

    Centre of test section : 23.0 mbgl

    Length of test section : 6.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 5.4 mbgl

    Correction to gauge pressure : 62.5 kPa

    66.0

    65.1

    63.0

    66.2

    85.8

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    162.5

    212.5

    252.5

    212.5

    162.5

    10.7

    13.8

    15.9

    14.1

    13.9

    100

    150

    190

    150

    100

    64.3

    83.0

    95.5

    84.3

    83.7

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    83.0

    83.7

    84.3

    95.5

    64.3

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 20.00 - 26.00 m

    Test No.: 3

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Comacchio Geo 305

    Driller: Terratest Pty Ltd.

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5818636.031 m

    Reduced Level: 14.537 m AHDLocation:

    Easting: 330882.109 m

    North west corner of former Bulleen Drive-In,Bulleen

    File: 31350061101 NEL-BH028 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 29/06/2017

    Borehole Logged By: MLM

    Drilling Start Date: 26/06/2017

    NEL-BH028 (REV 0)

    100

    150

    190

    150

    100

    PressureStage(kPa) 1 minStart

    16713

    16989

    17247

    17555

    18087

    16777

    17074

    17343

    17640

    18171

    3 min 4 min

    16906

    17808

    18338

    5 min

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    16841

    17155

    17438

    17724

    18255

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    64

    81

    95

    84

    84

    65

    84

    83

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    64

    85

    96

    85

    84

  • 0

    0.10

    0.20

    0.30

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.3

    0.0

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Top of test section : 28.0 mbgl

    Bottom of test section : 32.0 mbgl

    Centre of test section : 30.0 mbgl

    Length of test section : 4.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 5.4 mbgl

    Correction to gauge pressure : 62.5 kPa

    0.0

    0.2

    0.0

    0.0

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    312.5

    432.5

    562.5

    432.5

    312.5

    0.0

    0.1

    0.0

    0.0

    0.0

    250

    370

    500

    370

    250

    0.0

    0.3

    0.0

    0.0

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.3

    0.0

    0.0

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 28.00 - 32.00 m

    Test No.: 2

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Comacchio Geo 305

    Driller: Terratest Pty Ltd.

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5818636.031 m

    Reduced Level: 14.537 m AHDLocation:

    Easting: 330882.109 m

    North west corner of former Bulleen Drive-In,Bulleen

    File: 31350061101 NEL-BH028 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 29/06/2017

    Borehole Logged By: MLM

    Drilling Start Date: 26/06/2017

    NEL-BH028 (REV 0)

    250

    370

    500

    370

    250

    PressureStage(kPa) 1 minStart

    16321

    16325

    16336

    16336

    16340

    16321

    16325

    16336

    16336

    16340

    3 min 4 min

    16321

    16325

    16336

    16336

    16340

    5 min

    16321

    16325

    16336

    16336

    16340

    16321

    16326

    16336

    16336

    16340

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    16321

    16325

    16336

    16336

    16340

    16321

    16326

    16336

    16336

    16340

    16321

    16326

    16336

    16336

    16340

    16321

    16327

    16336

    16336

    16340

    16321

    16327

    16336

    16336

    16340

    16321

    16328

    16336

    16336

    16340

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    1

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

  • 0

    10

    20

    30

    40

    50

    0 100 200 300 400

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    29.5

    35.6

    43.1

    30.5

    24.8

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Top of test section : 32.0 mbgl

    Bottom of test section : 38.0 mbgl

    Centre of test section : 35.0 mbgl

    Length of test section : 6.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 5.4 mbgl

    Correction to gauge pressure : 62.5 kPa

    18.7

    16.4

    15.2

    14.0

    15.7

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    262.5

    362.5

    472.5

    362.5

    262.5

    4.9

    5.9

    7.2

    5.1

    4.1

    200

    300

    410

    300

    200

    29.5

    35.6

    43.1

    30.5

    24.8

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    35.6

    24.8

    30.5

    43.1

    29.5

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 32.00 - 38.00 m

    Test No.: 1

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Comacchio Geo 305

    Driller: Terratest Pty Ltd.

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5818636.031 m

    Reduced Level: 14.537 m AHDLocation:

    Easting: 330882.109 m

    North west corner of former Bulleen Drive-In,Bulleen

    File: 31350061101 NEL-BH028 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 29/06/2017

    Borehole Logged By: MLM

    Drilling Start Date: 26/06/2017

    NEL-BH028 (REV 0)

    200

    300

    410

    300

    200

    PressureStage(kPa) 1 minStart

    14460

    14848

    15328

    15694

    16035

    14491

    14885

    15373

    15725

    16060

    3 min 4 min

    14551

    14957

    15461

    15787

    16110

    5 min

    14580

    14992

    15503

    15817

    16135

    14610

    15028

    15546

    15848

    16160

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    14521

    14921

    15417

    15756

    16084

    14639

    15063

    15588

    15878

    16184

    14668

    15099

    15630

    15908

    16209

    14697

    15134

    15938

    16234

    14726

    15169

    15968

    16258

    14755

    15204

    15999

    16283

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    30

    36

    44

    31

    25

    30

    36

    44

    31

    25

    29

    36

    42

    31

    25

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    32

    37

    45

    31

    25

    30

    36

    43

    31

    25

    29

    36

    42

    30

    25

    29

    36

    42

    30

    25

    29

    35

    31

    24

    29

    35

    30

    25

    29

    35

    31

    25

  • 0

    0.2

    0.4

    0.6

    0.8

    1.0

    1.2

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.0

    1.1

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 26.7 mbgl

    Bottom of test section : 32.7 mbgl

    Centre of test section : 29.7 mbgl

    Length of test section : 6.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 6.4 mbgl

    Correction to gauge pressure : 72.3 kPa

    0.0

    0.0

    0.3

    0.0

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    322.3

    442.3

    572.3

    442.3

    322.3

    0.0

    0.0

    0.2

    0.0

    0.0

    250

    370

    500

    370

    250

    0.0

    0.0

    1.1

    0.0

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.0

    0.0

    0.0

    1.1

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 26.70 - 32.70 m

    Test No.: 6

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Comacchio Geo 305

    Driller: Terratest Pty Ltd.

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5819787.708 m

    Reduced Level: 13.904 m AHDLocation:

    Easting: 330664.909 m

    Warringal Parklands, south of football oval,Heidelberg

    File: 31350061101 NEL-BH029 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 13/07/2017

    Borehole Logged By: MLM

    Drilling Start Date: 3/07/2017

    NEL-BH029 (REV 0)

    250

    370

    500

    370

    250

    PressureStage(kPa) 1 minStart

    18887

    18890

    18896

    18906

    18906

    18887

    18890

    18896

    18906

    18906

    3 min 4 min

    18887

    18891

    18898

    18906

    18906

    5 min

    18887

    18891

    18899

    18906

    18906

    18887

    18891

    18901

    18906

    18906

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    18887

    18891

    18897

    18906

    18906

    18891

    18902 18903 18904 18905 18906

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    0

    1

    0

    0

    0

    0

    1

    0

    0

    0

    0

    1

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    0

    0

    0

    0

    0

    1

    0

    0

    0

    1 1 1 1 1

  • 0

    0.4

    0.8

    1.2

    1.6

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    1.3

    0.0

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 34.5 mbgl

    Bottom of test section : 38.5 mbgl

    Centre of test section : 36.5 mbgl

    Length of test section : 4.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 6.4 mbgl

    Correction to gauge pressure : 72.3 kPa

    0.0

    0.7

    0.0

    0.0

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    322.3

    452.3

    572.3

    452.3

    322.3

    0.0

    0.3

    0.0

    0.0

    0.0

    250

    380

    500

    380

    250

    0.0

    1.3

    0.0

    0.0

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    1.3

    0.0

    0.0

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 34.50 - 38.50 m

    Test No.: 5

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Comacchio Geo 305

    Driller: Terratest Pty Ltd.

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5819787.708 m

    Reduced Level: 13.904 m AHDLocation:

    Easting: 330664.909 m

    Warringal Parklands, south of football oval,Heidelberg

    File: 31350061101 NEL-BH029 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 13/07/2017

    Borehole Logged By: MLM

    Drilling Start Date: 3/07/2017

    NEL-BH029 (REV 0)

    250

    380

    500

    380

    250

    PressureStage(kPa) 1 minStart

    18820

    18838

    18853

    18857

    18857

    18820

    18840

    18853

    18857

    18857

    3 min 4 min

    18820

    18844

    18853

    18857

    18857

    5 min

    18820

    18845

    18853

    18857

    18857

    18820

    18846

    18853

    18857

    18857

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    18820

    18842

    18853

    18857

    18857

    18848

    18857

    18857

    18849 18850 18850

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    3

    0

    0

    0

    0

    1

    0

    0

    0

    0

    1

    0

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    1

    0

    0

    0

    0

    1

    0

    0

    0

    2

    0

    0

    1 1 1

  • 0

    0.10

    0.20

    0.30

    0.40

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.1

    0.4

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 41.8 mbgl

    Bottom of test section : 43.5 mbgl

    Centre of test section : 42.6 mbgl

    Length of test section : 1.7 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 6.4 mbgl

    Correction to gauge pressure : 72.3 kPa

    0.0

    0.1

    0.4

    0.0

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    322.3

    447.3

    572.3

    447.3

    322.3

    0.0

    0.0

    0.2

    0.0

    0.0

    250

    375

    500

    375

    250

    0.0

    0.1

    0.4

    0.0

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.1

    0.0

    0.0

    0.4

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 41.80 - 43.49 m

    Test No.: 3

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Comacchio Geo 305

    Driller: Terratest Pty Ltd.

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5819787.708 m

    Reduced Level: 13.904 m AHDLocation:

    Easting: 330664.909 m

    Warringal Parklands, south of football oval,Heidelberg

    File: 31350061101 NEL-BH029 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 13/07/2017

    Borehole Logged By: MLM

    Drilling Start Date: 3/07/2017

    NEL-BH029 (REV 0)

    250

    375

    500

    375

    250

    PressureStage(kPa) 1 minStart

    18450

    18680

    18684

    18687

    18687

    18450

    18680

    18684

    18687

    18687

    3 min 4 min

    18450

    18680

    18686

    18687

    18687

    5 min

    18450

    18680

    18686

    18687

    18687

    18450

    18680

    18687

    18687

    18687

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    18450

    18680

    18685

    18687

    18687

    18450

    18680

    18687

    18687

    18687

    18450

    18680

    18687

    18687

    18687

    18450

    18680

    18687

    18687

    18687

    18450

    18680

    18687

    18687

    18687

    18450

    18680

    18687

    18687

    18687

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    0

    1

    0

    0

    0

    0

    1

    0

    0

    0

    0

    0

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    1

    0

    0

    0

    0

    1

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

  • 0

    0.04

    0.08

    0.12

    0.16

    0.20

    0 250 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.0

    0.0

    0.2

    0.0

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Stages terminated early due to low or no flow induced in formation

    Top of test section : 49.0 mbgl

    Bottom of test section : 55.0 mbgl

    Centre of test section : 52.0 mbgl

    Length of test section : 6.0 m

    Pressure gauge height : 1.0 m

    Initial depth of GW : 6.4 mbgl

    Correction to gauge pressure : 72.3 kPa

    0.0

    0.0

    0.0

    0.0

    0.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    322.3

    572.3

    672.3

    572.3

    322.3

    0.0

    0.0

    0.0

    0.0

    0.0

    250

    500

    600

    500

    250

    0.0

    0.0

    0.2

    0.0

    0.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.0

    0.0

    0.0

    0.2

    0.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 49.00 - 55.00 m

    Test No.: 2

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Comacchio Geo 305

    Driller: Terratest Pty Ltd.

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5819787.708 m

    Reduced Level: 13.904 m AHDLocation:

    Easting: 330664.909 m

    Warringal Parklands, south of football oval,Heidelberg

    File: 31350061101 NEL-BH029 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: JM

    Drilling End Date: 13/07/2017

    Borehole Logged By: MLM

    Drilling Start Date: 3/07/2017

    NEL-BH029 (REV 0)

    250

    500

    600

    500

    250

    PressureStage(kPa) 1 minStart

    18407

    18412

    18420

    18421

    18421

    18407

    18413

    18421

    18421

    18421

    3 min 4 min

    18407

    18413

    18421

    18421

    18421

    5 min

    18407

    18413

    18421

    18421

    18421

    18407

    18413

    18421

    18421

    18421

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    18407

    18413

    18421

    18421

    18421

    18407

    18413

    18421

    18421

    18421

    18407

    18413

    18421

    18421

    18421

    18407

    18413

    18421

    18421

    18407

    18413

    18421

    18421

    18407

    18413

    18421

    18421

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    1

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

  • 0

    0.4

    0.8

    1.2

    1.6

    2.0

    0 100 200 300

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.6

    1.1

    1.9

    1.6

    1.1

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Top of test section : 15.8 mbgl

    Bottom of test section : 21.8 mbgl

    Centre of test section : 18.8 mbgl

    Length of test section : 6.0 m

    Pressure gauge height : 1.1 m

    Initial depth of GW : 6.5 mbgl

    Correction to gauge pressure : 74.1 kPa

    0.4

    0.6

    0.9

    0.9

    0.8

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    219.1

    289.1

    364.1

    289.1

    219.1

    0.1

    0.2

    0.3

    0.3

    0.2

    145

    215

    290

    215

    145

    0.6

    1.1

    1.9

    1.6

    1.1

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    1.1

    1.1

    1.6

    1.9

    0.6

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 15.80 - 21.80 m

    Test No.: 6

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Boart Longyear DB520

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5821952.953 m

    Reduced Level: 44.821 m AHDLocation:

    Easting: 330749.351 m

    South west corner of Borlase Reserve,Yallambie

    File: 31350061101 NEL-BH031 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 28/06/2017

    Borehole Logged By: KJB/AS

    Drilling Start Date: 21/06/2017

    NEL-BH031 (REV 0)

    145

    215

    290

    215

    145

    PressureStage(kPa) 1 minStart

    6869

    6875

    6887

    6907

    6923

    6869

    6876

    6889

    6908

    6924

    3 min 4 min

    6870

    6878

    6892

    6912

    6927

    5 min

    6871

    6879

    6894

    6913

    6927

    6871

    6880

    6896

    6915

    6928

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    6870

    6877

    6891

    6910

    6925

    6872

    6881

    6898

    6916

    6929

    6873

    6882

    6900

    6918

    6930

    6873

    6884

    6902

    6919

    6932

    6874

    6885

    6904

    6921

    6933

    6874

    6886

    6906

    6922

    6934

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    1

    1

    2

    2

    1

    1

    1

    2

    2

    2

    1

    1

    2

    1

    1

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    1

    2

    2

    1

    1

    1

    2

    2

    1

    1

    1

    2

    2

    1

    1

    1

    2

    2

    1

    1

    1

    2

    2

    1

    1

    1

    2

    1

    1

    1

    1

    2

    2

    1

  • 0

    0.4

    0.8

    1.2

    1.6

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    0.2

    0.6

    1.2

    0.8

    0.6

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Top of test section : 21.4 mbgl

    Bottom of test section : 27.5 mbgl

    Centre of test section : 24.5 mbgl

    Length of test section : 6.1 m

    Pressure gauge height : 1.5 m

    Initial depth of GW : 6.5 mbgl

    Correction to gauge pressure : 78.1 kPa

    0.1

    0.2

    0.4

    0.3

    0.3

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    328.1

    453.1

    578.1

    453.1

    328.1

    0.0

    0.1

    0.2

    0.1

    0.1

    250

    375

    500

    375

    250

    0.2

    0.6

    1.2

    0.8

    0.6

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    0.6

    0.6

    0.8

    1.2

    0.2

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 21.40 - 27.50 m

    Test No.: 5

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Boart Longyear DB520

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5821952.953 m

    Reduced Level: 44.821 m AHDLocation:

    Easting: 330749.351 m

    South west corner of Borlase Reserve,Yallambie

    File: 31350061101 NEL-BH031 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 28/06/2017

    Borehole Logged By: KJB/AS

    Drilling Start Date: 21/06/2017

    NEL-BH031 (REV 0)

    250

    375

    500

    375

    250

    PressureStage(kPa) 1 minStart

    6756

    6757

    6764

    6778

    6786

    6756

    6757

    6765

    6778

    6787

    3 min 4 min

    6757

    6759

    6767

    6780

    6788

    5 min

    6757

    6759

    6769

    6780

    6789

    6757

    6760

    6770

    6782

    6789

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    6757

    6758

    6766

    6780

    6788

    6760

    6771

    6782

    6790

    6761

    6772

    6784

    6791

    6762

    6774

    6785

    6791

    6762

    6775

    6785

    6792

    6763

    6776

    6786

    6792

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    0

    1

    1

    2

    1

    0

    1

    1

    0

    1

    0

    1

    1

    0

    1

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    0

    0

    1

    0

    1

    0

    1

    2

    2

    1

    1

    1

    0

    1

    1

    1

    2

    1

    1

    1

    1

    0

    1

    1

    1

    1

    1

    1

    1

    1

  • 0

    10

    20

    30

    40

    50

    60

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    27.3

    36.8

    48.4

    38.4

    28.9

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Top of test section : 28.3 mbgl

    Bottom of test section : 34.3 mbgl

    Centre of test section : 31.3 mbgl

    Length of test section : 6.0 m

    Pressure gauge height : 1.1 m

    Initial depth of GW : 6.5 mbgl

    Correction to gauge pressure : 73.9 kPa

    14.1

    13.6

    14.1

    14.3

    14.9

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    323.9

    448.9

    573.9

    448.9

    323.9

    4.6

    6.1

    8.1

    6.4

    4.8

    250

    375

    500

    375

    250

    27.3

    36.8

    48.4

    38.4

    28.9

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    36.8

    28.9

    38.4

    48.4

    27.3

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 28.30 - 34.30 m

    Test No.: 4

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Boart Longyear DB520

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5821952.953 m

    Reduced Level: 44.821 m AHDLocation:

    Easting: 330749.351 m

    South west corner of Borlase Reserve,Yallambie

    File: 31350061101 NEL-BH031 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 28/06/2017

    Borehole Logged By: KJB/AS

    Drilling Start Date: 21/06/2017

    NEL-BH031 (REV 0)

    250

    375

    500

    375

    250

    PressureStage(kPa) 1 minStart

    3600

    3880

    4500

    5006

    5401

    3635

    3920

    4553

    5050

    5436

    3 min 4 min

    3688

    3996

    4640

    5124

    5490

    5 min

    3713

    4032

    4701

    5160

    5522

    3739

    4064

    4752

    5200

    5555

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    3657

    3956

    4600

    5088

    5463

    3764

    4100

    4800

    5252

    5584

    3793

    4139

    4849

    5283

    5605

    3810

    4174

    4892

    5320

    5630

    3846

    4936

    5350

    5660

    4984

    5390

    5690

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    22

    36

    47

    38

    27

    31

    40

    40

    36

    27

    25

    36

    61

    36

    32

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    35

    40

    53

    44

    35

    26

    32

    51

    40

    33

    25

    36

    48

    52

    29

    29

    39

    49

    31

    21

    17

    35

    43

    37

    25

    36

    44

    30

    30

    48

    40

    30

  • 0

    4

    8

    12

    16

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    6.1

    8.2

    13.4

    10.6

    7.9

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Top of test section : 33.8 mbgl

    Bottom of test section : 39.8 mbgl

    Centre of test section : 36.8 mbgl

    Length of test section : 6.0 m

    Pressure gauge height : 1.6 m

    Initial depth of GW : 6.5 mbgl

    Correction to gauge pressure : 78.8 kPa

    3.1

    3.0

    3.9

    3.9

    4.0

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    328.8

    453.8

    578.8

    453.8

    328.8

    1.0

    1.4

    2.2

    1.8

    1.3

    250

    375

    500

    375

    250

    6.1

    8.2

    13.4

    10.6

    7.9

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    8.2

    7.9

    10.6

    13.4

    6.1

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 33.75 - 39.75 m

    Test No.: 3

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Boart Longyear DB520

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5821952.953 m

    Reduced Level: 44.821 m AHDLocation:

    Easting: 330749.351 m

    South west corner of Borlase Reserve,Yallambie

    File: 31350061101 NEL-BH031 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 28/06/2017

    Borehole Logged By: KJB/AS

    Drilling Start Date: 21/06/2017

    NEL-BH031 (REV 0)

    250

    375

    500

    375

    250

    PressureStage(kPa) 1 minStart

    2964

    3030

    3129

    3272

    3384

    2971

    3041

    3142

    3284

    3393

    3 min 4 min

    2982

    3059

    3173

    3312

    3410

    5 min

    2989

    3068

    3182

    3317

    3419

    2995

    3078

    3195

    3327

    3424

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    2977

    3051

    3156

    3294

    3401

    3002

    3086

    3210

    3338

    3432

    3007

    3095

    3222

    3347

    3440

    3013

    3105

    3236

    3358

    3448

    3019

    3112

    3249

    3369

    3456

    3025

    3112

    3263

    3378

    3463

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    6

    10

    14

    10

    8

    5

    8

    17

    18

    9

    7

    9

    9

    5

    9

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    7

    11

    13

    12

    9

    6

    10

    13

    10

    5

    7

    8

    15

    11

    8

    5

    9

    12

    9

    8

    6

    10

    14

    11

    8

    6

    7

    13

    11

    8

    6

    0

    14

    9

    7

  • 0

    4

    8

    12

    16

    20

    24

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    9.9

    12.1

    22.0

    12.2

    9.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Top of test section : 39.1 mbgl

    Bottom of test section : 45.1 mbgl

    Centre of test section : 42.1 mbgl

    Length of test section : 6.0 m

    Pressure gauge height : 1.2 m

    Initial depth of GW : 6.5 mbgl

    Correction to gauge pressure : 75.4 kPa

    5.1

    4.5

    6.4

    4.5

    4.6

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    325.4

    450.4

    575.4

    450.4

    325.4

    1.7

    2.0

    3.7

    2.0

    1.5

    250

    375

    500

    375

    250

    9.9

    12.1

    22.0

    12.2

    9.0

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    12.1

    9.0

    12.2

    22.0

    9.9

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Interval: 39.10 - 45.10 m

    Test No.: 2

    WATER PRESSURE TESTSheet 1 OF 1

    Project No: 31350061101

    Bearing: N/AInclination: -90°

    Client/Project: North East Link Project

    Drill Rig: Boart Longyear DB520

    Driller: South Western Drilling

    Datum/Coord.System: MGA94

    UTM Zone: 55SNorthing: 5821952.953 m

    Reduced Level: 44.821 m AHDLocation:

    Easting: 330749.351 m

    South west corner of Borlase Reserve,Yallambie

    File: 31350061101 NEL-BH031 Page 1 of 1

    GHD180 Lonsdale StreetMelbourne, Victoria 3000 See GHD Standard Sheets for details of abbreviations & basis of descriptions.

    Borehole Checked By: AS

    Drilling End Date: 28/06/2017

    Borehole Logged By: KJB/AS

    Drilling Start Date: 21/06/2017

    NEL-BH031 (REV 0)

    250

    375

    500

    375

    250

    PressureStage(kPa) 1 minStart

    2211

    2319

    2453

    2681

    2809

    2223

    2333

    2478

    2681

    2818

    3 min 4 min

    2245

    2358

    2519

    2722

    2836

    5 min

    2253

    2372

    2544

    2732

    2847

    2263

    2383

    2562

    2745

    2854

    2. Gauge Record

    2 min 6 min 7 min 8 min 9 min 10 min

    Flow Meter Readings (L)

    2235

    2345

    2500

    2708

    2826

    2274

    2398

    2587

    2757

    2863

    2282

    2408

    2603

    2770

    2872

    2292

    2420

    2629

    2781

    2879

    2301

    2421

    2650

    2792

    2888

    2310

    2440

    2673

    2803

    2899

    Water Taken Over Time Period (L)

    0-1min

    2-3min

    3-4min

    4-5min

    12

    12

    22

    27

    8

    10

    13

    19

    14

    10

    8

    14

    25

    10

    11

    1-2min

    5-6min

    6-7min

    7-8min

    8-9min

    9-10min

    12

    14

    25

    0

    9

    10

    11

    18

    13

    7

    11

    15

    25

    12

    9

    8

    10

    16

    13

    9

    10

    12

    26

    11

    7

    9

    1

    21

    11

    9

    9

    19

    23

    11

    11

  • 0

    10

    20

    30

    40

    0 100 200 300 400 500

    Pressure Head (kPa)

    Borehole size :

    Borehole Diameter : 96 mm

    Packer type : Double

    Packer Inflation Pressure :

    Packer seal condition :

    Friction losses :

    Inclination of Borehole : -90°

    4. Graphic Presentation

    3. Calculation

    5. Core Description

    6. Other Observations

    1. Field Record

    14.0

    21.3

    37.0

    32.5

    23.4

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Top of test section : 42.4 mbgl

    Bottom of test section : 49.8 mbgl

    Centre of test section : 46.1 mbgl

    Length of test section : 7.4 m

    Pressure gauge height : 0.8 m

    Initial depth of GW : 6.5 mbgl

    Correction to gauge pressure : 71.6 kPa

    5.9

    6.4

    8.7

    9.8

    9.8

    Flow Rateper m

    (L/min/m)

    LugeonValue

    (L/min/m)

    Flow RateQ

    (L/min)

    VolumeLoss(L)

    Effective Head(kPa)

    PressureStage(kPa)

    321.6

    446.6

    571.6

    446.6

    321.6

    1.9

    2.9

    5.0

    4.4

    3.2

    250

    375

    500

    375

    250

    14.0

    21.3

    37.0

    32.5

    23.4

    Analysed By : AY Date: 05/06/2019

    Checked By : AS/TJR Date: 11/06/2019

    21.3

    23.4

    32.5

    37.0

    14.0

    Flo

    w R

    ate

    Q (

    L/m

    in)

    Lugeon Unit K (L/min/m)

    5010 20 30 40 90807060 1000

    Inte