MDT Project Update March 22, 2019 Eli Cuelho TRI Environmental

MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

MDT Project Update

March 22, 2019

Eli Cuelho

TRI Environmental

Page 2: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Moisture Conditioning Subgrade

Page 3: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Checking moisture and vanes

Page 4: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Tracking Subgrade in Place

Page 5: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Compacting Subgrade

Page 6: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Leveling Subgrade

Page 7: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Recompacing Subgrade Surface

Page 8: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Finished Subgrade Surface

Page 9: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Subgrade Measurements

2 ft.

2 ft.

2 ft.

2 ft.

2 ft.

2 ft.

A

B

C

D

E

F

Measurement Type

Vane Shear – all layers

Moisture Content – all layers

Lightweight Deflectometer – final 3 layers

Dynamic Cone Penetrometer – final layer only

Sand Cone Density – final layer only

2 ft.

2 ft.2 ft.

2 ft.

4½ ft.

Subgrade

1

3

2

1

1

4

4

5

8

9

12

13

16

17

20

21

24

2

3

6

7

10

11

14

15

18

19

22

23

1

2

3

4

5

6

1

2

3

4

5

6

2 ft.4½ ft.

2

9 10

3 4

5 6

7 8

11 12

Measurement Type

Vane Shear – all layers

Moisture Content – all layers

Lightweight Deflectometer – final 3 layers

Dynamic Cone Penetrometer – final layer only

Sand Cone Density – final layer only

Page 10: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Moisture Content

• 72 measurements per test section

• Average values

– Test Section 1 = 27.9%

– Test Section 2 = 28.0%

– Test Section 3 = 28.0%

• Standard deviations are around 0.6%

Page 11: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Vane Shear Strength

• 144 measurements per test section

• Average values

– Test Section 1 = 101.2 kPa

– Test Section 2 = 99.1 kPa

– Test Section 3 = 99.3 kPa

• Standard deviations are around 10 kPa

Page 12: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

DCP

• Avg. per test section– Sect. 1 = 2.37

– Sect. 2 = 2.31

– Sect. 3 = 2.31

CBR = 292/(mm per blow)^1.12 [Kleyn EG July 1975]

0

6

12

18

24

30

36

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

De

pth

(in

.)

CBR (%)

1-B 1-C 1-D

1-E 1-F 2-A

2-B 2-C 2-D

2-E 2-F 3-A

3-B 3-C 3-D

3-E 3-F

Page 13: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

LWD

• Avg. per layer*

– Layer 4 = 5.98

– Layer 5 = 4.73

– Layer 6 = 3.94

• Avg. layer 6 per test section*

– Sect. 1 = 4.17

– Sect. 2 = 3.86

– Sect. 3 = 3.84

*units are MN/mm2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

1B 1C 1D 1E 1F 2A 2B 2C 2D 2E 2F 3A 3B 3C 3D 3E 3F

Dyn

amic

Sti

ffn

ess

(MN

/mm

2)

Test Section Location

Layer 4

Layer 5

Layer 6

Page 14: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Excavate Hole

Page 15: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Driving Anchor

Page 16: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Subgrade Sensor

Page 17: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Leveling and Setting Sensor

Page 18: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Finished Installations

Page 19: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Bringing in Crushed Base Course

Page 20: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Installing Base Course on Geosynthetics

Page 21: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Hand Leveling Base Course

Page 22: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Base Surface after Screeding

Page 23: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

Compacting Base Course

Page 24: MDT Project Update · Sand Cone Density t final layer only. Moisture Content •72 measurements per test section •Average values –Test Section 1 = 27.9% –Test Section 2 = 28.0%

2 ft.

2 ft.

2 ft.

2 ft.

2 ft.

2 ft.

A

B

C

D

E

F

Measurement Type

Moisture Content – all layers

Lightweight Deflectometer – all layers

Dynamic Cone Penetrometer – final layer only

Nuclear Densometer – final layer only

Sand Cone Density – final layer only

2 ft.

2 ft.

3½ ft.

2 ft.

2 ft.

3½ ft.

3½ ft.

Base Course

1

2

1

2

3

1

2

1

2

3

4

5

6

1

2

3

4

5

6

4½ ft.2 ft.4½ ft.

Base Course Measurements

Measurement Type

Moisture Content – all layers

Lightweight Deflectometer – all layers

Dynamic Cone Penetrometer – final layer only

Nuclear Densometer – final layer only

Sand Cone Density – final layer only