ATI Casting Service&
Wind EnergyWIndiana
Wind Energy Conference / Indianapolis, INJuly 21, 2010
© 2010 ATI Casting Service
2© ATI 2010. All Rights Reserved.
Company History• First casting poured on 7-24-34, with a crew of 7• Teledyne Industries purchases Casting Service in 1967• 1996 Merger between Allegheny Ludlum & Teledyne forms
Allegheny Teledyne Incorporated• 1999 Allegheny Teledyne transforms into Allegheny
Technologies Incorporated (ATI on the NYSE)• Alpena, Michigan - First expansion outside of LaPorte in
2008 • Added in-house machining capabilities for large castings
3© ATI 2010. All Rights Reserved.
4© ATI 2010. All Rights Reserved.
5© ATI 2010. All Rights Reserved.
6© ATI 2010. All Rights Reserved.
Wind Energy Gear Box Castings
7© ATI 2010. All Rights Reserved.
Casting Service – LaPorte, IN
Physical Plant - 550,000 Square Feet
8© ATI 2010. All Rights Reserved.
Casting Service – Alpena, MI
9© ATI 2010. All Rights Reserved.
Cumulative Global Wind Power DevelopmentActual 1990-2006 Forecast 2007-2011 Prediction 2012-2016
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
1990 2006 2011 2016
MW
Prediction Forecast Existing capacitySource: BTM Consult ApS - March 2007
10© ATI 2010. All Rights Reserved.
Installed capacity in the USACumulative end 2006: 11,635 MW
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
1995 1998 2001 2004 2007
MW
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Cu
mu
lati
ve
MW
Installed MW Forecast Cumulative Cumul. forecast
Source: BTM Consult ApS - March 2007
11© ATI 2010. All Rights Reserved.
• Quality expectations are high
• JIT/Pull inventory management is expected
• Market swings are dramatic
• Competition is global
12© ATI 2010. All Rights Reserved.
SUMMARY